Vehicle collision with other Lack of visibility Banks man /high visibility
Unloading of Rocks (Dumping) vehicle/person clothes/ensure ground stability
Banks man was not in
Workers buried while dumping placed Visual and audible reversing
alarm
Dust The area was not
barricaded Project site speed limit (20
Fall from height – vehicles km/h)
Lack of visibility Banks man /high visibility
Vehicle collision with other vehicle/ clothes/ensure ground stability
Placing of Rocks in Breakwater
person Banks man was not in and truck is levelled before
placed dumping
Reversing Check with banks man before
The area was not dumping backfill material
Fall from height – vehicles barricaded
Use dust mask / Use water to
Working in hot weather control dust
Ear protection
Rock Supply: Rough sea / poor weather Lack of experience Only berth in good sea
Transport vessel at conditions conditions, with trained
loading area / Barge Poor Lighting barge master/captain.
positioning at job site Darkness / reduced view Assure lighting inside the
Lack of fall protection boat and on the berth
Marine vessels and equipment’s in platform when
bad condition loading/offloading.
Use tug boats with sufficient
Incompetent crew capacity to safely
maneuver the vessels berthing
Man overboard and mooring
operations
Fall in water Only competent and certified
barge crew to
supervise and execute the
operations
All vessels and marine
equipment’s shall have
valid certificates and properly
checked and well
maintained before being used
on site
Weekly Look Ahead for
inclement weather
No operations in bad
weather conditions
Install guardrails / side
boards whenever possible
Proper housekeeping on
floating equipment to
avoid falling