No.

Uraian Pekerjaan Satuan Panjang Lebar Tinggi Jumlah Total Volume


A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi m2 836.77 9.40 7868.582
B PEKERJAAN ASPAL
1 Urugan Pasir t = 5cm m3 499.35 8.08 0.05 201.626
2 Lapis Permukaan penetrasi makadam m3 499.35 8.08 0.3 1209.759
3 Split 2/3 m2 499.35 8.08 4032.529
4 Prime Coat 1.5 kg/m2 m2 499.35 8.08 2 8065.057
5 Batu Tepi 15/20 m3 499.35 0.15 0.2 2 29.961
C PEKERJAAN BETON
1 Bekisting t = 12mm m3 180.47 0.2 0.012 0.433
2 Wiremesh M6 m2 180.47 7.735 1395.935
3 Beton Ready Mix k250 t = 20cm m3 180.47 7.735 0.2 279.187
D PEKERJAAN PAVING
1 Pasir t = 5cm m3 156.95 12.4 0.05 97.309
2 Pasang Paving k200 t = 6cm m2 156.95 12.4 1946.180
3 Kanstin Mutu k200 t = 6cm, l = 15cm, p = 30cm m' 156.95 2 313.900
E PEKERJAAN DRAINASE
1 Galian m3 321.73 0.6 0.6 115.823
2 Beton Siklup 15Mpa m3 321.73 0.15 0.6 28.956
3 Buis Beton U 30cm m' 321.73 321.730
4 Acian m2 321.73 0.5 2 321.730
No. Uraian Pekerjaan Kode Satuan Volume HSPK Jumlah Harga

A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi A.009 m2 7868.582 10,850 85,374,117
Jumlah 85,374,117
B PEKERJAAN ASPAL
1 Urugan Pasir t = 5cm K 516.A m3 201.626 112,465 22,675,917
2 Lapis Permukaan penetrasi makadam K 516.A m3 1209.759 404,866.41 489,790,619.16
3 Split 2/3 tebal 5cm K 516.B m2 4032.529 18,784.63 75,749,538.81
4 Prime Coat 1.5 kg/m2 K 615 m2 8065.057 12,393.36 99,953,176.12
5 Batu Tepi 15/20 K 517 m3 29.961 268,175.00 8,034,791.18
Jumlah 696,204,042
C PEKERJAAN BETON
1 Bekisting t = 12mm K 710 m3 0.433 250,632 108,555.52
2 Wiremesh M6 3.90 m2 1395.935 48,480.00 67,674,950.62
3 Beton Ready Mix k250 t = 20cm 3.80 m3 279.187 178,322.00 49,785,200.26
Jumlah 117,568,706.40
D PEKERJAAN PAVING
1 Pasir t = 5cm m3 97.309 41,225.00 4,011,563.53
2 Pasang Paving k200 t = 6cm m2 1946.180 72,354.78 140,815,425.74
3 Kanstin Mutu k200 t = 6cm, l = 15cm, p = 30cm m' 313.900 119,506.41 37,513,063.60
Jumlah 182,340,052.87
E PEKERJAAN DRAINASE
1 Galian B.001 m3 115.823 49,875.00 5,776,662.15
2 Beton Siklup 15Mpa m3 28.956 725,046.24 20,994,221.30
3 Buis Beton U 30cm m' 321.730 42,958.16 13,820,928.82
4 Acian m2 321.730 29,522.09 9,498,142.24
Jumlah 50,089,954.51
REKAPITULASI RENCANA ANGGARAN BIAYA

JUMLAH HARGA
NO JENIS PEKERJAAN
(Rp)
A PEKERJAAN PERSIAPAN 85,374,116.77
B PEKERJAAN ASPAL 696,204,042.09
C PEKERJAAN BETON 117,568,706.40
D PEKERJAAN PAVING 182,340,052.87
E PEKERJAAN DRAINASE 50,089,954.51

Total 1,131,576,872.63
PPN 10% 113,157,687.26
JUMLAH 1,244,734,559.89
PEMBULATAN 1,244,730,000.00

Terbilang : Satu Milyar Dua Ratus Empat Puluh Empat Juta Tujuh Ratus Tiga Puluh Ribu
Rupiah
JUMLAH HARGA BOBOT DURASI BULAN 1 BULAN 2 BULAN 3 BULAN 4
NO JENIS PEKERJAAN
(Rp) (%) (MINGGU) M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15

A PEKERJAAN PERSIAPAN 85,374,117 7.54 2 2.20 2.00 3.34

B PEKERJAAN ASPAL 696,204,042 61.53 14 1.41 4.39 5.39 6.39 6.80 7.59 7.35 7.36 6.36 4.35 4.14

C PEKERJAAN BETON 117,568,706 10.39 6 1.73 1.73 2.00 2.00 1.47 1.46

D PEKERJAAN PAVING 182,340,053 16.11 5 3.22 3.22 3.22 3.22 3.22

E PEKERJAAN DRAINASE 50,089,955 4.43 8 0.55 0.55 0.55 0.55 0.55 0.55 0.55

Total 1,131,576,873 RENCANA ### 0.00 2.20 2.00 4.75 4.39 8.61 11.34 11.75 13.37 13.13 9.38 8.37 4.90 4.69 0.55
100.00
PPN 10% 113,157,687 KUMULATIF### 0.00 2.20 4.20 8.95 13.34 21.95 33.30 45.05 58.41 71.54 80.92 89.30 94.20 98.89 99.45
JUMLAH 1,244,734,560
PEMBULATAN 1,244,730,000
BULAN 4
M16

0.55

0.55
100.00
DIREKTORAT JENDRAL BINA ANALI SA B IAYA PE K E R JAAN KODE
MARGA
DIREKTORAT BNA PROGRAM JALAN
SUB DIT. PEMBERSIHAN LOKASI
PERENCANAAN JALAN LOKAL &
KABUPATEN A.009

PROSES : ANGGAPAN / ASUMSI :


1. Material disiapkan di lokasi pekerjaan. 1. Menggunakan tenaga manusia 400 m2/hari
2. Menghampar pasir setebal 5 cm. 2. Material dikirim ke lokasi pekerjaan oleh supplier.
3. Batu pecah berukuran besar ( 10-15 cm ) 3. Material sudah di pecah/batu pecah.
disusun berdiri. 4. Tanah Dasar sudah dipersiapkan.
4. Batu pecah yang lebih kecil mengisi 5. Dipadatkan sampai tebal 15 cm
rongga-rongga diatasnya kemudian
dipadatkan/digilas mesin gilas

JUMLAH UPAH BIAYA SUB.TOTAL


P E K E R J A VOL HARI KODE
HARI-ORANG (Rp./org/hr) ( Rp. ) ( Rp. )

Pekerja 0.1 1.00 L17 63,500.00 6,350.00


Tukang - 1.00 L07 79,000.00 -
Kepala - 1.00 L02 85,000.00 -
Mandor 0.05 1.00 L01 90,000.00 4,500.00

PEKERJA 10,850.00
VOLUME HARGA BIAYA SUB.TOTAL
MATERIAL JUMLAH KODE
SATUAN Rp./Unit ( Rp. ) ( Rp. )

MATERIAL 0.00
JUMLAH HARI JAM HARGA BIAYA SUB.TOTAL
PERALATAN KODE
ALAT KERJA KERJA (Rp./JAM) ( Rp. ) ( Rp. )

PERALATAN 0.00
TOTAL (Rp.) 10,850.00

VOLUME : 7868.58 SATUAN : m2


1.3789
HARGA SATUAN Rp. 1.3800 per m2
DIREKTORAT JENDRAL BINA ANALI SA B IAYA PE K E R JAAN KODE
MARGA
DIREKTORAT BNA PROGRAM JALAN
SUB KONSTRUKSI LAPIS PONDASI BAWAH ( L P B ) TELFORD
DIT. PERENCANAAN JALAN LOKAL K 516.A
&KABUPATEN
( MENGGUNAKAN BURUH )

PROSES : ANGGAPAN / ASUMSI :


1. Material disiapkan di lokasi pekerjaan. 1. Menggunakan tenaga manusia 400 m2/hari
2. Menghampar pasir setebal 5 cm. 2. Material dikirim ke lokasi pekerjaan oleh supplier.
3. Batu pecah berukuran besar ( 10-15 cm ) 3. Material sudah di pecah/batu pecah.
disusun berdiri. 4. Tanah Dasar sudah dipersiapkan.
4. Batu pecah yang lebih kecil mengisi 5. Dipadatkan sampai tebal 15 cm
rongga-rongga diatasnya kemudian
dipadatkan/digilas mesin gilas
JUMLAH UPAH BIAYA SUB.TOTAL
P E K E R J A VOL HARI KODE
HARI-ORANG (Rp./org/hr) ( Rp. ) ( Rp. )

Mandor lapangan 0.03 1.00 L.03 0.03 85,000.00 2,550.00


Operator terlatih 0.01 1.00 L.04 0.01 75,000.00 750.00
Pekerja 1.0 1.00 L17 0.99 63,500.00 62,865.00

PEKERJA 66,165.00
VOLUME HARGA BIAYA SUB.TOTAL
M A T E R I A L JUMLAH KODE
SATUAN Rp./Unit ( Rp. ) ( Rp. )

Batu pecah 10 - 15 cm 0.5 m3 M022 548,900.0 274,450.00


Batu pecah 3 - 5 cm 0.1 m3 M025 548,900.0 54,890.00
Alat bantu 0.04 set M.16 70,000.00 2,800.00

MATERIAL 332,140.0
JUMLAH HARI JAM HARGA BIAYA SUB.TOTAL
PERALATAN KODE
ALAT KERJA KERJA (Rp./JAM) ( Rp. ) ( Rp. )

Roller 3 wheel 8-10 ton 0.01 1.00 E16 5 331,284.3 3,312.84

WATER TANKER 0.01 1.00 E23 5 3,248.57


3000-4500 L. 324,856.6

PERALATAN 6,561.41
TOTAL (Rp.) 404,866.4

VOLUME: 1210 SATUAN : M3


334.67
HARGA SATUAN Rp. 334.67 per m3
DIREKTORAT JENDRAL BINA ANALI SA B IAYA PE K E R JAAN KODE
MARGA DIREKTORAT BNA
PROGRAM JALAN SUB DIT.
KONSTRUKSI LAPIS PONDASI BAWAH ( L P B ) TELFORD
PERENCANAAN JALAN LOKAL &
KABUPATEN ( MENGGUNAKAN BURUH ) K 516.A

PROSES : ANGGAPAN / ASUMSI :


1. Material disiapkan di lokasi pekerjaan. 1. Menggunakan tenaga manusia 400 m2/hari
2. Menghampar pasir setebal 5 cm. 2. Material dikirim ke lokasi pekerjaan oleh supplier.
3. Batu pecah berukuran besar ( 10-15 cm ) 3. Material sudah di pecah/batu pecah.
disusun berdiri. 4. Tanah Dasar sudah dipersiapkan.
4. Batu pecah yang lebih kecil mengisi 5. Dipadatkan sampai tebal 15 cm
rongga-rongga diatasnya kemudian
dipadatkan/digilas mesin gilas
JUMLAH UPAH BIAYA SUB.TOTAL
P E K E R J A VOL HARI KODE
HARI-ORANG (Rp./org/hr) ( Rp. ) ( Rp. )

