13 25 D

A 0 6 17 29
3 9

29 36
I
10 17
0 0
0 0
IN C E F
9 13
9 13 13 23
13 23 23 29
23 29

B 0 9 G 13 21
0 9 21 29
ACT OP MP PE TE VAR HOL
A 4 6 8 6 0.4444 3
B 6 8 16 9 2.7778 0
C 2 4 6 4 0.4444 0
D 8 10 24 12 7.1111 4
E 7 10 13 10 1 0
F 4 6 8 6 0.4444 0
G 4 6 20 8 7.1111 8
H 4 6 8 6 0.4444 0
I 4 6 14 7 2.7778 -19
J 3 4 5 4 0.1111 0
K 2 4 6 4 0.4444 0

39 43
39 43
K FI 43 43
43 43

H J
35 39
35 39
29 35
29 35
TE 43
VAR 5.667
DESVST 2.38
1 PROBABILIDAD DE 40 2 PROBABILIDAD DE 80%
X 40 X 40
MU 43 MU 38.0004
DESVES 2.38 DESVES 2.38
Z -1.260252 Z 0.84
P(-1,26) 10.38% P(Z) 80%

tiempo reducido 5

TIEMPO DE ACTIVIDAD COSTO REDUCCION


MAXIMA DEL
NORMAL COMPRIMIDO NORMAL COMPRIMIDO TIEMPO
A 6 4 1,000 1,900 2
B 9 7 1,000 1,800 2
C 4 2 1,500 2,700 2
D 12 8 2,000 3,200 4
E 10 7 5,000 8,000 3
F 6 4 3,000 4,100 2
G 8 5 8,000 10,250 3
H 6 4 5,000 6,400 2
I 7 4 10,000 12,400 3
J 4 3 4,000 4,400 1
K 4 3 5,000 5,500 1
194
9.255
1.96

COSTO DE
COMPRENSION X
DIA
450
400 MIN 450A+ 400B + 600C + 300D + 1000E + 550F + 750G+ 700H + 800I + 400J + 500K
600 A >= 2
300 B>= 2
1000
550
750
700
800
400
500
00I + 400J + 500K