DINAS PENDIDIKAN
JALAN PATTIMURA NO. 40 A TELP. (0761) 42788
PEKANBARU
KEGIATAN :
ENGGINER ESTIMATE
(EE)
PEKERJAAN :
PEMBANGUNAN SMAN BARU , 4 RKB BERTINGKAT
LOKASI :
PEKANBARU
REKAPITULASI ( OWNER ESTIMATE )
KEGIATAN : PEMBANGUNAN SMAN BARU
PEKERJAAN : PEMBANGUNAN SMAN BARU , 4 RKB BERTINGKAT
LOKASI : TAMPAN
1 2 3
LANTAI I
I PEKERJAAN PERSIAPAN Rp. 5,500,000.00
II PEKERJAAN TANAH DAN PONDASI Rp. 117,749,236.93
III PEKERJAAN STRUKTUR Rp. 248,174,425.44
IV PEKERJAAN DINDING & PLESTERAN Rp. 120,691,716.24
V PEKERJAAN PINTU DAN JENDELA Rp. 70,243,470.05
VI PEKERJAAN PLAFOND Rp. 46,729,872.51
VII PEKERJAAN LANTAI Rp. 126,634,400.86
VIII PEKERJAAN ALAT PENGGANTUNG Rp. 18,495,020.00
IX PEKERJAAN INSTALASI LISTRIK Rp. 9,117,600.00
X PEKERJAAN INSTALASI AIR Rp. 2,473,450.00
XI PEKERJAAN PENGECATAN Rp. 29,203,790.79
XIII PEKERJAAN TANGGA 1 UNIT Rp. 16,575,449.88
XIV PEKERJAAN LUAR BANGUNAN Rp. 24,173,874.82
JUMLAH HARGA LANTAI I Rp. 835,762,307.52
LANTAI II
I PEKERJAAN STRUKTUR Rp. 93,058,783.74
II PEKERJAAN DINDING & PLESTERAN Rp. 108,559,772.24
III PEKERJAAN PINTU DAN JENDELA Rp. 59,449,912.05
IV PEKERJAAN KUDA - KUDA & ATAP Rp. 122,128,430.00
V PEKERJAAN PLAFOND Rp. 36,224,252.00
VI PEKERJAAN LANTAI Rp. 54,650,452.00
VII PEKERJAAN ALAT PENGGANTUNG Rp. 18,145,290.00
VIII PEKERJAAN INSTALASI LISTRIK Rp. 10,236,200.00
IX PEKERJAAN PENGECATAN Rp. 27,341,149.82
JUMLAH HARGA LANTAI II Rp. 529,794,241.84
( A ) JUMLAH HARGA PEKERJAAN Rp. 1,365,556,549.36
( B ) Pajak Pertambahan Nilai (PPN) = (A) x 10% Rp. 136,555,654.94
( C ) Jumlah Total Harga Pekerjaan = (A) + (B) Rp. 1,502,112,204.29
DIBULATKAN Rp. 1,502,112,000.00
Terbilang :
Satu Milyar Lima Ratus Tiga Puluh Tujuh Juta Empat Ratus Lima Puluh Sembilan Ribu Rupiah.