Mandor lapangan 0.03 1.00 L.03 0.03 85,000.00 2,550.00


Operator terlatih 0.01 1.00 L.04 0.01 75,000.00 750.00
Pekerja 1.0 1.00 L17 0.99 63,500.00 62,865.00

PEKERJA 66,165.00
VOLUME HARGA BIAYA SUB.TOTAL
M A T E R I A L JUMLAH KODE
SATUAN Rp./Unit ( Rp. ) ( Rp. )

Pasir urug / timbun 0.3 m3 M001 145,000.0 43,500.00


Alat bantu 0.04 set M.16 70,000.00 2,800.00

MATERIAL 46,300.00

PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB.TOTAL


ALAT KERJA KERJA (Rp./JAM) ( Rp. ) ( Rp. )

PERALATAN 0.00
TOTAL (Rp.) 112,465.0

VOLUME: 201.63 SATUAN : M3


557.79
HARGA SATUAN Rp. 557.79 per m3
DIREKTORAT JENDRAL BINA ANALI SA B IAYA PE K E R JAAN KODE
MARGA DIREKTORAT BNA
PROGRAM JALAN SUB DIT.
PERENCANAAN JALAN LOKAL & KONSTRUKSI LAPIS PONDASI BAWAH ( L P B ) TELFORD
KABUPATEN ( MENGGUNAKAN BURUH ) K 516.B

PROSES : ANGGAPAN / ASUMSI :


1. Material disiapkan di lokasi pekerjaan. 1. Menggunakan tenaga manusia 400 m2/hari
2. Menghampar pasir setebal 5 cm. 2. Material dikirim ke lokasi pekerjaan oleh supplier.
3. Batu pecah berukuran besar ( 10-15 cm ) 3. Material sudah di pecah/batu pecah.
disusun berdiri. 4. Tanah Dasar sudah dipersiapkan.
4. Batu pecah yang lebih kecil mengisi 5. Dipadatkan sampai tebal 15 cm
rongga-rongga diatasnya kemudian
dipadatkan/digilas mesin gilas
JUMLAH UPAH BIAYA SUB.TOTAL
P E K E R J A VOL HARI KODE
HARI-ORANG (Rp./org/hr) ( Rp. ) ( Rp. )

Mandor lapangan 0.03 1.00 L.03 0.03 85,000.00 2,550.00


Operator terlatih 0.01 1.00 L.04 0.01 75,000.00 750.00
Pekerja 1.0 1.00 L17 0.99 63,500.00 62,865.00

PEKERJA 66,165.00
VOLUME HARGA BIAYA SUB.TOTAL
M A T E R I A L JUMLAH KODE
SATUAN Rp./Unit ( Rp. ) ( Rp. )

Batu Pecah 2 - 3 cm 0.3 M3 M014 271,040.0 81,312.00


Alat bantu 0.04 set M.16 70,000.00 2,800.00

MATERIAL 84,112.00
JUMLAH HARI JAM HARGA BIAYA SUB.TOTAL
PERALATAN KODE
ALAT KERJA KERJA (Rp./JAM) ( Rp. ) ( Rp. )

PERALATAN 0.00
TOTAL (Rp.) 150,277.0

VOLUME: 4033 SATUAN : M2


37.27
HARGA SATUAN Rp. 37.27 per m2
DIREKTORAT JENDRAL BINA ANALI SA B IAYA PE K E R JAAN KODE
MARGA DIREKTORAT BNA
PROGRAM JALAN SUB DIT. LABURAN ASPAL SATU LAPIS (BURTU) atau (BURTU 1)
PERENCANAAN JALAN LOKAL &
KABUPATEN ( MENGGUNAKAN TENAGA MANUSIA ) K 615

PROSES : ANGGAPAN / ASUMSI :


1. Bersihkan pemukaan aspal 1. Hasil kerja 600m2/hari
dari oli dan material lepas 2.Agregat ukuran tunggal 20mm tersaring produksi unit pemecah
2. Semprotkan primer aspal cair batu ditimbun dilokasi pekerjaan oleh pemasok
MC "0" 3. Permukaan yang akan diaspal telah selesai dipadatkan dan terikat
3. Lapisan permukaan aspal dengan binder
dengan bitumen dan taburkan 4.Lapis prime/resap permukaan menggunakan aspal cutback a 1l/m2
split serta digilas 5. Lapis seal/penutup menggunakan aspal cutback a 1,6l/m2
6. Agregat ukuran tunggal 20mm dihampar dengan tenaga manusia
a 50m2/m3
7. sesuai Spesifikasi. B.M Th 1995

JUMLAH UPAH BIAYA SUB.TOTAL


P E K E R J A VOL HARI KODE
HARI-ORANG (Rp./org/hr) ( Rp. ) ( Rp. )

Mandor 0.01 3.00 L01 0.03 90,000.00 900.00


Tukang 0.01 3.00 L07 0.03 79,000.00 790.00
Pekerja 0.18 3.00 L17 0.54 63,500.00 11,430.00

PEKERJA 13,120.00
VOLUME HARGA BIAYA SUB.TOTAL
M A T E R I A L JUMLAH KODE
SATUAN Rp./Unit ( Rp. ) ( Rp. )

Batu pecah 1-2 mm 0.30 m3 M026 548,900.0 164,670.00


Batu pecah 0-5 mm 0.10 m3 M027 548,900.0 54,890.00
Pasir 0.05 m3 M001 145,000.0 7,250.00
Aspal bitumen 0.4 kg 2.1 7,996.0 2,998.50
Kerosin 0.05 Lt 18.37 11,518.0 575.90
Alat bantu 0.02 set M.16 70,000.0 1,050.00

MATERIAL 231,434
JUMLAH HARI JAM HARGA BIAYA SUB.TOTAL
PERALATAN KODE
ALAT KERJA KERJA (Rp./JAM) ( Rp. ) ( Rp. )

Roller 3 wheel 8-10 ton 0.01 3.00 E.16 15 331,284.3 3,312.84


Err:508 PERALATAN 3,312.84
TOTAL (Rp.) 247,867.2

VOLUME: 8065 SATUAN : m2


30.73
HARGA SATUAN Rp. 30.73 per m2

DIREKTORAT JENDRAL BINA ANALI SA B IAYA PE K E R JAAN KODE


MARGA DIREKTORAT BNA
PROGRAM JALAN SUB DIT. PASANGAN BATU TEPI
PERENCANAAN JALAN LOKAL &
KABUPATEN ( MENGGUNAKAN BURUH ) K 517

PROSES : ANGGAPAN / ASUMSI :


1. Material disiapkan oleh supplie1. Digunakan pada struktur-struktur lain yang menggunakan pasangan
lokasi pekerjaan. batu tepi.
2. Batu belah dipasang berdiri. 2. Material dikirim sampai lokasi.
3. Tidak termasuk pekerjaan galian /timbunan.

JUMLAH UPAH BIAYA SUB.TOTAL


P E K E R J A VOL HARI KODE
HARI-ORANG (Rp./org/hr) ( Rp. ) ( Rp. )

Mandor lapangan 0.03 1.00 L01 0.03 90,000.00 2,700.00


Pekerja 0.75 1.00 L17 0.75 63,500.00 47,625.00

PEKERJA 50,325.00
VOLUME HARGA BIAYA SUB.TOTAL
M A T E R I A L JUMLAH KODE
SATUAN Rp./Unit ( Rp. ) ( Rp. )

Pasir urug / timbun 0.36 m3 M001 145,000.0 52,200.00


Batu belah 15 - 20 cm 0.30 m3 M022 548,900.0 164,670.00
Alat bantu 0.01 set M.16 70,000.00 980.00

MATERIAL 217,850.0
JUMLAH HARI JAM HARGA BIAYA SUB.TOTAL
PERALATAN KODE
ALAT KERJA KERJA (Rp./JAM) ( Rp. ) ( Rp. )

Err:508 PERALATAN 0.00


TOTAL (Rp.) 268,175.0

VOLUME: 29.961 SATUAN : m3


8,950.80
HARGA SATUAN Rp. 8,950.80 per m3
DIREKTORAT JENDRAL BINA ANALI SA B IAYA PE K E R JAAN KODE
MARGA DIREKTORAT BNA
PROGRAM JALAN SUB DIT. CETAKAN (BEGISTING) BETON KONSTRUKSI
PERENCANAAN JALAN LOKAL &
KABUPATEN ( MENGGUNAKAN BURUH ) K 710

PROSES : ANGGAPAN / ASUMSI :


1. Pengadaan bahan oleh
1. Kelompok tukang kayu memasang 100 m2 dalam 5 hari kerja
leveransir
2. Tukang kayu memotong dan 2. 1/3 material dapat dipakai kembali
membuat acuan/perancah 3. Pengadaan bahan oleh leveransir
3. Tukang kayu membongkar Untuk 1 m3 beton diginakan 40 lbr playwood untuk : 120 cm x 240
4.
acuan perancah setelah cm x 1,7
disetujui oleh direksi 5. Tukang kayu bongkar perancah

JUMLAH UPAH BIAYA SUB.TOTAL


P E K E R J A VOL HARI KODE
HARI-ORANG (Rp./org/hr) ( Rp. ) ( Rp. )

Mandor lapangan 0.01 5.00 L01 0.05 90,000.00 900.00


Tukang 0.04 5.00 L08 0.20 79,000.00 3,160.00
Pekerja 0.07 5.00 L17 0.35 63,500.00 4,445.00

PEKERJA 8,505.00
VOLUME HARGA BIAYA SUB.TOTAL
M A T E R I A L JUMLAH KODE
SATUAN Rp./Unit ( Rp. ) ( Rp. )

Paku 0.20 kg 11.6 26,615.00 5,323.00


Kayu meranti untuk 0.03 m3 17.2 7,823,450 234,703.50
perancah/Bekisting
Alat bantu 0.03 set M.16 70,000.00 2,100.00

MATERIAL 242,127
JUMLAH HARI JAM HARGA BIAYA SUB.TOTAL
P E RALATAN KODE
ALAT KERJA KERJA (Rp./JAM) ( Rp. ) ( Rp. )

Err:508 PERALATAN 0.00


TOTAL (Rp.) 250,631.5

VOLUME: 0.43 SATUAN : m3


578,654.58
HARGA SATUAN Rp. 578,654.58 per m3

DIREKTORAT JENDRAL BINA ANALI SA B IAYA PE K E R JAAN KODE


MARGA DIREKTORAT BNA
PROGRAM JALAN SUB DIT. Memasang Wiremesh M6
PERENCANAAN JALAN LOKAL &
KABUPATEN ( MENGGUNAKAN BURUH ) 3.90

JUMLAH UPAH BIAYA SUB.TOTAL


P E K E R J A VOL HARI KODE
HARI-ORANG (Rp./org/hr) ( Rp. ) ( Rp. )

Mandor lapangan 0.06 5.00 L01 0.30 90,000.00 5,400.00


Kepala Tukang besi 0.006 5.00 L04 0.03 85,000.00 510.00
Tukang besi 0.016 5.00 L09 0.08 79,000.00 1,264.00
Pekerja tidak terampil 0.016 5.00 L17 0.08 63,500.00 1,016.00

