Anda di halaman 1dari 259

DAFTAR HARGA SATUAN BAHAN, UPAH DAN ALAT

KOTA CIREBON 2015

NO. JENIS - BAHAN / UPAH / ALAT HARGA SATUAN (Rp)

I BAHAN MATERIAL ALAM

1 Bambu Ampel 10,000.00 / btg


2 Bambu Ø 6-8 (6 m) 9,800.00 / btg
3 Batu Pecah 0,5-1 (mesin) 246,500.0 / m3
4 Batu Pecah 1-2 (mesin) 190,300.0 / m3
5 Batu Pecah 2-3 (mesin) 200,000.0 / m3
6 Batu Pecah 3-5 (mesin) 188,500.0 / m3
7 Batu Pecah 5-7 139,200.0 / m3
8 Batu Pecah 7-10 159,500.0 / m3
9 Batu Pecah 10-15 108,750.0 / m3
10 Batu Pecah 15-20 125,000.0 / m3
11 Koral Beton 155,000.0 / m3
12 Koral Blondos 97,005.0 / m3
13 Pasir Beton 120,000.0 / m3
14 Pasir Pasang 120,000.0 / m3
15 Pasir Urug 125,000.0 / m3
16 Semen PC (50 kg) 1,500.0 / kg
17 Semen PC Warna 5,600.0 / kg
18 Sirtu 66,600.0 / m3
19 Tali Ijuk 2,900.0 / kg
20 Tanah Urug 92,000.0 / m3
21 Ijuk 1,305.0 / kg
22 Asbes gelombang besar 73,500.0 / lbr
23 Asbes gelombang kecil 57,800.0 / lbr
24 hardplek (1x1 m2) 11,100.0 / lbr

II BAHAN MATERIAL CETAK

Bata Merah 6,760.0 / bh


1 Bata Merah 600.0 / bh
2 Bubung stel gelombang 26,900.0 / bh
3 Gravel 1/2 dia. 20 cm 40,600.0 / bh
4 Gravel 1/2 dia. 30 cm 42,800.0 / bh
5 Pipa beton (buis beton) Ø15-20 - 100 cm 45,100.0 / bh
6 Pipa beton (buis beton) Ø30 - 100 cm 47,300.0 / bh
7 Pipa beton (buis beton) Ø40 - 100 cm 60,900.0 / bh
8 Eternit GRC 58,000.0 / lbr
9 Eternit Kembang 0,5x1 m 41,700.0 / bh
10 Eternit Polos 1x1 m 14,900.0 / bh
11 Genteng Bubung Cisangkan Mawar 5,500.0 / bh
12 Genteng Bubung Jatiwangi 2,750.0 / bh
13 Genteng Bubung Morando glazuur 3,600.0 / bh
14 Genteng Bubung Turbo 2,200.0 / bh
15 Genteng Cisangkan Floral 7,540.0 / bh
16 Genteng Cisangkan Mawar 5,900.0 / bh
17 Genteng Cisangkan Melati 5,900.0 / bh
18 Genteng Bubung Metal 50,000.0 / bh
19 Genteng Metal 40,000.0 / bh
20 Genteng Metal pasir 45,000.0 / bh
20 Genteng Press Jatiwangi 1,350.0 / bh
21 Genteng Press Morando glazuur 2,600.0 / bh
22 Genteng Press Turbo 1,250.0 / bh
23 Gypsum Board (120x240x9 mm) 72,500.0 / lbr
24 Hollow 20 x 40 mmx1.8mm 24,000.0 / m'
25 Hollow 40 x 40 mmx1.8mm 27,000.0 / m'
26 Kaca Patri 800,000.0 / m2
27 Kaca Polos (tebal 3 mm) 50,700.0 / m2
28 Kaca Polos (tebal 5 mm) 69,100.0 / m2
29 Kaca Polos (tebal 8 mm) 133,000.0 / m2
30 Kaca Rayband 90,200.0 / m2
31 Keramik 10/20 (KW 1) corak 38,400.0 / m2
32 Keramik 10/20 (KW 1) polos 36,000.0 / m2
33 Keramik 20/20 (KW 1) corak 42,150.0 / m2
34 Keramik 20/20 (KW 1) polos 36,000.0 / m2
35 Keramik 20/25 (KW 1) corak 38,900.0 / m2
36 Keramik 20/25 (KW 1) polos 35,400.0 / m2
37 Keramik 30/30 (KW 1) anti slip 31,000.0 / m2
38 Keramik 30/30 (KW 1) corak 40,600.0 / m2
39 Keramik 30/30 (KW 1) polos 41,400.0 / m2
40 Marmer 595,000.0 / m2
41 Nok paten 30,450.0 / m1
42 Nok stel gelombang 17,400.0 / m1
43 Nok stel rata 19,000.0 / m1
44 Paving block abu-abu (6 cm) 33,000.0 / m2
45 Paving block warna (6 cm) 37,000.0 / m2
46 Paving block abu-abu (8 cm) 98,600.0 / m2
47 Paving block warna (8 cm) 50,900.0 / m2
48 Teraso 50,000.0 / m2
49 Teraso uk. 40x40 cm 50,000.0 / m2
50 Wallpaper 22,000.0 / m2
51 Tegel badak abu-abu 30x30 cm 2,900.0 / bh
52 Kuku macan / m'
53 Keramik 40/40 (KW 1) corak 37,000.0 / m2
54 Keramik 40/40 (KW 1) polos 52,300.0 / m2
55 Keramik Granit 30 x 30 cm 36,200.0 / m2
56 Keramik Granit 40 x 40 cm 42,900.0 / m2
57 Beton Ready Mix K-175 532,500.0 / m3
58 Beton Ready Mix K-225 555,100.0 / m3
59 Beton Ready Mix K-275 601,600.0 / m3
60 Beton Ready Mix K-300 602,600.0 / m3
61 Hollow 40 x 60 mmx2.3mm 49,400.0 / btg
62 Keramik 40/40 (KW 1) anti slip 50,700.0 / m2
63 Keramik 50/50 (KW 1) anti slip 88,000.0 / m2
64 Granit Roman 237,000.0 / m2
III BAHAN KAYU

1 Akustik (30x120 cm) 40,000.0 / lbr


2 Akustik (30x30 cm) 15,000.0 / lbr
3 Akustik (30x60 cm) 20,000.0 / lbr
4 Formika 3 mm 120X 140 125,000.0 / lbr
5 GRC 45,000.0 / lbr
6 Gypsum 60,000.0 / lbr
7 Kayu 5/7 meranti 2,700,000.0 / m3
8 Kayu Balau Papan 10,833,550.0 / m3
9 Kayu Balau Persegian 9,644,050.0 / m3
10 Kayu Borneo (MC) Papan 4,157,000.0 / m3
11 Kayu Borneo (MC) Persegian 5,241,990.0 / m3
12 Kayu Dolken dia 10 cm - 4 m 52,000.0 / btg
13 Kayu Dolken dia 12 cm - 4 m 53,240.0 / btg
14 Kayu Dolken dia 5 cm - 4 m 10,530.0 / btg
15 Kayu Dolken dia 8 cm - 4 m 17,000.0 / btg
16 Kayu Jati Papan Jabar 18,850,000 / m3
17 Kayu Jati Persegian Jabar 16,250,000 / m3
18 Kayu Kamper Medan Papan 1,162,500 / m3
19 Kayu Kamper Medan Persegian 6,568,900 / m3
20 Kayu Kamper Samarinda Papan 7,000,000 / m3
21 Kayu Kamper Samarinda Persegian 6,741,000 / m3
22 Kayu Kompas Papan 5,604,000 / m3
23 Kayu Kompas Persegian 7,129,200 / m3
24 Kayu Kruing Papan 5,604,000 / m3
25 Kayu Kruing Persegian 7,020,000 / m3
26 Kayu Meranti Bukit Papan 5,250,000 / m3
27 Kayu Meranti Bukit Persegian 4,000,000 / m3
28 Kayu Terentang Persegian 1,950,000 / m3
29 Plywood 4 mm 64,000.0 / lbr
30 Plywood 9 mm 136,500.0 / lbr
31 Profil Kayu (tebal 5 cm) 1,950.0 / m'
32 Profil Kayu (tebal 7 cm) 6,500.0 / m'
33 Propil Gypsum 19,800.0 / m1
34 Teakwood 4 mm (120x240x3) 137,000.0 / lbr
35 Teakwood 4 mm (120x240x5) 145,000.0 / lbr
36 Teakwood 4 mm (90x210x3) 127,270.0 / lbr
37 Triplek 4 mm (120X240X4) 62,500.0 / lbr
38 Triplek 4 mm (90X210X4) 48,000.0 / lbr
39 Triplek 9 mm (120X240X9) 153,790.0 / lbr
40 Kayu Arbise Papan 1,790,000.0 / m3
41 Kayu Arbise Persegian 935,000.0 / m3
42 Kayu Papan Cor 1,900,000.0 / m3

IV BAHAN BESI

1 Kunci allumunium 100,000.0 / bh


2 Engsel allumunium 17,500.0 / bh
3 Grendel allumunium 42,500.0 / bh
4 Alumunium Gelombang (0,55) 50,000.0 / m2
5 Baud dia 10 mm - 15 cm 4,940.0 / bh
6 Baud dia 12 mm - 15 cm 4,300.0 / bh
7 Baut Pentol 650.0 / bh
8 Baut Ring 260.0 / bh
9 Besi Beton U-24 11,200.0 / kg
10 Besi IWF 13,300.0 / kg
11 Besi Siku 12,200.0 / kg
12 Besi Strip 10,700.0 / kg
13 Jendela alumunium 102,900.0 / m1
14 Pintu alumunium 177,800.0 / m1
15 Door closer 125,000.0 / bh
16 Pegangan pintu / door holder 75,000.0 / bh
17 Door stop 15,000.0 / bh
18 Engsel Jendela 16,150.0 / bh
19 Engsel Pintu 21,500.0 / bh
20 Grendel Jendela 18,800.0 / bh
21 Grendel Pintu 16,100.0 / bh
22 Hak Angin 23,790.0 / bh
23 Jendela Nako 13,000.0 / set
24 Kain Kassa 62,920.0 / roll
25 Kait Angin 5,500.0 / bh
26 Kawat Beton 15,000.0 / kg
27 Kawat Duri 21,500.0 / kg
28 Kawat Gantungan 6,500.0 / m1
29 Kawat Harmonika 15,700.0 / m2
30 Kawat Kassa 21,600.0 / m2
31 Kawat Las 1,640.0 / bh
32 Kawat Nyamuk 20,000.0 / m2
33 Kunci Pintu Dorong 137,020.0 / bh
34 Kunci Pintu Besar (Double Slaag) 80,600.0 / bh
35 Kunci Pintu Kecil (Double Slaag) 37,600.0 / bh
36 Kunci selot 10,000.0 / bh
37 Kunci tanam silinder / kamar mandi 20,000.0 / bh
38 Kunci tanam antik 35,000.0 / bh
39 Kusen jendela alumunium 3" (Biasa) 90,400.0 / m1
40 Kusen jendela alumunium 3" (Brown) 96,400.0 / m1
41 Kusen pintu alumunium 4" (Brown) 120,500.0 / m1
42 Kusen pintu alumunium 4" ( biasa) 108,400.0 / m1
43 List Alumuium 9,500.0 / bh
44 Langko-Langko 10,800.0 / bh
45 Pagar BRC tinggi 120 cm p = 240 cm 255,000.0 / lbr
46 Pagar BRC tinggi 90 cm p = 240 cm 180,000.0 / lbr
47 Paku Biasa 1/2-1" 15,000.0 / kg
48 Paku Biasa 2-5" 14,000.0 / kg
49 Paku Eternit 21,500.0 / kg
50 Paku Hak 15 cm 15,600.0 / kg
51 Paku Pancing 23,000.0 / kg
52 Paku Reng / Usuk 19,400.0 / kg
53 Paku Skrup 2-5" 300.0 / bh
54 Pintu lipat 550,000.0 / m2
55 Pintu Frame Less t. 10 mm : 3,500,000.0 / Unit
56 Slot tanam 36,000.0 / bh
57 Rel pintu dorong 125,000.0 / m1
58 Rollingdoor alumunium 250,000.0 / m2
59 rollingdoor besi 225,000.0 / m2
60 Seng Gelombang 58,300.0 / lbr
61 Skrup 300.0 /
62 Spring Knip 12,100.0 / bh
63 Sunscreen Alumunium 200,000.0 / m2
64 T-Stuck 1 1/2" 20,000.0 / bh
65 Knee 2,500.0 / bh
66 Pipa Besi dia. 2" 16,000.0 / m1
67 Screw 8x16 240.0 / bh
68 Screw 8x1/2' 175.0 / bh
69 Polycarbonat 350,000.0 / m2
70 Besi Canal 10,800.0 / kg
71 Pintu Henderson 850,000.0 / m2
72 Engsel jendela almunium 15,000.0 / bh
73 Grendel jendela alumunium 7,500.0 / bh
74 Bouvenlicht alumunium 100,000.0 / m2
75 Span mur dia. 12 mm 50,000.0 / bh
76 Span mur dia. 16 mm 65,000.0 / bh
77 Baja ringan propil C spek : 0,75 95,000.0 / bh
78 Pipa galvanis 2" 98,000.0 / m1
79 Allumunium 3" 120,500.0 / m1
80 Railing Tangga 300,000.0 / m2
V BAHAN CAT DAN MINYAK

1 Cat Besi 35,000.0 / kg


2 Cat Genteng (sekualitas Matex) 25,600.0 / kg
3 Cat Kayu (sekualitas Bee Brand) 42,500.0 / kg
4 Cat Kayu (sekualitas Ftalite) 47,500.0 / kg
5 Cat Menie Besi / Kayu 40,000.0 / kg
6 Cat Tembok (sekualitas Mexilite) 15,000.0 / kg
7 Cat Tembok (sekualitas Vinilex) 15,000.0 / kg
8 Lem Kayu (Putih) 20,800.0 / kg
9 Lem Vinyl 22,500.0 / kg
10 Sealant silicon 11,000.0 / m1
11 Rol Cat 8,500.0 / bh
12 Minyak Bekisting 16,100.0 / ltr
13 Plamur Kayu (sekualitas Primair) 20,100.0 / kg
14 Plamur Kayu (sekualitas Vim) 15,800.0 / kg
15 Plamur Tembok (sekualitas Maxilite) 17,200.0 / kg
16 Politur (sekualitas DX) 49,600.0 / kg
17 Residu 9,000.0 / ltr
18 Tinner A 8,100.0 / blick
19 Vernis 15,000.0 / ltr
20 Timber (5 mm) 11,000.0 / m2
Oli 20,000.0 / ltr

VI BAHAN-BAHAN LAIN

1 Ampelas 5,600.0 / bh
2 Bak cuci piring stainless steel 190,000.0 / set
3 Bak mandi fiberglass 277,100.0 / bh
4 Bathtub (sekualitias expor) 4,000,000.0 / set
5 Closet duduk (sekwalitas TOTO - Lengkap 1,599,400.0 / set
6 Closet jongkok porcelain 120,500.0 / bh
7 Floordrain 40,000.0 / bh
8 Kran air dia. 1/2" 23,000.0 / bh
9 Kran air dia. 3/4" 33,000.0 / bh
10 Kuas 6,400.0 / bh
11 Pipa galvanis dia. 1 " 30,000.0 / btg
12 Pipa galvanis dia. 1 1/2 " 48,000.0 / btg
13 Pipa galvanis dia. 1/2 " 18,000.0 / btg
14 Pipa galvanis dia. 3 " 100,000.0 / btg
15 Pipa galvanis dia. 3/4 " 23,000.0 / btg
16 Pipa galvanis dia. 4 " 145,000.0 / btg
17 Pipa PVC AW dia 1 " 28,000.0 / btg
18 Pipa PVC AW dia 1 1/2 " 48,500.0 / btg
19 Pipa PVC AW dia 1/2 " 15,000.0 / btg
20 Pipa PVC AW dia 2 " 62,000.0 / btg
21 Pipa PVC AW dia 2 1/2 " 91,000.0 / btg
22 Pipa PVC AW dia 3 " 125,000.0 / btg
23 Pipa PVC AW dia 3/4 " 20,000.0 / btg
24 Pipa PVC AW dia 4 " 192,800.0 / btg
25 Pipa PVC AW dia 6 " 451,800.0 / btg
26 Pipa Tanah dia. 15 cm 10,000.0 / bh
27 Pipa Tanah dia. 20 cm 17,500.0 / bh
28 Seal Tape 1,300.0 / bh
29 Stop Kran 1" 54,200.0 / bh
30 Stop Kran 3/4" 42,200.0 / bh
31 Tangki Fibre Glass 1m3 1,481,900.0 / bh
32 Urinoir (sekualitas TOTO - lengkap) 1,807,200.0 / bh
33 Wastafel (sekualitas Export - lengkap) 3,250,000.0 / bh
34 Water Drain 18,100.0 / set
35 Monoblock (sekualitas Export - lengkap + a 3,000,000.0 / set
36 Pintu Fiber 370,000.0 / bh
37 Closet Duduk Biasa (sekwalitas TOTO) 750,000.0 / bh
38 Besi strek staang dia. 12 mm 10,500.0 / bh
39 Besi strek staang dia. 16 mm 15,500.0 / bh
40 Kabel NYM 4x16 mm 80,000.0 / m1
41 Kabel NYM 4x6 mm 35,000.0 / m1
42 Kabel NYM 3x2,5 mm 8,000.0 / m1
43 Washtafel (sekualitas TOTO - lengkap) 312,000.0 / set
Hand Showr + Kran Shower 930,000.0 / bh
VII INSTALASI LISTRIK

1 Biaya Penyambungan PAM 1,500,000.0 / unit


2 Biaya Penyambungan PLN 1,100.0 / watt
3 Lampu SL 11 Watt 37,000.0 / bh
4 Lampu Downlight 36,400.0 / bh
5 Lampu Pijar 25 Watt 3,500.0 / bh
6 Lampu Philip SL 18 Watt 38,500.0 / bh
7 Lampu TL 20 Watt (Biasa) 45,000.0 / bh
8 Lampu TL 20 watt [armateur bambu] 101,100.0 / set
9 Lampu TL 40 watt [armateur bambu] 112,700.0 / set
10 MCB 2 A --- 6 A 62,200.0 / bh
11 Stop Kontak 11,600.0 / bh
12 Saklar AC 86,700.0 / bh
13 Saklar Lampu 13,900.0 / bh
14 Kabel NYM 1,5 (3x1,5) 8,800.0 / m1
15 Kabel NYM 2,5 (2x2,5) 8,700.0 / m1
16 Pipa Listrik 5,800.0 / btg
17 Klem 5,900.0 / bh
18 Tedus 11,200.0 / bh
19 Isolasi 8,800.0 / bh
20 Konektor 12,900.0 / bh
21 Kabel tembaga anti petir 16 mm 58,800.0 / m'
22 Arde Tanah 18,500.0 / kg
23 Kabel NYM 1,5 (2x1,5) 12,900.0 / m1
24 Box skring besi 40x60 ( 20 group ) 254,200.0 / set
25 Box skring besi 30x40 ( 12 group ) 213,700.0 / set
26 Box skring besi 20x30 ( 6 group ) 115,500.0 / set
27 Box skring (sekolah / rumah) 28,900.0 / bh
28 Inbow dus 2,400.0 / bh
29 Solatip 7,000.0 / bh
29 Perlengkapan 74,220.0 / bh
UPAH PEKERJA

HARGA
NO URAIAN PEKERJA SATUAN KET
UPAH (Rp)

1 Kenek Truck 55,000.00 ORG/HR/8JAM


2 Kepala Tukang Batu 85,000.00 ORG/HR/8JAM
3 Kepala Tukang Besi 85,000.00 ORG/HR/8JAM
4 Kepala Tukang Besi Profil 85,000.00 ORG/HR/8JAM
5 Kepala Tukang Cat 85,000.00 ORG/HR/8JAM
6 Kepala Tukang Kayu 85,000.00 ORG/HR/8JAM
7 Mandor 85,000.00 ORG/HR/8JAM
8 Operator Alat Besar 85,000.00 ORG/HR/8JAM
9 Pekerja 65,000.00 ORG/HR/8JAM
10 Pekerja Setengah Terampil 65,000.00 ORG/HR/8JAM
11 Pekerja Terampil 70,000.00 ORG/HR/8JAM
12 Pembantu Operator/ Mekanik 60,000.00 ORG/HR/8JAM
13 Penjaga Malam 65,000.00 ORG/HR/8JAM
14 Supir Truck 50,000.00 ORG/HR/8JAM
15 Tukang Batu Setengah Terampil 75,000.00 ORG/HR/8JAM
16 Tukang Batu Terampil 75,000.00 ORG/HR/8JAM
17 Tukang Besi Beton Setengah Tera 75,000.00 ORG/HR/8JAM
18 Tukang Besi Beton Terampil 75,000.00 ORG/HR/8JAM
19 Tukang Besi Profil Setengah Teram 75,000.00 ORG/HR/8JAM
20 Tukang Besi Profil Terampil 75,000.00 ORG/HR/8JAM
21 Tukang Cat Setengah Terampil 75,000.00 ORG/HR/8JAM
22 Tukang Cat Terampil 75,000.00 ORG/HR/8JAM
23 Tukang Gali 80,000.00 ORG/HR/8JAM
24 Tukang Kayu Setengah Terampil 70,000.00 ORG/HR/8JAM
25 Tukang kayu Terampil 75,000.00 ORG/HR/8JAM
26 Tukang Pipa 70,000.00 ORG/HR/8JAM
27 Kepala Tukang Pipa 80,000.00 ORG/HR/8JAM

IX SEWA ALAT

1 Concrete Mixer 0,125 m3 35,000.0 / jam


2 Concrete Mixer 0,25 m3 35,000.0 / jam
3 Concrete Vibrator 25,000.0 / jam
4 Dump Truck 5 ton 101,500.0 / jam
ANALISA HARGA SATUAN PEKERJAAN
KOTA CIREBON
TAHUN 2015

HARGA SATUAN
KODE
INDEX URAIAN
ANALISA
Rp

SNI.100.04 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN


0.2000 Pembantu tukang 65,000.00
0.0500 Mandor 85,000.00

Keuntungan Max. 12,5 %

SNI.100.05 1 M2 PENGUKURAN DAN PEMASANGAN BOUWPLANK / PROPIL


0.0200 m3 Kayu kaso (kayu hutan) 4,000,000.00
0.0070 m3 Kayu papan (kayu hutan) 5,604,000.00
0.0200 kg Paku biasa 2" - 5" 14,000.00

0.1000 Oh Pembantu tukang 65,000.00


0.1000 Oh Tukang kayu 85,000.00
0.0100 Oh Kepala tukang 85,000.00
0.0050 Oh Mandor 85,000.00

Keuntungan Max. 12,5 %

SNI. 200.15 1 M3 GALIAN TANAH BIASA SEDALAM 3 M


0.8350 Oh Pembantu tukang 65,000.00
0.0730 Oh Mandor 85,000.00

Keuntungan Max. 12,5 %

SNI. 200.01 1 M3 GALIAN TANAH BIASA


0.5400 Pembantu tukang 65,000.00
0.0400 Mandor 85,000.00

Keuntungan Max. 12,5 %


SNI. 200.11 1 M3 URUGAN PASIR
1.2000 m3 Pasir urug 125,000.00

0.3000 Pembantu tukang 65,000.00


0.0100 Mandor 85,000.00

Keuntungan Max. 12,5 %

SNI.300.06 1 M3 MEMBUAT LANTAI KERJA BETON TUMBUK AD. 1:3:5


10.0000 kg Semen portland 1,500.00
0.0260 m3 Pasir beton 120,000.00
0.0440 m3 Kerikil 200,000.00

1.1500 Pembantu tukang 65,000.00


0.0200 Tukang batu 65,000.00
0.0020 Kepala tukang 85,000.00
0.0060 Mandor 85,000.00

Keuntungan Max. 12,5 %

SNI. 200.12 1 M3 URUGAN TANAH


1.2000 m3 Tanah atras 92,000.00

0.3000 Pembantu tukang 65,000.00


0.0100 Mandor 85,000.00

Keuntungan Max. 12,5 %

SNI. 200.13 1 M3 PASANGAN PONDASI BATU KALI


1.1000 m3 Batu Pecah 15-20 125,000.00
163 KG Semen PC (50 kg) 1500
0.5201 m3 Pasir Pasang 120000

0.3000 OH Pembantu tukang 65,000.00


0.0100 OH Mandor 85,000.00
0.06 OH Kepala Tukang 85,000.00
0.35 OH Tukang Batu
-
Keuntungan Max. 12,5 %

SNI.250.10 1 M3 PASANGAN PONDASI TIANG PANCANG 25 X 25


0.1500 m3 Batu Pecah 2-3 (mesin) 200000
60.5000 kg Semen portland 1,500.00
0.4500 m3 Pasir Beton 120,000.00
0.6700 m3 Pasir Pasang 120,000.00
0.0190 m3 Pasir Urug 125000
45.0000 kg Besi Beton U-24 11200
0.9000 kg Kawat Beton 15000
0.0320 m3 Kayu 5/7 merant 1950000
0.1200 kg Paku Biasa 2-5" 14000
0.09 ltr Minyak Bekistng 16100
0.24 kg Plamur Tembok (sekualita 17200

1 Oh Pembantu tukang 65,000.00


0.6700 Oh Tukang batu 75,000.00
0.0670 Oh Kepala tukang 85,000.00
0.0500 Oh Mandor 85,000.00

Keuntungan Max. 12,5 %

SNI. 300.19 1 M3 BETON BERTULANG AD. 1:2:3


200.0000 kg Semen portland 1,500.00
0.4000 m3 Pasir beton 120,000.00
0.7800 m3 Spleet 2/3 cm 200,000.00

1.6500 Pembantu tukang 65,000.00


0.2500 Tukang batu 75,000.00
0.0250 Kepala tukang 85,000.00
0.0800 Mandor 85,000.00

Keuntungan Max. 12,5 %


SNI. 300.32 1 KG PEMBESIAN DENGAN BESI POLOS ATAU BESI ULIR
1.0500 kg Besi beton 11,200.00
0.0150 kg Kawat beton 15,000.00

0.0070 Pembantu tukang 65,000.00


0.0070 Tukang besi 75,000.00
0.0007 Kepala tukang 85,000.00
0.0003 Mandor 85,000.00

Keuntungan Max. 12,5 %

SNI. 300.36 1 M2 PASANG BEKISTING UNTUK SLOOP, KOLOM BIASA & RINGBALK
0.0450 m3 Kayu hutan/papan/kaso 1,162,500.00
0.3000 kg Paku biasa 2" - 5" 14,000.00
0.1000 lt Pelumas bekisting 16,100.00

0.3000 Pembantu tukang 65,000.00


0.2600 Tukang kayu 75,000.00
0.0260 Kepala tukang 85,000.00
0.0050 Mandor 85,000.00

Keuntungan Max. 12,5 %

SNI. 300.37 1 M2 PASANG BEKISTING UNTUK KOLOM STRUKTUR


0.0400 m3 Kayu hutan/papan/kaso 4,000,000.00
0.0150 m3 Balok kayu hutan 4,000,000.00
0.4000 kg Paku biasa 2" - 5" 14,000.00
0.2000 lt Pelumas bekisting 16,100.00
0.3500 lb Triplex tebal 9 mm 153,790.00
2.0000 btg Dolken kayu Ø 8-10/4' 52,000.00

0.3000 Pembantu tukang 65,000.00


0.3300 Tukang kayu 75,000.00
0.0330 Kepala tukang 85,000.00
0.0060 Mandor 85,000.00

Keuntungan Max. 12,5 %


SNI. 300.38 1 M2 PASANG BEKISTING UNTUK BALOK
0.0400 m3 Kayu hutan/papan/kaso 4,000,000.00
0.0180 m3 Balok kayu hutan 4,000,000.00
0.4000 kg Paku biasa 2" - 5" 14,000.00
0.2000 lt Pelumas bekisting 16,100.00
0.3500 lb Triplex tebal 9 mm 153,790.00
2.0000 btg Dolken kayu Ø 8-10/4' 52,000.00

0.3200 Pembantu tukang 65,000.00


0.3300 Tukang kayu 75,000.00
0.0330 Kepala tukang 85,000.00
0.0060 Mandor 85,000.00

Keuntungan Max. 12,5 %

SNI.300.39 1 M2 PASANG BEKISTING UNTUK LANTAI


0.0400 m3 Kayu hutan/papan/kaso 4,000,000.00
0.0150 kg Balok kayu hutan 4,000,000.00
0.2000 lt Pelumas bekisting 14,000.00
0.4000 kg Paku biasa 2" - 5" 16,100.00
0.3500 lb Triplex tebal 9 mm 153,790.00
6.0000 btg Dolken kayu Ø 8-10/4' 52,000.00

0.3200 Pembantu tukang 65,000.00


0.3300 Tukang kayu 75,000.00
0.0330 Kepala tukang 85,000.00
0.0060 Mandor 85,000.00

Keuntungan Max. 12,5 %

SNI.350.11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA AD. 1:3


70.0000 bh Bata merah 5x11x22 cm 600.00
14.3700 kg Semen portland 1,500.00
0.0400 m3 Pasir pasang 120,000.00

0.3200 Pembantu tukang 65,000.00


0.1000 Tukang batu 75,000.00
0.0100 Kepala tukang 85,000.00
0.0150 Mandor 85,000.00

Keuntungan Max. 12,5 %

SNI.350.12 1 M2 PASANGAN BATA RINGAN HEBEL


8.0000 bh Bata merah 5x11x22 cm 6,760.00
14.3700 kg Semen portland 1,500.00
0.0400 m3 Pasir pasang 120,000.00

0.3200 Pembantu tukang 65,000.00


0.1000 Tukang batu 85,000.00
0.0100 Kepala tukang 75,000.00
0.0150 Mandor 85,000.00

Keuntungan Max. 12,5 %

SNI.360.03 1 M2 PLESTERAN AD. 1:3 TEBAL 15 MM


6.4800 kg Semen Portland 1,500.00
0.0190 m3 Pasir Pasang 120,000.00

0.2000 Pembantu tukang 65,000.00


0.1500 Tukang batu 75,000.00
0.0150 Kepala tukang 85,000.00
0.0100 Mandor 85,000.00

Keuntungan Max. 12,5 %

SNI. 360.07 1 M2 ACIAN


3.2500 kg Semen Portland 1,500.00

0.2000 Pembantu tukang 65,000.00


0.1000 Tukang kayu 75,000.00
0.0100 Kepala tukang 85,000.00
0.0100 Mandor 85,000.00
Keuntungan Max. 12,5 %

SNI.650.05 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM


11.0000 bh Keramik 30 x 30 cm 36,200.00
9.3000 kg Semen portland 1,500.00
0.0180 m3 Pasir pasang 120,000.00
1.5000 kg Semen warna 5,600.00

0.2700 Pembantu tukang 65,000.00


0.1300 Tukang Batu Terampil 75,000.00
0.0130 Kepala Tukang Batu 85,000.00
0.0140 Mandor 85,000.00

Keuntungan Max. 12,5 %

SNI.650.06 1 M2 PASANG LANTAI KERAMIK 50 X 50 CM


4.0000 bh Keramik 50 x 50 cm 88,000.00
9.3000 kg Semen portland 1,500.00
0.0180 m3 Pasir pasang 120,000.00
1.5000 kg Semen warna 5,600.00

0.2700 Pembantu tukang 65,000.00


0.1300 Tukang Batu Terampil 75,000.00
0.0130 Kepala Tukang Batu 85,000.00
0.0140 Mandor 85,000.00

Keuntungan Max. 12,5 %

SNI.650.07 1 M2 PASANG LANTAI GRANIT 60 X 60 CM


3.0000 bh GRANIT 60 X 60 237,000.00
9.3000 kg Semen portland 1,500.00
0.0180 m3 Pasir pasang 120,000.00
1.5000 kg Semen warna 5,600.00

0.2700 Pembantu tukang 65,000.00


0.1300 Tukang Batu Terampil 75,000.00
0.0130 Kepala Tukang Batu 85,000.00
0.0140 Mandor 85,000.00

Keuntungan Max. 12,5 %

SNI.650.07 1 M2 PASANG LANTAI KERAMIK 40 X 40 CM


6.0000 bh Keramik 40 x 40 cm 50,000.00
9.3000 kg Semen portland 1,500.00
0.0180 m3 Pasir pasang 120,000.00
1.5000 kg Semen warna 5,600.00

0.2700 Pembantu tukang 65,000.00


0.1300 Tukang Batu Terampil 75,000.00
0.0130 Kepala Tukang Batu 85,000.00
0.0140 Mandor 85,000.00

Keuntungan Max. 12,5 %

SNI.650.06 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM


25.0000 bh Keramik 20 x 20 cm 36,000.00
11.3800 kg Semen portland 1,500.00
0.0420 m3 Pasir pasang 120,000.00
1.5000 kg Semen warna 5,600.00

0.6200 Pembantu tukang 65,000.00


0.3500 Tukang Batu Terampil 75,000.00
0.0350 Kepala Tukang Batu 85,000.00
0.0300 Mandor 85,000.00

Keuntungan Max. 12,5 %

SNI.650.11 1 M2 PASANG DINDING KERAMIK 20 X 25 CM


20.0000 bh Keramik 20 x 25 cm 38,900.00
9.3000 kg Semen portland 1,500.00
0.0180 m3 Pasir pasang 120,000.00
1.5000 kg Semen warna 5,600.00

0.6000 Pembantu tukang 65,000.00


0.4500 Tukang Batu Terampil 75,000.00
0.0450 Kepala Tukang Batu 85,000.00
0.0300 Mandor 85,000.00

Keuntungan Max. 12,5 %

SNI.650.07 1 M2 PASANG LANTAI KERAMIK 20 X 10 CM


50.0000 bh Keramik 20 x 10 cm 42,150.00
11.3800 kg Semen portland 1,500.00
0.0420 m3 Pasir pasang 120,000.00
1.5000 kg Semen warna 5,600.00

0.6200 Pembantu tukang 65,000.00


0.3500 Tukang Batu Terampil 75,000.00
0.0350 Kepala Tukang Batu 85,000.00
0.0300 Mandor 85,000.00

Keuntungan Max. 12,5 %

SNI.452.38 1 M' PASANG GYPSUM BOARD


1.0000 m' Gypsum 60,000.00
0.0500 kg Paku biasa 1/2' -1' 14,000.00

0.1000 Pembantu tukang 65,000.00


0.2000 Tukang kayu 75,000.00
0.0200 Kepala tukang 85,000.00
0.0050 Mandor 85,000.00

Keuntungan Max. 12,5 %

SNI. 950,15 1 M2 PENGECATAN BETON EKSPOSE ( 1 LPS PLAMIR +1 LPS CAT DASAR + 2 LPS CAT PENUTU

0.1000 kg Plamir tembok 17,200.00


0.2600 kg Cat penutup 2 x ( tembok 15,000.00
0.1000 kg Cat dasar / menie 40,000.00

0.0200 Pembantu tukang 65,000.00


0.0630 Tukang cat 75,000.00
0.0063 Kepala tukang 85,000.00
0.0025 Mandor 85,000.00

Keuntungan Max. 12,5 %

SNI.550.07 MEMASANG 1 BUAH WASTHAFEL


1.0000 bh Wasthafel 3,250,000.00
1.0000 ls Perlengkapan 74,220.00
6.0000 Kg Semen warna 5,600.00
0.0100 m3 Pasir pasang 120,000.00

1.2000 Pembantu tukang 65,000.00


1.4500 Tukang Batu Terampil 75,000.00
0.1500 Kepala Tukang Batu 85,000.00
0.1000 Mandor 85,000.00

Keuntungan Max. 12,5 %

SNI.550.01 PASANG 1 BUAH CLOSET DUDUK/MONOBLOK


1.0000 bh Closet duduk/monoblok 750,000.00
1.0000 ls Perlengkapan 74,220.00

3.3000 Pembantu tukang 65,000.00


1.1000 Tukang kayu Terampil 75,000.00
0.0010 Kepala Tukang Kayu 85,000.00
0.1600 Mandor 85,000.00

Keuntungan Max. 12,5 %

1 PINTU FRAME LESS


1.0000 m' Rangka Alumunium 3,500,000.00
3.0800 m2 Daun Pintu Alumunium 177,800.00
1.8000 m2 Kaca 5" 69,100.00
1.8000 m' Sealant silicon 11,000.00
2.0000 ps Tarikan Pintu biasa 75,000.00
1.0000 bh Slot tanam 36,000.00

0.3404 Tukang 75,000.00


0.1434 Kepla Tukang 85,000.00
0.0262 Mandor 85,000.00

Keuntungan Max. 12,5 %

PASANG 1 m' LIST ALUMUNIUM


1.0000 m2 List Alumunium 9,500.00

0.1000 Pekerja 65,000.00


0.0500 Tukang Batu 75,000.00
0.0050 Kepala Tukang Batu 85,000.00
0.0050 Mandor 85,000.00

Keuntungan Max. 12,5 %

1m2 PENGECATAN DIDING DENGAN PROPAN


0.2500 kg Cat Tembok (sekualitas Me 15,000.00
0.1250 kg Tinner 8,100.00
0.0100 bh Rol Cat 8,500.00
0.5000 lbr Hamplas 5,600.00

0.1600 Pembantu Tukang 65,000.00


0.2800 Tukang Cat Setengah Tera 75,000.00
0.0300 Kepala Tukang Cat 85,000.00
0.0100 Mandor 85,000.00

Keuntungan Max. 12,5 %

1m2 PENGECATAN PLAFOND DENGAN PROPAN


0.1500 kg Cat Tembok Propan 15,000.00
0.1600 kg Plamour Tembok 17,200.00
0.0100 bh Rol Cat 8,500.00
0.0425 ls Steger Werk 12000

0.1600 Pembantu Tukang 65,000.00


0.2800 Tukang Cat Setengah Tera 75,000.00
0.0300 Kepala Tukang Cat 85,000.00
0.0100 Mandor 85,000.00

Keuntungan Max. 12,5 %

PASANG 1 BUAH JET WASHER


1.0000 bh Jet Washer 152,000.00

0.0100 Pekerja 65,000.00


0.1000 Tukang Batu 75,000.00
0.0100 Kepala Tukang Batu 85,000.00
0.0050 Mandor 85,000.00

Keuntungan Max. 12,5 %

PASANG 1 BUAH FLOLRDRAIN


1.0000 bh Floordrain 40,000.00

0.0100 Pekerja 65,000.00


0.1000 Tukang Batu 75,000.00
0.0100 Kepala Tukang Batu 85,000.00
0.0050 Mandor 85,000.00

Keuntungan Max. 12,5 %

PASANG 1 BUAH HAND SHOWER + KRAN SHOWER


1.0000 bh Hand Showr + Kran Show 930,000.00

0.0100 Pekerja 65,000.00


0.1000 Tukang Batu 75,000.00
0.0100 Kepala Tukang Batu 85,000.00
0.0050 Mandor 85,000.00

Keuntungan Max. 12,5 %

PASANG 1m2 RAILING TANGGA


1.0000 m2 Railing Tangga 300,000.00

1.8000 Pekerja 65,000.00


2.7000 Tukang batu 75,000.00
0.5400 Kepala Tukang Batu 85,000.00
0.1100 Mandor 85,000.00

Keuntungan Max. 12,5 %

PASANG 1m2 PIPA PVC Dia. 1"


0.2500 m' Pipa PVC dia. 1" 28,000.00
0.0800 bh Lem Paralon 5,900.00
1.0000 bh Sambungan 54,200.00
1.0000 ls Alat Pembantu 74,000.00

0.1200 Tukang Batu Terampil 75,000.00


0.0100 Mandor 85,000.00

Keuntungan Max. 12,5 %

PASANG 1m2 PIPA PVC Dia. 3/4"


0.2500 m' Pipa PVC dia. 3/4" 23,000.00
0.0800 bh Lem Paralon 5,900.00
1.0000 bh Sambungan 54,200.00
1.0000 ls Alat Pembantu 74,000.00

0.1200 Tukang Batu Terampil 75,000.00


0.0100 Mandor 85,000.00
Keuntungan Max. 12,5 %

PASANG 1m2 PIPA PVC Dia. 1/2"


0.2500 m' Pipa PVC dia. 1/2" 23,000.00
0.0800 bh Lem Paralon 5,900.00
1.0000 bh Sambungan 54,200.00
1.0000 ls Alat Pembantu 74,000.00

0.1200 Tukang Batu Terampil 75,000.00


0.0100 Mandor 85,000.00

Keuntungan Max. 12,5 %

PASANG 1m2 PIPA PVC Dia. 2"


0.2500 m' Pipa PVC dia. 2" 62,000.00
0.0800 bh Lem Paralon 5,900.00
1.0000 bh Sambungan 54,200.00
1.0000 ls Alat Pembantu 74,000.00

0.1200 Tukang Batu Terampil 75,000.00


0.0100 Mandor 85,000.00

Keuntungan Max. 12,5 %

PASANG 1m2 PIPA PVC Dia. 2 1/2"


0.2500 m' Pipa PVC dia. 2 1/2" 91,000.00
0.0800 bh Lem Paralon 5,900.00
1.0000 bh Sambungan 54,200.00
1.0000 ls Alat Pembantu 74,000.00

0.1200 Tukang Batu Terampil 75,000.00


0.0100 Mandor 85,000.00

Keuntungan Max. 12,5 %


PASANG 1m2 PIPA PVC Dia. 3"
0.2500 m' Pipa PVC dia. 3" 100,000.00
0.0800 bh Lem Paralon 5,900.00
1.0000 bh Sambungan 54,200.00
1.0000 ls Alat Pembantu 74,000.00

0.1200 Tukang Batu Terampil 75,000.00


0.0100 Mandor 85,000.00

Keuntungan Max. 12,5 %

PASANG 1m2 PIPA PVC Dia. 4"


0.2500 m' Pipa PVC dia. 4" 145,000.00
0.0800 bh Lem Paralon 5,900.00
1.0000 bh Sambungan 54,200.00
1.0000 ls Alat Pembantu 74,000.00

0.1200 Tukang Batu Terampil 75,000.00


0.0100 Mandor 85,000.00

Keuntungan Max. 12,5 %

PASANG 1 UNIT SEPTICKTANK + REMBESAN


4.5000 m3 Galian Tanah 35,000.00
0.2142 m3 Pasir Urug 90,000.00
2.2500 m2 Lantai Kerja t=10 cm 90,000.00
15.0000 m2 Pas. bata 1 PC : 2 PS + Pl 102,400.00
0.3000 m3 Plat beton penutup & bal 205,000.00
5.4000 m' Pipa PVC 4" jenis AW + 13,800.00
1.2000 m' Pipa GIP 1 1/2" 2,875.00
3.3750 m3 Galian tanah untuk remb 35,000.00
5.4000 m3 Pas. injuk 23,500.00
1.0500 m3 Urugan kerikil 3,5 cm 6,050.00
9.0000 m' Pipa PVC 4" berlobang je 13,800.00
1.1250 m3 Urugan kembali perataan 30,000.00
0.0920 ls Tambahan upah 100,000.00

