REKAPITULASI

DAFTAR KUANTITAS DAN HARGA

Pekerjaan : Latihan Penawaran


Tahun Anggaran : 2016

NO JENIS PEKERJAAN

I. PEKERJAAN PERSIAPAN
II. PEKERJAAN TANAH
III. PEKERJAAN PASANGAN
IV. PEKERJAAN BETON
V. PEKERJAAN ATAP PLAFOND
VI. PEKERJAAN INSTALASI LISTRIK & AIR
VII. PEKERJAAN PENGECATAN

JUMLAH
PPN 10%
TOTAL
DIBULATKAN

TERBILANG :

DUA RATUS ENAM JUTA ENAM RATUS EMPAT PULUH EMPAT JUTA RUPIAH

Malang, 21 Juli 2016


CV. RIZALDI JAYA

RIZALDI FIBIANTO
Direktur
JUMLAH HARGA ( Rp )

20,365,000.00
7,631,955.00
94,025,726.50
40,094,478.00
27,920,400.00
4,987,350.00
7,970,200.00

202,995,109.50
20,305,970.95
223,365,680.45
223,365,000.00

PAT JUTA RUPIAH


DAFTAR KUANTITAS DAN HARGA

Pekerjaan : Latihan Penawaran


Tahun Anggaran : 2016

No. Uraian Pekerjaan Satuan Volume Harga Satuan (Rp)

I. PEKERJAAN PERSIAPAN
1 Pek. Bowplank m' 50.000
2 Pek. Pembersihan lokasi ls 72.000

II. PEKERJAAN TANAH


1 Pek. Galian tanah padat m3 40.950
2 Pek. Urugan pasir dan Tanah m3 22.300

III. PEKERJAAN PASANGAN


1 Pek. Pasangan pondasi batu kali 1 : 4 m3 31.295
2 Pek. Pasangan batu merah 1 : 5 m2 274.180
3 Pek. Plesteran 1 : 4 m2 274.180
4 Pek. Acian m2 274.180
5 Pek. Pasang keramik 40 x 40 m2 40.500
6 Pek. Pasang keramik 20 x 20 m2 3.000

IV. PEKERJAAN BETON


1 Pek. Rabat cor 1 : 4 : 6 utk lantai bangunan m3 6.000
2 Pek. Sloof 15/20 m3 1.635
3 Pek. Kolom 15/25 m3 1.296
4 Pek. Ringbalk 15/20 m3 1.635
5 Pek. Kolom praktis 15/15 m3 0.510

V. PEKERJAAN ATAP DAN PLAFOND


1 Pek. Pasang rangka plafond metalfuring m2 43.500
2 Pek. Penutup plafond gypsumboard m2 43.500
3 Pek. Pasang rangka atap galvalum m2 43.500
4 Pek. Pasang genteng biasa m2 43.500
5 Pek. Pasang bubungan genteng beton m' 9.000

VII. PEKERJAAN INSTALASI LISTRIK & AIR


1 Pasang saklar singgle bh 1.000
2 Pasang saklar double bh 2.000
3 Pasang stop kontak bh 5.000
4 Pasang lampu XL 18 wat bh 11.500
5 Pasang kloset jongkok bh 1.000
6 Pasang bak mandi 0,3 m3 bh 1.000
7 Pasang kran air 3/4" bh 1.000
8 Pasang avour bh 1.000
10 Pipa PVC air bersih AWv3/4" m' 15.000
11 Pipa PVC air kotor D 3" m' 10.000

VIII. PEKERJAAN PENGECATAN


1 Pek. Pengecatan dinding m2 241.150
2 Pek. Pengecatan plafond m2 43.500
N HARGA

Harga Satuan (Rp) Jumlah Harga (Rp)

47,300.00 2,365,000.00
250,000.00 18,000,000.00
Jumlah 20,365,000.00

41,300.00 1,691,235.00
266,400.00 5,940,720.00
Jumlah 7,631,955.00

827,900.00 25,909,130.50
114,600.00 31,421,028.00
59,600.00 16,341,128.00
35,500.00 9,733,390.00
253,900.00 10,282,950.00
112,700.00 338,100.00
Jumlah 94,025,726.50

1,054,100.00 6,324,600.00
5,171,700.00 8,455,729.50
7,179,500.00 9,304,632.00
8,647,700.00 14,138,989.50
3,667,700.00 1,870,527.00
Jumlah 40,094,478.00

163,100.00 7,094,850.00
106,100.00 4,615,350.00
190,400.00 8,282,400.00
92,600.00 4,028,100.00
433,300.00 3,899,700.00
Jumlah 27,920,400.00

49,900.00 49,900.00
60,500.00 121,000.00
55,600.00 278,000.00
73,700.00 847,550.00
673,800.00 673,800.00
1,267,800.00 1,267,800.00
66,100.00 66,100.00
71,200.00 71,200.00
26,000.00 390,000.00
122,200.00 1,222,000.00
Jumlah 4,987,350.00

28,000.00 6,752,200.00
28,000.00 1,218,000.00
Jumlah 7,970,200.00
ANALISA HARGA SATUAN
Pekerjaan : Latihan Penawaran
Tahun Anggaran : 2016
SAT KOEF

1 1 m' Uitzet dan pasang bouwplank


Bahan :
Kayu kaso meranti klas C m3 0.0120
Kayu papan meranti 3/20 klas C m3 0.0070
Paku biasa 2" - 5" kg 0.0200

Upah :
Pekerja OH 0.1000
Tukang kayu OH 0.1000
Kepala tukang kayu OH 0.0100
Mandor OH 0.0050

10 %

2 1 m3 Galian tanah biasa sedalam 1 meter


Upah :
Pekerja OH 0.4000
Mandor OH 0.0400

10 %

3 1 m3 Pekerjaan urugan pasir


Bahan :
Pasir urug m3 1.2000

Upah :
Pekerja OH 0.3000
Mandor OH 0.0100

10 %

4 1 m3 Pasangan pondasi batu kali 1Pc : 4Ps


Bahan :
Semen Pc kg 163.0000
Pasir pasang m3 0.5200
Batu kali m3 1.2000

Upah :
Pekerja OH 1.5000
Tukang batu OH 0.7500
Kepala tukang OH 0.0750
Mandor OH 0.0750