Pekanbaru, 2013
DIBUAT OLEH :
KEPALA BIDANG PENGEMBANGAN SM
DINAS PENDIDIKAN KOTA PEKANBARU
Selaku Kuasa Pengguna Anggaran/PPK
H. ADDAURI, M.Pd
Nip. 195703141978011002
OWNER ESTIMATE ( O E )
KEGIATAN : PEMBANGUNAN SMAN BARU
PEKERJAAN : PEMBANGUNAN SMAN BARU , 4 RKB BERTINGKAT
LOKASI : TAMPAN
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
( Rp. ) ( Rp. )
A. LANTAI I
I. PEKERJAAN PERSIAPAN
1 Pek. Pembersihan Lokasi 1.000 Ls 1,500,000.00 1,500,000.00
2 Pek. Pembongkaran 1.000 Ls 2,000,000.00 2,000,000.00
3 Pek. Pasang Bouwplank / Pengukuran 1.000 Ls 1,500,000.00 1,500,000.00
4 Pek. Pasang Papan Nama proyek 1.000 Bh 500,000.00 500,000.00
Sub Total 5,500,000.00
B. LANTAI II
I. PEKERJAAN STRUKTUR
1 Pek. Cor Kolom( K' ) Beton Bertulang 5.587 M3 5,411,490.00 30,235,076.93
2 Pek. Cor Kolom ( K1' ) Beton Bertulang 1.455 M3 5,399,490.00 7,856,257.95
3 Pek. Cor Kolom ( K2 ) Beton Bertulang 0.330 M3 5,375,490.00 1,773,911.70
4 Pek. Cor Kolom ( K4 ) Beton Bertulang 0.176 M3 4,655,490.00 819,366.24
5 Pek. Cor Kolom Praktis 11/11 Beton Bertulang 0.864 M' 64,720.00 55,918.08
6 Pek. Cor Balok Praktis 11/11 Beton Bertulang 1.310 M' 64,720.00 84,750.84
7 Pek. Cor Kanopi Beton t = 8 cm 1.800 M3 3,827,860.00 6,890,148.00
8 Pek. Cor Ring Balok ( R ) Beton Bertulang 7.000 M3 4,705,730.00 32,940,110.00
9 Pek. Cor Ring Balok Janggutan ( R' ) Beton Bertulang 2.800 M3 4,429,730.00 12,403,244.00
Sub Total 93,058,783.74
V. PEKERJAAN PLAFOND
1 Pek. Pas. Rangka Plafond Metal Furing 235.000 M2 70,200.00 16,497,000.00
2 Pek. Pas. Rangka Plafond Kayu 50.600 M2 80,900.00 4,093,540.00
3 Pek. Pas. Plafond Gypsum Board t = 9 mm 235.000 M2 37,850.00 8,894,750.00
4 Pek. Pas. Plafond Lambreziring 50.600 M2 102,420.00 5,182,452.00
5 Pek. Pas. List Gypsum 66.000 M' 11,310.00 746,460.00
6 Pek. Pas. List Profil Kayu 85.000 M' 9,530.00 810,050.00
Sub Total 36,224,252.00
IX PEKERJAAN PENGECATAN
1Pek. Cat Air Dinding dan Kolom 1,016.327 M2 16,080.00 16,342,534.94
2Pek. Cat Air Plafond 235.000 M2 16,080.00 3,778,800.00
3Pek. Cat Vernish Pintu Panil 29.240 M2 32,630.00 954,101.20
4Pek. Cat Minyak Jendela, papan jalusi, kusen pintu dan jendela, 156.258 M2 30,290.00 4,733,039.68
Listplank
5 Pek. Cat Minyak Lambrezering 50.600 M2 30,290.00 1,532,674.00
Sub Total 27,341,149.82
Pekanbaru, 2013
DIBUAT OLEH :
KEPALA BIDANG PENGEMBANGAN SM
DINAS PENDIDIKAN KOTA PEKANBARU
Selaku Kuasa Pengguna Anggaran/PPK
H. ADDAURI, M.Pd
Nip. 195703141978011002
CV.ASRI ENGINEERING CONSULTANT
PERENCANAAN SEKOLAH
I PEKERJAAN PONDASI
1 Pekerjaan Galian
a Galian Pondasi Tapak Setempat
