Anda di halaman 1dari 26

eg ge

New Ground Tester


DET2/3

gg er
M g e
g
M

e
1
eg ge
Why do Earth Testing?

gg er
 Two types of testing

M g e • Soil resistivity: to help design electrical systems


• Electrode & Earth resistance: to ensure safety compliance

g
 A low Ground resistance is required to:
• Enable protective devices to operate in good time.
M
• Reduce ground potential rises (GPR).

e
• Minimise the energy of electric shock from GPR during fault:
– Step potential.
– Touch potential.
– Adjacent conductors.
 Testing is done to Standards (e.g. IEEE 81, 80, CFE 11)

2
eg ge
Megger’s DET Range

gg er
M g e
g
Price

DET2/2 DET2/3
M

e
DET4

DET3

DET14 & 24C

Performance
3
eg ge
Installed Earth/Ground System

gg er
M g
 Systems must be checked
regularly, especially if they
have high fault currents
e
g
 Large systems must have
very low resistances
M
<90mΩ is typical

e
 Noisy readings are
common in built up areas

4
eg ge
Example: Substation Ground System

gg er
M g e
g
M

e
5
eg ge
Ground Testing Theory at a Glance

 Measuring Ground Resistance

gg er
• Using basic Ohm’s Law

M g e V = IR
• Soil is a special case
– Must not polarise it during testing

g
– So, using switching signal
– Must allow time for energy
M
saturation

e
– So, use a slow switching rate
• Must avoid noise in built-up areas
– Most noise is at 60Hz

 Test Frequency setting is a balance


between avoiding noise and getting
good soil penetration
6
eg ge
gg er
M g e
g
M

e
Case Study:
Medway Power Station (UK)

7
eg ge
Case Study Location

gg er
M g e
g
M

e
 Medway Power Station, United Kingdom
 735 megawatts gas-fired power station
8
eg ge
Planning & Visual
Inspection

gg er
M g e On Day 1:
 Visual inspection
of the site was

g
done
 Planning for
every test was
M
made

e
 Risk assessment
was completed
 Approval for site
access granted

9
eg ge
Instrument and Test Lead Check

gg er
On Day 2:

M g
 Use a calibration checker to inspect the instrument before and
after testing
 Use a continuity checker to ensure test leads are intact with a
e
g
low resistance <100Ω
M

e
10
eg ge
Leakage Current

gg er
Day 2 continued…

M g
 Test done before shutdown of site
e
 Test over a few minutes to view fluctuations

g
 High amount of leakage current is an indication of
M

e
faults within the system (assets or ground system)

 A record of trend from tests over several years will


show any degradation

11
eg ge
Ductor (DLRO) Test
Day 2 continued…
 A test to ensure integrity of

gg er
connections throughout the system

M g Focus on connections from asset to


eGround Bar as well as Ground Bar to
Electrodes/Grid

g
Ensure no high resistance in
Ground connections to prevent this
M

e
12
eg ge
Fall of Potential Tests

gg er
Day 2 continued…

M g
 At least two full tests
are done
e
 Look for the

g
signature pattern
 True resistance to
M
ground is calculated

e
from this test

13
eg ge
FoP Background

gg er
 Fall of Potential Test

M g e • For measuring resistance


between an installed system
and the soil

g
• Auxiliary current probe must be
placed far outside zone of
influence (at least 4 times the
M
diagonal length of Ground

e
61.8%
System)
100%
• Several readings are taken to
build the graph and determine
the true resistance

14
eg ge
Step & Touch Potentials

Day 3:

gg er
 Measurement of resistance over 1m steps next to the fence

M g
 Measurement of resistance when touching the fence
 Calculate potentials using max. fault current of the power plant
e
g
M

e
15
eg ge
What are Step & Touch Potentials

Station

gg er
M g e Step & Touch

g
Potentials
M
Earth/Ground
system

e
 Any medium to high voltage installation must ensure safe step and touch potentials.
 These potentials are the voltage levels that a typical person would experience when
touching the fence or walking around the perimeter of the installation when a fault is
happening.
 In worst case scenarios, the maximum fault current will flow through the Earth/Ground
system and dangerous voltage levels could be experienced by people in the immediate
vicinity.
 Megger provides the test equipment that can assist in determining these potentials.
 Standards such as IEEE 81, and BS 7430 provide further information
16
eg ge
Dangers of Step & Touch Potentials

gg er
M g e
g
M

e
17
17
eg ge
Measuring Touch Potentials

gg er
M g e
g
M

e
 It is recommended to use a DET2/3 in the 4P test mode
 Connect C1 terminal to the Earth/Ground system inside the installation
 Connect P1 terminal to the fence
 Connect P2 to a spike 1m away from the fence
 Connect C2 to a spike outside the zone of influence of the Earth/Ground
system. This is the auxiliary current spike. This spike could be placed 30m
away or even 1km away depending on the size of the system under test.

18
eg ge
Measuring Step Potentials

gg er
M g e
g
M

e
1.0m 0.5m

 It is recommended to use a DET2/3 in the 4P test mode


 Connect C1 terminal to the Earth/Ground system inside the installation
 Connect P1 terminal to a spike placed 0.5m away from the fence.
 Connect P2 to a spike 1m away from the P1 spike
 Connect C2 to a spike outside the zone of influence of the Earth/Ground
system. This is the auxiliary current spike. This spike could be placed 30m
away or even 1km away depending on the size of the system under test.

20
eg ge
Soil Resistivity Tests
 It is important to test the soil around the site in at least two
different locations

gg er
 Soil Resistivity trend over time will show if the ground system

M gneeds improvement
e
g
M

e
23
eg ge
gg er
M g e
g
M

e
DET2/3 Features and Benefits

25
eg ge
All in One Ground Tester

gg er
Resistivity

M g e 4P ART
4 Pole

g
3P ART
M
3 Pole

e
2 Pole
Dual Clamp

A
Continuity

26
eg ge
Features & Benefits

Feature Benefit

gg er
M g
Colour Display
e • Full graphical functionality
• Daylight viewable with backlight
• Set distances for Resistivity

g
calculations
• Wenner & Schlumberger
methods
M
• View spike check results

e
Analogue Filter & • Keeps measurements accurate
Auto-Frequency Selection • Allows use of low power testing to
meet safety requirements
• Scans for “quiet” frequency and sets
the test accordingly

27
eg ge
Features & Benefits

Feature Benefit

gg er
M g
Data logging: 500 record
e •


Save up to 500 data points or graphs
Edit name of individual records
Download directly to flash drive

g
• Use PowerDB and auto-fill forms
M

e
Graphical Results Trace • View live measurements over time
• Diagnose problems by viewing
trends
• Start/Stop graphs to capture fall of
potential curve

28
eg ge
Features & Benefits

Feature Benefit

gg er
M g
Weatherproof: IP54 & IP65
protection
e
CATIV 300V protection
• Keep working outdoors with IP54
• Storage in vehicles with IP65

• Protect the user and the instrument

g
• Safe for ART testing on live
systems
M

e
10hr Battery life, with fast • Work all day, continuously
recharge to 50% • Recharge to 5hrs use during lunch

Continuity Mode • Ensure test leads are good


• Ensure installation has not
corroded
Stakeless and ART Modes • Provides flexibility & full
29
functionality
eg ge
New Kit: Features & Benefits

Feature Benefit

gg er
M g
All new test leads on
reels:
• Smooth action reels
• Spikes included on reels
ETK30, ETK50, ETK100C • Daisy-chain reels for longer and longer
e
g
lengths
• Supplied in 20m to 100m lengths
M

e
30

Anda mungkin juga menyukai