10 %
5 1 m2 Pasangan bata merah tebal 1/2 bata, 1Pc : 5Ps
Bahan :
Semen Pc kg 9.6800
Pasir pasang m3 0.0450
Batu bata 22 x 11 x 5 cm bh 70.0000

Upah :
Pekerja OH 0.3000
Tukang batu OH 0.1000
Kepala tukang OH 0.0100
Mandor OH 0.0150

10 %

6 1 m2 Plesteran halus 1Pc : 4Ps, tebal 1.5 cm


Bahan :
Semen Pc @ 40 kg kg 6.2400
Pasir pasang m3 0.0240

Upah :
Pekerja OH 0.3000
Tukang batu OH 0.1500
Kepala Tukang batu OH 0.0150
Mandor OH 0.0150

10 %

7 1 m2 Acian
Bahan :
Semen Pc @ 40 kg kg 3.2500

Upah :
Pekerja OH 0.2000
Tukang batu OH 0.1000
Kepala Tukang batu OH 0.0100
Mandor OH 0.0100

10 %
8 1 m2 pasang lantai keramik 40 x 40 cm polos
Bahan :
Keramik uk.40 x 40 cm m2 1.0500
Semen Pc @ 40 kg kg 7.4540
Kapur bubuk kg 3.9260
Semen warna kg 0.2000
Pasir pasang m3 0.0420

Upah :
Pekerja OH 0.2200
Tukang batu OH 0.1000
Kepala tukang OH 0.0120
Mandor OH 0.0125

10 %
9 1 m2 Pasang lantai keramik 20 x 20 cm
Bahan :
Keramik uk.20 x 20 cm m2 1.0600
Semen Pc @ 40 kg kg 7.4540
Kapur bubuk kg 3.9260
Pasir pasang m3 0.0420
Semen warna kg 0.3500

Upah :
Pekerja OH 0.2500
Tukang batu OH 0.1200
Kepala Tukang OH 0.0120
Mandor OH 0.0125

10 %

10 1 m3 Membuat beton 1Pc : 4Ps : 6Kr


Bahan :
Semen Pc kg 345.0000
Pasir cor m3 0.5175
Batu pecah 2/3 m3 0.5326
Air ltr 215.0000

Upah :
Pekerja OH 1.6500
Tukang batu OH 0.2750
Kepala tukang batu OH 0.0280
Mandor OH 0.0830

10 %

11 1 m3 Membuat beton mutu K-175


Bahan :
Semen Pc kg 326.0000
Pasir cor m3 0.5429
Batu pecah 2/3 m3 0.7622
Air ltr 215.0000

Upah :
Pekerja OH 1.6500
Tukang batu OH 0.2750
Kepala tukang batu OH 0.0280
Mandor OH 0.0830
10 %

12 1 m3 Membuat beton mutu K-225


Bahan :
Semen Pc kg 371.0000
Pasir cor m3 0.4986
Batu pecah 2/3 m3 0.7756
Air ltr 215.0000

Upah :
Pekerja OH 1.6500
Tukang batu OH 0.2750
Kepala tukang batu OH 0.0280
Mandor OH 0.0830
10 %

13 1 kg Pembesian dgn besi beton polos


Bahan :
Besi beton polos kg 1.0500
Kawat beton kg 0.0150

Upah :
Pekerja OH 0.0070
Tukang besi OH 0.0070
Kepala tukang OH 0.0007
Mandor OH 0.0003

10 %

14 1 m2 Pasang bekisting sloof


Bahan :
Kayu terentang m3 0.0450
Paku biasa 2 - 5" kg 0.3000
Minyak bekisting ltr 0.1000

Upah :
Pekerja OH 0.5200
Tukang kayu OH 0.2600
Kepala tukang OH 0.0260
Mandor OH 0.0260

10 %

15 1 m2 Pasang bekisting kolom praktis


Bahan :
Kayu klas III m3 0.0100
Paku biasa 2 - 5" kg 0.0500

Upah :
Pekerja OH 0.0450
Tukang kayu OH 0.1850
Kepala tukang OH 0.1000
Mandor OH 0.0450

10 %
16 1 m2 Pasang bekisting kolom struktur
Bahan :
Kayu terentang m3 0.0400
Paku biasa 2 - 5" kg 0.4000
Minyak bekisting ltr 0.2000
Balok kayu borneo m3 0.0150
Plywood 9 mm lbr 0.3500
Dolken kayu gelam dia.8 - 10 / 4 m btg 2.0000

Upah :
Pekerja OH 0.3000
Tukang kayu OH 0.3300
Kepala tukang OH 0.0330
Mandor OH 0.0060

10 %
17 1 m2 Pasang bekisting balok
Bahan :
Kayu terentang m3 0.0400
Paku biasa 2 - 5" kg 0.4000
Minyak bekisting ltr 0.2000
Balok kayu borneo m3 0.0180
Plywood 9 mm lbr 0.3500
Dolken kayu gelam dia.8 - 10 / 4 m btg 2.0000

Upah :
Pekerja OH 0.3200
Tukang kayu OH 0.3300
Kepala tukang OH 0.0330
Mandor OH 0.0060

10 %

18 1 m3 Membuat beton bertulang utk sloof


Beton mutu K.225 m3 1.0000
Besi beton polos kg 205.2000
Bekisting m2 7.2000

19 1 m3 Membuat beton bertulang utk kolom struktur 15/25


Beton mutu K.225 m3 1.0000
Besi beton polos kg 305.0000
Bekisting m2 7.1400

20 1 m3 Membuat beton bertulang utk kolom praktis


Beton mutu K.175 m3 1.0000
Besi beton polos kg 166.0000
Bekisting m2 13.0000

21 1 m3 Membuat beton bertulang utk ringbalk


Beton mutu K.225 m3 1.0000
Besi beton polos kg 145.0200
Bekisting m2 13.8200

22 1 m2 Pasang rangka atap galvalum


Bahan :
Rangka atap galvalum m2 1.0000
Rifet bh 30.0000

Upah :
Pekerja OH 0.1000
Tukang kayu OH 0.1000
Kepala Tukang OH 0.0100
Mandor OH 0.0050

