Survey Report

Project Name : Pengadaan Matrial Fire Fighting DDC ST IP Grati


Location : Pasuruan
Client : PLTGU Grati Pasuruan
Date of Survey : 22 Mei 2018

Activities
R. Panel DDC (Panel Bop & Supervisory):

Wagner

Panel Wagner Pressure Switch

Co2, 20kg
Co2, 30kg 1 2

Pipa Drain 25mm Discharge Piping

3 4

Note:
Merupakan gambaran Panel Bop & Supervisory. Area ini akan diproteksi dengan melakukan pemasangan fire
Suppression.
(1) Posisi Co2, 30kg
(2) Posisi Co2, 20kg
(3) Posisi Pipa Drain 25mm
(4) Posisi Discharge Piping

Team Survey: Made by, Checked by, Approved by,


1. Yohanes Setyo S
2. Heri Andrian
Survey Report
Project Name : Pengadaan Matrial Fire Fighting DDC ST IP Grati
Location : Pasuruan
Client : PLTGU Grati Pasuruan
Date of Survey : 22 Mei 2018

Activities
R. Panel DDC (Panel ST) :

Wagner 1

Pipa Drain 25mm

Panel Wagner Horn & Strobe

Co2, 20kg
5 6

Posisi Nozzle

Note:
Merupakan gambaran Panel ST. Area ini akan diproteksi dengan melakukan pemasangan fire Suppression.
(5) Posisi Co2, 20kg
(6) Posisi Nozzle
(7) Posisi Pipa Drain 25mm

Team Survey: Made by, Checked by, Approved by,


1. Yohanes Setyo S
2. Heri Andrian
Survey Report
Project Name : Pengadaan Matrial Fire Fighting DDC ST IP Grati
Location : Pasuruan
Client : PLTGU Grati Pasuruan
Date of Survey : 22 Mei 2018

Note:
- Ruang Panel DDC ST Terdiri Dari 1 Ruangan
- Total Panel Yang Akan Diproteksi Sebanyak 2 Panel
- Penambahan JB 1 Unit, Horn Strob 1 Unit, Manual Full 3 Unit
- Untuk Area Panel Akan Diproteksi Menggunakan Sistem Fire Suppression
- Untuk Dimensi Panel Bop & Supervisori, P = 11.25m, L = 0.8m, T = 2.3m
- Untuk Dimensi Panel ST, P = 4.8m, L = 0.8m, T = 2.3m

Team Survey: Made by, Checked by, Approved by,


1. Yohanes Setyo S
2. Heri Andrian
Survey Report
Project Name : Pengadaan Matrial Fire Fighting DDC ST IP Grati
Location : Pasuruan
Client : PLTGU Grati Pasuruan
Date of Survey : 22 Mei 2018

Layout
R. SDP (Panel Elektrikal pada Office Tower):

Team Survey: Made by, Checked by, Approved by,


1. Yohanes Setyo S
2. Heri Andrian
Survey Report
Project Name : Pengadaan Matrial Fire Fighting DDC ST IP Grati
Location : Pasuruan
Client : PLTGU Grati Pasuruan
Date of Survey : 22 Mei 2018

Layout
Shaft Plumbing (di dalam toilet pria pada Office Tower):

Team Survey: Made by, Checked by, Approved by,


1. Yohanes Setyo S
2. Heri Andrian
Survey Report
Project Name : Pengadaan Matrial Fire Fighting DDC ST IP Grati
Location : Pasuruan
Client : PLTGU Grati Pasuruan
Date of Survey : 22 Mei 2018

Layout
Shaft Elektrikal (Area Parkir):

Team Survey: Made by, Checked by, Approved by,


1. Yohanes Setyo S
2. Heri Andrian
Survey Report
Project Name : Pengadaan Matrial Fire Fighting DDC ST IP Grati
Location : Pasuruan
Client : PLTGU Grati Pasuruan
Date of Survey : 22 Mei 2018

Layout
Ruangan Panel LVMDP:

Team Survey: Made by, Checked by, Approved by,


1. Yohanes Setyo S
2. Heri Andrian