Anda di halaman 1dari 44

INOVASI SEBAGAI MOTOR

PERBAIKAN KINERJA

Ir. Tumiyana MBA

Monday, 9th July 2018


Bidakara Hotel – South Jakarta
Curriculum Vitae

Nama : Tumiyana

Education : - S2 Management – Jakarta Inst. Of Management


(1997)
- Sarjana Teknik Sipil – Universitas Borobudur (1994)

Work Experiences :

- Direktur Utama - PT Wijaya Karya (Persero) Tbk (April 2018 – now)

- Direktur Utama – PT PP (Persero) Tbk (2016 – April 2018)

- Direktur Keuangan – PT PP (Persero) Tbk (2008 – 2016)

- Kepala Divisi Operasi PT PP (Persero) Tbk (2004 – 2008)

- Kepala Cabang Utama – PT PP (Persero) Tbk (2000 – 2004)


2
- Manager Proyek – PT PP (Persero) Tbk (1995 – 2000) Spirit of Innovation
Curriculum Vitae
Name : Novias Nurendra

Education : Master of Science from HTW- Berlin (2011)


Bachelor from Civil Engineering – ITB (1993)

Work Experiences : Join with PT Wijaya Karya Tbk since 1993

- General Manager - System Development Department ( 2017 – now )


- Commissioner – PT Wika Bitumen (2016 – now)

- Several position in Senior Management Level at Infrastructure,


Investment and Power Construction Department (2012 – 2017)

- Project Manager at Algeria Highway Project in North Africa (2007-2009)

- Project Manager at several infrastructure projects in Indonesia


Car Terminal Tanjung Priok, Toll Road E3 Section, Jagorawi Widening
section Cibubur – Cibinong – Sentul, Semarang Northern Ring Road, 3
Niru Connecting Track – South Sumatera (1998 – 2007) Spirit of Innovation
1 INTRODUCTION ABOUT WIKA

2 CONSTRUCTION INDUSTRY

3 INNOVATION BASED ON TECHNOLOGY

4 ON-SITE EXECUTION INNOVATION

5 BUILDING INFORMATION MODELLING

6 SUMMARY

4
Vision and Mission

VISION
To be One of The Best Integrated EPC and Investment Company in South East Asia

MISSION
• Providing Excellent Integrated Products and Services on EPC and
Investment for Infrastructure, Building, Energy, Industrial Plant, Industry and
Realty & Property
• Accomplish Key Stakeholders Expectation
• Practicing Business Ethics to Promote Good Corporate Citizen and
Company Sustainability
• Strategic Overseas Expansion
• Implementing Best Practices Integrated Management
5
Spirit of Innovation
corporatesecretary@2017
Diversified Business

INFRASTRUCTURE & ENERGY &


INDUSTRY REALTY & PROPERTY INVESTMENT
BUILDING INDUSTRIAL PLANT

Precast Concrete: Civil Construction: EPC: Realty & Property: Energy


• Precast Concrete Product • Road and Bridge • Oil and Gas Plant • Landed House
• Natural Resources • Seaport, Jetty • Petrochemical Plant • High-rise (Apartment, Water & Environment
• Management • Dam & Barrage • Cement Plant, Power Plant • Condotel, Office Mixed Use)
• Mining, Biofuels, Fertilizer • Industrial Estate Transportation Infrastructure
Industrial Facilities: Building Construction:
• Steel Fabrication • Residential & Commercial Operation & Maintenance: Property Management
• Aluminum Casting • Airport • Power Plant
• Plastic Injection • Facility • Industrial Equipment

Bitumen: Steel Construction:


• Granular Asphalt • Erection
• Extraction Asphalt • Equipment Installation

BACKWARD FORWARD
WIKA divides its businesses into five segments which are: Infrastructure & Building, Energy and Industrial Plant, Realty & Property,
Industry and Investment. WIKA’s running its business segments by using forward and backward strategy.
Forward is WIKA’s Strategy to obtain all business that can be done in the future. Backward is WIKA’s Strategy to obtain all business or
company that supports WIKA’s Key competences.

6
Spirit of Innovation
corporatesecretary@2017
Business Portfolio

7
Spirit of Innovation
corporatesecretary@2017
MRT elevated sections have
reach 93.40%, underground
sections 94.70%,
and all sections already 100%
connected.
8
MRT Underground Section - Jakarta
Infrastructure & Building
A consortium led by WIKA built the longest
bridge in the eastern part of Indonesia.
NATIONAL ROADS, TOLL ROADS This new 3.4KM bridge connecting Rumah Tiga
AND BRIDGES
village with Hative Kecil in Ambon city.

