Anda di halaman 1dari 18

0 0

PEKERJAAN JALAN
DIMENSI VOLUME
STA
PANJANG RABAT BETON PASIR timbunan tanah
M M3 M3 M3
0 + 000
I 25.00 2.75 2.09 3.56
0 + 025
0 + 025
II 21.00 1.26 0.72 0.38
0 + 046
0 + 000
III 27.50 3.03 2.13 3.28
0 + 028
TOTAL 73.50 7.04 4.94 7.22

PEKERJAAN PLAT BETON


DIMENSI VOLUME
STA
PANJANG GALIAN PAS. BATU PLAT BETON BESI
M M3 M3 M3 KG
0 + 000
I 25.00 4.50 3.75
0 + 025
860.14
0 + 025
II 21.00 1.58 3.15
0 + 046
0 + 000
III 27.50 2.75 -
0 + 028
TOTAL 73.50 - 8.83 6.90 860.14

0 0
PEKERJAAN SALURAN
DIMENSI VOLUME
STA
PANJANG GALIAN URUGAN KEMBALI PAS. BATU COR LANTAI BETON
M M3 M3 M3 M3
0 + 000
I 50.00 32.85 8.21 18.24 1.80
0 + 050
0 + 050
II 25.00 16.42 4.11 9.12 0.90
0 + 075
TOTAL 75.00 49.27 12.32 27.36 2.70
PLESTERAN PASIR
M2 M3

81.00 0.75 L

40.50 0.38 R

121.50 1.13
RENCANA ANGGARAN BIAYA

KEGIATAN : PEMBANGUNAN SARANA DAN PRASARANA DESA


PEKERJAAN : PEMBANGUNAN RABAT BETON & PLAT BETON JALAN GAMPONG PEUNITI
LOKASI : KEC.BAITURAHMAN - KAB. KOTA MADIYA
T.A : 2017
HARGA

SATUAN
NO. URAIAN PEKERJAAN VOLUME ANALISA

( Rp. )

I. PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan 1.00 Pkt Ls 500,000.00
2 Pengukuran/Pemasangan Profil 1.00 Pkt Ls 500,000.00
3 Papan Nama Proyek 1.00 Pkt Ls 300,000.00
4 Administrasi Documentasi Proyek 1.00 Pkt Ls 500,000.00
SUB TOTAL
II. PEKERJAAN JALAN
1 Rabat Beton (Barem Jalan) K-250 7.04 M3 A.4.1.1.5 948,805.33
2 Pasir (bawah rabat Beton) 4.94 M 3
A.2.3.1.11 229,556.00
3 Timbunan Tanah 7.22 M3 A.2.3.1.14-a 290,750.00
SUB TOTAL
III. PEKERJAAN PLAT BETON
1 Pasangan Batu Gunung 1 : 4 8.83 M3 A.3.2.1.2 738,047.68
2 Penulangan Besi Beton Polos 860.14 Kg A.4.1.1.17 12,741.75
3 Beton Cor Plat Beton t = 20 cm 6.90 M 3
A.4.1.1.8 1,037,483.36
SUB TOTAL
MASTER ANALISA
REKAPITULASI
RENCANA ANGGARAN BIAYA

KEGIATAN : PEMBANGUNAN SARANA DAN PRASARANA DESA


PEKERJAAN : PEMBANGUNAN RABAT BETON & PLAT BETON JALAN GAMPONG PEUNITI
LOKASI : KEC.BAITURAHMAN - KAB. KOTA MADIYA
T.A : 2017

NO. URAIAN

I. PEKERJAAN PERSIAPAN
II. PEKERJAAN JALAN
III. PEKERJAAN PLAT BETON

(A) JUMLAH
(B) PAJAK = 15 % x (A)
(C) TOTAL = (A) + (B)
(D) DIBULATKAN
Terbilang : (Empat Puluh Satu Juta Tujuh Ratus Sembilan Puluh Ribu Rupiah)

Di Buat Oleh :
………………..

