Project Start Date
Contract No. AEL-RFQ-500-011 MONDAY 26, MAY 2018 Report Date:
Discipline : PMT Document Type: REP

Prepared by: Report No.: IISL-AEL-DPR-000 00000

EKERE, EDO-ABASI MICHAEL PROJECT ENGINEER WEATHER:

LOCATION: Indexpro Fabrication yard Port Harcpurt. PROGRESS PERCENTAGE: 0.0%

TIME: START: 00:00HRS FINISH: 00:00HRS

JOB SAFETY ANALYSIS

OBSERVATIONS

U-SEE U-ACT/OBSERVATION Daily CUMMULATIVE

MAN HOURS 0 0 10000.00%

LOST INJURY (LTI) 0 0


LOST WORK DAY (LWD) 0 0
MEDICAL TREATMENT CASE (MTC) 0 0
8000.00%
FIRST AID CASE (FAC) 0 0
SECURITY 0 0
U-SEE U-ACT/OBSERVATION PREVIOUS
NEAR MISS 0 0
UNSAFE ACTS 0 0 6000.00% UNSAFE ACTS 0

UNSAFE CONDITIONS 0 8 UNSAFE CONDITIONS 0

SAFE ACTS 0 0 8 SAFE ACTS 0

SAFE CONDITIONS 0 0 SAFE CONDITIONS 0


4000.00%
UNSAFE SUBTOTAL 0 0 TOOLBOX MEETING 0

SAFE SUBTOTAL 0 0 PERMIT TO WORK 0

OVERALL OBSERVATIONS 0 0 MAN HOURS 0

UNSAFE OBSERVATIONS CLOSED 0 0 UNSAFE OBSERVATIONS CLOSED 0


2000.00%
UNSAFE OBSERVATIONS OPEN 0 0 UNSAFE OBSERVATIONS OPEN 0

INSPECTIONS 0 0 SAFETY INDUCTION 0

SAFETY INDUCTION 0 0 JOB SAFETY ANALYSIS(JSA) 0

HAZARD HUNT 0 0 0.00% INSPECTION 0


CUMMULATIVE
DAILY TOOL BOX MEETING 0 0
GENERAL SAFETY MEETING 0 0
UNSAFE SUBTOTAL
JOB SAFETY ANALYSIS (JSA) 0 0 1 2 3 4
'PROGRESS REPORT'!#REF!
PERMIT TO WORK (PTW) 0 0

0 0%
STOPPAGE REPORT

CAUSE OF STOPAGE: WEATHER: COMMUNITY: OTHERS: (QA/QC, HSE,


SECURITY)
BRIEF DESCRIPTION:

TIME STOPPED: TIME RESUMED: HOURS LOST:


ACTION TAKEN:
COMMUNICATED BY MEANS OF: TO WHOM:

PROJECT PROGRESS
ACTIVITY DESCRIPTION STATUS
PREVIOUS TODAY PLAN ACTUAL TODATE
Kick-Off Meeting Yet to start 0% 0% 0% 0%
Reviewed of AFC Drawings Yet to start 0% 0% 0% 0%
Preparation of Shop Drawing Yet to start 0% 0% 0% 0%
Mobilization of Personnel Yet to start 0% 0% 0% 0%
Procurement of Materials Yet to start 0% 0% 0% 0%
Material Inspection Yet to start 0% 0% 0% 0%
Yet to start 0% 0% 0% 0%
Yet to start 0% 0% 0% 0%
Yet to start 0% 0% 0% 0%
Yet to start 0% 0% 0% 0%
Yet to start 0% 0% 0% 0%
Yet to start 0% 0% 0% 0%
Yet to start 0% 0% 0% 0%
Yet to start 0% 0% 0% 0%
Yet to start 0% 0% 0% 0%
Yet to start 0% 0% 0% 0%
Yet to start 0% 0% 0% 0%
Yet to start 0% 0% 0% 0%
Yet to start 0% 0% 0% 0%
Yet to start 0% 0% 0% 0%
Yet to start 0% 0% 0% 0%
Yet to start 0% 0% 0% 0%
Yet to start 0% 0% 0% 0%
Fit UP and Dimensional Control Yet to start 0% 0% 0% 0%
Tack Welding Yet to start 0% 0% 0% 0%
Welding Yet to start 0% 0% 0% 0%
MPI/Pull Test Yet to start 0% 0% 0% 0%
Blasting & Painting Yet to start 0% 0% 0% 0%
Stacking Yet to start 0% 0% 0% 0%
Loading Out Yet to start 0% 0% 0% 0%
Project Documentation Yet to start 0% 0% 0% 0%

WORK DONE TODAY


00:00hrs-00:00: Toolbox meeting,Topic: -
07:30hrs-07:45hrs: JHA
08:00hrs: PWT ISSUED
08:00hrs-09:00hrs:
09:00hr-10:00hrs:
08:00hrs-12:00hrs:
12:00hrs-13:00hrs:
13:00hrs-17:45hrs:
17:45hrs-18:00hrs:
18:00hrs: Work close

MAJOR HIGHLIGHT & CONCERNS

WORKPLAN FOR TOMORROW

CHALLENGES:

REPORT ISSUED BY INDEXPRO FOR AMAZON ENERGY LIMITED


NAME: OSAKPAMWAN ENABULELE NAME:
SIGN: SIGN:
DATE: DD/MM/YEAR DATE:

Page 1 of 8
FABRICATION LABOR TRACKING

FEBRUARY

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
DISCIPLINE

PMT 0 0 0 0 8 8 8 8 8 8 8 8 8 8 8 8 8 8
FITTER 0 0 0 0 0 0 0 5 5 5 5 5 5 3 3 3 3 3
WELDER 0 0 0 0 0 0 0 0 0 2 2 2 2 6 6 12 10 9
HELPER/GRINDER 0 0 0 0 0 0 0 5 5 5 5 5 5 6 6 7 7 4
PAINTER/BLASTER 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SCAFFOLDER 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
RIGGER 0 0 0 0 0 0 0 0 2 2 2 2 2 2 2 2 2 2
Machinist 0 0 0 0 0 0 0 0 2 2 2 2 2 2 2 1 0 0

TOTAL POB 0 0 0 0 8 8 8 18 22 24 24 24 24 27 27 33 30 0 26
FABRICATION LABOR T

20 21 22 23 24 25 26 27 28 1 2 3 5 6 7 8 9 10 11
DISCIPLINE

8 8 8 8 8 8 8 8 PMT 8 8 8 8 8 8 8 8 8 8
4 4 0 8 8 8 7 5 FITTER 5 4 2 2 0 0 0 0 6 6
9 9 9 9 9 12 15 9 WELDER 14 14 12 2 0 0 0 0 13 14
4 4 8 8 0 8 4 HELPER/GRINDER 6 3 4 2 0 0 0 0 3 4
0 0 0 0 0 4 5 PAINTER/BLASTER 0 0 3 4 4 4 5 5 5 0
0 0 0 0 0 0 0 SCAFFOLDER 0 0 0 0 0 0 0 0 2 0
2 2 2 2 2 2 2 RIGGER 2 2 2 2 0 0 4 4 4 4
1 1 2 2 0 2 0 MACHINE OPERATOR 1 1 1 1 1 0 0 1 1 2
CARPENTER 0 0 0 0 0 0 1 1 2 0
FIRE WATCH

28 28 17 0 37 37 30 46 33 559 TOTAL POB 36 32 32 21 13 12 18 19 44 38

CUMMULATIVE NO. OF POB 1180


FABRICATION LABOR TRACKING

MARCH

12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

8 8 8 8 8 8 8 8 8 8 8 8 8 8
1 1 5 3 3 2 0 1 1 1 1 1 1 8
17 15 10 16 10 1 3 0 1 3 3 3 0 12
4 4 5 4 6 2 0 0 0 0 0 0 0 6
0 0 5 6 5 5 5 5 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 4 4 0 2 2 0 0 0 0 0 0 2 4
2 2 2 1 1 1 1 1 1 1 1 1 1 5
1 2 2 0 0 0 0 1 0 1 1 1 1 2
8

33 36 41 38 35 21 17 16 11 14 14 14 13 0 53 0 0 0 0 0 621
S/N Equipment
1 WELDING MACHINE
2 9" GRINDING MACHINE

3 4.5" GRINDING MACHINE

4 OXYACETYLENE CUTTING SET (VICTOR)

5 CHAIN BLOCK 1TON

6 CHAIN BLOCK 2TON

7 CHAIN BLOCK 3TON

8 ELCTRODE QUIVER

9 ELECTRODE OVEN

10 EXTENSION CABLE

11 PENCIL GRINDER

12 WELDING CABLE (SET)

13 FLUK CAMP METER

14 FLUK TEMPERATURE GUAGE

15 FIRE EXTINGUISHER

16 PLATE BITE

17 TABLE VICE

18 MONDAY HAMMER

19 SELFLOADER

20 MECHANICAL JACK (10T)

21 MECHANICAL JACK (5T)

22 MAGNETIC DRILLING MACHINE


Qty Location
12 INDEXPRO FAB. YARD, PH

5 INDEXPRO FAB. YARD, PH

5 INDEXPRO FAB. YARD, PH

5 INDEXPRO FAB. YARD, PH

3 INDEXPRO FAB. YARD, PH

3 INDEXPRO FAB. YARD, PH

4 INDEXPRO FAB. YARD, PH

8 INDEXPRO FAB. YARD, PH

3 INDEXPRO FAB. YARD, PH

8 INDEXPRO FAB. YARD, PH

3 INDEXPRO FAB. YARD, PH

12 INDEXPRO FAB. YARD, PH

3 INDEXPRO FAB. YARD, PH

1 INDEXPRO FAB. YARD, PH

6 INDEXPRO FAB. YARD, PH

1 INDEXPRO FAB. YARD, PH

4 INDEXPRO FAB. YARD, PH

5 INDEXPRO FAB. YARD, PH

2 INDEXPRO FAB. YARD, PH

1 INDEXPRO FAB. YARD, PH

1 INDEXPRO FAB. YARD, PH

2 INDEXPRO FAB. YARD, PH