Keuntungan Max. 12,5 %


Jenis Pekerjaan : Pembuatan 1 m2 Kantor sementara lantai plesteran
Satuan Pembayaran : 1 m2
Referensi : AHSP PU-CK 2013; A. 2.2.1.5 ; Hal: 371

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 2
Tukang Kayu L.02 OH 2
Tukang batu L.02 OH 1
Kepala Tukang L.03 OH 0.3
Mandor L.04 OH 0.05
JUMLAH TENAGA KERJA
B BAHAN
Dolken kayu
diameter 8-10/400 cm Batang 1,250

Kayu m3 0,180
Paku biasa 2” – 5” Kg 0,080
Besi strip Kg 1,100
Semen Portland Kg 35,000
Pasir pasang m3 0,150
Pasir beton m3 0,100
Koral beton m3 0,150
Bata merah Bh 30,000
Seng plat Lbr 0,250
Jendela naco Bh 0,200
Kaca polos m2 0,080
Kunci tanam Bh 0,150
Plywood 4mm Lbr 0,060
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 10% x D
F Harga Satuan Pekerjaan (D+E)

Jenis Pekerjaan : Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter
Satuan Pembayaran : 1 m2
Referensi : AHSP PU-CK 2013; A. 2.2.1.2 ; Hal: 370
No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0,200
Tukang Kayu L.02 OH 0,400
Kepala Tukang L.03 OH 0,020
Mandor L.04 OH 0,020
JUMLAH TENAGA KERJA
B BAHAN
Dolken kayu Batang 1,250
diameter 8-10/400 cm

Semen portland Kg 2,50


Seng gelombang Lbr 1.2
Pasir beton m3 0,005
Koral beton m3 0,009
Kayu 5/7 m3 0,072
Paku biasa 2” – 5” Kg 0,060
Meni besi/kayu Liter 0,45
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 10% x D
F Harga Satuan Pekerjaan (D+E)

Jenis Pekerjaan : Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48
Satuan Pembayaran : 1 m3
Referensi : AHSP PU-CK A.4.1.1.12
No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 2,100
Tukang Batu L.02 OH 0,350
Kepala Tukang L.03 OH 0,035
Mandor L.04 OH 0,105
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 448,000
Pasir beton (BD Pasir = 1.400 Kg/m3) kg 667
Batu kerikil beton (BD Kerikil = 1.350 Kg/m3) kg 1000
Air (beton) Liter 215
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

PEKERJAAN INSTALASI LISTRIK


1 Titik Instalasi Penerangan
HARGA SATUAN JUMLAH HARGA
KOEFISIEN SAT URAIAN
Rp Rp
Bahan:
20.000 M1 Kabel NYY 3x2.5 m2 8,000.00 160,000.00
0.200 Roll Selotip 7,000.00 1,400.00
1.500 Btg Pipa listrik 5,800.00 8,700.00
1.000 Bh T-Dus 11,200.00 11,200.00
1.000 Bh Inbow Dus 2,400.00 2,400.00
0.100 lot Upah Kerja 162,400.00 16,240.00
Jumlah
Keuntungan Max. 10 %
Jumlah Total
Dibulatkan

1 Titik Instalasi Stop Kontak


HARGA SATUAN JUMLAH HARGA
KOEFISIEN SAT URAIAN
Rp Rp
Bahan:
20.000 M1 Kabel NYY 3x2.5 mm2 8,000.00 160,000.00
0.200 Roll Selotip 7,000.00 1,400.00
1.500 Btg Pipa listrik 5,800.00 8,700.00
1.000 Bh T-Dus 11,200.00 11,200.00
1.000 Bh Inbow Dus 2,400.00 2,400.00
0.100 lot Upah Kerja 162,400.00 16,240.00
Jumlah
Keuntungan Max. 10 %
Jumlah Total
Dibulatkan
JUMLAH
HARGA JUMLAH TOTAL

Rp
Rp

13,000.00
4,250.00
Jumlah 17,250.00
Keuntungan Max. 12,5 % 2,156.25
Jumlah Total 19,406.25
Dibulatkan 19,400.00

80,000.00
39,228.00
280.00 119,508.00

6,500.00
8,500.00
850.00
425.00 16,275.00
Jumlah 135,783.00
Keuntungan Max. 12,5 % 16,972.88
Jumlah Total 152,755.88
Dibulatkan 152,700.00

54,275.00
6,205.00
Jumlah 60,480.00
Keuntungan Max. 12,5 % 7,560.00
Jumlah Total 68,040.00
Dibulatkan 68,000.00

35,100.00
3,400.00
Jumlah 38,500.00
Keuntungan Max. 12,5 % 4,812.50
Jumlah Total 43,312.50
Dibulatkan 43,300.00

150,000.00
150,000.00
19,500.00
850.00 20,350.00
Jumlah 170,350.00
Keuntungan Max. 12,5 % 21,293.75
Jumlah Total 191,643.75
Dibulatkan 191,600.00

15,000.00
3,120.00
8,800.00
26,920.00
74,750.00
1,300.00
170.00
510.00
76,730.00
Jumlah 103,650.00
Keuntungan Max. 12,5 % 12,956.25
Jumlah Total 116,606.25
Dibulatkan 116,600.00

110,400.00
110,400.00
19,500.00
850.00 20,350.00
Jumlah 130,750.00
Keuntungan Max. 12,5 % 16,343.75
Jumlah Total 147,093.75
Dibulatkan 147,000.00

137,500.00 137,500.00
244,500.00 382,000.00
62,412.00 306,912.00
826,412.00
19,500.00
850.00 20,350.00
80000
Jumlah 100,350.00
Keuntungan Max. 12,5 % 12,543.75
Jumlah Total 112,893.75
Dibulatkan 112,800.00

30,000.00
90,750.00
54,000.00
80,400.00
2,375.00
504,000.00
13,500.00
62,400.00
1,680.00
1,449.00
4,128.00
844,682.00
65,000.00
50,250.00
5,695.00
4,250.00
125,195.00
Jumlah 969,877.00
Keuntungan Max. 12,5 % 121,234.63
Jumlah Total 1,091,111.63
Dibulatkan 1,091,100.00

300,000.00
48,000.00
156,000.00
504,000.00
107,250.00
18,750.00
2,125.00
6,800.00
134,925.00
Jumlah 638,925.00
Keuntungan Max. 12,5 % 79,865.63
Jumlah Total 718,790.63
Dibulatkan 718,700.00
11,760.00
225.00
11,985.00
455.00
525.00
59.50
25.50
1,065.00
Jumlah 13,050.00
Keuntungan Max. 12,5 % 1,631.25
Jumlah Total 14,681.25
Dibulatkan 14,600.00

52,312.50
4,200.00
1,610.00
58,122.50
19,500.00
19,500.00
2,210.00
425.00
41,635.00
Jumlah 99,757.50
Keuntungan Max. 12,5 % 12,469.69
Jumlah Total 112,227.19
Dibulatkan 112,200.00

160,000.00
60,000.00
5,600.00
3,220.00
53,826.50
104,000.00
386,646.50
19,500.00
24,750.00
2,805.00
510.00
47,565.00
Jumlah 434,211.50
Keuntungan Max. 12,5 % 54,276.44
Jumlah Total 488,487.94
Dibulatkan 488,400.00

160,000.00
72,000.00
5,600.00
3,220.00
53,826.50
104,000.00
398,646.50
20,800.00
24,750.00
2,805.00
510.00
48,865.00
Jumlah 447,511.50
Keuntungan Max. 12,5 % 55,938.94
Jumlah Total 503,450.44
Dibulatkan 503,400.00

160,000.00
60,000.00
2,800.00
6,440.00
53,826.50
312,000.00
595,066.50
20,800.00
24,750.00
2,805.00
510.00
48,865.00
Jumlah 643,931.50
Keuntungan Max. 12,5 % 80,491.44
Jumlah Total 724,422.94
Dibulatkan 724,400.00

42,000.00
21,555.00
4,800.00
68,355.00
20,800.00
7,500.00
850.00
1,275.00
30,425.00
Jumlah 98,780.00
Keuntungan Max. 12,5 % 12,347.50
Jumlah Total 111,127.50
Dibulatkan 111,100.00

54,080.00
21,555.00
4,800.00
80,435.00
20,800.00
8,500.00
750.00
1,275.00
31,325.00
Jumlah 111,760.00
Keuntungan Max. 12,5 % 13,970.00
Jumlah Total 125,730.00
Dibulatkan 125,700.00

9,720.00
2,280.00
12,000.00
13,000.00
11,250.00
1,275.00
850.00
26,375.00
Jumlah 38,375.00
Keuntungan Max. 12,5 % 4,796.88
Jumlah Total 43,171.88
Dibulatkan 43,100.00

4,875.00
4,875.00
13,000.00
7,500.00
850.00
850.00
22,200.00
Jumlah 27,075.00
Keuntungan Max. 12,5 % 3,384.38
Jumlah Total 30,459.38
Dibulatkan 30,400.00

398,200.00
13,950.00
2,160.00
8,400.00
422,710.00
17,550.00
9,750.00
1,105.00
1,190.00
29,595.00
Jumlah 452,305.00
Keuntungan Max. 12,5 % 56,538.13
Jumlah Total 508,843.13
Dibulatkan 508,800.00

352,000.00
13,950.00
2,160.00
8,400.00
376,510.00
17,550.00
9,750.00
1,105.00
1,190.00
29,595.00
Jumlah 406,105.00
Keuntungan Max. 12,5 % 50,763.13
Jumlah Total 456,868.13
Dibulatkan 456,800.00

711,000.00
13,950.00
2,160.00
8,400.00
735,510.00
17,550.00
9,750.00
1,105.00
1,190.00
29,595.00
Jumlah 765,105.00
Keuntungan Max. 12,5 % 95,638.13
Jumlah Total 860,743.13
Dibulatkan 860,700.00

300,000.00
13,950.00
2,160.00
8,400.00
324,510.00
17,550.00
9,750.00
1,105.00
1,190.00
29,595.00
Jumlah 354,105.00
Keuntungan Max. 12,5 % 44,263.13
Jumlah Total 398,368.13
Dibulatkan 398,300.00

900,000.00
17,070.00
5,040.00
8,400.00
930,510.00
40,300.00
26,250.00
2,975.00
2,550.00
72,075.00
Jumlah 1,002,585.00
Keuntungan Max. 12,5 % 125,323.13
Jumlah Total 1,127,908.13
Dibulatkan 1,127,900.00

778,000.00
13,950.00
2,160.00
8,400.00
802,510.00
39,000.00
33,750.00
3,825.00
2,550.00
79,125.00
Jumlah 881,635.00
Keuntungan Max. 12,5 % 110,204.38
Jumlah Total 991,839.38
Dibulatkan 991,800.00

2,107,500.00
17,070.00
5,040.00
8,400.00
2,138,010.00
40,300.00
26,250.00
2,975.00
2,550.00
72,075.00
Jumlah 2,210,085.00
Keuntungan Max. 12,5 % 276,260.63
Jumlah Total 2,486,345.63
Dibulatkan 2,486,300.00

60,000.00
700.00
60,700.00
6,500.00
15,000.00
1,700.00
425.00
23,625.00
Jumlah 84,325.00
Keuntungan Max. 12,5 % 10,540.63
Jumlah Total 94,865.63
Dibulatkan 94,800.00

SAR + 2 LPS CAT PENUTUP )

1,720.00
3,900.00
4,000.00
9,620.00
1,300.00
4,725.00
535.50
212.50
6,773.00
Jumlah 16,393.00
Keuntungan Max. 12,5 % 2,049.13
Jumlah Total 18,442.13
Dibulatkan 18,400.00

3,250,000.00
74,220.00
33,600.00
1,200.00
3,359,020.00
78,000.00
108,750.00
12,750.00
8,500.00
208,000.00
Jumlah 3,567,020.00
Keuntungan Max. 12,5 % 445,877.50
Jumlah Total 4,012,897.50
Dibulatkan 4,012,800.00

750,000.00
74,220.00
824,220.00
214,500.00
82,500.00
85.00
13,600.00
310,685.00
Jumlah 1,134,905.00
Keuntungan Max. 12,5 % 141,863.13
Jumlah Total 1,276,768.13
Dibulatkan 1,276,700.00

3,500,000.00
547,624.00
124,380.00
19,800.00
150,000.00
36,000.00
4,377,804.00
25,530.00
12,189.00
2,227.00
39,946.00
Jumlah 4,417,750.00
Keuntungan Max. 12,5 % 552,218.75
Jumlah Total 4,969,968.75
Dibulatkan 4,969,900.00

9,500.00
9,500.00
6,500.00
3,750.00
425.00
425.00
11,100.00
Jumlah 20,600.00
Keuntungan Max. 12,5 % 2,575.00
Jumlah Total 23,175.00
Dibulatkan 23,100.00

3,750.00
1,012.50
85.00
2,800.00

10,400.00 7,647.50
21,000.00
2,550.00
850.00

Jumlah 34,800.00
Keuntungan Max. 12,5 % 42,447.50
Jumlah Total 5,305.94
Dibulatkan 47,753.44
47,700.00
2,250.00
2,752.00
85.00
510.00

10,400.00 5,597.00
21,000.00
2,550.00
850.00

Jumlah 34,800.00
Keuntungan Max. 12,5 % 40,397.00
Jumlah Total 5,049.63
Dibulatkan 45,446.63
45,400.00

152,000.00

650.00 152,000.00
7,500.00
850.00
425.00

Jumlah 9,425.00
Keuntungan Max. 12,5 % 161,425.00
Jumlah Total 20,178.13
Dibulatkan 181,603.13
181,600.00

40,000.00

650.00 40,000.00
7,500.00
850.00
425.00

Jumlah 9,425.00
Keuntungan Max. 12,5 % 49,425.00
Jumlah Total 6,178.13
Dibulatkan 55,603.13
55,600.00

930,000.00

650.00 930,000.00
7,500.00
850.00
425.00

Jumlah 9,425.00
Keuntungan Max. 12,5 % 939,425.00
Jumlah Total 117,428.13
Dibulatkan 1,056,853.13
1,056,800.00

300,000.00

117,000.00 300,000.00
202,500.00
45,900.00
9,350.00

Jumlah 374,750.00
Keuntungan Max. 12,5 % 674,750.00
Jumlah Total 84,343.75
Dibulatkan 759,093.75
759,000.00

7,000.00
472.00
54,200.00
74,000.00

9,000.00 135,672.00
850.00

Jumlah 9,850.00
Keuntungan Max. 12,5 % 145,522.00
Jumlah Total 18,190.25
Dibulatkan 163,712.25
163,700.00

5,750.00
472.00
54,200.00
74,000.00

9,000.00 134,422.00
850.00
Jumlah 9,850.00
Keuntungan Max. 12,5 % 144,272.00
Jumlah Total 18,034.00
Dibulatkan 162,306.00
162,300.00

5,750.00
472.00
54,200.00
74,000.00

9,000.00 134,422.00
850.00

Jumlah 9,850.00
Keuntungan Max. 12,5 % 144,272.00
Jumlah Total 18,034.00
Dibulatkan 162,306.00
162,300.00

15,500.00
472.00
54,200.00
74,000.00

9,000.00 144,172.00
850.00

Jumlah 9,850.00
Keuntungan Max. 12,5 % 154,022.00
Jumlah Total 19,252.75
Dibulatkan 173,274.75
173,200.00

22,750.00
472.00
54,200.00
74,000.00

9,000.00 151,422.00
850.00

Jumlah 9,850.00
Keuntungan Max. 12,5 % 161,272.00
Jumlah Total 20,159.00
Dibulatkan 181,431.00
181,400.00

25,000.00
472.00
54,200.00
74,000.00

9,000.00 153,672.00
850.00

Jumlah 9,850.00
Keuntungan Max. 12,5 % 163,522.00
Jumlah Total 20,440.25
Dibulatkan 183,962.25
183,900.00

36,250.00
472.00
54,200.00
74,000.00

9,000.00 164,922.00
850.00

Jumlah 9,850.00
Keuntungan Max. 12,5 % 174,772.00
Jumlah Total 21,846.50
Dibulatkan 196,618.50
196,600.00

157,500.00
19,278.00
202,500.00
1,536,000.00
61,500.00
74,520.00
3,450.00
118,125.00
126,900.00
6,352.50
124,200.00
33,750.00
9,200.00
Jumlah
Keuntungan Max. 12,5 % 2,473,275.50
Jumlah Total 309,159.44
Dibulatkan 2,782,434.94
2,782,400.00

Jumlah
Harga Satuan
Harga
(Rp)
(Rp)

53,000 106,000
69,000 138,000
69,000 69,000
76,000 22,800
86,000 4,300
TENAGA KERJA 340,100

48,400
60,500,000

6,600,000 1,188,000,000
27,500 2,200,000
14,300 15,730,000
1,716 60,060,000
137,500 20,625,000
148,500 14,850,000
187,000 28,050,000
770 23,100,000
60,000 15,000,000
430,000 86,000,000
62,000 4,960,000
20,000 3,000,000
64,000 3,840,000
HARGA BAHAN 1,525,915

HARGA ALAT

1,866,015
186,602
2,052,617

g tinggi 2 meter
Jumlah
Harga Satuan
Harga
(Rp)
(Rp)

53,000 10,600,000
69,000 27,600,000
76,000 1,520,000
86,000 1,720,000
TENAGA KERJA 41,440

48,400
60,500,000

1,716 #VALUE! 85,800


84,700 101,640
148,500 742,500
187,000 1,683,000
6,600,000 475,200,000
27,500 1,650,000
36,300 #VALUE!
HARGA BAHAN 662,041

HARGA ALAT

703,481
70,348
773,829

mp (12 ± 2) cm, w/c = 0,48

Harga Jumlah
Satuan Harga
(Rp) (Rp)

53,000 111,300,000
69,000 24,150,000
76,000 2,660,000
85 8,925
H TENAGA KERJA 138,119

1,500 672,000,000
106 70,702
139 138,500
11 2,365
H HARGA BAHAN 883,567
,
H HARGA ALAT

1,021,686
102,169
1,123,855

JUMLAH
TOTAL

Rp

199,940.00
0.00
199,940.00
199,900.00

JUMLAH
TOTAL

Rp

199,940.00
0.00
199,940.00
199,900.00
FAKTOR TENAGA KERJA VOLUME
NO INDEX URAIAN

1 PEKERJAAN INSTALASI TITIK LAMPU


Instalasi Titik Lampu

Pemasangan + 10%

2 PEKERJAAN INSTALASI STOP KONTAK


Instalasi Stop Kontak

Pemasangan + 10%

3 PEKERJAAN INSTALASI STOP KONTAK AC


Instalasi Stop Kontak AC

Pemasangan + 10%

4 PEKERJAAN INSTALASI + OUTLET TELEPHONE


Instalasi + Outlet Telephone

Pemasangan + 10%

5 PEKERJAAN INSTALASI TITIK RADAR


Instalasi Radar
Pemasangan + 10%

6 PEKERJAAN INSTALASI Terminal BOX + KABEL ke TERMINAL BOX TELKOM


Instalasi Box + kabel ke terminal box Telkom

Pemasangan + 10%

7 PEKERJAAN INSTALASI SAKLAR TUNGGAL


Instalasi Saklar Tunggal

Pemasangan + 10%

8 PEKERJAAN INSTALASI SAKLAR GANDA


Instalasi Saklar Ganda

Pemasangan + 10%

9 PEKERJAAN INSTALASI SAKLAR HOTEL


Instalasi Saklar Hotel

Pemasangan + 10%

10 PASANG STOP KONTAK


Stop Kontak

Pemasangan + 10%

11 PASANG STOP KONTAK AC


Stop Kontak AC

Pemasangan + 10%

12 PASANG PANEL UTAMA LANTAI 1


Panel Utama Lantai 1

Pemasangan + 10%

13 PASANG PANEL PEMBAGI LANTAI 2


Panel Pembagi Lantai 2

Pemasangan + 10%

14 PASANG PANEL PEMBAGI LANTAI 3


Panel Pembagi Lantai 3

Pemasangan + 10%
15 PASANG FOTOCELL EX CELCON 6A
Fotocell ex celcon 6A

Pemasangan + 10%

16 PASANG ARDE 6m + BC -6
Arde 6 m + BC-6

Pemasangan + 10%

17 PASANG KABEL FEEDER KWH ke LP 1 NYM 3x4


Kabel Feeder KWH ke Lp 1 NYM 3x4

Pemasangan + 10%

18 PASANG KABEL FEEDER LP 1 ke LP 2 NYM 3x2,5


Kabel Feeder Lp 1 ke Lp 2 NYM 3x2.5

Pemasangan + 10%

19 PASANG KABEL FEEDER LP 2 ke LP 2 NYM 3x2,5


Kabel Feeder Lp 2 ke Lp 2 NYM 3x2.5

Pemasangan + 10%
JUMLAH HARGA JUMLAH TOTAL
Rp Rp

136,000.00

13,600.00
149,600.00
Keuntungan Max. 12,5 % 18,700.00
Jumlah Total 168,300.00
Dibulatkan 168,300.00

25,500.00

2,550.00
28,050.00
Keuntungan Max. 12,5 % 3,506.25
Jumlah Total 31,556.25
Dibulatkan 31,500.00

32,000.00

3,200.00
35,200.00
Keuntungan Max. 12,5 % 4,400.00
Jumlah Total 39,600.00
Dibulatkan 39,600.00

475,000.00

47,500.00
522,500.00
Keuntungan Max. 12,5 % 65,312.50
Jumlah Total 587,812.50
Dibulatkan 587,800.00

210,000.00
21,000.00
231,000.00
Keuntungan Max. 12,5 % 28,875.00
Jumlah Total 259,875.00
Dibulatkan 259,800.00

ERMINAL BOX TELKOM


225,000.00

22,500.00
247,500.00
Keuntungan Max. 12,5 % 30,937.50
Jumlah Total 278,437.50
Dibulatkan 278,400.00

18,500.00

1,850.00
20,350.00
Keuntungan Max. 12,5 % 2,543.75
Jumlah Total 22,893.75
Dibulatkan 22,800.00

19,500.00

1,950.00
21,450.00
Keuntungan Max. 12,5 % 2,681.25
Jumlah Total 24,131.25
Dibulatkan 24,100.00

57,500.00

5,750.00
63,250.00
Keuntungan Max. 12,5 % 7,906.25
Jumlah Total 71,156.25
Dibulatkan 71,100.00
18,500.00

1,850.00
20,350.00
Keuntungan Max. 12,5 % 2,543.75
Jumlah Total 22,893.75
Dibulatkan 22,800.00

42,500.00

4,250.00
46,750.00
Keuntungan Max. 12,5 % 5,843.75
Jumlah Total 52,593.75
Dibulatkan 52,500.00

395,000.00

39,500.00
434,500.00
Keuntungan Max. 12,5 % 54,312.50
Jumlah Total 488,812.50
Dibulatkan 488,800.00

395,000.00

39,500.00
434,500.00
Keuntungan Max. 12,5 % 54,312.50
Jumlah Total 488,812.50
Dibulatkan 488,800.00

395,000.00

39,500.00
434,500.00
Keuntungan Max. 12,5 % 54,312.50
Jumlah Total 488,812.50
Dibulatkan 488,800.00
525,000.00

52,500.00
577,500.00
Keuntungan Max. 12,5 % 72,187.50
Jumlah Total 649,687.50
Dibulatkan 649,600.00

33,000.00

3,300.00
36,300.00
Keuntungan Max. 12,5 % 4,537.50
Jumlah Total 40,837.50
Dibulatkan 40,800.00

65,000.00

6,500.00
71,500.00
Keuntungan Max. 12,5 % 8,937.50
Jumlah Total 80,437.50
Dibulatkan 80,400.00

15,000.00

1,500.00
16,500.00
Keuntungan Max. 12,5 % 2,062.50
Jumlah Total 18,562.50
Dibulatkan 18,500.00

15,000.00

1,500.00
16,500.00
Keuntungan Max. 12,5 % 2,062.50
Jumlah Total 18,562.50
Dibulatkan 18,500.00
PERHITNGAN VOLUME DAN RENCANA ANGGARAN BIAYA
PEKERJAAN : STRUKTUR, ARSITEKTUR & MEP
PROYEK : PEMBANGUNAN RUMAH SUSUN MAHASISWA 3 LANTAI UNIVERSITAS BOYOLALI
LOKASI : JL. ADI SUCIPTO 170 KARANG ASEM 57145 KAB. BOYOLALI PROV. JAWA TENGAH

RUMUS
NO URAIAN PEKERJAAN SPESIFIKASI RUMUS
P L T ∑

I. PEKERJAAN PERSIAPAN
1 Pengukuran dan Pemasangan Bouwplank
2 Direksi Keet
3 Papan Nama Proyek

SUB. TOTAL I.

II. PEKERJAAN TANAH DAN PONDASI


1 Galian Tanah Pondasi < 1 m
2 Tipe PC-1 Tx∑X@ 0.75 0.75 0.50 0.28
3 Tipe PC-2 Tx∑X@ 0.75 1.50 0.60 0.68
4 Tipe PC-3 Tx∑X@ 1.40 1.50 0.60 1.26
5 Tipe PC-4 Tx∑X@ 1.50 1.50 0.60 1.35
TOTAL GALIAN TANAH UNTUK PILE CAP
6 Galian Tanah Untuk Sloof PxLxT 17.27 2.50 0.1
7 Urugan Pasir Di Bawah Pile Cap t = 10 Cm Tx∑X@ 0.1 1.26
8 Urugan Pasir Di Bawah Sloof t = 10 Cm PxLxT 17.27 2.50 0.1
9 Lantai Kerja Di Bawah Pile Cap t = 5 Cm Tx∑X@ 0.5 1.26
10 Lantai Kerja Di Bawah Sloof t = 5 Cm PxLxT 17.27 2.50 0.5
11 Urugan Tanah Kembali 1/4xGalian
SUB. TOTAL II.

III. PEKERJAAN STRUKTUR BETON


A. PEKERJAAN PONDASI
1 Pekerjaan Pondasi Bor Pile Dia 80 cm
Pemotongan kepala tiang
Persiapan
Ongkos pengeboran Φ 80 cm
Air suplay
Beton cor K-250
Besi Beton 78.86 Kg/m3
lumpur dan pembuangan
Pemotongan/perapihan kepala tiang bore pile
2 Pile Cap PC 1
Beton Ready Mix Mutu K-350 K-350 PxLxT 0.75 0.75 0.5 0.28
Bekisting Kaso 5/7 + Multi 9mm PxLx@ 1.4 1.4 0.6 4.48
Besi HIJ Setara ∑
Tulangan D16-125 6.0 1.58
Tulangan D16-125 6.0 1.58
3 Tipe PC-2
Beton K-350 PxLxT 0.75 1.5 0.6 0.68
Bekisting Kaso 5/7 + Multi 9mm PxLx@ 1.5 1.5 0.6 2.7
Besi HIJ Setara ∑
Tulangan D16-125 6.0 1.58
Tulangan D19-125 6.0 1.58
4 Tipe PC-3
Beton K-350 PxLxT 1.4 1.5 0.6 1.26
Bekisting Kaso 5/7 + Multi 9mm PxLx@ 2.8 3 0.6 5.04
Besi HIJ Setara ∑
Tulangan D16-125 11.2 1.58
Tulangan D19-125 11.2 1.58
5 Tipe PC-4
Beton K-350 PxLxT 1.5 1.75 0.6 1.575
Bekisting Kaso 5/7 + Multi 9mm PxLx@ 3 3.5 0.6 6.3
Besi beton HIJ Setara ∑
Tulangan D16-125 12 1.58
Tulangan D19-125 12 1.58
6 Sloof (TB1) uk. 25/40
- Beton Ready Mix K-350 PxLxT 300.3 0.25 0.4
- Bekisting Kaso 5/7 + Multi 9mm PxLx@ 600.6 0.5 0.4 120.12
- Besi HIJ Setara ∑
Tulangan Pokok 8 D16 2,402.40 1.58 3,795.79
Tulangan Sengkang D10-100 24,024.00 0.62 14,894.88
TOTAL A
B. PEKRJAAN LANTAI DASAR
1 Kolom Type K1 ( uk. 30/40 )
- Beton Ready Mix Mutu K-350 : K-350 PxLxT 0.3 0.4 3.5 0.42
- Bekisting Kaso 5/7 + Multi 9mm PxLx@ 0.6 0.8 3.5 2.1
-Besi HIJ Setara ∑
Tulangan Pokok 10 D16
Tulangan Sengkang D10-150
2 Kolom Type K2 ( uk. 30/30 )
- Beton Ready Mix Mutu K-350 : K-350 PxLxT 0.3 0.3 3.5 0.315
-Bekisting Kaso 5/7 + Multi 9mm PxLx@ 0.3 0.3 3.5 1.05
-Besi HIJ Setara ∑
Tulangan Pokok 8 D16
Tulangan Sengkang D10-150
3 Tangga 20.00 1.50 6.85
- Beton Ready Mix Mutu K-350 : K-350 ###
1.01 10.28 ###
-Bekisting Kaso 5/7 + Multi 9mm ###
20.55 82.20
-Besi HIJ Setara ### 0.59 11.85 39.16
4 Plat Bordes uk. 20/35
- Beton Ready Mix Mutu K-350 : K-350 4.50 2.35 0.15 1.59
- Bekisting Kaso 5/7 + Multi 9mm 4.50 2.35 0.15 2.06
- Besi HIJ Setara 110.0 65.57 175.55
TOTAL B
C LANTAI 2
1 Balok B1 uk. 25/40
- Beton Ready Mix Mutu K-350 : K-350 PxLxT 0.25 0.4 4.25 0.425
- Bekesting Kaso 5/7 + Multi 9mm PxLx@ 0.25 0.4 4.25 4.46
- Besi HIJ Setara ∑
Tulangan Pokok 8 D16
Tulangan Sengkang D10-150
2 Balok B2 uk. 25/40
- Beton Ready Mix Mutu K-350 : K-350 PxLxT 0.25 0.4 2.05 0.205
- Bekesting Kaso 5/7 + Multi 9mm PxLx@ 0.25 0.4 2.05 2.1525
- Besi HIJ Setara ∑
Tulangan Pokok 8 D16
Tulangan Sengkang D10-150
3 Balok B3 uk. 25/40
- Beton Ready Mix Mutu K-350 : K-350 PxLxT 0.25 0.4 37.5 3.75
- Bekesting Kaso 5/7 + Multi 9mm PxLx@ 0.25 0.4 37.5 39.375
- Besi HIJ Setara ∑
Tulangan Pokok 9 D16
Tulangan Sengkang D10-150
4 Balok B4 uk. 25/40
- Beton Ready Mix Mutu K-350 : K-350 PxLxT 0.25 0.4 2.05 0.205
- Bekesting Kaso 5/7 + Multi 9mm PxLx@ 0.25 0.4 2.05 2.1525
- Besi HIJ Setara ∑
Tulangan Pokok 9 D16
Tulangan Sengkang D10-150
5 Balok B5 uk. 25/40
- Beton Ready Mix Mutu K-350 : K-350 PxLxT 0.3 0.5 6.25 0.9375
- Bekesting Kaso 5/7 + Multi 9mm PxLx@ 0.3 0.5 6.25 8.125
- Besi HIJ Setara ∑
Tulangan Pokok 10 D16
Tulangan Sengkang D10-150
6 Plat Beton Tebal 13 cm
- Beton Ready Mix Mutu K-350 : K-350 PxLxT 59.25 17.6 0.12
- Bekesting Kaso 5/7 + Multi 9mm PxLx@
- Pembesian U-24 ( Ф8-150 Double ) : HIJ Setara ∑
Pekerjaan Kolom :
8 Kolom Type K1 ( uk. 30/40 )
- Beton Ready Mix Mutu K-350 : K-350 PxLxT 0.3 0.4 4.25 0.51
- Bekisting Kaso 5/7 + Multi 9mm PxLx@ 0.3 0.4 4.25 5.95
-Besi HIJ Setara ∑
Tulangan Pokok 10 D16
Tulangan Sengkang D10-150
Pekerjaan Tangga :
9 Tangga (Lantai 2 ke Lantai 3)
- Beton Ready Mix Mutu K-350 : K-350 4.5 2.35 0.15 1.59
-Bekisting Kaso 5/7 + Multi 9mm 4.5 2.35 0.15 2.06
-Besi HIJ Setara 109.98 65.565 175.55
10 Plat Bordes uk. 20/35
- Beton Ready Mix Mutu K-350 : K-350 1.5 0.25 0.4 0.15
- Bekisting Kaso 5/7 + Multi 9mm 3.00 0.5 0.4 3.2
- Besi HIJ Setara 9.00 1.58 14.22
TOTAL C
D. LANTAI 3
1 Balok B1 uk. 25/40
- Beton Ready Mix Mutu K-350 : K-350 PxLxT 0.25 0.4 4.25 0.425
- Bekesting Kaso 5/7 + Multi 9mm PxLx@ 0.25 0.4 4.25 4.46
- Besi HIJ Setara ∑
Tulangan Pokok 8 D16
Tulangan Sengkang D10-150
2 Balok B2 uk. 25/40
- Beton Ready Mix Mutu K-350 : K-350 PxLxT 0.25 0.4 2.05 0.205
- Bekesting Kaso 5/7 + Multi 9mm PxLx@ 0.25 0.4 2.05 2.15
- Besi HIJ Setara ∑
Tulangan Pokok 8 D16
Tulangan Sengkang D10-150
3 Balok B3 uk. 25/40
- Beton Ready Mix Mutu K-350 : K-350 PxLxT 0.25 0.4 3.75 0.375
- Bekesting Kaso 5/7 + Multi 9mm PxLx@ 0.25 0.4 3.75 3.9375
- Besi HIJ Setara ∑
Tulangan Pokok 9 D16
Tulangan Sengkang D10-150
4 Balok B4 uk. 25/40
- Beton Ready Mix Mutu K-350 : K-350 PxLxT 0.25 0.4 2.05 0.205
- Bekesting Kaso 5/7 + Multi 9mm PxLx@ 0.25 0.4 2.05 2.1525
- Besi HIJ Setara ∑
Tulangan Pokok 9 D16
Tulangan Sengkang D10-150
5 Balok B5 uk. 25/40
- Beton Ready Mix Mutu K-350 : K-350 PxLxT 0.3 0.5 6.25 0.9375
- Bekesting Kaso 5/7 + Multi 9mm PxLx@ 0.3 0.5 6.25 8.125
- Besi HIJ Setara ∑
Tulangan Pokok 10 D16
Tulangan Sengkang D10-150
6 Plat Beton Tebal 13 cm
- Beton Ready Mix Mutu K-350 : K-350
- Bekisting Kaso 5/7 + Multi 9mm
- Besi HIJ Setara
Pekerjaan Kolom :
7 Kolom Type K1 ( uk. 30/40 )
- Beton Ready Mix Mutu K-350 : K-350 PxLxT 0.3 0.4 3.2 0.384
- Bekisting Kaso 5/7 + Multi 9mm PxLx@ 0.3 0.4 3.2 4.48
-Besi HIJ Setara ∑
Tulangan Pokok 10 D16
Tulangan Sengkang D10-150
8 Tangga (Lantai 2 ke Lantai 3)
- Beton Ready Mix Mutu K-350 : K-350 4.5 2.35 0.15 1.59
-Bekisting Kaso 5/7 + Multi 9mm 4.5 2.35 0.15 2.06
-Besi HIJ Setara 109.98 65.565 175.55
9 Plat Bordes uk. 20/35
- Beton Ready Mix Mutu K-350 : K-350 1.5 0.25 0.4 0.15
- Bekisting Kaso 5/7 + Multi 9mm 3.00 0.5 0.4 3.2
- Besi HIJ Setara 9.00 1.58 10.58
TOTAL D
E. LANTAI DAK/JEMUR
1 Balok B1 uk. 25/40
- Beton Ready Mix Mutu K-350 : K-350 PxLxT 0.25 0.4 4.25 0.425
- Bekesting Kaso 5/7 + Multi 9mm PxLx@ 0.25 0.4 4.25 4.4625
- Besi HIJ Setara ∑
Tulangan Pokok 7 D16
Tulangan Sengkang D10-150
2 Balok B2 uk. 25/40
- Beton Ready Mix Mutu K-350 : K-350 PxLxT 0.25 0.4 2.05 0.205
- Bekesting Kaso 5/7 + Multi 9mm PxLx@ 0.25 0.4 2.05 2.1525
- Besi HIJ Setara ∑
Tulangan Pokok 7 D16
Tulangan Sengkang D10-150
3 Balok B3 uk. 25/40
- Beton Ready Mix Mutu K-350 : K-350 PxLxT 0.25 0.4 3.75 0.375
- Bekesting Kaso 5/7 + Multi 9mm PxLx@ 0.25 0.4 3.75 3.9375
- Besi HIJ Setara ∑
Tulangan Pokok 7 D16
Tulangan Sengkang D10-150
4 Balok B4 uk. 25/40
- Beton Ready Mix Mutu K-350 : K-350 PxLxT 0.25 0.4 2.05 0.205
- Bekesting Kaso 5/7 + Multi 9mm PxLx@ 0.25 0.4 2.05 2.1525
- Besi HIJ Setara ∑
Tulangan Pokok 9 D16
Tulangan Sengkang D10-150
5 Balok B5 uk. 25/40
- Beton Ready Mix Mutu K-350 : K-350 PxLxT 0.3 0.5 6.25 0.9375
- Bekesting Kaso 5/7 + Multi 9mm PxLx@ 0.3 0.5 6.25 8.125
- Besi HIJ Setara ∑
Tulangan Pokok 9 D16
Tulangan Sengkang D10-150
6 Plat Beton Tebal 13 cm
- Beton Ready Mix Mutu K-350 : K-350
- Bekisting Kaso 5/7 + Multi 9mm
- Besi HIJ Setara
TOTAL E
SUB TOTAL III

IV. PEKERJAAN ATAP


1 Atap genteng metal T=0.35 MM
2 Nok genteng (termasuk jurai)
3 Lisplang GRC tebal 9 mm lebar 30 cm
4 Rangka Atap Baja Ringan
SUB TOTAL IV

V. PEKERJAAN DINDING
A. LANTAI DASAR
1 Pasangan dinding bata merah 1:5 termasuk tangga & dinding shaft
2 Pasangan dinding bata merah penahan tanah urugan keliling bangunan tinggi 60 cm
3 Pasangan dinding kamar mandi trasram 1:3
4 Plester dinding kamar mandi trasram 1:3
5 Plester + aci dinding bata merah
6 Kolom praktis & balok praktis 11/11 termasuk opening kusen aluminium
7 Perapihan kolom beton
8 Perapihan pelat beton bawah tangga + bordes
9 Perapihan balok beton + balok tangga + balustrade
10 Pas. besi Black Steel railling dengan kaki pada tga tengah dan tga samping dia. 2 1/2" finish cat (terpasang)
11 Pas. besi Black Steel railling yang nempel di dinding pada tga tengah dan tga samping dia. 2 1/2" finish cat (terpasang)
12 Pasang dudukan railling tangga tengah dan tangga samping
13 Pas. Plint Keramik 10x40 dinding corridor/selasar dan unit kamar
14 Pas. Tralis R. Jemur Black Steel Railing dia. 2 1/2" finish cat (terpasang)
15 Perapihan topi jendela
16 Cor topi jendela t= 8 cm (termasuk bekisting dan pembesian Φ 8 - 200 rangkap)
TOTAL A
B. LANTAI 2
1 Pasangan dinding bata merah 1:5 termasuk tangga & dinding shaft
2 Plester + aci dinding bata merah
3 Pasangan dinding kamar mandi trasram 1:3
4 Plester dinding kamar mandi trasram 1:3
5 Kolom praktis & balok praktis 11/11 termasuk opening kusen aluminium
6 Perapihan kolom beton
7 Perapihan pelat beton bawah tangga + bordes
8 Perapihan balok beton + balok tangga + balustrade
9 Pas. besi Black Steel railling dengan kaki pada tga tengah dan tga samping dia. 2 1/2" finish cat (terpasang)
10 Pas. besi Black Steel railling yang nempel di dinding pada tga samping dia.2 1/2" finish cat (terpasang)
11 Pasang dudukan railling tangga tengah dan tangga samping
12 Pas. Plint Keramik 10x40 dinding corridor/selasar dan unit kamar
13 Pas. Tralis R. Jemur Black Steel Railing dia. 2 1/2" finish cat (terpasang)
14 Pas. Tralis utama cor beton Dia 2.5" + frame balok beton 11x11 + railling besi 2.5" + cat (Balkon)
15 Perapihan topi jendela
16 Cor topi jendela t= 8 cm (termasuk bekisting dan pembesian Φ 8 - 200 rangkap)
TOTAL B
C. LANTAI 3
1 Pasangan dinding bata merah 1:5 termasuk tangga & dinding shaft
2 Plester + aci dinding bata merah
3 Pasangan dinding kamar mandi trasram 1:3
4 Plester dinding kamar mandi trasram 1:3
5 Kolom praktis & balok praktis 11/11 termasuk opening kusen aluminium
6 Perapihan kolom beton
7 Perapihan pelat beton bawah tangga + bordes
8 Perapihan balok beton + balok tangga + balustrade
9 Pas. besi Black Steel railling dengan kaki pada tga tengah dan tga samping dia. 2 1/2" finish cat (terpasang)
10 Pas. besi Black Steel railling yang nempel di dinding pada tga samping dia.2 1/2" finish cat (terpasang)
11 Pasang dudukan railling tangga tengah dan tangga samping
12 Pas. Plint Keramik 10x40 dinding corridor/selasar dan unit kamar
13 Pas. Tralis R. Jemur Black Steel Railing dia. 2 1/2" finish cat (terpasang)
14 Pas. Tralis utama cor beton Dia 2.5" + frame balok beton 11x11 + railling besi 2.5" + cat (Balkon)
15 Perapihan topi jendela
16 Cor topi jendela t= 8 cm (termasuk bekisting dan pembesian Φ 8 - 200 rangkap)
TOTAL C
D. LANTAI DAK
SUB TOTAL V

