CRONOGRAMA VALORIZADO DE OBRA

OBRA :

ENTIDAD :

ITEM DESCRIPCION MESES

MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 TOTAL


TOTAL COSTO DIRECTO 401,216.01 537,949.88 786,336.99 932,508.13 992,529.49 1,063,297.34 955,566.37 640,245.26 6,309,649.47
GASTOS GENERALES 12.00% 48,145.92 64,553.99 94,360.44 111,900.98 119,103.54 127,595.68 114,667.96 76,829.43 757,157.94
UTILIDAD 8.00% 32,097.28 43,035.99 62,906.96 74,600.65 79,402.36 85,063.79 76,445.31 51,219.62 504,771.96
SUB TOTAL 481,459.21 645,539.86 943,604.39 1,119,009.76 1,191,035.39 1,275,956.81 1,146,679.64 768,294.31 7,571,579.36
I.G.V. 18% 86,662.66 116,197.17 169,848.79 201,421.76 214,386.37 229,672.23 206,402.34 138,292.98 1,362,884.29

TOTAL PRESUPUESTO 568,121.87 761,737.03 1,113,453.18 1,320,431.52 1,405,421.76 1,505,629.04 1,353,081.98 906,587.29 8,934,463.65
PORCENTAJE MENSUAL 6.36% 9.30% 13.43% 16.04% 16.08% 17.01% 12.82% 8.96% 100.00%
PORCENTAJE ACUMULADO 6.36% 15.66% 29.09% 45.13% 61.21% 78.22% 91.04% 100.00%

120.00%

100.00%

80.00%

60.00%
Row 17

40.00%

20.00%

0.00%
0 1 2 3 4 5 6 7 8 9
CRONOGRAMA DE PAGOS

OBRA

ENTIDAD

PRESUPUESTO BASE : 8,934,463.65


PLAZO DE EJECUCION : 240 DIAS CALENDARIOS

MES
DESCRIPCION PORCENTAJE PARCIAL (S/.) SUBTOTAL (S/.)
DIAS
ADELANTO DIRECTO 20.00% 1,786,892.73
ADELANTO MATERIAL 40.00% 3,573,785.46 5,360,678.19
VALORIZACION N°1 PRIMER MES 30 2.54% 227,248.75 227,248.75
VALORIZACION N°2 SEGUNDO MES 30 3.41% 304,694.81 304,694.81
VALORIZACION N°3 TERCER MES 30 4.98% 445,381.27 445,381.27
VALORIZACION N°4 CUARTO MES 30 5.91% 528,172.61 528,172.61
VALORIZACION N°5 QUINTO MES 30 6.29% 562,168.70 562,168.70
VALORIZACION N°6 SEXTO MES 30 6.74% 602,251.62 602,251.62
VALORIZACION N°7 SEPTIMO MES 30 6.06% 541,232.79 541,232.79
VALORIZACION N°8 OCTAVO MES 30 4.06% 362,634.91 362,634.91

SUB TOTALES (S/.) 100% 8,934,463.65


TOTALES S/. 8,934,463.65
Nombre de tarea Duración Comienzo Fin Predecesoras
IMPLEMNTACION DEL NUEVO CENTRO DE SERVICIO AL
CONTRIBUYENTE Y CENTRO DE CONTROL Y sáb mar
211 días
FISCALIZACION EN LA ZONA NORTE 1 DE LIMA 01/11/14 30/06/15
METROPOLITANA Y CALLAO

sáb mié
ESTRUCTURAS 200 días 01/11/14 17/06/15
sáb mié
OBRAS PROVISIONALES 200 días 01/11/14 17/06/15
sáb sáb
ENTREGA DEL TERRENO 0 días 01/11/14 01/11/14
sáb lun
CARTEL DE OBRA DE 3.60x2.40 m. 2 días 4
01/11/14 03/11/14
sáb mar
CERCO PERIMETRICO PROVISIONAL 3 días 4
01/11/14 04/11/14
sáb mar
ALMACEN, OFICINA,GUARDIANIA Y SERVICIOS 3 días 4
01/11/14 04/11/14
sáb mié
ALQUILER DE BAÑOS QUIMICOS 200 días 4
01/11/14 17/06/15
sáb mié
SUMINISTRO DE AGUA 200 días 8FF
01/11/14 17/06/15
sáb mié
SUMINISTRO DE ENERGIA 200 días 8FF
01/11/14 17/06/15
sáb mié
SEGURIDAD 200 días 4
01/11/14 17/06/15
sáb mié
TRAZO, NIVELES Y REPLANTEO 4 días 4
01/11/14 05/11/14
sáb mar
TRANSPORTE DE EQUIPOS Y MATERIALES 3 días 4
01/11/14 04/11/14
mar sáb
TRABAJOS PRELIMINARES 22 días 04/11/14 29/11/14
mar sáb
DEMOLICIONES 22 días 04/11/14 29/11/14
mar vie
DEMOLICION DE PISO DE CONCRETO 15 días 6
04/11/14 21/11/14
mar vie
DEMOLICION ESTRUCTURAS DE CONCRETO 15 días 16FF
04/11/14 21/11/14
mar vie
DEMOLICION MURO DE LADRILLOS 15 días 16FF
04/11/14 21/11/14
mar vie
DEMOLICION DE CIMIENTO 15 días 16FF
04/11/14 21/11/14
vie sáb
ACARREO DE MATERIAL DEMOLIDO 7 días 16,17,18,19
21/11/14 29/11/14
vie sáb
ELIMINACION DE MATERIAL DEMOLIDO 7 días 20CC
21/11/14 29/11/14
mar lun
DESMONTAJE 5 días 04/11/14 10/11/14
mar vie
DESMONTAJE DE PORTON METALICO 3 días 6
04/11/14 07/11/14
vie lun
DESMONTAJE DE ESCALERA METALICA 2 días 23
07/11/14 10/11/14
sáb mié
SEGURIDAD Y SALUD EN OBRA 120 días 01/11/14 18/03/15
ELABORACION, IMPLEMENTACION DEL PLAN DE sáb vie
30 días 4
SEGURIDAD 01/11/14 05/12/14
sáb mié
EQUIPOS DE PROTECCION INDIVIDUAL 120 días 26CC
01/11/14 18/03/15
sáb mié
EQUIPOS DE PROTECCION COLECTIVA 120 días 26CC
01/11/14 18/03/15
sáb mié
SEÑALIZACION TEMPORAL DE SEGURIDAD 120 días 26CC
01/11/14 18/03/15
sáb mié
CAPACITACION EN SEGURIDAD Y SALUD 120 días 26CC
01/11/14 18/03/15
RECURSOS PARA RESPUESTA ANTE EMERGENCIA DE sáb mié
120 días 26CC
SEGURIDAD 01/11/14 18/03/15
mar mié
MOVIMIENTO DE TIERRA 93 días 04/11/14 18/02/15
mié vie
EXCAVACION Y ELIMINACION DE MATERIAL MASIVO 20 días 6,12
05/11/14 28/11/14
mar vie
EXCAV. MANUAL DE ZANJAS P/CIMIENTOS 15 días 6
04/11/14 21/11/14
vie mar
EXCAVACION MANUAL DE CALZADURAS 15 días 19
21/11/14 09/12/14
vie jue
NIVELACION DE TERRENO CON EQUIPO PESADO 5 días 33
28/11/14 04/12/14
lun mié
NIVELACION DE TERRENO CON EQUIPO LIVIANO 3 días 82
16/02/15 18/02/15
RELLENO COMPACTADO C/MATERIAL PROPIO vie mar
3 días 34
(C/EQUIPO) 21/11/14 25/11/14
RELLENO COMPACTADO C/MATERIAL DE vie jue
5 días 33
PRESTAMO(EQUIPO) 28/11/14 04/12/14
ACARREO INTERNO, MATERIAL PROCEDENTE DE mar lun
5 días 34,35
EXCAVACIONES 09/12/14 15/12/14
lun lun
ELIMINACION DE MATERIAL EXCEDENTE ACARREADO 7 días 40
15/12/14 22/12/14
vie mié
OBRAS DE CONCRETO SIMPLE 22 días 21/11/14 17/12/14
vie vie
CALZADURAS 12 días 33
28/11/14 12/12/14
jue sáb
ENCOFRADO Y DESENCOFRADO DE CALZADURAS 14 días 43CC-1 día
27/11/14 13/12/14
CIMIENTO CORRIDO.- CONCRETO CICLOPEO C:H 1:10 vie jue
5 días 34
+ 30% P.G. 21/11/14 27/11/14
jue mar
CONCRETO EN SOBRECIMIENTO 10 días 45
27/11/14 09/12/14
mié mié
ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO 12 días 46CC-1 día
26/11/14 10/12/14
vie mié
SOLADO C:H 1:12, e=0.10m 4 días 34,43
12/12/14 17/12/14
mar mar
FALSO PISO MEZCLA 1:8 e=4" 6 días 38
25/11/14 02/12/14
mié vie
CONCRETO ARMADO 112 días 26/11/14 03/04/15
lun sáb
ZAPATAS 11 días 08/12/14 20/12/14
ZAPATAS.- CONCRETO F'c=210 kg/cm2; CEMENTO mié sáb
3 días 43,48
TIPO 1 17/12/14 20/12/14
lun mié
ZAPATAS .- ACERO FY=42OO KG/CM 8 días 52CF
08/12/14 17/12/14
mié sáb
COLUMNAS 52 días 26/11/14 24/01/15
COLUMNAS.- CONCRETO F'c=210 kg/cm2; CEMENTO sáb vie
30 días 52,43
TIPO 1 20/12/14 23/01/15
COLUMNAS-ENCOFRADO Y DESENCOFRADO vie sáb
32 días 55CC-1 día
NORMAL 19/12/14 24/01/15
mié sáb
COLUMNAS.- ACERO FY=4200 KG/CM 21 días 55CF
26/11/14 20/12/14
mié sáb
PLACAS 52 días 26/11/14 24/01/15
PLACAS.- CONCRETO F'c=210 kg/cm2; CEMENTO TIPO sáb vie
30 días 55CC
1 20/12/14 23/01/15
vie sáb
PLACAS-ENCOFRADO Y DESENCOFRADO NORMAL 32 días 59CC-1 día
19/12/14 24/01/15
mié sáb
PLACAS.- ACERO FY=4200 KG/CM 21 días 59CF
26/11/14 20/12/14
mar vie
VIGAS 52 días 30/12/14 27/02/15
vie jue
VIGAS.- CONCRETO F'c=210 kg/cm2; CEMENTO TIPO 30 días 55,57
23/01/15
jue 26/02/15
vie
VIGAS-ENCOFRADO Y DESENCOFRADO NORMAL 32 días 63CC-1 día
22/01/15 27/02/15
mar vie
VIGAS.- ACERO FY=4200 KG/CM2 21 días 63CF
30/12/14 23/01/15
mar jue
LOSA ALIGERADA 51 días 30/12/14 26/02/15
vie jue
LOSA ALIGERADA-CONCRETO F´c=210 kg/cm2 30 días 63FF
23/01/15 26/02/15
LOSA ALIGERADA-ENCOFRADO Y DESENCOFRADO jue mié
30 días 67CC-1 día
NORMAL 22/01/15 25/02/15
mar vie
ACERO DE REFUERZO EN LOSAS 21 días 65FF
30/12/14 23/01/15
mar mié 68FF
LOSAS ALIGERADAS.- LADRILLO HUECO 30x30x15 cm 20 días
03/02/15 25/02/15
mar mié 68FF
LOSAS ALIGERADAS.- LADRILLO HUECO 30x30x20 cm 20 días
03/02/15 25/02/15
sáb vie
LOSA MACIZA 42 días 10/01/15 27/02/15
mié jue
LOSA MACIZA 20 días 67FF
04/02/15 26/02/15
LOSA MACIZA-ENCOFRADO Y DESENCOFRADO mar vie
22 días 73CC-1 día
NORMAL 03/02/15 27/02/15
sáb mié
ACERO DE REFUERZO EN LOSAS 21 días 73CF
10/01/15 04/02/15
jue vie
ESCALERA 38 días 19/02/15 03/04/15
ESCALERA.- CONCRETO F'c=210 kg/cm2; CEMENTO jue jue
30 días 63
TIPO 1 26/02/15 02/04/15
mié vie
ESCALERA-ENCOFRADO Y DESENCOFRADO NORMAL 32 días 77CC-1 día
25/02/15 03/04/15
jue jue
ESCALERA.- ACERO FY=4200 KG/CM2 7 días 77CF
19/02/15 26/02/15
jue jue
ARQUITECTURA 147 días 04/12/14 21/05/15
mar lun
ALBAÑILERIA 97 días 09/12/14 30/03/15
mar dom
MURO DE LADRILLO KK DE SOGA 60 días 46
09/12/14 15/02/15
mar dom
MURO DE LADRILLO KK DE CABEZA 60 días 82FF
09/12/14 15/02/15
sáb lun
TABIQUERIA DRYWALL DOS LADOS 7 días ###
21/03/15 30/03/15
sáb lun
TABIQUERIA DRYWALL EN DINTELES 7 días ###
21/03/15 30/03/15
sáb lun
TABIQUERIA SUPERBOARD 7 días ###
21/03/15 30/03/15
vie jue
REVOQUES Y ENLUCIDOS 66 días 23/01/15 09/04/15
lun lun
TARRAJEO FROTACHADO MUROS INTERIORES 25 días 82
16/02/15
jue 16/03/15
lun
TARRAJEO FROTACHADO MUROS EXTERIOR 15 días 82,55,63,67
26/02/15 16/03/15
TARRAJEO FROTACHADO EN MUROS EXTERNOS lun jue
COLINDANTES CON VECINOS
21 días 16/03/15 09/04/15 89
vie lun
TARRAJEO IMPERMEABILIZADO 2 días 55
23/01/15 26/01/15
mié lun
TARRAJEO DE COLUMNAS 10 días 88FF,89FF
04/03/15 16/03/15
jue jue
TARRAJEO DE VIGAS 6 días 63,67
26/02/15
lun 05/03/15
vie
VESTIDURA DE DERRAMES (e = 0,15) 4 días 88,89
16/03/15
jue 20/03/15
vie
VESTIDURA DE FONDO ESCALERA 1 día 77
02/04/15 03/04/15
jue mié
CIELORASOS 35 días 26/02/15 08/04/15
jue mié
CIELORRASO C/MEZCLA C:A 1:5 35 días 67,93FF
26/02/15 08/04/15
jue mié
CIELORRASO CON IMPERMEABILIZANTE 5 días 59,73
26/02/15 04/03/15
jue sáb
FALSO CIELO CON BALDOSAS ACUSTICA 20 días 67,73
26/02/15 21/03/15
sáb 67,73
FALSO CIELO RASO CON DRYWALL 20 días jue 26/02/15
21/03/15
FALSO CIELORRASO CON DRYWALL CON PERFILES jue vie
7 días 67,73
METALICOS EN T INVERTIDA 26/02/15 06/03/15
FALSO CIELO RASO CON BALDOSA DE PLACA YESO
CARTON+LAMINA PVC DE 60 X 60 CM 7 días jue 26/02/15 vie 06/03/15 67,73