PEKERJA 8,190.00
VOLUME HARGA BIAYA SUB.TOTAL
M A T E R I A L JUMLAH KODE
SATUAN Rp./Unit ( Rp. ) ( Rp. )

Wiremesh M6 0.01 roll M.18 3,959,000 39,590.00


Alat bantu 0.01 set M.16 70,000.00 700.00

MATERIAL 40,290.00
JUMLAH HARI JAM HARGA BIAYA SUB.TOTAL
PERALATAN KODE
ALAT KERJA KERJA (Rp./JAM) ( Rp. ) ( Rp. )

Err:508 PERALATAN 0.00


TOTAL (Rp.) 48,480.00

VOLUME: 1396 SATUAN : m2


34.73
HARGA SATUAN Rp. 34.73 per m2
DIREKTORAT JENDRAL BINA ANALI SA B IAYA PE K E R JAAN KODE
MARGA DIREKTORAT BNA
PROGRAM JALAN SUB DIT. Membuat Beton Mutu f'c = 21,7 MPa (K 250),
PERENCANAAN JALAN LOKAL &
KABUPATEN Slump (12 + 2) cm 3.80
( MENGGUNAKAN BURUH )
JUMLAH UPAH BIAYA SUB.TOTAL
P E K E R J A VOL HARI KODE
HARI-ORANG (Rp./org/hr) ( Rp. ) ( Rp. )

Mandor lapangan 0.08 5.00 L01 0.42 90,000.00 7,470.00


Kepala Tukang batu 0.03 5.00 L02 0.42 85,000.00 2,380.00
Tukang batu 0.275 5.00 L07 1.38 79,000.00 21,725.00
Pekerja tidak terampil 1.650 5.00 L17 8.25 63,500.00 104,775.00

PEKERJA 136,350.00
VOLUME HARGA BIAYA SUB.TOTAL
M A T E R I A L JUMLAH KODE
SATUAN Rp./Unit ( Rp. ) ( Rp. )

Portland Cement (PC) 3.84 kg M037 1,925.00 7,392.00


Pasir ex palu 0.49 m3 70,000.00 34,580.00

MATERIAL 41,972.00
JUMLAH HARI JAM HARGA BIAYA SUB.TOTAL
PERALATAN KODE
ALAT KERJA KERJA (Rp./JAM) ( Rp. ) ( Rp. )

Err:508 PERALATAN 0.00


TOTAL (Rp.) 178,322.00

VOLUME: 279.19 SATUAN : m3


638.72
HARGA SATUAN Rp. 638.72 per m3
DIREKTORAT JENDRAL BINA ANALI SA B IAYA PE K E R JAAN KODE
MARGA DIREKTORAT BNA
PROGRAM JALAN SUB DIT. Memasang Paving stone Mutu K 200, tebal 6 cm
PERENCANAAN JALAN LOKAL &
KABUPATEN ( MENGGUNAKAN BURUH ) 3.80

JUMLAH UPAH BIAYA SUB.TOTAL


P E K E R J A VOL HARI KODE
HARI-ORANG (Rp./org/hr) ( Rp. ) ( Rp. )

Mandor lapangan 0.01 5.00 L01 0.05 90,000.00 900.00


Kepala Tukang batu 0.015 5.00 L02 0.08 85,000.00 1,275.00
Tukang batu 0.150 5.00 L07 0.75 79,000.00 11,850.00
Pekerja 0.200 5.00 L17 1.00 63,500.00 12,700.00

PEKERJA 26,725.00
VOLUME HARGA BIAYA SUB.TOTAL
M A T E R I A L JUMLAH KODE
SATUAN Rp./Unit ( Rp. ) ( Rp. )

Pasir urug 0.10 m3 M001 145,000 14,500.00

MATERIAL 14,500.00
JUMLAH HARI JAM HARGA BIAYA SUB.TOTAL
PERALATAN KODE
ALAT KERJA KERJA (Rp./JAM) ( Rp. ) ( Rp. )

Err:508 PERALATAN 0.00


TOTAL (Rp.) 41,225.00

VOLUME: 97.309 SATUAN : m3


423.65
HARGA SATUAN Rp. 423.65 per m3
DIREKTORAT JENDRAL BINA ANALI SA B IAYA PE K E R JAAN KODE
MARGA DIREKTORAT BNA
PROGRAM JALAN SUB DIT.
Memasang Paving stone Mutu K 200, tebal 6 cm
PERENCANAAN JALAN LOKAL &
KABUPATEN ( MENGGUNAKAN BURUH ) 3.80

JUMLAH UPAH BIAYA SUB.TOTAL


P E K E R J A VOL HARI KODE
HARI-ORANG (Rp./org/hr) ( Rp. ) ( Rp. )

Mandor lapangan 0.01 5.00 L01 0.05 90,000.00 900.00


Kepala Tukang batu 0.015 6.00 L02 0.09 85,000.00 1,275.00
Tukang batu 0.150 5.00 L07 0.75 79,000.00 11,850.00
Pekerja 0.200 5.00 L17 1.00 63,500.00 12,700.00

PEKERJA 26,725.00
VOLUME HARGA BIAYA SUB.TOTAL
M A T E R I A L JUMLAH KODE
SATUAN Rp./Unit ( Rp. ) ( Rp. )

Paving stone 6 cm,


abu-abu 1.01 m2 6.57 45,178.00 45,629.78

MATERIAL 45,629.78
JUMLAH HARI JAM HARGA BIAYA SUB.TOTAL
PERALATAN KODE
ALAT KERJA KERJA (Rp./JAM) ( Rp. ) ( Rp. )

Err:508 PERALATAN 0.00


TOTAL (Rp.) 72,354.78

VOLUME: 1946 SATUAN : m2


37.18
HARGA SATUAN Rp. 37.18 per m2
DIREKTORAT JENDRAL BINA ANALI SA B IAYA PE K E R JAAN KODE
MARGA DIREKTORAT BNA
PROGRAM JALAN SUB DIT. Memasang Kansteen beton 40x20x10
PERENCANAAN JALAN LOKAL & 3.80
KABUPATEN ( MENGGUNAKAN BURUH )

JUMLAH UPAH BIAYA SUB.TOTAL


P E K E R J A VOL HARI KODE
HARI-ORANG (Rp./org/hr) ( Rp. ) ( Rp. )

Mandor lapangan 0.01 5.00 L01 0.05 90,000.00 900.00


Kepala Tukang batu 0.015 5.00 L02 0.08 85,000.00 1,275.00
Tukang batu 0.100 5.00 L07 0.50 79,000.00 7,900.00
Pekerja 0.100 5.00 L17 0.50 63,500.00 6,350.00

PEKERJA 16,425.00
VOLUME HARGA BIAYA SUB.TOTAL
M A T E R I A L JUMLAH KODE
SATUAN Rp./Unit ( Rp. ) ( Rp. )

Kansteen 2.00 bh 51,500.00 103,000.00


Plesteran 1 : 3 0.0043 m3 18,933.67 81.41
MATERIAL 103,081.41
JUMLAH HARI JAM HARGA BIAYA SUB.TOTAL
PERALATAN KODE
ALAT KERJA KERJA (Rp./JAM) ( Rp. ) ( Rp. )

Err:508 PERALATAN 0.00


TOTAL (Rp.) 119,506.41

VOLUME: 313.9 SATUAN : m'


380.71
HARGA SATUAN Rp. 380.71 per m'

DIREKTORAT JENDRAL BINA ANALI SA B IAYA PE K E R JAAN KODE


MARGA DIREKTORAT BNA
PROGRAM JALAN SUB DIT. Galian tanah biasa sedalam 1 Meter
PERENCANAAN JALAN LOKAL &
KABUPATEN ( MENGGUNAKAN BURUH ) B.001

JUMLAH UPAH BIAYA SUB.TOTAL


P E K E R J A VOL HARI KODE
HARI-ORANG (Rp./org/hr) ( Rp. ) ( Rp. )

Mandor lapangan 0.025 5.00 L01 0.13 90,000.00 2,250.00


Pekerja 0.750 5.00 L17 3.75 63,500.00 47,625.00

PEKERJA 49,875.00
VOLUME HARGA BIAYA SUB.TOTAL
M A T E R I A L JUMLAH KODE
SATUAN Rp./Unit ( Rp. ) ( Rp. )

MATERIAL 0.00
JUMLAH HARI JAM HARGA BIAYA SUB.TOTAL
PERALATAN KODE
ALAT KERJA KERJA (Rp./JAM) ( Rp. ) ( Rp. )

Err:508 PERALATAN 0.00


TOTAL (Rp.) 49,875.00

VOLUME: 115.82 SATUAN : m3


430.61
HARGA SATUAN Rp. 430.61 per m3
DIREKTORAT JENDRAL BINA
ANALI SA B IAYA PE K E R JAAN KODE
MARGA DIREKTORAT BNA
PROGRAM JALAN SUB DIT. Memasang 1 m3 beton siklop
PERENCANAAN JALAN LOKAL &
KABUPATEN ( MENGGUNAKAN BURUH )

JUMLAH UPAH BIAYA SUB.TOTAL


P E K E R J A VOL HARI KODE
HARI-ORANG (Rp./org/hr) ( Rp. ) ( Rp. )

Mandor lapangan 0.170 5.00 L01 0.85 90,000.00 15,300.00


Kepala tukang 0.085 5.00 L02 0.43 85,000.00 7,225.00
Tukang batu 0.85 5.00 L07 4.25 79,000.00 67,150.00
Pekerja 3.40 5.00 L17 17.00 63,500.00 215,900.00

PEKERJA 305,575.00
VOLUME HARGA BIAYA SUB.TOTAL
M A T E R I A L JUMLAH KODE
SATUAN Rp./Unit ( Rp. ) ( Rp. )

Batu belah 15 - 20 cm 0.480 m3 M022 548,900.0 263472


Portland cement (PC) 1.940 kg M037 1,925.0 3734.5
Pasir beton 0.312 m3 M004 200,100.0 62431.2
Kerikil 0.468 m3 6.14 150,967.0 70652.556
Besi beton 1.260 kg 7.9 14,873.0 18739.98
Kawat beton 0.018 kg M135 24,500.0 441
MATERIAL 419,471.24
JUMLAH HARI JAM HARGA BIAYA SUB.TOTAL
PERALATAN KODE
ALAT KERJA KERJA (Rp./JAM) ( Rp. ) ( Rp. )
Err:508 PERALATAN 0.00
TOTAL (Rp.) 725,046.24

VOLUME: 28.956 SATUAN : m3


25,039.84
HARGA SATUAN Rp. 25,039.84 per m3

DIREKTORAT JENDRAL BINA


ANALI SA B IAYA PE K E R JAAN KODE
MARGA DIREKTORAT BNA
PROGRAM JALAN SUB DIT. 1 m' Pasangan saluran buis beton 1/2 U 30 cm
PERENCANAAN JALAN LOKAL &
KABUPATEN ( MENGGUNAKAN BURUH )

JUMLAH UPAH BIAYA SUB.TOTAL


P E K E R J A VOL HARI KODE
HARI-ORANG (Rp./org/hr) ( Rp. ) ( Rp. )