VI. PEKERJAAN LANTAI


A. LANTAI DASAR
1 Pasang keramik lantai termasuk selasar + Entrance 40x40
2 Pasang keramik tangga 40x40
3 Pasang Step nozing 10 x 40 cm
4 Pasang lantai keramik km/wc + Janitor 30x30
5 Pasang keramik dinding km/wc 30x30 + Janitor
6 Border keramik dinding 15x30
7 Waterproofing (liquid/cement base) di daerah km/wc T = 25 cm
8 Waterproofing (liquid/cement base) di daerah lantai T. Jemur, termasuk dinding T = 15 cm
9 Waterproofing (liquid/cement base) + screed pada canopy jendela

B. LANTAI 2
1 Pasang lantai keramik km/wc + Janitor 30x30
2 Pasang keramik dinding km/wc 30x30 + Janitor
3 Border keramik dinding 15x30
4 Pasang keramik lantai 40x40 area unit, lobby dan selasar
5 Pasang keramik tangga 40x40
6 Pasang Step nozing 10 x 40 cm
7 Waterproofing (bitumen) tahap 1 di atas lantai beton
8 Trasram pengisi lantai daerah km/wc T = 20 cm + peninggian closet T = 20 cm
9 Waterproofing (liquid/cement base) tahap 2 di atas peninggian km/wc
10 Waterproofing (liquid/cement base) di daerah km/wc pada dinding T = 25 cm
11 Waterproofing (liquid/cement base) di daerah lantai T. Jemur, termasuk dinding T = 15 cm
12 Waterproofing (liquid/cement base) + screed pada canopy jendela

C. LANTAI 3
1 Pasang lantai keramik km/wc + Janitor 30x30
2 Pasang keramik dinding km/wc 30x30 + Janitor
3 Border keramik dinding 15x30
4 Pasang keramik lantai 40x40 area unit, lobby dan selasar
5 Pasang keramik tangga 40x40
6 Pasang Step nozing 10 x 40 cm
7 Waterproofing (bitumen) tahap 1 di atas lantai beton
8 Trasram pengisi lantai daerah km/wc T = 20 cm + peninggian closet T = 20 cm
9 Waterproofing (liquid/cement base) tahap 2 di atas peninggian km/wc
10 Waterproofing (liquid/cement base) di daerah km/wc pada dinding T = 25 cm
11 Waterproofing (liquid/cement base) di daerah lantai T. Jemur, termasuk dinding T = 15 cm
12 Waterproofing (liquid/cement base) + screed pada canopy jendela

D. LANTAI DAK
SUB TOTAL VI

VII. PEKERJAAN KUSEN, PINTU DAN JENDELA


A. LANTAI DASAR
1 Rangka hollow 40.40.1,2 + Daun Pintu calsiboard (terpasang) type PS
2 Kusen Aluminium + Daun Pintu Engeirng wood t=4 cm (terpasang) type P1' (hunian)
3 Kusen Aluminium + Daun Pintu kaca t=6 mm + Jendela (terpasang) type PJ1
4 Kusen Aluminium + Daun Pintu kaca t=6 mm + Jendela (terpasang) type PJ2
5 Kusen Aluminium + Daun Pintu kaca t=6 mm + Jendela (terpasang) type PJ3
6 Kusen PVC + Daun Pintu PVC klas 1/super (terpasang) Kamar Mandi P3' dan P3
7 Kusen Aluminium + Daun Pintu kaca t=6 mm (terpasang) type P2
8 Kusen Aluminium + Daun Pintu PVC klas 1/super (terpasang) type P4
9 Kusen Aluminium + Daun jendela (terpasang) type J1
10 Pintu Baja area gerobak sampah type PB
11 Bouvenlight BV1
12 Pintu Shaft PS'
TOTAL A
B. LANTAI 2
1 Rangka hollow 40.40.1,2 + Daun Pintu calsiboard (terpasang) type PS
2 Kusen Aluminium + Daun Pintu Engeirng wood t=4 cm (terpasang) type P1' (hunian)
3 Kusen Aluminium + Daun Pintu kaca t=6 mm + Jendela (terpasang) type PJ4
4 Kusen PVC + Daun Pintu PVC klas 1/super (terpasang) Kamar Mandi P3' dan P3
5 Kusen Aluminium + Daun Pintu PVC klas 1/super (terpasang) type P4
6 Kusen Aluminium + Daun jendela (terpasang) type J1
7 Kusen Aluminium + Daun jendela (terpasang) type J2
8 Bouvenlight BV1
9 Pintu Shaft PS'
TOTAL B
C. LANTAI 3
1 Rangka hollow 40.40.1,2 + Daun Pintu calsiboard (terpasang) type PS
2 Kusen Aluminium + Daun Pintu Engeirng wood t=4 cm (terpasang) type P1' (hunian)
3 Kusen Aluminium + Daun Pintu kaca t=6 mm + Jendela (terpasang) type PJ4
4 Kusen PVC + Daun Pintu PVC klas 1/super (terpasang) Kamar Mandi P3' dan P3
5 Kusen Aluminium + Daun Pintu PVC klas 1/super (terpasang) type P4
6 Kusen Aluminium + Daun jendela (terpasang) type J1
7 Bouvenlight BV1
8 Pintu Shaft PS'
TOTAL C
SUB TOTAL VII

VIII. PEKERJAAN PLAFOND


A. LANTAI DASAR
1 Penutup plafond Gypsum T=9 MM + rangka metal furring uk 60x120 cm
2 List plafond gypsum 5/5
3 Plafond kamar mandi calsiboard 6 mm + rangka metal furing 60x120 cm
TOTAL A
B. LANTAI 2
1 Penutup plafond Gypsum T=9 MM + rangka metal furring uk 60x120 cm
2 List plafond gypsum 5/5
3 Plafond kamar mandi calsiboard 6 mm + rangka metal furing 60x120 cm
TOTAL B
C. LANTAI TIGA
1 Penutup plafond Gypsum T=9 MM + rangka metal furring uk 60x120 cm
2 List plafond gypsum 5/5
3 Plafond kamar mandi calsiboard 6 mm + rangka metal furing 60x120 cm
TOTAL C
SUB TOTAL VIII

IX. PEKERJAAN PENGECETAN


A. LANTAI DASAR
1 Cat dinding bag. Luar termasuk kolom (exterior)
2 Cat dinding bag. Luar termasuk kolom (interior)
3 Cat balok beton + pelat bawah tangga
4 Cat plafond
5 Cat list plafond
6 Cat topi beton

B. LANTAI 2
1 Cat dinding bag. Luar termasuk kolom (exterior)
2 Cat dinding bag. Luar termasuk kolom (interior)
3 Cat balok beton + pelat bawah tangga
4 Cat Atap Entrance + Kolom
5 Cat plafond
6 Cat list plafond
7 Cat topi beton

C. LANTAI 3
1 Cat dinding bag. Luar termasuk kolom (exterior)
2 Cat dinding bag. Luar termasuk kolom (interior)
3 Cat balok beton + pelat bawah tangga
4 Cat plafond
5 Cat list plafond
6 Cat topi beton

SUB TOTAL IX

X. PEKERJAAN SANITAIR
A. LANTAI DASAR
1 Pasang closet duduk type standart (lengkap terpasang)
2 Pasang kran 0,5"
3 Pasang shower + kran type double (terpasang)
4 Pasangan floor drain stainless
5 Westafel
6 Meja dapur + keramik
7 Kitchen zing + kran
8 Urinoir

B. LANTAI 2
1 Pasang closet duduk type standart (lengkap terpasang)
2 Pasang kran 0,5"
3 Pasang shower + kran type double (terpasang)
4 Pasangan floor drain stainless
5 Westafel
6 Meja dapur + keramik
7 Kitchen zing + kran
C. LANTAI 3
1 Pasang closet duduk type standart (lengkap terpasang)
2 Pasang kran 0,5"
3 Pasang shower + kran type double (terpasang)
4 Pasangan floor drain stainless
5 Westafel
6 Meja dapur + keramik
7 Kitchen zing + kran

SUB TOTAL X

XI. PEKERJAAN INSTALASI LISTRIK


A. LANTAI DASAR
1 Pekerjaan PLN @
2 - Biaya Pemasangan ( BP) @
3 - Uang Jaminan Langganan ( UJL)
4 - Sertifikasi Laik Operasi ( SL O ) Jaminan Instalasi Gambar
5 - Kabel Tray W200 x H100 @
6 - Elbow W200 x H100 @
7 - TL 1 x 36 W, TL Balk Type @
8 - TL 1 x 36 W, TL Balk Type c/w battery charger @
9 - Lampu baret isi TL Bulat-32 watt c/w battery charger @
10 - Lampu Downlight 8 Watt @
11 - Lampu Downlight 8 Watt c/w battery charger @
12 - Stop Kontak 1P, 220 Volt, 13A, Wall Type @
13 - Saklar 1 gang @
14 - Saklar 2 gang @
15 - Saklar Hotel @
16 - NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu @
17 - NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak @

B. LANTAI 2
1 - Kabel Tray W200 x H100 @
2 - Elbow W200 x H100 @
3 - TL 1 x 36 W, TL Balk Type @
4 - TL 1 x 36 W, TL Balk Type c/w battery charger @
5 - Lampu baret isi TL Bulat-32 watt c/w battery charger @
6 - Lampu Downlight 8 Watt @
7 - Lampu Downlight 8 Watt c/w battery charger @
8 - Stop Kontak 1P, 220 Volt, 13A, Wall Type @
9 - Saklar 1 gang @
10 - Saklar 2 gang @
11 - Saklar Hotel @
12 - NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu @
13 - NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak @

C. LANTAI 3
1 - Kabel Tray W200 x H100 @
2 - Elbow W200 x H100 @
3 - TL 1 x 36 W, TL Balk Type @
4 - TL 1 x 36 W, TL Balk Type c/w battery charger @
5 - Lampu baret isi TL Bulat-32 watt c/w battery charger @
6 - Lampu Downlight 8 Watt @
7 - Lampu Downlight 8 Watt c/w battery charger @
8 - Stop Kontak 1P, 220 Volt, 13A, Wall Type @
9 - Saklar 1 gang @
10 - Saklar 2 gang @
11 - Saklar Hotel @
12 - NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu @
13 - NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak @

SUB TOTAL XI

XII. PEK. PLUMBING (INSTALASI AIR BERSIH, AIR KOTOR)


1. Pek. Instalasi Air Bersih
A. LANTAI DASAR
1 - PVC AW dia. 15 P 120.00
2 - PVC AW dia. 20 P 100.00
3 - PVC AW dia. 25 P 6.00
4 - PVC AW dia. 40 P 52.00
5 - PVC AW dia. 50 (Riser dari Tangki Air Atas) P 30.00
6 - PVC AW dia. 50 (Riser ke tanki air atas) P 32.00
7 Peralatan Katup-katup
8 (Ball Valve & Gate Valve)
9 - dia. 40 P 4.00
10 - dia. 20 P 2.00

B. LANTAI 2
1 - PVC AW dia. 15 P 120.00
2 - PVC AW dia. 20 P 56.00
3 - PVC AW dia. 25 P 6.00
4 - PVC AW dia. 40 P 52.00
5 - PVC AW dia. 50 (Riser dari Tangki Air Atas) P 20.00
6 Peralatan Katup-katup
7 (Ball Valve & Gate Valve)
8 - dia. 40 P 4.00

C. LANTAI 3
1 - PVC AW dia. 15 P 120.00
2 - PVC AW dia. 20 P 56.00
3 - PVC AW dia. 25 P 6.00
4 - PVC AW dia. 40 P 52.00
5 - PVC AW dia. 50 (Riser dari Tangki Air Atas) P 20.00
6 Peralatan Katup-katup
7 (Ball Valve & Gate Valve)
8 - dia. 40 P 4.00
2. Pek. Instalasi Air Kotor
A. LANTAI DASAR
1 - dia. 150 ( horisontal pipa air kotor ) P 38.00
2 - dia. 100 ( horisontal pipa air bekas ) P 42.00
3 - dia. 150 ( riser pipa air kotor ) P 30.00
4 - dia. 100 ( riser pipa air bekas ) P 30.00
5 - dia. 100 P 27.00
6 - dia. 80 P 40.00
7 - dia. 50 P 44.00
8 Floor Drain (FD)
9 - FD, dia. 50 P 34.00
10 Clean Out (CO)
11 - CO, dia. 150 P 4.00
12 - CO, dia. 100 P 6.00
13 - CO, dia. 80 P 2.00

B. LANTAI 2
1 - dia. 150 ( riser pipa air kotor ) P 20.00
2 - dia. 100 ( riser pipa air bekas ) P 20.00
3 - dia. 100 P 27.00
4 - dia. 80 P 40.00
5 - dia. 50 P 44.00
6 Floor Drain (FD)
7 - FD, dia. 50 P 34.00

C. LANTAI 3
1 - dia. 150 ( riser pipa air kotor ) P 10.00
2 - dia. 100 ( riser pipa air bekas ) P 10.00
3 - dia. 100 P 27.00
4 - dia. 80 P 40.00
5 - dia. 50 P 44.00
6 Floor Drain (FD)
7 - FD, dia. 50 P 34.00

SUB TOTAL XII


TOTAL
VOL. PEKERJAAN
HARGA SATUAN JUMLAH SUB. TOTAL BOBOT
@ JUMLAH SAT.

156.00 M' 152,700.00 23,821,200.00


16.00 M
2 2,052,616.50 32,841,864.00
1.00 Ls 300,000.00 300,000.00

56,963,064.00 0.77

9.00 1.27 m3
55.00 22.28 m3
6.00 4.54 m3
15.00 12.15 m3
85.00 40.23 m3 43,300.00 1,741,812.86
4.32 m3 43,300.00 186,947.75
85.00 10.71 m3 191,600.00 2,052,036.00
4.32 m3 191,600.00 827,233.00
85.00 53.55 m3 116,600.00 6,243,930.00
21.59 m3 116,600.00 2,517,102.50
11.14 m3 147,000.00 1,636,996.59
15,206,058.71 0.205
975.20 m3
212.00 nos
1.00 Ls 5,000,000.00 5,000,000.00
975.20 m' 300,000.00 292,560,000.00
1.00 ls 1,000,000.00 1,000,000.00
275.84 m3 803,950.00 221,761,568.00
21,752.72 kg 11,200.00 243,630,464.00
275.84 m3 60,000.00 16,550,400.00
212.00 ttk 60,600.00 12,847,200.00

9.0 1.26 m3 1,123,854.52 1,416,056.69


9.0 24.2 M
2 153,790.00 3,720,487.68

9.0 85.21 Kg 11,200.00 954,374.40


9.0 85.21 Kg 11,200.00 954,374.40

55.00 22.275 m3 1,123,854.52 25,033,859.38


55.00 89.1 M
2 153,790.00 13,702,689.00

55.00 520.74 Kg 11,200.00 5,832,288.00


55.00 520.74 Kg 11,200.00 5,832,288.00

6.00 4.536 m3 1,123,854.52 5,097,804.09


6.00 18.144 m2 153,790.00 2,790,365.76

6.00 106.04 Kg 11,200.00 1,187,665.92


6.00 106.04 Kg 11,200.00 1,187,665.92

15.00 14.175 m3 1,123,854.52 15,930,637.79


15.00 56.7 m2 153,790.00 8,719,893.00
15.00 284.04 Kg 11,200.00 3,181,248.00
15.00 284.04 Kg 11,200.00 3,181,248.00

1.00 30.03 m3 1,123,854.52 33,749,351.16


1.00 240.24 m2 153,790.00 36,946,509.60

1.00 3,795.79 Kg 11,200.00 42,512,870.40


1.00 14,894.88 Kg 11,200.00 166,822,656.00
1,172,103,965.19

78.00 32.76 m3 1,123,854.52 36,817,473.99


78.00 327.6 m2 153,790.00 50,381,604.00

4,308 Kg 11,200.00 48,248,928.00


1,459.82 Kg 11,200.00 16,350,006.40

2 0.63 m3 1,123,854.52 708,028.35


2 4.2 m2 153,790.00 645,918.00

88.37 Kg 11,200.00 989,721.60


31.67 Kg 11,200.00 354,733.87

11.28 m3 1,123,854.52 12,680,450.52


106.86 m2 153,790.00 16,433,999.40
39.16 Kg 11,200.00 438,639.60

1.74 m3 1,123,854.52 1,951,292.41


2.06 m2 153,790.00 316,038.45
175.55 Kg 11,200.00 1,966,104.00
188,282,938.58
96 40.8 m3 1,123,854.52 45,853,264.31
96 428.4 m2 153,790.00 65,883,636.00

3862.94 Kg 11,200.00 43,264,928.00


1880.83 Kg 11,200.00 21,065,296.00

28 5.74 m3 1,123,854.52 67,734,711.77


28 60.27 m2 153,790.00 9,268,923.30

530 Kg 11,200.00 5,938,330


236 Kg 11,200.00 2,643,200

2 7.5 m3 1,123,854.52 8,428,909


2 78.75 m2 153,790.00 12,110,963

83 Kg 11,200.00 927,864
34 Kg 11,200.00 383,309

14 2.87 m3 1,123,854.52 3,225,462


14 30.135 m2 153,790.00 4,634,462

317 Kg 11,200.00 3,550,624


193 Kg 11,200.00 2,158,195

4 3.75 m3 1,123,854.52 4,214,454.44


4 32.5 m2 153,790.00 4,998,175.00

316 Kg 11,200.00 3,534,720.00


148 Kg 11,200.00 1,652,672.00

110 m3 1,123,854.52 123,361,014.97


1,004 m2 153,790.00 154,462,831.25
15,013 Kg 11,200.00 168,143,852.80

78 39.78 m3 1,123,854.52 44,706,932.71


78 464.1 m2 153,790.00 71,373,939.00

5231.07 Kg 11,200.00 58,587,984.00


1781.26 Kg 11,200.00 19,950,112.00

1.74 m3 1,123,854.52 1,951,292.41


2.06 m2 153,790.00 316,038.45
175.55 Kg 11,200.00 1,966,104.00

1.00 0.15 m3 1,123,854.52 168,578.18


1.00 3.2 m2 153,790.00 492,128.00
1.00 14.22 Kg 11,200.00 159,264.00
957,112,169.68

81 34.425 m3 1,123,854.52 38,688,691.76


81 361.46 m2 153,790.00 55,589,317.88

3259.36 Kg 11,200.00 36,504,820.80


1586.95 Kg 11,200.00 17,773,862.40

25 5.125 m3 1,123,854.52 5,759,754.40


25 53.8125 m2 153,790.00 8,275,824.38

485.235 Kg 11,200.00 5,434,632.00


217 Kg 11,200.00 2,430,400.00
2 0.75 m3 1,123,854.52 842,890.89
2 7.875 m2 153,790.00 1,211,096.25

82.85 Kg 11,200.00 927,864.00


34.22 Kg 11,200.00 383,308.80

14 2.87 m3 1,123,854.52 3,225,462.47


14 30.135 m2 153,790.00 4,634,461.65

317.02 Kg 11200.00 3,550,626.24


192.70 Kg 11200.00 2,158,195.20

4 3.75 m3 1,123,854.52 4,214,454.44


4 32.5 m2 153,790.00 4,998,175.00

315.6 Kg 11,200.00 3,534,720.00


147.56 Kg 11,200.00 1,652,672.00

109.77 m3 1,123,854.52 123,361,014.97


1004.38 m2 153,790.00 154,462,831.25
15012.84 Kg 11,200.00 168,143,852.80

78 29.952 m3 1,123,854.52 33,661,690.51


78 349.44 m2 153,790.00 53,740,377.60

3938.69 Kg 11,200.00 44,113,305.60


1334.69 Kg 11,200.00 14,948,577.28

1.74 m3 1,123,854.52 1,951,292.41


2.06 m2 153,790.00 316,038.45
175.55 Kg 11,200.00 1,966,104.00

1.00 0.15 m3 1,123,854.52 168,578.18


1.00 3.2 m2 153,790.00 492,128.00
1.00 10.58 Kg 11,200.00 118,496.00
799,235,517.59

95 40.38 m3 1,123,854.52 45,375,626.14


95 423.94 m2 153,790.00 65,197,348.13

3185.59 Kg 11,200.00 35,678,580.00


1861.24 Kg 11,200.00 20,845,888.00

26 5.33 m3 1,123,854.52 5,990,144.58


26 55.965 m2 153,790.00 8,606,857.35

420.537 Kg 11,200.00 4,710,014.40


225.68 Kg 11,200.00 2,527,616.00

2 0.75 m3 1,123,854.52 8,850,354.33


2 7.88 m2 153,790.00 1,211,096.25

59.18 Kg 11,200.00 662,760.00


34.22 Kg 11,200.00 383,308.80

14 2.87 m3 1,123,854.52 3,225,462.47


14 30.135 m2 153,790.00 4,634,461.65

317.02 Kg 11,200.00 3,550,626.24


192.70 Kg 11,200.00 2,158,195.20
4 3.75 m3 1,123,854.52 4,214,454.44
4 32.5 m2 153,790.00 4,998,175.00

276.15 Kg 11,200.00 3,092,880.00


147.56 Kg 11,200.00 1,652,672.00

88.91 m3 1,123,854.52 99,921,905.15


1004.38 m2 153,790.00 154,462,831.25
15012.84 Kg 11,200.00 168,143,852.80
650,095,110.17
3,766,829,701.21 50.87

818.30 M2 176,750.00 144,634,525.00


150.00 M' 166,650.00 24,997,500.00
258.20 M' 108,070.00 27,903,674.00
818.30 M2 166,650.00 136,369,695.00
333,905,394.00 4.51

979.90 M2 ### 91,556,309.77


72.84 M2 ### 6,805,757.33
123.24 M2 90,734.34 11,182,100.06
246.48 M2 27,969.14 6,893,833.63
1959.79 M2 49,001.60 96,032,845.66
4.01 M3 2,626,000.00 10,530,260.00
90.62 M2 75,750.00 6,864,465.00
43.28 M2 75,750.00 3,278,460.00
14.20 M2 75,750.00 1,075,650.00
18.00 M 424,200.00 7,635,600.00
39.00 M 196,950.00 7,681,050.00
21.00 Bh 35,350.00 742,350.00
670.30 M 49,756.97 33,352,096.99
4.00 unit 2,525,000.00 10,100,000.00
121.00 M 75,750.00 9,165,750.00
6.12 M3 3,535,000.00 21,634,200.00
324,530,728.44

954.43 M2 93,434.34 89,176,537.13


1908.86 M2 49,001.60 93,537,194.18
136.08 M2 90,734.34 12,347,128.99
272.16 M2 27,969.14 7,612,081.14
5.32 M3 2,626,000.00 13,970,320.00
90.62 M2 75,750.00 6,864,465.00
43.28 M2 75,750.00 3,278,460.00
14.20 M2 75,750.00 1,075,650.00
18.00 M1 424,200.00 7,635,600.00
39.00 M1 196,950.00 7,681,050.00
21.00 Bh 35,350.00 742,350.00
677.80 M1 49,756.97 33,725,274.27
4.00 unit 2,525,000.00 10,100,000.00
1.00 unit 5,050,000.00 5,050,000.00
121.00 M1 75,750.00 9,165,750.00
6.12 M3 3,535,000.00 21,634,200.00
323,596,060.70

954.43 M2 93,434.34 89,176,537.13


1908.86 M2 49,001.60 93,537,194.18
136.08 M2 90,734.34 12,347,128.99
272.16 M2 27,969.14 7,612,081.14
5.32 M3 2,626,000.00 13,970,320.00
90.62 M2 75,750.00 6,864,465.00
43.28 M2 75,750.00 3,278,460.00
14.20 M2 75,750.00 1,075,650.00
6.00 M1 424,200.00 2,545,200.00
13.00 M1 196,950.00 2,560,350.00
8.00 Bh 35,350.00 282,800.00
677.80 M1 49,756.97 33,725,274.27
4.00 unit 2,525,000.00 10,100,000.00
1.00 unit 5,050,000.00 5,050,000.00
121.00 M1 75,750.00 9,165,750.00
6.12 M3 3,535,000.00 21,634,200.00
312,925,410.70

649,763,785.73 8.77

778.25 M2 165,782.17 129,019,973.80


63.75 M2 165,782.17 10,568,613.34
100.8 M' 49,756.97 5,015,502.58
61.2 M2 160,429.17 9,818,265.20
228.83 M2 176,236.90 40,328,289.83
128.2 M' 53,291.97 6,832,030.55
58.2 M2 60,600.00 3,526,920.00
78.64 M2 60,600.00 4,765,584.00
45.78 M2 95,011.70 4,349,635.63
214,224,814.93

77.4 M2 160,429.17 12,417,217.76


299.33 M2 176,236.90 52,752,991.28
180.3 M' 53,291.97 9,608,542.19
714.23 M2 165,782.17 118,406,599.28
63.75 M2 165,782.17 10,568,613.34
91.2 M' 49,756.97 4,537,835.66
77.4 M2 176,750.00 13,680,450.00
45.36 M2 121,403.48 5,506,861.85
77.4 M2 60,600.00 4,690,440.00
74.4 M2 60,600.00 4,508,640.00
78.64 M2 60,600.00 4,765,584.00
45.78 M2 95,011.70 4,349,635.63
245,793,410.99

77.4 M2 160,429.17 12,417,217.76


299.33 M2 176,236.90 52,752,991.28
180.3 M' 53,291.97 9,608,542.19
714.23 M2 165,782.17 118,406,599.28
63.75 M2 165,782.17 10,568,613.34
91.2 M' 49,756.97 4,537,835.66
77.4 M2 176,750.00 13,680,450.00
45.36 M2 121,403.48 5,506,861.85
77.4 M2 60,600.00 4,690,440.00
74.4 M2 60,600.00 4,508,640.00
78.64 M2 60,600.00 4,765,584.00
45.78 M2 95,011.70 4,349,635.63
245,793,410.99

705,811,636.90 9.53

23 Unit 1,212,000.00 27,876,000.00


17 Unit 2,525,000.00 42,925,000.00
1 Unit 8,282,000.00 8,282,000.00
1 Unit 5,959,000.00 5,959,000.00
2 Unit 4,332,900.00 8,665,800.00
32 Unit 959,500.00 30,704,000.00
5 Unit 4,343,000.00 21,715,000.00
24 Unit 858,500.00 20,604,000.00
42 Unit 2,307,850.00 96,929,700.00
2 Unit 4,545,000.00 9,090,000.00
18 Unit 454,500.00 8,181,000.00
0 Unit 959,500.00 -
280,931,500.00

23 Unit 1,212,000.00 27,876,000.00


21 Unit 2,525,000.00 53,025,000.00
1 Unit 7,266,950.00 7,266,950.00
36 Unit 959,500.00 34,542,000.00
24 M2 858,500.00 20,604,000.00
42 Unit 2,307,850.00 96,929,700.00
2 Unit 2,603,780.00 5,207,560.00
25 Unit 454,500.00 11,362,500.00
4 Unit 959,500.00 3,838,000.00
260,651,710.00

23 Unit 1,212,000.00 27,876,000.00


21 Unit 2,525,000.00 53,025,000.00
1 Unit 7,266,950.00 7,266,950.00
36 Unit 959,500.00 34,542,000.00
24 M2 858,500.00 20,604,000.00
42 Unit 2,307,850.00 96,929,700.00
25 Unit 454,500.00 11,362,500.00
4 Unit 959,500.00 3,838,000.00
255,444,150.00
797,027,360.00 10.76
781.85 M2 90,900.00 71,070,165.00
894.65 M' 15,150.00 13,553,947.50
55.2 M2 90,900.00 5,017,680.00
89,641,792.50

717.47 M2 90,900.00 65,218,023.00


965.1 M' 15,150.00 14,621,265.00
71.4 M2 90,900.00 6,490,260.00
86,329,548.00

767.47 M2 90,900.00 69,763,023.00


1002.6 M' 15,150.00 15,189,390.00
71.4 M2 90,900.00 6,490,260.00
91,442,673.00
267,414,013.50 3.61

548.71 M2 30,300.00 16,625,913.00


1411.08 M2 23,230.00 32,779,388.40
57.48 M2 23,230.00 1,335,260.40
837.05 M2 23,230.00 19,444,671.50
357.86 M2 23,230.00 8,313,087.80
76.56 M2 23,230.00 1,778,488.80
80,276,809.90

496.45 M2 30,300.00 15,042,435.00


1412.4 M2 23,230.00 32,810,052.00
57.48 M2 23,230.00 1,335,260.40
58.26 M2 23,230.00 1,353,379.80
788.87 M2 23,230.00 18,325,450.10
386.04 M2 23,230.00 8,967,709.20
76.56 M2 23,230.00 1,778,488.80
79,612,775.30

496.45 M2 30,300.00 15,042,435.00


1412.4 M2 23,230.00 32,810,052.00
57.48 M2 23,230.00 1,335,260.40
767.47 M2 23,230.00 17,828,328.10
401.04 M2 23,230.00 9,316,159.20
76.56 M2 23,230.00 1,778,488.80
78,110,723.50
238,000,308.70 3.21

16 Buah 1,868,500.00 29,896,000.00


25 Buah 75,750.00 1,893,750.00
16 Buah 252,500.00 4,040,000.00
16 Buah 85,850.00 1,373,600.00
16 Buah 1,565,500.00 25,048,000.00
12 M' 757,500.00 9,090,000.00
4 Buah 1,111,000.00 4,444,000.00
2 Buah 2,272,500.00 4,545,000.00
80,330,350.00

21 Buah 1,868,500.00 39,238,500.00


21 Buah 75,750.00 1,590,750.00
21 Buah 252,500.00 5,302,500.00
29 Buah 85,850.00 2,489,650.00
21 Buah 1,565,500.00 32,875,500.00
12 M' 757,500.00 9,090,000.00
4 Buah 1,111,000.00 4,444,000.00
95,030,900.00
21 Buah 1,868,500.00 39,238,500.00
21 Buah 75,750.00 1,590,750.00
21 Buah 252,500.00 5,302,500.00
29 Buah 85,850.00 2,489,650.00
21 Buah 1,565,500.00 32,875,500.00
12 M' 757,500.00 9,090,000.00
4 Buah 1,111,000.00 4,444,000.00
95,030,900.00
270,392,150.00 3.65

30,000.00 30,000.00 VA 45,000,000.00 45,000,000.00


36,000.00 36,000.00 VA
36,000.00 36,000.00 VA

34.00 34.00 Unit 208,868.00 7,101,512.00


1.00 1.00 Titik 208,868.00 208,868.00
6.00 6.00 Titik 332,290.00 1,993,740.00
3.00 3.00 bh 901,930.00 2,705,790.00
3.00 3.00 bh 901,930.00 2,705,790.00
66.00 66.00 bh 213,615.00 14,098,590.00
8.00 8.00 bh 806,990.00 6,455,920.00
22.00 22.00 bh 42,723.00 939,906.00
23.00 23.00 bh 28,482.00 655,086.00
10.00 10.00 bh 33,229.00 332,290.00
7.00 7.00 bh 71,205.00 498,435.00
86.00 86.00 bh 270,579.00 23,269,794.00
22.00 22.00 bh 327,543.00 7,205,946.00
68,171,667.00
34.00 34.00 Unit 208,868.00 7,101,512.00
1.00 1.00 Titik 208,868.00 208,868.00
6.00 6.00 Titik 332,290.00 1,993,740.00
3.00 3.00 bh 901,930.00 2,705,790.00
3.00 3.00 bh 901,930.00 2,705,790.00
66.00 66.00 bh 213,615.00 14,098,590.00
8.00 8.00 bh 806,990.00 6,455,920.00
22.00 22.00 bh 42,723.00 939,906.00
21.00 21.00 bh 28,482.00 598,122.00
9.00 9.00 bh 33,229.00 299,061.00
10.00 10.00 bh 71,205.00 712,050.00
86.00 86.00 bh 270,579.00 23,269,794.00
22.00 22.00 bh 327,543.00 7,205,946.00
68,295,089.00

34.00 34.00 Unit 208,868.00 7,101,512.00


1.00 1.00 Titik 208,868.00 208,868.00
6.00 6.00 Titik 332,290.00 1,993,740.00
3.00 3.00 bh 901,930.00 2,705,790.00
3.00 3.00 bh 901,930.00 2,705,790.00
66.00 66.00 bh 213,615.00 14,098,590.00
8.00 8.00 bh 806,990.00 6,455,920.00
22.00 22.00 bh 42,723.00 939,906.00
21.00 21.00 bh 28,482.00 598,122.00
9.00 9.00 bh 33,229.00 299,061.00
10.00 10.00 bh 71,205.00 712,050.00
86.00 86.00 bh 270,579.00 23,269,794.00
22.00 22.00 bh 327,543.00 7,205,946.00
68,295,089.00
204,761,845.00 2.77
120.00 m' 13,766.30 1,651,956.00
100.00 m' 17,801.25 1,780,125.00
6.00 m' 18,513.30 111,079.80
52.00 m' 33,703.70 1,752,592.40
30.00 m' 33,703.70 1,011,111.00
32.00 m' 33,703.70 1,078,518.40

4.00 m' 422,483.00 1,689,932.00


2.00 m' 237,350.00 474,700.00
9,550,014.60

120.00 m' 13,766.30 1,651,956.00


56.00 m' 17,801.25 996,870.00
6.00 m' 18,513.30 111,079.80
52.00 m' 33,703.70 1,752,592.40
20.00 m' 33,703.70 674,074.00

4.00 m' 422,483.00 1,689,932.00


6,876,504.20

120.00 m' 13,766.30 1,651,956.00


56.00 m' 17,801.25 996,870.00
6.00 m' 18,513.30 111,079.80
52.00 m' 33,703.70 1,752,592.40
20.00 m' 33,703.70 674,074.00

4.00 m' 422,483.00 1,689,932.00


6,876,504.20

38.00 m' 232,603.00 8,838,914.00


42.00 m' 104,434.00 4,386,228.00
30.00 m' 232,603.00 6,978,090.00
30.00 m' 104,434.00 3,133,020.00
27.00 m' 104,434.00 2,819,718.00
40.00 m' 71,917.05 2,876,682.00
44.00 m' 46,045.90 2,026,019.60

34.00 m' 156,651.00 5,326,134.00

4.00 m' 270,579.00 1,082,316.00


6.00 m' 237,350.00 1,424,100.00
2.00 m' 142,410.00 284,820.00
39,176,041.60

20.00 m' 232,603.00 4,652,060.00


20.00 m' 104,434.00 2,088,680.00
27.00 m' 104,434.00 2,819,718.00
40.00 m' 71,917.05 2,876,682.00
44.00 m' 46,045.90 2,026,019.60

34.00 m' 156,651.00 5,326,134.00


19,789,293.60

10.00 m' 232,603.00 2,326,030.00


10.00 m' 104,434.00 1,044,340.00
27.00 m' 104,434.00 2,819,718.00
40.00 m' 71,917.05 2,876,682.00
44.00 m' 46,045.90 2,026,019.60
34.00 m' 156,651.00 5,326,134.00
16,418,923.60
98,687,281.80 1.33
7,404,762,599.54 100.00
PERHITNGAN RENCANA ANGGARAN BIAYA
PEKERJAAN : STRUKTUR, ARSITEKTUR & MEP
PROYEK : PEMBANGUNAN RUMAH SUSUN MAHASISWA 3 LANTAI UNIVERSITAS BOYOLALI
LOKASI : JL. ADI SUCIPTO 170 KARANG ASEM 57145 KAB. BOYOLALI PROV. JAWA TENGAH
VOL. PEKERJAAN
NO URAIAN PEKERJAAN
JUMLAH SAT.

I. PEKERJAAN PERSIAPAN
1 Pengukuran dan Pemasangan Bouwplank 156 M'
2 Direksi Keet 16 M2
3 Papan Nama Proyek 1 Ls

SUB. TOTAL I.

II. PEKERJAAN TANAH DAN PONDASI


1 Galian Tanah Pondasi < 1 m
2 Tipe PC-1 1.265625 m3
3 Tipe PC-2 22.275 m3
4 Tipe PC-3 4.536 m3
5 Tipe PC-4 12.15 m3
TOTAL GALIAN TANAH UNTUK PILE CAP 40.22663 m3
6 Galian Tanah Untuk Sloof 4.3175 m3
7 Urugan Pasir Di Bawah Pile Cap 10.71 m3
8 Urugan Pasir Di Bawah Sloof 4.3175 m3
9 Lantai Kerja Di Bawah Pile Cap 53.55 m3
10 Lantai Kerja Di Bawah Sloof 21.5875 m3
11 Urugan Tanah Kembali 11.13603 m3
SUB. TOTAL II.