PISOS 95 días jue lun


04/12/14 23/03/15

CONTRAPISO E=0.05 10 días jue mar 49,67


26/02/15 10/03/15

PISO PORCELANATO 2 días mar jue 104


10/03/15 12/03/15

PISO CERAMICO ANTIDESLIZANTE 10 días mar sáb 104


10/03/15 21/03/15

PISO DE CEMENTO SEMI-PULIDO Y BRUÑADO 6 días mar mar 38,104


10/03/15 17/03/15

PISO DE CEMENTO SEMI-PULIDO 6 días mar mar 107FF


10/03/15 17/03/15
vie mar
PISO DE CEMENTO PULIDO E IMPERMEABILIZADO 3 días 108FF
13/03/15 17/03/15
mar vie
PISO TECNICO 3 días 104
10/03/15 13/03/15
vie mar
PISO DE CEMENTO FROTACHADO Y BRUÑADO 15 días 107FF
27/02/15 17/03/15
jue jue
RAMPA 6 días 39
04/12/14 11/12/14
jue mar
VEREDA 4 días 39
04/12/14 09/12/14
jue dom
PATIO 15 días 39
04/12/14 21/12/14
REVESTIMIENTO DE PASO Y CONTRAPASO CON mar mar
6 días 104
PORCELANATO 10/03/15 17/03/15
REVESTIMIENTO DE GRADA CON CEMENTO lun mar
7 días 108FF
SEMIPULIDO 09/03/15 17/03/15
mar lun
CANTONERA DE FIERRO EN ESCALERA 5 días 115,116
17/03/15 23/03/15
mar sáb
CANTONERA DE TERRAZO LAVADO 4 días 104
10/03/15 14/03/15
lun jue
CONTRAZOCALOS 15 días 16/03/15 02/04/15
lun jue
CONTRAZOCALO DE CEMENTO PULIDO H=0.20 15 días 88,89
16/03/15
lun 02/04/15
jue
CONTRAZOCALO DE PORCELANATO 15 días 88,89
16/03/15 02/04/15
lun mié
CONTRAZOCALO CERAMICO PIRITA BLANCO 2 días 88,89
16/03/15 18/03/15
lun mié
CONTRAZOCALO DE PVC 2 días 88,89
16/03/15 18/03/15
lun vie
CONTRAZOCALO DE GRANITO 4 días 88,89
16/03/15 20/03/15
sáb jue
ZOCALOS 10 días 21/03/15 02/04/15
sáb jue 88,89,105,1
ZOCALO DE CERAMICO 10 días 21/03/15 02/04/15 06
sáb mar 88,89,105,1
ZOCALO DE PORCELANATO 2 días 21/03/15 24/03/15 06
jue mar
CUBIERTAS 10 días 26/02/15 10/03/15
jue mar
LADRILLO PASTELERO 10 días 67
26/02/15 10/03/15
lun jue
CARPINTERIA DE MADERA 21 días 16/03/15 09/04/15
lun jue
PUERTAS DE MADERA 21 días 88,89,92,93
16/03/15
lun 09/04/15
jue
TABIQUERIA DE MELAMINE EN BAÑOS H=1.70 M 3 días 131FF
06/04/15
jue 09/04/15
jue
TABIQUERIA DE MELAMINE EN BAÑOS H=2.10 M 6 días 131FF
02/04/15 09/04/15
lun jue
CARPINTERIA METALICA Y HERRERIA 15 días 23/03/15 09/04/15
lun jue
PUERTAS CONTRAPLACADA METAL CORTAFUEGOS 15 días 131FF
23/03/15
lun 09/04/15
jue
PUERTA METALICA PARA INGRESO DE PERSONAL 15 días 135FF
23/03/15
lun 09/04/15
jue
PUERTA METALICA DE MALLA ELECTROSOLDADA 15 días 136FF
23/03/15
lun 09/04/15
jue
PUERTA METALICA LEVADIZA SECCIONABLE 15 días 137FF
23/03/15
vie 09/04/15
jue
ESCALERA GATO 5 días 135FF
03/04/15 09/04/15
PASAMANO DE FIERRO DIAMETRO 2" CON 2 FIERROS
DE 1" 5 días vie 03/04/15 jue 09/04/15 135FF
PASAMANO DE FIERRO DIAMETRO 2" CON 4 FIERROS
DE 1" 5 días vie 03/04/15 jue 09/04/15 140FF
PASAMANO DE FIERRO DIAMETRO 2" CON TUBOS
SUJETADORES DE 1/2" 5 días vie 03/04/15 jue 09/04/15 140FF
PASAMANO DE FIERRO DIAMETRO 2" CON VIDRIO
INCOLORO TEMPLADO E=6 MM 5 días vie 03/04/15 jue 09/04/15 140FF
BARANDA DE FIERRO DIAMETRO 2" (RAMPA) 5 días vie 03/04/15 jue 09/04/15 140FF
jue sáb
VIDRIOS, CRISTALES Y SIMILARES 15 días 09/04/15 25/04/15
sáb 130,134
VENTANA DE VIDRIO LAMINADO E=8. MM 15 días jue 09/04/15
25/04/15
sáb
MAMPARA CRISTAL TEMPLADO E=10MM 15 días jue 09/04/15 146FF
25/04/15
sáb
MAMPARA DE VIDRIO LAMINADO E=10MM 15 días jue 09/04/15 146FF
25/04/15
sáb
MAMPARA DE VIDRIO LAMINADO E=10MM 15 días jue 09/04/15 146FF
25/04/15
ESPEJOS DE VIDRIO DOBLE E=4 MM EN MARCO DE sáb 146FF
ALUMINIO 15 días jue 09/04/15
25/04/15
ESPEJOS DE VIDRIO DOBLE E=4 MM EN MARCO DE sáb 146FF
MADERA 15 días jue 09/04/15
25/04/15
sáb sáb
CERRAJERIA 7 días 18/04/15 25/04/15
sáb sáb 130FF,145FF
BISAGRA CAPUCHINA ALUMINIZADA 7 días 18/04/15 25/04/15 ,134FF
sáb sáb 130FF,145FF
CERRADURA CON PALETA LATERAL 7 días 18/04/15 25/04/15 ,134FF
sáb sáb 130FF,145FF
CIERRAPUERTAS HIDRAULICAS 7 días 18/04/15 25/04/15 ,134FF
sáb sáb 130FF,145FF
BARRA ANTIPANICO 7 días 18/04/15 25/04/15 ,134FF
sáb sáb 130FF,145FF
CERRADURA DE POMO 7 días 18/04/15 25/04/15 ,134FF
sáb sáb 130FF,145FF
BISAGRA TIPO PIVOT EUROPEO 7 días 18/04/15 25/04/15 ,134FF
sáb sáb 130FF,145FF
BISAGRA ALTA DE ROTACION 7 días
18/04/15 25/04/15 ,134FF
sáb sáb 130FF,145FF
BISAGRA BAJA DE ROTACION 7 días
18/04/15 25/04/15 ,134FF
sáb sáb 130FF,145FF
CERRADURA ALTA(PICAPORTE) 7 días
18/04/15 25/04/15 ,134FF
sáb sáb 130FF,145FF
CERRADURA DE PISO 7 días
18/04/15 25/04/15 ,134FF
sáb sáb 130FF,145FF
FRENO HIDRAULICO 7 días
18/04/15 25/04/15 ,134FF
sáb sáb 130FF,145FF
TIRADOR DE ACERO 7 días
18/04/15 25/04/15 ,134FF
sáb jue
PINTURA 22 días 25/04/15 21/05/15
88,89,92,93,
sáb vie
PINTURA EN INTERIORES 17 días 97,131,135,
25/04/15 15/05/15 145
sáb vie
PINTURA EN EXTERIORES 17 días 166FF
25/04/15 15/05/15
sáb
PINTURA LATEX 2 MANOS EN CIELO RASO Y VIGAS 17 días vie 15/05/15 166FF
25/04/15
PINTURA EPOXICA EN PISO 5 días vie 15/05/15 jue 21/05/15 166
jue sáb
APARATOS Y ACCESORIOS SANITARIOS 21 días 09/04/15 02/05/15
jue sáb
INODORO 21 días 131,135
09/04/15 02/05/15
jue sáb
LAVATORIO OVALIN 21 días 171FF
09/04/15 02/05/15
sáb 171FF
LAVATORIO MANANTIAL CON GRIFERIA TEMPORIZADA 21 días jue 09/04/15
02/05/15
LAVATORIO ANCON GRANDE BLANCO CON GRIFERIA sáb 171FF
TEMPORIZADA 21 días jue 09/04/15
02/05/15
sáb 171FF
LAVADERO DE ACERO INOXIDABLE 21 días jue 09/04/15
02/05/15
sáb
URINARIO ACADEMY CON VALVULA FLUXOMETRICA 21 días jue 09/04/15 171FF
02/05/15
sáb
LLAVE SIMPLE DE BRONCE DE 8" P/DUCHA 21 días jue 09/04/15 171FF
02/05/15
sáb
PAPELERA DE ACERO INOX. 21 días jue 09/04/15 171FF
02/05/15
DISPENSADOR DE JABON LIQUIDO(ADOSADO CON sáb 171FF
ACERO INOXIDABLE) 21 días jue 09/04/15
02/05/15
sáb 171FF
AGARRADERA TUBULAR CROMADA D=1 1/2" 21 días jue 09/04/15
02/05/15
sáb
COLOCACION DE APARATOS SANITARIOS 21 días jue 09/04/15 171FF
02/05/15
COLOCACION DE ACCESORIOS SANITARIOS 21 días jue sáb 171FF
09/04/15 02/05/15