10 %
23 1 m2 Pasang genteng biasa
Bahan :
Genteng Biasa bh 25.0000

Upah :
Pekerja OH 0.1500
Tukang kayu OH 0.0600
Kepala Tukang OH 0.0600
Mandor OH 0.0080

10 %

24 1 m' Pasang Bubungan Genteng Beton


Bahan :
Semen Pc @ 40 kg kg 8.0000
Pasir Pasang m3 0.0320
Bubungan Genteng Beton bh 6.0000

Upah :
Pekerja OH 0.4000
Tukang kayu OH 0.2000
Kepala Tukang OH 0.0200
Mandor OH 0.0020

10 %

25 1 m2 Pasang rangka plafond metal furing


Bahan :
Rangka metalfuring komplit m2 1.0000

Upah :
Pekerja OH 0.2250
Tukang kayu OH 0.2000
Kepala Tukang OH 0.1000
Mandor OH 0.0090

10 %

26 1 m2 Pasang penutup plafond gypsumboard


Bahan :
Gypsum board m2 1.1000
Paku sekrup kg 0.0200

Upah :
Pekerja OH 0.0300
Tukang kayu OH 0.0700
Kepala Tukang OH 0.0070
Mandor OH 0.0015

10 %
27 1 Bh Pasang saklar tunggal
Bahan :
Saklar tunggal bh 1.0000
Inbow Dos bh 1.0000
Upah pasang ls 1.0000

10 %

28 1 Bh Pasang saklar ganda


Bahan :
Saklar ganda bh 1.0000
Inbow Dos bh 1.0000
Upah pasang ls 1.0000

10 %

29 1 Bh Pasang stop kontak


Bahan :
Stop Kontak bh 1.0000
Inbow Dos bh 1.0000
Upah Pasang ls 1.0000

10 %

30 1 Bh Pasang Lampu XL 18 wat


Bahan :
Lampu Xl 18 wat bh 1.0000
Upah Pasang ls 1.0000

10 %

31 Memasang 1 bh kloset jongkok


Bahan :
Closet jongkok bh 1.0000
Semen Pc kg 6.0000
Pasir pasang m3 0.0100

Upah :
Pekerja OH 1.0000
Tukang batu OH 1.5000
Kepala Tukang OH 0.1500
Mandor OH 0.1600

10 %

32 Memasang 1 bh bak mandi


Bahan :
Bak Mandi bh 1.0000
Semen Pc kg 6.0000
Pasir pasang m3 0.0100

Upah :
Pekerja OH 1.0000
Tukang batu OH 1.5000
Kepala Tukang OH 0.1500
Mandor OH 0.1600

10 %
33 1 m' Pasang pipa PVC AW dia. 3/4" utk air bersih
Bahan :
Pipa PVC AW dia. 3/4" m' 1.2000
Perlengkapan % 35.0000

Upah :
Pekerja OH 0.0350
Tukang pipa OH 0.0600
Kepala Tukang OH 0.0060
Mandor OH 0.0018

10 %

34 1 m' Pasang pipa PVC D dia. 3" utk air kotor


Bahan :
Pipa PVC dia. 3" m' 1.2000
Perlengkapan % 35.0000

Upah :
Pekerja OH 0.0360
Tukang pipa OH 0.0600
Kepala Tukang OH 0.0060
Mandor OH 0.0018

10 %

35 1 Bh Pasang avour
Bahan :
Avour bh 1.0000

Upah :
Pekerja OH 0.0100
Tukang pipa OH 0.1000
Kepala Tukang OH 0.0100
Mandor OH 0.0050

10 %

36 1 Bh Pasang tempat sabun


Bahan :
Tempat sabun bh 1.0000

Upah :
Pekerja OH 0.0100
Tukang pipa OH 0.1000
Kepala Tukang OH 0.0100
Mandor OH 0.0050

10 %

37 Memasang 1 bh Kran air dia. 3/4"


Bahan :
Kran Air bh 1.0000
Seal Tape bh 0.0250

Upah :
Pekerja OH 0.0100
Tukang batu OH 0.1000
Kepala Tukang OH 0.0100
Mandor OH 0.0050

10 %
38 1 m2 Pekerjaan pengecatan dinding dalam / plafond
Bahan :
Plamir Tembok kg 0.1000
Kertas gosok lbr 0.2500
Kuas bh 0.0200
Cat dasar kg 0.1000
Cat penutup 2x kg 0.2600

Upah :
Pekerja OH 0.0200
Tukang cat OH 0.0630
Kepala Tukang OH 0.0060
Mandor OH 0.0025

10 %
A SATUAN

HARGA SAT. JUMLAH

61,200.00 734.40
3,300,000.00 23,100.00
42,000.00 840.00
Jumlah : 24,674.40

84,000.00 8,400.00
85,000.00 8,500.00
95,000.00 950.00
100,000.00 500.00
Jumlah : 18,350.00
Jumlah Total : 43,024.40
Overhead + Profit : 4,302.44
Total : 47,326.84
Dibulatkan : 47,300.00

84,000.00 33,600.00
100,000.00 4,000.00
Jumlah : 37,600.00
Jumlah Total : 37,600.00
Overhead + Profit : 3,760.00
Total : 41,360.00
Dibulatkan : 41,300.00

180,000.00 216,000.00
Jumlah 216,000.00

84,000.00 25,200.00
100,000.00 1,000.00
Jumlah 26,200.00
Jumlah Total : 242,200.00
Overhead + Profit : 24,220.00
Total : 266,420.00
Dibulatkan : 266,400.00
1,560.00 254,280.00
150,000.00 78,000.00
180,000.00 216,000.00
Jumlah 548,280.00

84,000.00 126,000.00
85,000.00 63,750.00
95,000.00 7,125.00
100,000.00 7,500.00
Jumlah 204,375.00
Jumlah Total : 752,655.00
Overhead + Profit : 75,265.50
Total : 827,920.50
Dibulatkan : 827,900.00
1,560.00 15,100.80
150,000.00 6,750.00
660.00 46,200.00
Jumlah 68,050.80

84,000.00 25,200.00
85,000.00 8,500.00
95,000.00 950.00
100,000.00 1,500.00
Jumlah 36,150.00
Jumlah Total : 104,200.80
Overhead + Profit : 10,420.08
Total : 114,620.88
Dibulatkan : 114,600.00