III. PEKERJAAN STRUKTUR BETON


A. PEKERJAAN PONDASI
1 Pekerjaan Pondasi Bor Pile Dia 80 cm 975.2 m3
Pemotongan kepala tiang 212 nos
Persiapan 1 Ls
Ongkos pengeboran Φ 80 cm 975.2 m'
Air suplay 1 ls
Beton cor K-250 275.84 m3
Besi Beton 78.86 Kg/m3 21752.72 kg
lumpur dan pembuangan 275.84 m3
Pemotongan/perapihan kepala tiang bore pile 212 ttk
2 Pile Cap PC 1
Beton Ready Mix Mutu K-350 1.26 m3
Bekisting 24.192 M2
Besi
Tulangan 85.212 Kg
Tulangan 85.212 Kg
3 Tipe PC-2
Beton 22.275 m3
Bekisting 89.1 M2
Besi
Tulangan 520.74 Kg
Tulangan 520.74 Kg
4 Tipe PC-3
Beton 4.536 m3
Bekisting 18.144 m2
Besi
Tulangan 106.0416 Kg
Tulangan 106.0416 Kg
5 Tipe PC-4
Beton 14.175 m3
Bekisting 56.7 m2
Besi beton
Tulangan 284.04 Kg
Tulangan 284.04 Kg
6 Sloof (TB1) uk. 25/40
- Beton Ready Mix 30.03 m3
- Bekisting 240.24 m2
- Besi
Tulangan Pokok 3795.792 Kg
Tulangan Sengkang 14894.88 Kg
TOTAL A
B. PEKRJAAN LANTAI DASAR
1 Kolom Type K1 ( uk. 30/40 )
- Beton Ready Mix Mutu K-350 : 32.76 m3
- Bekisting 327.6 m2
-Besi
Tulangan Pokok 4307.94 Kg
Tulangan Sengkang 1459.822 Kg
2 Kolom Type K2 ( uk. 30/30 )
- Beton Ready Mix Mutu K-350 : 0.63 m3
-Bekisting 4.2 m2
-Besi
Tulangan Pokok 88.368 Kg
Tulangan Sengkang 31.67267 Kg
3 Tangga
- Beton Ready Mix Mutu K-350 : 11.283 m3
-Bekisting 106.86 m2
-Besi 39.16425 Kg
4 Plat Bordes uk. 20/35
- Beton Ready Mix Mutu K-350 : 1.73625 m3
- Bekisting 2.055 m2
- Besi 175.545 Kg
TOTAL B
C LANTAI 2
1 Balok B1 uk. 25/40
- Beton Ready Mix Mutu K-350 : 40.8 m3
- Bekesting 428.4 m2
- Besi
Tulangan Pokok 3862.94 Kg
Tulangan Sengkang 1880.83 Kg
2 Balok B2 uk. 25/40
- Beton Ready Mix Mutu K-350 : 5.74 m3
- Bekesting 60.27 m2
- Besi
Tulangan Pokok 530.208 Kg
Tulangan Sengkang 236 Kg
3 Balok B3 uk. 25/40
- Beton Ready Mix Mutu K-350 : 7.5 m3
- Bekesting 78.75 m2
- Besi
Tulangan Pokok 82.845 Kg
Tulangan Sengkang 34.224 Kg
4 Balok B4 uk. 25/40
- Beton Ready Mix Mutu K-350 : 2.87 m3
- Bekesting 30.135 m2
- Besi
Tulangan Pokok 317.02 Kg
Tulangan Sengkang 192.696 Kg
5 Balok B5 uk. 25/40
- Beton Ready Mix Mutu K-350 : 3.75 m3
- Bekesting 32.5 m2
- Besi
Tulangan Pokok 315.6 Kg
Tulangan Sengkang 147.56 Kg
6 Plat Beton Tebal 13 cm
- Beton Ready Mix Mutu K-350 : 109.766 m3
- Bekesting 1004.375 m2
- Pembesian U-24 ( Ф8-150 Double ) : 15012.84 Kg
Pekerjaan Kolom :
8 Kolom Type K1 ( uk. 30/40 )
- Beton Ready Mix Mutu K-350 : 39.78 m3
- Bekisting 464.1 m2
-Besi
Tulangan Pokok 5231.07 Kg
Tulangan Sengkang 1781.26 Kg
Pekerjaan Tangga :
9 Tangga (Lantai 2 ke Lantai 3)
- Beton Ready Mix Mutu K-350 : 1.73625 m3
-Bekisting 2.055 m2
-Besi 175.545 Kg
10 Plat Bordes uk. 20/35
- Beton Ready Mix Mutu K-350 : 0.15 m3
- Bekisting 3.2 m2
- Besi 14.22 Kg
TOTAL C
D. LANTAI 3
1 Balok B1 uk. 25/40
- Beton Ready Mix Mutu K-350 : 34.425 m3
- Bekesting 361.4625 m2
- Besi
Tulangan Pokok 3259.359 Kg
Tulangan Sengkang 1586.952 Kg
2 Balok B2 uk. 25/40
- Beton Ready Mix Mutu K-350 : 5.125 m3
- Bekesting 53.8125 m2
- Besi
Tulangan Pokok 485.235 Kg
Tulangan Sengkang 217 Kg
3 Balok B3 uk. 25/40
- Beton Ready Mix Mutu K-350 : 0.75 m3
- Bekesting 7.875 m2
- Besi
Tulangan Pokok 82.845 Kg
Tulangan Sengkang 34.224 Kg
4 Balok B4 uk. 25/40
- Beton Ready Mix Mutu K-350 : 2.87 m3
- Bekesting 30.135 m2
- Besi
Tulangan Pokok 317.0202 Kg
Tulangan Sengkang 192.696 Kg
5 Balok B5 uk. 25/40
- Beton Ready Mix Mutu K-350 : 3.75 m3
- Bekesting 32.5 m2
- Besi
Tulangan Pokok 315.6 Kg
Tulangan Sengkang 147.56 Kg
6 Plat Beton Tebal 13 cm
- Beton Ready Mix Mutu K-350 : 109.766 m3
- Bekisting 1004.375 m2
- Besi 15012.84 Kg
Pekerjaan Kolom :
7 Kolom Type K1 ( uk. 30/40 )
- Beton Ready Mix Mutu K-350 : 29.952 m3
- Bekisting 349.44 m2
-Besi
Tulangan Pokok 3938.688 Kg
Tulangan Sengkang 1334.694 Kg
8 Tangga (Lantai 2 ke Lantai 3)
- Beton Ready Mix Mutu K-350 : 1.73625 m3
-Bekisting 2.055 m2
-Besi 175.545 Kg
9 Plat Bordes uk. 20/35
- Beton Ready Mix Mutu K-350 : 0.15 m3
- Bekisting 3.2 m2
- Besi 10.58 Kg
TOTAL D
E. LANTAI DAK/JEMUR
1 Balok B1 uk. 25/40
- Beton Ready Mix Mutu K-350 : 40.375 m3
- Bekesting 423.9375 m2
- Besi
Tulangan Pokok 3185.588 Kg
Tulangan Sengkang 1861.24 Kg
2 Balok B2 uk. 25/40
- Beton Ready Mix Mutu K-350 : 5.33 m3
- Bekesting 55.965 m2
- Besi
Tulangan Pokok 420.537 Kg
Tulangan Sengkang 225.68 Kg
3 Balok B3 uk. 25/40
- Beton Ready Mix Mutu K-350 : 0.75 m3
- Bekesting 7.875 m2
- Besi
Tulangan Pokok 59.175 Kg
Tulangan Sengkang 34.224 Kg
4 Balok B4 uk. 25/40
- Beton Ready Mix Mutu K-350 : 2.87 m3
- Bekesting 30.135 m2
- Besi
Tulangan Pokok 317.0202 Kg
Tulangan Sengkang 192.696 Kg
5 Balok B5 uk. 25/40
- Beton Ready Mix Mutu K-350 : 3.75 m3
- Bekesting 32.5 m2
- Besi
Tulangan Pokok 276.15 Kg
Tulangan Sengkang 147.56 Kg
6 Plat Beton Tebal 13 cm
- Beton Ready Mix Mutu K-350 : 88.91 m3
- Bekisting 1004.375 m2
- Besi 15012.84 Kg
TOTAL E
SUB TOTAL III

IV. PEKERJAAN ATAP


1 Atap genteng metal T=0.35 MM 818.3 M2
2 Nok genteng (termasuk jurai) 150 M'
3 Lisplang GRC tebal 9 mm lebar 30 cm 258.2 M'
4 Rangka Atap Baja Ringan 818.3 M2
SUB TOTAL IV
V. PEKERJAAN DINDING
A. LANTAI DASAR
1 Pasangan dinding bata merah 1:5 termasuk tangga & dinding shaft 979.9 M2
2 Pasangan dinding bata merah penahan tanah urugan keliling banguna 72.84 M2
3 Pasangan dinding kamar mandi trasram 1:3 123.24 M2
4 Plester dinding kamar mandi trasram 1:3 246.48 M2
5 Plester + aci dinding bata merah 1959.79 M2
6 Kolom praktis & balok praktis 11/11 termasuk opening kusen alumini 4.01 M3
7 Perapihan kolom beton 90.62 M2
8 Perapihan pelat beton bawah tangga + bordes 43.28 M2
9 Perapihan balok beton + balok tangga + balustrade 14.2 M2
10 Pas. besi Black Steel railling dengan kaki pada tga tengah dan tga sam 18 M
11 Pas. besi Black Steel railling yang nempel di dinding pada tga tengah 39 M
12 Pasang dudukan railling tangga tengah dan tangga samping 21 Bh
13 Pas. Plint Keramik 10x40 dinding corridor/selasar dan unit kamar 670.3 M
14 Pas. Tralis R. Jemur Black Steel Railing dia. 2 1/2" finish cat (terpasa 4 unit
15 Perapihan topi jendela 121 M
16 Cor topi jendela t= 8 cm (termasuk bekisting dan pembesian Φ 8 - 2 6.12 M3
TOTAL A
B. LANTAI 2
1 Pasangan dinding bata merah 1:5 termasuk tangga & dinding shaft 954.43 M2
2 Plester + aci dinding bata merah 1908.86 M2
3 Pasangan dinding kamar mandi trasram 1:3 136.08 M2
4 Plester dinding kamar mandi trasram 1:3 272.16 M2
5 Kolom praktis & balok praktis 11/11 termasuk opening kusen alumini 5.32 M3
6 Perapihan kolom beton 90.62 M2
7 Perapihan pelat beton bawah tangga + bordes 43.28 M2
8 Perapihan balok beton + balok tangga + balustrade 14.2 M2
9 Pas. besi Black Steel railling dengan kaki pada tga tengah dan tga sam 18 M1
10 Pas. besi Black Steel railling yang nempel di dinding pada tga samping 39 M1
11 Pasang dudukan railling tangga tengah dan tangga samping 21 Bh
12 Pas. Plint Keramik 10x40 dinding corridor/selasar dan unit kamar 677.8 M1
13 Pas. Tralis R. Jemur Black Steel Railing dia. 2 1/2" finish cat (terpasa 4 unit
14 Pas. Tralis utama cor beton Dia 2.5" + frame balok beton 11x11 + rail 1 unit
15 Perapihan topi jendela 121 M1
16 Cor topi jendela t= 8 cm (termasuk bekisting dan pembesian Φ 8 - 2 6.12 M3
TOTAL B
C. LANTAI 3
1 Pasangan dinding bata merah 1:5 termasuk tangga & dinding shaft 954.43 M2
2 Plester + aci dinding bata merah 1908.86 M2
3 Pasangan dinding kamar mandi trasram 1:3 136.08 M2
4 Plester dinding kamar mandi trasram 1:3 272.16 M2
5 Kolom praktis & balok praktis 11/11 termasuk opening kusen alumini 5.32 M3
6 Perapihan kolom beton 90.62 M2
7 Perapihan pelat beton bawah tangga + bordes 43.28 M2
8 Perapihan balok beton + balok tangga + balustrade 14.2 M2
9 Pas. besi Black Steel railling dengan kaki pada tga tengah dan tga sam 6 M1
10 Pas. besi Black Steel railling yang nempel di dinding pada tga samping 13 M1
11 Pasang dudukan railling tangga tengah dan tangga samping 8 Bh
12 Pas. Plint Keramik 10x40 dinding corridor/selasar dan unit kamar 677.8 M1
13 Pas. Tralis R. Jemur Black Steel Railing dia. 2 1/2" finish cat (terpasa 4 unit
14 Pas. Tralis utama cor beton Dia 2.5" + frame balok beton 11x11 + rail 1 unit
15 Perapihan topi jendela 121 M1
16 Cor topi jendela t= 8 cm (termasuk bekisting dan pembesian Φ 8 - 2 6.12 M3
TOTAL C
SUB TOTAL V

VI. PEKERJAAN LANTAI


A. LANTAI DASAR
1 Pasang keramik lantai termasuk selasar + Entrance 40x40 778.25 M2
2 Pasang keramik tangga 40x40 63.75 M2
3 Pasang Step nozing 10 x 40 cm 100.8 M'
4 Pasang lantai keramik km/wc + Janitor 30x30 61.2 M2
5 Pasang keramik dinding km/wc 30x30 + Janitor 228.83 M2
6 Border keramik dinding 15x30 128.2 M'
7 Waterproofing (liquid/cement base) di daerah km/wc T = 25 cm 58.2 M2
8 Waterproofing (liquid/cement base) di daerah lantai T. Jemur, termas 78.64 M2
9 Waterproofing (liquid/cement base) + screed pada canopy jendela 45.78 M2

B. LANTAI 2
1 Pasang lantai keramik km/wc + Janitor 30x30 77.4 M2
2 Pasang keramik dinding km/wc 30x30 + Janitor 299.33 M2
3 Border keramik dinding 15x30 180.3 M'
4 Pasang keramik lantai 40x40 area unit, lobby dan selasar 714.23 M2
5 Pasang keramik tangga 40x40 63.75 M2
6 Pasang Step nozing 10 x 40 cm 91.2 M'
7 Waterproofing (bitumen) tahap 1 di atas lantai beton 77.4 M2
8 Trasram pengisi lantai daerah km/wc T = 20 cm + peninggian closet 45.36 M2
9 Waterproofing (liquid/cement base) tahap 2 di atas peninggian km/wc 77.4 M2
10 Waterproofing (liquid/cement base) di daerah km/wc pada dinding T 74.4 M2
11 Waterproofing (liquid/cement base) di daerah lantai T. Jemur, termas 78.64 M2
12 Waterproofing (liquid/cement base) + screed pada canopy jendela 45.78 M2

C. LANTAI 3
1 Pasang lantai keramik km/wc + Janitor 30x30 77.4 M2
2 Pasang keramik dinding km/wc 30x30 + Janitor 299.33 M2
3 Border keramik dinding 15x30 180.3 M'
4 Pasang keramik lantai 40x40 area unit, lobby dan selasar 714.23 M2
5 Pasang keramik tangga 40x40 63.75 M2
6 Pasang Step nozing 10 x 40 cm 91.2 M'
7 Waterproofing (bitumen) tahap 1 di atas lantai beton 77.4 M2
8 Trasram pengisi lantai daerah km/wc T = 20 cm + peninggian closet 45.36 M2
9 Waterproofing (liquid/cement base) tahap 2 di atas peninggian km/wc 77.4 M2
10 Waterproofing (liquid/cement base) di daerah km/wc pada dinding T 74.4 M2
11 Waterproofing (liquid/cement base) di daerah lantai T. Jemur, termas 78.64 M2
12 Waterproofing (liquid/cement base) + screed pada canopy jendela 45.78 M2

SUB TOTAL VI

VII. PEKERJAAN KUSEN, PINTU DAN JENDELA


A. LANTAI DASAR
1 Rangka hollow 40.40.1,2 + Daun Pintu calsiboard (terpasang) type 23 Unit
2 Kusen Aluminium + Daun Pintu Engeirng wood t=4 cm (terpasang) ty 17 Unit
3 Kusen Aluminium + Daun Pintu kaca t=6 mm + Jendela (terpasang) 1 Unit
4 Kusen Aluminium + Daun Pintu kaca t=6 mm + Jendela (terpasang) 1 Unit
5 Kusen Aluminium + Daun Pintu kaca t=6 mm + Jendela (terpasang) 2 Unit
6 Kusen PVC + Daun Pintu PVC klas 1/super (terpasang) Kamar Mandi 32 Unit
7 Kusen Aluminium + Daun Pintu kaca t=6 mm (terpasang) type P2 5 Unit
8 Kusen Aluminium + Daun Pintu PVC klas 1/super (terpasang) type P4 24 Unit
9 Kusen Aluminium + Daun jendela (terpasang) type J1 42 Unit
10 Pintu Baja area gerobak sampah type PB 2 Unit
11 Bouvenlight BV1 18 Unit
12 Pintu Shaft PS' 0 Unit
TOTAL A
B. LANTAI 2
1 Rangka hollow 40.40.1,2 + Daun Pintu calsiboard (terpasang) type 23 Unit
2 Kusen Aluminium + Daun Pintu Engeirng wood t=4 cm (terpasang) ty 21 Unit
3 Kusen Aluminium + Daun Pintu kaca t=6 mm + Jendela (terpasang) 1 Unit
4 Kusen PVC + Daun Pintu PVC klas 1/super (terpasang) Kamar Mandi 36 Unit
5 Kusen Aluminium + Daun Pintu PVC klas 1/super (terpasang) type P4 24 M2
6 Kusen Aluminium + Daun jendela (terpasang) type J1 42 Unit
7 Kusen Aluminium + Daun jendela (terpasang) type J2 2 Unit
8 Bouvenlight BV1 25 Unit
9 Pintu Shaft PS' 4 Unit
TOTAL B
C. LANTAI 3
1 Rangka hollow 40.40.1,2 + Daun Pintu calsiboard (terpasang) type 23 Unit
2 Kusen Aluminium + Daun Pintu Engeirng wood t=4 cm (terpasang) ty 21 Unit
3 Kusen Aluminium + Daun Pintu kaca t=6 mm + Jendela (terpasang) 1 Unit
4 Kusen PVC + Daun Pintu PVC klas 1/super (terpasang) Kamar Mandi 36 Unit
5 Kusen Aluminium + Daun Pintu PVC klas 1/super (terpasang) type P4 24 M2
6 Kusen Aluminium + Daun jendela (terpasang) type J1 42 Unit
7 Bouvenlight BV1 25 Unit
8 Pintu Shaft PS' 4 Unit
TOTAL C
SUB TOTAL VII

VIII. PEKERJAAN PLAFOND


A. LANTAI DASAR
1 Penutup plafond Gypsum T=9 MM + rangka metal furring uk 60x120 781.85 M2
2 List plafond gypsum 5/5 894.65 M'
3 Plafond kamar mandi calsiboard 6 mm + rangka metal furing 60x120 55.2 M2
TOTAL A
B. LANTAI 2
1 Penutup plafond Gypsum T=9 MM + rangka metal furring uk 60x120 717.47 M2
2 List plafond gypsum 5/5 965.1 M'
3 Plafond kamar mandi calsiboard 6 mm + rangka metal furing 60x120 71.4 M2
TOTAL B
C. LANTAI TIGA
1 Penutup plafond Gypsum T=9 MM + rangka metal furring uk 60x120 767.47 M2
2 List plafond gypsum 5/5 1002.6 M'
3 Plafond kamar mandi calsiboard 6 mm + rangka metal furing 60x120 71.4 M2
TOTAL C
SUB TOTAL VIII

IX. PEKERJAAN PENGECETAN


A. LANTAI DASAR
1 Cat dinding bag. Luar termasuk kolom (exterior) 548.71 M2
2 Cat dinding bag. Luar termasuk kolom (interior) 1411.08 M2
3 Cat balok beton + pelat bawah tangga 57.48 M2
4 Cat plafond 837.05 M2
5 Cat list plafond 357.86 M2
6 Cat topi beton 76.56 M2

B. LANTAI 2
1 Cat dinding bag. Luar termasuk kolom (exterior) 496.45 M2
2 Cat dinding bag. Luar termasuk kolom (interior) 1412.4 M2
3 Cat balok beton + pelat bawah tangga 57.48 M2
4 Cat Atap Entrance + Kolom 58.26 M2
5 Cat plafond 788.87 M2
6 Cat list plafond 386.04 M2
7 Cat topi beton 76.56 M2

C. LANTAI 3
1 Cat dinding bag. Luar termasuk kolom (exterior) 496.45 M2
2 Cat dinding bag. Luar termasuk kolom (interior) 1412.4 M2
3 Cat balok beton + pelat bawah tangga 57.48 M2
4 Cat plafond 767.47 M2
5 Cat list plafond 401.04 M2
6 Cat topi beton 76.56 M2

SUB TOTAL IX

X. PEKERJAAN SANITAIR
A. LANTAI DASAR
1 Pasang closet duduk type standart (lengkap terpasang) 16 Buah
2 Pasang kran 0,5" 25 Buah
3 Pasang shower + kran type double (terpasang) 16 Buah
4 Pasangan floor drain stainless 16 Buah
5 Westafel 16 Buah
6 Meja dapur + keramik 12 M'
7 Kitchen zing + kran 4 Buah
8 Urinoir 2 Buah

B. LANTAI 2
1 Pasang closet duduk type standart (lengkap terpasang) 21 Buah
2 Pasang kran 0,5" 21 Buah
3 Pasang shower + kran type double (terpasang) 21 Buah
4 Pasangan floor drain stainless 29 Buah
5 Westafel 21 Buah
6 Meja dapur + keramik 12 M'
7 Kitchen zing + kran 4 Buah

C. LANTAI 3
1 Pasang closet duduk type standart (lengkap terpasang) 21 Buah
2 Pasang kran 0,5" 21 Buah
3 Pasang shower + kran type double (terpasang) 21 Buah
4 Pasangan floor drain stainless 29 Buah
5 Westafel 21 Buah
6 Meja dapur + keramik 12 M'
7 Kitchen zing + kran 4 Buah

SUB TOTAL X

XI. PEKERJAAN INSTALASI LISTRIK


A. LANTAI DASAR
1 Pekerjaan PLN 30000 VA
2 - Biaya Pemasangan ( BP) 36000 VA
3 - Uang Jaminan Langganan ( UJL) 36000 VA
4 - Sertifikasi Laik Operasi ( SL O ) Jaminan Instalasi Gambar
5 - Kabel Tray W200 x H100 34 Unit
6 - Elbow W200 x H100 1 Titik
7 - TL 1 x 36 W, TL Balk Type 6 Titik
8 - TL 1 x 36 W, TL Balk Type c/w battery charger 3 bh
9 - Lampu baret isi TL Bulat-32 watt c/w battery charger 3 bh
10 - Lampu Downlight 8 Watt 66 bh
11 - Lampu Downlight 8 Watt c/w battery charger 8 bh
12 - Stop Kontak 1P, 220 Volt, 13A, Wall Type 22 bh
13 - Saklar 1 gang 23 bh
14 - Saklar 2 gang 10 bh
15 - Saklar Hotel 7 bh
16 - NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu 86 bh
17 - NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak 22 bh

B. LANTAI 2
1 - Kabel Tray W200 x H100 34 Unit
2 - Elbow W200 x H100 1 Titik
3 - TL 1 x 36 W, TL Balk Type 6 Titik
4 - TL 1 x 36 W, TL Balk Type c/w battery charger 3 bh
5 - Lampu baret isi TL Bulat-32 watt c/w battery charger 3 bh
6 - Lampu Downlight 8 Watt 66 bh
7 - Lampu Downlight 8 Watt c/w battery charger 8 bh
8 - Stop Kontak 1P, 220 Volt, 13A, Wall Type 22 bh
9 - Saklar 1 gang 21 bh
10 - Saklar 2 gang 9 bh
11 - Saklar Hotel 10 bh
12 - NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu 86 bh
13 - NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak 22 bh

C. LANTAI 3
1 - Kabel Tray W200 x H100 34 Unit
2 - Elbow W200 x H100 1 Titik
3 - TL 1 x 36 W, TL Balk Type 6 Titik
4 - TL 1 x 36 W, TL Balk Type c/w battery charger 3 bh
5 - Lampu baret isi TL Bulat-32 watt c/w battery charger 3 bh
6 - Lampu Downlight 8 Watt 66 bh
7 - Lampu Downlight 8 Watt c/w battery charger 8 bh
8 - Stop Kontak 1P, 220 Volt, 13A, Wall Type 22 bh
9 - Saklar 1 gang 21 bh
10 - Saklar 2 gang 9 bh
11 - Saklar Hotel 10 bh
12 - NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu 86 bh
13 - NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak 22 bh

SUB TOTAL XI

XII. PEK. PLUMBING (INSTALASI AIR BERSIH, AIR KOTOR)


1. Pek. Instalasi Air Bersih
A. LANTAI DASAR
1 - PVC AW dia. 15 120 m'
2 - PVC AW dia. 20 100 m'
3 - PVC AW dia. 25 6 m'
4 - PVC AW dia. 40 52 m'
5 - PVC AW dia. 50 (Riser dari Tangki Air Atas) 30 m'
6 - PVC AW dia. 50 (Riser ke tanki air atas) 32 m'
7 Peralatan Katup-katup
8 (Ball Valve & Gate Valve)
9 - dia. 40 4 m'
10 - dia. 20 2 m'

B. LANTAI 2
1 - PVC AW dia. 15 120 m'
2 - PVC AW dia. 20 56 m'
3 - PVC AW dia. 25 6 m'
4 - PVC AW dia. 40 52 m'
5 - PVC AW dia. 50 (Riser dari Tangki Air Atas) 20 m'
6 Peralatan Katup-katup
7 (Ball Valve & Gate Valve)
8 - dia. 40 4 m'

C. LANTAI 3
1 - PVC AW dia. 15 120 m'
2 - PVC AW dia. 20 56 m'
3 - PVC AW dia. 25 6 m'
4 - PVC AW dia. 40 52 m'
5 - PVC AW dia. 50 (Riser dari Tangki Air Atas) 20 m'
6 Peralatan Katup-katup
7 (Ball Valve & Gate Valve)
8 - dia. 40 4 m'

2. Pek. Instalasi Air Kotor


A. LANTAI DASAR
1 - dia. 150 ( horisontal pipa air kotor ) 38 m'
2 - dia. 100 ( horisontal pipa air bekas ) 42 m'
3 - dia. 150 ( riser pipa air kotor ) 30 m'
4 - dia. 100 ( riser pipa air bekas ) 30 m'
5 - dia. 100 27 m'
6 - dia. 80 40 m'
7 - dia. 50 44 m'
8 Floor Drain (FD)
9 - FD, dia. 50 34 m'
10 Clean Out (CO)
11 - CO, dia. 150 4 m'
12 - CO, dia. 100 6 m'
13 - CO, dia. 80 2 m'

B. LANTAI 2
1 - dia. 150 ( riser pipa air kotor ) 20 m'
2 - dia. 100 ( riser pipa air bekas ) 20 m'
3 - dia. 100 27 m'
4 - dia. 80 40 m'
5 - dia. 50 44 m'
6 Floor Drain (FD)
7 - FD, dia. 50 34 m'

C. LANTAI 3
1 - dia. 150 ( riser pipa air kotor ) 10 m'
2 - dia. 100 ( riser pipa air bekas ) 10 m'
3 - dia. 100 27 m'
4 - dia. 80 40 m'
5 - dia. 50 44 m'
6 Floor Drain (FD)
7 - FD, dia. 50 34 m'

SUB TOTAL XII


TOTAL
AS BOYOLALI
JAWA TENGAH

HARGA SATUAN JUMLAH SUB. TOTAL BOBOT

152,700 23,821,200
2,052,617 32,841,864
300,000 300,000

56,963,064.00 0.77

43,300 1,741,813
43,300 186,948
191,600 2,052,036
191,600 827,233
116,600 6,243,930
116,600 2,517,103
147,000 1,636,997
15,206,058.71 0.21

5,000,000 5,000,000
300,000 292,560,000
1,000,000 1,000,000
803,950 221,761,568
11,200 243,630,464
60,000 16,550,400
60,600 12,847,200

1,123,855 1,416,057
153,790 3,720,488

11,200 954,374
11,200 954,374

1,123,855 25,033,859
153,790 13,702,689

11,200 5,832,288
11,200 5,832,288

1,123,855 5,097,804
153,790 2,790,366

11,200 1,187,666
11,200 1,187,666

1,123,855 15,930,638
153,790 8,719,893

11,200 3,181,248
11,200 3,181,248

1,123,855 33,749,351
153,790 36,946,510

11,200 42,512,870
11,200 166,822,656
1,172,103,965

1,123,855 36,817,474
153,790 50,381,604

11,200 48,248,928
11,200 16,350,006

1,123,855 708,028
153,790 645,918

11,200 989,722
11,200 354,734

1,123,855 12,680,451
153,790 16,433,999
11,200 438,640

1,123,855 1,951,292
153,790 316,038
11,200 1,966,104
188,282,939

1,123,855 45,853,264
153,790 65,883,636

11,200 43,264,928
11,200 21,065,296

1,123,855 67,734,712
153,790 9,268,923

11,200 5,938,330
11,200 2,643,200

1,123,855 8,428,909
153,790 12,110,963

11,200 927,864
11,200 383,309

1,123,855 3,225,462
153,790 4,634,462

11,200 3,550,624
11,200 2,158,195

1,123,855 4,214,454
153,790 4,998,175

11,200 3,534,720
11,200 1,652,672

1,123,855 123,361,015
153,790 154,462,831
11,200 168,143,853

1,123,855 44,706,933
153,790 71,373,939

11,200 58,587,984
11,200 19,950,112

1,123,855 1,951,292
153,790 316,038
11,200 1,966,104

1,123,855 168,578
153,790 492,128
11,200 159,264
957,112,170

1,123,855 38,688,692
153,790 55,589,318

11,200 36,504,821
11,200 17,773,862

1,123,855 5,759,754
153,790 8,275,824

11,200 5,434,632
11,200 2,430,400

1,123,855 842,891
153,790 1,211,096

11,200 927,864
11,200 383,309

1,123,855 3,225,462
153,790 4,634,462

11,200 3,550,626
11,200 2,158,195

1,123,855 4,214,454
153,790 4,998,175

11,200 3,534,720
11,200 1,652,672

1,123,855 123,361,015
153,790 154,462,831
11,200 168,143,853

1,123,855 33,661,691
153,790 53,740,378

11,200 44,113,306
11,200 14,948,577

1,123,855 1,951,292
153,790 316,038
11,200 1,966,104
1,123,855 168,578
153,790 492,128
11,200 118,496
799,235,518

1,123,855 45,375,626
153,790 65,197,348

11,200 35,678,580
11,200 20,845,888

1,123,855 5,990,145
153,790 8,606,857

11,200 4,710,014
11,200 2,527,616

1,123,855 8,850,354
153,790 1,211,096

11,200 662,760
11,200 383,309

1,123,855 3,225,462
153,790 4,634,462

11,200 3,550,626
11,200 2,158,195

1,123,855 4,214,454
153,790 4,998,175

11,200 3,092,880
11,200 1,652,672

1,123,855 99,921,905
153,790 154,462,831
11,200 168,143,853
650,095,110
3,766,829,701.21 50.87

176,750 144,634,525
166,650 24,997,500
108,070 27,903,674
166,650 136,369,695
333,905,394.00 4.51
93,434 91,556,310
93,434 6,805,757
90,734 11,182,100
27,969 6,893,834
49,002 96,032,846
2,626,000 10,530,260
75,750 6,864,465
75,750 3,278,460
75,750 1,075,650
424,200 7,635,600
196,950 7,681,050
35,350 742,350
49,757 33,352,097
2,525,000 10,100,000
75,750 9,165,750
3,535,000 21,634,200
324,530,728

93,434 89,176,537
49,002 93,537,194
90,734 12,347,129
27,969 7,612,081
2,626,000 13,970,320
75,750 6,864,465
75,750 3,278,460
75,750 1,075,650
424,200 7,635,600
196,950 7,681,050
35,350 742,350
49,757 33,725,274
2,525,000 10,100,000
5,050,000 5,050,000
75,750 9,165,750
3,535,000 21,634,200
323,596,061

93,434 89,176,537
49,002 93,537,194
90,734 12,347,129
27,969 7,612,081
2,626,000 13,970,320
75,750 6,864,465
75,750 3,278,460
75,750 1,075,650
424,200 2,545,200
196,950 2,560,350
35,350 282,800
49,757 33,725,274
2,525,000 10,100,000
5,050,000 5,050,000
75,750 9,165,750
3,535,000 21,634,200
312,925,411
649,763,785.73 8.77

165,782 129,019,974
165,782 10,568,613
49,757 5,015,503
160,429 9,818,265
176,237 40,328,290
53,292 6,832,031
60,600 3,526,920
60,600 4,765,584
95,012 4,349,636
214,224,815

160,429 12,417,218
176,237 52,752,991
53,292 9,608,542
165,782 118,406,599
165,782 10,568,613
49,757 4,537,836
176,750 13,680,450
121,403 5,506,862
60,600 4,690,440
60,600 4,508,640
60,600 4,765,584
95,012 4,349,636
245,793,411

160,429 12,417,218
176,237 52,752,991
53,292 9,608,542
165,782 118,406,599
165,782 10,568,613
49,757 4,537,836
176,750 13,680,450
121,403 5,506,862
60,600 4,690,440
60,600 4,508,640
60,600 4,765,584
95,012 4,349,636
245,793,411
705,811,636.90 9.53

1,212,000 27,876,000
2,525,000 42,925,000
8,282,000 8,282,000
5,959,000 5,959,000
4,332,900 8,665,800
959,500 30,704,000
4,343,000 21,715,000
858,500 20,604,000
2,307,850 96,929,700
4,545,000 9,090,000
454,500 8,181,000
959,500 -
280,931,500

1,212,000 27,876,000
2,525,000 53,025,000
7,266,950 7,266,950
959,500 34,542,000
858,500 20,604,000
2,307,850 96,929,700
2,603,780 5,207,560
454,500 11,362,500
959,500 3,838,000
260,651,710

1,212,000 27,876,000
2,525,000 53,025,000
7,266,950 7,266,950
959,500 34,542,000
858,500 20,604,000
2,307,850 96,929,700
454,500 11,362,500
959,500 3,838,000
255,444,150
797,027,360.00 10.76

90,900 71,070,165
15,150 13,553,948
90,900 5,017,680
89,641,793
90,900 65,218,023
15,150 14,621,265
90,900 6,490,260
86,329,548

90,900 69,763,023
15,150 15,189,390
90,900 6,490,260
91,442,673
267,414,013.50 3.61

30,300 16,625,913
23,230 32,779,388
23,230 1,335,260
23,230 19,444,672
23,230 8,313,088
23,230 1,778,489
80,276,810

30,300 15,042,435
23,230 32,810,052
23,230 1,335,260
23,230 1,353,380
23,230 18,325,450
23,230 8,967,709
23,230 1,778,489
79,612,775

30,300 15,042,435
23,230 32,810,052
23,230 1,335,260
23,230 17,828,328
23,230 9,316,159
23,230 1,778,489
78,110,724
238,000,308.70 3.21

1,868,500 29,896,000
75,750 1,893,750
252,500 4,040,000
85,850 1,373,600
1,565,500 25,048,000
757,500 9,090,000
1,111,000 4,444,000
2,272,500 4,545,000
80,330,350

1,868,500 39,238,500
75,750 1,590,750
252,500 5,302,500
85,850 2,489,650
1,565,500 32,875,500
757,500 9,090,000
1,111,000 4,444,000
95,030,900

1,868,500 39,238,500
75,750 1,590,750
252,500 5,302,500
85,850 2,489,650
1,565,500 32,875,500
757,500 9,090,000
1,111,000 4,444,000
95,030,900
270,392,150.00 3.65

45,000,000 45,000,000

208,868 7,101,512
208,868 208,868
332,290 1,993,740
901,930 2,705,790
901,930 2,705,790
213,615 14,098,590
806,990 6,455,920
42,723 939,906
28,482 655,086
33,229 332,290
71,205 498,435
270,579 23,269,794
327,543 7,205,946
68,171,667

208,868 7,101,512
208,868 208,868
332,290 1,993,740
901,930 2,705,790
901,930 2,705,790
213,615 14,098,590
806,990 6,455,920
42,723 939,906
28,482 598,122
33,229 299,061
71,205 712,050
270,579 23,269,794
327,543 7,205,946
68,295,089

208,868 7,101,512
208,868 208,868
332,290 1,993,740
901,930 2,705,790
901,930 2,705,790
213,615 14,098,590
806,990 6,455,920
42,723 939,906
28,482 598,122
33,229 299,061
71,205 712,050
270,579 23,269,794
327,543 7,205,946
68,295,089
204,761,845.00 2.77

13,766 1,651,956
17,801 1,780,125
18,513 111,080
33,704 1,752,592
33,704 1,011,111
33,704 1,078,518

422,483 1,689,932
237,350 474,700
9,550,015

13,766 1,651,956
17,801 996,870
18,513 111,080
33,704 1,752,592
33,704 674,074
422,483 1,689,932
6,876,504

13,766 1,651,956
17,801 996,870
18,513 111,080
33,704 1,752,592
33,704 674,074

422,483 1,689,932
6,876,504

232,603 8,838,914
104,434 4,386,228
232,603 6,978,090
104,434 3,133,020
104,434 2,819,718
71,917 2,876,682
46,046 2,026,020

156,651 5,326,134

270,579 1,082,316
237,350 1,424,100
142,410 284,820
39,176,042

232,603 4,652,060
104,434 2,088,680
104,434 2,819,718
71,917 2,876,682
46,046 2,026,020

156,651 5,326,134
19,789,294

232,603 2,326,030
104,434 1,044,340
104,434 2,819,718
71,917 2,876,682
46,046 2,026,020

156,651 5,326,134
16,418,924
98,687,281.80 1.33
7,404,762,599.54 100
REKAPITULASI RENCANA ANGGARAN BIAYA

Kegiatan : PEMBANGUNAN RUMAH SUSUN MAHASISWA UNIVERSITAS BOYOLALI


Lokasi : JL. ADI SUCIPTO 170 KARANG ASEM KAB. BOYOLALI JAWA TENGAH

JUMLAH HARGA
NO. JENIS PEKERJAAN
(Rp.)
I. PEKERJAAN PERSIAPAN 56,963,064.00
JUMLAH I 56,963,064.00
II. PEKERJAAN GALIAN TANAH 15,206,058.71
JUMLAH II 15,206,058.71
III. PEKERJAAN STRUKTUR BETON
A. Pondasi 1,172,103,965.19
B. Lantai Dasar 188,282,938.58
C. Lantai 2 957,112,169.68
D. Lantai 3 799,235,517.59
E Lantai Dak 650,095,110.17
JUMLAH III 3,766,829,701.21
IV. PEKERJAAN ATAP 333,905,394.00
JUMLAH IV 333,905,394.00
V. PEKERJAAN DINDING
A. Lantai Dasar 324,530,728.44
B. Lantai 2 323,596,060.70
C. Lantai 3 312,925,410.70
JUMLAH V 649,763,785.73
VI. PEKERJAAN LANTAI
A. Lantai Dasar 214,224,814.93
B. Lantai 2 245,793,410.99
C. Lantai 3 245,793,410.99
JUMLAH VI 705,811,636.90
VII. PEKERJAAN KUSEN, PINTU DAN JENDELA
A. Lantai Dasar 280,931,500.00
B. Lantai 2 260,651,710.00
C. Lantai 3 255,444,150.00
JUMLAH VII 797,027,360.00
VIII. PEKERJAAN PLAFOND
A. Lantai Dasar 89,641,792.50
B. Lantai 2 86,329,548.00
C. Lantai 3 91,442,673.00
JUMLAH VIII 267,414,013.50
IX. PEKERJAAN PENGECATAN
A. Lantai Dasar 80,276,809.90
B. Lantai 2 79,612,775.30
C. Lantai 3 78,110,723.50
IX 238,000,308.70

X. PEKERJAAN SANITAIR
A. Lantai Dasar 80,330,350.00
B. Lantai 2 95,030,900.00
C. Lantai 3 95,030,900.00
JUMLAH X 270,392,150.00
XI. PEKERJAAN INSTALASI LISTRIK
A. Lantai 1 68,171,667.00
B. Lantai 2 68,295,089.00
C. Lantai 3 68,295,089.00
JUMLAH XI 204,761,845.00
XII. PEKERJAAN PLUMBING (INSTALASI AIR BERSIH, AIR KOTOR)
A. Lantai Dasar 48,726,056.20
B. Lantai 2 26,665,797.80
C. Lantai 3 23,295,427.80
JUMLAH XII 98,687,281.80
JUMLAH TOTAL 7,404,762,599.54
DIBULATKAN 7,404,762,000.00
KURVA S
PEKERJAAN : STRUKTUR, ARSITEKTUR & MEP
PROYEK : PROYEK PEMBANGUNAN RUMAH SUSUN MAHASISWA 3 LANTAI UNIVERSITAS BOYOLALI
LOKASI : JL. ADI SUCIPTO 170 KARANG ASEM KAB. BOYOLALI JAWA TENGAH
Cash Flow
Kegiatan : PEMBANGUNAN RUMAH SUSUN MAHASISWA UNIVERSITAS BOYOLALI
Lokasi : JL. ADI SUCIPTO 170 KARANG ASEM KAB. BOYOLALI JAWA TENGAH

PERIODE RENCANA PROGRES RENCANA ARUS KAS (Rp.)


BULAN MINGGU MINGGU KUMULATIF MINGGUAN
1 0.37 0.37 -
2 0.37 0.74 -
Bulan Ke 1
3 0.10 0.84 -
4 0.10 0.94 7,296,300.57
5 5.06 6.00 374,939,270.05
6 5.06 11.06 374,939,270.05
Bulan Ke 2
7 5.06 16.13 374,939,270.05
8 1.54 17.66 113,723,674.02
9 1.54 19.20 113,723,674.02
10 5.01 24.21 370,867,850.06
Bulan Ke 3
11 5.01 29.21 370,867,850.06
12 4.99 34.20 369,250,650.43
13 4.30 38.51 318,748,170.74
14 4.15 42.66 307,570,360.21
Bulan Ke 4
15 4.15 46.81 307,570,360.21
16 5.05 51.86 374,042,418.25
17 9.38 61.24 694,477,076.98
18 2.66 63.90 196,907,191.38
Bulan Ke 5
19 2.66 66.56 196,907,191.38
20 2.53 69.09 187,176,369.86
21 4.20 73.29 311,193,856.06
22 4.13 77.42 305,516,501.56
Bulan Ke 6
23 4.19 81.61 310,423,347.91
24 2.78 84.39 205,560,161.59
25 2.97 87.35 219,667,647.74
26 3.17 90.52 234,815,160.31
Bulan Ke 7
27 2.82 93.34 208,827,093.38
28 2.82 96.17 208,945,536.17
29 3.16 99.33 233,932,037.82
Bulan Ke 8 30 0.34 99.66 24,986,501.64
31 0.34 100.00 24,986,501.64

TOTAL 7,404,762,599.54

TOTAL DIBULATKAN 7,404,762,000.00


w
UNIVERSITAS BOYOLALI
OYOLALI JAWA TENGAH

CANA ARUS KAS (Rp.)