VARIOS 143 días mar jue


09/12/14 21/05/15
sáb
LIMPIEZA PERMANENTE DE OBRA 120 días jue 21/05/15 165FF
03/01/15
mar 113
BRUÑAS SEGUN DETALLE (1CM) 3 días vie 12/12/14
09/12/14
mar 104
SARDINEL PERALTADO E=0.15 m 3 días vie 13/03/15
10/03/15
mar ###
TOPELLANTAS 0.20x0.15 m 5 días lun 23/03/15
17/03/15
MESA DE CONCRETO E=0.10 M PARA OVALINES mar mié ###
REVESTIDO CON TERRAZO 7 días
17/03/15 25/03/15
mar mié ###
SEMBRIO DE GRASS EN CHAMPAS 7 días
17/03/15 25/03/15
mar mié ###
FALSA COLUMNA DE DRYWALL 7 días
17/03/15 25/03/15
mar mié ###
PANEL DE ALUMINIO COMPUESTO ALUCOBOND 7 días
17/03/15 25/03/15
mar mié ###
PICTOGRAMAS DE SEÑALIZACIÓN – DEFENSA CIVIL 7 días
17/03/15 25/03/15
mar mié ###
EXTINTOR DE POLVO QUIMICO SECO 7 días
17/03/15 25/03/15
mar mié ###
EXTINTOR DE CO2 7 días
17/03/15 25/03/15
vie mar
INSTALACIONES SANITARIAS 187 días 21/11/14 23/06/15
vie jue
TRABAJOS PRELIMINARES 115 días 21/11/14 02/04/15
vie jue
EXCAVACION 5 días 21/11/14 27/11/14 34
mar 197
REFINE Y NIVELACION DE FONDO DE ZANJA A=0.40 m. 10 días jue 27/11/14
09/12/14
mar sáb 198
CAMA DE ARENA e=0.10 m. 10 días
09/12/14 20/12/14
sáb 201,242
RELLENO Y COMPACTACION MANUAL DE ZANJA 10 días jue 02/04/15
21/03/15
mar sáb
RED DE AGUA FRIA 35 días 10/02/15 21/03/15
mar jue
TUBERIAS 15 días 10/02/15 26/02/15
mar jue
TUBERIAS DE PVC CL-10 ROSCADO D=2" (COLGADO) 15 días 197FF,67FF
10/02/15 26/02/15
TUBERIA DE PVC CL-10 ROSCADO D=1 mar
1/2"(COLGADA) 15 días jue 26/02/15 203FF
10/02/15
mar
TUBERIA DE PVC CL-10 ROSCADO D=1 1/2" 15 días jue 26/02/15 203FF
10/02/15
TUBERIA DE PVC CL-10 ROSCADO D=1 mar
1/4"(COLGADA) 15 días jue 26/02/15 203FF
10/02/15
mar
TUBERIA DE PVC CL-10 ROSCADO D=1 1/4" 15 días jue 26/02/15 203FF
10/02/15
mar
TUBERIA DE PVC CL-10 ROSCADO D=3/4" COLGADO 15 días jue 26/02/15 203FF
10/02/15
mar
TUBERIA DE PVC CL-10 ROSCADO D=3/4" 15 días jue 26/02/15 203FF
10/02/15
mar
TUBERIA DE PVC CL-10 ROSCADO D=1/2"(COLGADO) 15 días jue 26/02/15 203FF
10/02/15
mar
TUBERIA DE PVC CL-10 ROSCADO D=1/2" 15 días jue 26/02/15 203FF
10/02/15
mar jue
ACEESORIOS 15 días 10/02/15 26/02/15
mar
CODO DE PVC CL-10 ROSCADO DE 2" x 90° 15 días jue 26/02/15 202FF
10/02/15
mar
CODO DE PVC CL-10 ROSCADO DE 1 1/2" x 90° 15 días jue 26/02/15 202FF
10/02/15
mar
CODO DE PVC CL-10 ROSCADO DE 1 1/4" x 90° 15 días jue 26/02/15 202FF
10/02/15
mar
CODO DE PVC CL-10 ROSCADO DE 3/4" x 90° 15 días jue 26/02/15 202FF
10/02/15
mar
CODO DE PVC CL-10 ROSCADO DE 1/2" x 90° 15 días jue 26/02/15 202FF
10/02/15
mar
TEE DE PVC CL-10 ROSCADO DE 2" 15 días jue 26/02/15 202FF
10/02/15
mar
TEE DE PVC CL-10 ROSCADO DE 1 1/2" 15 días jue 26/02/15 202FF
10/02/15
mar
TEE DE PVC CL-10 ROSCADO DE 1 1/4" 15 días jue 26/02/15 202FF
10/02/15
mar
TEE DE PVC CL-10 ROSCADO DE 3/4" 15 días jue 26/02/15 202FF
10/02/15
mar
REDUCCION DE PVC CL-10 ROSCADO DE 2" A 1 1/2" 15 días jue 26/02/15 202FF
10/02/15
mar
REDUCCION DE PVC CL-10 ROSCADO DE 2" A 3/4" 15 días jue 26/02/15 202FF
10/02/15
mar
REDUCCION DE PVC CL-10 ROSCADO DE 2" A 1/2" 15 días jue 26/02/15 202FF
10/02/15
REDUCCION DE PVC CL-10 ROSCADO DE 1 1/2" A 1 mar
1/4" 15 días jue 26/02/15 202FF
10/02/15
mar
REDUCCION DE PVC CL-10 ROSCADO DE 1 1/2" A 1/2" 15 días jue 26/02/15 202FF
10/02/15
mar
REDUCCION DE PVC CL-10 ROSCADO DE 1 1/4" A 3/4" 15 días jue 26/02/15 202FF
10/02/15
mar
REDUCCION DE PVC CL-10 ROSCADO DE 1 1/4" A 1/2" 15 días jue 26/02/15 202FF
10/02/15
mar
REDUCCION DE PVC CL-10 ROSCADO DE 3/4" A 1/2" 15 días jue 26/02/15 202FF
10/02/15
jue mié
VALVULAS 5 días 26/02/15 04/03/15
jue mié
VALVULAS ESFERICAS DE BRONCE D=1 1/2" 5 días 203
26/02/15 04/03/15
mié 203
VALVULAS ESFERICAS DE BRONCE DE D=1 1/4" 5 días jue 26/02/15
04/03/15
mié
VALVULAS ESFERICAS DE BRONCE 3/4" 5 días jue 26/02/15 203
04/03/15
mié
VALVULAS ESFERICAS DE BRONCE 1/2" 5 días jue 26/02/15 203
04/03/15
mié lun
SALIDAS 10 días 04/03/15 16/03/15
mié lun
SALIDAS PARA AGUA D=1/2" 10 días 231
04/03/15 16/03/15
mié 231
SALIDA DE AGUA FRIA DE PVC SAP Ø 1" 10 días lun 16/03/15
04/03/15
mié
SALIDA DE AGUA FRIA CON TUBERIA DE PVC 1 1/4" 10 días lun 16/03/15 231
04/03/15
mié sáb
EQUIPOS DE BOMBEO 15 días 04/03/15 21/03/15
mié sáb
SUMINISTRO DE EQUIPOS 15 días 91,203,231
04/03/15 21/03/15
mié sáb
INSTALACION DE EQUIPOS 15 días 91,203,231
04/03/15 21/03/15
mié sáb
RED DE DESAGUE 40 días 04/02/15 21/03/15
mié jue
TUBERIAS PVC C-10 20 días 04/02/15 26/02/15
mié
TUBERIA DE PVC CL-10 ROSCADO D=3/4" COLGADO 20 días jue 26/02/15 197FF,67FF
04/02/15
mié
TUBERIA DE PVC CL-10 ROSCADO D=1"(COLGADA) 20 días jue 26/02/15 197FF,67FF
04/02/15
mié jue
TUBERIA PVC SAL 20 días 04/02/15 26/02/15
mié 244FF
TUBERIA DE PVC SAL 6" 20 días jue 26/02/15
04/02/15
mié
TUBERIA DE PVC SAL 6" (COLGADA) 20 días jue 26/02/15 244FF
04/02/15
mié
TUBERIA DE PVC SAL 4" 20 días jue 26/02/15 244FF
04/02/15
mié
TUBERIA DE PVC SAL 4" (COLGADA) 20 días jue 26/02/15 244FF
04/02/15
mié
TUBERIA DE PVC SAL 3" 20 días jue 26/02/15 244FF
04/02/15
mié
TUBERIA DE PVC SAL 3" (COLGADA) 20 días jue 26/02/15 244FF
04/02/15
mié
TUBERIA DE PVC SAL 2" 20 días jue 26/02/15 244FF
04/02/15
mié
TUBERIA DE PVC SAL 2" (COLGADA) 20 días jue 26/02/15 244FF
04/02/15
jue sáb
SALIDAS 20 días 26/02/15 21/03/15
jue sáb 244,49,104F
SALIDA PARA DESAGUE D=2" 20 días 26/02/15 21/03/15 F
jue sáb 244,49,104F
SALIDA PARA DESAGUE D=3" 20 días 26/02/15 21/03/15 F
jue sáb 244,49,104F
SALIDA PARA DESAGUE D=4" 20 días 26/02/15 21/03/15 F
sáb 244,49,104F
SALIDA DE VENTILACION CON TUBERIA PVC 2" 20 días jue 26/02/15 F
21/03/15
sáb 244,49,104F
SUMIDERO CON REJILLA DE BRONCE DE 2" 20 días jue 26/02/15 F
21/03/15
sáb 244,49,104F
SUMIDERO CON REJILLA DE BRONCE DE 3" 20 días jue 26/02/15 F
21/03/15
sáb 244,49,104F
SUMIDERO CON SIFON DE ACERO IINOXIDABLE DE 3" 20 días jue 26/02/15 F
21/03/15
sáb 244,49,104F
REGISTRO ROSCADO DE BRONCE CROMADO DE 2" 20 días jue 26/02/15 F
21/03/15
sáb 244,49,104F
REGISTRO ROSCADO DE BRONCE CROMADO DE 3" 20 días jue 26/02/15 F
21/03/15
REGISTRO ROSCADO DE BRONCE CROMADO DE 3" sáb 244,49,104F
(COLGADO) 20 días jue 26/02/15 F
21/03/15
sáb 244,49,104F
REGISTRO ROSCADO DE BRONCE CROMADO DE 4" 20 días jue 26/02/15 F
21/03/15
REGISTRO ROSCADO DE BRONCE CROMADO DE 4" sáb 244,49,104F
(COLGADO) 20 días jue 26/02/15 F
21/03/15
REGISTRO ROSCADO DE BRONCE CROMADO DE 6" sáb 244,49,104F
(COLGADO) 20 días jue 26/02/15 F
21/03/15
jue sáb
ACCESORIOS 20 días 26/02/15 21/03/15
sáb 244,49,104F
CODO DE PVC CL-10 ROSCADO DE 3/4" x 90° 20 días jue 26/02/15 F
21/03/15
sáb 244,49,104F
CODO DE PVC CL-10 ROSCADO DE 3/4" x 45° 20 días jue 26/02/15 F
21/03/15
sáb 244,49,104F
CODO DE PVC CL-10 ROSCADO DE 1" x 45° 20 días jue 26/02/15 F
21/03/15
sáb 244,49,104F
TEE DE PVC CL-10 ROSCADO DE 1" 20 días jue 26/02/15 F
21/03/15
sáb 244,49,104F
REDUCCION DE PVC CL-10 ROSCADO DE 1" A 3/4" 20 días jue 26/02/15 F
21/03/15
sáb 244,49,104F
REDUCCION PVC SAL DE 4" A 1" 20 días jue 26/02/15 F
21/03/15
sáb 244,49,104F
ADAPTADOR PRESION ROSCA DE 1" 20 días jue 26/02/15 F
21/03/15
sáb 244,49,104F
ADAPTADOR PRESION ROSCA DE 3/4" 20 días jue 26/02/15 F
21/03/15
sáb 244,49,104F
REDUCCION PVC SAL DE 3" A 1" 20 días jue 26/02/15 F
21/03/15
sáb 244,49,104F
CODO DE PVC SAL DE 4" x 45° 20 días jue 26/02/15 F
21/03/15
sáb 244,49,104F
CODO DE PVC SAL DE 3" x 90° 20 días jue 26/02/15 F
21/03/15
sáb 244,49,104F
CODO DE PVC SAL DE 3" x 45° 20 días jue 26/02/15 F
21/03/15
sáb 244,49,104F
CODO DE PVC SAL DE 2" x 45° 20 días jue 26/02/15 F
21/03/15
sáb 244,49,104F
CODO DE PVC SAL DE 2" x 90° 20 días jue 26/02/15 F
21/03/15
sáb 244,49,104F
TEE DE PVC SAL DE 3" 20 días jue 26/02/15 F
21/03/15
sáb 244,49,104F
TEE DE PVC SAL DE 4" 20 días jue 26/02/15 F
21/03/15
sáb 244,49,104F
YEE DE PVC SAL DE 3" x 3" 20 días jue 26/02/15 F
21/03/15
sáb 244,49,104F
YEE DE PVC SAL DE 4" x 4" 20 días jue 26/02/15 F
21/03/15
sáb 244,49,104F
YEE DE PVC SAL DE 6" x 6" 20 días jue 26/02/15 F
21/03/15
sáb 244,49,104F
YEE DOBLE DE PVC SAL DE 4" x 4" 20 días jue 26/02/15 F
21/03/15
sáb 244,49,104F
REDUCCION PVC SAL DE 3" A 2" 20 días jue 26/02/15 F
21/03/15
sáb 244,49,104F
REDUCCION PVC SAL DE 4" A 3" 20 días jue 26/02/15 F
21/03/15
sáb 244,49,104F
REDUCCION PVC SAL DE 4" A 2" 20 días jue 26/02/15 F
21/03/15
sáb 244,49,104F
REDUCCION PVC SAL DE 6" A 4" 20 días jue 26/02/15 F
21/03/15
sáb 244,49,104F
REDUCCION PVC SAL DE 6" A 3" 20 días jue 26/02/15 F
21/03/15
sáb 244,49,104F
REDUCCION PVC SAL DE 6" A 2" 20 días jue 26/02/15 F
21/03/15
jue mié
EQUIPO DE BOMBEO, INCLUYE TABLERO 5 días 26/02/15 04/03/15
jue mié
SUMINISTRO DE EQUIPO DE BOMBEO 5 días 244,91
26/02/15 04/03/15
jue mié
INSTALACION DE EQUIPOS DE BOMBEO 5 días 297FF
26/02/15 04/03/15
mié mar
RED DE AGUA CONTRAINCENDIO 67 días 08/04/15 23/06/15
mié lun
TUBERIAS SCH 40 60 días 08/04/15 15/06/15
mié lun
TUBERIA DE ACERO CEDULA 40 D = 4" (COLGADA) 60 días 97
08/04/15 15/06/15
mié 97
TUBERIA DE ACERO CEDULA 40 D = 4" 60 días lun 15/06/15
08/04/15
mié
TUBERIA DE ACERO CEDULA 40 D = 3" (COLGADA) 60 días lun 15/06/15 97
08/04/15
mié 97
TUBERIA DE ACERO CEDULA 40 D = 2 1/2" (COLGADA) 60 días lun 15/06/15
08/04/15
mié 97
TUBERIA DE ACERO CEDULA 40 D = 2" 60 días lun 15/06/15
08/04/15
mié
TUBERIA DE ACERO CEDULA 40 D = 2" (COLGADA) 60 días lun 15/06/15 97
08/04/15
mié 97
TUBERIA DE ACERO CEDULA 40 D = 1 1/2" (COLGADA) 60 días lun 15/06/15
08/04/15
mié 97
TUBERIA DE ACERO CEDULA 40 D = 1 1/4" (COLGADA) 60 días lun 15/06/15
08/04/15
mié 97
TUBERIA DE ACERO CEDULA 40 D = 1" (COLGADA) 60 días lun 15/06/15
08/04/15
EQUIPOS DE BOMBEO 7 días lun mar
15/06/15 23/06/15

