DAERAH BANDUNG
DIAMBIL DARI STANDAR BIAYA BELANJA DAERAH PEMERINTAH
PROPINSI JAWA BARAT TAHUN 2005
HARGA PASAR SETEMPAT BULAN FEBRUARI 2005
363 Kunci Slaag Silinder SEIS type 210 s/d 226 bh 325,000.00
364 Kunci 2 Slaag SEIS Standar bh 225,000.00
365 Kunci 2 Slaag Silinder Utama Standard bh 470,000.00
366 Kunci 2 Slaag besar Yale bh 195,000.00
367 Kunci 2 Slaag Kuda Terbang bh 75,000.00
368 Kunci Slaag ISO bh 157,000.00
369 Kunci Slaag Ancor asli bh 136,000.00
370 Kunci KM/WC merk Alpha bulat bh 70,000.00
371 Kunci Silender ALFA Pintu Allumunium bh 375,000.00
372 Tarikan Pintu Allumunium bh 375,000.00
373 engsel pintu kuningan 3" bh 16,500.00
374 engsel pintu kuningan 4" bh 18,500.00
375 engsel pintu Unilon standard ps 10,000.00
376 engsel jendela Unilon ps 9,000.00
377 engsel stainless steel setara YANK 3" bh 8,500.00
378 engsel stainless steel setara YANK 4" bh 11,000.00
379 engsel piano RRC m' 14,200.00
380 grendel ukuran kecil bh 5,000.00
381 grendel ukuran besar bh 11,000.00
382 kait angin jendela biasa ps 5,000.00
383 kait angin jendela antik ps 20,000.00
384 kait angin sendok stainlesssteel/ kuningan bh 40,000.00
385 espagnolet tanam bh 42,000.00
Drs. KARTOLO
KOLONEL CZI NRP 30325
PENGECORAN JALAN DESA SUBANG
volume panjang 889 m1 x lebar 2,5 m1
dengan ketebalan 15 cm
333.38 m3
Beton 1:3:5 material dan pekerja
333.38 m3 semen 1,550.00 zak 54,000.00 83,700,000.00
333.38 pasir beton 180.02 m3 312,500.00 56,257,031.25
333.38 split 303.37 m3 440,000.00 133,483,350.00
14.00 tk.batu 23.00 org/hr 150,000.00 3,450,000.00
14.00 mandor 23.00 org/hr 200,000.00 4,600,000.00
14.00 pekerja 69.00 org/hr 100,000.00 6,900,000.00
14.00 pelaksana 23.00 org/hr 250,000.00 5,750,000.00
294,140,381.25
14.00 sewa alat
ASUMSI PELAKSANAAN mobil molen 19.00 hr 600,000.00 11,400,000.00
23 HARI 5 MOBIL COR PER HARI exavator 19.00 hr 225,000.00 4,275,000.00
solar exavator 3,040.00 liter 9,000.00 27,360,000.00
342.00 m3 solar mobil molen 665.00 liter 9,000.00 5,985,000.00
operator exavator dan supir truck 19.00 org/hr 200,000.00 3,800,000.00
operator truck 19.00 org/hr 200,000.00 3,800,000.00
56,620,000.00
350,760,381.25
273,440,381.25
#REF! sewa alat
ASUMSI PELAKSANAAN mobil molen 23.00 hr 600,000.00 13,800,000.00
23 HARI 5 MOBIL COR PER HARI exavator 23.00 hr 225,000.00 5,175,000.00
solar exavator 3,680.00 liter 9,000.00 33,120,000.00
342.00 m3 solar mobil molen 805.00 liter 9,000.00 7,245,000.00
operator exavator dan supir truck 23.00 org/hr 200,000.00 4,600,000.00
operator truck 23.00 org/hr 200,000.00 4,600,000.00
68,540,000.00
341,980,381.25
95.25
asumsi pelaksanaan 6.80
pelaksanaan