……………………
……………….
NG PEUNITI

JUMLAH

HARGA

( Rp.
)

500,000.00
500,000.00
300,000.00
500,000.00
1,800,000.00

6,674,845.49
1,133,673.78
2,099,418.53
9,907,937.80

6,513,270.76
10,959,699.04
7,158,635.15
24,631,604.96
NG PEUNITI

JUMLAH HARGA
( Rp. )

1,800,000.00
9,907,937.80
24,631,604.96

36,339,542.76
5,450,931.41
41,790,474.17
41,790,000.00
h)

…………
RENCANA ANGGARAN BIAYA

KEGIATAN : PEMBANGUNAN SARANA DAN PRASARANA DESA


PEKERJAAN : PEMBANGUNAN SALURAN GAMPONG PEUNITI
LOKASI : KEC.BAITURAHMAN - KAB. KOTA MADIYA
T.A : 2017
HARGA

SATUAN
NO. URAIAN PEKERJAAN VOLUME ANALISA

( Rp. )
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan 1.00 Pkt Ls 300,000.00
2 Pengukuran/Pemasangan Profil 1.00 Pkt Ls 500,000.00
3 Papan Nama Proyek 1.00 Pkt Ls 300,000.00
4 Administrasi Documentasi Proyek 1.00 Pkt Ls 500,000.00
SUB TOTAL
II. PEKERJAAN SALURAN
1 Galian tanah pondasi 49.27 M3 A.2.3.1.1 58,250.00
2 Urugan kembali 12.32 M3 A.2.3.1.9 41,500.00
3 Pasangan Batu Gunung 1 : 4 27.36 M3 A.3.2.1.2 738,047.68
4 Cor Lantai Beton; t= 12 cm 2.70 M3 A.4.1.1.4 761,389.06
5 Plesteran 1 : 4 tebal 10 mm 121.50 M2 A.4.4.2.2 60,783.50
6 Urugan Pasir Bawah Lantai 1.13 M3 A.2.3.1.11 229,556.00
SUB TOTAL
REKAPITULASI
RENCANA ANGGARAN BIAYA

KEGIATAN : PEMBANGUNAN SARANA DAN PRASARANA DESA


PEKERJAAN : PEMBANGUNAN SALURAN GAMPONG PEUNITI
LOKASI : KEC.BAITURAHMAN - KAB. KOTA MADIYA
T.A : 2017

NO. URAIAN

I. PEKERJAAN PERSIAPAN
II. PEKERJAAN SALURAN

(A) JUMLAH
(B) PAJAK = 15 % x (A)
(C) TOTAL = (A) + (B)
(D) DIBULATKAN
Terbilang : -

Di Buat Oleh :
………………..

……………………
……………….
JUMLAH

HARGA

( Rp.
)

300,000.00
500,000.00
300,000.00
500,000.00
1,600,000.00

2,869,831.88
511,150.31
20,192,984.49
2,055,750.45
7,385,195.25
258,250.50
33,273,162.87
JUMLAH HARGA
( Rp. )

1,600,000.00
33,273,162.87

34,873,162.87
5,230,974.43
40,104,137.30
40,104,000.00
-

…………
ANALISA HARGA SATUAN

A.2.3.1.1 Penggalian 1 m³ tanah biasa sedalam 1 m


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A TENAGA
Pekerja L.01 OH 0.750 75,000.00 56,250.00
Mandor L.04 OH 0.025 80,000.00 2,000.00
JUMLAH TENAGA KERJA 58,250.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah (A+B+C) 58,250.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 58,250.00

A.2.3.1.9 Pengurugan kembali 1 m³ Galian Tanah


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A TENAGA
Pekerja L.01 OH 0.500 75,000.00 37,500.00
Mandor L.04 OH 0.050 80,000.00 4,000.00
JUMLAH TENAGA KERJA 41,500.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
JUMLAH HARGA PERALATAN
D Jumlah (A+B+C) 41,500.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 41,500.00

A.2.3.1.11 Pengurugan 1 m³ dengan pasir urug


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A TENAGA
Pekerja L.01 OH 0.300 75,000.00 22,500.00
Mandor L.04 OH 0.010 80,000.00 800.00
JUMLAH TENAGA KERJA 23,300.00
B BAHAN
Pasir Urug m³ 1.200 171,880.00 206,256.00

JUMLAH HARGA BAHAN 206,256.00


C PERALATAN
JUMLAH HARGA PERALATAN
D Jumlah (A+B+C) 229,556.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 229,556.00

A.2.3.1.14-a Pengurugan 1 m³ dengan tanah timbun padat


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A TENAGA
Pekerja L.01 OH 0.250 75,000.00 18,750.00
Mandor L.04 OH 0.025 80,000.00 2,000.00
JUMLAH TENAGA KERJA 20,750.00
B BAHAN
Tanah Timbun m³ 1.200 225,000.00 270,000.00

JUMLAH HARGA BAHAN 270,000.00


C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah (A+B+C) 290,750.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 290,750.00

