ELECTRICAL WORKS - CARMEN POWERHOUSE

SCOPE OF WORKS:

1. ) Supply & Installation of Wires for ligthing fixtures , Convenience Outlet t inside PVC Conduit & fitt

2.) Supply & Installation of lighting fixtures , Convenience Outlet .

3.) Supply & Installation of switches .

4. ) Supply & Installation of electrical Boxes. (JUNCTION BOX ,UTILITY BOX )

5. ) Supply & Installation of WIRES FROM END OF LIGHTING CIRCUIT TO SPARE BRANCH OF EXISTING PA
15A ACB FOR OCP

a.) QUANTITY TAKE OFF & COSTING

MATERIAL
DESCRIPTION OF MATERIALS UNIT
S QTY.

BRANCH CKT. LINE

3.5 mm 2 THWN-2/THHN-2 Cu Wire 1 roll

20 mm Ø PVC Pipe 20 le.

Conduit ,fittings & accessories 1 lot

LIGHTING FIXTURES AND OTHERS


2-18W LED TUBE W/ FLOURESCENT LOUVER RECESSED
TYPE WITH ALLUMINUM REFLECTOR 4 set

SWITCHES

2 Gang " Flush Type " Switch 1 set

CIRCUIT BREAKER FOR OVERCURRENT PROTECTION

15 AT ACB 1- Phase,2 POLE 240 VAC 1 pc.

BOXES & MISC.

Junction Box 5 pc.

Utility Box 2 pc.

20 mm Ø PVC , Octagonal box Connector 28 pc.

Electrical Tape 5 ROLL

RUBBER Tape 1 roll

Tie Wire Ga # 16 1 kg.


Total

b.) LABOR COST

Output per Activity/


Manpower Requirement
day Duration

Electrician

Helper

Total

TOTAL COST OF ITEM -


inside PVC Conduit & fittings .

E BRANCH OF EXISTING PANEL WITH

3750

UNIT PRICE TOTAL 6.666667

3250.00 3,250.00

80.00 1,600.00

2500.00 2,500.00

1600.00 6,400.00

- #REF! #REF!

150.00 150.00

660.00 660.00

30.00 150.00

30.00 60.00

8.00 224.00

65.00 325.00

100.00 100.00

80.00 80.00
15,499.00

Rate / Day Total

5,114.67

5,114.67

OST OF ITEM - 20,613.67