SUMINISTRO DE EQUIPO 7 días lun mar 301


15/06/15 23/06/15

INSTALACION DE EQUIPO 7 días lun mar 301


15/06/15 23/06/15

VALVULAS 30 días mar lun


12/05/15 15/06/15
mar
VALVULA SIAMESA 4"x2 1/2"x2 1/2" 30 días lun 15/06/15 300FF
12/05/15
mar
VALVULA DE BOLA D=1" 30 días lun 15/06/15 300FF
12/05/15
mar
VALVULA MARIPOSA 4" 30 días lun 15/06/15 300FF
12/05/15
mar
VALVULA ANGULAR 2 1/2" 30 días lun 15/06/15 300FF
12/05/15
jue mar
ACCESORIOS 60 días 16/04/15 23/06/15
mar 313FF,310FF
SUMINISTRO DE ROCIADORES TIPO UP RIGHT DE 3/4 60 días jue 16/04/15 ,300FF
23/06/15
SUMINISTRO DE ROCIADORES TIPO PENDIENT 1/2" mar 313FF,310FF
DE 68°C 60 días jue 16/04/15 ,300FF
23/06/15
SUMINISTRO DE ROCIADORES TIPO PENDIENT 1/2" mar 313FF,310FF
DE 93°C 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
COLOCACION DE ROCIADORES 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
GABINETE DE AGUA CONTRA INCENDIOS DE 2 1/2" 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
GABINETE DE AGUA CONTRA INCENDIOS DE 2" 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
ESTACION DE CONTROL DE ROCIADORES 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
CODO DE ACERO CEDULA 40 DE 1"x90º 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
CODO DE ACERO CEDULA 40 DE 1 1/4"x90º 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
CODO DE ACERO CEDULA 40 DE 1 1/2"x90º 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
CODO DE ACERO CEDULA 40 DE 2"x90º 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
CODO DE ACERO CEDULA 40 DE 2 1/2"x90º 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
CODO DE ACERO CEDULA 40 DE 3"x90º 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
CODO DE ACERO CEDULA 40 DE 4"x90º 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
CRUZ DE ACERO CEDULA 40 DE 1 1/2" 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
CRUZ DE ACERO CEDULA 40 DE 2" 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
CRUZ DE ACERO CEDULA 40 DE 2 1/2" 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
CRUZ DE ACERO CEDULA 40 DE 3" 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
TEE DE ACERO CEDULA 40 DE 1" 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
TEE DE ACERO CEDULA 40 DE 1 1/4" 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
TEE DE ACERO CEDULA 40 DE 1 1/2" 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
TEE DE ACERO CEDULA 40 DE 2" 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
TEE DE ACERO CEDULA 40 DE 2 1/2" 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
TEE DE ACERO CEDULA 40 DE 3" 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
TEE DE ACERO CEDULA 40 DE 4" 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
REDUCCION DE ACERO CEDULA 40 DE 4" A 3" 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
REDUCCION DE ACERO CEDULA 40 DE 4 A 2 1/2" 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
REDUCCION DE ACERO CEDULA 40 DE 4" A 2" 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
REDUCCION DE ACERO CEDULA 40 DE 3" A 2 1/2" 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
REDUCCION DE ACERO CEDULA 40 DE 3" A 2" 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
REDUCCION DE ACERO CEDULA 40 DE 3" A 1 1/4" 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
REDUCCION DE ACERO CEDULA 40 DE 3" A 1" 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
REDUCCION DE ACERO CEDULA 40 DE 2 1/2" A 2" 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
REDUCCION DE ACERO CEDULA 40 DE 2 1/2" A 1 1/2" 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
REDUCCION DE ACERO CEDULA 40 DE 2 1/2" A 1 1/4" 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
REDUCCION DE ACERO CEDULA 40 DE 2 1/2" A 1" 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
REDUCCION DE ACERO CEDULA 40 DE 2" A 3/4" 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
REDUCCION DE ACERO CEDULA 40 DE 2" A 1 1/2" 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
REDUCCION DE ACERO CEDULA 40 DE 2" A 1 1/4" 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
REDUCCION DE ACERO CEDULA 40 DE 2" A 1" 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
REDUCCION DE ACERO CEDULA 40 DE 1 1/2" A 1 1/4" 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
REDUCCION DE ACERO CEDULA 40 DE 1 1/2" A 1" 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
REDUCCION DE ACERO CEDULA 40 DE 1 1/4" A 1" 60 días jue 16/04/15 ,300FF
23/06/15
mar 313FF,310FF
REDUCCION DE ACERO CEDULA 40 DE 1" A 1/2" 60 días jue 16/04/15 ,300FF
23/06/15
sáb mar
VARIOS 21 días 30/05/15 23/06/15
300FF,310FF
mar ,313FF,318F
PRUEBA HIDRAULICA DE TUBERIA DE DESAGUE 3 días vie 19/06/15
23/06/15 F
300FF,310FF
PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA DE mar ,313FF,318F
AGUA 3 días vie 19/06/15
23/06/15 F
300FF,310FF
PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA mar ,313FF,318F
ACI 3 días vie 19/06/15
23/06/15 F
300FF,310FF
mar ,313FF,318F
DESINFECCION DE CISTERNA ACI 3 días vie 19/06/15
23/06/15 F
300FF,310FF
mar ,313FF,318F
DESINFECCION DE CISTERNA(CONSUMO HUMANO) 3 días vie 19/06/15
23/06/15 F
300FF,310FF
mar ,313FF,318F
TAPA DE CISTERNA 0.60x0.60 M. (PLANCHA 3/16") 7 días lun 15/06/15
23/06/15 F
300FF,310FF
mar ,313FF,318F
TAPA METALICA PARA POZO SUMIDERO 7 días lun 15/06/15
23/06/15 F
300FF,310FF
mar ,313FF,318F
REJILLA METALICA EN CUARTO DE BOMBAS 7 días lun 15/06/15
23/06/15 F
300FF,310FF
CUNETA A=10 CM EN TECHO CON CEMENTO PULIDO mar ,313FF,318F
IMPERMEABILIZADO 7 días lun 15/06/15
23/06/15 F
300FF,310FF
mar ,313FF,318F
SOMBRERO DE VENTILACION DE 2" 7 días lun 15/06/15
23/06/15 F
300FF,310FF
mar ,313FF,318F
GRIFO PARA RIEGO DE 1/2" 7 días lun 15/06/15
23/06/15 F
300FF,310FF
NICHO INC. MARCO Y TAPA EN MURO PARA ALOJAR sáb mar ,313FF,318F
VALVULAS ESFERICAS 15 días
06/06/15 23/06/15 F
300FF,310FF
sáb mar ,313FF,318F
SUMINISTRO DE CALENTADOR DE AGUA PARA 110LT 21 días
30/05/15 23/06/15 F
300FF,310FF
sáb mar ,313FF,318F
INSTALACION DE CALENTADOR DE AGUA PARA 110 LT 21 días
30/05/15 23/06/15 F
300FF,310FF
sáb mar ,313FF,318F
CAJA DE REGISTRO ALB. DE 12" x 24" P/DESAGUE 15 días
06/06/15 23/06/15 F
300FF,310FF
sáb mar ,313FF,318F
CAJA DE REGISTRO DE 24" x 24" P/DESAGUE 15 días
06/06/15 23/06/15 F
mar mar