Tipe P2 16.00 1.20 1.20 1.20 27.65 M3 29.76 0.05
Tipe P1 6.00 0.80 0.80 0.55 2.11 M3 0.05
b Balok Sloof
Balok 20/50 (S)
Melintang As 1, 3, 5, 6 4.00 6.87 0.55 0.05 0.76 M3
Melintang 6.00 2.10 0.60 0.05 0.38 M3
b Balok Sloof
Balok 20/50 (S)
Melintang As 1, 3, 5, 6 4.00 6.87 0.55 0.05 0.76 M3
Melintang 6.00 2.10 0.60 0.05 0.38 M3
II PEKERJAAN STRUKTUR
1 Pek. Cor Kolom 30/40
Tipe K 2 (30/40) 12.00 3.88 0.30 0.40 5.59 M3
5.59 M3
IV PEKERJAAN PLAFOND
1 Pek. Pas. Rangka Plafond
R. Kelas 2.00 8.00 18.00 1.00 288.00 M2
Gudang 2.00 4.50 2.00 1.00 18.00 M2
Teras 1 2.00 22.48 2.20 1.00 98.91 M2
404.91 M2
V PEKERJAAN LANTAI
1 Pek. Urugan Tanah dibawah lantai dipadatkan
Bangunan utama 1.00 22.50 10.20 0.20 45.90 M3
45.90 M3
VI PEKERJAAN TANGGA
1 Pek. Galian Pondasi
1.00 1.25 0.30 0.60 0.23 M3
0.23 M3
1 2 3 4 5
I TENAGA KERJA
1 MANDOR ORANG / HARI 84,000.00
2 KEPALA TUKANG ORANG / HARI 82,000.00
3 TUKANG ORANG / HARI 73,000.00
4 PEKERJA ORANG / HARI 58,000.00
II BAHAN
A BAHAN PASANGAN
1 PASIR URUG M3. 110,000.00
2 PASIR PASANG M3. 125,000.00
3 PASIR BETON / COR M3. 173,000.00
4 TANAH URUG / TIMBUN M3. 65,500.00
5 KERIKIL / KORAL BETON M3. 200,000.00
6 BATU BATA Uk 5 x 10 x 20 BH. 675.00
7 PORTLAND CEMENT / SEMEN PADANG TYPE I KG. 1,320.00
8 PORTLAND CEMENT WARNA KG. 2,500.00
9 PAVING BLOK TEBAL 6 CM BH. 1,800.00
B BAHAN KAYU
1 KAYU KELAS I ( KULIM ) M3. 6,800,000.00
2 KAYU KELAS II M3. 3,675,000.00
3 KAYU LAMBERZIRING (JELUTUNG) M3. 5,100,000.00
4 PAPAN/KAYU SURIAN M3. 3,500,000.00
5 KAYU KELAS III M3. 2,100,000.00
6 KAYU CEROCOK / KAYU UBAR BTG. 26,000.00
7 KAYU DOLKEN DIA. 5 - 10 CM PANJANG 400 CM BTG. 15,000.00
8 KAYU PROFIL M' 3,700.00
9 PAPAN LISPLANK UKIR M' 84,000.00
10 PAPAN SINGAP UKIR (GRC) M2. 630,000.00
11 SELEMBAYUNG UKIR PASANG 400,000.00
C BAHAN BESI
1 BESI BETON KG. 12,000.00
2 KAWAT IKAT BETON (BANDRAT) KG. 17,000.00
3 RANGKA PLAFOND METAL FURING M' 9,000.00
4 RANGKA KUDA-KUDA BAJA RINGAN M2 185,000.00
Page 15
NO. JENIS BAHAN SATUAN HARGA SATUAN KETERANGAN
1 2 3 4 5
E BAHAN ATAP
1 SENG PLAT LBR. 47,000.00
2 SENG GELOMBANG M2. 80,500.00
3 ATAP GENTENG METAL 0,25 MM M2. 52,000.00
4 PERABUNG GENTENG METAL BULAT LBR. 27,300.00
5 BOLA - BOLA ATAP GENTENG LBR. 25,000.00
6 PLASTIK GOT M' 28,750.00
G BAHAN PIPA
1 PIPA PVC AW 1/2 " M' 5,250.00
2 PIPA PVC AW 3/4 " M' 6,750.00
3 PIPA PVC AW 3 " M' 55,000.00
4 PIPA PVC AW 4 " M' 61,000.00
H BAHAN SANITAIR
1 KLOSET JONGKOK PORSELIN BH. 325,000.00
2 KLOSET DUDUK BH. 1,450,000.00
3 WASTAFEL BH. 700,000.00
4 BAK CUCI STANLEES STEEL/ KITCHEN SINK BH. 400,000.00
5 FLOOR DRAIN SETARA BH. 15,000.00
6 BAK FIBERGLASS BH. 250,000.00
