Material Upah Kerja

Harga Total Bobot Upah Kerja Material Harga Total


NO URAIAN PEKERJAAN VOL SAT HARGA SAT. JML.HARGA Harga Satuan Jumlah Harga
Rp Rp Rp Rp Rp % Rp Rp
TAMBAHAN
IMB 12,000,000
Water Heater 2,600,000
Pipa Water Heater & Knee Accessories 660,000
Kaca Mati Kamar mandi 1,157,500
Pintu Kaca Kama mandi 3,254,100
Accessories Kamar mandi (Engsel & Handle) 2,151,122
Ongkos Pasang Kaca Kamar mandi 750,000
Pipa AC & Kabel AC 1,800,000
Keramik Dinding Belakang 2,520,000
Tambahan Kabel Etherna 377,100
Photo cell 120,000
Kusen pintu kamar mandi 800,000
Penangkal Petir 3,800,000
Wastafel 1,725,000
Toren Air 1,700,000
Pompa Dorong 800,000
Pompa Jet Pump 1,800,000
Lampu Gantung 4,000,000
LED Strip 450,000
Konektor LED Strip 140,000
Keramik Dinding Taman 2,520,000
Keramik Lantai Taman 1,793,724
Potong Pohon Rambutan 1,000,000
Tangga Monyet ke toren 600,000
Tralis Jemuran + Pagar Duri 6,700,000
Canopy Jemuran 6,500,000
Kaca Canopy Carport 1,000,000
Pembuatan Taman Mini & Kolam 13,000,000
Pembuatan Kitchen set 21,000,000
Keramik Kitchen Set 788,000
Granit Kitchen Set 3,000,000
Kompor Tanam + Cook Hood 3,350,000
Sink Cucian Piring 2,512,170
Kran Sink 260,000
Keramik Carport 2,500,000
Keramik Carport 3,957,300
Perapihan Taman 1,000,000
Pembuatan Pagar & Carport Tambahan & Taman 16,500,000
Pagar Besi luar 8,500,000
Renovasi 123 Hutang 13,000,000
152,086,016

TOTAL KESELURUHAN 969,086,016