INSTALACIONES ELECTRICAS Y ELECTROMECANICAS 123 días 10/02/15 30/06/15
mar mar
INSTALACIONES ELECTRICAS 123 días 10/02/15 30/06/15
mar mié
SALIDAS 50 días 10/02/15 08/04/15
mar jue
SALIDAS PARA CENTRO DE LUZ 15 días 67FF
10/02/15 26/02/15
mar jue
SALIDA EN PARED 15 días 383FF
10/02/15 26/02/15
mar jue
SALIDA PARA LUMINARIA DE EMERGENCIA 15 días 383FF
10/02/15 26/02/15
SALIDA PARA TOMACORRIENTE DOBLE CON PUESTA
A TIERRA 15 días jue 26/02/15 lun 16/03/15 88FF
SALIDA P/TOMACORRIENTE DOBLE ALTO C/PUESTA A
TIERRA DE 15A.220V 15 días jue 26/02/15 lun 16/03/15 88FF
SALIDA P/TOMACORRIENTE DOBLE ALTO C/PUESTA A
TIERRA A PRUEBA DE AGUA 15 días jue 26/02/15 lun 16/03/15 88FF
SALIDA PARA TOMACORRIENTE DOBLE
ESTABILIZADA 15A, SERIE MAGIC 15 días jue 26/02/15 lun 16/03/15 88FF
SALIDA P/TOMACORRIENTE ALTO DOBLE
ESTABILIZADO 15 A, SERIE MAGIC 15 días jue 26/02/15 lun 16/03/15 88FF
SALIDA PARA TOMACORRIENTE DOBLE
ESTABILIZADA 15A, SERIE MAGIC EN MUEBLE 15 días jue 26/02/15 lun 16/03/15 88FF
SALIDA P/TOMACORRIENTE EN TECHO DOBLE
ESTABILIZADO 15 A C/LINEA A TIERRA 15 días jue 26/02/15 lun 16/03/15 88FF
mié 89
SALIDA PARA SENSOR DE MONOXIDO DE CARBONO 20 días lun 16/03/15
08/04/15
mié 89
SALIDA P/DATA 20 días lun 16/03/15
08/04/15
mié
SALIDA PARA DATA EN MUEBLE 20 días lun 16/03/15 89
08/04/15
mié
SALIDA PARA DATA EN PISO 20 días lun 16/03/15 89
08/04/15
mié
SALIDA PARA TV ADOSADA EN TECHO 20 días lun 16/03/15 89
08/04/15
mié
SALIDA PARA CIRCUITO CERRADO DE TV (CCTV) 20 días lun 16/03/15 89
08/04/15
mié
SALIDA PARA DETECTORES DE HUMO 20 días lun 16/03/15 89
08/04/15
mié
SALIDA PARA DETECTOR DE TEMPERATURA 20 días lun 16/03/15 89
08/04/15
mié
SALIDA PARA TECLADO DE ALARMA 20 días lun 16/03/15 89
08/04/15
mié
SALIDA PARA SENSOR DE APERTURA 20 días lun 16/03/15 89
08/04/15
mié
SALIDA PARA SENSOR DE VIBRACION 20 días lun 16/03/15 89
08/04/15
SALIDA PARA INTERRUPTOR DE ALARMA CONTRA mié 89
INCENDIO 20 días lun 16/03/15
08/04/15
mié 89
SALIDA PARA SIRENA ESTROBOSCOPICA 20 días lun 16/03/15
08/04/15
mié
SALIDA PARA UPS 20 días lun 16/03/15 89
08/04/15
mié
SALIDA PARA RACK 20 días lun 16/03/15 89
08/04/15
mié
SALIDA PARA CONTROL DE COLAS 20 días lun 16/03/15 89
08/04/15
mié
SALIDA PARA CENTRAL DE CCTV 20 días lun 16/03/15 89
08/04/15
SALIDA PARA CENTRAL DE ALARMA mié 89
CONTRAINCENDIO 20 días lun 16/03/15
08/04/15
mié 89
SALIDA DE FUERZA PARA ELECTROBOMBAS 20 días lun 16/03/15
08/04/15
mié 89
SALIDA DE FUERZA PARA BOMBA CONTRA INCENDIO 20 días lun 16/03/15
08/04/15
mié 89
SALIDA DE FUERZA PARA AIRE ACONDICIONADO 20 días lun 16/03/15
08/04/15
mié
SALIDA DE FUERZA (TERMOSTATO) 20 días lun 16/03/15 89
08/04/15
mié
SALIDA DE FUERZA PARA EXTRACTORES 20 días lun 16/03/15 89
08/04/15
mié
SALIDA DE FUERZA (SECADORAS DE MANO) 20 días lun 16/03/15 89
08/04/15
mié
SALIDA PARA CENTRAL DE TELEFONOS 20 días lun 16/03/15 89
08/04/15
mié
SALIDA DE FUERZA PARA ASCENSOR 20 días lun 16/03/15 89
08/04/15
mié
SALIDA PARA LETRERO LUMINOSO 20 días lun 16/03/15 89
08/04/15
sáb lun
CAJA DE PASES 7 días 07/03/15 16/03/15
sáb 88FF
CAJA DE PASE CUADRADA 200x200x100 mm 7 días lun 16/03/15
07/03/15
sáb
CAJA DE PASE CUADRADA 250x250x100 mm 7 días lun 16/03/15 88FF
07/03/15
sáb
CAJA DE PASE CUADRADA 150x150x75 mm 7 días lun 16/03/15 88FF
07/03/15
sáb
CAJA DE PASE OCTOGONAL 100x55mm 7 días lun 16/03/15 88FF
07/03/15
sáb
CAJA DE PASE ADOSADA 1000x750x150 mm 7 días lun 16/03/15 88FF
07/03/15
lun mié
TUBERIAS, CABLES Y AFINES 20 días 16/03/15 08/04/15
ALIMENTADOR 2(3-1X150+1X150(N)+1X50(T)mm2 mié 88FF,97FF
N2XOH - 105mm Ø EMT 20 días lun 16/03/15
08/04/15
ALIMENTADOR 3-1X35+1X16(T)mm2 N2XOH - 80mm Ø mié 88FF,97FF
EMT 20 días lun 16/03/15
08/04/15
ALIMENTADOR 2(3-1X95+1X95(N)+1X35(T)mm2 mié 88FF,97FF
N2XOH - 80mm Ø EMT 20 días lun 16/03/15
08/04/15
ALIMENTADOR 3-1X35+1X35(N)+1X16(T)mm2 N2XOH - mié 88FF,97FF
80mm Ø EMT 20 días lun 16/03/15
08/04/15
ALIMENTADOR 3-1X95mm2 N2XH+1X50mm2 NHX - mié 88FF,97FF
80mm Ø PVC-P 20 días lun 16/03/15
08/04/15
ALIMENTADOR 3-1X6+1X6(N)+1X6(T)mm2 N2XOH - mié 88FF,97FF
35mm Ø EMT 20 días lun 16/03/15
08/04/15
ALIMENTADOR 3-1X10+1X10(N)+1X10(T)mm2 N2XOH - mié 88FF,97FF
40mm Ø EMT 20 días lun 16/03/15
08/04/15
ALIMENTADOR 3-1x16 + 1X16(N) + 1x10(T)mm2 mié 88FF,97FF
N2XOH- 40mm Ø EMT 20 días lun 16/03/15
08/04/15
ALIMENTADOR 3-1X35+1X35(N)+1X16(T)mm2 N2XOH - mié 88FF,97FF
65mm Ø EMT 20 días lun 16/03/15
08/04/15
ALIMENTADOR 3-1X120+1X120(N)+1X50(T)mm2 mié 88FF,97FF
N2XOH - 90mm Ø EMT 20 días lun 16/03/15
08/04/15
mié 88FF,97FF
CABLE PUESTA A TIERRA 95mm2 Cu - 55mm PVC-P 20 días lun 16/03/15
08/04/15
mié
CABLE PUESTA A TIERRA 10mm2 Cu - 25mm PVC-P 20 días lun 16/03/15 88FF,97FF
08/04/15
mié
TUBERIA EMT Ø 105mm 20 días lun 16/03/15 88FF,97FF
08/04/15
vie mar
TABLEROS DE DISTRIBUCION 15 días 15/05/15 02/06/15
mar 166,88
TABLERO GENERADOR TGS(SEGUN PLANO) 15 días vie 15/05/15
02/06/15
mar 166,88
TABLERO GENERAL TG (SEGUN PLANO) 15 días vie 15/05/15
02/06/15
mar 166,88
TABLERO DISTRIBUCION TMGB(SEGUN PLANO) 15 días vie 15/05/15
02/06/15
mar 166,88
TABLERO DISTRIBUCION TD 1.1 (SEGUN PLANO) 15 días vie 15/05/15
02/06/15
mar 166,88
TABLERO DISTRIBUCION TD 1.2 (SEGUN PLANO) 15 días vie 15/05/15
02/06/15
mar 166,88
TABLERO DISTRIBUCION TD 1.3 (SEGUN PLANO) 15 días vie 15/05/15
02/06/15
mar 166,88
TABLERO DISTRIBUCION TD 1.4 (SEGUN PLANO) 15 días vie 15/05/15
02/06/15
mar 166,88
TABLERO DISTRIBUCION TD 2.1 (SEGUN PLANO) 15 días vie 15/05/15
02/06/15
mar 166,88
TABLERO DISTRIBUCION TD 2.2 (SEGUN PLANO) 15 días vie 15/05/15
02/06/15
mar 166,88
TABLERO DISTRIBUCION TD 2.3 (SEGUN PLANO) 15 días vie 15/05/15
02/06/15
mar 166,88
TABLERO DISTRIBUCION TD 2.4 (SEGUN PLANO) 15 días vie 15/05/15
02/06/15
mar 166,88
TABLERO DISTRIBUCION TD-S (SEGUN PLANO) 15 días vie 15/05/15
02/06/15
mar 166,88
TABLERO DISTRIBUCION TE 1.1 (SEGUN PLANO) 15 días vie 15/05/15
02/06/15
mar 166,88
TABLERO DISTRIBUCION TE 1.2 (SEGUN PLANO) 15 días vie 15/05/15
02/06/15
mar 166,88
TABLERO DISTRIBUCION TE 2.1 (SEGUN PLANO) 15 días vie 15/05/15
02/06/15
mar 166,88
TABLERO DISTRIBUCION TE 2.2 (SEGUN PLANO) 15 días vie 15/05/15
02/06/15
mar 166,88
TABLERO DISTRIBUCION TD UPS 1 (SEGUN PLANO) 15 días vie 15/05/15
02/06/15
mar
TABLERO DISTRIBUCION TD UPS 2 (SEGUN PLANO) 15 días vie 15/05/15 166,88
02/06/15
mar 166,88
TABLERO DISTRIBUCION TF AAC 1.1 (SEGUN PLANO) 15 días vie 15/05/15
02/06/15