7 KRAN AIR DIA. 3/4" , 1/2" BH. 28,000.00
8 SEAL TAPE BH. 4,500.00
9 PINTU FIBER KOMPLIT BH. 290,000.00
10 STOP KRAN DIA. 3/4" UNIT 28,000.00
I BAHAN PAKU
1 PAKU ATAP GENTENG METAL KG. 25,000.00
2 PAKU KAYU KG. 15,000.00
3 PAKU SERI KG. 18,000.00
4 PAKU 2" - 5" KG. 15,000.00
5 PAKU GYPSUM KG. 25,000.00
6 PAKU SKRUP KG. 21,000.00
K BAHAN KACA
1 KACA BENING 3 MM M2. 68,250.00
2 KACA BENING 5 MM M2. 99,000.00
3 KACA BURAM 5 MM M2. 120,000.00
Page 16
NO. JENIS BAHAN SATUAN HARGA SATUAN KETERANGAN
1 2 3 4 5
L BAHAN LISTRIK
1 INSTALASI TITIK LAMPU (KABEL INSTALASI STANDAR PLN) TTK. 175,000.00
2 LAMPU SAVE ENERGY 18 WATT BH. 45,000.00
3 LAMPU ARMATURE DOWN LIGHT 10" (24 WATT PHILIPS) BH. 100,000.00
4 LAMPU TL ARM REFLEXION MIRROR 2 X 18 WATT BH. 325,000.00
5 STOP KONTAK BH. 13,800.00
6 SAKLAR GANDA BH. 20,000.00
7 SAKLAR TUNGGAL BH. 18,400.00
8 SAKLAR TRIPLE BH. 25,000.00
9 PANEL DISTRIBUSI (STANDAR PLN) UNIT 1,500,000.00
10 MAIN PANEL BOX ( STANDAR PLN ) UNIT 500,000.00
11 SUB PANEL BOX ( STANDAR PLN ) UNIT 57,000.00
M BAHAN FINISHING
1 CAT MINYAK SETARA PLATON KG. 50,000.00
2 CAT TEMBOK SETARA PLATON KG. 20,000.00
3 CAT VERNISH KG. 55,000.00
4 CAT KAYU DASAR / MENI KG. 24,000.00
5 MINYAK CAT LTR. 27,600.00
6 THINEER LTR. 27,600.00
7 RESIDU KG. 10,000.00
8 DEMPUL KG. 26,000.00
9 PLAMIR RJ KG. 20,000.00
10 KERTAS PASIR / AMPLAS LBR. 5,000.00
11 TEPUNG PENGISI NAT KERAMIK KG. 12,000.00
12 KUAS 3" BH. 10,000.00
13 MINYAK BEKISTING LTR. 8,000.00
Pekanbaru, 2013
DIBUAT OLEH :
KEPALA BIDANG PENGEMBANGAN SM
DINAS PENDIDIKAN KOTA PEKANBARU
Selaku Kuasa Pengguna Anggaran/PPK
H. ADDAURI, M.Pd
Nip. 195703141978011002
Page 17
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
KEGIATAN : PEMBANGUNAN SMAN BARU
PEKERJAAN : PEMBANGUNAN SMAN BARU , 4 RKB BERTINGKAT
LOKASI : TAMPAN
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6
1 M3 URUGAN KEMBALI
TENAGA
Pekerja 0.1920 OH 58,000.00 11,136.00
Mandor 0.0190 OH 84,000.00 1,596.00
SUB TOTAL 12,732.00 -
JUMLAH 12,732.00
DIBULATKAN 12,732.00
1 M3 URUGAN PASIR
TENAGA
Pekerja 0.3000 OH 58,000.00 17,400.00
Tukang - OH - -
Kepala Tukang - OH - -
Mandor 0.0100 OH 84,000.00 840.00
BAHAN
Pasir urug 1.2000 M3 110,000.00 132,000.00
SUB TOTAL 18,240.00 132,000.00
JUMLAH 150,240.00
DIBULATKAN 150,240.00
1 M3 URUGAN TANAH
TENAGA
Pekerja 0.3000 OH 58,000.00 17,400.00
Tukang - OH - -
Kepala Tukang - OH - -
Mandor 0.0100 OH 84,000.00 840.00
BAHAN
Tanah 1.2000 M3 65,500.00 78,600.00
SUB TOTAL 18,240.00 78,600.00
JUMLAH 96,840.00
DIBULATKAN 96,840.00
ANALISA BIAYA KONSTRUKSI PEKERJAAN DINDING
