The concrete industry offers no comment Please note that w/cm ratio and strength are
regarding performance or durability of the interrelated and specifications that include
prescriptive requirements to meet the concrete requirements such as 0.45 w/cm
owner’s concrete requirements. ratio and a 20 MPa strength lead to contractor
ordering problems when 20 MPa concrete is
The concrete producer assumes no ordered at time of placement rather than the
responsibility for issues related to 0.45 w/cm ratio concrete specified.
compressive strength, concrete durability
or performance since the owner has selected Quality Product, Total Performance and
a prescriptive method of concrete Customer Satisfaction are very important to
specification. the RMCAO.
The owner is also responsible for indicating We would be pleased to answer any
mix design modifications to address any questions you may have.
concrete quality concerns raised by the
concrete testing program or workability
concerns raised by the contractor. The
concrete producer will revise their material
supply quotation based upon these 905-507-1122
modifications. 905-890-8122 Fax
info@rmcao.org
We would like to point out that minimum www.rmcao.org
cement contents, as currently specified in
OPSS 1350 and various ACI standards, only Ready Mixed Concrete Association of Ontario
guarantee the minimum amount of cement in
the mix and not the minimum durability of the 112003-4