mar 166,88
TABLERO DISTRIBUCION TF AAC 1.2 (SEGUN PLANO) 15 días vie 15/05/15
02/06/15
mar 166,88
TABLERO DISTRIBUCION TF AAC 2.1 (SEGUN PLANO) 15 días vie 15/05/15
02/06/15
mar 166,88
TABLERO DISTRIBUCION TF AAC 2.2 (SEGUN PLANO) 15 días vie 15/05/15
02/06/15
mar 166,88
TABLERO DE FUERZA TF-CHILLER (SEGUN PLANO) 15 días vie 15/05/15
02/06/15
mar 166,88
TABLERO DE FUERZA T-VAC 3 (SEGUN PLANO) 15 días vie 15/05/15
02/06/15
mar 166,88
CENTRAL DE ALARMA CONTRAINCENDIO ( ACI ) 15 días vie 15/05/15
02/06/15
mar 166,88
SUMINISTRO UPS DE 50 KVA 15 días vie 15/05/15
02/06/15
mar 166,88
INSTALACION UPS DE 50 KVA 15 días vie 15/05/15
02/06/15
mar 166,88
SUMINISTRO UPS DE 40 KVA 15 días vie 15/05/15
02/06/15
mar 166,88
INSTALACION UPS DE 40 KVA 15 días vie 15/05/15
02/06/15
mar 166,88
CENTRAL DE CCTV 15 días vie 15/05/15
02/06/15
mar 166,88
TRANSFORMADOR DE AISLAMIENTO 50 KVA 15 días vie 15/05/15
02/06/15
mar 166,88
TRANSFORMADOR DE AISLAMIENTO 40 KVA 15 días vie 15/05/15
02/06/15
mar 166,88
RACK 15 días vie 15/05/15
02/06/15
mar 166,88
CENTRAL DE TELEFONO 15 días vie 15/05/15
02/06/15
mar 166,88
SUMINISTRO DE ASCENSOR 15 días vie 15/05/15
02/06/15
mar 166,88
INSTALACION DE ASCENSOR 15 días vie 15/05/15
02/06/15
mar jue
ARTEFACTOS DE ALUMBRADO 15 días 02/06/15 18/06/15
LUMINARIA MODELO AHR 2X28W EE(470051137) O mar ###
SIMILAR 15 días jue 18/06/15
02/06/15
LUMINARIA MODELO AHR 2X54W EE(470050462) O mar ###
SIMILAR 15 días jue 18/06/15
02/06/15
LUMINARIA MODELO RES E. 4X18W T8 EE(H34097610) mar ###
O SIMILAR 15 días jue 18/06/15
02/06/15
LUMINARIA MODELO NAIRA E. 4X14W T5 (H38401805) mar ###
O SIMILAR 15 días jue 18/06/15
02/06/15
LUMINARIA MODELO ULTRA FACETADO E. 2X18W EE mar ###
(H38401810) O SIMILAR 15 días jue 18/06/15
02/06/15
LUMINARIA MODELO ULTRA FACETADO E. 2X26W EE mar ###
(H38401810) O SIMILAR 15 días jue 18/06/15
02/06/15
LUMINARIA MODELO ULTRA FACETADO E. 2X42W EE mar ###
O SIMILAR 15 días jue 18/06/15
02/06/15
LUMINARIA MODELO BE E. 1X28W EE (CESP3679) O mar ###
SIMILAR 15 días jue 18/06/15
02/06/15
LUMINARIA MODELO BE 1X14W EE (CESP3679) O mar ###
SIMILAR 15 días jue 18/06/15
02/06/15
mar ###
LUMINARIA MODELO METAL SPOT E 70HM O SIMILAR 15 días jue 18/06/15
02/06/15
LUMINARIA MODELO ALPHA SPOT AD- mar
2X18W(CESP2967) O SIMILAR 15 días jue 18/06/15 ###
02/06/15
LUMINARIA MODELO ALPHA SPOT E- mar ###
2X18W(CESP4312) O SIMILAR 15 días jue 18/06/15
02/06/15
LUMINARIA MODELO ALPHA SPOT E- mar ###
1X18W(CESP1033) O SIMILAR 15 días jue 18/06/15
02/06/15
LUMINARIA MODELO ALPHA SPOT E- mar ###
2X26W(CESP4329) O SIMILAR 15 días jue 18/06/15
02/06/15
mar ###
LUMINARIA MODELO DL-104(CESP3609) O SIMILAR 15 días jue 18/06/15
02/06/15
mar ###
LUMINARIA MODELO KAVA LEDS 1 TI O SIMILAR 15 días jue 18/06/15
02/06/15
mar ###
LUMINARIA MODELO GEOTEC 70HM 22 O SIMILAR 15 días jue 18/06/15
02/06/15
mar ###
LUMINARIA MODELO GEOTEC 70HM 10 O SIMILAR 15 días jue 18/06/15
02/06/15
LUMINARIA MODELO ZORUS A 400HM(331090030) O mar ###
SIMILAR 15 días jue 18/06/15
02/06/15
mar ###
LUMINARIA MODELO RLD-L 2X35W O SIMILAR 15 días jue 18/06/15
02/06/15
LUMINARIA MODELO MITHOS YL HM 35W 22 O mar ###
SIMILAR 15 días jue 18/06/15
02/06/15
mar ###
LUMINARIA DE EMERGENCIA 15 días jue 18/06/15
02/06/15
jue mar ###
EQUIPOS SISTEMA CONTRAINCENDIO Y ROBO 10 días
18/06/15 30/06/15
mar 478
DETECTOR DE HUMO 10 días jue 18/06/15
30/06/15
mar 478
DETECTOR DE TEMPERATURA 10 días jue 18/06/15
30/06/15
mar 478
TECLADO DE ALARMA 10 días jue 18/06/15
30/06/15
mar 478
SENSOR DE APERTURA 10 días jue 18/06/15
30/06/15
mar 478
SENSOR DE VIBRACION 10 días jue 18/06/15
30/06/15
mar 478
INTERRUPTOR DE ALARMA CONTRA INCENDIOS 10 días jue 18/06/15
30/06/15
mar 478
SIRENA ESTROBOSCOPICA 10 días jue 18/06/15
30/06/15
mar 478
SENSOR DE MONOXIDO DE CARBONO 10 días jue 18/06/15
30/06/15
lun lun
SISTEMA DE AIRE ACONDICIONADO 25 días 16/03/15 13/04/15
lun lun
EQUIPOS DE EXPANSION DIRECTA 25 días
16/03/15 13/04/15
SUMINISTRO DE EQUIPOS DE EXPANSION DIRECTA
EN OFICINAS 25 días lun 16/03/15 lun 13/04/15 88,89
INSTALACION DE EQUIPOS DE EXPANSION DIRECTA
EN OFICINAS 25 días lun 16/03/15 lun 13/04/15 88,89
INSTALACION DE EQUIPOS DE EXPANSION DIRECTA
EN SERVIDORES 25 días lun 16/03/15 lun 13/04/15 88,89
INSTALACION DE EQUIPOS DE EXPANSION DIRECTA 25 días lun 16/03/15 lun 13/04/15 88,89
lun lun
VENTILACION MECANICA 25 días
16/03/15 13/04/15
SUMINISTRO DE MATERIALES PARA EXTRACCION DE
MONOXIDO 25 días lun 16/03/15 lun 13/04/15 88,89
INSTALACION DE SISTEMA DE EXTRACCION DE
MONOXIDO 25 días lun 16/03/15 lun 13/04/15 88,89
SUMINISTRO DE MATERIALES PARA EXTRACCION EN
BAÑOS 25 días lun 16/03/15 lun 13/04/15 88,89
INSTALACION DE SISTEMA DE EXTRACCION EN
BAÑOS 25 días lun 16/03/15 lun 13/04/15 88,89
SUMINISTRO DE MATERIALES PARA INYECCION DE
AIRE FRESCO 25 días lun 16/03/15 lun 13/04/15 88,89
INSTALACION DE SISTEMA PARA INYECCION DE AIRE
FRESCO 25 días lun 16/03/15 lun 13/04/15 88,89
SUMINISTRO DE MATERIALES PARA PRESURIZACION
DE ESCALERAS 25 días lun 16/03/15 lun 13/04/15 88,89
INSTALACION DE PRESURIZACION DE ESCALERAS 25 días lun 16/03/15 lun 13/04/15 88,89
sáb mar
OTROS 88 días 21/03/15 30/06/15
mar dom 114FF,427,4
POZOS DE TIERRA 5 días 02/06/15 07/06/15 41
SUMINISTRO DE GRUPO ELECTROGENO 120 KW 5 días lun 08/06/15 vie 12/06/15 525
mar dom 114FF,427,4
INSTALACION DE GRUPO ELECTROGENO 120 KW 5 días 41
02/06/15 07/06/15
sáb mié 393FF
BANDEJA PORTACABLES 200x54 P/COMUNICACION 15 días
21/03/15
sáb 08/04/15
mié
BANDEJA PORTACABLES 300x54 P/COMUNICACION 15 días 393FF
21/03/15
sáb 08/04/15
mié
BANDEJA PORTACABLES 400x54 P/COMUNICACION 15 días 393FF
21/03/15
sáb 08/04/15
mié
BANDEJA PORTACABLES 500x54 P/COMUNICACION 15 días 393FF
21/03/15
sáb 08/04/15
mié
BANDEJA PORTACABLES 600x54 P/COMUNICACION 15 días 393FF
21/03/15 08/04/15
sáb mié 393FF
BANDEJA PORTACABLES DE ALIMENTADORES 150x54 15 días
21/03/15 08/04/15
sáb mié 393FF
BANDEJA PORTACABLES DE ALIMENTADORES 300x54 15 días
21/03/15 08/04/15
sáb mié 393FF
BANDEJA PORTACABLES DE ALIMENTADORES 400x54 15 días
21/03/15 08/04/15
sáb mié 393FF
BANDEJA PORTACABLES DE ALIMENTADORES 600x54 15 días
21/03/15 08/04/15
mar 114FF,427,4
SUMINISTRO DE SUBESTACION 6 días lun 08/06/15 41
02/06/15
mar mar 537
COLOCACION DE SUBESTACION 7 días
09/06/15 16/06/15
mar mar
FIN DE OBRA 0 días ###
30/06/15 30/06/15
Costo

