Anda di halaman 1dari 20
DR. H.MALLESHAPPA .LF.S., STATE LEVEL ENVIRONMENT MEMBER SECRETARY IMPACT ASSESSMENT AUTHORITY, TAMILNADU, 31d Floor, Panagal Mealigai, Ses Not Jeenis Road, Saidaret, Chennab15, SEWAVTNIF-468/EC/ (6122/2012 ot: 01.11.2012. To ‘The General Manager, Apticot Realtors Pvt. Lid, Level -6, Chennai Cli Centre, 408 11 Or Radhakrishnan Sail, (Chenna-600 004. Si, ‘Sub: SEIAA, TN - Environmental Clearance - Proposal to develep sn Integrated Industrial Township Development - M/s. APRICOT. REALTORS PRIVATE LIMITED, S.F.No.14, 16, 19, 162, 148207, 1482A, 151M, etc of Panchanthirthi Vilage, S.F.No.72, 7&, 78, £86, 87, 91, $3, 95 etc of Kunnappattu Vilage , S.F.No.173/5B, 1747, 17415 etc of Palyanur Vilage, S.F.No.4/8 of Amur Vilage, ‘Chengalpattu Taluk, Kancheepuram District, Chennai ~ Issued — Regarding Ret 4. Your application 31.05.2012 submited to SEIAA, TN 2. Minutes ofthe SEAC meeting held on 10.10.2012 13. Mnuies of the SEIAA meeting held on 01.11.2012 This has reference to your application dated 31.05.2012 submited fo the ‘State Level Envionment Impact Assessment Authority, Tamil Nadu seeking Enviconmental Clearance under the Environment impact Assessment "Noticaton, 2008. The projest proposal is for development of an Integrated Industria! ‘Township at S.FNos. listed vide Annexure. The total area of development is 130.3577 ha (322.12 acres) and total buit up area is reported as 884970 m* to ‘accommodate iniustries that do not atract the provisions of EIA notification 2008. The propoted Integrated Industrial Township wil develop industil plots ‘with infrastructural facities such as. Roads, water supply system, storm water ‘drains, Green Belt development for housing industies Viz., Auto Ancilay, Electronics and White Goods, Food and Fast Moving Consumer Goods (FMCG), Ready Bult Factories, and Logistics. Other amenities ke bank, post office, tiring centre, primary heath cente, recreational ares viz ret ‘udiorum & exibtion cente and ules ike 110 KVA substation, HT routng tnaintonance yard and storagtreuseldaposelsysem wil also be developed by the Developer. The cost of the project Rs.227.96 croves.The industria uits suit be required to obtain consent ftom Taminadu Polson Control Board indvdsaly with thee respecve STP, ETP and APC measures, The breakin of te toll area i tabulated as below: [SNe] Area Breakup [| __Areain Sam. ta Petar “308577 Balto Area a8? "OS area Green belt development {s Serr rr [6 | Carpering area | ‘Rmentos @ | Recreationataea | 3 iy [10 Parcels / Logistics | 118572 ‘Water requirement of the project during construction phase 150 KLD which shall be met from the supply of CMWSSB, Total Water requirement for ‘operation phase is 2910.16 KLD which wil be met from CMWSSB. In the 2010.16 KLD of fresh water utlized, 788.59 KLO will be used for industrial operations end 2121.87 KLD will be used for domestic purpose, The quarity of wastewater generated wil be 2407 KLD which incudes 708.73 KLD of trade efuent generated from industiies proposed to be housed in the Inlegrated Industrial Township and 1697.26 KLO of domestic sewage. It is ‘expected that 05% of treated sewage! effluent is recovered after loss which ‘accaunts for 2287 KLD and out of 2287 KLD of treated sewage! effvent, 475 LD willbe used for AC make up, 616 KLD willbe used for green belt, 774 KLD wil be used for gardening by the Industies to be established and 422 KLD will toe used for Flushing. A dedicated elevated reclaimed water reservoir for the STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY ‘storage of ferary treated combined effluent sewage is proposed so as to ‘recycle the same for non potable water fe for flushing, landscape, iigation ‘and AC water make up. ‘The hnalidual industries and the Developer has to provide separately their own STP and ETP colection, storage and reuse mechanism forthe treated ‘sewage and trade effluent, after satisfying the characteristics by the individual Industry. The industrial units wil be mandated to provide complete treatment system for teatment of sewage & trade effuent tothe standards prescribed by the TNPCB before leting into combined collection, storage, Reuse and Disposal system, ‘Municipal Solid Waste (400 Kg) generated throughout the construction Phase and 2.0 Thay generated from the common utities, commercial ‘establishments eto will be cobected and composted in the Organic Waste Convertor by the Developer. The non hazardous waste §7.4 Tilay and hazardous waste 2 Tiday generated by the individual industries will be handled by the respective industry 2s per the Municipal Solid Waste (M & H) Rules 2000 and Hazardous Waste (Management Handling Trans Boundary Movement) Rules 2008, and as per the procedure prescribed by TNPCB, “The power required is of 107 MW with backup power of 2 Nos. DG set of capacity 1000 KVA each and 1 No. DG set of 1250 KVA, ‘The project activty is covered in 8(b) of the Schedule and fais under ‘81 ‘category. As per the amendment dt. 1.12.2009 tothe EIA notification, 2006, the Industial estate of area less than 500 ha but contain building and construction projects > 20,000 sq.m and or development area more than 50 ha willbe treated 18s activity listed at serial no. 8 (a) or B (b) in the schedule as the case may be.

Anda mungkin juga menyukai