Mandor lapangan 0.019 5.00 L01 0.10 90,000.00 1,710.00


Kepala tukang 0.019 5.00 L02 0.10 85,000.00 1,615.00
Tukang batu 0.19 5.00 L07 0.95 79,000.00 15,010.00
Pekerja 0.38 5.00 L17 1.90 63,500.00 24,130.00

PEKERJA 42,465.00
VOLUME HARGA BIAYA SUB.TOTAL
M A T E R I A L JUMLAH KODE
SATUAN Rp./Unit ( Rp. ) ( Rp. )

Pas. Bata campuran 1


Pc : 3 Psr 0.015 m2 143,413.66 2151.2049
Urugan pasir 0.025 m3 M001 173,250.0 4331.25

493.16
Buis beton 1/2 U 30 cm 0.010 bh 10.10 49,316.00

MATERIAL 493.16
JUMLAH HARI JAM HARGA BIAYA SUB.TOTAL
PERALATAN KODE
ALAT KERJA KERJA (Rp./JAM) ( Rp. ) ( Rp. )
Err:508 PERALATAN 0.00
TOTAL (Rp.) 42,958.16

VOLUME: 321.73 SATUAN : m'


133.52
HARGA SATUAN Rp. 133.52 per m'

DIREKTORAT JENDRAL BINA


ANALI SA B IAYA PE K E R JAAN KODE
MARGA DIREKTORAT BNA
PROGRAM JALAN SUB DIT. 1 m2 Acian
PERENCANAAN JALAN LOKAL &
KABUPATEN ( MENGGUNAKAN BURUH )

JUMLAH UPAH BIAYA SUB.TOTAL


P E K E R J A VOL HARI KODE
HARI-ORANG (Rp./org/hr) ( Rp. ) ( Rp. )

Mandor lapangan 0.008 5.00 L01 0.04 90,000.00 720.00


Kepala tukang 0.150 5.00 L02 0.75 85,000.00 12,750.00
Tukang batu 0.075 5.00 L07 0.38 79,000.00 5,925.00
Pekerja 0.15 5.00 L17 0.75 63,500.00 9,525.00

PEKERJA 28,920.00
VOLUME HARGA BIAYA SUB.TOTAL
M A T E R I A L JUMLAH KODE
SATUAN Rp./Unit ( Rp. ) ( Rp. )

Plesteran campuran
1 Pc : 3 Psr 0.032 kg 18,933.67 602.09

MATERIAL 602.09

PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB.TOTAL


ALAT KERJA KERJA (Rp./JAM) ( Rp. ) ( Rp. )
Err:508 PERALATAN 0.00
TOTAL (Rp.) 29,522.09

VOLUME: 321.73 SATUAN : m2


91.76
HARGA SATUAN Rp. 91.76 per m2
Presedence Diagram Methode (PDM)

NO JENIS PEKERJAAN DURASI (MINGGU) SUCESSOR HUBUNGAN


A PEKERJAAN PERSIAPAN 2 B FS-1
B PEKERJAAN ASPAL 14 C SS+3
C PEKERJAAN BETON 6 D SS-1
E SS+2
D PEKERJAAN PAVING 5 E FS-2
E PEKERJAAN DRAINASE 8 - -

SS+3 SS-1 3 D 8
3 5 8
0 A 2 FS-1 1 B 15 4 C 10
0 2 2 1 14 15 4 6 10 FS-2
6 E 14
SS+2 6 8 14
DAFTAR UPAH
TAHUN ANGGARAN 2016
Err:509
KODE URAIAN SATUAN UPAH KETERANGAN

L01 Mandor Org/hr 90,000.00


L02 Kepala Tukang Batu Org/hr 85,000.00
L03 Kepala Tukang Kayu Org/hr 85,000.00
L04 Kepala Tukang Besi Org/hr 85,000.00
L05 Kepala Tukang Cat Org/hr 85,000.00
L06 Kepala Tukang Listrik Org/hr 85,000.00
L07 Tukang Batu Org/hr 79,000.00
L08 Tukang Kayu Org/hr 79,000.00
L09 Tukang Besi/Baja Org/hr 79,000.00
L10 Tukang Cat Org/hr 79,000.00
L11 Tukang Listrik Org/hr 79,000.00
L12 Tukang Pipa Org/hr 79,000.00
L13 Tukang Plitur Org/hr 79,000.00
L14 Tukang Taman Org/hr 79,000.00
L15 Tukang Aspal Org/hr 79,000.00
L16 Pembantu Tukang Org/hr 63,500.00
L17 Pekerja Biasa Org/hr 63,500.00
L18 Penjaga Malam Org/hr 50,000.00
L19 Sopir Org/hr 75,000.00
L20 Operator Org/hr 75,000.00
L21 Mekanik Org/hr 75,000.00
L22 Pembantu Sopir Org/hr 65,000.00
L23 Pembantu Operator Org/hr 65,000.00
L24 Pembantu Mekanik Org/hr 65,000.00
L25 Juru Ukur Org/hr 160,000.00
L26 Engineer dan Crew Ls 550,000.00
L27 Tenaga Ahli Geolistrik Org/hr 750,000.00
L28 Tenaga Ahli Geofisika Or / hr 750,000.00
DAFTAR HARGA BAHAN BANGUNAN
TAHUN ANGGARAN 2016
KODE BAHAN BANGUNAN SATUAN HARGA