1,560.00 9,734.40
150,000.00 3,600.00
Jumlah 13,334.40

84,000.00 25,200.00
85,000.00 12,750.00
95,000.00 1,425.00
100,000.00 1,500.00
Jumlah 40,875.00
Jumlah Total : 54,209.40
Overhead + Profit : 5,420.94
Total : 59,630.34
Dibulatkan : 59,600.00

1,560.00 5,070.00
Jumlah 5,070.00

84,000.00 16,800.00
85,000.00 8,500.00
95,000.00 950.00
100,000.00 1,000.00
Jumlah 27,250.00
Jumlah Total : 32,320.00
Overhead + Profit : 3,232.00
Total : 35,552.00
Dibulatkan : 35,500.00
45,000.00 45,001.05
1,560.00 1,567.45
1,320.00 1,323.93
3,600.00 3,600.20
150,000.00 150,000.04
Jumlah 201,492.67

84,000.00 18,480.00
85,000.00 8,500.00
95,000.00 1,140.00
100,000.00 1,250.00
Jumlah 29,370.00
Jumlah Total : 230,862.67
Overhead + Profit : 23,086.27
Total : 253,948.94
Dibulatkan : 253,900.00
42,000.00 44,520.00
1,560.00 11,628.24
1,320.00 5,182.32
150,000.00 6,300.00
3,600.00 1,260.00
Jumlah 68,890.56

84,000.00 21,000.00
85,000.00 10,200.00
95,000.00 1,140.00
100,000.00 1,250.00
Jumlah 33,590.00
Jumlah Total : 102,480.56
Overhead + Profit : 10,248.06
Total : 112,728.62
Dibulatkan : 112,700.00

1,560.00 538,200.00
150,000.00 77,625.00
270,000.00 143,802.00
120.00 25,800.00
Jumlah 785,427.00

84,000.00 138,600.00
85,000.00 23,375.00
95,000.00 2,660.00
100,000.00 8,300.00
Jumlah 172,935.00
Jumlah Total : 958,362.00
Overhead + Profit : 95,836.20
Total : 1,054,198.20
Dibulatkan : 1,054,100.00

1,560.00 508,560.00
150,000.00 81,428.57
270,000.00 205,800.00
120.00 25,800.00
Jumlah 821,588.57

84,000.00 138,600.00
85,000.00 23,375.00
95,000.00 2,660.00
100,000.00 8,300.00
Jumlah 172,935.00
Jumlah Total : 994,523.57
Overhead + Profit : 99,452.36
Total : 1,093,975.93
Dibulatkan : 1,093,900.00

1,560.00 578,760.00
150,000.00 74,785.71
270,000.00 209,400.00
120.00 25,800.00
Jumlah 888,745.71

84,000.00 138,600.00
85,000.00 23,375.00
95,000.00 2,660.00
100,000.00 8,300.00
Jumlah 172,935.00
Jumlah Total : 1,061,680.71
Overhead + Profit : 106,168.07
Total : 1,167,848.79
Dibulatkan : 1,167,800.00

9,600.00 10,080.00
16,200.00 243.00
Jumlah 10,323.00

84,000.00 588.00
85,000.00 595.00
95,000.00 66.50
100,000.00 30.00
Jumlah 1,279.50
Jumlah Total : 11,602.50
Overhead + Profit : 1,160.25
Total : 12,762.75
Dibulatkan : 12,700.00

3,840,000.00 172,800.00
42,000.00 12,600.00
6,000.00 600.00
Jumlah 186,000.00

84,000.00 43,680.00
85,000.00 22,100.00
95,000.00 2,470.00
100,000.00 2,600.00
Jumlah 70,850.00
Jumlah Total : 256,850.00
Overhead + Profit : 25,685.00
Total : 282,535.00
Dibulatkan : 282,500.00

3,300,000.00 33,000.00
42,000.00 2,100.00
Jumlah 35,100.00

84,000.00 3,780.00
85,000.00 15,725.00
95,000.00 9,500.00
100,000.00 4,500.00
Jumlah 33,505.00
Jumlah Total : 68,605.00
Overhead + Profit : 6,860.50
Total : 75,465.50
Dibulatkan 75,400.00

3,840,000.00 153,600.00
42,000.00 16,800.00
6,000.00 1,200.00
2,040,000.00 30,600.00
138,000.00 48,300.00
42,600.00 85,200.00
Jumlah 335,700.00

84,000.00 25,200.00
85,000.00 28,050.00
95,000.00 3,135.00
100,000.00 600.00
Jumlah 56,985.00
Jumlah Total : 392,685.00
Overhead + Profit : 39,268.50
Total : 431,953.50
Dibulatkan 431,900.00

3,840,000.00 153,600.00
42,000.00 16,800.00
6,000.00 1,200.00
2,040,000.00 36,720.00
138,000.00 48,300.00
42,600.00 85,200.00
Jumlah 341,820.00

84,000.00 26,880.00
85,000.00 28,050.00
95,000.00 3,135.00
100,000.00 600.00
Jumlah 58,665.00
Jumlah Total : 400,485.00
Overhead + Profit : 40,048.50
Total : 440,533.50
Dibulatkan 440,500.00

1,167,800.00 1,167,800.00
9,600.00 1,969,920.00
282,500.00 2,034,000.00
Jumlah Total : 5,171,720.00
Dibulatkan 5,171,700.00
BUTUH GAK
1,167,800.00 1,167,800.00
9,600.00 2,928,000.00
431,900.00 3,083,766.00
Jumlah Total : 7,179,566.00
Dibulatkan 7,179,500.00

1,093,900.00 1,093,900.00
9,600.00 1,593,600.00
75,400.00 980,200.00
Jumlah Total : 3,667,700.00
Dibulatkan 3,667,700.00

1,167,800.00 1,167,800.00
9,600.00 1,392,192.00
440,500.00 6,087,710.00
Jumlah Total : 8,647,702.00
Dibulatkan 8,647,700.00
144,000.00 144,000.00
360.00 10,800.00
Jumlah 154,800.00

