Objective:
- Build an Online Electronic Bank Withdrawal System
- Build a Network Setup (existing one)
- Build a Data Centre (existing one)
The development of the system is a 15 months project. The system created is based on the
electronic Bank Withdrawal System that will help the customers do their withdrawal more
efficiently on time.
Provided below are the main requirements of the system:
- Keeping up with time and technology
- Create application for both Mobile phones/Tablets/Smart Phones and Desktop users
- Printing receipt for the customers
- Windows Server 2012 R2 Installation
- Web server Installation
- Storage area
- Network setup
- Data centre
Project Deliverables
The business case, project charter, scope statement, cost baseline, status report project
presentation and the final project report plus any other supporting documents are required to
manage this particular project.
Since the project is an Online Electronic Bank Withdrawal System, it needs a Network Setup
to manage the functionality of the system. It also needs an Internet access via ISP and the
Servers to host the system to run. Thus, the most deliverables will be the setup of the Network
and a storage facility.
After the Network setup completes and settled. The system needs to be policed and sound the
users’ with an interview to give their opinions and views about the system before the actual
programming takes place.
Included in the network setup, the Data Center is needed to house the system with the Network
core setup.
The systems will integrate both phone and desktop application. Both and will be programmed
in advance during the commencement of the project for users/customers to installed on the their
devices and for the bank to installed on their desktops.
Project analysis design will be carried out during the commencement of the project in order to
program a successful functioning system.
The project deliverable are as of follow:
- The setup of a network
- Data center
- Server Installations
Windows Server 20012 R2
Web server (Apache Server)
Application Server (Oracle)
Exchange Server
Domain Controller
File Server
Router Installation/Switches Installations
Cat 5 cables
Wireless Access points/MDFs
- System Analysis Design and programming of the Online Electronic Bank
Withdrawal System
- User interaction views and options
- Programming of the Online Electronic Bank Withdrawal System
- Programming of the application for mobile devices etc.
- Testing and Monitoring of the System.
The Budget Overrun is to cater for the emergencies and other risks that might occur during
the project phase of execution.