Kend Ringan 2 Ton = 0.0002 + 0.0002 = 0.0004 Truk as 13 ton = 0.141 + 0.9238 = 1.0648 Truk 3 as 20 ton = 0.2923 + 0.7452 = 1.0375
5 Menghitung Lintas Ekivalen Permulaan
Kend Ringan 2 Ton = 2342.56x0.5x0.0004 = 0.469 Truk as 13 ton = 292.82x0.5x1.0648 = 155.897 Truk 3 as 20 ton = 73.205x0.5x1.0375 = 37.975 194.341 6 Menghitung Lintas Ekivalen Akhir Kend Ringan 2 Ton = 2342.56x0.5x0.0004 = 1.011 Truk as 13 ton = 292.82x0.5x1.0648 = 336.571 Truk 3 as 20 ton = 73.205x0.5x1.0375 = 81.985 419.568 7 Menghitung LET = ½ (LEP +LEA) LET = 306.954
8 Menghitung LER = LET x UR/10 ; UR = 10 tahun
LER = 306.954 9 Menghitung Koefisien Distribusi (Cj) Daftar II SNI 1989, Jalan 2 lajur, 2 arah (2 lane, 2 ways) Kend ringan < 5 ton C = 0.5 Kend berat > 5 ton C = 0.5 10 Tanah Dasar CBR Design = 6% maka DDT = 5
11 Berdasarkan data DDT = 5 & LER = 307, maka
ITP = 8.5 ITP' = 8.6 (Faktor Regional 1)
12 Diambil bahan perkerasan berupa :
Lapis Permukaan Beton = 0.4 a1 → 15 d1 Batu Pecah Kelas A = 0.14 a2 → 20 d2 Pasir Batu Kelas A = 0.13 a3 → 30 d3
13 Menghitung tebal lapisan perkerasan
ITP' = a1.D1 + a2.D2 + a3.D3 maka diambil tebal perkerasan Lapisan Pasir Batu Kelas A (D3) = 70 cm Batu Pecah Kelas A (D2) = 20 cm Lapis Permukaan Beton (D1) = 15 cm TOTAL 105 cm