KUMULATIF
BULANAN
-
-
-
7,296,300.57 7,296,300.57
382,235,570.62
757,174,840.67
1,132,114,110.72
1,238,541,484.17 1,245,837,784.74
1,359,561,458.75
1,730,429,308.81
2,101,297,158.87
1,224,710,024.56 2,470,547,809.29
2,789,295,980.03
3,096,866,340.25
3,404,436,700.46
1,307,931,309.41 3,778,479,118.71
4,472,956,195.69
4,669,863,387.07
4,866,770,578.45
1,275,467,829.60 5,053,946,948.30
5,365,140,804.37
5,670,657,305.93
5,981,080,653.84
1,132,693,867.13 6,186,640,815.43
6,406,308,463.17
6,641,123,623.49
6,849,950,716.87
872,255,437.61 7,058,896,253.05
7,292,828,290.86
7,317,814,792.51
283,905,041.10 7,342,801,294.15

7,404,762,599.54

7,404,762,000.00
KODE
NO URAIAN PEKERJAAN DURASI
KEGIATAN
1 PEKERJAAN PERSIAPAN 0 A
2 PEKERJAAN TANAH & PONDASI 0 B

3 0 C
PEKERJAAN STRUKTUR BETON
4 PEKERJAAN ATAP 0 D
5 PEKERJAAN DINDING 0 E
6 PEKERJAAN PELAPIS LANTAI 0 F
7 PEKERJAAN KUSEN, PINTU & JENDELA 0 G
8 PEKERJAAN PLAFOND 0 H
9 PEKERJAAN PENGECATAN 0 I
10 PEKERJAAN SANITAIR 0 J
11 PEKERJAAN INSTALASI LISTRIK Err:509 K
12 PEK. PLUMBING (INSTALASI AIR BERSIH, AIR KOTOR) 0 L

NO URAIAN PEKERJAAN DURASI SATUAN

1 PEKERJAAN PERSIAPAN 0 MINGGU


2 PEKERJAAN TANAH & PONDASI 0 MINGGU
3 PEKERJAAN STRUKTUR BETON 0 MINGGU
4 PEKERJAAN ATAP 0 MINGGU
5 PEKERJAAN DINDING 0 MINGGU
6 PEKERJAAN PELAPIS LANTAI 0 MINGGU
7 PEKERJAAN KUSEN, PINTU & JENDELA 0 MINGGU
8 PEKERJAAN PLAFOND 0 MINGGU
9 PEKERJAAN PENGECATAN 0 MINGGU
10 PEKERJAAN SANITAIR 0 MINGGU
11 PEKERJAAN INSTALASI LISTRIK Err:509 MINGGU
12 PEK. PLUMBING (INSTALASI AIR BERSIH, AIR KOTOR) 0 MINGGU
KEGIATAN
SEBELUMNYA Kegiatan : PEMBANGUNAN RUMAH SUSUN MAHASISWA UN
Lokasi : JL. ADI SUCIPTO 170 KARANG ASEM KAB. BOYO
B
C,L

E,F KEGIATAN

I A PEKERJAAN PERSIAPAN
D B PEKERJAAN GALIAN TANAH
G C PEKERJAAN STRUKTUR BETON
I 1
J 2
3
I 4
H 5
K D PEKERJAAN ATAP
E PEKERJAAN DINDING
1
2
3
F PEKERJAAN LANTAI
1
2
3
G PEKERJAAN KUSEN, PINTU DAN JENDELA
1
2
3
H PEKERJAAN PLAFOND
1
2
3
I PEKERJAAN PENGECETAN
1
2
3
J PEKERJAAN SANITAIR
1
2
3
K PEKERJAAN INSTALASI LISTRIK
1
2
3
L PEK. PLUMBING ( INSTALASI AIR BERSIH AIR KOTOR )
1
2
L

3
TABEL CPM (AoA)

atan : PEMBANGUNAN RUMAH SUSUN MAHASISWA UNIVERSITAS BOYOLALI


si : JL. ADI SUCIPTO 170 KARANG ASEM KAB. BOYOLALI JAWA TENGAH

DURASI
JENIS PEKERJAAN
(HARI)
PEKERJAAN PERSIAPAN 14
PEKERJAAN GALIAN TANAH 14
PEKERJAAN STRUKTUR BETON
Pondasi 21
Lantai 1 12
Lantai 2 21
Lantai 3 21
Lantai Dak 12
PEKERJAAN ATAP 7
PEKERJAAN DINDING
Lantai 1 42
Lantai 2 35
Lantai 3 28
PEKERJAAN LANTAI
Lantai 1 14
Lantai 2 14
Lantai 3 14
PEKERJAAN KUSEN, PINTU DAN JENDELA
Lantai 1 14
Lantai 2 14
Lantai 3 14
PEKERJAAN PLAFOND
Lantai 1 7
Lantai 2 7
Lantai 3 7
PEKERJAAN PENGECETAN
Lantai 1 21
Lantai 2 21
Lantai 3 21
PEKERJAAN SANITAIR
Lantai 1 7
Lantai 2 7
Lantai 3 7
PEKERJAAN INSTALASI LISTRIK
Lantai 1 7
Lantai 2 7
Lantai 3 7
PEK. PLUMBING ( INSTALASI AIR BERSIH AIR KOTOR )
Lantai 1 14
Lantai 2 14
Lantai 3 14
ABEL CPM (AoA)

OLALI
GAH

ES EF LS LF TF AKTIFITAS KRITIS

0 14 0 14 0 YA
14 28 14 28 0 YA
0 YA
28 49 28 49 0 YA
49 63 49 63 2 YA
63 91 63 91 7 YA
91 119 91 119 7 YA
119 133 119 210 79 YA
113 217 210 217 97 YA

63 105 63 105 0 TIDAK


91 126 91 126 0 TIDAK
119 147 119 147 0 TIDAK
`
112 126 112 126 0 TIDAK
133 147 133 147 0 TIDAK
154 168 154 168 0 TIDAK

133 147 133 147 0 TIDAK


154 168 154 175 7 TIDAK
175 189 175 189 0 TIDAK

147 154 147 154 0 TIDAK


168 175 168 175 0 TIDAK
189 196 189 196 0 TIDAK

154 175 154 175 0 TIDAK


175 196 175 196 0 TIDAK
196 217 196 217 0 TIDAK

105 112 105 112 0 TIDAK


126 133 126 133 0 TIDAK
147 154 147 154 0 TIDAK

126 133 126 133 0 TIDAK


147 154 147 154 0 TIDAK
168 175 168 175 0 TIDAK

49 63 49 189 126
63 77 189 203 126
77 217 203 217 126
NO JENIS PEKERJAAN

1 PEKERJAAN PERSIAPAN
2 PEKERJAAN GALIAN TANAH
3 PEKERJAAN STRUKTUR BETON
1
2
3
4
5
4 PEKERJAAN ATAP
5 PEKERJAAN DINDING
1
2
3
6 PEKERJAAN LANTAI
1
2
3
7 PEKERJAAN KUSEN, PINTU DAN JENDELA
1
2
3
8 PEKERJAAN PLAFOND
1
2
3
9 PEKERJAAN PENGECETAN
1
2
3
10 PEKERJAAN SANITAIR
1
2
3
11 PEKERJAAN INSTALASI LISTRIK
1
2
3
12 PEK. PLUMBING ( INSTALASI AIR BERSIH AIR KO
1
2
3
JENIS PEKERJAAN DURASI SATUAN

PEKERJAAN PERSIAPAN 14 MINGGU


PEKERJAAN GALIAN TANAH 14 MINGGU
PEKERJAAN STRUKTUR BETON
Pondasi 21 MINGGU
Lantai 1 12 MINGGU
Lantai 2 21 MINGGU
Lantai 3 21 MINGGU
Lantai Dak 12 MINGGU
PEKERJAAN ATAP 7 MINGGU
PEKERJAAN DINDING
Lantai 1 42 MINGGU
Lantai 2 35 MINGGU
Lantai 3 28 MINGGU
PEKERJAAN LANTAI
Lantai 1 14 MINGGU
Lantai 2 14 MINGGU
Lantai 3 14 MINGGU
PEKERJAAN KUSEN, PINTU DAN JENDELA
Lantai 1 14 MINGGU
Lantai 2 14 MINGGU
Lantai 3 14 MINGGU
PEKERJAAN PLAFOND MINGGU
Lantai 1 7 MINGGU
Lantai 2 7 MINGGU
Lantai 3 7 MINGGU
PEKERJAAN PENGECETAN
Lantai 1 21 MINGGU
Lantai 2 21 MINGGU
Lantai 3 21 MINGGU
PEKERJAAN SANITAIR
Lantai 1 7 MINGGU
Lantai 2 7 MINGGU
Lantai 3 7 MINGGU
PEKERJAAN INSTALASI LISTRIK
Lantai 1 7 MINGGU
Lantai 2 7 MINGGU
Lantai 3 7 MINGGU
PEK. PLUMBING ( INSTALASI AIR BERSIH AIR KOTOR )
Lantai 1 14 MINGGU
Lantai 2 14 MINGGU
Lantai 3 14 MINGGU
KODE
NO JENIS PEKERJAAN
KEGIATAN
1 PEKERJAAN PERSIAPAN A
2 PEKERJAAN GALIAN TANAH B
3 PEKERJAAN STRUKTUR BETON
1 Pondasi C1
2 Lantai 1 C2
3 Lantai 2 C3
4 Lantai 3 C4
5 Lantai Dak C5
4 PEKERJAAN ATAP D
5 PEKERJAAN DINDING
1 Lantai 1 E1
2 Lantai 2 E2
3 Lantai 3 E3
6 PEKERJAAN LANTAI
1 Lantai 1 F1
2 Lantai 2 F2
3 Lantai 3 F3
7 PEKERJAAN KUSEN, PINTU DAN JENDELA
1 Lantai 1 G1
2 Lantai 2 G2
3 Lantai 3 G3
8 PEKERJAAN PLAFOND
1 Lantai 1 H1
2 Lantai 2 H2
3 Lantai 3 H3
9 PEKERJAAN PENGECETAN
1 Lantai 1 I1
2 Lantai 2 I2
3 Lantai 3 I3
10 PEKERJAAN SANITAIR
1 Lantai 1 J1
2 Lantai 2 J2
3 Lantai 3 J3
11 PEKERJAAN INSTALASI LISTRIK
1 Lantai 1 K1
2 Lantai 2 K2
3 Lantai 3 K3
12 PEK. PLUMBING ( INSTALASI AIR BERSIH AIR KOTOR )
1 Lantai 1 L1
2 Lantai 2 L2
3 Lantai 3 L3
KEGIATAN
SEBELUMNYA

B
C1
C2
C3
C4
C5

C2
C3
C4

J1
J2
J3

K1
K2
K3

G1
G2
G3

H1
H2
H3

E1
E2
E3

F1
F2
F3

C2
L1
L2
ANALISA TEKNIK

PROYEK : PROYEK PEMBANGUNAN RUMAH SUSUN MAHASISWA 3 LANTAI UNIVERSITAS BOYOLAL


LOKASI : JL. ADI SUCIPTO 170 KARANG ASEM KAB. BOYOLALI JAWA TENGAH

I. PEKERJAAN GALIAN
1 Pekejaan galian tanah pondasi 40.23 m3
Pekerjaan Ini membutuhkan tenaga kerja :
Pekerja dengan koefisien analis 0.835 Oh
Mandor dengan koefisien analis 0.073 Oh
Faktor tenaga kerja 0.908
Dapat menghasilkan Pekejaan galian tanah pondasi
Pekerja 1.00 org : 0.835
Mandor 1.00 org : 0.073
Total Tenaga Kerja yang di butuhkan
Pekerja 40.226625 m3 : 1.20
Mandor 40.226625 m3 : 14
Pekerjaan ini Direncanakan selesai selama = 14
Jadi setiap harinya membutuhkan
Pekerja 33.589232 hok : 14
Mandor 2.9365436 hok : 14

2 Pek. urugan pasir dibawah pondasi 26.2 m3


Pekerjaan Ini membutuhkan tenaga kerja :
Pekerja dengan koefisien analis 0.3 Oh
Mandor dengan koefisien analis 0.01 Oh
Faktor tenaga kerja 0.31
Dapat menghasilkan Pek. urugan pasir dibawah pondasi
Pekerja 1.00 : 0.3
Mandor 1.00 : 0.01
Total Tenaga Kerja yang di butuhkan
Pekerja 26.2 : 3.33
Mandor 26.2 : 100
Pekerjaan ini Direncanakan selesai selama = 4
Jadi setiap harinya membutuhkan
Pekerja 7.8490594 hok : 4
Mandor 0.2616353 hok : 4
Pekerjaan membutuhkan bahan :
Pasir Urug dengan koefisien analis 1.2 m3
Total Bahan yang dibutuhkan :
Pasir Urug 26.2 m3 x 1.2

II. PEKERJAAN PONDASI DAN BETON


1 PEKERJAAN PONDASI 40.23 m3
Pekerjaan Ini membutuhkan tenaga kerja :
Pekerja 0.78 Oh
Tukang Batu 0.39 Oh
Kepala Tukang 0.039 Oh
Mandor 0.039 Oh
Faktor Tenaga Kerja 1.248
Dapat menghasilkan
Pekerja 1 org : 0.78
Tukang Batu 1 org : 0.39
Kepala Tukang 1 org : 0.039
Mandor 1 org : 0.039
Total Tenaga Kerja yang di butuhkan
Pekerja 40.226625 m3 : 1.2820513
Tukang Batu 40.226625 m3 : 2.5641026
Kepala Tukang 40.226625 m3 : 25.641026
Mandor 40.226625 m3 : 25.641026
Pekerjaan ini Direncanakan selesai selama = 7
Jadi setiap harinya membutuhkan
Pekerja 31.376768 hok : 7
Tukang Batu 15.688384 hok : 7
Kepala Tukang 1.5688384 hok : 7
Mandor 1.5688384 hok : 7

2 Pasang sloof 30.03 m3


Pekerjaan Ini membutuhkan tenaga kerja :
Perkerja 1.65 Oh
Tukang Besi 0.07 Oh
Tukang Batu 0.275 Oh
Tukang Kayu 0.26 Oh
Kepala Tukang 0.026 Oh
Mandor 0.026 Oh
Faktor tenaga kerja 2.307
Dapat menghasilkan
Perkerja 1 org : 1.65
Tukang Besi 1 org : 0.07
Tukang Batu 1 org : 0.275
Tukang Kayu 1 org : 0.26
Kepala Tukang 1 org : 0.026
Mandor 1 org : 0.026
Total Tenaga Kerja yang di butuhkan
Perkerja 30.03 m3 : 0.6060606
Tukang Besi 30.03 m3 : 14.285714
Tukang Batu 30.03 m3 : 3.6363636
Tukang Kayu 30.03 m3 : 3.8461538
Kepala Tukang 30.03 m3 : 38.461538
Mandor 30.03 m3 : 38.461538
Pekerjaan ini Direncanakan selesai selama = 7
Jadi setiap harinya membutuhkan
Perkerja 49.5495 hok : 7
Tukang Besi 2.1021 hok : 7
Tukang Batu 8.25825 hok : 7
Tukang Kayu 7.8078 hok : 7
Kepala Tukang 0.78078 hok : 7
Mandor 0.78078 hok : 7
Pekerjaan membutuhkan bahan :
Semen Portlan (PC) (50 kg) dengan koefisien analis 371 kg
Pasir Beton dengan koefisien analis 0.5429 m3
Batu pecah 2-3 cm (Maks. 30 mm) dengan koefisien analis 0.7622 m3
Besi Beton ( Polos / Ulir ) dengan koefisien analis 201.01 kg
Kawat Beton dengan koefisien analis 0.15 kg
Papan terentang (Perancah/Acuan beton) dengan koefisien analis 0.2 m3
Paku Biasa 5 - 10 Cm dengan koefisien analis 0.15 kg
Minyak Bekisting dengan koefisien analis 0.5 ltr
Total Bahan yang dibutuhkan :
Semen Portlan (PC) (50 kg) 30.03 m3 x 371
Pasir Beton 30.03 m3 x 0.5429
Batu pecah 2-3 cm (Maks. 30 mm) 30.03 m3 x 0.7622
Besi Beton ( Polos / Ulir ) 30.03 m3 x 201.01
Kawat Beton 30.03 m3 x 0.15
Papan terentang (Perancah/Acuan beton) 30.03 m3 x 0.2
Paku Biasa 5 - 10 Cm 30.03 m3 x 0.15
Minyak Bekisting 30.03 m3 x 0.5

3 Pile Cap 42.25 m3


Pekerjaan Ini membutuhkan tenaga kerja :
Perkerja 1.65 Oh
Tukang Besi 0.07 Oh
Tukang Batu 0.275 Oh
Tukang Kayu 0.26 Oh
Kepala Tukang 0.026 Oh
Mandor 0.026 Oh
Faktor tenaga kerja 2.307
Dapat menghasilkan
Perkerja 1 org : 1.65
Tukang Besi 1 org : 0.07
Tukang Batu 1 org : 0.275
Tukang Kayu 1 org : 0.26
Kepala Tukang 1 org : 0.026
Mandor 1 org : 0.026
Total Tenaga Kerja yang di butuhkan
Perkerja 42.25 m3 : 0.6060606
Tukang Besi 42.25 m3 : 14.285714
Tukang Batu 42.25 m3 : 3.6363636
Tukang Kayu 42.25 m3 : 3.8461538
Kepala Tukang 42.25 m3 : 38.461538
Mandor 42.25 m3 : 38.461538
Pekerjaan ini Direncanakan selesai selama = 7
Jadi setiap harinya membutuhkan
Perkerja 69.7059 hok : 7
Tukang Besi 2.95722 hok : 7
Tukang Batu 11.61765 hok : 7
Tukang Kayu 10.98396 hok : 7
Kepala Tukang 1.098396 hok : 7
Mandor 1.098396 hok : 7
Pekerjaan membutuhkan bahan :
Semen Portlan (PC) (50 kg) dengan koefisien analis 371 kg
Pasir Beton dengan koefisien analis 0.5429 m3
Batu pecah 2-3 cm (Maks. 30 mm) dengan koefisien analis 0.7622 m3
Besi Beton ( Polos / Ulir ) dengan koefisien analis 201.01 kg
Kawat Beton dengan koefisien analis 0.15 kg
Papan terentang (Perancah/Acuan beton) dengan koefisien analis 0.2 m3
Paku Biasa 5 - 10 Cm dengan koefisien analis 0.15 kg
Minyak Bekisting dengan koefisien analis 0.5 ltr
Total Bahan yang dibutuhkan :
Semen Portlan (PC) (50 kg) 42.25 m3 x 371
Pasir Beton 42.25 m3 x 0.5429
Batu pecah 2-3 cm (Maks. 30 mm) 42.25 m3 x 0.7622
Besi Beton ( Polos / Ulir ) 42.25 m3 x 201.01
Kawat Beton 42.25 m3 x 0.15
Papan terentang (Perancah/Acuan beton) 42.25 m3 x 0.2
Paku Biasa 5 - 10 Cm 42.25 m3 x 0.15
Minyak Bekisting 42.25 m3 x 0.5

III. PEKERJAAN LANTAI DASAR


1 Pas. kolom beton UK 30/40 33.39 m3
Pekerjaan Ini membutuhkan tenaga kerja :
Perkerja 1.65 Oh
Tukang Besi 0.07 Oh
Tukang Batu 0.275 Oh
Tukang Kayu 0.26 Oh
Kepala Tukang 0.026 Oh
Mandor 0.026 Oh
Faktor tenaga kerja 2.307
Dapat menghasilkan
Perkerja 1 org : 1.65
Tukang Besi 1 org : 0.07
Tukang Batu 1 org : 0.275
Tukang Kayu 1 org : 0.26
Kepala Tukang 1 org : 0.026
Mandor 1 org : 0.026
Total Tenaga Kerja yang di butuhkan
Perkerja 33.39 m3 : 0.6060606
Tukang Besi 33.39 m3 : 14.285714
Tukang Batu 33.39 m3 : 3.6363636
Tukang Kayu 33.39 m3 : 3.8461538
Kepala Tukang 33.39 m3 : 38.461538
Mandor 33.39 m3 : 38.461538
Pekerjaan ini Direncanakan selesai selama = 7
Jadi setiap harinya membutuhkan
Perkerja 55.09 hok : 7
Tukang Besi 2.34 hok : 7
Tukang Batu 9.18 hok : 7
Tukang Kayu 8.68 hok : 7
Kepala Tukang 0.87 hok : 7
Mandor 0.87 hok : 7
Pekerjaan membutuhkan bahan :
Semen Portlan (PC) (50 kg) dengan koefisien analis 338 kg
Pasir Beton dengan koefisien analis 0.5429 m3
Batu pecah 2-3 cm (Maks. 30 mm) dengan koefisien analis 0.7622 m3
Besi Beton ( Polos / Ulir ) dengan koefisien analis 154 kg
Kawat Beton dengan koefisien analis 23.1 kg
Papan terentang (Perancah/Acuan beton) dengan koefisien analis 0.7272 m3
Paku 5 -12 cm dengan koefisien analis 7.272 kg
Minyak Bekisting dengan koefisien analis 3.636 ltr
Balok kayu kelas II (stoot) dengan koefisien analis 0.2727 m3
Plywood tebal 9 mm (120x240 cm) dengan koefisien analis 6.363 lbr
Dolken kayu galam, Ø(8-10), p=4 m dengan koefisien analis 36.36 btg
Kayu Balok Lokal Kelas II (2xpakai) dengan koefisien analis 18.72 btg
Paku 5 cm - 12 cm dengan koefisien analis 1.04 kg
Papan Terentang (2x pakai) 50% dengan koefisien analis 0.03328 m3
Total Bahan yang dibutuhkan :
Semen Portlan (PC) (50 kg) 33.39 m3 x 338
Pasir Beton 33.39 m3 x 0.5429
Batu pecah 2-3 cm (Maks. 30 mm) 33.39 m3 x 0.7622
Besi Beton ( Polos / Ulir ) 33.39 m3 x 154
Kawat Beton 33.39 m3 x 23.1
Papan terentang (Perancah/Acuan beton) 33.39 m3 x 0.7272
Paku 5 -12 cm 33.39 m3 x 7.272
Minyak Bekisting 33.39 m3 x 3.636
Balok kayu kelas II (stoot) 33.39 m3 x 0.2727
Plywood tebal 9 mm (120x240 cm) 33.39 m3 x 6.363
Dolken kayu galam, Ø(8-10), p=4 m 33.39 m3 x 36.36
Kayu Balok Lokal Kelas II (2xpakai) 33.39 m3 x 18.72
Paku 5 cm - 12 cm 33.39 m3 x 1.04
Papan Terentang (2x pakai) 50% 33.39 m3 x 0.03328

2 Pekerjaan Tangga 13.02 m3


Pekerjaan Ini membutuhkan tenaga kerja :
Perkerja 1.65 Oh
Tukang Besi 0.07 Oh
Tukang Batu 0.275 Oh
Tukang Kayu 0.26 Oh
Kepala Tukang 0.026 Oh
Mandor 0.026 Oh
Faktor tenaga kerja 2.307
Dapat menghasilkan
Perkerja 1 org : 1.65
Tukang Besi 1 org : 0.07
Tukang Batu 1 org : 0.275
Tukang Kayu 1 org : 0.26
Kepala Tukang 1 org : 0.026
Mandor 1 org : 0.026
Total Tenaga Kerja yang di butuhkan
Perkerja 13.02 m3 : 0.6060606
Tukang Besi 13.02 m3 : 14.285714
Tukang Batu 13.02 m3 : 3.6363636
Tukang Kayu 13.02 m3 : 3.8461538
Kepala Tukang 13.02 m3 : 38.461538
Mandor 13.02 m3 : 38.461538
Pekerjaan ini Direncanakan selesai selama = 4
Jadi setiap harinya membutuhkan
Perkerja 21.48 hok : 4
Tukang Besi 0.91 hok : 4
Tukang Batu 3.58 hok : 4
Tukang Kayu 3.39 hok : 4
Kepala Tukang 0.34 hok : 4
Mandor 0.34 hok : 4
Pekerjaan membutuhkan bahan :
Semen Portlan (PC) (50 kg) dengan koefisien analis 338 kg
Pasir Beton dengan koefisien analis 0.5429 m3
Batu pecah 2-3 cm (Maks. 30 mm) dengan koefisien analis 0.7622 m3
Besi Beton ( Polos / Ulir ) dengan koefisien analis 154 kg
Kawat Beton dengan koefisien analis 23.1 kg
Papan terentang (Perancah/Acuan beton) dengan koefisien analis 0.7272 m3
Paku 5 -12 cm dengan koefisien analis 7.272 kg
Minyak Bekisting dengan koefisien analis 3.636 ltr
Balok kayu kelas II (stoot) dengan koefisien analis 0.2727 m3
Plywood tebal 9 mm (120x240 cm) dengan koefisien analis 6.363 lbr
Dolken kayu galam, Ø(8-10), p=4 m dengan koefisien analis 36.36 btg
Kayu Balok Lokal Kelas II (2xpakai) dengan koefisien analis 18.72 btg
Paku 5 cm - 12 cm dengan koefisien analis 1.04 kg
Papan Terentang (2x pakai) 50% dengan koefisien analis 0.03328 m3
Total Bahan yang dibutuhkan :
Semen Portlan (PC) (50 kg) 13.02 m3 x 338
Pasir Beton 13.02 m3 x 0.5429
Batu pecah 2-3 cm (Maks. 30 mm) 13.02 m3 x 0.7622
Besi Beton ( Polos / Ulir ) 13.02 m3 x 154
Kawat Beton 13.02 m3 x 23.1
Papan terentang (Perancah/Acuan beton) 13.02 m3 x 0.7272
Paku 5 -12 cm 13.02 m3 x 7.272
Minyak Bekisting 13.02 m3 x 3.636
Balok kayu kelas II (stoot) 13.02 m3 x 0.2727
Plywood tebal 9 mm (120x240 cm) 13.02 m3 x 6.363
Dolken kayu galam, Ø(8-10), p=4 m 13.02 m3 x 36.36
Kayu Balok Lokal Kelas II (2xpakai) 13.02 m3 x 18.72
Paku 5 cm - 12 cm 13.02 m3 x 1.04
Papan Terentang (2x pakai) 50% 13.02 m3 x 0.03328

3 Pekerjaan Plat Bordes 3.79 m3


Pekerjaan Ini membutuhkan tenaga kerja :
Perkerja 1.65 Oh
Tukang Besi 0.07 Oh
Tukang Batu 0.275 Oh
Tukang Kayu 0.26 Oh
Kepala Tukang 0.026 Oh
Mandor 0.026 Oh
Faktor tenaga kerja 2.307
Dapat menghasilkan
Perkerja 1 org : 1.65
Tukang Besi 1 org : 0.07
Tukang Batu 1 org : 0.275
Tukang Kayu 1 org : 0.26
Kepala Tukang 1 org : 0.026
Mandor 1 org : 0.026
Total Tenaga Kerja yang di butuhkan
Perkerja 3.79 m3 : 0.6060606
Tukang Besi 3.79 m3 : 14.285714
Tukang Batu 3.79 m3 : 3.6363636
Tukang Kayu 3.79 m3 : 3.8461538
Kepala Tukang 3.79 m3 : 38.461538
Mandor 3.79 m3 : 38.461538
Pekerjaan ini Direncanakan selesai selama = 1
Jadi setiap harinya membutuhkan
Perkerja 6.2555625 hok : 1
Tukang Besi 0.2653875 hok : 1
Tukang Batu 1.0425938 hok : 1
Tukang Kayu 0.985725 hok : 1
Kepala Tukang 0.0985725 hok : 1
Mandor 0.0985725 hok : 1
Pekerjaan membutuhkan bahan :
Semen Portlan (PC) (50 kg) dengan koefisien analis 338 kg
Pasir Beton dengan koefisien analis 0.5429 m3
Batu pecah 2-3 cm (Maks. 30 mm) dengan koefisien analis 0.7622 m3
Besi Beton ( Polos / Ulir ) dengan koefisien analis 154 kg
Kawat Beton dengan koefisien analis 23.1 kg
Papan terentang (Perancah/Acuan beton) dengan koefisien analis 0.7272 m3
Paku 5 -12 cm dengan koefisien analis 7.272 kg
Minyak Bekisting dengan koefisien analis 3.636 ltr
Balok kayu kelas II (stoot) dengan koefisien analis 0.2727 m3
Plywood tebal 9 mm (120x240 cm) dengan koefisien analis 6.363 lbr
Dolken kayu galam, Ø(8-10), p=4 m dengan koefisien analis 36.36 btg
Kayu Balok Lokal Kelas II (2xpakai) dengan koefisien analis 18.72 btg
Paku 5 cm - 12 cm dengan koefisien analis 1.04 kg
Papan Terentang (2x pakai) 50% dengan koefisien analis 0.03328 m3
Total Bahan yang dibutuhkan :
Semen Portlan (PC) (50 kg) 3.79 m3 x 338
Pasir Beton 3.79 m3 x 0.5429
Batu pecah 2-3 cm (Maks. 30 mm) 3.79 m3 x 0.7622
Besi Beton ( Polos / Ulir ) 3.79 m3 x 154
Kawat Beton 3.79 m3 x 23.1
Papan terentang (Perancah/Acuan beton) 3.79 m3 x 0.7272
Paku 5 -12 cm 3.79 m3 x 7.272
Minyak Bekisting 3.79 m3 x 3.636
Balok kayu kelas II (stoot) 3.79 m3 x 0.2727
Plywood tebal 9 mm (120x240 cm) 3.79 m3 x 6.363
Dolken kayu galam, Ø(8-10), p=4 m 3.79 m3 x 36.36
Kayu Balok Lokal Kelas II (2xpakai) 3.79 m3 x 18.72
Paku 5 cm - 12 cm 3.79 m3 x 1.04
Papan Terentang (2x pakai) 50% 3.79 m3 x 0.03328

IV. PEKERJAAN LANTAI 2


1 Pasang balok B1 UK 25/40 60.66 m3
Pekerjaan Ini membutuhkan tenaga kerja :
Perkerja 1.65 Oh
Tukang Besi 0.07 Oh
Tukang Batu 0.275 Oh
Tukang Kayu 0.26 Oh
Kepala Tukang 0.026 Oh
Mandor 0.026 Oh
Faktor tenaga kerja 2.307
Dapat menghasilkan
Perkerja 1 org : 1.65
Tukang Besi 1 org : 0.07
Tukang Batu 1 org : 0.275
Tukang Kayu 1 org : 0.26
Kepala Tukang 1 org : 0.026
Mandor 1 org : 0.026
Total Tenaga Kerja yang di butuhkan
Perkerja 60.66 m3 : 0.6060606
Tukang Besi 60.66 m3 : 14.285714
Tukang Batu 60.66 m3 : 3.6363636
Tukang Kayu 60.66 m3 : 3.8461538
Kepala Tukang 60.66 m3 : 38.461538
Mandor 60.66 m3 : 38.461538
Pekerjaan ini Direncanakan selesai selama = 10
Jadi setiap harinya membutuhkan
Perkerja 100.089 hok : 10
Tukang Besi 4.2462 hok : 10
Tukang Batu 16.6815 hok : 10
Tukang Kayu 15.7716 hok : 10
Kepala Tukang 1.57716 hok : 10
Mandor 1.57716 hok : 10
Pekerjaan membutuhkan bahan :
Semen Portlan (PC) (50 kg) dengan koefisien analis 338 kg
Pasir Beton dengan koefisien analis 0.5429 m3
Batu pecah 2-3 cm (Maks. 30 mm) dengan koefisien analis 0.7622 m3
Besi Beton ( Polos / Ulir ) dengan koefisien analis 93 kg
Kawat Beton dengan koefisien analis 13.95 kg
Papan terentang (Perancah/Acuan beton) dengan koefisien analis 0.3332 m3
Paku 5 -12 cm dengan koefisien analis 3.332 kg
Minyak Bekisting dengan koefisien analis 1.666 ltr
Balok kayu kelas II (stoot) dengan koefisien analis 0.12495 m3
Plywood tebal 9 mm (120x240 cm) dengan koefisien analis 2.9155 lbr
Dolken kayu galam, Ø(8-10), p=4 m dengan koefisien analis 49.98 btg
Kayu Balok Lokal Kelas II (2xpakai) dengan koefisien analis 18.72 btg
Paku 5 cm - 12 cm dengan koefisien analis 1.04 kg
Papan Terentang (2x pakai) 50% dengan koefisien analis 0.03328 m3
Total Bahan yang dibutuhkan :
Semen Portlan (PC) (50 kg) 60.66 m3 x 338
Pasir Beton 60.66 m3 x 0.5429
Batu pecah 2-3 cm (Maks. 30 mm) 60.66 m3 x 0.7622
Besi Beton ( Polos / Ulir ) 60.66 m3 x 93
Kawat Beton 60.66 m3 x 13.95
Papan terentang (Perancah/Acuan beton) 60.66 m3 x 0.3332
Paku 5 -12 cm 60.66 m3 x 3.332
Minyak Bekisting 60.66 m3 x 1.666
Balok kayu kelas II (stoot) 60.66 m3 x 0.12495
Plywood tebal 9 mm (120x240 cm) 60.66 m3 x 2.9155
Dolken kayu galam, Ø(8-10), p=4 m 60.66 m3 x 49.98
Kayu Balok Lokal Kelas II (2xpakai) 60.66 m3 x 18.72
Paku 5 cm - 12 cm 60.66 m3 x 1.04
Papan Terentang (2x pakai) 50% 60.66 m3 x 0.03328

2 PLAT BETON 109.77 m3


Pekerjaan Ini membutuhkan tenaga kerja :
Perkerja 1.65 Oh
Tukang Besi 0.07 Oh
Tukang Batu 0.275 Oh
Tukang Kayu 0.26 Oh
Kepala Tukang 0.026 Oh
Mandor 0.026 Oh
Faktor tenaga kerja 2.307
Dapat menghasilkan
Perkerja 1 org : 1.65
Tukang Besi 1 org : 0.07
Tukang Batu 1 org : 0.275
Tukang Kayu 1 org : 0.26
Kepala Tukang 1 org : 0.026
Mandor 1 org : 0.026
Total Tenaga Kerja yang di butuhkan
Perkerja 110 m3 : 0.6060606
Tukang Besi 110 m3 : 14.285714
Tukang Batu 110 m3 : 3.6363636
Tukang Kayu 110 m3 : 3.8461538
Kepala Tukang 110 m3 : 38.461538
Mandor 110 m3 : 38.461538
Pekerjaan ini Direncanakan selesai selama = 8
Jadi setiap harinya membutuhkan
Perkerja 181 hok : 8
Tukang Besi 8 hok : 8
Tukang Batu 30 hok : 8
Tukang Kayu 29 hok : 8
Kepala Tukang 3 hok : 8
Mandor 3 hok : 8
Pekerjaan membutuhkan bahan :
Semen Portlan (PC) (50 kg) dengan koefisien analis 338 kg
Pasir Beton dengan koefisien analis 0.5429 m3
Batu pecah 2-3 cm (Maks. 30 mm) dengan koefisien analis 0.7622 m3
Besi Beton ( Polos / Ulir ) dengan koefisien analis 93 kg
Kawat Beton dengan koefisien analis 13.95 kg
Papan terentang (Perancah/Acuan beton) dengan koefisien analis 0.3332 m3
Paku 5 -12 cm dengan koefisien analis 3.332 kg
Minyak Bekisting dengan koefisien analis 1.666 ltr
Balok kayu kelas II (stoot) dengan koefisien analis 0.12495 m3
Plywood tebal 9 mm (120x240 cm) dengan koefisien analis 2.9155 lbr
Dolken kayu galam, Ø(8-10), p=4 m dengan koefisien analis 49.98 btg
Kayu Balok Lokal Kelas II (2xpakai) dengan koefisien analis 18.72 btg
Paku 5 cm - 12 cm dengan koefisien analis 1.04 kg
Papan Terentang (2x pakai) 50% dengan koefisien analis 0.03328 m3
Total Bahan yang dibutuhkan :
Semen Portlan (PC) (50 kg) 109.77 m3 x 338
Pasir Beton 109.77 m3 x 0.5429
Batu pecah 2-3 cm (Maks. 30 mm) 109.77 m3 x 0.7622
Besi Beton ( Polos / Ulir ) 109.77 m3 x 93
Kawat Beton 109.77 m3 x 13.95
Papan terentang (Perancah/Acuan beton) 109.77 m3 x 0.3332
Paku 5 -12 cm 109.77 m3 x 3.332
Minyak Bekisting 109.77 m3 x 1.666
Balok kayu kelas II (stoot) 109.77 m3 x 0.12495
Plywood tebal 9 mm (120x240 cm) 109.77 m3 x 2.9155
Dolken kayu galam, Ø(8-10), p=4 m 109.77 m3 x 49.98
Kayu Balok Lokal Kelas II (2xpakai) 109.77 m3 x 18.72
Paku 5 cm - 12 cm 109.77 m3 x 1.04
Papan Terentang (2x pakai) 50% 109.77 m3 x 0.03328

3 Pasang kolom K1 30/40 cm 39.78 m3


Pekerjaan Ini membutuhkan tenaga kerja :
Perkerja 1.65 Oh
Tukang Besi 0.07 Oh
Tukang Batu 0.275 Oh
Tukang Kayu 0.26 Oh
Kepala Tukang 0.026 Oh
Mandor 0.026 Oh
Faktor tenaga kerja 2.307
Dapat menghasilkan
Perkerja 1 org : 1.65
Tukang Besi 1 org : 0.07
Tukang Batu 1 org : 0.275
Tukang Kayu 1 org : 0.26
Kepala Tukang 1 org : 0.026
Mandor 1 org : 0.026
Total Tenaga Kerja yang di butuhkan
Perkerja 39.78 m3 : 0.6060606
Tukang Besi 39.78 m3 : 14.285714
Tukang Batu 39.78 m3 : 3.6363636
Tukang Kayu 39.78 m3 : 3.8461538
Kepala Tukang 39.78 m3 : 38.461538
Mandor 39.78 m3 : 38.461538
Pekerjaan ini Direncanakan selesai selama = 7
Jadi setiap harinya membutuhkan
Perkerja 65.637 hok : 7
Tukang Besi 2.7846 hok : 7
Tukang Batu 10.9395 hok : 7
Tukang Kayu 10.3428 hok : 7
Kepala Tukang 1.03428 hok : 7
Mandor 1.03428 hok : 7
Pekerjaan membutuhkan bahan :
Semen Portlan (PC) (50 kg) dengan koefisien analis 338 kg
Pasir Beton dengan koefisien analis 0.5429 m3
Batu pecah 2-3 cm (Maks. 30 mm) dengan koefisien analis 0.7622 m3
Besi Beton ( Polos / Ulir ) dengan koefisien analis 154 kg
Kawat Beton dengan koefisien analis 23.1 kg
Papan terentang (Perancah/Acuan beton) dengan koefisien analis 0.7272 m3
Paku 5 -12 cm dengan koefisien analis 7.272 kg
Minyak Bekisting dengan koefisien analis 3.636 ltr
Balok kayu kelas II (stoot) dengan koefisien analis 0.2727 m3
Plywood tebal 9 mm (120x240 cm) dengan koefisien analis 6.363 lbr
Dolken kayu galam, Ø(8-10), p=4 m dengan koefisien analis 36.36 btg
Kayu Balok Lokal Kelas II (2xpakai) dengan koefisien analis 18.72 btg
Paku 5 cm - 12 cm dengan koefisien analis 1.04 kg
Papan Terentang (2x pakai) 50% dengan koefisien analis 0.03328 m3
Total Bahan yang dibutuhkan :
Semen Portlan (PC) (50 kg) 39.78 m3 x 338
Pasir Beton 39.78 m3 x 0.5429
Batu pecah 2-3 cm (Maks. 30 mm) 39.78 m3 x 0.7622
Besi Beton ( Polos / Ulir ) 39.78 m3 x 154
Kawat Beton 39.78 m3 x 23.1
Papan terentang (Perancah/Acuan beton) 39.78 m3 x 0.7272
Paku 5 -12 cm 39.78 m3 x 7.272
Minyak Bekisting 39.78 m3 x 3.636
Balok kayu kelas II (stoot) 39.78 m3 x 0.2727
Plywood tebal 9 mm (120x240 cm) 39.78 m3 x 6.363
Dolken kayu galam, Ø(8-10), p=4 m 39.78 m3 x 36.36
Kayu Balok Lokal Kelas II (2xpakai) 39.78 m3 x 18.72
Paku 5 cm - 12 cm 39.78 m3 x 1.04
Papan Terentang (2x pakai) 50% 39.78 m3 x 0.03328

4 Pekerjaan Tangga 3.79 m3


Pekerjaan Ini membutuhkan tenaga kerja :
Perkerja 1.65 Oh
Tukang Besi 0.07 Oh
Tukang Batu 0.275 Oh
Tukang Kayu 0.26 Oh
Kepala Tukang 0.026 Oh
Mandor 0.026 Oh
Faktor tenaga kerja 2.307
Dapat menghasilkan
Perkerja 1 org : 1.65
Tukang Besi 1 org : 0.07
Tukang Batu 1 org : 0.275
Tukang Kayu 1 org : 0.26
Kepala Tukang 1 org : 0.026
Mandor 1 org : 0.026
Total Tenaga Kerja yang di butuhkan
Perkerja 3.79 m3 : 0.6060606
Tukang Besi 3.79 m3 : 14.285714
Tukang Batu 3.79 m3 : 3.6363636
Tukang Kayu 3.79 m3 : 3.8461538
Kepala Tukang 3.79 m3 : 38.461538
Mandor 3.79 m3 : 38.461538
Pekerjaan ini Direncanakan selesai selama = 2
Jadi setiap harinya membutuhkan
Perkerja 6.26 hok : 2
Tukang Besi 0.27 hok : 2
Tukang Batu 1.04 hok : 2
Tukang Kayu 0.99 hok : 2
Kepala Tukang 0.10 hok : 2
Mandor 0.10 hok : 2
Pekerjaan membutuhkan bahan :
Semen Portlan (PC) (50 kg) dengan koefisien analis 338 kg
Pasir Beton dengan koefisien analis 0.5429 m3
Batu pecah 2-3 cm (Maks. 30 mm) dengan koefisien analis 0.7622 m3
Besi Beton ( Polos / Ulir ) dengan koefisien analis 154 kg
Kawat Beton dengan koefisien analis 23.1 kg
Papan terentang (Perancah/Acuan beton) dengan koefisien analis 0.7272 m3
Paku 5 -12 cm dengan koefisien analis 7.272 kg
Minyak Bekisting dengan koefisien analis 3.636 ltr
Balok kayu kelas II (stoot) dengan koefisien analis 0.2727 m3
Plywood tebal 9 mm (120x240 cm) dengan koefisien analis 6.363 lbr
Dolken kayu galam, Ø(8-10), p=4 m dengan koefisien analis 36.36 btg
Kayu Balok Lokal Kelas II (2xpakai) dengan koefisien analis 18.72 btg
Paku 5 cm - 12 cm dengan koefisien analis 1.04 kg
Papan Terentang (2x pakai) 50% dengan koefisien analis 0.03328 m3
Total Bahan yang dibutuhkan :
Semen Portlan (PC) (50 kg) 3.79 m3 x 338
Pasir Beton 3.79 m3 x 0.5429
Batu pecah 2-3 cm (Maks. 30 mm) 3.79 m3 x 0.7622
Besi Beton ( Polos / Ulir ) 3.79 m3 x 154
Kawat Beton 3.79 m3 x 23.1
Papan terentang (Perancah/Acuan beton) 3.79 m3 x 0.7272
Paku 5 -12 cm 3.79 m3 x 7.272
Minyak Bekisting 3.79 m3 x 3.636
Balok kayu kelas II (stoot) 3.79 m3 x 0.2727
Plywood tebal 9 mm (120x240 cm) 3.79 m3 x 6.363
Dolken kayu galam, Ø(8-10), p=4 m 3.79 m3 x 36.36
Kayu Balok Lokal Kelas II (2xpakai) 3.79 m3 x 18.72
Paku 5 cm - 12 cm 3.79 m3 x 1.04
Papan Terentang (2x pakai) 50% 3.79 m3 x 0.03328

5 Pekerjaan Plat Bordes 3.35 m3


Pekerjaan Ini membutuhkan tenaga kerja :
Perkerja 1.65 Oh
Tukang Besi 0.07 Oh
Tukang Batu 0.275 Oh
Tukang Kayu 0.26 Oh
Kepala Tukang 0.026 Oh
Mandor 0.026 Oh
Faktor tenaga kerja 2.307
Dapat menghasilkan
Perkerja 1 org : 1.65
Tukang Besi 1 org : 0.07
Tukang Batu 1 org : 0.275
Tukang Kayu 1 org : 0.26
Kepala Tukang 1 org : 0.026
Mandor 1 org : 0.026
Total Tenaga Kerja yang di butuhkan
Perkerja 3.35 m3 : 0.6060606
Tukang Besi 3.35 m3 : 14.285714
Tukang Batu 3.35 m3 : 3.6363636
Tukang Kayu 3.35 m3 : 3.8461538
Kepala Tukang 3.35 m3 : 38.461538
Mandor 3.35 m3 : 38.461538
Pekerjaan ini Direncanakan selesai selama = 1
Jadi setiap harinya membutuhkan
Perkerja 5.5275 hok : 1
Tukang Besi 0.2345 hok : 1
Tukang Batu 0.92125 hok : 1
Tukang Kayu 0.871 hok : 1
Kepala Tukang 0.0871 hok : 1
Mandor 0.0871 hok : 1
Pekerjaan membutuhkan bahan :
Semen Portlan (PC) (50 kg) dengan koefisien analis 338 kg
Pasir Beton dengan koefisien analis 0.5429 m3
Batu pecah 2-3 cm (Maks. 30 mm) dengan koefisien analis 0.7622 m3
Besi Beton ( Polos / Ulir ) dengan koefisien analis 154 kg
Kawat Beton dengan koefisien analis 23.1 kg
Papan terentang (Perancah/Acuan beton) dengan koefisien analis 0.7272 m3
Paku 5 -12 cm dengan koefisien analis 7.272 kg
Minyak Bekisting dengan koefisien analis 3.636 ltr
Balok kayu kelas II (stoot) dengan koefisien analis 0.2727 m3
Plywood tebal 9 mm (120x240 cm) dengan koefisien analis 6.363 lbr
Dolken kayu galam, Ø(8-10), p=4 m dengan koefisien analis 36.36 btg
Kayu Balok Lokal Kelas II (2xpakai) dengan koefisien analis 18.72 btg
Paku 5 cm - 12 cm dengan koefisien analis 1.04 kg
Papan Terentang (2x pakai) 50% dengan koefisien analis 0.03328 m3
Total Bahan yang dibutuhkan :
Semen Portlan (PC) (50 kg) 3.35 m3 x 338
Pasir Beton 3.35 m3 x 0.5429
Batu pecah 2-3 cm (Maks. 30 mm) 3.35 m3 x 0.7622
Besi Beton ( Polos / Ulir ) 3.35 m3 x 154
Kawat Beton 3.35 m3 x 23.1
Papan terentang (Perancah/Acuan beton) 3.35 m3 x 0.7272
Paku 5 -12 cm 3.35 m3 x 7.272
Minyak Bekisting 3.35 m3 x 3.636
Balok kayu kelas II (stoot) 3.35 m3 x 0.2727
Plywood tebal 9 mm (120x240 cm) 3.35 m3 x 6.363
Dolken kayu galam, Ø(8-10), p=4 m 3.35 m3 x 36.36
Kayu Balok Lokal Kelas II (2xpakai) 3.35 m3 x 18.72
Paku 5 cm - 12 cm 3.35 m3 x 1.04
Papan Terentang (2x pakai) 50% 3.35 m3 x 0.03328

