3. Refrigerant pipes.
Page 2
Saigon M&C Tower Project
Method Statement For Fire Stopping
General:
Items: - The Method Statement For Air Conditioning Pipe Insulation Works
Aim:
The aim of works is to describe mechanical works associated with insulation of
Chiller pipe, A/C drain pipe & Refrigerant pipe (copper pipe) to ensure compliance
with contract requirements approved shop drawings, materials, specification and
quality control.
Scope of Works:
This method statement covers work related to HVAC pipe of the SAIGON M&C
TOWER Project
Installation works:
pipe Type Std Tube Std Tube Pre-Cut sheet Pre-Cut sheet
Page 3
Saigon M&C Tower Project
Method Statement For Fire Stopping
1 2
Measure & cut the length Cut the isulation tube according
insulation tube to the lengthwise
Page 4
Saigon M&C Tower Project
Method Statement For Fire Stopping
3 4
5 Insulation tube 6
(refer to table 01)
Press together two surface firmly of seam Add adhesive tape at the connection joint
b. For pipe size 150A and over: Use Pre-Cut sheet insulation
1 2
Measure the circumference with an Cut the pre-cut sheet insulation with
insuflex strip a knife or blade
Page 5
Saigon M&C Tower Project
Method Statement For Fire Stopping
1 2
Measure & cut the length Slip full length of insulation tube
insulation tube
3 4
Page 6
Saigon M&C Tower Project
Method Statement For Fire Stopping
Refrigerant pipe
1A 1B
Slip full length of insulation tube Cut the isulation tube according to
(for small size pipe) the lengthwise (for big size pipe)
2A 2B
Page 7
Saigon M&C Tower Project
Method Statement For Fire Stopping
3A 3B
Press together two surface firmly of joint Press together two surface firmly of seam
Adhesive tape 25x0.6mm thk at connection joint Insulation tube 19mm thk
10
D1
1 2
L
L
D1
Measure the circumference of flange Transfer dimension of circumference &
connection with an sheet strip distance between two flange connection
Page 8
Saigon M&C Tower Project
Method Statement For Fire Stopping
3 4
D2
D2
5 6
Mark-up curve with radius for 5 points and Cut off pre-cut sheet out follow 5 points
connect them with a through line to be marked
7 8
Apply adhesive on both joining surface Apply adhesive on both fitting covers
evenly & around valve body tightly together
Page 9
Saigon M&C Tower Project
Method Statement For Fire Stopping
Pre-cut sheet insulation shall be to fixed Add insuflex cover for valve handle
by adhesive
1 2 3
Measure the circumference of flange connection (e), between two flange connection
(a), two distance between flange connention & valve body (b & c) and diameter of
valve spindle (d)
4 5
Page 10
Saigon M&C Tower Project
Method Statement For Fire Stopping
8
9
Measure the height (A, B) of valve Transfer dimension of circumference (C) &
handle height (A & B) onto pre-cut sheet
6 11
Measure the height (A, B) of valve Apply adhesive on both fitting covers
handle tightly together
12
Page 11
Saigon M&C Tower Project
Method Statement For Fire Stopping
1 2
P
P
3 4
H2
H1
Measured the inner height of the elbow Measured the outer height of the elbow
5 6
H2
H1 H1
Page 12
Saigon M&C Tower Project
Method Statement For Fire Stopping
7 8
H2
H1 H1
Make three elbow Connect the lines and cut the fitting cover out
9 10
Join two surface firmly together Join two surface firmly together
11
Completed
Page 13
Saigon M&C Tower Project
Method Statement For Fire Stopping
b) Tee:
D
Measure and transfer dimension of tee Cut off pre-cut sheet out at highest point
to be marked
Branch pipe
t
D
Page 14
Saigon M&C Tower Project
Method Statement For Fire Stopping
c) Reducing:
1 2
4 5 6
7 8 9
10 11 12