84,000.00 8,400.00
85,000.00 8,500.00
95,000.00 950.00
100,000.00 500.00
Jumlah 18,350.00
Jumlah Total : 173,150.00
Overhead + Profit : 17,315.00
Total : 190,465.00
Dibulatkan 190,400.00
2,400.00 60,000.00
Jumlah 60,000.00

84,000.00 12,600.00
85,000.00 5,100.00
95,000.00 5,700.00
100,000.00 800.00
Jumlah 24,200.00
Jumlah Total : 84,200.00
Overhead + Profit : 8,420.00
Total : 92,620.00
Dibulatkan 92,600.00

1,560.00 12,480.00
150,000.00 4,800.00
54,000.00 324,000.00
Jumlah 341,280.00

84,000.00 33,600.00
85,000.00 17,000.00
95,000.00 1,900.00
100,000.00 200.00
Jumlah 52,700.00
Jumlah Total : 393,980.00
Overhead + Profit : 39,398.00
Total : 433,378.00
Dibulatkan 433,300.00

102,000.00 102,000.00
Jumlah 102,000.00

84,000.00 18,900.00
85,000.00 17,000.00
95,000.00 9,500.00
100,000.00 900.00
Jumlah 46,300.00
Jumlah Total : 148,300.00
Overhead + Profit : 14,830.00
Total : 163,130.00
Dibulatkan 163,100.00
75,240.00 82,764.00
221,400.00 4,428.00
Jumlah 87,192.00

84,000.00 2,520.00
85,000.00 5,950.00
95,000.00 665.00
100,000.00 150.00
Jumlah 9,285.00
Jumlah Total : 96,477.00
Overhead + Profit : 9,647.70
Total : 106,124.70
Dibulatkan 106,100.00
16,800.00 16,800.00
3,600.00 3,600.00
25,000.00 25,000.00
Jumlah 45,400.00
Jumlah Total : 45,400.00
Overhead + Profit : 4,540.00
Total : 49,940.00
Dibulatkan 49,900.00

26,400.00 26,400.00
3,600.00 3,600.00
25,000.00 25,000.00
Jumlah 55,000.00
Jumlah Total : 55,000.00
Overhead + Profit : 5,500.00
Total : 60,500.00
Dibulatkan 60,500.00

21,960.00 21,960.00
3,600.00 3,600.00
25,000.00 25,000.00
Jumlah 50,560.00
Jumlah Total : 50,560.00
Overhead + Profit : 5,056.00
Total : 55,616.00
Dibulatkan 55,600.00

42,000.00 42,000.00
25,000.00 25,000.00
Jumlah 67,000.00
Jumlah Total : 67,000.00
Overhead + Profit : 6,700.00
Total : 73,700.00
Dibulatkan 73,700.00

360,000.00 360,000.00
1,560.00 9,360.00
150,000.00 1,500.00
Jumlah 370,860.00

84,000.00 84,000.00
85,000.00 127,500.00
95,000.00 14,250.00
100,000.00 16,000.00
Jumlah 241,750.00
Jumlah Total : 612,610.00
Overhead + Profit : 61,261.00
Total : 673,871.00
Dibulatkan 673,800.00

900,000.00 900,000.00
1,560.00 9,360.00
150,000.00 1,500.00
Jumlah 910,860.00

84,000.00 84,000.00
85,000.00 127,500.00
95,000.00 14,250.00
100,000.00 16,000.00
Jumlah 241,750.00
Jumlah Total : 1,152,610.00
Overhead + Profit : 115,261.00
Total : 1,267,871.00
Dibulatkan 1,267,800.00
9,600.00 11,520.00
9,600.00 3,360.00
Jumlah 14,880.00

84,000.00 2,940.00
85,000.00 5,100.00
95,000.00 570.00
100,000.00 180.00
Jumlah 8,790.00
Jumlah Total : 23,670.00
Overhead + Profit : 2,367.00
Total : 26,037.00
Dibulatkan 26,000.00

66,000.00 79,200.00
66,000.00 23,100.00
Jumlah 102,300.00

84,000.00 3,024.00
85,000.00 5,100.00
95,000.00 570.00
100,000.00 180.00
Jumlah 8,874.00
Jumlah Total : 111,174.00
Overhead + Profit : 11,117.40
Total : 122,291.40
Dibulatkan 122,200.00

54,000.00 54,000.00
Jumlah 54,000.00

84,000.00 840.00
85,000.00 8,500.00
95,000.00 950.00
100,000.00 500.00
Jumlah 10,790.00
Jumlah Total : 64,790.00
Overhead + Profit : 6,479.00
Total : 71,269.00
Dibulatkan 71,200.00
48,000.00 48,000.00
Jumlah 48,000.00

84,000.00 840.00
85,000.00 8,500.00
95,000.00 950.00
100,000.00 500.00
Jumlah 10,790.00
Jumlah Total : 58,790.00
Overhead + Profit : 5,879.00
Total : 64,669.00
Dibulatkan 64,600.00

49,200.00 49,200.00
4,200.00 105.00
Jumlah 49,305.00

84,000.00 840.00
85,000.00 8,500.00
95,000.00 950.00
100,000.00 500.00
Jumlah 10,790.00
Jumlah Total : 60,095.00
Overhead + Profit : 6,009.50
Total : 66,104.50
Dibulatkan 66,100.00
21,600.00 2,160.00
4,800.00 1,200.00
14,400.00 288.00
39,000.00 3,900.00
39,000.00 10,140.00
Jumlah 17,688.00

84,000.00 1,680.00
85,000.00 5,355.00
95,000.00 570.00
100,000.00 250.00
Jumlah 7,855.00
Jumlah Total : 25,543.00
Overhead + Profit : 2,554.30
Total : 28,097.30
Dibulatkan 28,000.00
DAFTAR HARGA SATUAN
UPAH TENAGA
Pekerjaan : Latihan Penawaran
Tahun Anggaran : 2016

NO. JENIS SATUAN

1 Pekerja OH
2 Tukang batu OH
3 Tukang kayu OH
4 Tukang besi OH
5 Tukang listrik OH
6 Tukang pipa OH
7 Tukang cat OH
8 Kepala tukang OH
9 Mandor OH
N

HARGA SATUAN ( Rp )

