The document provides comments on improving a test package for review, requesting the inclusion of isometric drawings and P&IDs, weld inspection reports, verification of support locations and valve tags on drawings, identification of weld mappings, and provision of calibrated pressure gauges and a test manifold on site.
The document provides comments on improving a test package for review, requesting the inclusion of isometric drawings and P&IDs, weld inspection reports, verification of support locations and valve tags on drawings, identification of weld mappings, and provision of calibrated pressure gauges and a test manifold on site.
The document provides comments on improving a test package for review, requesting the inclusion of isometric drawings and P&IDs, weld inspection reports, verification of support locations and valve tags on drawings, identification of weld mappings, and provision of calibrated pressure gauges and a test manifold on site.
2. Provide weld visual inspection report or welding log 3. Fill up necessary document prior to submittal for reviewed 4. Review first the test package prior to submittal to VPCI 5. Print the document in a cleared copy and working package (as possible A3 for the drawing and P&ID) 6. Arrange test package according to table of content 7. Indicate in the isometric drawing the highest and lowest point of pressure gauge 8. Verify support location on the isometric drawing and support tag no. 9. Valve tag not indicate on the isometric drawing 10. Identified weld mapping on the isometric drawing (welding joint number) 11. Provide pressure gauge calibration certificate used 12. Provide test manifold on site