1 M2 PASANGAN BATA MERAH TEBAL 1 BATA (1:3)
TENAGA
Pekerja 0.6500 OH 58,000.00 37,700.00
Tukang 0.2000 OH 73,000.00 14,600.00
Kepala Tukang 0.0200 OH 82,000.00 1,640.00
Mandor 0.0300 OH 84,000.00 2,520.00
BAHAN
Batu Bata 160.0000 Bh 675.00 108,000.00
Semen Portland 32.9500 Kg 1,320.00 43,494.00
Pasir Pasang 0.0910 M3 125,000.00 11,375.00
SUB TOTAL 56,460.00 162,869.00
JUMLAH 219,329.00
DIBULATKAN 219,320.00
Page 18 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6
Page 19 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6
1 M2 PLESTERAN CIPRAT
TENAGA
Pekerja 0.3000 OH 58,000.00 17,400.00
Tukang batu 0.1000 OH 73,000.00 7,300.00
Kepala Tukang 0.0100 OH 82,000.00 820.00
Mandor 0.0150 OH 84,000.00 1,260.00
BAHAN
Semen Portland 4.3200 Kg 1,320.00 5,702.40
Pasir Pasang 0.0060 M3 125,000.00 750.00
SUB TOTAL 26,780.00 6,452.40
JUMLAH 33,232.40
DIBULATKAN 33,230.00
Page 20 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6
Page 21 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6
Page 22 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6
Page 23 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6
Page 24 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6
Page 25 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6
Page 26 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6
Page 27 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6
JUMLAH 5,891,490.00
DIBULATKAN 5,891,490.00
Page 28 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6
Page 30 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6
Page 32 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6
Page 33 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6
Page 34 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6
JUMLAH 3,879,298.00
DIBULATKAN 3,879,290.00
Page 35 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6
Page 36 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6
Page 37 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6
Page 38 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6
1 BH MEMASANG 1 BUAH BAK KONTROL PAS.BATU BATA (45 x 45) TINGGI 50 CM
TENAGA
Pekerja 1.4200 OH 58,000.00 82,360.00
Tukang Batu 0.4730 OH 73,000.00 34,529.00
Kepala Tukang 0.0470 OH 82,000.00 3,854.00
Mandor 0.0710 OH 84,000.00 5,964.00
BAHAN
Batu bata 250.0000 Bh 675.00 168,750.00
Semen portland 77.0000 Kg 1,320.00 101,640.00
Pasir Pasang 0.1300 M3 125,000.00 16,250.00
Batu Kerikil 0.0200 M3 200,000.00 4,000.00
Besi Beton 2.6000 Kg 12,000.00 31,200.00
Pasir beton 0.0900 M3 173,000.00 15,570.00
SUB TOTAL 126,707.00 337,410.00
JUMLAH 464,117.00