A.3.2.1.2 Pemasangan 1 m³ Pondasi Batu Belah campuran 1SP : 4 PP


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A TENAGA
Pekerja L.01 OH 1.500 75,000.00 112,500.00
Tukang L.02 OH 0.750 95,000.00 71,250.00
Kepala Tukang L.03 OH 0.075 110,000.00 8,250.00
Mandor L.04 OH 0.075 80,000.00 6,000.00
JUMLAH TENAGA KERJA 198,000.00
B BAHAN
Batu Kali / Batu Belah ( Sungai / Gunung ) m³ 1.200 225,000.00 270,000.00
Semen Portlan Kg 163.000 1,656.25 269,968.75
Pasir Pasang m³ 0.520 151.79 78.93

JUMLAH HARGA BAHAN 540,047.68


C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah (A+B+C) 738,047.68
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 738,047.68
A.4.1.1.1 Membuat 1 m³ beton mutu f’= 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A TENAGA
Pekerja L.01 OH 1.650 75,000.00 123,750.00
Tukang L.02 OH 0.275 95,000.00 26,125.00
Kepala Tukang L.03 OH 0.028 110,000.00 3,080.00
Mandor L.04 OH 0.083 80,000.00 6,640.00
JUMLAH TENAGA KERJA 159,595.00
B BAHAN
Semen Portlan Kg 247.000 1,656.25 409,093.75
Pasir Beton Kg 869.000 127.32 110,639.79
Kerikil (Maks 30 mm) Kg 999.000 127.32 127,191.20
Air Liter 215.000 100.00 21,500.00
JUMLAH HARGA BAHAN 668,424.74
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah (A+B+C) 828,019.74
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 828,019.74

A.4.1.1.4 Membuat 1 m³ lantai kerja beton mutu f’= 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A TENAGA
Pekerja L.01 OH 1.200 75,000.00 90,000.00
Tukang L.02 OH 0.200 95,000.00 19,000.00
Kepala Tukang L.03 OH 0.020 110,000.00 2,200.00
Mandor L.04 OH 0.060 80,000.00 4,800.00
JUMLAH TENAGA KERJA 116,000.00
B BAHAN
Semen Portlan Kg 230.000 1,656.25 380,937.50
Pasir Beton Kg 893.000 127.32 113,695.44
Kerikil (Maks 30 mm) Kg 1,027.000 127.32 130,756.12
Air Liter 200.000 100.00 20,000.00
JUMLAH HARGA BAHAN 645,389.06
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah (A+B+C) 761,389.06
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 761,389.06
A.4.1.1.5 Membuat 1 m³ beton mutu f'c = 14,5 Mpa (K 175), slump (12 ± 2) cm, w/c = 0,66
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A TENAGA
Pekerja L.01 OH 1.650 75,000.00 123,750.00
Tukang L.02 OH 0.275 95,000.00 26,125.00
Kepala Tukang L.03 OH 0.028 110,000.00 3,080.00
Mandor L.04 OH 0.083 80,000.00 6,640.00
JUMLAH TENAGA KERJA 159,595.00
B BAHAN
Semen Portlan Kg 326.000 1,656.25 539,937.50
Pasir Beton Kg 760.000 127.32 96,762.07
Kerikil (Maks 30 mm) Kg 1,029.000 127.32 131,010.76
Air Liter 215.000 100.00 21,500.00
JUMLAH HARGA BAHAN 789,210.33
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah (A+B+C) 948,805.33
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 948,805.33

A.4.1.1.8 Membuat 1 m³ beton mutu f'c = 21.7 Mpa (K 250), Slump (12 ± 2) cm, w/c = 0.56
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A TENAGA
Pekerja L.01 OH 1.650 75,000.00 123,750.00
Tukang L.02 OH 0.275 95,000.00 26,125.00
Kepala Tukang L.03 OH 0.028 110,000.00 3,080.00
Mandor L.04 OH 0.083 80,000.00 6,640.00
JUMLAH TENAGA KERJA 159,595.00
B BAHAN
Semen Portlan Kg 384.000 1,656.25 636,000.00
Pasir Beton Kg 692.000 127.32 88,104.41
Kerikil (Maks 30 mm) Kg 1,039.000 127.32 132,283.94
Air Liter 215.000 100.00 21,500.00
JUMLAH HARGA BAHAN 877,888.36
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah (A+B+C) 1,037,483.36
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 1,037,483.36
A.4.1.1.17 Pembesian 10 kg dengan besi polos
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A TENAGA
Pekerja L.01 OH 0.070 75,000.00 5,250.00
Tukang L.02 OH 0.070 95,000.00 6,650.00
Kepala Tukang L.03 OH 0.007 110,000.00 770.00
Mandor L.04 OH 0.004 80,000.00 320.00
JUMLAH TENAGA KERJA 12,990.00
B BAHAN
Besi Beton Polos Kg 10.500 10,630.00 111,615.00
Kawat Beton Kg 0.150 18,750.00 2,812.50
JUMLAH HARGA BAHAN 114,427.50
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah (A+B+C) 127,417.50
Jumlah / Kg 12,741.75
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 12,741.75