M001 Pasir Urug 1 m³ 145,000.00


M002 Pasir Pasang 1 m³ 173,250.00
M003 Pasir Hitam 1 m³ 193,200.00
M004 Pasir Cor 1 m³ 200,100.00
M005 Pasir Silika 1 Kg 14,300.00
M006 Tanah Urug 1 m³ 105,500.00
M007 Sirtu 1 m³ 165,000.00
M008 Tanah Urug Taman/Katel 1 m³ 125,000.00
M009 Tanah Liat 1 m³ 95,000.00
M010 Batu Belah Gunung 1 m³ 172,500.00
M011 Batu Belah Kali 1 m³ 185,400.00
M012 Batu Kali 1 m³ 187,300.00
M013 Stenslah/batu pecah tangan 1/2 1 m³ 253,000.00
M014 Stenslah/batu pecah tangan 2/3 1 m³ 247,500.00
M015 Stenslah/batu pecah tangan 3/5 1 m³ 229,500.00
M016 Stenslah/batu pecah tangan 4/6 - 5/7 1 m³ 203,500.00
M017 Batu pecah mesin 1/1 1 m³ 296,450.00
M018 Batu pecah mesin 1/2 1 m³ 275,300.00
M019 Batu pecah mesin 2/3 1 m³ 271,040.00
M020 Batu pecah mesin 3/5 1 m³ 250,200.00
M021 Batu pecah mesin 4/6 - 5/7 1 m³ 231,100.00
M022b Batu Pecah 10 - 15 cm 1 m³ 548,900.00
M023a Batu Pecah 5 - 7 cm 1 m³ 548,900.00
M024a Batu Pecah 3 - 5 cm 1 m³ 548,900.00
M025a Batu Pecah 2 - 3 cm 1 m³ 548,900.00
M026a Batu Pecah 1 - 2 cm 1 m³ 548,900.00
M027a Batu Pecah 0.5 - 1 cm (Chipping) 1 m³ 548,900.00
M022 Bata Merah 1 bh 825.00
M022.a Batu Bata Tahan Api 1 bh 18,100.00
M023 Bata Berongga 1 bh 1,265.00
M024 Batako 1 bh 7,300.00
M025 Rooster 1 bh 12,925.00
M026 Batu Granito 1 kg 6,050.00
M027 Batu Teraso 1 kg 4,950.00
M028 Batu Palimanan 1 m² 135,000.00
M029 Batu Tempel Hitam 1 m² 112,500.00
M030 Hollow Blok (HB.20) 1 bh 7,500.00
M031 Hollow Blok (HB.15) 1 bh 7,700.00
M032 Hollow Blok (HB.10) 1 bh 5,750.00
M033 Paving Block Segi Empat Biasa 1 bh 2,500.00
M034 Paving Block Segi Empat Warna 1 bh 3,200.00
M035 Paving Block Segi Enam Biasa 1 bh 3,600.00
M036.a Paving Block Segi Enam Warna 1 bh 3,800.00
KODE BAHAN BANGUNAN SATUAN HARGA
M036.b Paving Block Tiga Berlian Biasa 1 bh 1,870.00
M036.c Paving Block Tiga Berlian Warna 1 bh 2,145.00
M037 Portland Cement (PC) 1 kg 1,925.00
M037.a Portland Cement (PC) Tahan Api 1 kg 6,325.00
M038 Portland Cement (PC) Putih 1 kg 3,850.00
M039 Portland Cement (PC) Warna 1 kg 7,150.00
M040 Portland Cement (PC) Grouting 1 kg 11,275.00
KODE BAHAN BANGUNAN SATUAN HARGA
M041 Kapur 1 m³ 1,732,500.00
M042 Gamping 1 kg 1,705.00
M043 Semen Merah 1 m³ 259,400.00
M044 Buis Beton Ø 0.20 m 1 m¹ 51,300.00
M045 Buis Beton Ø 0.30 m 1 m¹ 66,550.00
M046 Buis Beton Ø 0.40 m 1 m¹ 87,000.00
M047 Buis Beton Ø 0.50 m 1 m¹ 108,500.00
M048 Buis Beton Ø 0.60 m 1 m¹ 151,250.00
M049 Buis Beton Ø 0.80 m 1 m¹ 272,250.00
M050 Buis Beton Ø 0.90 m 1 m¹ 291,500.00
M051 Buis Beton Ø 1.00 m 1 m¹ 350,900.00
M052 Buis Beton U Ø 0.20 m 1 m¹ 41,250.00
M053 Buis Beton U Ø 0.30 m 1 m¹ 57,900.00
M054 Reng : 2/3, 3/5 1 m³ 6,600,000.00
M055 Usuk : 5/7 1 m³ 6,600,000.00
M056 Balok 1 m³ 7,150,000.00
M057 Papan (2x20) cm 1 m³ 7,425,000.00
M058 Papan (3x20) cm 1 m³ 7,535,000.00
M059 Papan (3x30) cm 1 m³ 7,535,000.00
M060 Reng 2/3, 3/5 1 m³ 6,879,600.00
M061 Usuk 5/7 1 m³ 6,879,600.00
M062 Balok 1 m³ 7,713,400.00
M063 Papan (2x20) cm 1 m³ 7,425,000.00
M064 Papan (3x20) cm 1 m³ 8,250,000.00
M065 Papan (3x30) cm 1 m³ 8,250,000.00
M066 Reng 2/3, 3/5 1 m³ 8,250,000.00
M067 Usuk 5/7 1 m³ 8,250,000.00
M068 Balok 1 m³ 8,525,000.00
M069 Papan (2x20) cm 1 m³ 8,822,000.00
M070 Papan (3x20) cm 1 m³ 8,822,000.00
M071 Papan (3x30) cm 1 m³ 8,822,000.00
M078 Reng 2/3, 3/5 1 m³ 10,835,000.00
M079 Usuk 5/7 1 m³ 10,835,000.00
M080 Balok 1 m³ 11,951,500.00
M081 Papan (2x20) cm 1 m³ 12,925,000.00
M082 Papan (3x20) cm 1 m³ 13,750,000.00
M083 Papan (3x30) cm 1 m³ 13,750,000.00
M084 Balok Kayu Kelas III 1 m³ 4,400,000.00
M085 Papan Kayu kelas III 1 m³ 5,225,000.00
M088 Bambu Ø 10 cm 1 btg 27,500.00
M089 Dolken Kayu Ø 8 cm 1 btg 38,300.00
M090 List Kayu Profil 1 m¹ 10,725.00
M091 List Kayu 2/4 1 m³ 4,864,400.00
M092 Gedeg (2.00 x 3.00) m 1 Ibr 75,000.00
M093 Bilik Bambu 1 m² 131,200.00
M094 Reng : 2/3, 3/5 1 m³ 15,950,000.00
M095 Usuk : 5/7 1 m³ 15,950,000.00
KODE BAHAN BANGUNAN SATUAN HARGA
M096 Balok 1 m³ 15,950,000.00
KODE BAHAN BANGUNAN SATUAN HARGA
M097 Papan (2x20) cm 1 m³ 18,150,000.00
M098 Papan (3x20) cm 1 m³ 18,150,000.00
M099 Papan (3x30) cm 1 m³ 18,150,000.00
M100 Reng 2/3, 3/5 1 m³ 18,700,000.00
M101 Usuk 5/7 1 m³ 18,700,000.00
M102 Balok 1 m³ 18,700,000.00
M103 Papan (2x20) cm 1 m³ 18,700,000.00
M104 Papan (3x20) cm 1 m³ 18,700,000.00
M105 Papan (3x30) cm 1 m³ 18,700,000.00
M106 Reng : 2/3, 3/5 1 m³ 27,038,400.00
M107 Usuk : 5/7 1 m³ 27,038,400.00
M108 Balok 1 m³ 29,000,000.00
M109 Papan (2x20) cm 1 m³ 29,000,000.00
M110 Papan (3x20) cm 1 m³ 29,000,000.00
M111 Papan (3x30) cm 1 m³ 29,000,000.00
M112 Besi Beton Polos 1 kg 11,600.00
M113 Besi Beton Ulir 1 kg 13,000.00
M114 Besi Strip / Plat Plendes 1 kg 13,800.00
M115 Besi Beugel/Kawel 1 kg 14,740.00
M116 Baja Profil 1 kg 14,025.00
M116.a Plat Baja 1 kg 14,850.00
M116.b Roda Railling bh 25,000.00
M117 Angker Bar / Dynabolt 1 kg 25,300.00
M118 Kabel prestressed 1 kg 41,600.00
M119 Pintu Besi Baja 1 m² 863,500.00
M120 Pintu Gulung Besi 1 m² 2,585,000.00
M121 Pintu Lipat 1 m² 1,925,000.00
M122 Rolling Door 1 m² 1,645,400.00
M123 Pagar Besi 1 m² 770,000.00
M124 Pintu Pagar besi 1 m² 852,500.00
M124.a Pagar Model BRC tinggi 1 m 1 m¹ 385,000.00
M124.b Pintu Pagar Model BRC tinggi 1 m 1 m¹ 495,000.00
M125 Profil Aluminium Putih 1 m¹ 104,500.00
M126 Profil Aluminium Coklat 1 m¹ 137,500.00
M127 Sunscream Aluminium 1 m² 401,500.00
M128 Pintu Fiber KM 1 Unit 440,000.00
M129 Atap Aluminium 1 m² 137,500.00
M130 Bubung Atap Aluminium 1 m² 126,500.00
M131 Aluminium Foil/Sesalation 1 m² 39,050.00
M132 Baja Ringan 1 Kg 55,000.00
M133 Kawat Galvanis 2 mm 1 Kg 54,450.00
M134 Kawat Galvanis 3 mm 1 Kg 107,900.00
M135 Kawat Beton/Bendrat RRT 1 Kg 24,500.00
M136 Kawat Harmonika Gas 1 m² 26,400.00
M137 Kawat Duri 1 Kg 25,850.00
M138 Kawat Nyamuk 1 m² 24,750.00
M139 Kawat Nyamuk/Kasa Plastik 1 m² 23,650.00
KODE BAHAN BANGUNAN SATUAN HARGA
M140 Paku Kayu Segala Ukuran 1 Kg 22,000.00
KODE BAHAN BANGUNAN SATUAN HARGA
M141 Paku Seng Segala Ukuran 1 Kg 28,270.00
M142 Paku Asbes Segala Ukuran 1 bh 660.00
M143 Paku Sumbat Segala Ukuran 1 bh 990.00
M144 Paku Kait Segala Ukuran 1 bh 825.00
M145 Sekrup segala ukuran 1 bh 495.00
M146 Baut Segala Ukuran 1 kg 24,750.00
M147 Paku Keling 1 bh 4,070.00
M148 Paku Beton 1 kg 49,500.00
M148.a Wire Mesh 1 kg 22,275.00
M148.b Sealant 1 tube 38,500.00
M148.c Aluminium Strip 1 m¹ 21,725.00
M148.d Profil Kaca 1 m¹ 14,025.00
M148.e Venetion blinds dan vertical blinds (tirai) 1 m² 682,550.00
M148.f Atap Seng Galvalum 1 m² 136,125.00
M148.g Bubung Atap Seng Galvalum 1 m² 132,550.00
M149 Genteng Biasa ex. Malang 1 bh 1,800.00
M150 Genteng Press ex. Trenggalek 1 bh 1,950.00
M151 Genteng Karang Pilang ex. Malang 1 bh 2,475.00
M152 Genteng Karang Pilang ex. Trenggalek 1 bh 2,750.00
M153 Genteng Karang Pilang ex. Surabaya 1 bh 3,025.00
M154 Genteng Beton sekualitas Varia Usaha 1 bh 5,225.00
M155 Genteng Kaca 1 bh 19,250.00
M156 Bubung Genteng Biasa ex. Malang 1 bh 3,500.00
M157 Bubung Genteng Press ex. Trenggalek 1 bh 4,125.00
M158 Bubung Genteng Karang Pilang ex. Malang 1 bh 6,500.00
M159 Bubung Genteng Karang Pilang ex. Trenggalek 1 bh 6,325.00
M160 Bubung Genteng Karang Pilang ex. Surabaya 1 bh 7,150.00
M161 Bubung Genteng Beton sekualitas Varia Usaha 1 bh 9,350.00
M162 Genteng Palentong Kecil 1 bh 3,025.00
M163 Genteng Kodok Glazuur 1 bh 3,850.00
M164 Genteng Palentong Super/Besar 1 bh 5,775.00
M165 Bubung Genteng Palentong Kecil 1 bh 5,225.00
M166 Bubung Genteng Kodok Glazuur 1 bh 9,900.00
M167 Bubung Genteng Palentong Super/Besar 1 bh 10,725.00
M168 Genteng Aspal 1 Ibr 8,525.00
M169 Genteng Metal 1 lbr 137,700.00
M170 Atap Sirap 1 bh 1,936.00
M171 Bubung Genteng Aspal 1 bh 54,571.00
M172 Bubung Genteng Metal 1 bh 137,700.00
M173 Bubung Atap Sirap 1 bh 148,500.00
M173.a Plastik Aerator 1 bh 8,360.00
M174 Seng plat BJLS 30 L = 0.45 M 1 m¹ 44,550.00
M175 Seng plat BJLS 30 L = 0.60 M 1 m¹ 50,490.00
M176 Seng plat BJLS 30 L = 0.90 M 1 m¹ 63,360.00
M177 Seng plat BJLS 28 (90 x 180) cm 1 lbr 85,250.00
M178 Atap Seng Gelombang 1 Ibr 60,500.00
M179 Bubung Seng Gelombang 1 lbr 95,370.00
KODE BAHAN BANGUNAN SATUAN HARGA
M180 Roof Light Fibreglass 1 m² 94,600.00
M181 Atap Polycarbonat 1 m² 192,500.00
KODE BAHAN BANGUNAN SATUAN HARGA
M182 Asbes Gelombang (3.00 x 1.05) m x 4 mm 1 lbr 127,050.00
M183 Asbes Gelombang (2.70 x 1.05) m x 4 mm 1 lbr 117,227.00
M184 Asbes Gelombang (2.40 x 1.05) m x 4 mm 1 lbr 101,750.00
M185 Asbes Gelombang (2.10 x 1.05) m x 4 mm 1 lbr 90,530.00
M186 Asbes Gelombang (1.50 x 1.05) m x 4 mm 1 lbr 67,485.00
M187 Asbes Gelombang (2.50 x 0.92) m x 5 mm 1 lbr 127,050.00
M188 Asbes Gelombang (2.25 x 0.92) m x 5 mm 1 lbr 110,550.00
M189 Asbes Gelombang (2.00 x 0.92) m x 5 mm 1 lbr 99,275.00
M190 Asbes Gelombang (1.80 x 0.92) m x 5 mm 1 lbr 75,350.00
M191 Asbes Gelombang (3.00 x 1.08) m x 6 mm 1 lbr 166,364.00
