MINUTES OF PRE-BID MEETING

Paint, Plaster Patch & Miscellaneous Repair Work at


45-C1, Gulberg III – LAHORE

RFQ No. 19PK5018Q2002

DATED: 8/30/2018 TIME: 12:00AM

LOCATION: 45-C1, Gulberg III, Lahore

Following FSNs and the contractors have attended the meeting:


FSNs:
 Asif Yaqoob, Procurement & Contracting Supervisor
 Umair Shahzad, Procurement Agent
 Abdul Shakoor, Maintenance Foreman
Contractors:
1. Sher M. Khan, Classic International
2. Gohar Ali Muzzafar, Tooba Construct
3. Zahid Abbas, Tooba Construct
4. Asif Noor, Tahzib Engineering
5. Shahbaz Gul, Tahzib Engineering
6. Arslan Shaukat, Shaukat & Company
7. Mudasir, Shaukat & Company
8. Nasir Khan, Wadaan Engineering Construction
9. Musa Khan, Wadaan Engineering Construction
10. Sabaz Ali, Sabaz Ali Contractor
11. Rahat Mansha, Sabaz Ali Contractor
12. Muhammad Ijaz, ECS – Engineering Construction
13. Zafar Jawaid, Tawreek Dimensions Cont.
14. Rasheed Ahmad, Hight Tech Inc.
15. Abdul Hafeez, High Tech Inc.

Following points have discussed during the meeting:

1. The period of performance has changed from 60 calendar days to 60 workdays.


2. Estimated price of the main entrance wooden door is US$3,000.00; the Contracting
Officer will finalize design later.
3. Measurements of the paint area has been taken by the contractors during the site survey,
 Estimated interior paint area: Approximately 18000 Sq. ft.

[RFQ 19-PK5018-Q-2002 – PAINT, PLASTER PATCH WORK AND MISC. REPAIR WORK PROJECT AT
45-C1, GULBERG III, LAHORE

Page 1
 Estimated Water supply pipeline: Total Approximate 300 R/ft.
 Estimated Razor wire: Total Approximate 610 R/ft.
 Estimated Grinding and Polishing Work: Total Approximately 7000 Sq. ft.

CLOSING DATE: The closing date of the offer date is September 6, 2018 at 1500 hrs. Late
offer will not be accepted

FIRM FIXED PRICE: This is a Firm Fixed Price Contract

COMMENCING WORK: Commence work under this contract within 10 days after the date
the Contractor receives notice to proceed.

LIQUIDATION DAMANGES: Failure to complete the job on schedule, or any extension, the
Contractor shall pay liquidated damages to the Government in the amount of Rupees
10,000.00 for each day of delay until the work is completed.

SF1442 FORM: SF-1442 is very important. Offerors should complete blocks 14 through 17
as appropriate of the SF-1442 Page: 1

S/NO Description Copies


Required
Volume I Standard Form 1442 including a Price Proposal and -1 copies
Complete Section B, Attachment 2, “Breakdown of
Proposal Price by Divisions of Specifications”, and
completed section K
Volume II Performance schedule in the form of a “bar chart” and -1 copies
Business Management/Technical Proposal.

BREAKDOWN OF PROPOSAL: (Page No. 22) Fill out the Breakdown of Proposal Price by
Divisions of Specifications

SECTION J & K: Read Section J (Pages 39-41) & K (Page 41-42) as a guide line how to prepare
the solicitation package

EVALUTATION FACTOR (SECTION K): The Government will award the contract to the
technically acceptable, responsible offeror with the lowest evaluated price resulting from the
solicitation. The Government may award a contract on the basis of initial offers received,
without discussions. Therefore, each initial offer should contain the offeror’s best terms
from a price and technical standpoint.

DUNDS NUMBER: The contractor is responsible to obtain the DUNS number (DATA
UNIVERSAL NUMBERING SYSTEM), details will be provided via email.

SECURITY PROCEDURE:

[RFQ 19-PK5018-Q-2002 – PAINT, PLASTER PATCH WORK AND MISC. REPAIR WORK PROJECT AT
45-C1, GULBERG III, LAHORE

Page 2
 Contractor will be responsible to provide the list of labor with the copies of CNIC
 Contractor will be responsible to provide names of laborers as many as possible
numbers of persons for submitting gate access request to Security Section so if
anyone will be missed due to some reason, a replacement will be ok to visit CGOB.
 Laborer will not be allowed to walk around without escort

PPE: Personal Protection Gear: Contractor will be responsible to provide proper PPE to
Laborer on site, Laborer will not be allowed to work without PPE.

COR: Mr. Naeem Ibrahim, Facility Manager will be the COR for this contract.

END TEXT