84,000.00
85,000.00
85,000.00
85,000.00
85,000.00
85,000.00
85,000.00
95,000.00
100,000.00

Malang, 21 Juli 2016


CV. RIZALDI JAYA

RIZALDI FIBIANTO
Direktur
DAFTAR HARGA SATUAN
BAHAN BANGUNAN

Pekerjaan : latihan Penawaran


Tahun Anggaran : 2016

NO. JENIS

1 Batu pecah 2/3


2 Batu kali 15/20
3 Air
4 Pasir pasang / beton
5 Pasir urug
6 Portland Cement Pc @ 40 kg
7 Portland Cement Pc
8 Semen warna
9 Batu bata 22 x 11 x 5 cm
10 Keramik uk.40 x 40 cm polos
11 Keramik lantai 20 x 20 cm
12 Kapur bubuk
13 Kaso kayu meranti klas III
14 Papan kayu meranti klas III
15 Kaso kayu borneo klas III
16 Kayu terentang / meranti klas C
17 Plywood 9 mm
18 Dolken kayu gelam dia.8 - 10 / 4 m
19 Genteng biasa
20 Bubungan genteng beton
21 Gypsumboard
22 Paku sekrup
23 Besi beton polos
24 Paku biasa 2" - 5"
25 Minyak bekisting
26 Cat tembok
27 Kuas
28 Kertas gosok
29 Plamir tembok
30 Saklar tunggal
31 Saklar ganda
32 Inbow dos
33 Stop kontak
34 Pipa PVC AW dia.3/4"
35 Pipa PVC D dia.3"
36 Closet jongkok
37 Bak mandi
38 Tempat sabun
39 Avour
40 Seal tape
41 Kran dia.3/4"
42 Sewa alat bor strouss dia.30 cm
43 Rangka atap galvalume
44 Rifet
45 Rangka metalfuring
46 Kawat beton
47 Lampu XL 18 wat
SATUAN
UNAN

SATUAN HARGA SATUAN ( Rp )

m3 270,000.00
m3 180,000.00
ltr 120.00
m3 150,000.00
m3 180,000.00
zak 62,400.00
kg 1,560.00
kg 3,600.00
bh 660.00
m2 45,000.00
m2 42,000.00
kg 1,320.00
bh 61,200.00
m3 3,300,000.00
m3 2,040,000.00
m3 3,840,000.00
lbr 138,000.00
btg 42,600.00
bh 2,400.00
bh 54,000.00
m2 75,240.00
kg 221,400.00
kg 9,600.00
kg 42,000.00
ltr 6,000.00
kg 39,000.00
bh 14,400.00
lbr 4,800.00
kg 21,600.00
bh 16,800.00
bh 26,400.00
bh 3,600.00
bh 21,960.00
m' 9,600.00
m' 66,000.00
bh 360,000.00
bh 900,000.00
bh 48,000.00
bh 54,000.00
bh 4,200.00
bh 49,200.00
jam 72,000.00
m2 144,000.00
bh 360.00
m2 102,000.00
kg 16,200.00
bh 42,000.00

Malang, 21 Juli 2016


CV. RIZALDI JAYA

RIZALDI FIBIANTO
Direktur
JADWAL PELAKS

Pekerjaan : Latihan Penawaran


Tahun Anggaran : 2016

Bobot
No. Uraian Pekerjaan (%)
1 2 3 4 5 6

I. PEKERJAAN PERSIAPAN
1 Pek. Bowplank 1.17 1.17
2 Pek. Pembersihan lokasi 8.87 8.87

II. PEKERJAAN TANAH


1 Pek. Galian tanah padat 0.83 0.83
2 Pek. Urugan pasir dan Tanah 2.93

III. PEKERJAAN PASANGAN


1 Pek. Pasangan pondasi batu kali 1 : 4 12.76 3.19 4.79 4.79
2 Pek. Pasangan batu merah 1 : 5 15.48 5.16
3 Pek. Plesteran 1 : 4 8.05
4 Pek. Acian 4.79
5 Pek. Pasang keramik 40 x 40 5.07
6 Pek. Pasang keramik 20 x 20 0.17

IV. PEKERJAAN BETON


1 Pek. Rabat cor 1 : 4 : 6 utk lantai bangunan 3.12
2 Pek. Sloof 15/20 4.17 2.08 2.08
3 Pek. Kolom 15/25 4.58 2.06 1.26
4 Pek. Ringbalk 15/20 6.97 3.48
5 Pek. Kolom praktis 15/15 0.92 0.92

V. PEKERJAAN ATAP DAN PLAFOND


1 Pek. Pasang rangka plafond metalfuring 3.50
2 Pek. Penutup plafond gypsumboard 2.27
3 Pek. Pasang rangka atap galvalum 4.08
4 Pek. Pasang genteng biasa 1.98
5 Pek. Pasang bubungan genteng beton 1.92

VII. PEKERJAAN INSTALASI LISTRIK & AIR


1 Pasang saklar singgle 0.02
2 Pasang saklar double 0.06
3 Pasang stop kontak 0.14
4 Pasang lampu XL 18 wat 0.42
5 Pasang kloset jongkok 0.33
6 Pasang bak mandi 0,3 m3 0.62
7 Pasang kran air 3/4" 0.03
8 Pasang avour 0.04
Err:509 Err:509 Err:509
10 Pipa PVC air bersih AWv3/4" 0.19
11 Pipa PVC air kotor D 3" 0.60

VIII. PEKERJAAN PENGECATAN


1 Pek. Pengecatan dinding 3.33
2 Pek. Pengecatan plafond 0.60
Err:509
10.03 4.02 4.79 6.87 5.07 9.90
10.03 14.06 18.84 25.71 30.78 40.68
JADWAL PELAKSANAAN
Chart Title

WAKTU PELAKSANAAN 120 HARI KALENDER


MINGGU KE - Ket.
7 8 9 10 11 12 13 14 15 16 17 18

2.93

5.16 5.16
4.03 4.03
2.40 2.40
1.69 1.69 1.69
0.17

3.12

1.26
3.48

1.75 1.75
1.14 1.14
2.04 2.04
0.99 0.99
1.92

0.02
0.06
0.14
0.42
0.33
0.62
0.03
0.04
Err:509
0.19
0.60

1.66 1.66
0.45 0.15

9.90 7.39 8.45 10.30 10.57 3.61 2.29 1.69 Err:509 1.66 0.45 0.15
50.58 57.98 66.43 76.73 87.29 90.90 93.19 94.88 Err:509 Err:509 Err:509 Err:509

Malang, 21 Juli 2016


CV. RIZALDI JAYA

RIZALDI FIBIANTO
Direktur
Ket.

