4 HAND-HOLDING SERVICES
TPP Technologies
72 Le Thanh Ton| Ben Nghe Ward | District 1 | HCMC | Vietnam
T: +84 028 22 24 1357
M: +84 934.144.498
E: hoang.lam@tpptechnologies.com
www.tpptechnologies.com
Modeling & Coordination Simulation & Project Cost Estimates Operation and Document
Management Management Controller
Director
Software Project
BIM Consultancy Training
License Consultancy
Project Manager
Lâm Thanh Hoàng
Contractual &
Project Leader Implementation
Invoicing Matters
Đỗ Công Nguyên Trần Tăng Trung
Bạch Thị Thùy Linh
Construction
3 Thien Nam Offshore ✓ Oil and Gas ✓ Primavera ✓ Training and hand-
holding
4 Hitachi, Ltd., Ho Chi ✓ Metro ✓ Primavera ✓ Implementation
Minh City Urban
Railway Line 1
5 Alpha King ✓ Construction ✓ Primavera ✓ Planning Services
10
11
12
13
14
• Day 1
• Understand the Project and help advise the Project Manager develop the WBS
Create Calendar required for the project
• Understand the activities to be created and if required define any Step
Templates for activities.
• Develop the Project Plan, Add the activities
• Define the Relationships, Define any constrain
• Develop the Activity Codes required in the project for grouping, Schedule the Project
Will advise the Best Practices if any like (Templates Creation, Step Templates, Copy and Paste)
• Day 2
• Check the Integrity of the schedule and guide the Project Manager on
how to fix the same.
• Create S-Curve and other key resources required for developing resource
histogram.
• Assign S-Curve Resource and other key resources to the activities.
• Create best practice layouts to view the Project in different formats.
• View Critical Path
• Day 3
• Analyze the critical path and optimize the project
• Advise the Best Practices when optimizing the project Plan. What to look out for
in the schedule.
• Guide the user on Creating Baseline
• Day 4
• Understand the Reporting Progress Period and guide the user on how to create
the Financial Periods
• Guide the user on how to update the Project and hand hold the updating process.
• Watch the user update for 1 progress period and guide him the best practice.
• Guide the user on how to anaylze the project plan.
• Generate the S-Curve
• Day 5
• Updating the progress for couple of progress periods.
• Anaylze the Project and Guide the user on how to control the Project Plan
• Variance Analysis
• Reporting.