M192 Asbes Gelombang (2.70 x 1.08) m x 6 mm 1 lbr 154,137.50
M193 Asbes Gelombang (2.10 x 1.08) m x 6 mm 1 lbr 110,330.00
M194 Asbes Gelombang (1.80 x 1.08) m x 6 mm 1 lbr 90,750.00
M195 Bubung Stel Gelombang 0.92 m 1 Ibr 55,110.00
M196 Bubung Stel Gelombang 1.05 m 1 lbr 58,630.00
M197 Bubung Stel Gelombang 1.08 m 1 lbr 58,960.00
M198 Bubung Paten 0.92 m 1 lbr 51,260.00
M199 Bubung Paten 1.05 m 1 lbr 50,820.00
M200 Bubung Paten 1.08 m 1 lbr 54,670.00
M201 Bubung Stel Rata 0.92 m 1 Ibr 55,110.00
M202 Bubung Stel Rata 1.05 m 1 lbr 46,860.00
M203 Asbes (1,00 x 1,00) m x 6 mm 1 lbr 21,560.00
M204 Asbes (1,00 x 1,00) m x 5 mm 1 Ibr 20,240.00
M205 Asbes (1,00 x 1,00) m x 4 mm 1 lbr 19,635.00
M206 Asbes (1,00 x 1,00) m x 3,5 mm 1 Ibr 18,920.00
M207 Akustik (30 x 30) cm 1 Ibr 18,425.00
M208 Akustik (30 x 60) cm 1 Ibr 32,835.00
M209 Akustik (60 x 120) cm 1 lbr 42,790.00
M210 Harplek 4 mm 1 m² 63,360.00
M211 List Gypsum 1 m' 16,940.00
M212 Soft Board 1 Ibr 69,575.00
M213 Gypsum Board 9 mm 1 Ibr 82,500.00
M214 Triplek 3 mm 1 lbr 60,775.00
M215 Triplek 4 mm 1 lbr 96,250.00
M216 Multiplek 6 mm 1 lbr 110,000.00
M217 Multiplek 9 mm 1 lbr 171,875.00
M218 Multiplek 10 mm 1 lbr 181,500.00
M219 Multiplek 12 mm 1 lbr 233,750.00
M220 Multiplek 18 mm 1 lbr 295,625.00
M221 Plywood Lapis Aluminium 1 lbr 118,500.00
M222 Plywood (30 x 60) cm x 4 mm 1 lbr 9,460.00
M223 Plywood (30 x 60) cm x 6 mm 1 Ibr 12,925.00
M224 Plywood (60 x 120) cm x 4 mm 1 Ibr 29,040.00
M225 Plywood (60 x 120) cm x 6 mm 1 lbr 34,650.00
M226 Plywood (120 x 240) cm x 4 mm 1 Ibr 123,750.00
M227 Teakwood (30 x 60) cm x 4 mm 1 lbr 10,450.00
M228 Teakwood (60 x 120) cm x 4 mm 1 lbr 33,550.00
KODE BAHAN BANGUNAN SATUAN HARGA
M229 Teakwood (120 x 240) cm x 4 mm 1 Ibr 112,500.00
M230 Kloset Jongkok Porselin Kw. A 1 Unit 412,500.00
M231 Kloset Duduk Porselin Kw. A 1 Unit 2,846,250.00
M232 Kloset Jongkok Lux 1 Unit 412,500.00
M233 Kloset Duduk Lux 1 Unit 1,925,000.00
M234 Kloset Jongkok Teraso 1 bh 316,250.00
M235 Kran Air 1/2 " 1 bh 183,425.00
M236 Kran Air 3/4 " 1 bh 204,550.50
M237 Bak Mandi Teraso 1 bh 166,100.00
M238 Bak Mandi Fibre 1 bh 487,025.00
M239 Bak Mandi Plastik 1 bh 238,260.00
M240 Bak Mandi Porselin 1 bh 2,772,000.00
M241 Kran Bathub Panas dan dingin 1 bh 1,950,000.00
M242 Bak Cuci Firing Teraso 1 bh 275,000.00
M243 Bak Cuci Firing Stainless 1 bh 1,250,000.00
M244 Badkip Porselen 1 bh 4,996,750.00
M245 Urinoir Porselin 1 bh 2,516,750.00
M246 Urinoir Keramik 1 bh 2,681,800.00
M247 Wastafel Komplit (Kran + Sipon) Lux 1 Unit 1,677,500.00
M248 Wastafel Komplit (Kran + Sipon) Kw. A 1 Unit 650,000.00
M249 Tempat Sabun Keramik 1 bh 225,000.00
M250 Afor Stainless 1 bh 71,500.00
M251 Afor Plastic 1 bh 18,150.00
M252 Kaca Wastafel 1 bh 93,500.00
M253 Kunci Tanam sekualitas SOLID 1 bh 375,000.00
M254 Kunci Tanam sekualitas DEKSON 1 bh 385,000.00
M255 Kunci Pintu Kamar Mandi sekualitas SOLID 1 bh 375,000.00
M256 Kunci Silinder 1 bh 181,500.00
M257 Engsel Pintu sekualitas SOLID 1 set 38,500.00
M258 Engsel Jendela sekualitas SOLID 1 set 31,350.00
M259 Hak Angin sekualitas SOLID 1 set 34,375.00
M260 Spring Knip 1 bh 19,250.00
M261 Kait Angin sekualitas SOLID 1 bh 18,150.00
M262 Grendel Pintu sekualitas SOLID 1 bh 54,000.00
M263 Grendel Jendela sekualitas SOLID 1 bh 47,500.00
M264 Door Closer sekualitas SOLID 1 bh 194,590.00
M265 Slot/Kunci Pintu sekualitas SOLID 1 bh 425,000.00
M266 Door Holder sekualitas SOLID 1 bh 138,930.00
M267 Door Stop sekualitas SOLID 1 bh 49,500.00
M268 Rel Pintu Dorong sekualitas Handerson 1 bh 550,000.00
M269 Kunci Lemari 1 bh 17,500.00
M270 Kaca Polos tebal 3 mm sekualitas Asahi Mas 1 m² 110,200.00
M271 Kaca Polos tebal 5 mm sekualitas Asahi Mas 1 m² 139,920.00
M272 Kaca Polos tebal 8 mm sekualitas Asahi Mas 1 m² 270,600.00
M273 Kaca Polos tebal 12 mm sekualitas Asahi Mas 1 m² 375,540.00
M274 Kaca Buram tebal 3 mm sekualitas Asahi Mas 1 m² 106,480.00
M275 Kaca Buram tebal 5 mm sekualitas Asahi Mas 1 m² 169,840.00
KODE BAHAN BANGUNAN SATUAN HARGA
M276 Kaca Buram tebal 8 mm sekualitas Asahi Mas 1 m² 227,370.00
KODE BAHAN BANGUNAN SATUAN HARGA
M277 Kaca Buram tebal 12 mm sekualitas Asahi Mas 1 m² 373,120.00
M278 Kaca Cermin tebal 5 mm sekualitas Asahi Mas 1 m² 220,000.00
M279 Kaca Cermin tebal 6 mm sekualitas Asahi Mas 1 m² 281,380.00
M280 Kaca Cermin tebal 8 mm sekualitas Asahi Mas 1 m² 383,460.00
M281 Kaca Rayben tebal 3 mm sekualitas Asahi Mas 1 m² 137,720.00
M282 Kaca Rayben tebal 5 mm sekualitas Asahi Mas 1 m² 201,960.00
M283 Kaca Rayben tebal 8 mm sekualitas Asahi Mas 1 m² 413,490.00
M284 Kaca Rayben tebal 12 mm sekualitas Asahi Mas 1 m² 660,330.00
M285 Jendela Nako + accessories 1 m² 269,830.00
M286 Glass Block 1 bh 26,290.00
M287 Painting Glass 1 m² 614,570.00
M288 Kaca "Wireglass" 5 mm 1 m² 689,700.00
M289 Kaca Patri 5 mm 1 m² 1,504,140.00
M290 Ubin pc abu-abu 40 x 40 cm 1 bh 2,750.00
M291 Ubin pc abu-abu 30 x 30 cm 1 bh 2,035.00
M292 Ubin pc abu-abu 20 x 20 cm 1 bh 1,375.00
M293 Ubin pc warna 40 x 40 cm 1 bh 3,190.00
M294 Ubin pc warna 30 x 30 cm 1 bh 1,980.00
M295 Ubin pc warna 20 x 20 cm 1 bh 1,485.00
M296 Ubin Terasso 40 x 40 cm 1 bh 4,510.00
M297 Ubin Terasso 30 x 30 cm 1 bh 3,190.00
M298 Ubin sekualitas Granit Tile ex. China 40 x 40 cm 1 bh 16,720.00
M299 Ubin sekualitas Granit Tile ex. China 60 x 60 cm 1 bh 40,000.00
M299a Ubin Teralux Kerang 40 x 40 cm 1 bh 45,100.00
M299b Ubin Teralux Kerang 30 x 30 cm 1 bh 38,610.00
M299c Ubin Teralux Kerang 60 x 60 cm 1 bh 77,440.00
M299d Ubin Teralux Marmer 40 x 40 cm 1 bh 57,970.00
M300 Plint ubin pc abu-abu 15 x 20 cm 1 bh 3,190.00
M301 Plint ubin pc abu-abu 10 x 30 cm 1 bh 3,520.00
M302 Plint ubin pc abu-abu 10 x 40 cm 1 bh 3,850.00
M303 Plint ubin pc warna 10 x 20 cm 1 bh 1,980.00
M304 Plint ubin pc warna 10 x 30 cm 1 bh 2,530.00
M305 Plint ubin pc warna 10 x 40 cm 1 bh 3,850.00
M306 Plint Ubin Terasso 10 x 30 cm 1 bh 4,510.00
M307 Plint Ubin Terasso 10 x 40 cm 1 bh 6,490.00
M308 Plint Ubin sekualitas Granit Tile ex. China 10 x 40 cm 1 bh 11,000.00
M309 Plint Ubin sekualitas Granit Tile ex. China 10 x 60 cm 1 bh 15,000.00
M310 Lantai keramik artistik 10 x 20 1 bh 9,570.00
M311 Lantai keramik artistik 10 x 10 1 bh 9,570.00
M312 Lantai keramik artistik 5 x 20 1 bh 9,570.00
M313 Plint keramik artistik 10 x 20 1 bh 19,140.00
M314 Plint keramik artistik 10 x 10 1 bh 19,140.00
M315 Plint keramik artistik 5 x 20 1 bh 19,140.00
M316 Internal cove 5 x 5 x 20 cm 1 bh 25,520.00
M316.a Bahan Teraso Cor 1 m³ 200,310.00
M317 Keramik Lantai 40 x 40 cm putih sekualitas Asia 1 bh 22,137.50
M318 Keramik Lantai 40 x 40 cm warna/motif sekualitas Asia 1 bh 23,613.33
KODE BAHAN BANGUNAN SATUAN HARGA
M319 Keramik Lantai 30 x 30 cm putih sekualitas Asia 1 bh 10,005.00
KODE BAHAN BANGUNAN SATUAN HARGA
M320 Keramik Lantai 30 x 30 cm warna/motif sekualitas Asia 1 bh 10,465.00
M321 Keramik Lantai 20 x 20 cm putih sekualitas Asia 1 bh 4,250.40
M322 Keramik Lantai 20 x 20 cm warna/motif sekualitas Asia 1 bh 4,554.00
M323 Keramik Lantai KM 20 x 20 cm sekualitas Asia 1 bh 2,585.00
M324 Plint Keramik Lantai 10 x 20 cm sekualitas Asia 1 bh 5,170.00
M325 Plint Keramik Lantai 10 x 30 cm sekualitas Asia 1 bh 9,570.00
M326 Plint Keramik Lantai 10 x 40 cm sekualitas Asia 1 bh 11,000.00
M327 Keramik Dinding 20 x 25 cm sekualitas Asia 1 bh 4,620.00
M328 Keramik Dinding 20 x 20 cm sekualitas Asia 1 bh 3,300.00
M329 Porselin 15 x 15 cm putih 1 bh 1,045.00
M330 Porselin 15 x 15 cm warna 1 bh 1,045.00
M331 Porselin 10 x 20 cm warna 1 bh 990.00
M332 Porselin 20 x 20 cm warna 1 bh 2,200.00
M333 Gymflour 1 m² 254,210.00
M333.a Parquet 1 m² 450,000.00
M333.b Karpet 1 m² 62,040.00
M333.c Lantai marmer 100x100 cm sekualitas ex Tulungagung 1 m² 445,775.00
M333.d Porselin 11 x 11 cm putih 1 m² 935.00
M333.e Porselin 11 x 11 cm warna 1 m² 1,210.00
M333.f Wall Paper 1 m² 61,270.00
M333.g Batu Ampyangan Granit 1 kg 8,500.00
M334 Pipa PVC tipe AW Ø 1/2" sekualitas Maspion 1 m¹ 7,920.00
M335 Pipa PVC tipe AW Ø 3/4" sekualitas Maspion 1 m¹ 9,680.00
M336 Pipa PVC tipe AW Ø 1" sekualitas Maspion 1 m¹ 12,100.00
M337 Pipa PVC tipe AW Ø 1.5" sekualaitas Maspion 1 m¹ 17,270.00
M338 Pipa PVC tipe AW Ø 2" sekualitas Maspion 1 m¹ 22,440.00
M339 Pipa PVC tipe AW Ø 2.5" sekualitas Maspion 1 m¹ 43,010.00
M340 Pipa PVC tipe AW Ø 3 " sekualitas Maspion 1 m¹ 61,270.00
M341 Pipa PVC tipe AW Ø 4 " sekualitas Maspion 1 m¹ 89,100.00
M342 Pipa PVC tipe AW Ø 6 " sekualitas Maspion 1 m¹ 185,680.00
M343 Pipa PVC tipe AW Ø 8 " sekualitas Maspion 1 m¹ 230,120.00
M344 Pipa PVC tipe D Ø 1/2 " sekualitas Maspion 1 m¹ 5,600.00
M345 Pipa PVC tipe D Ø 3/4 " sekualaitas Maspion 1 m¹ 6,710.00
M346 Pipa PVC tipe D Ø 1" sekualitas Maspion 1 m¹ 8,800.00
M347 Pipa PVC tipe D Ø 1.5 " sekualitas Maspion 1 m¹ 11,000.00
M348 Pipa PVC tipe D Ø 2 " sekualitas Maspion 1 m¹ 23,500.00
