1 Kantor Satpam
- Lampu Neon 28 2 56
- TV HSE 85 1 85
- Dispencer 300 1 300
- AC 320 1 320
- Receptacle 1 Ph 660 1 660
4 Gudang
Lampu TL 36 2 72
AC 320 1 320
Receptacle 1 Ph 660 1 660
5 Sport Station
Lampu TL 36 4 144
Tread Mill 450 1 450
Receptacle 1 Ph 660 1 660
7 OFFICE
Lampu Depan 36 18 648
Lampu Belakang 36 18 648
1.KLINIK Room
Lampu TL 15 8 120
AC 320 2 640
Receptacle 1 Ph 660 2 1320
2. Warsila Room
Lampu TL 15 16 240
AC 320 1 320
Receptacle 1 Ph 660 4 2640
3. Owner Room
Lampu TL 15 16 240
AC 320 2 640
Receptacle 1 Ph 660 4 2640
Dispencer 190 1 190
4. Consultant Room
Lampu TL 15 16 240
AC 320 2 640
Receptacle 1 Ph 660 4 2640
Dispencer 190 1 190
5. Meeting Room
Lampu Downlight 18 8 144
AC 660 1 660
Receptacle 1 Ph 660 3 1980
TV 160 1 160
6. PM Room
Lampu Bohlam 19 1 19
Lampu Sorot 3 3 9
TV 130 1 130
AC 320 1 320
Receptacle 1 Ph 660 1 660
7. HSE Room
Lampu Bohlam 19 3 57
AC 320 1 320
Receptacle 1 Ph 660 1 660
8. VIP Room
Lampu Baret 18 1 18
Lampu Led Strip 1.08 100 108
Lampu Sorot 3 3 9
TV 150 1 150
Kulkas 125.4 1 125.4
9.Manager, Engineer & Contraction Room
Lampu Bohlam 19 19 361
AC 320 4 1280
10. Rilex Room
Lampu Downlight 18 4 72
Lampu Sorot 15 3 45
TV 150 1 150
8 Mushola
Lampu Bohlam 19 22 418
Speaker / TOA 60 2 120
AC 320 2 640
9 Happiness Coffee
Lampu Sorot 3 18 54
Lampu Bohlam 11.5 4 46
TV 130 1 130
Kulkas 120 1 120
AC 320 2 640
Dispencer 80 1 80
10 Parkiran, Taman & Kolam
Lampu Kolam 25 5 125
Lampu 19 10 190
TOTAL KONSUMSI ENERGI PERHARI (WH)
TOTAL KONSUMSI ENERGI PERHARI (KWH)
HARGA ENERGI LISTRIK PLN PER KWH (Rp.)
HARGA ENERGI LISTRIK PLN PER HARI (Rp.)
HARGA ENERGI LISTRIK PLN PER BULAN (Rp.)
HARGA ENERGI LISTRIK PLN PER TAHUN (Rp.)
Jumlah Total pemakaian
Pemakaian/hari energi per hari
(Hour) (WH)
12 672
12 1020
24 7200
24 7680
6 3960
7 252
12 1296
12 388.8
12 62400
12 7200
12 2640
12 864
12 3840
12 7920
6 864
4 1800
1 660
12 864
6 216
12 7776
12 7776
12 1440
12 7680
1 1320
8 1920
8 2560
4 10560
8 1920
8 5120
4 10560
24 4560
8 1920
8 5120
4 10560
24 4560
2 288
2 1320
2 3960
2 320
8 152
8 72
2 260
8 2560
2 1320
12 684
12 3840
4 2640
1 18
2 216
2 18
2 300
24 3009.6
12 4332
12 15360
12 864
12 540
12 1800
10 4180
8 960
8 5120
12 648
12 552
6 780
24 2880
12 7680
24 1920
11 1375
12 2280
269337.4
269.3374
1,467.28
395,193.38
11,855,801.41
142,269,616.90
DETAIL KONSUMSI LISTRIK ENERGI TERBARUKAN (PLTS, HYBRID PLTB & PLTS,
6 864
4 1800
12 7776
12 7776
12 1440
8 1920
8 1920
8 1920
2 288
2 320
8 152
8 72
2 260
12 684
1 18
2 216
2 18
2 300
12 4332
12 864
12 540
12 1800
10 4180
12 648
12 552
6 780
11 1375
12 2280
45483.8
45.4838
1,467.28
66,737.47
2,002,124.10
24,025,489.22
223853.6
223.8536
1,467.28
/HARI 328,455.91
/BULAN 9,853,677.31
/TAHUN 118,244,127.67
DETAIL BIAYA INVESTASI UNTUK ENERGI TERBARUKAN
No Detail Produk Harga (Rp.) Keterangan
A PLTS 20 kW
1. Modul Surya * Menggunakan Eks Proyek PLTS Kendari
2. Battery * Menggunakan Eks Proyek PLTS Kendari
3. Inverter * Menggunakan Eks Proyek PLTS Kendari
4. Kabel * Menggunakan Eks Proyek PLTS Kendari
5. Panel dan Aksesoris Lainnya * Menggunakan Eks Proyek PLTS Kendari
D PLT Biogas
Generator Biogas 9,500,000
F Save Energy
-Smart Sensor 4,500,000
TOTAL BIAYA INVESTASI 23,550,000 Untuk Sistem Energi Terbarukan di Senayan