100%

50%
0%
METODE PELAKSANAAN PEKERJAAN

Pekerjaan : Latihan Penawaran


Tahun Anggaran : 2016

I. PENDAHULUAN

1. LATAR BELAKANG
Latar belakang pembuatan metode pelaksanaan ini agar dapat mudah dipahami secara teknis maupun pelaksanaann
berdasarkan pada data - data yang telah di cantumkan dalam dokumen lelang.

2. MAKSUD DAN TUJUAN


Maksud dan tujuan dibuatnya metode pelaksanaan ini agar dapat mempermudah penerapan pelaksanaan pekerjaan
dari pekerjaan persiapan hingga pekerjaan finishing di lapangan yang secara teknis dapat dipertanggung jawabkan ke

3. LINGKUP PEKERJAAN
I. PEKERJAAN PERSIAPAN
II. PEKERJAAN TANAH
III. PEKERJAAN PASANGAN
IV. PEKERJAAN BETON
V. PEKERJAAN ATAP PLAFOND
VI. PEKERJAAN INSTALASI LISTRIK & AIR
VII. PEKERJAAN PENGECATAN

II. METODE PENYELESAIAN PEKERJAAN

1. Pek. Pematokan dan pengukuran


Diawali dengan pekerjaan pengukuran di lokasi pekerjaan agar dapat mendapatkan data yang nantinya digunaka
perhitungan volume pekerjaan, dan selanjutnya pemasangan patok - patok sebagai tanda bahwa lokasi yang siap
karena telah diukur sebelumnya.

2. Pek. Pembersihan lokasi


Membersihkan lokasi / area pekerjaan yang akan dikerjakan dari macam - macam benda atau barang yang dapat
jalannya pekerjaan dilapangan, yang kemudian dibuang keluar dari area / lokasi pekerjaan

3. Pek. Galian tanah padat


Diawali dengan penggalian tanah yang akan digunakan untuk penempatan rencana pondasi batu kali yang sebelu
sesuai dengan bentuk dan ukuran yang telah ditentukan oleh data yang telah tersedia.

4. Pek. Pasangan pondasi batu kali 1 : 4


Pemasangan pondasi batu kali dengan spesi 1 : 4, dipasang sesuai dengan bentuk dan ukuran yang ada pada pere
dipasang sesuai dengan volume yang telah ditentukan oleh data yang telah tersedia.
5. Pek. Sloof Beton
Melakukan pekerjaan pembesian terlebih dahulu yaitu memotong besi sesuai ukuran dan merangkainya menjad
penguat beton sloof. Setelah melakukan pekerjaan pembesian selanjutnya membuat bekisting yang terbuat dari
triplek yang kemudian dipaku dan di pasang di atas pasangan pondasi yang berguna sebagai cetakan beton sloof
membuat adukan beton sesuai dengan mutu / kualitas beton yang direncanakan, dan kemudian menuangkan ke
yang sebelumnya telah diletakkan tulangan besi yang telah dibuat tadi. Setelah semua proses telah selesai dan b
mengeras sehingga dapat digunakan sebagai mana mestinya segera melepas bekisting yang terpasang pada renc
tersebut.

6. Pek. Kolom Beton


Melaksanakan pekerjaan pembesian yaitu memotong besi sesuai ukuran yang ditentukan kemudian membengko
merangkai besi agar menjadi tulangan untuk beton pada kolom. Setelah melakukan pembesian pekerjaan selanju
bekisting dari kayu dan papan triplek kemudian dipaku sehingga menjadi sebuah cetakan beton kolom dan kolom
Selanjutnya membuat mutu beton sesuai dengan rencana yang telah ditentukan dan setelah adukan tersebut jad
dituangkan kedalam bekisting yang tadinya telah di pasang tulangan untuk kolom. Setelah proses pengecoran se
menunggu beton tersebut mengeras dan mencukupi sesuai usia beton yang d tentukan dan kemudian Melepas b
kolom tersebut.
7. Pek. Pasangan dinding
Pemasangan dinding bata merah dilakukan setelah pekerjaan pondasi, sloof, dan kolom selesai. Pemasangannya
kolom dan tinggi dari kolom yang telah selesai dipasang, pemasangan dinding bata merah direkatkan dengan spe
dipasang tegak lurus dengan tinggi kolom.

8. Pek. Ringbalk
Melaksanakan pekerjaan pembesian untuk rencana ringbalk mulai dari pemotongan hingga perakitan menjadi se
seelah itu diletakkan di atas pasangan dinding batu bata. Kemudian membuat bekisting untuk cetakan ringbalk, d
dengan ukuran dan panjang yang direncanakan sebelumnya. Setelah pmasangan tulangan dan bekisting pada rin
lalu membuat adukan untuk beton ringbalk dengan mutu yang sesuai dengan perencanaan. Setelah semua seles
telah dibuat dituangkan ke dalam cetakan ringbalk yang berada di atas pasangan dinding batu bata. Jika beton te
yang ditentukan maka bekisting yang menutupi ringbalk bisa di lepas.

9. Plesteran, Acian dan Pemasangan saklar lampu


Pekerjaan pemasangan saklar lampu dipasang sesuai dengan jumlah dan spesifikasi yang ada pada data atau dok
itu dilakukan pekerjaan plesteran dengan spesi 1 : 4, dikerjakan diseluruh bagian dinding yang akan diplester sesu
dan luas yang akan dikerjakan lalu kemudian dilanjutkan dengan pekerjaan acian yang melapisi seluruh bagian di
plester sesuai dengan ukuran dan luas yang tertera pada data yang disediakan.