DIBULATKAN 464,110.00
Page 39 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6
Page 40 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6
Page 41 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6
1 M2 PASANG LANTAI KERAMIK 30x30
TENAGA
Pekerja 0.6200 OH 58,000.00 35,960.00
Tukang Batu 0.3500 OH 73,000.00 25,550.00
Kepala Tukang 0.0350 OH 82,000.00 2,870.00
Mandor 0.0300 OH 84,000.00 2,520.00
BAHAN
Keramik 30x30 11.0000 Bh 7,200.00 79,200.00
Semen Portland 11.3800 Kg 1,320.00 15,021.60
Pasir Pasang 0.0420 M3 125,000.00 5,250.00
Semen warna 1.0000 Kg 12,000.00 12,000.00
SUB TOTAL 66,900.00 111,471.60
JUMLAH 178,371.60
DIBULATKAN 178,370.00
1 M2 PASANG LANTAI KERAMIK 20x20
TENAGA
Pekerja 0.6200 OH 58,000.00 35,960.00
Tukang Batu 0.3500 OH 73,000.00 25,550.00
Kepala Tukang 0.0350 OH 82,000.00 2,870.00
Mandor 0.0300 OH 84,000.00 2,520.00
BAHAN
Keramik 20x20 25.0000 Bh 2,600.00 65,000.00
Semen Portland 11.3800 Kg 1,320.00 15,021.60
Pasir Pasang 0.0420 M3 125,000.00 5,250.00
Semen warna 1.0000 Kg 12,000.00 12,000.00
SUB TOTAL 66,900.00 97,271.60
JUMLAH 164,171.60
DIBULATKAN 164,170.00
Page 42 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6
1 M2 VERNISH
TENAGA
Pekerja 0.1600 OH 58,000.00 9,280.00
Tukang Cat 0.1600 OH 73,000.00 11,680.00
Kepala Tukang 0.0160 OH 82,000.00 1,312.00
Mandor 0.0025 OH 84,000.00 210.00
BAHAN
Vernish 0.1500 Ltr 55,000.00 8,250.00
Dempul 0.0500 Kg 26,000.00 1,300.00
Amplas 0.1000 Lbt 5,000.00 500.00
Kuas 0.0100 Bh 10,000.00 100.00
SUB TOTAL 22,482.00 10,150.00
JUMLAH 32,632.00
DIBULATKAN 32,630.00
Page 43 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6
1 M2 PENGECATAN BIDANG TEMBOK BARU BAG LUAR(1 PLAMIR : 1 CAT DASAR : 2 CAT PENUTUP)
TENAGA
Pekerja 0.0200 OH 58,000.00 1,160.00
Tukang Cat 0.0630 OH 73,000.00 4,599.00
Kepala Tukang 0.0063 OH 82,000.00 516.60
Mandor 0.0025 OH 84,000.00 210.00
BAHAN
Plamir 0.1000 Kg 20,000.00 2,000.00
Cat dasar 0.1000 Kg 20,000.00 2,000.00
Cat penutup 2X 0.2600 Kg 20,000.00 5,200.00
SUB TOTAL 6,485.60 9,200.00
JUMLAH 15,685.60
DIBULATKAN 15,680.00
1 M2 PAVING BLOCK
TENAGA
Pekerja 0.4500 OH 58,000.00 26,100.00
Tukang Batu 0.0200 OH 73,000.00 1,460.00
Kepala Tukang 0.0200 OH 82,000.00 1,640.00
Mandor 0.0020 OH 84,000.00 168.00
BAHAN
Paving blok 38.0000 Bh 1,800.00 68,400.00
Pasir Pasang 0.0070 M3 125,000.00 875.00
SUB TOTAL 29,368.00 69,275.00
JUMLAH 98,643.00
DIBULATKAN 98,640.00
Page 44 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6
Pekanbaru, 2013
DIBUAT OLEH :
KEPALA BIDANG PENGEMBANGAN SM
DINAS PENDIDIKAN KOTA PEKANBARU
Selaku Kuasa Pengguna Anggaran/PPK
