Table of Contents
1.0 Purpose..........................................................................................................................................................2
2.0 Scope.............................................................................................................................................................2
4.0 Responsibilities.............................................................................................................................................2
4.1 Quality................................................................................................................................................2
5.0 References.....................................................................................................................................................2
6.0 Procedure......................................................................................................................................................3
6.1 Final Inspection..................................................................................................................................3
6.2 Disposition.........................................................................................................................................3
6.2.1 Accept..................................................................................................................................3
6.2.2 Reject....................................................................................................................................3
6.3 Reprocessing After Final Inspection..................................................................................................3
8.0 Appendix.......................................................................................................................................................5
8.1 Guidelines for Writing Final Inspection Instructions........................................................................5
1.0 Purpose
This document establishes a system and documentation requirements for final inspection.
2.0 Scope
This procedure applies to final inspections performed at the facilities of [Company Name].
4.0 Responsibilities
4.1 Quality
Quality is responsible for the timely final inspection of product, and for notifying Manufacturing
or Material Support Services when final inspection is complete. Quality is also responsible for
writing Inspection Instructions for final inspections that are adequate and appropriate for the
product being inspected.
5.0 References
Material Inspection Status
6.0 Procedure
6.2 Disposition
6.2.1 Accept
Identify product as accepted.
Check traveler for completeness up to inspection step, if applicable.
Forward the product and traveler to the next step on the traveler and notify
operator, if applicable. If the traveler is complete or no traveler exists, notify
Manufacturing Department Manager of accepted material.
6.2.2 Reject
Identify product as rejected.
Check traveler for completeness up to inspection step, if applicable.
Notify Manufacturing and/or Materials Support Services of nonconforming
material.
Quality Notified,
Final Inspection Due
Quality Inspects,
Records Data
if Applicable
No
Quality Indicates
Rejected Status,
Notifies Material Control
8.0 Appendix
Inspection Instructions are to verify that product meets engineering specifications. Inspection
Instructions cannot impose new design requirements or workmanship standards on the
product.
It is the responsibility of the Inspection Instruction author to:
Select the attributes to be inspected and the sampling plan for each attribute. Product may be
100% inspected or a lot of product may be sample inspected. See Acceptance Sampling Plans
for the list of available sampling plans.
Note: If acceptance sampling is used, the accept number for the plan must be zero, and the reject
number for the plan must be one.