VI. LANTAI 3
1 Pasang balok B1 UK 25/40 46.92 m3
Pekerjaan Ini membutuhkan tenaga kerja :
Perkerja 1.65 Oh
Tukang Besi 0.07 Oh
Tukang Batu 0.275 Oh
Tukang Kayu 0.26 Oh
Kepala Tukang 0.026 Oh
Mandor 0.026 Oh
Faktor tenaga kerja 2.307
Dapat menghasilkan
Perkerja 1 org : 1.65
Tukang Besi 1 org : 0.07
Tukang Batu 1 org : 0.275
Tukang Kayu 1 org : 0.26
Kepala Tukang 1 org : 0.026
Mandor 1 org : 0.026
Total Tenaga Kerja yang di butuhkan
Perkerja 46.92 m3 : 0.6060606
Tukang Besi 46.92 m3 : 14.285714
Tukang Batu 46.92 m3 : 3.6363636
Tukang Kayu 46.92 m3 : 3.8461538
Kepala Tukang 46.92 m3 : 38.461538
Mandor 46.92 m3 : 38.461538
Pekerjaan ini Direncanakan selesai selama = 7
Jadi setiap harinya membutuhkan
Perkerja 77.418 hok : 7
Tukang Besi 3.2844 hok : 7
Tukang Batu 12.903 hok : 7
Tukang Kayu 12.1992 hok : 7
Kepala Tukang 1.21992 hok : 7
Mandor 1.21992 hok : 7
Pekerjaan membutuhkan bahan :
Semen Portlan (PC) (50 kg) dengan koefisien analis 338 kg
Pasir Beton dengan koefisien analis 0.5429 m3
Batu pecah 2-3 cm (Maks. 30 mm) dengan koefisien analis 0.7622 m3
Besi Beton ( Polos / Ulir ) dengan koefisien analis 93 kg
Kawat Beton dengan koefisien analis 13.95 kg
Papan terentang (Perancah/Acuan beton) dengan koefisien analis 0.3332 m3
Paku 5 -12 cm dengan koefisien analis 3.332 kg
Minyak Bekisting dengan koefisien analis 1.666 ltr
Balok kayu kelas II (stoot) dengan koefisien analis 0.12495 m3
Plywood tebal 9 mm (120x240 cm) dengan koefisien analis 2.9155 lbr
Dolken kayu galam, Ø(8-10), p=4 m dengan koefisien analis 49.98 btg
Kayu Balok Lokal Kelas II (2xpakai) dengan koefisien analis 18.72 btg
Paku 5 cm - 12 cm dengan koefisien analis 1.04 kg
Papan Terentang (2x pakai) 50% dengan koefisien analis 0.03328 m3
Total Bahan yang dibutuhkan :
Semen Portlan (PC) (50 kg) 46.92 m3 x 338
Pasir Beton 46.92 m3 x 0.5429
Batu pecah 2-3 cm (Maks. 30 mm) 46.92 m3 x 0.7622
Besi Beton ( Polos / Ulir ) 46.92 m3 x 93
Kawat Beton 46.92 m3 x 13.95
Papan terentang (Perancah/Acuan beton) 46.92 m3 x 0.3332
Paku 5 -12 cm 46.92 m3 x 3.332
Minyak Bekisting 46.92 m3 x 1.666
Balok kayu kelas II (stoot) 46.92 m3 x 0.12495
Plywood tebal 9 mm (120x240 cm) 46.92 m3 x 2.9155
Dolken kayu galam, Ø(8-10), p=4 m 46.92 m3 x 49.98
Kayu Balok Lokal Kelas II (2xpakai) 46.92 m3 x 18.72
Paku 5 cm - 12 cm 46.92 m3 x 1.04
Papan Terentang (2x pakai) 50% 46.92 m3 x 0.03328

2 PLAT BETON 109.77 m3


Pekerjaan Ini membutuhkan tenaga kerja :
Perkerja 1.65 Oh
Tukang Besi 0.07 Oh
Tukang Batu 0.275 Oh
Tukang Kayu 0.26 Oh
Kepala Tukang 0.026 Oh
Mandor 0.026 Oh
Faktor tenaga kerja 2.307
Dapat menghasilkan
Perkerja 1 org : 1.65
Tukang Besi 1 org : 0.07
Tukang Batu 1 org : 0.275
Tukang Kayu 1 org : 0.26
Kepala Tukang 1 org : 0.026
Mandor 1 org : 0.026
Total Tenaga Kerja yang di butuhkan
Perkerja 109.77 m3 : 0.6060606
Tukang Besi 109.77 m3 : 14.285714
Tukang Batu 109.77 m3 : 3.6363636
Tukang Kayu 109.77 m3 : 3.8461538
Kepala Tukang 109.77 m3 : 38.461538
Mandor 109.77 m3 : 38.461538
Pekerjaan ini Direncanakan selesai selama = 7
Jadi setiap harinya membutuhkan
Perkerja 181.1139 hok : 7
Tukang Besi 7.68362 hok : 7
Tukang Batu 30.18565 hok : 7
Tukang Kayu 28.53916 hok : 7
Kepala Tukang 2.853916 hok : 7
Mandor 2.853916 hok : 7
Pekerjaan membutuhkan bahan :
Semen Portlan (PC) (50 kg) dengan koefisien analis 338 kg
Pasir Beton dengan koefisien analis 0.5429 m3
Batu pecah 2-3 cm (Maks. 30 mm) dengan koefisien analis 0.7622 m3
Besi Beton ( Polos / Ulir ) dengan koefisien analis 93 kg
Kawat Beton dengan koefisien analis 13.95 kg
Papan terentang (Perancah/Acuan beton) dengan koefisien analis 0.3332 m3
Paku 5 -12 cm dengan koefisien analis 3.332 kg
Minyak Bekisting dengan koefisien analis 1.666 ltr
Balok kayu kelas II (stoot) dengan koefisien analis 0.12495 m3
Plywood tebal 9 mm (120x240 cm) dengan koefisien analis 2.9155 lbr
Dolken kayu galam, Ø(8-10), p=4 m dengan koefisien analis 49.98 btg
Kayu Balok Lokal Kelas II (2xpakai) dengan koefisien analis 18.72 btg
Paku 5 cm - 12 cm dengan koefisien analis 1.04 kg
Papan Terentang (2x pakai) 50% dengan koefisien analis 0.03328 m3
Total Bahan yang dibutuhkan :
Semen Portlan (PC) (50 kg) 109.77 m3 x 338
Pasir Beton 109.77 m3 x 0.5429
Batu pecah 2-3 cm (Maks. 30 mm) 109.77 m3 x 0.7622
Besi Beton ( Polos / Ulir ) 109.77 m3 x 93
Kawat Beton 109.77 m3 x 13.95
Papan terentang (Perancah/Acuan beton) 109.77 m3 x 0.3332
Paku 5 -12 cm 109.77 m3 x 3.332
Minyak Bekisting 109.77 m3 x 1.666
Balok kayu kelas II (stoot) 109.77 m3 x 0.12495
Plywood tebal 9 mm (120x240 cm) 109.77 m3 x 2.9155
Dolken kayu galam, Ø(8-10), p=4 m 109.77 m3 x 49.98
Kayu Balok Lokal Kelas II (2xpakai) 109.77 m3 x 18.72
Paku 5 cm - 12 cm 109.77 m3 x 1.04
Papan Terentang (2x pakai) 50% 109.77 m3 x 0.03328

3 Pasang kolom K1 30/40 379.392 m3


Pekerjaan Ini membutuhkan tenaga kerja :
Perkerja 1.65 Oh
Tukang Besi 0.07 Oh
Tukang Batu 0.275 Oh
Tukang Kayu 0.26 Oh
Kepala Tukang 0.026 Oh
Mandor 0.026 Oh
Faktor tenaga kerja 2.307
Dapat menghasilkan
Perkerja 1 org : 1.65
Tukang Besi 1 org : 0.07
Tukang Batu 1 org : 0.275
Tukang Kayu 1 org : 0.26
Kepala Tukang 1 org : 0.026
Mandor 1 org : 0.026
Total Tenaga Kerja yang di butuhkan
Perkerja 379.392 m3 : 0.6060606
Tukang Besi 379.392 m3 : 14.285714
Tukang Batu 379.392 m3 : 3.6363636
Tukang Kayu 379.392 m3 : 3.8461538
Kepala Tukang 379.392 m3 : 38.461538
Mandor 379.392 m3 : 38.461538
Pekerjaan ini Direncanakan selesai selama = 12
Jadi setiap harinya membutuhkan
Perkerja 625.9968 hok : 12
Tukang Besi 26.55744 hok : 12
Tukang Batu 104.3328 hok : 12
Tukang Kayu 98.64192 hok : 12
Kepala Tukang 9.864192 hok : 12
Mandor 9.864192 hok : 12
Pekerjaan membutuhkan bahan :
Semen Portlan (PC) (50 kg) dengan koefisien analis 338 kg
Pasir Beton dengan koefisien analis 0.5429 m3
Batu pecah 2-3 cm (Maks. 30 mm) dengan koefisien analis 0.7622 m3
Besi Beton ( Polos / Ulir ) dengan koefisien analis 154 kg
Kawat Beton dengan koefisien analis 23.1 kg
Papan terentang (Perancah/Acuan beton) dengan koefisien analis 0.7272 m3
Paku 5 -12 cm dengan koefisien analis 7.272 kg
Minyak Bekisting dengan koefisien analis 3.636 ltr
Balok kayu kelas II (stoot) dengan koefisien analis 0.2727 m3
Plywood tebal 9 mm (120x240 cm) dengan koefisien analis 6.363 lbr
Dolken kayu galam, Ø(8-10), p=4 m dengan koefisien analis 36.36 btg
Kayu Balok Lokal Kelas II (2xpakai) dengan koefisien analis 18.72 btg
Paku 5 cm - 12 cm dengan koefisien analis 1.04 kg
Papan Terentang (2x pakai) 50% dengan koefisien analis 0.03328 m3
Total Bahan yang dibutuhkan :
Semen Portlan (PC) (50 kg) 379.392 m3 x 338
Pasir Beton 379.392 m3 x 0.5429
Batu pecah 2-3 cm (Maks. 30 mm) 379.392 m3 x 0.7622
Besi Beton ( Polos / Ulir ) 379.392 m3 x 154
Kawat Beton 379.392 m3 x 23.1
Papan terentang (Perancah/Acuan beton) 379.392 m3 x 0.7272
Paku 5 -12 cm 379.392 m3 x 7.272
Minyak Bekisting 379.392 m3 x 3.636
Balok kayu kelas II (stoot) 379.392 m3 x 0.2727
Plywood tebal 9 mm (120x240 cm) 379.392 m3 x 6.363
Dolken kayu galam, Ø(8-10), p=4 m 379.392 m3 x 36.36
Kayu Balok Lokal Kelas II (2xpakai) 379.392 m3 x 18.72
Paku 5 cm - 12 cm 379.392 m3 x 1.04
Papan Terentang (2x pakai) 50% 379.392 m3 x 0.03328

4 Pekerjaan Tangga 3.79 m3


Pekerjaan Ini membutuhkan tenaga kerja :
Perkerja 1.65 Oh
Tukang Besi 0.07 Oh
Tukang Batu 0.275 Oh
Tukang Kayu 0.26 Oh
Kepala Tukang 0.026 Oh
Mandor 0.026 Oh
Faktor tenaga kerja 2.307
Dapat menghasilkan
Perkerja 1 org : 1.65
Tukang Besi 1 org : 0.07
Tukang Batu 1 org : 0.275
Tukang Kayu 1 org : 0.26
Kepala Tukang 1 org : 0.026
Mandor 1 org : 0.026
Total Tenaga Kerja yang di butuhkan
Perkerja 3.79 m3 : 0.6060606
Tukang Besi 3.79 m3 : 14.285714
Tukang Batu 3.79 m3 : 3.6363636
Tukang Kayu 3.79 m3 : 3.8461538
Kepala Tukang 3.79 m3 : 38.461538
Mandor 3.79 m3 : 38.461538
Pekerjaan ini Direncanakan selesai selama = 1
Jadi setiap harinya membutuhkan
Perkerja 6.26 hok : 1
Tukang Besi 0.27 hok : 1
Tukang Batu 1.04 hok : 1
Tukang Kayu 0.99 hok : 1
Kepala Tukang 0.10 hok : 1
Mandor 0.10 hok : 1
Pekerjaan membutuhkan bahan :
Semen Portlan (PC) (50 kg) dengan koefisien analis 338 kg
Pasir Beton dengan koefisien analis 0.5429 m3
Batu pecah 2-3 cm (Maks. 30 mm) dengan koefisien analis 0.7622 m3
Besi Beton ( Polos / Ulir ) dengan koefisien analis 154 kg
Kawat Beton dengan koefisien analis 23.1 kg
Papan terentang (Perancah/Acuan beton) dengan koefisien analis 0.7272 m3
Paku 5 -12 cm dengan koefisien analis 7.272 kg
Minyak Bekisting dengan koefisien analis 3.636 ltr
Balok kayu kelas II (stoot) dengan koefisien analis 0.2727 m3
Plywood tebal 9 mm (120x240 cm) dengan koefisien analis 6.363 lbr
Dolken kayu galam, Ø(8-10), p=4 m dengan koefisien analis 36.36 btg
Kayu Balok Lokal Kelas II (2xpakai) dengan koefisien analis 18.72 btg
Paku 5 cm - 12 cm dengan koefisien analis 1.04 kg
Papan Terentang (2x pakai) 50% dengan koefisien analis 0.03328 m3
Total Bahan yang dibutuhkan :
Semen Portlan (PC) (50 kg) 3.79 m3 x 338
Pasir Beton 3.79 m3 x 0.5429
Batu pecah 2-3 cm (Maks. 30 mm) 3.79 m3 x 0.7622
Besi Beton ( Polos / Ulir ) 3.79 m3 x 154
Kawat Beton 3.79 m3 x 23.1
Papan terentang (Perancah/Acuan beton) 3.79 m3 x 0.7272
Paku 5 -12 cm 3.79 m3 x 7.272
Minyak Bekisting 3.79 m3 x 3.636
Balok kayu kelas II (stoot) 3.79 m3 x 0.2727
Plywood tebal 9 mm (120x240 cm) 3.79 m3 x 6.363
Dolken kayu galam, Ø(8-10), p=4 m 3.79 m3 x 36.36
Kayu Balok Lokal Kelas II (2xpakai) 3.79 m3 x 18.72
Paku 5 cm - 12 cm 3.79 m3 x 1.04
Papan Terentang (2x pakai) 50% 3.79 m3 x 0.03328

5 Pekerjaan Plat Bordes 3.35 m3


Pekerjaan Ini membutuhkan tenaga kerja :
Perkerja 1.65 Oh
Tukang Besi 0.07 Oh
Tukang Batu 0.275 Oh
Tukang Kayu 0.26 Oh
Kepala Tukang 0.026 Oh
Mandor 0.026 Oh
Faktor tenaga kerja 2.307
Dapat menghasilkan
Perkerja 1 org : 1.65
Tukang Besi 1 org : 0.07
Tukang Batu 1 org : 0.275
Tukang Kayu 1 org : 0.26
Kepala Tukang 1 org : 0.026
Mandor 1 org : 0.026
Total Tenaga Kerja yang di butuhkan
Perkerja 3.35 m3 : 0.6060606
Tukang Besi 3.35 m3 : 14.285714
Tukang Batu 3.35 m3 : 3.6363636
Tukang Kayu 3.35 m3 : 3.8461538
Kepala Tukang 3.35 m3 : 38.461538
Mandor 3.35 m3 : 38.461538
Pekerjaan ini Direncanakan selesai selama = 1
Jadi setiap harinya membutuhkan
Perkerja 5.5275 hok : 1
Tukang Besi 0.2345 hok : 1
Tukang Batu 0.92125 hok : 1
Tukang Kayu 0.871 hok : 1
Kepala Tukang 0.0871 hok : 1
Mandor 0.0871 hok : 1
Pekerjaan membutuhkan bahan :
Semen Portlan (PC) (50 kg) dengan koefisien analis 338 kg
Pasir Beton dengan koefisien analis 0.5429 m3
Batu pecah 2-3 cm (Maks. 30 mm) dengan koefisien analis 0.7622 m3
Besi Beton ( Polos / Ulir ) dengan koefisien analis 154 kg
Kawat Beton dengan koefisien analis 23.1 kg
Papan terentang (Perancah/Acuan beton) dengan koefisien analis 0.7272 m3
Paku 5 -12 cm dengan koefisien analis 7.272 kg
Minyak Bekisting dengan koefisien analis 3.636 ltr
Balok kayu kelas II (stoot) dengan koefisien analis 0.2727 m3
Plywood tebal 9 mm (120x240 cm) dengan koefisien analis 6.363 lbr
Dolken kayu galam, Ø(8-10), p=4 m dengan koefisien analis 36.36 btg
Kayu Balok Lokal Kelas II (2xpakai) dengan koefisien analis 18.72 btg
Paku 5 cm - 12 cm dengan koefisien analis 1.04 kg
Papan Terentang (2x pakai) 50% dengan koefisien analis 0.03328 m3
Total Bahan yang dibutuhkan :
Semen Portlan (PC) (50 kg) 3.35 m3 x 338
Pasir Beton 3.35 m3 x 0.5429
Batu pecah 2-3 cm (Maks. 30 mm) 3.35 m3 x 0.7622
Besi Beton ( Polos / Ulir ) 3.35 m3 x 154
Kawat Beton 3.35 m3 x 23.1
Papan terentang (Perancah/Acuan beton) 3.35 m3 x 0.7272
Paku 5 -12 cm 3.35 m3 x 7.272
Minyak Bekisting 3.35 m3 x 3.636
Balok kayu kelas II (stoot) 3.35 m3 x 0.2727
Plywood tebal 9 mm (120x240 cm) 3.35 m3 x 6.363
Dolken kayu galam, Ø(8-10), p=4 m 3.35 m3 x 36.36
Kayu Balok Lokal Kelas II (2xpakai) 3.35 m3 x 18.72
Paku 5 cm - 12 cm 3.35 m3 x 1.04
Papan Terentang (2x pakai) 50% 3.35 m3 x 0.03328

VII. LANTAI DAK


1 Pasang balok B1 UK 25/40 53.08 m3
Pekerjaan Ini membutuhkan tenaga kerja :
Perkerja 1.65 Oh
Tukang Besi 0.07 Oh
Tukang Batu 0.275 Oh
Tukang Kayu 0.26 Oh
Kepala Tukang 0.026 Oh
Mandor 0.026 Oh
Faktor tenaga kerja 2.307
Dapat menghasilkan
Perkerja 1 org : 1.65
Tukang Besi 1 org : 0.07
Tukang Batu 1 org : 0.275
Tukang Kayu 1 org : 0.26
Kepala Tukang 1 org : 0.026
Mandor 1 org : 0.026
Total Tenaga Kerja yang di butuhkan
Perkerja 53.08 m3 : 0.6060606
Tukang Besi 53.08 m3 : 14.285714
Tukang Batu 53.08 m3 : 3.6363636
Tukang Kayu 53.08 m3 : 3.8461538
Kepala Tukang 53.08 m3 : 38.461538
Mandor 53.08 m3 : 38.461538
Pekerjaan ini Direncanakan selesai selama = 7
Jadi setiap harinya membutuhkan
Perkerja 87.57375 hok : 7
Tukang Besi 3.71525 hok : 7
Tukang Batu 14.595625 hok : 7
Tukang Kayu 13.7995 hok : 7
Kepala Tukang 1.37995 hok : 7
Mandor 1.37995 hok : 7
Pekerjaan membutuhkan bahan :
Semen Portlan (PC) (50 kg) dengan koefisien analis 338 kg
Pasir Beton dengan koefisien analis 0.5429 m3
Batu pecah 2-3 cm (Maks. 30 mm) dengan koefisien analis 0.7622 m3
Besi Beton ( Polos / Ulir ) dengan koefisien analis 93 kg
Kawat Beton dengan koefisien analis 13.95 kg
Papan terentang (Perancah/Acuan beton) dengan koefisien analis 0.3332 m3
Paku 5 -12 cm dengan koefisien analis 3.332 kg
Minyak Bekisting dengan koefisien analis 1.666 ltr
Balok kayu kelas II (stoot) dengan koefisien analis 0.12495 m3
Plywood tebal 9 mm (120x240 cm) dengan koefisien analis 2.9155 lbr
Dolken kayu galam, Ø(8-10), p=4 m dengan koefisien analis 49.98 btg
Kayu Balok Lokal Kelas II (2xpakai) dengan koefisien analis 18.72 btg
Paku 5 cm - 12 cm dengan koefisien analis 1.04 kg
Papan Terentang (2x pakai) 50% dengan koefisien analis 0.03328 m3
Total Bahan yang dibutuhkan :
Semen Portlan (PC) (50 kg) 53.08 m3 x 338
Pasir Beton 53.08 m3 x 0.5429
Batu pecah 2-3 cm (Maks. 30 mm) 53.08 m3 x 0.7622
Besi Beton ( Polos / Ulir ) 53.08 m3 x 93
Kawat Beton 53.08 m3 x 13.95
Papan terentang (Perancah/Acuan beton) 53.08 m3 x 0.3332
Paku 5 -12 cm 53.08 m3 x 3.332
Minyak Bekisting 53.08 m3 x 1.666
Balok kayu kelas II (stoot) 53.08 m3 x 0.12495
Plywood tebal 9 mm (120x240 cm) 53.08 m3 x 2.9155
Dolken kayu galam, Ø(8-10), p=4 m 53.08 m3 x 49.98
Kayu Balok Lokal Kelas II (2xpakai) 53.08 m3 x 18.72
Paku 5 cm - 12 cm 53.08 m3 x 1.04
Papan Terentang (2x pakai) 50% 53.08 m3 x 0.03328

2 PLAT BETON 88.91 m3


Pekerjaan Ini membutuhkan tenaga kerja :
Perkerja 1.65 Oh
Tukang Besi 0.07 Oh
Tukang Batu 0.275 Oh
Tukang Kayu 0.26 Oh
Kepala Tukang 0.026 Oh
Mandor 0.026 Oh
Faktor tenaga kerja 2.307
Dapat menghasilkan
Perkerja 1 org : 1.65
Tukang Besi 1 org : 0.07
Tukang Batu 1 org : 0.275
Tukang Kayu 1 org : 0.26
Kepala Tukang 1 org : 0.026
Mandor 1 org : 0.026
Total Tenaga Kerja yang di butuhkan
Perkerja 88.91 m3 : 0.6060606
Tukang Besi 88.91 m3 : 14.285714
Tukang Batu 88.91 m3 : 3.6363636
Tukang Kayu 88.91 m3 : 3.8461538
Kepala Tukang 88.91 m3 : 38.461538
Mandor 88.91 m3 : 38.461538
Pekerjaan ini Direncanakan selesai selama = 7
Jadi setiap harinya membutuhkan
Perkerja 146.7015 hok : 7
Tukang Besi 6.2237 hok : 7
Tukang Batu 24.45025 hok : 7
Tukang Kayu 23.1166 hok : 7
Kepala Tukang 2.31166 hok : 7
Mandor 2.31166 hok : 7
Pekerjaan membutuhkan bahan :
Semen Portlan (PC) (50 kg) dengan koefisien analis 338 kg
Pasir Beton dengan koefisien analis 0.5429 m3
Batu pecah 2-3 cm (Maks. 30 mm) dengan koefisien analis 0.7622 m3
Besi Beton ( Polos / Ulir ) dengan koefisien analis 93 kg
Kawat Beton dengan koefisien analis 13.95 kg
Papan terentang (Perancah/Acuan beton) dengan koefisien analis 0.3332 m3
Paku 5 -12 cm dengan koefisien analis 3.332 kg
Minyak Bekisting dengan koefisien analis 1.666 ltr
Balok kayu kelas II (stoot) dengan koefisien analis 0.12495 m3
Plywood tebal 9 mm (120x240 cm) dengan koefisien analis 2.9155 lbr
Dolken kayu galam, Ø(8-10), p=4 m dengan koefisien analis 49.98 btg
Kayu Balok Lokal Kelas II (2xpakai) dengan koefisien analis 18.72 btg
Paku 5 cm - 12 cm dengan koefisien analis 1.04 kg
Papan Terentang (2x pakai) 50% dengan koefisien analis 0.03328 m3
Total Bahan yang dibutuhkan :
Semen Portlan (PC) (50 kg) 88.91 m3 x 338
Pasir Beton 88.91 m3 x 0.5429
Batu pecah 2-3 cm (Maks. 30 mm) 88.91 m3 x 0.7622
Besi Beton ( Polos / Ulir ) 88.91 m3 x 93
Kawat Beton 88.91 m3 x 13.95
Papan terentang (Perancah/Acuan beton) 88.91 m3 x 0.3332
Paku 5 -12 cm 88.91 m3 x 3.332
Minyak Bekisting 88.91 m3 x 1.666
Balok kayu kelas II (stoot) 88.91 m3 x 0.12495
Plywood tebal 9 mm (120x240 cm) 88.91 m3 x 2.9155
Dolken kayu galam, Ø(8-10), p=4 m 88.91 m3 x 49.98
Kayu Balok Lokal Kelas II (2xpakai) 88.91 m3 x 18.72
Paku 5 cm - 12 cm 88.91 m3 x 1.04
Papan Terentang (2x pakai) 50% 88.91 m3 x 0.03328

VIII. PEKERJAAN DINDING


1 LANTAI DASAR
A Pasang dinding 1 bata merah 1175.98 m2
Pekerjaan Ini membutuhkan tenaga kerja :
Perkerja 0.65 Oh
Tukang Batu 0.2 Oh
Kepala Tukang 0.02 Oh
Mandor 0.03 Oh
Faktor tenaga kerja 0.9
Dapat menghasilkan Pasang dinding 1 bata merah
Perkerja 1 org : 0.65
Tukang Batu 1 org : 0.2
Kepala Tukang 1 org : 0.02
Mandor 1 org : 0.03
Total Tenaga Kerja yang di butuhkan
Perkerja 1175.98 m2 : 1.5384615
Tukang Batu 1175.98 m2 : 5
Kepala Tukang 1175.98 m2 : 50
Mandor 1175.98 m2 : 33.333333
Pekerjaan ini Direncanakan selesai selama = 4
Jadi setiap harinya membutuhkan
Perkerja 16.95785 hok : 4
Tukang Batu 5.2178 hok : 4
Kepala Tukang 0.52178 hok : 4
Mandor 0.78267 hok : 4
Pekerjaan membutuhkan bahan :
Bata Merah dengan koefisien analis 140 Bh
Semen Portlan (PC) (50 kg) dengan koefisien analis 22.2 Kg
Pasir pasang dengan koefisien analis 0.102 M³
Total Bahan yang dibutuhkan :
Bata Merah 1175.98 m2 x 140
Semen Portlan (PC) (50 kg) 1175.98 m2 x 22.2
Pasir pasang 1175.98 m2 x 0.102

B Pekerjaan acian dinding bata 1959.79 m2


Pekerjaan Ini membutuhkan tenaga kerja :
Perkerja 0.2 Oh
Tukang Batu 0.1 Oh
Kepala Tukang 0.01 Oh
Mandor 0.01 Oh
Faktor tenaga kerja 0.32
Dapat menghasilkan Pekerjaan acian dinding bata
Perkerja 1 org : 0.2
Tukang Batu 1 org : 0.1
Kepala Tukang 1 org : 0.01
Mandor 1 org : 0.01
Total Tenaga Kerja yang di butuhkan
Perkerja 1959.79 m2 : 5
Tukang Batu 1959.79 m2 : 10
Kepala Tukang 1959.79 m2 : 100
Mandor 1959.79 m2 : 100
Pekerjaan ini Direncanakan selesai selama = 38
Jadi setiap harinya membutuhkan
Perkerja 391.958 hok : 38
Tukang Batu 195.979 hok : 38
Kepala Tukang 19.5979 hok : 38
Mandor 19.5979 hok : 38
Pekerjaan membutuhkan bahan :
Semen Portlan (PC) (50 kg) dengan koefisien analis 3.25 kg
Total Bahan yang dibutuhkan :
Semen Portlan (PC) (50 kg) 1959.79 m2 x 3.25

2 LANTAI 2
A Pasang dinding 1 bata merah 1090.51 m2
Pekerjaan Ini membutuhkan tenaga kerja :
Perkerja 0.65 Oh
Tukang Batu 0.2 Oh
Kepala Tukang 0.02 Oh
Mandor 0.03 Oh
Faktor tenaga kerja 0.9
Dapat menghasilkan Pasang dinding 1 bata merah
Perkerja 1 org : 0.65
Tukang Batu 1 org : 0.2
Kepala Tukang 1 org : 0.02
Mandor 1 org : 0.03
Total Tenaga Kerja yang di butuhkan
Perkerja 1090.51 m2 : 1.5384615
Tukang Batu 1090.51 m2 : 5
Kepala Tukang 1090.51 m2 : 50
Mandor 1090.51 m2 : 33.333333
Pekerjaan ini Direncanakan selesai selama = 4
Jadi setiap harinya membutuhkan
Perkerja 16.95785 hok : 4
Tukang Batu 5.2178 hok : 4
Kepala Tukang 0.52178 hok : 4
Mandor 0.78267 hok : 4
Pekerjaan membutuhkan bahan :
Bata Merah dengan koefisien analis 140 Bh
Semen Portlan (PC) (50 kg) dengan koefisien analis 22.2 Kg
Pasir pasang dengan koefisien analis 0.102 M³
Total Bahan yang dibutuhkan :
Bata Merah 1090.51 m2 x 140
Semen Portlan (PC) (50 kg) 1090.51 m2 x 22.2
Pasir pasang 1090.51 m2 x 0.102

B Pekerjaan acian dinding bata 2181.02 m2


Pekerjaan Ini membutuhkan tenaga kerja :
Perkerja 0.2 Oh
Tukang Batu 0.1 Oh
Kepala Tukang 0.01 Oh
Mandor 0.01 Oh
Faktor tenaga kerja 0.32
Dapat menghasilkan Pekerjaan acian dinding bata
Perkerja 1 org : 0.2
Tukang Batu 1 org : 0.1
Kepala Tukang 1 org : 0.01
Mandor 1 org : 0.01
Total Tenaga Kerja yang di butuhkan
Perkerja 2181.02 m2 : 5
Tukang Batu 2181.02 m2 : 10
Kepala Tukang 2181.02 m2 : 100
Mandor 2181.02 m2 : 100
Pekerjaan ini Direncanakan selesai selama = 31
Jadi setiap harinya membutuhkan
Perkerja 436.204 hok : 31
Tukang Batu 218.102 hok : 31
Kepala Tukang 21.8102 hok : 31
Mandor 21.8102 hok : 31
Pekerjaan membutuhkan bahan :
Semen Portlan (PC) (50 kg) dengan koefisien analis 3.25 kg
Total Bahan yang dibutuhkan :
Semen Portlan (PC) (50 kg) 2181.02 m2 x 3.25
3 LANTAI 3
A Pasang dinding 1 bata merah 1090.51 m2
Pekerjaan Ini membutuhkan tenaga kerja :
Perkerja 0.65 Oh
Tukang Batu 0.2 Oh
Kepala Tukang 0.02 Oh
Mandor 0.03 Oh
Faktor tenaga kerja 0.9
Dapat menghasilkan Pasang dinding 1 bata merah
Perkerja 1 org : 0.65
Tukang Batu 1 org : 0.2
Kepala Tukang 1 org : 0.02
Mandor 1 org : 0.03
Total Tenaga Kerja yang di butuhkan
Perkerja 1090.51 m2 : 1.5384615
Tukang Batu 1090.51 m2 : 5
Kepala Tukang 1090.51 m2 : 50
Mandor 1090.51 m2 : 33.333333
Pekerjaan ini Direncanakan selesai selama = 4
Jadi setiap harinya membutuhkan
Perkerja 16.95785 hok : 4
Tukang Batu 5.2178 hok : 4
Kepala Tukang 0.52178 hok : 4
Mandor 0.78267 hok : 4
Pekerjaan membutuhkan bahan :
Bata Merah dengan koefisien analis 140 Bh
Semen Portlan (PC) (50 kg) dengan koefisien analis 22.2 Kg
Pasir pasang dengan koefisien analis 0.102 M³
Total Bahan yang dibutuhkan :
Bata Merah 1090.51 m2 x 140
Semen Portlan (PC) (50 kg) 1090.51 m2 x 22.2
Pasir pasang 1090.51 m2 x 0.102

B Pekerjaan acian dinding bata 2181.02 m2


Pekerjaan Ini membutuhkan tenaga kerja :
Perkerja 0.2 Oh
Tukang Batu 0.1 Oh
Kepala Tukang 0.01 Oh
Mandor 0.01 Oh
Faktor tenaga kerja 0.32
Dapat menghasilkan Pekerjaan acian dinding bata
Perkerja 1 org : 0.2
Tukang Batu 1 org : 0.1
Kepala Tukang 1 org : 0.01
Mandor 1 org : 0.01
Total Tenaga Kerja yang di butuhkan
Perkerja 2181.02 m2 : 5
Tukang Batu 2181.02 m2 : 10
Kepala Tukang 2181.02 m2 : 100
Mandor 2181.02 m2 : 100
Pekerjaan ini Direncanakan selesai selama = 24
Jadi setiap harinya membutuhkan
Perkerja 436.204 hok : 24
Tukang Batu 218.102 hok : 24
Kepala Tukang 21.8102 hok : 24
Mandor 21.8102 hok : 24
Pekerjaan membutuhkan bahan :
Semen Portlan (PC) (50 kg) dengan koefisien analis 3.25 kg
Total Bahan yang dibutuhkan :
Semen Portlan (PC) (50 kg) 2181.02 m2 x 3.25

4 LANTAI DAK
A Pasang dinding 1 bata merah Err:509 m2
Pekerjaan Ini membutuhkan tenaga kerja :
Perkerja 0.65 Oh
Tukang Batu 0.2 Oh
Kepala Tukang 0.02 Oh
Mandor 0.03 Oh
Faktor tenaga kerja 0.9
Dapat menghasilkan Pasang dinding 1 bata merah
Perkerja 1 org : 0.65
Tukang Batu 1 org : 0.2
Kepala Tukang 1 org : 0.02
Mandor 1 org : 0.03
Total Tenaga Kerja yang di butuhkan
Perkerja Err:509 m2 : 1.5384615
Tukang Batu Err:509 m2 : 5
Kepala Tukang Err:509 m2 : 50
Mandor Err:509 m2 : 33.333333
Pekerjaan ini Direncanakan selesai selama = 3
Jadi setiap harinya membutuhkan
Perkerja 16.95785 hok : 3
Tukang Batu 5.2178 hok : 3
Kepala Tukang 0.52178 hok : 3
Mandor 0.78267 hok : 3
Pekerjaan membutuhkan bahan :
Bata Merah dengan koefisien analis 140 Bh
Semen Portlan (PC) (50 kg) dengan koefisien analis 22.2 Kg
Pasir pasang dengan koefisien analis 0.102 M³
Total Bahan yang dibutuhkan :
Bata Merah Err:509 m2 x 140
Semen Portlan (PC) (50 kg) Err:509 m2 x 22.2
Pasir pasang Err:509 m2 x 0.102

B Pekerjaan acian dinding bata Err:509 m2


Pekerjaan Ini membutuhkan tenaga kerja :
Perkerja 0.2 Oh
Tukang Batu 0.1 Oh
Kepala Tukang 0.01 Oh
Mandor 0.01 Oh
Faktor tenaga kerja 0.32
Dapat menghasilkan Pekerjaan acian dinding bata
Perkerja 1 org : 0.2
Tukang Batu 1 org : 0.1
Kepala Tukang 1 org : 0.01
Mandor 1 org : 0.01
Total Tenaga Kerja yang di butuhkan
Perkerja Err:509 m2 : 5
Tukang Batu Err:509 m2 : 10
Kepala Tukang Err:509 m2 : 100
Mandor Err:509 m2 : 100
Pekerjaan ini Direncanakan selesai selama = 11
Jadi setiap harinya membutuhkan
Perkerja Err:509 hok : 11
Tukang Batu Err:509 hok : 11
Kepala Tukang Err:509 hok : 11
Mandor Err:509 hok : 11
Pekerjaan membutuhkan bahan :
Semen Portlan (PC) (50 kg) dengan koefisien analis 3.25 kg
Total Bahan yang dibutuhkan :
Semen Portlan (PC) (50 kg) Err:509 m2 x 3.25

PEKERJAAN LANTAI
LANTAI DASAR
Pasang lantai keramik 40x40 cm 842 m2
Pekerjaan Ini membutuhkan tenaga kerja :
Pekerja 0.35 Oh
Tukang Batu 0.035 Oh
Kepala Tukang 0.062 Oh
Mandor 0.031 Oh
Faktor tenaga kerja 0.478
Dapat menghasilkan
Pekerja 1 org : 0.35
Tukang Batu 1 org : 0.035
Kepala Tukang 1 org : 0.062
Mandor 1 org : 0.031
Total Tenaga Kerja yang di butuhkan
Pekerja 842 m2 : 2.8571429
Tukang Batu 842 m2 : 28.571429
Kepala Tukang 842 m2 : 16.129032
Mandor 842 m2 : 32.258065
Pekerjaan ini Direncanakan selesai selama = 14
Jadi setiap harinya membutuhkan
Pekerja 294.7 hok : 14
Tukang Batu 29.47 hok : 14
Kepala Tukang 52.204 hok : 14
Mandor 26.102 hok : 14
Pekerjaan membutuhkan bahan :
keramik 40 x 40 cm dengan koefisien analis 7 Bh
Semen Portland dengan koefisien analis 11.38 Kg
Pasir Pasang dengan koefisien analis 0.042 M³
Semen Warna dengan koefisien analis 1.5 Kg
Total Bahan yang dibutuhkan :
keramik 40 x 40 cm 842 m2 x 7
Semen Portland 842 m2 x 11.38
Pasir Pasang 842 m2 x 0.042
Semen Warna 842 m2 x 1.5

LANTAI 2
Pasang lantai keramik 40x40 cm 777.98 m2
Pekerjaan Ini membutuhkan tenaga kerja :
Pekerja 0.35 Oh
Tukang Batu 0.035 Oh
Kepala Tukang 0.062 Oh
Mandor 0.031 Oh
Faktor tenaga kerja 0.478
Dapat menghasilkan
Pekerja 1 org : 0.35
Tukang Batu 1 org : 0.035
Kepala Tukang 1 org : 0.062
Mandor 1 org : 0.031
Total Tenaga Kerja yang di butuhkan
Pekerja 777.98 m2 : 2.8571429
Tukang Batu 777.98 m2 : 28.571429
Kepala Tukang 777.98 m2 : 16.129032
Mandor 777.98 m2 : 32.258065
Pekerjaan ini Direncanakan selesai selama = 14
Jadi setiap harinya membutuhkan
Pekerja 272.293 hok : 14
Tukang Batu 27.2293 hok : 14
Kepala Tukang 48.23476 hok : 14
Mandor 24.11738 hok : 14
Pekerjaan membutuhkan bahan :
keramik 40 x 40 cm dengan koefisien analis 7 Bh
Semen Portland dengan koefisien analis 11.38 Kg
Pasir Pasang dengan koefisien analis 0.042 M³
Semen Warna dengan koefisien analis 1.5 Kg
Total Bahan yang dibutuhkan :
keramik 40 x 40 cm 777.98 m2 x 7
Semen Portland 777.98 m2 x 11.38
Pasir Pasang 777.98 m2 x 0.042
Semen Warna 777.98 m2 x 1.5

LANTAI 3
Pasang lantai keramik 40x40 cm 777.98 m2
Pekerjaan Ini membutuhkan tenaga kerja :
Pekerja 0.35 Oh
Tukang Batu 0.035 Oh
Kepala Tukang 0.062 Oh
Mandor 0.031 Oh
Faktor tenaga kerja 0.478
Dapat menghasilkan
Pekerja 1 org : 0.35
Tukang Batu 1 org : 0.035
Kepala Tukang 1 org : 0.062
Mandor 1 org : 0.031
Total Tenaga Kerja yang di butuhkan
Pekerja 777.98 m2 : 2.8571429
Tukang Batu 777.98 m2 : 28.571429
Kepala Tukang 777.98 m2 : 16.129032
Mandor 777.98 m2 : 32.258065
Pekerjaan ini Direncanakan selesai selama = 14
Jadi setiap harinya membutuhkan
Pekerja 272.293 hok : 14
Tukang Batu 27.2293 hok : 14
Kepala Tukang 48.23476 hok : 14
Mandor 24.11738 hok : 14
Pekerjaan membutuhkan bahan :
keramik 40 x 40 cm dengan koefisien analis 7 Bh
Semen Portland dengan koefisien analis 11.38 Kg
Pasir Pasang dengan koefisien analis 0.042 M³
Semen Warna dengan koefisien analis 1.5 Kg
Total Bahan yang dibutuhkan :
keramik 40 x 40 cm 777.98 m2 x 7
Semen Portland 777.98 m2 x 11.38
Pasir Pasang 777.98 m2 x 0.042
Semen Warna 777.98 m2 x 1.5

PEKERJAAN FLAPOND
LANTAI DASAR
Penutup plafond Gypsum T=9 MM 837.05 m1
Pekerjaan Ini membutuhkan tenaga kerja :
Pekerja 0.05 Oh
Tukang kayu 0.05 Oh
Kepala tukang 0.005 Oh
Mandor 0.003 Oh
Faktor tenaga kerja 0.108
Dapat menghasilkan
Pekerja 1 org : 0.05
Tukang kayu 1 org : 0.05
Kepala tukang 1 org : 0.005
Mandor 1 org : 0.003
Total Tenaga Kerja yang di butuhkan
Pekerja 837.05 m1 : 20
Tukang kayu 837.05 m1 : 20
Kepala tukang 837.05 m1 : 200
Mandor 837.05 m1 : 333.33333
Pekerjaan ini Direncanakan selesai selama = 7
Jadi setiap harinya membutuhkan
Pekerja 41.8525 hok : 7
Tukang kayu 41.8525 hok : 7
Kepala tukang 4.18525 hok : 7
Mandor 2.51115 hok : 7
Pekerjaan membutuhkan bahan :
List gypsum dengan koefisien analis 1.05 M¹
Tepung gypsum dengan koefisien analis 0.15 Kg
Total Bahan yang dibutuhkan :
List gypsum 837.05 m2 x 1.05
Tepung gypsum 837.05 m2 x 0.15

LANTAI DUA
Penutup plafond Gypsum T=9 MM 788.87 m1
Pekerjaan Ini membutuhkan tenaga kerja :
Pekerja 0.05 Oh
Tukang kayu 0.05 Oh
Kepala tukang 0.005 Oh
Mandor 0.003 Oh
Faktor tenaga kerja 0.108
Dapat menghasilkan
Pekerja 1 org : 0.05
Tukang kayu 1 org : 0.05
Kepala tukang 1 org : 0.005
Mandor 1 org : 0.003
Total Tenaga Kerja yang di butuhkan
Pekerja 788.87 m1 : 20
Tukang kayu 788.87 m1 : 20
Kepala tukang 788.87 m1 : 200
Mandor 788.87 m1 : 333.33333
Pekerjaan ini Direncanakan selesai selama = 7
Jadi setiap harinya membutuhkan
Pekerja 39.4435 hok : 7
Tukang kayu 39.4435 hok : 7
Kepala tukang 3.94435 hok : 7
Mandor 2.36661 hok : 7
Pekerjaan membutuhkan bahan :
List gypsum dengan koefisien analis 1.05 M¹
Tepung gypsum dengan koefisien analis 0.15 Kg
Total Bahan yang dibutuhkan :
List gypsum 788.87 m2 x 1.05
Tepung gypsum 788.87 m2 x 0.15