M349 Pipa PVC tipe D Ø 2.5 " sekualitas Maspion 1 m¹ 23,760.00
M350 Pipa PVC tipe D Ø 3 " sekualitas Maspion 1 m¹ 34,210.00
M351 Pipa PVC tipe D Ø 4 " sekualitas Maspion 1 m¹ 48,180.00
M352 Pipa PVC tipe C Ø 1/2 " sekualitas Maspion 1 m¹ 3,300.00
M353 Pipa PVC tipe C Ø 3/4 " sekualitas Maspion 1 m¹ 5,060.00
M354 Pipa PVC tipe C Ø 1" sekualitas Maspion 1 m¹ 6,600.00
M355 Pipa PVC tipe C Ø 1.5 " sekualitas Maspion 1 m¹ 8,470.00
M356 Pipa PVC tipe C Ø 2 " sekualitas Maspion 1 m¹ 13,420.00
M357 Pipa PVC tipe C Ø 2.5 " sekualitas Maspion 1 m¹ 17,050.00
M358 Pipa PVC tipe C Ø 3 " sekualitas Maspion 1 m¹ 19,690.00
M359 Pipa PVC tipe C Ø 4 " sekualitas Maspion 1 m¹ 25,520.00
KODE BAHAN BANGUNAN SATUAN HARGA
M360 Shock PVC Ø 1/2 " sekualitas Masion 1 bh 3,520.00
KODE BAHAN BANGUNAN SATUAN HARGA
M361 Shock PVC Ø 3/4 " sekualitas Maspion 1 bh 4,180.00
M362 Shock PVC Ø 1 " sekualitas Maspion 1 bh 4,840.00
M363 Shock PVC Ø 1.5 " sekualitas Maspion 1 bh 6,270.00
M364 Shock PVC Ø 2 " sekualitas Maspion 1 bh 7,590.00
M365 Shock PVC Ø 2.5 " sekualitas Maspion 1 bh 8,250.00
M366 Shock PVC Ø 3 " sekualitas Maspion 1 bh 9,680.00
M367 Shock PVC Ø 4 " sekualitas Maspion 1 bh 10,340.00
M368 Knee PVC Ø 1/2 " sekualitas Maspion 1 bh 4,000.00
M369 Knee PVC Ø 3/4 " sekualitas Maspion 1 bh 4,840.00
M370 Knee PVC Ø 1 " sekualitas Maspion 1 bh 5,500.00
M371 Knee PVC Ø 1.5 " sekualitas Maspion 1 bh 6,930.00
M372 Knee PVC Ø 2 " sekualitas Maspion 1 bh 7,590.00
M373 Knee PVC Ø 2.5 " sekualitas Maspion 1 bh 9,020.00
M374 Knee PVC Ø 3 " sekualitas Maspion 1 bh 11,770.00
M375 Knee PVC Ø 4 " sekualitas Maspion 1 bh 18,590.00
M376 Pipa Galvanis Ø 1/2" tebal 1.8 mm skw. Spindo 1 m¹ 25,300.00
M377 Pipa Galvanis Ø 3/4" tebal 1.8 mm skw. Spindo 1 m¹ 33,330.00
M378 Pipa Galvanis Ø 1 ", tebal 2 mm skw. Spindo 1 m¹ 53,680.00
M379 Pipa Galvanis Ø 1.5 ", tebal 2 mm skw. Spindo 1 m¹ 76,780.00
M380 Pipa Galvanis Ø 2 ", tebal 2.3 mm skw. Spindo 1 m¹ 104,280.00
M381 Pipa Galvanis Ø 2.5 ", tebal 2.5 mm skw. Spindo 1 m¹ 131,780.00
M382 Pipa Galvanis Ø 3" tebal 2.5 mm skw. Spindo 1 m¹ 159,280.00
M383 Pipa Galvanis Ø 4" tebal 2.8 mm skw. Spindo 1 m¹ 214,280.00
M384 Shock Galvanis Ø 1/2 " skw. Spindo 1 bh 4,812.50
M385 Shock Galvanis Ø 3/4 " skw. Spindo 1 bh 6,187.50
M386 Shock Galvanis Ø 1 " skw. Spindo 1 bh 9,625.00
M387 Shock Galvanis Ø 1.5 " skw. Spindo 1 bh 17,187.50
M388 Shock Galvanis Ø 2 " skw. Spindo 1 bh 26,125.00
M389 Shock Galvanis Ø 2.5 " skw. Spindo 1 bh 48,125.00
M390 Shock Galvanis Ø 3 " skw. Spindo 1 bh 70,812.50
M391 Shock Galvanis Ø 4 " skw. Spindo 1 bh 116,187.50
M392 Knee Galvanis Ø 1/2 " skw. Spindo 1 bh 5,500.00
M393 Knee Galvanis Ø 3/4 " skw. Spindo 1 bh 8,250.00
M394 Knee Galvanis Ø 1 " skw. Spindo 1 bh 11,687.50
M395 Knee Galvanis Ø 1.5 " skw. Spindo 1 bh 22,687.50
M396 Knee Galvanis Ø 2 " skw. Spindo 1 bh 35,750.00
M397 Knee Galvanis Ø 2.5 " skw. Spindo 1 bh 68,062.50
M398 Knee Galvanis Ø 3 " skw. Spindo 1 bh 103,125.00
M399 Knee Galvanis Ø 4 " skw. Spindo 1 bh 170,625.00
M400 Pipa Screen PVC tipe AW Ø 6 " skw. Maspion 1 m¹ 179,107.50
M400.a Pipa PVC tipe AW Ø 5 " skw. Maspion 1 m¹ 115,555.00
M400.b Pipa Screen PVC tipe AW Ø 5 " skw. Maspion 1 m¹ 147,565.00
M400.c Pipa PVC moof 6 m S - 12,5 Ø 2" skw. Maspion 1 m¹ 33,660.00
M400.d Pipa PVC moof 6 m S - 12,5 Ø 2,5" skw. Maspion 1 m¹ 46,887.50
M400.e Pipa PVC moof 6 m S - 12,5 Ø 3" skw. Maspion 1 m¹ 69,850.00
M400.f Pipa PVC moof 6 m S - 12,5 Ø 4" skw. Maspion 1 m¹ 102,492.50
M400.g Pipa PVC moof 6 m S - 12,5 Ø 6" skw. Maspion 1 m¹ 221,430.00
KODE BAHAN BANGUNAN SATUAN HARGA
M400.h Pipa PVC moof 6 m S - 12,5 Ø 8" skw. Maspion 1 m¹ 358,627.50
KODE BAHAN BANGUNAN SATUAN HARGA
M401 Kertas Gosok 1 Lbr 13,500.00
M402 Plamir Kayu sekualitas cap Pedang 1 kg 64,500.00
M403 Plamir Tembok 1 kg 19,250.00
M404 Plamir Besi 1 Kg 49,500.00
M405 Dempul Jadi 1 kg 63,250.00
M406 Minyak Cat 1 Ltr 20,872.50
M407 Spiritus 1 Ltr 13,750.00
M408 Sirlak 1 kg 176,550.00
M409 Cat meni kayu sekualitas Emco 1 kg 32,312.50
M410 Cat meni besi sekualitas Emco 1 kg 41,250.00
M411 Cat Dasar Kayu sekualitas Emco 1 kg 71,250.00
M412 Cat Dasar Tembok eksterior sekualitas Mowilex 1 kg 85,000.00
M413 Cat Dasar Besi sekualitas Emco 1 kg 61,600.00
M414 Cat Kayu sekualitas Emco 1 kg 60,500.00
M415 Cat Tembok eksterior sekualitas Mowilex 1 kg 80,960.00
M415.a Cat Tembok Interior sekualitas ICI Catylac 1 kg 39,800.00
M415.b Cat Tembok Eksterior sekualitas ICI Weathar Shield 1 kg 85,000.00
M416 Cat Besi sekualitas Emco 1 kg 53,680.00
M417 Cat Genting sekualitas Nippon Paint 1 kg 145,750.00
M418 Waterproofing sekualitas Sika 1 kg 181,500.00
M419 Vernis 1 Ltr 69,575.00
M420 Politur Jadi 1 Ltr 85,250.00
M421 Kuas 1 bh 20,625.00
M422 Lem Kayu 1 kg 38,500.00
M423 Lem Pipa PVC 1 kg 38,060.00
M424 Lem vinyl 1 kg 66,330.00
M425 Residu atau Teer 1 Ltr 30,140.00
M426 Teak oli 1 Ltr 16,750.00
M427 Kalkarium 1 kg 9,570.00
M428 Kapur Sirih 1 kg 5,170.00
M429 Soda api 1 kg 26,290.00
M430 Sabun 1 kg 38,720.00
M430.a Vinyl (30x30)cm 1 bh 26,510.00
M430.b Batu Apung 1 kg 42,680.00
M430.c Alang-Alang 1 ikat 4,510.00
M431 Tandon Air PVC V = 0.5 m3 1 bh 2,656,500.00
M432 Tandon Air PVC V = 1.0 m3 1 bh 3,668,500.00
M433 Tandon Air Stainless V = 0.5 m3 1 bh 2,217,710.00
M434 Tandon Air Stainless V = 1.0 m3 1 bh 3,713,710.00
M435 Sumur Pompa Tangan Lengkap sekualitas Dragon 1 Unit 550,000.00
M436 Pompa Air sekualitas Sanyo 1 Unit 935,000.00
M437 Kabel NYA 2.5 mm 1 m¹ 9,250.00
M438 Kabel NYA 4.0 mm 1 m¹ 13,250.00
M438a Kabel NYYHY 3x4 mm 1 m¹ 18,300.00
M438b Kabel NYYHY 3x1.5 mm 1 m¹ 11,500.00
M439 Stop Kontak 1 bh 27,000.00
M440 Saklar Broco Tunggal 1 bh 36,300.00
KODE BAHAN BANGUNAN SATUAN HARGA
M440.a Saklar Broco Ganda 1 bh 41,580.00
KODE BAHAN BANGUNAN SATUAN HARGA
M441 Las doof 1 bh 715.00
M442 Isolator 1 m¹ 880.00
M443 T dos PVC 1 bh 2,500.00
M444 Pipa PVC 5/8" 1 Ljr 9,350.00
M445 Fiting Flafond 1 bh 13,750.00
M446 Zekering Kast Lokal 1 Group 1 Unit 88,400.00
M447 Zekering Kast Lokal 2 Group 1 Unit 126,500.00
M448 Zekering Kast Lokal 3 Group 1 Unit 170,995.00
M449 Lampu TL Komplit 20 Watt sekualitas Phillip 1 bh 71,940.00
M450 Lampu TL Komplit 40 Watt sekualitas Phillip 1 bh 103,290.00
M451 Lampu XL (Lilin) 5 Watt sekualitas Phillip 1 bh 30,613.00
M452 Lampu XL (Lilin) 8 Watt sekualitas Phillip 1 bh 34,091.75
M453 Lampu XL (Lilin) 14 Watt sekualitas Phillip 1 bh 38,962.00
M454 Lampu XL (Lilin) 18 Watt sekualitas Phillip 1 bh 43,136.50
M455 Lampu XL (Lilin) 23 Watt sekualitas Phillip 1 bh 49,500.00
M456 Lampu Pijar 5 - 40 Watt sekualitas Phillip 1 bh 24,400.00
M457 Lampu Pijar 50 -100 Watt sekualitas Phillip 1 bh 45,000.00
M458 Tambah Daya 2200 Watt 1 Ls 4,864,400.00
M459 Pasang Baru PLN 1 Ls 6,949,100.00
M460 Pipa Arde 1 m¹ 137,500.00
M460.a Splits Dia 1 1 bh 104,775.00
M460.b Timah 1 kg 544,500.00
M460.c Kawat BC 1 m¹ 55,137.50
M460.d Klemp 1 bh 2,900.00
M461 Rumput Lamur 1 m² 11,000.00
M462 Rumput Gajah Mutiara 1 m² 11,000.00
M463 Semak Hias 1 m² 15,367.00
M464 Pohon Pelindung 1 btg 233,893.00
M464.a Gebalan rumput Gajah mutiara 1 m² 12,100.00
M465 Tali ijuk 1 kg 26,700.00
M466 ljuk 1 m³ 203,500.00
M467 Waterstop Lebar 150 mm 1 m¹ 38,720.00
M468 Waterstop Lebar 200 mm 1 m¹ 69,938.00
M469 Waterstop Lebar 230 mm 1 m¹ 81,675.00
M470 Rumput Common Bermuda Grass 1 m² 16,335.00
M471 Pupuk 1 kg 3,850.00
M471a Obat Tanaman 1 ltr 109,202.50
M472 Tali Plastik Ø 0.8 cm 1 m¹ 3,025.00
M473 Elektroda 1 kg 43,318.00
M474 Minyak bekisting 1 ltr 3,267.00
M475 Formika (90 x 120) cm 1 lbr 77,682.00
M476 Strorox 100 1 kg 101,156.00
M477 Formtie 1 bh 8,349.00
M478 Batacote 1 kg 7,502.00
M479 Rapidrant 1 Gln 38,720.00
M480 Puzzdith - 100 XR 1 Ltr 77,682.00
M481 Seal Tape / TBA 1 bh 4,500.00
KODE BAHAN BANGUNAN SATUAN HARGA
M482 Bensin Industri 1 ltr 11,275.00
KODE BAHAN BANGUNAN SATUAN HARGA
M482.a Bensin Umum 1 Itr 6,500.00
M483 Solar Industri 1 Itr 11,000.00
M483.a Solar Umum 1 Itr 4,500.00
M484 Minyak Pelumas 1 Itr 41,250.00
M485 Grease 1 kg 27,830.00
M486 Air Bersih 1 Itr 100.00
M487 Kuas 4" 1 bh 18,150.00
M488 Lampu Mercury 1 bh 301,576.00
M489 Jaring PEDT Mesh 2,5 cm 1 bh 39,974.00
M490 Rumput Sintetis (30x30)cm 1 bh 19,987.00
M491 Kalsiboard 4.5 mm 1 lbr 112,369.95
M492 Kalsiboard 9 mm 1 lbr 215,445.95
M493 Eternit 100x100 tbl 3,5 mm 1 lbr 24,756.05
M494 Metal furing 1 m' 18,342.50
M495 Kawat seng polos 1 Kg 30,043.75
M496 Ramset / Dynabolt 1 Bh 6,325.00
M497 Lapis aluminum jeruk 1 m2 37,950.00
M498 Pipa stainless steel 2" 1 m' 158,125.00
M499 Stud Track 7,6 1 m' 31,625.00
M500 Gypsum Board 12 mm 1 lbr 107,525.00
M501 Usuk Canal C 75. 0.75 1 m1 18,975.00
M502 Reng Purlin R 36.055 1 m1 12,650.00
M503 Baut 1 bh 126.50
M504 Batu sisir 1 m² 101,073.50
M505 Coating batu alam 1 kg 56,925.00
M506 Engsel casement 15 " bh 41,112.50
M507 Tempered kaca m2 632,500.00

