Anda di halaman 1dari 16

Location :

REMAINING WORKS REMARKS


Location : BUILDING 1 - MAIN OFFICE

REMAINING WORKS REMARKS

1. Downspouts - Front(South) and Back(North) Side

2. Apron - Around the Building

3. Canopy - Doors at North Side - 2 nos.


- Door at West Side - 1 no.
- Door at East Side - 1 no.

4. RCC Slab/Stair - Doors at North Side - 2 nos.


- Door at West Side - 1 no.
- Door at East Side - 1 no.

5. Concrete Ramp - At the Porch (GL F/1-4)

6. Concrete Slab/Plinth - At the Porch (GL F/8-10)

7. Open Ditch - At the Porch (GL F/1-4)


- At West Side
- Front in between Porch

8. Open Ditch with Steel Grating - At West Side


- At the Porch (GL F/8-10)

9. Planter Box - At the Porch (GL F/1-4)


Location : BUILDING 2 - KOREAN STAFF ACCOMODATION

REMAINING WORKS REMARKS

1. Downspouts At B2A
- North & South Side
At B2B
- South & West Side

2. Apron - Around the Building (B2A & B2B)

3. Canopy At B2A
- Door at West Side - 1 no.
- Doors at North Side - 2 nos.
- Door at South Side - 1 no.
At B2B
- Door at West Side - 1 no.
- Door at East Side - 1 no.
- Door at South Side - 1 no.

4. RCC Slab/Stair At B2A


- Doors at West, North & South Side - 4 nos.
At B2B
- Doors at West, South, East & North Side - 4 nos.

5. Open Ditch At B2A


- At West Side
At B2B
- At East Side

6. Open Ditch with Steel Grating At B2A


- At South Side
At B2B
- At West Side
- At East Side
Location : BUILDING 3 - MESS HALL

REMAINING WORKS REMARKS

1. Downspouts - At West Side


- At East Side

2. Apron - Around the Building

3. Canopy - Doors at West Side - 3 nos.


- Doors at East Side - 2 nos.

4. RCC Slab/Stair - Doors at West Side - 3 nos.


- Doors at East Side - 2 nos.

5. Open Ditch with Steel Grating - At West Side


- At East Side
Location : BUILDING 9 - KOREAN WORKERS ACCOMODATION

REMAINING WORKS REMARKS

1. Bricks for Walls (External) - Around the building

2. Bricks for Toilet Walls - 8 nos.

3. Stiffener Columns - 4 nos. (west & east side)


- 7 nos. (north side)
- 7 nos. (south side)

4. Floor Slab - Whole building area

5. Lintel Beams - Around the building

6. Roofing with Insulation - Whole building

7. Wall Sheet - Around the building

8. Gutter & Downspout - north & south side

9. Apron - Around the Building

10. Canopy - At North Side Door - 1 no.


- At West Side Door - 1 no.
- At East Side Door - 1 no.
- At South Side Door - 1 no.

11. RCC Slab/Stair - Doors at West Side - 3 nos.


- Doors at East Side - 2 nos.

12. Open Ditch - north & west side

13. Open Ditch with Steel Grating - At West Side


Location : BUILDING 8 - KOREAN WORKERS ACCOMODATION

REMAINING WORKS REMARKS

1. Steel Columns - 2 nos @ GL A/1 & B/1

2. Truss - Whole building

3. Purlins - Whole building

4. Stiffener Columns - 4 nos. (west & east side)


- 7 nos. (north side)
- 7 nos. (south side)

5. Floor Slab - Whole building area

6. Lintel Beams - Around the building

7. Roofing with Insulation - Whole building

8. Wall Sheet - Around the building

9. Gutter & Downspout - north & south side

10. Apron - Around the Building

11. Canopy - At North Side Door - 1 no.


- At West Side Door - 1 no.
- At East Side Door - 1 no.
- At South Side Door - 1 no.

12. RCC Slab/Stair - Doors at West, East, North & South Side

13. Open Ditch - north & west side

14. Open Ditch with Steel Grating - At West Side

15. Bricks for Walls (External) - Around the building

16. Bricks for Toilet Walls - 10 nos.


Location : GENERATOR ROOM

REMAINING WORKS REMARKS

1. Concrete Ramps - 2 nos @ the sliding gate

2. Gutter & Downspout - At North Side

3. Sliding Gates - 2 nos. at North Side

4. Louvers - 3 nos. at South Side


- 1 no. at West Side
- 1 no. at East Side
Location : WATER TREATMENT SYSTEM

REMAINING WORKS REMARKS

1. Gutter & Downspout - At South Side

2. Door - At East Side (only opening)

3. Louvers - 1 no. at West Side (window opening only)


- 1 no. at South Side (window opening only)
- 1 no. at North Side (no window opening)

4. Concrete Ramp (1000x1200 mm) - At North Side

Anda mungkin juga menyukai