Merah Putih Bridge - Ambon

Merah Putih Bridge

X
Management Meeting
Investor Relations Spirit of Innovation
9
JATIGEDE
JATIGEDE DAM
DAM
Located
Located in Jatigede
in Jatigede district,
district, West
West Java. Java.
With With
height moreheight moreand
than 100m than
100m
980 cubicand
mtr980 cubic
capacity, mtr capacity,
planned planned
to have function to have
to irrigate function
90.000 acre to X
area,
Investor providing
irrigate 90.000
Relations fresh water
acre for society
area, .
providing fresh water for society . Spirit of Innovation
Infrastructure & Building
AIRPORTS

Ngurah Rai Airport

2nd biggest airport located in the


eastern part of Indonesia, with high
capacity of 12,5 million passengers
per day
Management MeetingX
11
Ngurah Rai International Airport - Bali
East West Motorway Algeria – North Africa
100 km, 30 Overpass & Underpass
50 Engineers, 1000 skill labors
2007 - 2011
Will it ever open ?

Start construction : 5 Sept.2006


Plan to operate : 30 Oct. 2011
Latest update : 2021
Initial cost : Euro 2,83 Billion
Latest update : Euro 10 Billion

17
Soekarno – Hatta Airport Jakarta

18
1 INTRODUCTION

2 CONSTRUCTION INDUSTRY

3 INNOVATION IN WIKA

4 CONSOLIDATION TEST

5 FINISHING GONDOLA

6 BUILDING INFORMATION MODELLING

1
9
Construction Industry Growth

20
Spirit of Innovation
corporatesecretary@2017
Construction Industry Productivity

21
Spirit of Innovation
Source : McKinsey analysis
corporatesecretary@2017
Labor productivity growth

22
Spirit of Innovation
corporatesecretary@2017
Improvement area & cost savings

Source :
McKinsey Global 23
Institute analysis
Spirit of Innovation
corporatesecretary@2017
Five trends will shape construction

24
Source : McKinsey analysis Spirit of Innovation
corporatesecretary@2017
1 INTRODUCTION

2 CONSTRUCTION INDUSTRY

3 INNOVATION BASED ON TECHNOLOGY

4 FINISHING GONDOLA

5 BUILDING INFORMATION MODELLING

6 SUMMARY

2
5
J 57 Mini Sky City in Changsha

“ Prefabricate buildings
off-site to increase the
speed & quality of
construction”

57 Floors in 19 days

Mr. Zhang Yue


Founder & Chairman
Broad Group

26
Spirit of Innovation
corporatesecretary@2017
Prefabricated Building & House

Stainless Steel Structure


5 Times Less Energy
100 Times Cleaner Air
100 % Factory-made

27
Spirit of Innovation
corporatesecretary@2017
New Structural Material for Projects

28
Spirit of Innovation
corporatesecretary@2017
1 INTRODUCTION

2 CONSTRUCTION INDUSTRY

3 CONSOLIDATION TEST

4 ON-SITE EXECUTION INNOVATION

5 BUILDING INFORMATION MODELLING

6 SUMMARY

2
9
Pemilihan Jenis Test Konsolidasi

LATAR BELAKANG

Tanah Lempung Oedometer

Mudah Konsolidasi

Parameter Konsolidasi

Automatic
Consolidometer
Uji Laboratorium

30
Spirit of Innovation
corporatesecretary@2017
Oedometer
Tes Konsolidasi menggunakan Oedometer ( SNI 2812 – 2011, ASTM D 2435 – 02)

PROSES
TES

Mulai
- Alat konsolidasi satu arah berdasarkan
SNI 2812 – 2011 dan ASTM D 2435 – 02
- Membutuhkan waktu tujuh hari untuk
memperoleh hasil tes

Selesai
31
Spirit of Innovation
corporatesecretary@2017
Automatic Consolidometer
Full Automatic High Pressure Pneumatic Consolidometer (TB 10102 – 2010)

PROSES
TES
a. Merupakan alat tes konsolidasi otomatis
b. Menggunakan mesin dan teknologi Mulai
terbaru di Indonesia
c. Menggunakan kontrol dan sensor deteksi
secara otomatis
Selesai
d. Sebagian besar pekerjaan dilakukan secara
komputerisasi
e. Mengurangi kesalahan pekerjaan secara manual Parameter yang dapat
diperoleh diantaranya nilai
f. Pengolahan data menggunakan Soil Test
: eo, Cc, Cv, t90,Grafik e –
Microcomputer Control Data Acquisition p, Grafik e – log.
Processing System 32
Spirit of Innovation
corporatesecretary@2017
Efisiensi Alat Test