H. ADDAURI, M.Pd
Nip. 195703141978011002
Page 45 of 57
A
Kaki Kuda2 0.06 0.12 9.82 0.070704
Tiang Makelar 0.06 0.12 2.26 0.016272
Balok Tarik 0.06 0.12 6.63 2 0.095472
Balok Gapit 0.06 0.12 5 2 0.072
Skor Verikal 0.06 0.12 2 2 0.0288
Skor Diagonal' 0.06 0.12 2.9 2 0.04176
0.325008
Jumlah Kuda-kuda 2.5 0.81252
ATAP TERAS
I 2.695 3.15 8.48925
ATAP UTAMA
I 118.3589 126.8482
II 107.3584
III 89.20268
IV
LT I
Jumlah T.Kayu L.Kayu P. Kayu Luas Volume Engsel Grendel
Type
Unit M M M M2 M3 4" 3" 4" 3"
PJ 2 0.05 0.13 12.85 3.4 0.083525 3 2 2 2
P' 1 0.05 0.13 4.9 1.71 0.03185 3 0 2 0
P1 3 0.05 0.13 11 3.92 0.0715 6 0 2 0
J 25 0.05 0.13 14 2.72 0.091 0 6 0 6
J2 0.05 0.13 10.2 1.955 0.0663 0 4 0 4
V1 4 0.05 0.13 6 0.96 0.039 0 0 0 0
V2 0 0.05 0.13 3.5 0.57 0.02275 0 0 0 0
LT II
Jumlah T.Kayu L.Kayu P. Kayu Luas Volume Engsel Grendel
Type
Unit M M M M2 M3 4" 3" 4" 3"
PJ 1 0.05 0.13 12.85 3.4 0.083525 3 2 2 2
P 1 0.05 0.13 8.9 2.52 0.05785 3 0 2 0
P2 4 0.05 0.13 11 3.92 0.0715 6 0 2 0
J 24 0.05 0.13 14 2.72 0.091 0 6 0 6
J1 1 0.05 0.13 10.2 1.955 0.0663 0 4 0 4
V1 4 0.05 0.13 6 0.96 0.039 0 0 0 0
V2 0 0.05 0.13 3.5 0.57 0.02275 0 0 0 0
MEJA LABOR
Jumlah T.Kayu L.Kayu P. Kayu Luas Volume Engsel Grendel
Type
Unit M M M M2 M3 4" 3" 4" 3"
P1 7 0.04 0.1 6.4 0 0.0256 0 0 0 0
H.Jendela H.Angin K.Tanam J.Kaca K.Mati K.Buram P. Panel P.fiber Ventilasi K
Bh Bh 2 Slaag M2 M2 M2 M2 Unit M2
1 2 1 0.45 0 0 1.72 0 0.65
0 0 1 0 0 0 1.52 0 0
0 0 1 0 0 0 2.795 0 0.63
3 6 0 1.35 0 0 0 0 0.75
2 4 0 0.9 0 0 0 0 0.5
0 0 0 0 0 0.69 0 0 0
0 0 0 0 0.4 0 0 0 0
0 0.1792 0 0 0 0 0 0 0
T.J.Kaca T. K. Mati T. K. Buram T.P.Panel T.P.fiber T.Ventilasi Mati
0.9 0 0 3.44 0 1.3
0 0 0 1.52 0 0
0 0 0 8.385 0 1.89
33.75 0 0 0 0 18.75
0 0 0 0 0 0
0 0 2.76 0 0 0
0 0 0 0 0 0
0 0 0 8.2586 0 0
cat minyak Cat pintu panel Cat Jendela
kozen
6.425 6.88 0.672
1.225 3.04
8.25 16.77
87.5 0 25.2
0 0 0
6 0 0
0 0 0
0
7.168 16.5172 0
P1 0.006165 12 0.88776 1.4 2.857143
5.98 9.333333 49.54884
3.08 19.04762 52.08192 101.6308
kg
Tulangan Pokok
begel
160.4544 kg
Tulangan Pokok
begel
193.992 kg
Tulangan Pokok
begel
111.792 kg
Tulangan Pokok
begel
189.3888 kg
Tulangan Pokok
begel
152.3988 kg
Tulangan Pokok
begel
192.5453 kg
Tulangan Pokok
begel
151.511 kg
Tulangan Pokok
begel
147.0633 kg
Tulangan Pokok
begel
87.543 kg
Tulangan Pokok
begel
89.1048 kg
Tulangan Pokok
begel
145.1104 kg
Tulangan Pokok
begel
216.186 kg
Tulangan Pokok
begel
97.07429 kg
Tulangan Pokok
begel
136.7808 kg
Tulangan Pokok
begel
131.52 kg
Tulangan Pokok
begel
175.6731 kg
Tulangan Pokok
begel
143.7952 kg
Tulangan Pokok
begel
119.6902 kg
kg