LANTAI TIGA
Penutup plafond Gypsum T=9 MM 838.87 m1
Pekerjaan Ini membutuhkan tenaga kerja :
Pekerja 0.05 Oh
Tukang kayu 0.05 Oh
Kepala tukang 0.005 Oh
Mandor 0.003 Oh
Faktor tenaga kerja 0.108
Dapat menghasilkan
Pekerja 1 org : 0.05
Tukang kayu 1 org : 0.05
Kepala tukang 1 org : 0.005
Mandor 1 org : 0.003
Total Tenaga Kerja yang di butuhkan
Pekerja 838.87 m1 : 20
Tukang kayu 838.87 m1 : 20
Kepala tukang 838.87 m1 : 200
Mandor 838.87 m1 : 333.33333
Pekerjaan ini Direncanakan selesai selama = 7
Jadi setiap harinya membutuhkan
Pekerja 41.9435 hok : 7
Tukang kayu 41.9435 hok : 7
Kepala tukang 4.19435 hok : 7
Mandor 2.51661 hok : 7
Pekerjaan membutuhkan bahan :
List gypsum dengan koefisien analis 1.05 M¹
Tepung gypsum dengan koefisien analis 0.15 Kg
Total Bahan yang dibutuhkan :
List gypsum 838.87 m2 x 1.05
Tepung gypsum 838.87 m2 x 0.15

IX LANTAI DAK
1 Penutup plafond Gypsum T=9 MM 29.25 m1
Pekerjaan Ini membutuhkan tenaga kerja :
Pekerja 0.05 Oh
Tukang kayu 0.05 Oh
Kepala tukang 0.005 Oh
Mandor 0.003 Oh
Faktor tenaga kerja 0.108
Dapat menghasilkan
Pekerja 1 org : 0.05
Tukang kayu 1 org : 0.05
Kepala tukang 1 org : 0.005
Mandor 1 org : 0.003
Total Tenaga Kerja yang di butuhkan
Pekerja 29.25 m1 : 20
Tukang kayu 29.25 m1 : 20
Kepala tukang 29.25 m1 : 200
Mandor 29.25 m1 : 333.33333
Pekerjaan ini Direncanakan selesai selama = 1
Jadi setiap harinya membutuhkan
Pekerja 1.4625 hok : 1
Tukang kayu 1.4625 hok : 1
Kepala tukang 0.14625 hok : 1
Mandor 0.08775 hok : 1
Pekerjaan membutuhkan bahan :
List gypsum dengan koefisien analis 1.05 M¹
Tepung gypsum dengan koefisien analis 0.15 Kg
Total Bahan yang dibutuhkan :
List gypsum 29.25 m2 x 1.05
Tepung gypsum 29.25 m2 x 0.15
X PEKERJAAN PENGECETAN
1 LANTAI DASAR
Pekerjaan pengecatan dinding, kanopi beton dan listplang 3231.26 m2
Pekerjaan Ini membutuhkan tenaga kerja :
Pekerja 0.02 Oh
Tukang cat 0.063 Oh
Kepala tukang 0.0063 Oh
Mandor 0.0025 Oh
Faktor tenaga kerja 0.0918
Dapat menghasilkan Pekerjaan pengecatan dinding, kanopi beton dan listplang
Pekerja 1 org : 0.02
Tukang cat 1 org : 0.063
Kepala tukang 1 org : 0.0063
Mandor 1 org : 0.0025
Total Tenaga Kerja yang di butuhkan
Pekerja 3231.26 m2 : 50
Tukang cat 3231.26 m2 : 15.873016
Kepala tukang 3231.26 m2 : 158.73016
Mandor 3231.26 m2 : 400
Pekerjaan ini Direncanakan selesai selama = 21
Jadi setiap harinya membutuhkan
Pekerja 64.6252 hok : 21
Tukang cat 203.56938 hok : 21
Kepala tukang 20.356938 hok : 21
Mandor 8.07815 hok : 21
Pekerjaan membutuhkan bahan :
Plamir tembok dengan koefisien analis 0.1 Kg
Cat dasar dengan koefisien analis 0.1 Kg
Cat penutup 2x setara Metrolit dengan koefisien analis 0.26 Kg
Total Bahan yang dibutuhkan :
Plamir tembok 3231.26 m2 x 0.1
Cat dasar 3231.26 m2 x 0.1
Cat penutup 2x setara Metrolit 3231.26 m2 x 0.26

2 LANTAI DUA
Pekerjaan pengecatan dinding, kanopi beton dan listplang 2371.45 m2
Pekerjaan Ini membutuhkan tenaga kerja :
Pekerja 0.02 Oh
Tukang cat 0.063 Oh
Kepala tukang 0.0063 Oh
Mandor 0.0025 Oh
Faktor tenaga kerja 0.0918
Dapat menghasilkan Pekerjaan pengecatan dinding, kanopi beton dan listplang
Pekerja 1 org : 0.02
Tukang cat 1 org : 0.063
Kepala tukang 1 org : 0.0063
Mandor 1 org : 0.0025
Total Tenaga Kerja yang di butuhkan
Pekerja 2371.45 m2 : 50
Tukang cat 2371.45 m2 : 15.873016
Kepala tukang 2371.45 m2 : 158.73016
Mandor 2371.45 m2 : 400
Pekerjaan ini Direncanakan selesai selama = 21
Jadi setiap harinya membutuhkan
Pekerja 47.429 hok : 21
Tukang cat 149.40135 hok : 21
Kepala tukang 14.940135 hok : 21
Mandor 5.928625 hok : 21
Pekerjaan membutuhkan bahan :
Plamir tembok dengan koefisien analis 0.1 Kg
Cat dasar dengan koefisien analis 0.1 Kg
Cat penutup 2x setara Metrolit dengan koefisien analis 0.26 Kg
Total Bahan yang dibutuhkan :
Plamir tembok 2371.45 m2 x 0.1
Cat dasar 2371.45 m2 x 0.1
Cat penutup 2x setara Metrolit 2371.45 m2 x 0.26

3 LANTAI TIGA
Pekerjaan pengecatan dinding, kanopi beton dan listplang 2676.32 m2
Pekerjaan Ini membutuhkan tenaga kerja :
Pekerja 0.02 Oh
Tukang cat 0.063 Oh
Kepala tukang 0.0063 Oh
Mandor 0.0025 Oh
Faktor tenaga kerja 0.0918
Dapat menghasilkan Pekerjaan pengecatan dinding, kanopi beton dan listplang
Pekerja 1 org : 0.02
Tukang cat 1 org : 0.063
Kepala tukang 1 org : 0.0063
Mandor 1 org : 0.0025
Total Tenaga Kerja yang di butuhkan
Pekerja 2676.32 m2 : 50
Tukang cat 2676.32 m2 : 15.873016
Kepala tukang 2676.32 m2 : 158.73016
Mandor 2676.32 m2 : 400
Pekerjaan ini Direncanakan selesai selama = 21
Jadi setiap harinya membutuhkan
Pekerja 53.5264 hok : 21
Tukang cat 168.60816 hok : 21
Kepala tukang 16.860816 hok : 21
Mandor 6.6908 hok : 21
Pekerjaan membutuhkan bahan :
Plamir tembok dengan koefisien analis 0.1 Kg
Cat dasar dengan koefisien analis 0.1 Kg
Cat penutup 2x setara Metrolit dengan koefisien analis 0.26 Kg
Total Bahan yang dibutuhkan :
Plamir tembok 2676.32 m2 x 0.1
Cat dasar 2676.32 m2 x 0.1
Cat penutup 2x setara Metrolit 2676.32 m2 x 0.26

4 LANTAI DAK
Pekerjaan pengecatan dinding, kanopi beton dan listplang Err:509 m2
Pekerjaan Ini membutuhkan tenaga kerja :
Pekerja 0.02 Oh
Tukang cat 0.063 Oh
Kepala tukang 0.0063 Oh
Mandor 0.0025 Oh
Faktor tenaga kerja 0.0918
Dapat menghasilkan Pekerjaan pengecatan dinding, kanopi beton dan listplang
Pekerja 1 org : 0.02
Tukang cat 1 org : 0.063
Kepala tukang 1 org : 0.0063
Mandor 1 org : 0.0025
Total Tenaga Kerja yang di butuhkan
Pekerja Err:509 m2 : 50
Tukang cat Err:509 m2 : 15.873016
Kepala tukang Err:509 m2 : 158.73016
Mandor Err:509 m2 : 400
Pekerjaan ini Direncanakan selesai selama = 7
Jadi setiap harinya membutuhkan
Pekerja Err:509 hok : 7
Tukang cat Err:509 hok : 7
Kepala tukang Err:509 hok : 7
Mandor Err:509 hok : 7
Pekerjaan membutuhkan bahan :
Plamir tembok dengan koefisien analis 0.1 Kg
Cat dasar dengan koefisien analis 0.1 Kg
Cat penutup 2x setara Metrolit dengan koefisien analis 0.26 Kg
Total Bahan yang dibutuhkan :
Plamir tembok Err:509 m2 x 0.1
Cat dasar Err:509 m2 x 0.1
Cat penutup 2x setara Metrolit Err:509 m2 x 0.26

XI PEKERJAAN PLUMBING
1 AIR BERSIH
A LANTAI DASAR
Pas. Inst.air pipa PVC 1/2" 304.00 m1
Pekerjaan Ini membutuhkan tenaga kerja :
Pekerja 0.036 Oh
Tukang Pipa 0.06 Oh
Kepala Tukang 0.006 Oh
Mandor 0.0018 Oh
Perlengkapan 35% harga pipa 0.35 lot
Faktor tenaga kerja 0.4538
Dapat menghasilkan
Pekerja 1 org : 0.036
Tukang Pipa 1 org : 0.06
Kepala Tukang 1 org : 0.006
Mandor 1 org : 0.0018
Perlengkapan 35% harga pipa 1 org : 0.35
Total Tenaga Kerja yang di butuhkan
Faktor tenaga kerja 304.00 m1 : 27.777778
Dapat menghasilkan 304.00 m1 : 16.666667
Pekerja 304.00 m1 : 166.66667
Mandor 304.00 m1 : 555.55556
Perlengkapan 35% harga pipa 304.00 m1 : 2.8571429
Pekerjaan ini Direncanakan selesai selama = 7
Jadi setiap harinya membutuhkan
Pekerja 10.944 hok : 7
Mandor 18.24 hok : 7
Perlengkapan 35% harga pipa 1.824 hok : 7
Pekerjaan ini Direncanakan selesai selama 0.5472 hok : 7
Perlengkapan 35% harga pipa 106.4 hok : 7
Pekerjaan membutuhkan bahan :
Pipa PVC Ø 1 1/2" dengan koefisien analis 1.2 Bh
Total Bahan yang dibutuhkan :
Pipa PVC Ø 1 1/2" 304.00 m1 x 1.2

B LANTAI 2
Pas. Inst.air pipa PVC 1/2" 232.00 m1
Pekerjaan Ini membutuhkan tenaga kerja :
Pekerja 0.036 Oh
Tukang Pipa 0.06 Oh
Kepala Tukang 0.006 Oh
Mandor 0.0018 Oh
Perlengkapan 35% harga pipa 0.35 lot
Faktor tenaga kerja 0.4538
Dapat menghasilkan
Pekerja 1 org : 0.036
Tukang Pipa 1 org : 0.06
Kepala Tukang 1 org : 0.006
Mandor 1 org : 0.0018
Perlengkapan 35% harga pipa 1 org : 0.35
Total Tenaga Kerja yang di butuhkan
Faktor tenaga kerja 232.00 m1 : 27.777778
Dapat menghasilkan 232.00 m1 : 16.666667
Pekerja 232.00 m1 : 166.66667
Mandor 232.00 m1 : 555.55556
Perlengkapan 35% harga pipa 232.00 m1 : 2.8571429
Pekerjaan ini Direncanakan selesai selama = 7
Jadi setiap harinya membutuhkan
Pekerja 8.352 hok : 7
Mandor 13.92 hok : 7
Perlengkapan 35% harga pipa 1.392 hok : 7
Pekerjaan ini Direncanakan selesai selama 0.4176 hok : 7
Perlengkapan 35% harga pipa 81.2 hok : 7
Pekerjaan membutuhkan bahan :
Pipa PVC Ø 1 1/2" dengan koefisien analis 1.2 Bh
Total Bahan yang dibutuhkan :
Pipa PVC Ø 1 1/2" 232.00 m1 x 1.2

C LANTAI TIGA
Pas. Inst.air pipa PVC 1/2" 196.00 m1
Pekerjaan Ini membutuhkan tenaga kerja :
Pekerja 0.036 Oh
Tukang Pipa 0.06 Oh
Kepala Tukang 0.006 Oh
Mandor 0.0018 Oh
Perlengkapan 35% harga pipa 0.35 lot
Faktor tenaga kerja 0.4538
Dapat menghasilkan
Pekerja 1 org : 0.036
Tukang Pipa 1 org : 0.06
Kepala Tukang 1 org : 0.006
Mandor 1 org : 0.0018
Perlengkapan 35% harga pipa 1 org : 0.35
Total Tenaga Kerja yang di butuhkan
Faktor tenaga kerja 196.00 m1 : 27.777778
Dapat menghasilkan 196.00 m1 : 16.666667
Pekerja 196.00 m1 : 166.66667
Mandor 196.00 m1 : 555.55556
Perlengkapan 35% harga pipa 196.00 m1 : 2.8571429
Pekerjaan ini Direncanakan selesai selama = 7
Jadi setiap harinya membutuhkan
Pekerja 7.056 hok : 7
Mandor 11.76 hok : 7
Perlengkapan 35% harga pipa 1.176 hok : 7
Pekerjaan ini Direncanakan selesai selama 0.3528 hok : 7
Perlengkapan 35% harga pipa 68.6 hok : 7
Pekerjaan membutuhkan bahan :
Pipa PVC Ø 1 1/2" dengan koefisien analis 1.2 Bh
Total Bahan yang dibutuhkan :
Pipa PVC Ø 1 1/2" 196.00 m1 x 1.2

D LANTAI DAK
Pas. Inst.air pipa PVC 1/2" Err:509 m1
Pekerjaan Ini membutuhkan tenaga kerja :
Pekerja 0.036 Oh
Tukang Pipa 0.06 Oh
Kepala Tukang 0.006 Oh
Mandor 0.0018 Oh
Perlengkapan 35% harga pipa 0.35 lot
Faktor tenaga kerja 0.4538
Dapat menghasilkan
Pekerja 1 org : 0.036
Tukang Pipa 1 org : 0.06
Kepala Tukang 1 org : 0.006
Mandor 1 org : 0.0018
Perlengkapan 35% harga pipa 1 org : 0.35
Total Tenaga Kerja yang di butuhkan
Faktor tenaga kerja Err:509 m1 : 27.777778
Dapat menghasilkan Err:509 m1 : 16.666667
Pekerja Err:509 m1 : 166.66667
Mandor Err:509 m1 : 555.55556
Perlengkapan 35% harga pipa Err:509 m1 : 2.8571429
Pekerjaan ini Direncanakan selesai selama = 2
Jadi setiap harinya membutuhkan
Pekerja Err:509 hok : 2
Mandor Err:509 hok : 2
Perlengkapan 35% harga pipa Err:509 hok : 2
Pekerjaan ini Direncanakan selesai selama Err:509 hok : 2
Perlengkapan 35% harga pipa Err:509 hok : 2
Pekerjaan membutuhkan bahan :
Pipa PVC Ø 1 1/2" dengan koefisien analis 1.2 Bh
Total Bahan yang dibutuhkan :
Pipa PVC Ø 1 1/2" Err:509 m1 x 1.2

2 AIR KOTOR
A LANTAI DASAR
Pas. Inst.air Kotor pipa PVC 4" 285.00 m1
Pekerjaan Ini membutuhkan tenaga kerja :
Pekerja 0.081 Oh
Tukang Pipa 0.135 Oh
Kepala Tukang 0.0135 Oh
Mandor 0.0041 Oh
Perlengkapan 35% harga pipa 0.35 lot
Faktor tenaga kerja 0.5836
Dapat menghasilkan
Pekerja 1 org : 0.081
Tukang Pipa 1 org : 0.135
Kepala Tukang 1 org : 0.0135
Mandor 1 org : 0.0041
Perlengkapan 35% harga pipa 1 org : 0.35
Total Tenaga Kerja yang di butuhkan
Faktor tenaga kerja 285.00 m1 : 12.345679
Dapat menghasilkan 285.00 m1 : 7.4074074
Pekerja 285.00 m1 : 74.074074
Mandor 285.00 m1 : 243.90244
Perlengkapan 35% harga pipa 285.00 m1 : 2.8571429
Pekerjaan ini Direncanakan selesai selama = 7
Jadi setiap harinya membutuhkan
Pekerja 23.085 hok : 7
Mandor 38.475 hok : 7
Perlengkapan 35% harga pipa 3.8475 hok : 7
Pekerjaan ini Direncanakan selesai selama 1.1685 hok : 7
Perlengkapan 35% harga pipa 99.75 hok : 7
Pekerjaan membutuhkan bahan :
Pipa PVC Ø 4" dengan koefisien analis 1.2 Bh
Total Bahan yang dibutuhkan :
Pipa PVC Ø 4" 285.00 m1 x 1.2

B LANTAI DUA
Pas. Inst.air Kotor pipa PVC 4" 185.00 m1
Pekerjaan Ini membutuhkan tenaga kerja :
Pekerja 0.081 Oh
Tukang Pipa 0.135 Oh
Kepala Tukang 0.0135 Oh
Mandor 0.0041 Oh
Perlengkapan 35% harga pipa 0.35 lot
Faktor tenaga kerja 0.5836
Dapat menghasilkan
Pekerja 1 org : 0.081
Tukang Pipa 1 org : 0.135
Kepala Tukang 1 org : 0.0135
Mandor 1 org : 0.0041
Perlengkapan 35% harga pipa 1 org : 0.35
Total Tenaga Kerja yang di butuhkan
Faktor tenaga kerja 185.00 m1 : 12.345679
Dapat menghasilkan 185.00 m1 : 7.4074074
Pekerja 185.00 m1 : 74.074074
Mandor 185.00 m1 : 243.90244
Perlengkapan 35% harga pipa 185.00 m1 : 2.8571429
Pekerjaan ini Direncanakan selesai selama = 7
Jadi setiap harinya membutuhkan
Pekerja 14.985 hok : 7
Mandor 24.975 hok : 7
Perlengkapan 35% harga pipa 2.4975 hok : 7
Pekerjaan ini Direncanakan selesai selama 0.7585 hok : 7
Perlengkapan 35% harga pipa 64.75 hok : 7
Pekerjaan membutuhkan bahan :
Pipa PVC Ø 4" dengan koefisien analis 1.2 Bh
Total Bahan yang dibutuhkan :
Pipa PVC Ø 4" 185.00 m1 x 1.2

C LANTAI TIGA
Pas. Inst.air Kotor pipa PVC 4" 165.00 m1
Pekerjaan Ini membutuhkan tenaga kerja :
Pekerja 0.081 Oh
Tukang Pipa 0.135 Oh
Kepala Tukang 0.0135 Oh
Mandor 0.0041 Oh
Perlengkapan 35% harga pipa 0.35 lot
Faktor tenaga kerja 0.5836
Dapat menghasilkan
Pekerja 1 org : 0.081
Tukang Pipa 1 org : 0.135
Kepala Tukang 1 org : 0.0135
Mandor 1 org : 0.0041
Perlengkapan 35% harga pipa 1 org : 0.35
Total Tenaga Kerja yang di butuhkan
Faktor tenaga kerja 165.00 m1 : 12.345679
Dapat menghasilkan 165.00 m1 : 7.4074074
Pekerja 165.00 m1 : 74.074074
Mandor 165.00 m1 : 243.90244
Perlengkapan 35% harga pipa 165.00 m1 : 2.8571429
Pekerjaan ini Direncanakan selesai selama = 7
Jadi setiap harinya membutuhkan
Pekerja 13.365 hok : 7
Mandor 22.275 hok : 7
Perlengkapan 35% harga pipa 2.2275 hok : 7
Pekerjaan ini Direncanakan selesai selama 0.6765 hok : 7
Perlengkapan 35% harga pipa 57.75 hok : 7
Pekerjaan membutuhkan bahan :
Pipa PVC Ø 4" dengan koefisien analis 1.2 Bh
Total Bahan yang dibutuhkan :
Pipa PVC Ø 4" 165.00 m1 x 1.2

D LANTAI DAK
Pas. Inst.air Kotor pipa PVC 4" Err:509 m1
Pekerjaan Ini membutuhkan tenaga kerja :
Pekerja 0.081 Oh
Tukang Pipa 0.135 Oh
Kepala Tukang 0.0135 Oh
Mandor 0.0041 Oh
Perlengkapan 35% harga pipa 0.35 lot
Faktor tenaga kerja 0.5836
Dapat menghasilkan
Pekerja 1 org : 0.081
Tukang Pipa 1 org : 0.135
Kepala Tukang 1 org : 0.0135
Mandor 1 org : 0.0041
Perlengkapan 35% harga pipa 1 org : 0.35
Total Tenaga Kerja yang di butuhkan
Faktor tenaga kerja Err:509 m1 : 12.345679
Dapat menghasilkan Err:509 m1 : 7.4074074
Pekerja Err:509 m1 : 74.074074
Mandor Err:509 m1 : 243.90244
Perlengkapan 35% harga pipa Err:509 m1 : 2.8571429
Pekerjaan ini Direncanakan selesai selama = 5
Jadi setiap harinya membutuhkan
Pekerja Err:509 hok : 5
Mandor Err:509 hok : 5
Perlengkapan 35% harga pipa Err:509 hok : 5
Pekerjaan ini Direncanakan selesai selama Err:509 hok : 5
Perlengkapan 35% harga pipa Err:509 hok : 5
Pekerjaan membutuhkan bahan :
Pipa PVC Ø 4" dengan koefisien analis 1.2 Bh
Total Bahan yang dibutuhkan :
Pipa PVC Ø 4" Err:509 m1 x 1.2
TAS BOYOLALI

= 1.1976047904 m3
= 13.698630137 m3

= 33.589231875 ~ 33.6 hok


= 2.936543625 ~ 3 hok
hr

hr = 2.3992308482 ~ 2 org
hr = 0.2097531161 ~ 0 org

= 3.3333333333 ~ 3.3 m3
= 100 ~ 100 m3

= 7.849059375 ~ 8 hok
= 0.2616353125 ~ 0 hok
hr

hr = 1.9622648438 ~ 2 org
hr = 4~ 4 org

= 31.3962375 ~ 31 m3
= 1.2820512821 m3
= 2.5641025641 m3
= 25.641025641 m3
= 25.641025641 m3

= 31.3767675 ~ 31 hok
= 15.68838375 ~ 16 hok
= 1.568838375 ~ 2 hok
= 1.568838375 ~ 2 hok
hr

hr = 4.4823953571 ~ 4 org
hr = 2.2411976786 ~ 2 org
hr = 0.2241197679 ~ 0 org
hr = 0.2241197679 ~ 0 org

= 0.6060606061 m3
= 14.285714286 m3
= 3.6363636364 m3
= 3.8461538462 m3
= 38.461538462 m3
= 38.461538462 m3

= 49.5495 ~ 50 hok
= 2.1021 ~ 2 hok
= 8.25825 ~ 8 hok
= 7.8078 ~ 8 hok
= 0.78078 ~ 1 hok
= 0.78078 ~ 1 hok
hr

hr = 7.0785 ~ 7 org
hr = 0.3003 ~ 0 org
hr = 1.17975 ~ 1 org
hr = 1.1154 ~ 1 org
hr = 0.11154 ~ 0 org
hr = 0.11154 ~ 0 org
= 11141.13 ~ 11141.13 kg
= 16.303287 ~ 16.303287 m3
= 22.888866 ~ 22.888866 m3
= 6036.3303 ~ 6036.3303 kg
= 4.5045 ~ 4.5045 kg
= 6.006 ~ 6.006 m3
= 4.5045 ~ 4.5045 kg
= 15.015 ~ 15.015 ltr

= 0.6060606061 m3
= 14.285714286 m3
= 3.6363636364 m3
= 3.8461538462 m3
= 38.461538462 m3
= 38.461538462 m3

= 69.7059 ~ 70 hok
= 2.95722 ~ 3 hok
= 11.61765 ~ 12 hok
= 10.98396 ~ 11 hok
= 1.098396 ~ 1 hok
= 1.098396 ~ 1 hok
hr

hr = 9.9579857143 ~ 10 org
hr = 0.42246 ~ 0 org
hr = 1.6596642857 ~ 2 org
hr = 1.5691371429 ~ 2 org
hr = 0.1569137143 ~ 0 org
hr = 0.1569137143 ~ 0 org
= 15673.266 ~ 15673.266 kg
= 22.9353534 ~ 23 m3
= 32.1999012 ~ 32 m3
= 8491.86846 ~ 8492 kg
= 6.3369 ~ 6 kg
= 8.4492 ~ 8 m3
= 6.3369 ~ 6 kg
= 21.123 ~ 21 ltr

= 0.6060606061 m3
= 14.285714286 m3
= 3.6363636364 m3
= 3.8461538462 m3
= 38.461538462 m3
= 38.461538462 m3

= 55.09 ~ 55.09 hok


= 2.34 ~ 2.34 hok
= 9.18 ~ 9.18 hok
= 8.68 ~ 8.68 hok
= 0.87 ~ 0.87 hok
= 0.87 ~ 0.87 hok
hr

hr = 7.87 ~ 8 org
hr = 0.33 ~ 0 org
hr = 1.31 ~ 1 org
hr = 1.24 ~ 1 org
hr = 0.12 ~ 0 org
hr = 0.12 ~ 0 org
= 11,285.82 ~ 11,286 kg
= 18.13 ~ 18 m3
= 25.45 ~ 25 m3
= 5,142.06 ~ 5,142 kg
= 771.31 ~ 771 kg
= 24.28 ~ 24 m3
= 242.81 ~ 243 kg
= 121.41 ~ 121 ltr
= 9.11 ~ 9 m3
= 212.46 ~ 212 lbr
= 1,214.06 ~ 1,214 btg
= 625.06 ~ 625 btg
= 34.73 ~ 35 kg
= 1.11 ~ 1 m3

= 0.6060606061 m3
= 14.285714286 m3
= 3.6363636364 m3
= 3.8461538462 m3
= 38.461538462 m3
= 38.461538462 m3

= 21.48 ~ 21 hok
= 0.91 ~ 1 hok
= 3.58 ~ 4 hok
= 3.39 ~ 3 hok
= 0.34 ~ 0 hok
= 0.34 ~ 0 hok
hr
hr = 5.37 ~ 5.37 org
hr = 0.23 ~ 0.23 org
hr = 0.90 ~ 0.90 org
hr = 0.85 ~ 0.85 org
hr = 0.08 ~ 0.08 org
hr = 0.08 ~ 0.08 org

= 4,400.51 ~ 4,400.51 kg
= 7.07 ~ 7.07 m3
= 9.92 ~ 9.92 m3
= 2,004.96 ~ 2,004.96 kg
= 300.74 ~ 300.74 kg
= 9.47 ~ 9.47 m3
= 94.68 ~ 94.68 kg
= 47.34 ~ 47.34 ltr
= 3.55 ~ 3.55 m3
= 82.84 ~ 82.84 lbr
= 473.38 ~ 473.38 btg
= 243.72 ~ 243.72 btg
= 13.54 ~ 13.54 kg
= 0.43 ~ 0.43 m3

= 0.6060606061 m3
= 14.285714286 m3
= 3.6363636364 m3
= 3.8461538462 m3
= 38.461538462 m3
= 38.461538462 m3

= 6.2555625 ~ 6 hok
= 0.2653875 ~ 0 hok
= 1.04259375 ~ 1 hok
= 0.985725 ~ 1 hok
= 0.0985725 ~ 0 hok
= 0.0985725 ~ 0 hok
hr

hr = 6.2555625 ~ 6 org
hr = 0.2653875 ~ 0 org
hr = 1.04259375 ~ 1 org
hr = 0.985725 ~ 1 org
hr = 0.0985725 ~ 0 org
hr = 0.0985725 ~ 0 org

= 1281.4425 ~ 1281.4 kg
= 2.058269625 ~ 2.1 m3
= 2.88969075 ~ 2.9 m3
= 583.8525 ~ 583.9 kg
= 87.577875 ~ 87.6 kg
= 2.756997 ~ 2.8 m3
= 27.56997 ~ 27.6 kg
= 13.784985 ~ 13.8 ltr
= 1.033873875 ~ 1.0 m3
= 24.12372375 ~ 24.1 lbr
= 137.84985 ~ 137.8 btg
= 70.9722 ~ 71.0 btg
= 3.9429 ~ 3.9 kg
= 0.1261728 ~ 0.1 m3
= 0.6060606061 m3
= 14.285714286 m3
= 3.6363636364 m3
= 3.8461538462 m3
= 38.461538462 m3
= 38.461538462 m3

= 100.089 ~ 100 hok


= 4.2462 ~ 4 hok
= 16.6815 ~ 17 hok
= 15.7716 ~ 16 hok
= 1.57716 ~ 2 hok
= 1.57716 ~ 2 hok
hr

hr = 10.0089 ~ 10 org
hr = 0.42462 ~ 0 org
hr = 1.66815 ~ 2 org
hr = 1.57716 ~ 2 org
hr = 0.157716 ~ 0 org
hr = 0.157716 ~ 0 org

= 20503.08 ~ 20503 kg
= 32.932314 ~ 33 m3
= 46.235052 ~ 46 m3
= 5641.38 ~ 5641 kg
= 846.207 ~ 846 kg
= 20.211912 ~ 20 m3
= 202.11912 ~ 202 kg
= 101.05956 ~ 101 ltr
= 7.579467 ~ 8 m3
= 176.85423 ~ 177 lbr
= 3031.7868 ~ 3032 btg
= 1135.5552 ~ 1136 btg
= 63.0864 ~ 63 kg
= 2.0187648 ~ 2 m3

= 0.6060606061 m3
= 14.285714286 m3
= 3.6363636364 m3
= 3.8461538462 m3
= 38.461538462 m3
= 38.461538462 m3

= 181 ~ 181 hok


= 8 ~ 8 hok
= 30 ~ 30 hok
= 29 ~ 29 hok
= 3 ~ 3 hok
= 3 ~ 3 hok
hr

hr = 23 ~ 23 org
hr = 1 ~ 1 org
hr = 4 ~ 4 org
hr = 4 ~ 4 org
hr = 0 ~ 0 org
hr = 0 ~ 0 org
= 37,100.91 ~ 37,100.91 kg
= 59.59 ~ 59.59 m3
= 83.66 ~ 83.66 m3
= 10,208.24 ~ 10,208.24 kg
= 1,531.24 ~ 1,531.24 kg
= 36.57 ~ 36.57 m3
= 365.74 ~ 365.74 kg
= 182.87 ~ 182.87 ltr
= 13.72 ~ 13.72 m3
= 320.02 ~ 320.02 lbr
= 5,486.10 ~ 5,486.10 btg
= 2,054.82 ~ 2,054.82 btg
= 114.16 ~ 114.16 kg
= 3.65 ~ 3.65 m3

= 0.6060606061 m3
= 14.285714286 m3
= 3.6363636364 m3
= 3.8461538462 m3
= 38.461538462 m3
= 38.461538462 m3

= 65.637 ~ 66 hok
= 2.7846 ~ 3 hok
= 10.9395 ~ 11 hok
= 10.3428 ~ 10 hok
= 1.03428 ~ 1 hok
= 1.03428 ~ 1 hok
hr

hr = 9.3767142857 ~ 9 org
hr = 0.3978 ~ 0 org
hr = 1.5627857143 ~ 2 org
hr = 1.4775428571 ~ 1 org
hr = 0.1477542857 ~ 0 org
hr = 0.1477542857 ~ 0 org
= 13445.64 ~ 13446 kg
= 21.596562 ~ 22 m3
= 30.320316 ~ 30 m3
= 6126.12 ~ 6126 kg
= 918.918 ~ 919 kg
= 28.928016 ~ 29 m3
= 289.28016 ~ 289 kg
= 144.64008 ~ 145 ltr
= 10.848006 ~ 11 m3
= 253.12014 ~ 253 lbr
= 1446.4008 ~ 1446 btg
= 744.6816 ~ 745 btg
= 41.3712 ~ 41 kg
= 1.3238784 ~ 1 m3

= 0.6060606061 m3
= 14.285714286 m3
= 3.6363636364 m3
= 3.8461538462 m3
= 38.461538462 m3
= 38.461538462 m3

= 6.26 ~ 6 hok
= 0.27 ~ 0 hok
= 1.04 ~ 1 hok
= 0.99 ~ 1 hok
= 0.10 ~ 0 hok
= 0.10 ~ 0 hok
hr

hr = 3.13 ~ 3.13 org


hr = 0.13 ~ 0.13 org
hr = 0.52 ~ 0.52 org
hr = 0.49 ~ 0.49 org
hr = 0.05 ~ 0.05 org
hr = 0.05 ~ 0.05 org

= 1,281.44 ~ 1,281.44 kg
= 2.06 ~ 2.06 m3
= 2.89 ~ 2.89 m3
= 583.85 ~ 583.85 kg
= 87.58 ~ 87.58 kg
= 2.76 ~ 2.76 m3
= 27.57 ~ 27.57 kg
= 13.78 ~ 13.78 ltr
= 1.03 ~ 1.03 m3
= 24.12 ~ 24.12 lbr
= 137.85 ~ 137.85 btg
= 70.97 ~ 70.97 btg
= 3.94 ~ 3.94 kg
= 0.13 ~ 0.13 m3
= 0.6060606061 m3
= 14.285714286 m3
= 3.6363636364 m3
= 3.8461538462 m3
= 38.461538462 m3
= 38.461538462 m3

= 5.5275 ~ 6 hok
= 0.2345 ~ 0 hok
= 0.92125 ~ 1 hok
= 0.871 ~ 1 hok
= 0.0871 ~ 0 hok
= 0.0871 ~ 0 hok
hr

hr = 5.5275 ~ 6 org
hr = 0.2345 ~ 0 org
hr = 0.92125 ~ 1 org
hr = 0.871 ~ 1 org
hr = 0.0871 ~ 0 org
hr = 0.0871 ~ 0 org

= 1132.3 ~ 1132.3 kg
= 1.818715 ~ 1.8 m3
= 2.55337 ~ 2.6 m3
= 515.9 ~ 515.9 kg
= 77.385 ~ 77.4 kg
= 2.43612 ~ 2.4 m3
= 24.3612 ~ 24.4 kg
= 12.1806 ~ 12.2 ltr
= 0.913545 ~ 0.9 m3
= 21.31605 ~ 21.3 lbr
= 121.806 ~ 121.8 btg
= 62.712 ~ 62.7 btg
= 3.484 ~ 3.5 kg
= 0.111488 ~ 0.1 m3

= 0.6060606061 m3
= 14.285714286 m3
= 3.6363636364 m3
= 3.8461538462 m3
= 38.461538462 m3
= 38.461538462 m3

= 77.418 ~ 77 hok
= 3.2844 ~ 3 hok
= 12.903 ~ 13 hok
= 12.1992 ~ 12 hok
= 1.21992 ~ 1 hok
= 1.21992 ~ 1 hok
hr

hr = 11.059714286 ~ 11 org
hr = 0.4692 ~ 0 org
hr = 1.8432857143 ~ 2 org
hr = 1.7427428571 ~ 2 org
hr = 0.1742742857 ~ 0 org
hr = 0.1742742857 ~ 0 org

= 15858.96 ~ 15859 kg
= 25.472868 ~ 25 m3
= 35.762424 ~ 36 m3
= 4363.56 ~ 4364 kg
= 654.534 ~ 655 kg
= 15.633744 ~ 16 m3
= 156.33744 ~ 156 kg
= 78.16872 ~ 78 ltr
= 5.862654 ~ 6 m3
= 136.79526 ~ 137 lbr
= 2345.0616 ~ 2345 btg
= 878.3424 ~ 878 btg
= 48.7968 ~ 49 kg
= 1.5614976 ~ 2 m3

= 0.6060606061 m3
= 14.285714286 m3
= 3.6363636364 m3
= 3.8461538462 m3
= 38.461538462 m3
= 38.461538462 m3

= 181.1139 ~ 181.1139 hok


= 7.68362 ~ 7.68362 hok
= 30.18565 ~ 30.18565 hok
= 28.53916 ~ 28.53916 hok
= 2.853916 ~ 2.853916 hok
= 2.853916 ~ 2.853916 hok
hr

hr = 25.873414286 ~ 26 org
hr = 1.09766 ~ 1 org
hr = 4.3122357143 ~ 4 org
hr = 4.0770228571 ~ 4 org
hr = 0.4077022857 ~ 0 org
hr = 0.4077022857 ~ 0 org
= 37100.908 ~ 37101 kg
= 59.5919614 ~ 60 m3
= 83.6636452 ~ 84 m3
= 10208.238 ~ 10208 kg
= 1531.2357 ~ 1531 kg
= 36.5740312 ~ 37 m3
= 365.740312 ~ 366 kg
= 182.870156 ~ 183 ltr
= 13.7152617 ~ 14 m3
= 320.022773 ~ 320 lbr
= 5486.10468 ~ 5486 btg
= 2054.81952 ~ 2055 btg
= 114.15664 ~ 114 kg
= 3.65301248 ~ 4 m3

= 0.6060606061 m3
= 14.285714286 m3
= 3.6363636364 m3
= 3.8461538462 m3
= 38.461538462 m3
= 38.461538462 m3

= 625.9968 ~ 626 hok


= 26.55744 ~ 27 hok
= 104.3328 ~ 104 hok
= 98.64192 ~ 99 hok
= 9.864192 ~ 10 hok
= 9.864192 ~ 10 hok
hr

hr = 52.1664 ~ 52 org
hr = 2.21312 ~ 2 org
hr = 8.6944 ~ 9 org
hr = 8.22016 ~ 8 org
hr = 0.822016 ~ 1 org
hr = 0.822016 ~ 1 org

= 128234.496 ~ 128234 kg
= 205.9719168 ~ 206 m3
= 289.1725824 ~ 289 m3
= 58426.368 ~ 58426 kg
= 8763.9552 ~ 8764 kg
= 275.8938624 ~ 276 m3
= 2758.938624 ~ 2759 kg
= 1379.469312 ~ 1379 ltr
= 103.4601984 ~ 103 m3
= 2414.071296 ~ 2414 lbr
= 13794.69312 ~ 13795 btg
= 7102.21824 ~ 7102 btg
= 394.56768 ~ 395 kg
= 12.62616576 ~ 13 m3

= 0.6060606061 m3
= 14.285714286 m3
= 3.6363636364 m3
= 3.8461538462 m3
= 38.461538462 m3
= 38.461538462 m3

= 6.26 ~ 6 hok
= 0.27 ~ 0 hok
= 1.04 ~ 1 hok
= 0.99 ~ 1 hok
= 0.10 ~ 0 hok
= 0.10 ~ 0 hok
hr

hr = 6.26 ~ 6.26 org


hr = 0.27 ~ 0.27 org
hr = 1.04 ~ 1.04 org
hr = 0.99 ~ 0.99 org
hr = 0.10 ~ 0.10 org
hr = 0.10 ~ 0.10 org

= 1,281.44 ~ 1,281.44 kg
= 2.06 ~ 2.06 m3
= 2.89 ~ 2.89 m3
= 583.85 ~ 583.85 kg
= 87.58 ~ 87.58 kg
= 2.76 ~ 2.76 m3
= 27.57 ~ 27.57 kg
= 13.78 ~ 13.78 ltr
= 1.03 ~ 1.03 m3
= 24.12 ~ 24.12 lbr
= 137.85 ~ 137.85 btg
= 70.97 ~ 70.97 btg
= 3.94 ~ 3.94 kg
= 0.13 ~ 0.13 m3
= 0.6060606061 m3
= 14.285714286 m3
= 3.6363636364 m3
= 3.8461538462 m3
= 38.461538462 m3
= 38.461538462 m3

= 5.5275 ~ 6 hok
= 0.2345 ~ 0 hok
= 0.92125 ~ 1 hok
= 0.871 ~ 1 hok
= 0.0871 ~ 0 hok
= 0.0871 ~ 0 hok
hr

hr = 5.5275 ~ 6 org
hr = 0.2345 ~ 0 org
hr = 0.92125 ~ 1 org
hr = 0.871 ~ 1 org
hr = 0.0871 ~ 0 org
hr = 0.0871 ~ 0 org

= 1132.3 ~ 1132.3 kg
= 1.818715 ~ 1.8 m3
= 2.55337 ~ 2.6 m3
= 515.9 ~ 515.9 kg
= 77.385 ~ 77.4 kg
= 2.43612 ~ 2.4 m3
= 24.3612 ~ 24.4 kg
= 12.1806 ~ 12.2 ltr
= 0.913545 ~ 0.9 m3
= 21.31605 ~ 21.3 lbr
= 121.806 ~ 121.8 btg
= 62.712 ~ 62.7 btg
= 3.484 ~ 3.5 kg
= 0.111488 ~ 0.1 m3

= 0.6060606061 m3
= 14.285714286 m3
= 3.6363636364 m3
= 3.8461538462 m3
= 38.461538462 m3
= 38.461538462 m3

= 87.57375 ~ 88 hok
= 3.71525 ~ 4 hok
= 14.595625 ~ 15 hok
= 13.7995 ~ 14 hok
= 1.37995 ~ 1 hok
= 1.37995 ~ 1 hok
hr

hr = 12.510535714 ~ 13 org
hr = 0.53075 ~ 1 org
hr = 2.0850892857 ~ 2 org
hr = 1.9713571429 ~ 2 org
hr = 0.1971357143 ~ 0 org
hr = 0.1971357143 ~ 0 org
= 17939.35 ~ 17939 kg
= 28.8144175 ~ 29 m3
= 40.453765 ~ 40 m3
= 4935.975 ~ 4936 kg
= 740.39625 ~ 740 kg
= 17.68459 ~ 18 m3
= 176.8459 ~ 177 kg
= 88.42295 ~ 88 ltr
= 6.63172125 ~ 7 m3
= 154.7401625 ~ 155 lbr
= 2652.6885 ~ 2653 btg
= 993.564 ~ 994 btg
= 55.198 ~ 55 kg
= 1.766336 ~ 2 m3

