#4 @ 9 in. C/C
#3 @ 4 in. C/C
#3 @ 10 in. C/C
#4 @ 10 in. C/C
#3 @ 4 in. C/C
DEPTH = 5.5 in
#3 @ 10 in. C/C
Weight
Dia. Length No. No.3 No.4 No.5 No.6
Shorter Bottom 3 4.19 32 75
3 4.19 32 75
Longer Bottom 3 6.11 22 75
3 6.11 22 75
Shorter Top 4 1.60 29 46
3 1.25 29 20
Longer Top 3 2.24 18 23
4 1.72 18 31
Shorter Hangers 3 2.42 2 3
Longer Hangers 3 3.61 2 4
Total weight in kgs: 368 81 0 0 G.Total= 448
Volume of Concrete = 143.62 Cft Dry vol. = 243.3 Unit Unit Rate Amount
Steel (40), Cost per kg = 40 Rs. Cement= 27.8 Bags @ 400.00 11122
Steel (60), Cost per kg = 72 Rs. Sand = 69.5 Cft @ 15.00 1043
Concrete per Cft = 250.00 Rs. Aggregate 139.0 Cft @ 100.00 13902
Total Cost of Slab = 68233 Rs. Steel = 449.0 Kgs @ 72.00 32328
Total Material Cost = 58395