S/. 5,692,916.82

S/. 1,943,457.87

S/. 77,539.18

S/. 0.00

S/. 2,380.43

S/. 5,290.35

S/. 11,844.00

S/. 3,200.00

S/. 4,800.00

S/. 6,000.00

S/. 24,000.00

S/. 5,024.40

S/. 15,000.00

S/. 118,047.43

S/. 117,249.89

S/. 46,323.20

S/. 14,355.73

S/. 6,520.36

S/. 17,613.37

S/. 13,444.86

S/. 18,992.37

S/. 797.54

S/. 340.94
S/. 456.60
S/. 91,782.16
S/. 40,500.00

S/. 42,960.60

S/. 5,606.25

S/. 1,606.73

S/. 300.00

S/. 808.58

S/. 282,971.07

S/. 27,984.23

S/. 11,596.94

S/. 21,968.38
S/. 8,256.57
S/. 844.00

S/. 2,029.19

S/. 11,480.00

S/. 13,543.85
S/. 185,267.91
S/. 61,563.69
S/. 34,579.54
S/. 13,605.37

S/. 1,617.82

S/. 817.41

S/. 1,744.94

S/. 6,903.12

S/. 2,295.49

S/. 1,311,554.34

S/. 69,694.07

S/. 48,457.43
S/. 21,236.64

S/. 223,795.56

S/. 56,752.71

S/. 72,800.29

S/. 94,242.56

S/. 363,824.50

S/. 113,374.26

S/. 117,383.57

S/. 133,066.67

S/. 307,250.55
S/. 87,138.46
S/. 79,215.65
S/. 140,896.44

S/. 289,445.46
S/. 88,261.56
S/. 78,284.00

S/. 55,264.31

S/. 805.47

S/. 66,830.12

S/. 30,729.39

S/. 15,489.88

S/. 3,705.18

S/. 11,534.33

S/. 26,814.81

S/. 7,428.28

S/. 13,605.22
S/. 5,781.31
S/. 1,446,969.91

S/. 156,617.20

S/. 78,234.61

S/. 8,521.26

S/. 66,239.46

S/. 1,221.57

S/. 2,400.30

S/. 170,465.91
S/. 67,762.73
S/. 3,699.35
S/. 14,718.51
S/. 5,355.54
S/. 54,223.47
S/. 8,783.11
S/. 12,840.15
S/. 3,083.05
S/. 236,009.42