= 0.6060606061 m3
= 14.285714286 m3
= 3.6363636364 m3
= 3.8461538462 m3
= 38.461538462 m3
= 38.461538462 m3

= 146.7015 ~ 146.7015 hok


= 6.2237 ~ 6.2237 hok
= 24.45025 ~ 24.45025 hok
= 23.1166 ~ 23.1166 hok
= 2.31166 ~ 2.31166 hok
= 2.31166 ~ 2.31166 hok
hr

hr = 20.957357143 ~ 21 org
hr = 0.8891 ~ 1 org
hr = 3.4928928571 ~ 3 org
hr = 3.3023714286 ~ 3 org
hr = 0.3302371429 ~ 0 org
hr = 0.3302371429 ~ 0 org
= 30051.58 ~ 30052 kg
= 48.269239 ~ 48 m3
= 67.767202 ~ 68 m3
= 8268.63 ~ 8269 kg
= 1240.2945 ~ 1240 kg
= 29.624812 ~ 30 m3
= 296.24812 ~ 296 kg
= 148.12406 ~ 148 ltr
= 11.1093045 ~ 11 m3
= 259.217105 ~ 259 lbr
= 4443.7218 ~ 4444 btg
= 1664.3952 ~ 1664 btg
= 92.4664 ~ 92 kg
= 2.9589248 ~ 3 m3

= 1.5384615385 m2
= 5 m2
= 50 m2
= 33.333333333 m2

= 764.387 ~ 17.0 hok


= 235.196 ~ 5.2 hok
= 23.5196 ~ 0.5 hok
= 35.2794 ~ 0.8 hok
hr
hr = 4.2394625 ~ org ###
hr = 1.30445 ~ org ###
hr = 0.130445 ~ org ###
hr = 0.1956675 ~ org ###

= 164637.2 ~ 164637 Bh
= 26106.756 ~ 26107 Kg
= 119.94996 ~ 120 M³

= 5 m2
= 10 m2
= 100 m2
= 100 m2

= 391.958 ~ 391.958 hok


= 195.979 ~ 195.979 hok
= 19.5979 ~ 19.5979 hok
= 19.5979 ~ 19.5979 hok
hr

hr = 10.314684211 ~ 10 org
hr = 5.1573421053 ~ 5 org
hr = 0.5157342105 ~ 1 org
hr = 0.5157342105 ~ 1 org

= 6369.3175 ~ 6369 kg
= 1.5384615385 m2
= 5 m2
= 50 m2
= 33.333333333 m2

= 708.8315 ~ 16.95785 hok


= 218.102 ~ 5.2178 hok
= 21.8102 ~ 0.52178 hok
= 32.7153 ~ 0.78267 hok
hr

hr = 4.2394625 ~ 4 org
hr = 1.30445 ~ 1 org
hr = 0.130445 ~ 0 org
hr = 0.1956675 ~ 0 org

= 152671.4 ~ 152671 Bh
= 24209.322 ~ 24209 Kg
= 111.23202 ~ 111 M³

= 5 m2
= 10 m2
= 100 m2
= 100 m2

= 436.204 ~ 436.204 hok


= 218.102 ~ 218.102 hok
= 21.8102 ~ 21.8102 hok
= 21.8102 ~ 21.8102 hok
hr

hr = 14.071096774 ~ 14 org
hr = 7.0355483871 ~ 7 org
hr = 0.7035548387 ~ 1 org
hr = 0.7035548387 ~ 1 org

= 7088.315 ~ 7088 kg
= 1.5384615385 m2
= 5 m2
= 50 m2
= 33.333333333 m2

= 708.8315 ~ 17 hok
= 218.102 ~ 5 hok
= 21.8102 ~ 1 hok
= 32.7153 ~ 1 hok
hr

hr = 4.2394625 ~ 4 org
hr = 1.30445 ~ 1 org
hr = 0.130445 ~ 0 org
hr = 0.1956675 ~ 0 org

= 152671.4 ~ 152671 Bh
= 24209.322 ~ 24209 Kg
= 111.23202 ~ 111 M³

= 5 m2
= 10 m2
= 100 m2
= 100 m2

= 436.204 ~ 436.204 hok


= 218.102 ~ 218.102 hok
= 21.8102 ~ 21.8102 hok
= 21.8102 ~ 21.8102 hok
hr

hr = 18.175166667 ~ 18 org
hr = 9.0875833333 ~ 9 org
hr = 0.9087583333 ~ 1 org
hr = 0.9087583333 ~ 1 org

= 7088.315 ~ 7088 kg

= 1.5384615385 m2
= 5 m2
= 50 m2
= 33.333333333 m2

= Err:509 ~ 17 hok
= Err:509 ~ 5 hok
= Err:509 ~ 1 hok
= Err:509 ~ 1 hok
hr

hr = 5.6526166667 ~ 6 org
hr = 1.7392666667 ~ 2 org
hr = 0.1739266667 ~ 0 org
hr = 0.26089 ~ 0 org

= Err:509 ~ Err:509 Bh
= Err:509 ~ Err:509 Kg
= Err:509 ~ Err:509 M³
= 5 m2
= 10 m2
= 100 m2
= 100 m2

= Err:509 ~ Err:509 hok


= Err:509 ~ Err:509 hok
= Err:509 ~ Err:509 hok
= Err:509 ~ Err:509 hok
hr

hr = Err:509 ~ Err:509 org


hr = Err:509 ~ Err:509 org
hr = Err:509 ~ Err:509 org
hr = Err:509 ~ Err:509 org

= Err:509 ~ Err:509 kg

= 2.8571428571 m2
= 28.571428571 m2
= 16.129032258 m2
= 32.258064516 m2

= 294.7 ~ 294.7 hok


= 29.47 ~ 29.47 hok
= 52.204 ~ 52.204 hok
= 26.102 ~ 26.102 hok
hr

hr = 21.05 ~ 21 org
hr = 2.105 ~ 2 org
hr = 3.7288571429 ~ 4 org
hr = 1.8644285714 ~ 2 org
= 5894 ~ 5894 Bh
= 9581.96 ~ 9581.96 Kg
= 35.364 ~ 35.364 M³
= 1263 ~ 1263 Kg

= 2.8571428571 m2
= 28.571428571 m2
= 16.129032258 m2
= 32.258064516 m2

= 272.293 ~ 272 hok


= 27.2293 ~ 27 hok
= 48.23476 ~ 48 hok
= 24.11738 ~ 24 hok
hr

hr = 19.4495 ~ 19 org
hr = 1.94495 ~ 2 org
hr = 3.44534 ~ 3 org
hr = 1.72267 ~ 2 org

= 5445.86 ~ 5445.86 Bh
= 8853.4124 ~ 8853.4124 Kg
= 32.67516 ~ 32.67516 M³
= 1166.97 ~ 1166.97 Kg

= 2.8571428571 m2
= 28.571428571 m2
= 16.129032258 m2
= 32.258064516 m2

= 272.293 ~ 272 hok


= 27.2293 ~ 27 hok
= 48.23476 ~ 48 hok
= 24.11738 ~ 24 hok
hr

hr = 19.4495 ~ 19 org
hr = 1.94495 ~ 2 org
hr = 3.44534 ~ 3 org
hr = 1.72267 ~ 2 org

= 5445.86 ~ 5445.86 Bh
= 8853.4124 ~ 8853.4124 Kg
= 32.67516 ~ 32.67516 M³
= 1166.97 ~ 1166.97 Kg

= 20 m1
= 20 m1
= 200 m1
= 333.33333333 m1

= 41.8525 ~ 41.8525 hok


= 41.8525 ~ 41.8525 hok
= 4.18525 ~ 4.18525 hok
= 2.51115 ~ 2.51115 hok
hr

hr = 5.9789285714 ~ 6 org
hr = 5.9789285714 ~ 6 org
hr = 0.5978928571 ~ 1 org
hr = 0.3587357143 ~ 0 org
= 878.9025 ~ 878.9025 M¹
= 125.5575 ~ 125.5575 Kg

= 20 m1
= 20 m1
= 200 m1
= 333.33333333 m1

= 39.4435 ~ 39.4435 hok


= 39.4435 ~ 39.4435 hok
= 3.94435 ~ 3.94435 hok
= 2.36661 ~ 2.36661 hok
hr

hr = 5.6347857143 ~ 6 org
hr = 5.6347857143 ~ 6 org
hr = 0.5634785714 ~ 1 org
hr = 0.3380871429 ~ 0 org

= 828.3135 ~ 828.3135 M¹
= 118.3305 ~ 118.3305 Kg

= 20 m1
= 20 m1
= 200 m1
= 333.33333333 m1

= 41.9435 ~ 41.9435 hok


= 41.9435 ~ 41.9435 hok
= 4.19435 ~ 4.19435 hok
= 2.51661 ~ 2.51661 hok
hr

hr = 5.9919285714 ~ 6 org
hr = 5.9919285714 ~ 6 org
hr = 0.5991928571 ~ 1 org
hr = 0.3595157143 ~ 0 org

= 880.8135 ~ 880.8135 M¹
= 125.8305 ~ 125.8305 Kg

= 20 m1
= 20 m1
= 200 m1
= 333.33333333 m1

= 1.4625 ~ 1.4625 hok


= 1.4625 ~ 1.4625 hok
= 0.14625 ~ 0.14625 hok
= 0.08775 ~ 0.08775 hok
hr

hr = 1.4625 ~ 1 org
hr = 1.4625 ~ 1 org
hr = 0.14625 ~ 0 org
hr = 0.08775 ~ 0 org

= 30.7125 ~ 30.7125 M¹
= 4.3875 ~ 4.3875 Kg
= 50 m2
= 15.873015873 m2
= 158.73015873 m2
= 400 m2

= 64.6252 ~ 64.6252 hok


= 203.56938 ~ 203.56938 hok
= 20.356938 ~ 20.356938 hok
= 8.07815 ~ 8.07815 hok
hr

hr = 3.0773904762 ~ 3 org
hr = 9.69378 ~ 10 org
hr = 0.969378 ~ 1 org
hr = 0.3846738095 ~ 0 org

= 32312.6 ~ 32313 Kg
= 32312.6 ~ 32313 Kg
= 12427.923077 ~ 12428 Kg

= 50 m2
= 15.873015873 m2
= 158.73015873 m2
= 400 m2

= 47.429 ~ 47.429 hok


= 149.40135 ~ 149.40135 hok
= 14.940135 ~ 14.940135 hok
= 5.928625 ~ 5.928625 hok
hr

hr = 2.2585238095 ~ 2 org
hr = 7.11435 ~ 7 org
hr = 0.711435 ~ 1 org
hr = 0.2823154762 ~ 0 org

= 23714.5 ~ 23715 Kg
= 23714.5 ~ 23715 Kg
= 9120.9615385 ~ 9121 Kg

= 50 m2
= 15.873015873 m2
= 158.73015873 m2
= 400 m2

= 53.5264 ~ 53.5264 hok


= 168.60816 ~ 168.60816 hok
= 16.860816 ~ 16.860816 hok
= 6.6908 ~ 6.6908 hok
hr

hr = 2.5488761905 ~ 3 org
hr = 8.02896 ~ 8 org
hr = 0.802896 ~ 1 org
hr = 0.3186095238 ~ 0 org

= 26763.2 ~ 26763 Kg
= 26763.2 ~ 26763 Kg
= 10293.538462 ~ 10294 Kg
= 50 m2
= 15.873015873 m2
= 158.73015873 m2
= 400 m2

= Err:509 ~ Err:509 hok


= Err:509 ~ Err:509 hok
= Err:509 ~ Err:509 hok
= Err:509 ~ Err:509 hok
hr

hr = Err:509 ~ Err:509 org


hr = Err:509 ~ Err:509 org
hr = Err:509 ~ Err:509 org
hr = Err:509 ~ Err:509 org

= Err:509 ~ Err:509 Kg
= Err:509 ~ Err:509 Kg
= Err:509 ~ Err:509 Kg

= 27.777777778 m1
= 16.666666667 m1
= 166.66666667 m1
= 555.55555556 m1
= 2.8571428571 m1

= 10.944 ~ 11 hok
= 18.24 ~ 18 hok
= 1.824 ~ 2 hok
= 0.5472 ~ 1 hok
= 106.4 ~ 106 hok
hr

hr = 1.5634285714 ~ 2 org
hr = 2.6057142857 ~ 3 org
hr = 0.2605714286 ~ 0 org
hr = 0.0781714286 ~ 0 org
hr = 15.2 ~ 15 org

= 48 ~ 48 Bh

= 27.777777778 m1
= 16.666666667 m1
= 166.66666667 m1
= 555.55555556 m1
= 2.8571428571 m1

= 8.352 ~ 8 hok
= 13.92 ~ 14 hok
= 1.392 ~ 1 hok
= 0.4176 ~ 0 hok
= 81.2 ~ 81 hok
hr

hr = 1.1931428571 ~ 1 org
hr = 1.9885714286 ~ 2 org
hr = 0.1988571429 ~ 0 org
hr = 0.0596571429 ~ 0 org
hr = 11.6 ~ 12 org

= 48 ~ 48 Bh
= 27.777777778 m1
= 16.666666667 m1
= 166.66666667 m1
= 555.55555556 m1
= 2.8571428571 m1

= 7.056 ~ 7 hok
= 11.76 ~ 12 hok
= 1.176 ~ 1 hok
= 0.3528 ~ 0 hok
= 68.6 ~ 69 hok
hr

hr = 1.008 ~ 1 org
hr = 1.68 ~ 2 org
hr = 0.168 ~ 0 org
hr = 0.0504 ~ 0 org
hr = 9.8 ~ 10 org

= 48 ~ 48 Bh

= 27.777777778 m1
= 16.666666667 m1
= 166.66666667 m1
= 555.55555556 m1
= 2.8571428571 m1

= Err:509 ~ Err:509 hok


= Err:509 ~ Err:509 hok
= Err:509 ~ Err:509 hok
= Err:509 ~ Err:509 hok
= Err:509 ~ Err:509 hok
hr

hr = Err:509 ~ Err:509 org


hr = Err:509 ~ Err:509 org
hr = Err:509 ~ Err:509 org
hr = Err:509 ~ Err:509 org
hr = Err:509 ~ Err:509 org

= 48 ~ 48 Bh

= 12.345679012 m1
= 7.4074074074 m1
= 74.074074074 m1
= 243.90243902 m1
= 2.8571428571 m1

= 23.085 ~ 23 hok
= 38.475 ~ 38 hok
= 3.8475 ~ 4 hok
= 1.1685 ~ 1 hok
= 99.75 ~ 100 hok
hr

hr = 3.2978571429 ~ 3 org
hr = 5.4964285714 ~ 5 org
hr = 0.5496428571 ~ 1 org
hr = 0.1669285714 ~ 0 org
hr = 14.25 ~ 14 org

= 18 ~ 18 Bh
= 12.345679012 m1
= 7.4074074074 m1
= 74.074074074 m1
= 243.90243902 m1
= 2.8571428571 m1

= 14.985 ~ 15 hok
= 24.975 ~ 25 hok
= 2.4975 ~ 2 hok
= 0.7585 ~ 1 hok
= 64.75 ~ 65 hok
hr

hr = 2.1407142857 ~ 2 org
hr = 3.5678571429 ~ 4 org
hr = 0.3567857143 ~ 0 org
hr = 0.1083571429 ~ 0 org
hr = 9.25 ~ 9 org

= 18 ~ 18 Bh

= 12.345679012 m1
= 7.4074074074 m1
= 74.074074074 m1
= 243.90243902 m1
= 2.8571428571 m1

= 13.365 ~ 13 hok
= 22.275 ~ 22 hok
= 2.2275 ~ 2 hok
= 0.6765 ~ 1 hok
= 57.75 ~ 58 hok
hr
hr = 1.9092857143 ~ 2 org
hr = 3.1821428571 ~ 3 org
hr = 0.3182142857 ~ 0 org
hr = 0.0966428571 ~ 0 org
hr = 8.25 ~ 8 org

= 18 ~ 18 Bh

= 12.345679012 m1
= 7.4074074074 m1
= 74.074074074 m1
= 243.90243902 m1
= 2.8571428571 m1

= Err:509 ~ Err:509 hok


= Err:509 ~ Err:509 hok
= Err:509 ~ Err:509 hok
= Err:509 ~ Err:509 hok
= Err:509 ~ Err:509 hok
hr

hr = Err:509 ~ Err:509 org


hr = Err:509 ~ Err:509 org
hr = Err:509 ~ Err:509 org
hr = Err:509 ~ Err:509 org
hr = Err:509 ~ Err:509 org

= 18 ~ 18 Bh
BARCHAT
PEKERJAAN : STRUKTUR, ARSITEKTUR & MEP
PROYEK : PROYEK PEMBANGUNAN RUMAH SUSUN MAHASISWA 3 LANTAI UNIVERSITAS BOYOLALI
LOKASI : JL. ADI SUCIPTO 170 KARANG ASEM KAB. BOYOLALI JAWA TENGAH

Deviasi
BARCHAT KEBU

VOLUME DURASI
No URAIAN PEKERJAAN
( HARI )
1 2 3 4 5 6 7 8 9 10 11 12
I Pekerjaan Persiapan 173.00 14
II Pekerjaan Galian dan Urugan 66.39 14
III Pekerjaan Struktur
A. Pekerjaan Pondasi
- Bor Pile 40.23 7
- Pile cap 42.25 7
- Pasangan Sloof 30.03 7

1.Lantai Dasar
- Kolom 33.39 7
- Tangga 13.02 4
- Plat Bordes 3.79 1
2. lantai Dua
- Balok 60.66 10
- Plat Beton 109.77 8
- Kolom 39.78 7
- Beton Tangga 3.79 2
- Plat Bordes 3.35 1
3. Lantai Tiga
- Balok 46.92 7
- Plat Beton 109.77 7
- Kolom 379.39 12
- Beton Tangga 3.79 1
- Plat Bordes 3.35 1
4. Lantai Dak
- Balok 53.08 7
- Plat Beton 88.91 7
IV Pekerjaan Arsitektur
1.Lantai Satu
A. Pekerjaan Dinding 1175.98 42
B. Pekerjaan Plafond 837.05 7
C. Pekerjaan Plumbing
Air Bersih 304.00 7
Air Kotor 285.00 7
D. Pekerjaan Pengecetan 3231.26 21
2.Lantai dua
A. Pekerjaan Dinding 1090.51 35
B. Pekerjaan Plafond 788.87 7
C. Pekerjaan Plumbing
Air Bersih 232.00 7
Air Kotor 185.00 7
D. Pekerjaan Pengecetan 2371.45 21
3. Lantai tiga
A. Pekerjaan Dinding 1090.51 28
B. Pekerjaan Plafond 838.87 7
C. Pekerjaan Plumbing
Air Bersih 196.00 7
Air Kotor 165.00 7
D. Pekerjaan Pengecetan 2676.32 21
BARCHAT KEBUTUHAN BAHAN ALAT DAN TENAGA KERJA

MINGGU

13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
TABEL KEBUTUHAN ALAT

NO URAIAN PEKERJAAN
1.PEKERJAAN STRUKTUR
PEKERJAAN PERSIAPAN

TIANG PANCANG

Pekerjan Lantai kerja beton

Beton K350
Pile Cap

A. PEKERJAAN PONDASI Pembesian

Bekisting

Pekerjan Lantai kerja beton

Beton K350
Sloof

Pembesian

Bekisting

B. PEKERJAAN GALIAN DAN URUGAN

D.PEKERJAAN STRUCTURE

Beton K350

Kolom
Pembesian

Bekisting
Kolom

Bekisting

Beton K350

Lantai Dasar Tangga


Pembesian

Bekisting

Beton K350

Plat Bordes
Pembesian

Bekisting

Beton K350

Balok
Pembesian

Bekisting

Beton K350

Plat Lantai
Pembesian

Bekisting

Beton K350
Lantai Dua
Kolom
Pembesian

Bekisting

Beton K350

Tangga
Tangga
Pembesian

Bekisting

Beton K350

Plat Bordes
Pembesian

Bekisting

Beton K350

Balok
Pembesian

Bekisting

Beton K350

Lantai tiga Plat Lantai


Pembesian

Bekisting

Beton K350

Kolom
Pembesian

Bekisting

Beton K350

Balok
Pembesian

Bekisting
Lantai Dak

Beton K350

Plat dak
Lantai Dak

Beton K350

Plat dak
Pembesian

Bekisting

G. PEKERJAAN STRUKTUR BAJA


2. PEKERJAAN ARSITEKTUR
I. LANTAI 1 (SATU)

A. PEKERJAAN DINDING

B. PEK. KUSEN, PINTU / JENDELA TERMASUK FINISHING

C. PEKERJAAN FINISHING LANTAI & DINDING

D. PEKERJAAN PLAFOND

E. PEKERJAAN SANITAIR

F. PEKERJAAN PENGECATAN

II. LANTAI 2 ( DUA )

A. PEKERJAAN DINDING
B. PEK. KUSEN, PINTU / JENDELA TERMASUK FINISHING

C. PEKERJAAN FINISHING LANTAI & DINDING

D. PEKERJAAN PLAFOND

E. PEKERJAAN SANITAIR

F. PEKERJAAN PENGECATAN

III. LANTAI 3 ( TIGA )

A. PEKERJAAN DINDING

B. PEK. KUSEN, PINTU / JENDELA TERMASUK FINISHING

C. PEKERJAAN FINISHING LANTAI & DINDING

D. PEKERJAAN PLAFOND
D. PEKERJAAN PLAFOND

E. PEKERJAAN PENGECATAN

F. PEKERJAAN PENUTUP ATAP

3. PEKERJAAN MEKANIKAL & ELEKTRIKAL

A. PEKERJAAN INSTALASI AIR CONDITIONING

B. PEKERJAAN INSTALASI PLUMBING

D. PEKERJAAN INSTALASI LISTRIK

F. PEKERJAAN INSTALASI FIRE ALARM (TYPE SEMI ADDRESSABLE)


HAN ALAT
HARGA
KEBUTUHAN ALAT SATUAN JUMLAH
SEWA
Rp

Bore Pile Mechine unit 1 489,000


Mesin sedot air unit 2 8,000
Cangkul unit 2 65,000
Linggis unit 3 60,000
Pengki unit 3 15,000
Theodolite unit 1 275,000
Concrete pan mixer unit 1 361,500
Truck Mixer unit 1 59,700
Water Tanker unit 1 283,700
Concrete pan mixer unit 1 361,500
Truck Mixer unit 1 597,000
Water Tanker unit 1 284,000
Vibrator unit 2 14,200
Bar bender unit 1 12,900
Bar Cutter unit 1 12,900
Palu unit 3 20,000
Bekisting knock down unit 4 123,000
Concrete pan mixer unit 1 361,500
Truck Mixer unit 1 59,700
Water Tanker unit 1 283,700
Concrete pan mixer unit 1 361,500
Truck Mixer unit 1 597,000
Water Tanker unit 1 284,000
Vibrator unit 2 14,200
Bar Cutter unit 1 12,900
Bar Bender unit 1 12,900
Palu unit 3 20,000
Bekisting knock down unit 8 134,000
Stamper unit 3 290,000
Cangkul unit 2 65,000
Dump Truck unit 4 297,700
Patok unit 3 10,000

Concrete pan mixer unit 1 361,500


Truck Mixer unit 1 597,000
Water Tanker unit 1 284,000
Vibrator unit 2 14,200
Bar Cutter unit 1 12,900
Bar Bender unit 1 12,900
Palu unit 3 20,000
Scaffolding unit 448 279,000
Concrete pan mixer unit 1 361,500
Truck Mixer unit 1 597,000
Water Tanker unit 1 284,000
Vibrator unit 2 14,200
Bar Cutter unit 1 12,900
Bar Bender unit 1 12,900
Palu unit 3 20,000
Bekisting knock down unit 4 123,000
Concrete pan mixer unit 1 361,500
Truck Mixer unit 1 597,000
Water Tanker unit 1 284,000
Vibrator unit 2 14,200
Bar Cutter unit 1 12,900
Bar Bender unit 1 12,900
Palu unit 3 20,000
Bekisting knock down unit 4 134,000
Concrete pan mixer unit 1 361,500
Truck Mixer unit 1 597,000
Water Tanker unit 1 284,000
Vibrator unit 2 14,200
Bar Cutter unit 1 12,900
Bar Bender unit 1 12,900
Palu unit 3 20,000
Bekisting knock down unit 4 134,000
Concrete pan mixer unit 1 361,500
Truck Mixer unit 1 597,000
Water Tanker unit 1 284,000
Vibrator unit 2 14,200
Bar Cutter unit 1 12,900
Bar Bender unit 1 12,900
Palu unit 3 20,000
Bekisting knock down unit 8 134,000
scaffolding unit 448 279,000
Concrete pan mixer unit 1 361,500
Truck Mixer unit 1 597,000
Water Tanker unit 1 284,000
Vibrator unit 2 14,200
Bar Cutter unit 1 12,900
Bar Bender unit 1 12,900
Palu unit 3 20,000
Bekisting knock down unit 8 134,000
Concrete pan mixer unit 1 361,500
Truck Mixer unit 1 597,000
Water Tanker unit 1 284,000
Vibrator unit 2 14,200
Bar Cutter unit 1 12,900
Bar Bender unit 1 12,900
Palu unit 3 20,000
Bekisting knock down unit 4 134,000
Concrete pan mixer unit 1 361,500
Truck Mixer unit 1 597,000
Water Tanker unit 1 284,000
Vibrator unit 2 14,200
Bar Cutter unit 1 12,900
Bar Bender unit 1 12,900
Palu unit 3 20,000
Bekisting knock down unit 8 134,000
Concrete pan mixer unit 1 361,500
Truck Mixer unit 1 597,000
Water Tanker unit 1 284,000
Vibrator unit 2 14,200
Bar Cutter unit 1 12,900
Bar Bender unit 1 12,900
Palu unit 3 20,000
Bekisting knock down unit 4 134,000
Concrete pan mixer unit 1 361,500
Truck Mixer unit 1 597,000
Water Tanker unit 1 284,000
Vibrator unit 2 14,200
Bar Cutter unit 1 12,900
Bar Bender unit 1 12,900
Palu unit 3 20,000
Bekisting knock down unit 4 123,000
scaffolding unit 448 279,000
Concrete pan mixer unit 1 361,500
Truck Mixer unit 1 597,000
Water Tanker unit 1 284,000
Vibrator unit 2 14,200
Bar Cutter unit 1 12,900
Bar Bender unit 1 12,900
Palu unit 3 20,000
Bekisting knock down unit 4 134,000
Concrete pan mixer unit 1 361,500
Truck Mixer unit 1 597,000
Water Tanker unit 1 284,000
Vibrator unit 2 14,200
Bar Cutter unit 1 12,900
Bar Bender unit 1 12,900
Palu unit 3 20,000
Bekisting knock down unit 4 134,000
Concrete pan mixer unit 1 361,500
Truck Mixer unit 1 597,000
Water Tanker unit 1 284,000
Vibrator unit 2 14,200
Bar Cutter unit 1 12,900
Bar Bender unit 1 12,900
Palu unit 3 20,000
Bekisting knock down unit 4 134,000
Mesin Las unit 1 450,000
Katrol unit 1 150,000

Sendok Aduk unit 2 25,000


Ember Aduk unit 2 10,000
Palu unit 2 20,000
kuas unit 2 10,000
Tata Kayu unit 2 15,000
Mesin Serut unit 1 25,000
Obeng unit 2 20,000
Skrup unit 2 60,000
Slot unit 2 100,000
Kuas unit 2 10,000
Ampelas unit 2 15,000
Sendok Aduk unit 2 25,000
Ember Aduk unit 2 10,000
Palu unit 2 20,000
kuas unit 2 10,000
Tata Kayu unit 3 15,000
Mesin Serut unit 1 25,000
Obeng unit 3 20,000
Skrup unit 3 60,000
Slot unit 3 100,000
Kuas unit 3 10,000
Ampelas unit 3 15,000
Cangkul unit 2 65,000
Serok unit 2 90,000
Roskam unit 2 25,000
Kuas unit 2 10,000
Ampelas unit 2 15,000
Plamir unit 2 85,000

Sendok Aduk unit 2 25,000


Ember Aduk unit 2 10,000
Palu unit 2 20,000
kuas unit 2 10,000
Tata Kayu unit 2 15,000
Mesin Serut unit 1 25,000
Obeng unit 2 20,000
Skrup unit 2 60,000
Slot unit 2 100,000
Kuas unit 2 10,000
Ampelas unit 2 15,000
Sendok Aduk unit 3 25,000
Ember Aduk unit 1 10,000
Palu unit 3 20,000
kuas unit 3 10,000
Tata Kayu unit 3 15,000
Mesin Serut unit 3 25,000
Obeng unit 3 20,000
Skrup unit 2 60,000
Slot unit 2 100,000
Kuas unit 2 10,000
Ampelas unit 2 15,000
Cangkul unit 2 65,000
Serok unit 2 90,000
Roskam unit 2 25,000
Kuas unit 2 10,000
Ampelas unit 2 15,000
Plamir unit 2 85,000

Sendok Aduk unit 2 25,000


Ember Aduk unit 2 10,000
Palu unit 2 20,000
kuas unit 2 10,000
Tata Kayu unit 2 15,000
Mesin Serut unit 1 25,000
Obeng unit 2 20,000
Skrup unit 2 60,000
Slot unit 2 100,000
Kuas unit 2 10,000
Ampelas unit 2 15,000
Sendok Aduk unit 2 25,000
Ember Aduk unit 2 10,000
Palu unit 2 20,000
kuas unit 2 10,000
Tata Kayu unit 3 15,000
Mesin Serut unit 1 25,000
Obeng unit 3 20,000
Skrup unit 3 60,000
Slot unit 3 100,000
Kuas unit 3 10,000
Ampelas unit 3 15,000
Kuas unit 2 10,000
Ampelas unit 2 15,000
Plamir unit 2 85,000
Mesin Las unit 1 450,000
Gegep unit 3 35,000
Tang unit 3 25,000

Tang unit 2 65,000


Karter unit 2 10,000
Obeng unit 2 20,000
Tes Pen unit 2 15,000
Voltmeter unit 1 75,000
Gergaji Besi unit 3 45,000
Obeng unit 3 20,000
Cangkul unit 3 65,000
Linggis unit 3 60,000
Pengki unit 3 15,000
Pecok unit 3 25,000
Tang unit 3 65,000
Karter unit 3 10,000
Obeng unit 3 20,000
Tes Pen unit 3 15,000
Voltmeter unit 1 75,000
Tang unit 2 65,000
Karter unit 2 10,000
Obeng unit 2 20,000
Tes Pen unit 2 15,000
Voltmeter unit 1 75,000
VOLUME DURASI
No URAIAN PEKERJAAN BULAN KE - 1
( HARI )
minggu minggu
ke-1 ke-2
I Pekerjaan Persiapan 173 14 86.5 86.5
II Pekerjaan Galian dan Urugan 66 14
III Pekerjaan Struktur
A. Pekerjaan Pondasi
- Bor Pile 40 7
- Pile cap 42 7
- Pasangan Sloof 30 7

1.Lantai Dasar
- Kolom (m3) 33 7
- Plat Bordes 4 4
- Pekerjaan Tangga (m3) 13 1
2. lantai Dua
- Balok (m3) 61 10
- Plat Beton (m3) 110 8
- Kolom (m3) 40 7
- Pekerjaan Tangga (m3) 4 2
- Plat Bordes 3 1
3. Lantai Tiga
- Balok (m3) 47 7
- Plat Beton (m3) 110 7
- Kolom (m3) 379 12
- Pekerjaan Tangga (m3) 4 1
- Plat Bordes 3 1
4. Lantai Dak
- Balok (m3) 53 7
- Plat Beton (m3) 89 7

IV Pekerjaan Arsitektur
1.Lantai Satu
A. Pekerjaan Dinding 1176 42
B. Pekerjaan Plafond 837 7
C. Pekerjaan Plumbing
Air Bersih 304 7
Air Kotor 285 7
D. Pekerjaan Pengecetan 3231 21
2.Lantai dua
A. Pekerjaan Dinding 1091 35
B. Pekerjaan Plafond 789 7
C. Pekerjaan Plumbing
Air Bersih 232 7
Air Kotor 185 7
D. Pekerjaan Pengecetan 2371 21
3. Lantai tiga
A. Pekerjaan Dinding 1091 28
B. Pekerjaan Plafond 839 7
C. Pekerjaan Plumbing
Air Bersih 196 7
Air Kotor 165 7
D. Pekerjaan Pengecetan 2676 21
BARCHAT VOLUME

JANGKA WAKTU PE
BULAN KE - 1 BULAN KE - 2 BULAN KE - 3
minggu minggu minggu minggu minggu minggu minggu minggu minggu minggu
ke-3 ke-4 ke-5 ke-6 ke-7 ke-8 ke-9 ke-10 ke-11 ke-12

33.1951 33.1951

40.2
42.2
30

33
4
13

30.33 30.33
55

196 196 196

304
285
232
185

196
165
OLUME

JANGKA WAKTU PELAKSANAAN 7 BULAN 2 MINGGU KALENDER KERJA


BULAN KE - 4 BULAN KE - 5 BULAN KE - 6
minggu minggu minggu minggu minggu minggu minggu minggu minggu minggu
ke-13 ke-14 ke-15 ke-16 ke-17 ke-18 ke-19 ke-20 ke-21 ke-22

55
40
4
3

47
110
189.696 189.696
4
3

53
89

196 196 196


837
218.102 218.102 218.102 218.102 218.102
BULAN KE - 6 BULAN KE - 7 BULAN KE - 8
minggu minggu minggu minggu minggu minggu minggu minggu minggu
ke-23 ke-24 ke-25 ke-26 ke-27 ke-28 ke-29 ke-30 ke-31

1077.09 1077.09 1077.09


789

790.5 790.5 790.5

892.1 892.1 892.1


DURAS
VOLUME JUMLAH I
No URAIAN PEKERJAAN
PEKERJA
( HARI )

I Pekerjaan Struktur
A.Pekerjaan Galian dan Urugan 1466.00
Mandor 1
6
Tukang 3
Pekerja 3

B. Pekerjaan Pondasi
- Tiang pancang 56.00
Mandor 1
6
Tukang 3
Pekerja 3
- Pile cap 26.00
Mandor 1
Tukang 3 6
Pekerja 3

- Sloof 33.00 1
Mandor 3
6
Tukang 3
Pekerja

- Pondasi tangga 0.70


Mandor 1
6
Tukang 3
Pekerja 3

- Plat Lantai 266.00


Mandor 1
18
Tukang 3
Pekerja 3
D.Pekerjaan Upper Structure
1.Lantai Satu
- Kolom 22.00
Mandor 1
6
Tukang 3
Pekerja 3
- Pekerjaan Tangga 13.00
Mandor 1
6
Tukang 3
Pekerja 3

2. lantai Dua
- Balok 48.00
Mandor 1
6
Tukang 3
Pekerja 3

- Plat Lantai 92.00


Mandor 1
12
Tukang 3
Pekerja 3

- Kolom 17.00
Mandor 1
6
Tukang 3
Pekerja 3

- Pekerjaan Tangga 13.00


Mandor 1
6
Tukang 3
Pekerja 3

3. Lantai Tiga
- Balok 45.00
Mandor 1
6
Tukang 3
Pekerja 3

- Plat Lantai 69.00


Mandor 1
12
Tukang 3
Pekerja 3

- Kolom 9.00
Mandor 1
6
Tukang 3
Pekerja 3

4. Ring Balok
- Balok 25.00
6
Mandor 1
6
Tukang 3
Pekerja 3

- Plat Dak 21.00


Mandor 1
6
Tukang 3
Pekerja 3

E.Pekerjaan Baja / Atap 35120


Mandor 1
18
Tukang 3
Pekerja 3
II Pekerjaan Arsitektur

1.Lantai Satu
A. Pekerjaan Dinding , Lantai dan 2605.00
Mandor 1
18
Tukang 6
Pekerja 6

B.Pek. Kusen Pintu / Jendela terma 29.00


Mandor 1
6
Tukang 3
Pekerja 3

D. Pekerjaan Langit - Langit 755.00


Mandor 1
12
Tukang 3
Pekerja 3

E. Pekerjaan Plumbing 56.00


Mandor 1
6
Tukang 3
Pekerja 3

2.Lantai dua
A. Pekerjaan Dinding , Lantai dan 2605.00
Mandor 1
18
Tukang 6
Pekerja 6

B.Pek. Kusen Pintu / Jendela 29.00


termasuk Finishing
Mandor 1 6
6
Tukang 3
Pekerja 3

D. Pekerjaan Langit - Langit 762.00


Mandor 1
12
Tukang 3
Pekerja 3

E. Pekerjaan Sanitair 36.00


Mandor 1
6
Tukang 3
Pekerja 3

3. Lantai tiga
A. Pekerjaan Dinding , Lantai dan 412.00
Mandor 1
12
Tukang 3
Pekerja 3

B.Pek. Kusen Pintu / Jendela 14.00


termasuk Finishing
Mandor 1 6
Tukang 3
Pekerja 3

D. Pekerjaan Langit - Langit 261.00


Mandor 1
12
Tukang 3
Pekerja 3

E. Pekerjaan Plumbing 411.00


Mandor 1
6
Tukang 3
Pekerja 3
BARCHAT KEBUTUHAN PEK

JANGKA WAKTU PELAKSANAAN 4 BULAN 1 MINGGU KALENDER


DESEMBER JANUARI FEBRUARI
minggu minggu minggu minggu minggu minggu minggu minggu minggu minggu
ke-1 ke-2 ke-3 ke-4 ke-5 ke-6 ke-7 ke-8 ke-9 ke-10

6
18
18

6
18
18

6
18
18

6
18
18

6
18
18

6 6 6
18 18 18
18 18 18

6
18
18
6
18
18

6
18
18

6 6
18 18
18 18

6
18
18

6
18
18

6
18
18

6
18
18
6
36
36
RCHAT KEBUTUHAN PEKERJA

AN 1 MINGGU KALENDER KERJA


FEBRUARI MARET APRIL
minggu minggu minggu minggu minggu minggu minggu
ke-11 ke-12 ke-13 ke-14 ke-15 ke-16 ke-17
6
18
18

6
18
18
6
18
18

6
18
18

6 6 6
18 18 18
18 18 18

6 6
36 36
36 36

6
18
18

6 6
18 18
18 18

6
18
18

6 6 6
36 36 36
36 36 36

6
18
18

6 6
18 18
18 18

6
18
18

6 6
18 18
18 18

6
18
18

6 6
18 18
18 18

6
18
18

Anda mungkin juga menyukai

  • Cinta
    Cinta
    Dokumen4 halaman
    Cinta
    Salman
    Belum ada peringkat
  • Joshi
    Joshi
    Dokumen2 halaman
    Joshi
    Salman
    Belum ada peringkat
  • Haul
    Haul
    Dokumen1 halaman
    Haul
    Salman
    Belum ada peringkat
  • Cint
    Cint
    Dokumen4 halaman
    Cint
    Salman
    Belum ada peringkat
  • Perbedaan Struktur Kalimat Bahasa Indonesia dan Jepang
    Perbedaan Struktur Kalimat Bahasa Indonesia dan Jepang
    Dokumen2 halaman
    Perbedaan Struktur Kalimat Bahasa Indonesia dan Jepang
    Salman
    Belum ada peringkat
  • Hyaku Monogatari
    Hyaku Monogatari
    Dokumen8 halaman
    Hyaku Monogatari
    Salman
    Belum ada peringkat
  • Joshi
    Joshi
    Dokumen2 halaman
    Joshi
    Salman
    Belum ada peringkat
  • Origami
    Origami
    Dokumen1 halaman
    Origami
    Salman
    Belum ada peringkat
  • Cinta
    Cinta
    Dokumen3 halaman
    Cinta
    Salman
    Belum ada peringkat
  • Gakh Penting
    Gakh Penting
    Dokumen2 halaman
    Gakh Penting
    Salman
    Belum ada peringkat
  • Konjungsi
    Konjungsi
    Dokumen15 halaman
    Konjungsi
    Salman
    Belum ada peringkat
  • Dialek Jepang
    Dialek Jepang
    Dokumen4 halaman
    Dialek Jepang
    Salman
    Belum ada peringkat
  • Musik 5
    Musik 5
    Dokumen2 halaman
    Musik 5
    Salman
    Belum ada peringkat
  • Gak Phenting
    Gak Phenting
    Dokumen2 halaman
    Gak Phenting
    Salman
    Belum ada peringkat
  • Kata Pengantar
    Kata Pengantar
    Dokumen2 halaman
    Kata Pengantar
    Salman
    Belum ada peringkat
  • Musik 2
    Musik 2
    Dokumen2 halaman
    Musik 2
    Salman
    Belum ada peringkat
  • KanjiSejarah,Jenis,CaraBaca,danKomponen
    KanjiSejarah,Jenis,CaraBaca,danKomponen
    Dokumen4 halaman
    KanjiSejarah,Jenis,CaraBaca,danKomponen
    Salman
    Belum ada peringkat
  • Analisa Hidrometer
    Analisa Hidrometer
    Dokumen5 halaman
    Analisa Hidrometer
    Salman
    Belum ada peringkat
  • BAB I.abstrak Tanah Pengujian
    BAB I.abstrak Tanah Pengujian
    Dokumen4 halaman
    BAB I.abstrak Tanah Pengujian
    Christian Yang
    Belum ada peringkat
  • Hanja Lesson
    Hanja Lesson
    Dokumen47 halaman
    Hanja Lesson
    Salman
    Belum ada peringkat
  • Musik 3
    Musik 3
    Dokumen2 halaman
    Musik 3
    Salman
    Belum ada peringkat
  • Music
    Music
    Dokumen14 halaman
    Music
    Salman
    Belum ada peringkat
  • Cover ACC
    Cover ACC
    Dokumen1 halaman
    Cover ACC
    Salman
    Belum ada peringkat
  • Daftar Isi
    Daftar Isi
    Dokumen3 halaman
    Daftar Isi
    Salman
    Belum ada peringkat
  • Cover
    Cover
    Dokumen1 halaman
    Cover
    Salman
    Belum ada peringkat
  • Bab Iii
    Bab Iii
    Dokumen16 halaman
    Bab Iii
    Salman
    Belum ada peringkat
  • Bab Ii
    Bab Ii
    Dokumen1 halaman
    Bab Ii
    Salman
    Belum ada peringkat
  • Bab Iv
    Bab Iv
    Dokumen4 halaman
    Bab Iv
    Salman
    100% (1)
  • Tugas Aplikasi Komputer
    Tugas Aplikasi Komputer
    Dokumen1 halaman
    Tugas Aplikasi Komputer
    Salman
    Belum ada peringkat