Anda di halaman 1dari 3

Application No.

Support Tel.: 6671 7122 Support Email: install@spgroup.com.sg

Application for Electricity Connection to Transmission System (CS1)


Internet Application No.: SA00000872

Details of LEW

Name of LEW: BAU LEW 01

LEW No.: 920030

Tel / Mobile No.: 92123342 Fax:

Email Address: adse2@hjadc.com.sg

Forwarding Address

Blk / Hse No.: 1223 Unit No.:

Street: Jalan Kecil Postal Code: 122211

Details of the Project

Project Description: aaaa?

Previous Consultation No. (If Any):

Site Address

Blk / Hse No.: 123 Unit No.:

Street: aaa Postal Code: 122211

Type Of Developer: Commercial

If Others, Please Specify:

Block No. Applied Load Existing Load (for Existing Connection)

N/A N/A N/A

Type of Development: Commercial cum Residential Building

If Others, Please Specify:

Type Of Business Activity: Office

If Others, Please Specify:

Page 1 of 3 / Application for Electricity Connection to Application No.:


Transmission System (CS1)
Details of the Project Representative

Name of Applicant / Company: 111

ROC / NRIC No.: SFSDF12312

Department / Sub-BU:

Salutation: Madam

Name of Project Representative: 11

Designation of Project Representative: 11

Tel / Mobile No.: 66671712 Fax:

Email Address: aa@aa.com

Forwarding Address

Blk / Hse No.: 121 Unit No.:

Street: 1111 Postal Code: 122211

Details of the Installation

Supply Voltage: 230 V (Single Phase)


Type of Connection: Amalgamation of supply

Generation Capacity: kWAC kWP

If Others, Please Specify:

Load Requirement: 40A Power Factor: 0.85

Gross Floor Area: m2

Load Projection:
Year 1 (MVA) Year 2 (MVA) Year 3 (MVA) Year 4 (MVA) Year 5 (MVA)

Utility Account No. (Existing): No

Existing Approved Load: kVA Power Factor:

Voltage Sensitive: No

Estimated Ultimate Load: 11 kVA

Expected Year of Reaching Ultimate Load: 2019

Remarks:

Page 2 of 3 / Application for Electricity Connection to Application No.:


Transmission System (CS1)
Service Connection Requirement

Contestable Account: No

MSSL Account No.:

Fault Current Contribution: Negligible

Type of Premises:

Total Contracted Capacity:

No. of Service Connection Cables / Circuits:

Initial Contracted Capacity: No. of Months: 0

Landlord Contracted Capacity:

Estimated Landlord Load: kVA

Total Load Requirement:

Target Date of Energization: 30 Mar, 2018

Type of Metering Scheme: NORMAL

Change Metering Scheme: No

If Yes, Please Specify:


Direct Move-in: No

GST Registration No.:

GST Registration Date:

Upload Documents

S / No. File Name File Description File Size (MB)


1 Application missing.docx Others-test docs 0.19 MB

Declaration

✔ I confirm that I am the LEW in charge of this project and that I have verified that the information submitted
herein is correct. I confirm too, that I have the owner's consent to submit the application on his behalf and I shall
be wholly responsible and shall indemnify SP Services Limited should there be any misrepresentation or
inaccuracy in relation to the owner's consent or the information submitted. I also undertake to inform SP Services
Limited should there be subsequent changes to the information submitted.

Page 3 of 3 / Application for Electricity Connection to Application No.:


Transmission System (CS1)

Anda mungkin juga menyukai