S/. 29,465.15

S/. 2,091.90

S/. 126,869.81
S/. 51,629.34
S/. 10,411.91
S/. 15,541.31

S/. 282,208.97

S/. 50,533.85

S/. 133,925.92

S/. 11,256.95

S/. 10,386.04

S/. 7,647.96
S/. 3,278.14

S/. 6,958.00

S/. 38,380.33
S/. 3,414.85
S/. 2,606.01

S/. 1,999.72

S/. 2,176.59

S/. 3,331.45

S/. 5,223.44

S/. 1,089.72

S/. 35,392.84
S/. 10,567.75
S/. 22,649.16
S/. 521.69

S/. 494.50
S/. 1,159.74
S/. 32,399.27

S/. 31,734.44

S/. 664.83

S/. 43,287.78

S/. 43,287.78

S/. 36,472.59
S/. 25,754.40
S/. 9,432.99
S/. 1,285.20
S/. 93,529.09
S/. 26,790.75
S/. 6,085.80
S/. 7,087.50
S/. 28,218.75
S/. 1,271.81
S/. 1,947.75
S/. 6,400.38
S/. 8,079.75
S/. 5,290.11
S/. 2,356.49
S/. 122,829.78
S/. 53,271.75
S/. 30,108.96
S/. 22,522.50
S/. 14,082.60
S/. 270.00
S/. 2,573.97

S/. 24,134.57

S/. 2,980.69

S/. 55.24

S/. 7,357.94

S/. 3,844.75

S/. 6,548.75

S/. 191.52

S/. 526.68

S/. 574.56

S/. 127.24

S/. 1,145.16

S/. 627.72

S/. 154.32

S/. 94,092.80

S/. 72,967.06

S/. 2,970.38
S/. 17,236.38
S/. 918.98
S/. 46,831.10

S/. 13,000.00

S/. 8,800.00

S/. 2,850.00
S/. 1,160.00
S/. 2,292.18
S/. 6,800.00
S/. 800.00
S/. 3,000.00
S/. 660.00
S/. 720.00
S/. 5,113.80
S/. 1,635.12

S/. 72,698.59
S/. 18,506.88
S/. 4,799.98

S/. 5,886.22

S/. 2,477.64

S/. 2,932.30

S/. 438.25

S/. 3,543.70

S/. 17,291.03

S/. 3,556.99

S/. 1,268.80

S/. 11,996.80

S/. 412,825.09

S/. 4,257.20
S/. 1,225.70
S/. 306.89

S/. 890.74
S/. 1,833.87
S/. 41,229.56

S/. 6,412.28

S/. 1,831.39

S/. 249.36

S/. 271.35

S/. 727.80

S/. 229.19

S/. 1,098.90

S/. 535.93

S/. 282.05

S/. 1,186.31

S/. 491.84

S/. 31.20

S/. 41.64

S/. 46.48

S/. 32.76

S/. 44.20

S/. 93.80

S/. 62.30

S/. 31.20

S/. 21.00

S/. 15.90

S/. 10.66

S/. 6.50

S/. 9.80

S/. 7.60

S/. 3.20
S/. 10.60

S/. 23.00

S/. 7,266.04

S/. 2,217.71
S/. 2,407.73
S/. 278.82
S/. 2,361.78
S/. 6,261.40

S/. 3,174.84
S/. 813.76
S/. 2,272.80
S/. 20,798.00

S/. 9,513.00

S/. 11,285.00

S/. 65,008.71

S/. 5,057.06
S/. 3,772.56
S/. 1,284.50
S/. 15,217.80
S/. 827.96
S/. 1,266.68
S/. 2,547.35
S/. 2,491.04
S/. 5,023.77
S/. 2,488.97
S/. 396.23
S/. 175.80
S/. 27,253.85

S/. 5,402.88

S/. 4,172.61

S/. 3,577.92

S/. 3,406.20

S/. 978.51
S/. 1,762.74

S/. 3,347.28

S/. 194.88

S/. 740.19

S/. 1,639.20

S/. 973.80

S/. 755.84

S/. 301.80

S/. 2,902.00

S/. 451.36

S/. 9.20

S/. 3.20

S/. 47.70

S/. 40.60

S/. 87.29

S/. 37.60

S/. 4.20

S/. 10.07

S/. 35.91

S/. 75.18

S/. 83.16

S/. 34.23

S/. 46.44

S/. 363.97

S/. 292.82
S/. 251.84

S/. 235.68

S/. 425.18

S/. 23.24

S/. 20.14

S/. 124.70

S/. 12.47

S/. 127.88

S/. 28.97

S/. 28.97

S/. 14,578.00

S/. 9,328.00

S/. 5,250.00

S/. 274,614.93

S/. 151,833.64

S/. 21,196.89
S/. 4,812.85
S/. 16,215.59
S/. 16,453.08
S/. 3,330.97
S/. 28,025.69
S/. 5,879.30
S/. 7,815.67
S/. 48,103.60
S/. 50,500.00

S/. 27,000.00

S/. 23,500.00

S/. 1,893.57
S/. 370.17

S/. 574.20

S/. 129.84

S/. 819.36

S/. 70,387.72

S/. 1,850.00

S/. 9,960.00

S/. 640.00

S/. 6,330.00

S/. 1,800.00

S/. 3,200.00

S/. 3,750.00

S/. 8,710.98

S/. 861.36

S/. 153.56

S/. 1,063.14

S/. 867.80

S/. 290.34

S/. 2,442.72

S/. 66.78

S/. 358.90

S/. 844.58

S/. 1,301.70

S/. 2,075.14

S/. 769.40
S/. 434.70

S/. 1,502.57

S/. 1,283.28

S/. 643.17

S/. 896.98

S/. 277.29

S/. 524.58

S/. 164.86

S/. 874.30

S/. 1,731.03

S/. 387.15

S/. 796.73

S/. 1,011.45

S/. 62.43

S/. 287.15

S/. 2,044.77

S/. 1,754.91

S/. 381.87

S/. 187.15

S/. 940.47

S/. 260.58

S/. 524.02

S/. 1,005.33

S/. 5,074.55

S/. 27,714.69
S/. 2,074.53

S/. 3,515.59

S/. 9,625.11

S/. 342.84

S/. 338.64

S/. 500.00

S/. 230.00

S/. 497.70

S/. 2,041.33

S/. 448.20

S/. 422.20

S/. 2,416.96

S/. 1,200.00

S/. 700.00

S/. 2,656.98

S/. 704.61

S/. 1,889,663.95

S/. 1,006,694.05

S/. 159,024.94

S/. 54,214.38

S/. 183.64

S/. 6,756.48

S/. 23,274.72
S/. 376.23
S/. 1,011.78
S/. 9,557.80
S/. 3,125.54
S/. 9,849.75
S/. 2,751.98
S/. 1,023.24
S/. 8,249.37
S/. 9,796.38
S/. 656.05
S/. 1,851.74
S/. 1,776.06
S/. 5,587.42
S/. 2,855.68
S/. 93.60
S/. 323.08
S/. 323.08
S/. 1,173.12
S/. 1,080.04
S/. 570.54
S/. 197.02
S/. 173.38
S/. 150.86
S/. 335.22
S/. 838.25
S/. 457.34
S/. 5,274.36
S/. 2,389.76
S/. 1,006.50
S/. 986.10
S/. 162.52
S/. 86.55
S/. 505.38
S/. 3,285.52
S/. 80.80
S/. 339.20
S/. 349.91
S/. 1,441.02
S/. 1,074.59
S/. 85,220.95

S/. 6,364.03
S/. 1,197.31
S/. 6,850.54
S/. 1,482.19
S/. 1,933.11
S/. 5,916.00
S/. 8,452.45
S/. 8,935.92
S/. 8,031.86
S/. 27,201.23
S/. 1,100.19
S/. 222.31
S/. 7,533.81
S/. 567,188.69

S/. 2,300.00

S/. 168,717.00

S/. 843.00

S/. 2,775.00

S/. 2,769.00

S/. 2,907.00

S/. 2,775.00

S/. 3,054.00

S/. 2,226.00

S/. 2,349.00

S/. 2,226.00

S/. 2,073.00

S/. 2,520.00

S/. 1,950.00

S/. 2,097.00

S/. 1,062.00

S/. 13,476.00

S/. 12,468.00

S/. 2,526.00

S/. 2,652.00

S/. 2,103.00
S/. 2,805.00

S/. 17,730.00

S/. 3,537.00

S/. 5,850.00

S/. 49,500.00

S/. 15,000.00

S/. 42,200.00

S/. 12,700.00

S/. 5,000.00

S/. 12,536.00

S/. 17,698.00

S/. 3,000.00

S/. 5,000.00

S/. 108,000.00

S/. 30,764.69

S/. 158,057.30

S/. 5,354.70

S/. 571.47

S/. 6,412.25

S/. 27,610.96

S/. 821.96

S/. 39,607.38

S/. 5,867.76

S/. 14,023.90

S/. 497.96

S/. 3,905.88

S/. 4,912.25
S/. 5,108.74

S/. 2,951.84

S/. 785.96

S/. 2,024.82

S/. 3,217.35

S/. 1,741.47

S/. 1,160.98

S/. 1,066.47

S/. 610.49

S/. 976.47

S/. 28,826.24

S/. 33,916.65

S/. 12,966.26

S/. 3,481.92

S/. 1,853.87

S/. 1,510.48

S/. 1,630.48

S/. 3,609.06

S/. 4,822.74

S/. 4,041.84

S/. 408,195.00
S/. 280,350.00
S/. 196,500.00
S/. 49,100.00
S/. 27,800.00
S/. 6,950.00
S/. 127,845.00
S/. 40,080.00
S/. 10,020.00
S/. 15,647.00
S/. 3,911.00
S/. 17,616.00
S/. 4,404.00
S/. 28,934.00
S/. 7,233.00
S/. 474,774.90

S/. 8,198.72
S/. 130,000.00
S/. 32,300.00
S/. 2,284.69
S/. 3,063.36
S/. 2,219.59
S/. 8,928.95
S/. 1,151.58
S/. 1,610.95
S/. 1,836.98
S/. 922.03
S/. 2,258.05

S/. 250,000.00

S/. 30,000.00

S/. 0.00