A.4.4.2.2 Pemasangan 1 m² Plesteran 1 SP : 2 PP tebal 10 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A TENAGA
Pekerja L.01 OH 0.300 75,000.00 22,500.00
Tukang L.02 OH 0.150 95,000.00 14,250.00
Kepala Tukang L.03 OH 0.015 110,000.00 1,650.00
Mandor L.04 OH 0.015 80,000.00 1,200.00
JUMLAH TENAGA KERJA 39,600.00
B BAHAN
Semen Portlan Kg 10.224 1,656.25 16,933.50
Pasir Pasang m³ 0.020 212,500.00 4,250.00

JUMLAH HARGA BAHAN 21,183.50


C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah (A+B+C) 60,783.50
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 60,783.50
DAFTAR HARGA SATUAN BAHAN BANGUNAN
UNTUK KABUPATEN BANDA ACEH

NO URAIAN BAHAN SATUAN HARGA (Rp)

1 Air Liter 100.00


2 Batu Bata Buah 850.00
3 Batu Kali / Batu Belah ( Sungai / Gunung ) M3 225,000.00
4 Batu Pecah 2-3 cm M3 312,500.00
5 Besi Beton Polos Kg 10,630.00
6 Besi Beton Ulir Kg 11,250.00
7 Cat Kayu Dasar Kg 62,500.00
8 Cat Kayu Mengkilat Kg 72,500.00
9 Cat Tembok Kg 143,750.00
10 Dempul Kayu Kg 70,000.00
11 Engsel Jendela Pasang 27,500.00
12 Engsel Pintu Pasang 43,750.00
13 Floor Drain Buah 18,750.00
14 Granite uk 60 x 60 M2 312,500.00
15 Kait Angin Psg 18,750.00
16 Kawat Beton Kg 18,750.00
17 Kayu Bakau 10 cm Batang 30,000.00
18 Kayu Dolken 8-10 cm, panjang 4 m Batang 65,000.00
19 Kayu Klas I ( Seumatok / Ulin / dll ) M3 7,125,000.00
20 Kayu Klas II ( Kamper / Kruing / dll ) M3 4,375,000.00
21 Kayu Klas III ( Borneo / dll ) M3 4,000,000.00
22 Kayu Klas IV ( Sengon / dll ) M3 3,750,000.00
23 Lem kayu kg 25,000.00
24 Kayu Cerucuk 10 cm Batang 30,000.00
25 Kertas Amplas Lembar 6,250.00
26 Kran Air Buah 25,000.00
27 Minyak Bekisting Liter 18,500.00
28 Multipleks 4 mm Lembar 108,000.00
29 Multipleks 6 mm Lembar 135,500.00
30 Multipleks 9 mm Lembar 156,250.00
31 Paku Kayu Kg 16,250.00
32 Pasir Beton / Kerikil M3 171,880.00
33 Pasir Beton Kg 127.32
34 Kerikil Kg 127.32
35 Pasir Pasang M3 212,500.00
36 Pasir Pasang Kg 151.79
37 Pasir Urug M3 171,880.00
45 Plamur Kg 22,000.00
46 Residu Kg 43,750.00
47 Semen @ 40 Kg Zak 66,250.00
48 Semen @ 50 Kg Zak 93,750.00
49 Semen Portlan Kg 1,656.25
50 Semen Putih @ 50 Kg Zak 200,000.00
51 Semen Warna Kg 4,000.00
52 Tanah Timbun M3 225,000.00
DAFTAR UPAH KERJA
UNTUK KABUPATEN BANDA ACEH

NO URAIAN TENAGA SATUAN HARGA (Rp)

1 Mandor Orang 80,000.00


2 Kepala Tukang Orang 110,000.00
3 Tukang Orang 95,000.00
4 Pekerja Orang 75,000.00
URAIAN TYPE PANJANG JUMLAH Bj
NO JLH VOLUME SAT
PEKERJAAN DIAMETER (m) PANJANG (kg/m)

1 plat beton 860.14 KG


1 10.00 6.67 92.44 616.27 0.62 379.93 kg 0.44
2 10.00 306.67 2.54 778.93 0.62 480.21 kg 0.56