10. Pek. Pemasangan rangka atap, genteng dan bubungan


Melaksanakan Perakitan rangka atap galvalum sesuai ukuran yang telah disediakan dan dipasang di atas ringbalk
sebagai tumpuan, selanjutnya dilakukan pemasangan genteng biasa dipasang secara rapat agar tidak mengakibat
kemudian hari. Setelah pemasangan genteng penutup atap dilanjutkan dengan pemasangan bubungan genteng b
spesi.

11. Pek. Pemasangan Plafond dan Instalasi Listrik


Memulai dengan pemasangan rangka plafond metalfuring dan di pasang sesuai dengan elevasi dan ukuran yang
sebelumnya, perakitan dimulai dari mengukur luasan yang akan dipasang rangka plafond setelah itu mulai menya
dengan baut atau sekrup pada rangka tersebut. Setelah pemasangan rangka plafond selesai selanjutnya mulai m
listrik sebelum akhirnya di pasang penutup rangka plafond. Selanjutnya dilakukan pemasangan penutup plafond
gypsumboard dengan cara di paku atau di sekrup sesuai dengan perencanaan sebelumnya.

12. Pek. Urugan Pasir dibawah lantai dan saluran pipa air kotor
Untuk pekerjaan urugan pasir dibawah lantai akan dikerjakan setelah seluruh elemen pada bangunan terpasang,
digunakan sebagai dasar untuk penempatan rabat beton dengan spesi 1 : 4 : 6 dan lantai keramik. Sebelum diber
pemasangan keramik terlebih dahulu dilakukan pemasangan pipa PVC untuk air kotor, lalu dilanjutkan dengan pe
dan pemasangan keramik lantai.

13. Pek. Pemasangan Kelengkapan untuk kamar mandi dan saluran pipa air bersih
Setelah pakerjaan pembuatan kamar mandi beserta pekerjaan pemasangan instalasi air bersih telah terpasang ke
kamar mandi di plester dan lapisi dengan keramik kamar mandi ukuran 20/25 dengan ketinggian yang sesuai den
kemudian di pasang bak mandi dan kloset jongkok serta wadah untuk sabun yang terbuat dari keramik, bersama
pemasangan keramik lantai kamar mandi dipasang juga avour sebagai saluran pembuangan air kotor.

14. Pek. Pengecatan pada dinding dan plafond


Untuk pekerjaan pengecatan pada plafond dan dinding dilakukan setelah semua elemen atau bagian pekerjaan t
dilakukan pertama adalah pengecatan terhadap plafond dengan cat yang spesifikasinya sesuai dengan standar un
pada plafond, dilanjutkan dengan pengecatan dinding bagian dalam dengan spesifikasi cat yang sesuai untuk din
Selanjutnya diteruskan mengecat dinding bagian luar dengan spesifikasi cat weathershield (Tahan Cuaca), dan di
pembersihan lahan yang telah selesai dikerjakan.
III. URAIAN PEKERJAAN PENUNJANG
Untuk penunjang pekerjaan di ssegala bidang, dibutuhkan beberapa kegiatan demi mempermudah / memperlan
segala bidang pekerjaan yang sedang dikerjakan, antara lain adalah sebagai berikut :

- Pembekalan keselamatan dalam bekerja kepada tenaga kerja di lingkup pekerjaan.


- Penyiapan fasilitas untuk operasional di lingkup pekerjaan.
- Penyuplaian material yang dibutuhkan untuk pekerjaan di lapangan / proyek
- Menyiapkan tempat atau lokasi untuk mobilisasi alat atau kendaraan yang akan masuk proyek, dll.

IV. PENUTUP
Sehubungan dengan dibuatnya metode pekerjaan ini agar dapat dipahami oleh pekerja maupun pelaksana proye
juga sebagai acuan dalam melaksanakan pekerjaan agar berjalan lancar dan aman sesuai prosedur dan tata cara
s maupun pelaksanaannyadi lapangan yang

n pelaksanaan pekerjaan di lapangan mulai


ertanggung jawabkan kebenarannya.

yang nantinya digunakan sebagai acuan


a bahwa lokasi yang siap untuk dikerjakan

atau barang yang dapat mengganggu


n

dasi batu kali yang sebelumnya telah digali

uran yang ada pada perencanaan dan


n merangkainya menjadi tulangan sebagai
kisting yang terbuat dari kayu usuk dan
agai cetakan beton sloof, setelah itu
mudian menuangkan ke dalam bekisting
roses telah selesai dan beton telah
ang terpasang pada rencana beton sloof

n kemudian membengkokkan dan


besian pekerjaan selanjutnya membuat
n beton kolom dan kolom praktis.
elah adukan tersebut jadi langsung
h proses pengecoran selesai selanjutnya
dan kemudian Melepas bekesting dari beton
selesai. Pemasangannya sesuai lebar antar
h direkatkan dengan spesi 1 : 5 dan

gga perakitan menjadi sebuah tulangan,


untuk cetakan ringbalk, dipasang sesuai
n dan bekisting pada ringbalk telah selesai
an. Setelah semua selesai adukan yang
batu bata. Jika beton telah mencapai umur

ada pada data atau dokumen. Dan setelah


yang akan diplester sesuai dengan lebar
elapisi seluruh bagian dinding yang di

dipasang di atas ringbalk yang berguna


at agar tidak mengakibatkan kebocoran di
gan bubungan genteng beton yang diberi

elevasi dan ukuran yang telah ditentukan


setelah itu mulai menyatukan rangka
esai selanjutnya mulai memasang instalasi
angan penutup plafond dengan
ya.

da bangunan terpasang, yang nantinya


keramik. Sebelum diberi rabat beton dan
u dilanjutkan dengan pekerjaan rabat beton

bersih telah terpasang kemudian dinding


tinggian yang sesuai dengan perencanaan,
at dari keramik, bersamaan dengan
gan air kotor.

atau bagian pekerjaan telah selesai. Yang


esuai dengan standar untuk pengecatan
at yang sesuai untuk dinding bagian dalam.
ld (Tahan Cuaca), dan diakhiri dengan
permudah / memperlancar pekerjaan di

maupun pelaksana proyek di lapangan dan


i prosedur dan tata cara yang ada.

Malang, 21 Juli 2016


CV. RIZALDI JAYA

RIZALDI FIBIANTO
Direktur

Anda mungkin juga menyukai