Automatic
Tinjauan Satuan Oedometer
Consolidometer
Jumlah Sampel Uji Per Alat Sampel 2 32
Waktu tes untuk satu sampel hari 7 3
Kapasitas Uji dalam 6 bulan Sampel 52 1920
Prosentase Alat dipakai % 90 80
Sampel yang dapat di uji sampel 47 1536
Jumlah Alat yang Dibutuhkan Set 64 2
Biaya Pembelian Alat Rp 436,966,400 338,780,000

Item Oedometer Automatic Consolidometer


Mutu Tervalidasi Tervalidasi
Waktu 7 hari 3 hari
Efisiensi Biaya 100% 77,5%

33
Spirit of Innovation
corporatesecretary@2017
Gondola for finishing process

1. Konsep desain
gondola sangat efektif
diterapkan pada
proyek jalan layang
yang menggunakan
struktur atas segmen
box girder.

2. Pada saat gondola


berpindah melewati
kolom hanya perlu
membuka engselnya
saja, tidak perlu
membongkar secara
keseluruhan.

Waktu pengerjaan finishing dapat lebih singkat

34
Spirit of Innovation
corporatesecretary@2017
Gondola for finishing process

a. Finishing antar segmen b. Setting pipa plumbing c. Finishing kolom

d. Finishing parapet e. Pada bagian bottom truss akan 35


dibuka kunci slot pengamannya. Spirit of Innovation
corporatesecretary@2017
1 INTRODUCTION

2 CONSTRUCTION INDUSTRY

3 CONSOLIDATION TEST

4 FINISHING GONDOLA

5 BUILDING INFORMATION MODELLING

6 SUMMARY

3
6
Building Information Modelling

BIM
3D Modeling

2D CAD Drafting

Hand Drawing

TECHNOLOGY BOOSTER EFFICIENCY

37
Spirit of Innovation
corporatesecretary@2017
Bentley Descartes V8i Concept Station Open Bridge Modeller 1 3
2 4
Gint
Inroad Designer
LumenRT Leap Bridge

Context Capture

Prostructure

Projectwise

Assetwise 38
Spirit of Innovation
corporatesecretary@2017
Building Information Modelling
Architect Architect Menurut penelitian di Stanford
University for Integrated Facilities
Cost Engineer
Engineering manfaat lain
Cost Engineer MEP MEP

diantaranya :

1. Mengeliminir lebih dari 40% biaya


perubahan yang tidak diprediksi.

2. Akurasi estimasi biaya +/- 3%.


Owner Civil Engineer Owner Civil Engineer

3. Reduksi < 80% waktu yang


dibutuhkan untuk estimasi biaya.

Procurement Project Manager Procurement Project Manager


4. Menyisihkan lebih dari 10% nilai
Construction Manager Construction Manager kontrak, ditinjau dari pendeteksian
BIM dini ketidak cocokan desain.
Menciptakan desain dengan obyek yang cerdas.
5. Mereduksi waktu pelaksanaan
proyek lebih dari 7%.
Tanpa mempertimbangkan berapa kali desain
tersebut diubah serta siapa yang mengubahnya, data
tersebut tetap konsisten, terkoordinasi dan lebih akurat
bagi semua pemangku kepentingan.
39
Spirit of Innovation
corporatesecretary@2017
Why Building Information Modelling ?

40
Spirit of Innovation
corporatesecretary@2017
1

6 SUMMARY

4
1
Conclusion

• Reshape regulation and raise transparency

• Rewire the contractual framework

• Rethink design & engineering process

• Improve procurement and supply chain management

• Improve on-site execution

•Infuse digital technology, new materials & advanced


automation

•Re-skill the workforce 42


Spirit of Innovation
Source : McKinsey analysis corporatesecretary@2017
Technologies will increase construction productivity from
the early stage of project ….

43
Spirit of Innovation
corporatesecretary@2017
THANK YOU
PT Wijaya Karya (Persero) Tbk
D.I Panjaitan Kav. 9-10 Jakarta 13340. Indonesia
Telepon: +62 21 8192808
Fax: +62 21 85911969
investor-relations@wika.co.id

Anda mungkin juga menyukai