bh
bh
bh

m1
bh
bh
KETERANGAN

Tanah dan Pasir

Batu,Bata & Beton Block

Per Meter isi 45


Per Meter isi 45
Per Meter isi 28
Per Meter isi 28
KETERANGAN
Per Meter isi 33
Per Meter isi 33
Semen
KETERANGAN

Buis Beton

Kayu Borneo

Kayu Meranti

Kayu Kruing

Kayu Kamper

Kayu Lain-lain

Kayu Jati Ex Malang


KETERANGAN
KETERANGAN

Kayu Jati Ex Madiun/Ngawi

Kayu Jati Ex Bojonegoro

Besi dan Aluminium


KETERANGAN
KETERANGAN

Atap Genteng

Atap Seng / Asbes


KETERANGAN
KETERANGAN

Kayu Olahan
KETERANGAN

Perlengkapan Kamar Mandi

Alat-Alat Penggantung

Kaca
KETERANGAN
KETERANGAN

Perlengkapan Lantai
KETERANGAN
KETERANGAN

Perpipaan
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
Plitur & Cat

Peralatan Air Bersih

Instalasi Listrik
KETERANGAN
KETERANGAN

Lain - Lain
KETERANGAN
KETERANGAN
HARGA DAN SEWA PERALATAN

KEGIATAN
PEKERJAAN
LOKASI

BIAYA SEWA PASTI


NO. KODE JENIS ALAT HARGA ALAT
(PER JAM)

1 E01 Asphalt Mixing Plant 3,640,178,000.00 4,588,341.08


2 E02 Asphalt Finisher 1,249,709,000.00 656,108.73
3 E03 Asphalt Sprayer 153,810,000.00 91,065.31
4 E04 Bulldozer 100-150 Hp 1,719,685,000.00 789,611.60
5 E05 Compressor 4000-6500 L\M 227,867,000.00 225,099.49
6 E06 Concrete Mixer 0.3-0.6 M3 16,050,000.00 102,025.15
7 E07 Crane 10-15 Ton 3,845,259,000.00 1,266,370.71
8 E08 Dump Truck 6 Ton 277,065,800.00 322,980.60
9 E09 Dump Truck 8 Ton 483,479,821.00 566,327.94
10 E10 Excavator 80-140 Hp 1,121,533,000.00 597,862.67
11 E11 Flat Bed Truck 3-4 M3 757,658,000.00 632,539.77
12 E12 Generator Set 544,317,000.00 559,519.63
13 E13 Motor Grader >100 Hp 1,845,724,000.00 777,049.01
14 E14 Track Loader 75-100 Hp 783,293,000.00 380,730.42
15 E15 Wheel Loader 1.0-1.6 M3 1,606,463,000.00 635,419.39
16 E16 Three Wheel Roller 6-8 T 712,085,000.00 331,284.26
17 E17 Tandem Roller 6-8 T. 1,709,004,000.00 630,082.22
18 E18 Tire Roller 8-10 T. 1,570,147,000.00 636,324.37
19 E19 Vibratory Roller 5-8 T. 1,281,753,000.00 526,904.52
20 E20 Concrete Vibrator 13,853,290.00 63,111.39
21 E21 Stone Crusher 3,149,907,000.00 1,291,177.34
22 E22 Water Pump 70-100 Mm 18,701,941.50 59,663.17
23 E23 Water Tanker 3000-4500 L. 284,834,000.00 324,856.56
24 E24 Pedestrian Roller 135,296,000.00 101,167.36
25 E25 Tamper 21,362,000.00 65,188.76
26 E26 Jack Hammer 42,725,000.00 51,389.17
27 E27 Fulvi Mixer 3,560,425,000.00 2,916,627.38
28 E28 Concrete Pump 284,834,000.00 320,488.52
29 E29 Trailer 20 Ton 1,068,127,000.00 658,885.41
30 E30 Pile Driver + Hammer 2,848,340,000.00 782,672.75
31 E31 Crane On Track 35 Ton 2,848,340,000.00 953,992.34
32 E32 Welding Set 106,812,000.00 152,865.67
33 E33 Bore Pile Machine 3,263,232,000.00 1,101,572.91
34 E34 Asphalt Liquid Mixer (kap 1000) 356,042,000.00 146,126.06
35 E35 Trailler 15 Ton/TRONTON 647,350,000.00 656,969.45
36 E36 Rock Drill Breaker 58,261,000.00 98,997.10
37 E37 Cold Milling 647,350,000.00 763,458.42
38 E38 Cold Recycler 10,197,000,000.00 4,471,422.48
39 E39 Hot Recycler 33,140,250,000.00 8,937,033.78
40 E40 Aggregat (chip) Spreader 447,535,000.00 622,343.61
41 E41 Asphalt Distribution 447,535,000.00 429,254.69
42 E42 Split Form Paver 1,514,982,000.00 642,301.76
43 E43 Concrete Pan Mixer 1,133,000,000.00 758,905.79
44 E44 Concrete Breaker 10,197,000,000.00 3,159,922.48
45 E45 Asphalt Tanker 566,500,000.00 597,689.15
46 E46 Cement Tanker 566,500,000.00 577,689.15
47 E47 Concrete Mixer (350) 39,655,000.00 99,301.02
48 E48 Vibrating Rammer 22,660,000.00 64,603.81
49 E49 Truk Mixer 849,750,000.00 719,279.25
50 E50 Bore Pile Machine 3,263,232,000.00 1,332,861.43
51 E51 Crane On Track 75 - 100Ton 2,848,340,000.00 1,158,922.75
52 E52 Blending Equipment 566,500,000.00 339,190.04
64 E53 Mesin Potong Rumput 2,750,000.00
65 E54 Pick Up Truck 229,900,000.00
66 E55 Chain Saw 3,850,000.00 47,515.67
53 Bar Bender - 32,472.86
54 Bar Cutter - 32,472.86
55 Breaker - 213,071.43
56 Grouting Pump - 256,071.43
57 Jack Hidrolic - 47,521.43
58 Mesin Las - 48,901.43
59 Pile Driver Leader, 75 Kw - 191,571.43
60 Pile Hammer - 67,171.43
61 Pile Hammer, 2,5 Ton - 43,221.43
62 Stressing Jack - 232,421.43
63 Welding Machine, 300 A - 51,821.43