Dear CVEN3031/3731 Students,

You are required to submit the following files as part of Project#1 assessment.
S.No. Submissions Requirements Naming Weight Old New Mode of
convention of the Deadline Deadline submission
file
1 Group 1. Calibrated base model Aimsun file GroupXX- 15% 21-09- 21-09- Group
project Calibrated.ang 2018 2018
2. Green-time ramp metering Aimsun GroupXX- (no
file GreenTime.ang change)
3. Flow ramp metering Aimsun file GroupXX-Flow.ang
4. Delay ramp metering Aimsun file GroupXX-
Delay.ang
5. Alinea ramp metering Aimsun file GroupXX-
Alinea.ang
6. Project report: A single “pdf” GroupXX-
document (15 pages). Things to ProjectReport.pdf
include:
• Calibration and stability
analysis
• All ramp metering calculations
with logical motivation for each
setting that you mention
• All assumptions
• Any screenshots
• Summary
2 Individual A single “pdf” document (5 pages). zID-IndReport.pdf 10% 21-09- 28-09- Individual
report Things to include: 2018 2018
• Issues not considered in the group
project
• Cost-benefit analysis (guidelines
to be provided in the lecture on
07-09-2018)
• Calculations
3 Self- A single “pdf” document (2 pages). zID-SelfAssess.pdf 5% 21-09- 28-09- Individual
assessment Things to include: 2018 2018
• Qualitative assessment of each
member in the group (including
self)
• Quantitative assessment of each
member in the group (including
self)
4 Literature A single “pdf” document (5 pages). zID-LitRev.pdf 10% 21-09- 21-09- Individual
review Things to include: 2018 2018
• Review of 4 methods (no
• Summary change)
Check the Moodle announcement
(dated 31-08-2018) for more details.

Other important things to note:

1. As you may see in the above table, the deadline for submissions 2 and 3 have been revised. It
is only fair for individuals to comment on other group members and to discuss the issues not
considered in the group report when the group projects are finalised and submitted. Therefore, it
has been decided to extend the deadline for the individual and the self-assessment reports by
one week.
2. For each type of ramp metering algorithm available on Aimsun, you can test a variety of ramp
metering parameter settings. But make sure you show calculations (like %improvements, etc.)
and report at least two “different” settings. Also, include your logical motivation for those settings.
In the Aimsun file that you submit, you may show one of these two settings for each type of
algorithm. A sample table is shown below.

Metric Base Model Green Green Flow 1 Flow Delay 1 Delay Alinea 1* Alinea 2
Time Time 2 2* 2*
1*
Speed
Delay
TT
.
.
.
.
* indicates the ones shown in the Aimsun files
3. Don’t forget to refer to the Project description document available on Moodle for more

information.

I wish you all the best,