I. GENERAL
In the past, maintaining operational equipment has become more and more
important.
Apart from detecting faults at an early stage, saving cost is an essential aspect
as regards the maintenance of transformers. High availability means an increase
in your efficiency and thus also in your profitability.
However, it is not possible to draw the conclusion that detecting one of the
above mentioned gasses is indicative of the corresponding fault, as each of these
gasses may also formed in the case of different faults.
Thus, it is necessary not only to know the absolute gas quantities but also to
determine certain ratios of fault indicator gas concentrations.
Depending on the selection of these ratios, different schemes of interprehtions
will be obtained.
+ Taking oil sample from electrical equipment using glass sampling tube or
syringe
*' Dissolve gas analysis using Gas Ratio Methd: standard IEC 599-1978.
(lrABLE j)
+ Dissolve gas analysis using Key Gasses Method: standard IEEE Std. C57.104-
1991 (*TABLE 3.1)
Taking OilSample
- Trafo in normalcondition
TDCG > 720 ppm - Sample oilwillbe taken
next 1 (one) year
SUMMARY
PT. TIGRIS PRIMORDIA KENCAI{A
TABLE 2
Condition 3 571-1400 401 -1 000 4001 -1 0000 51-80 1 01 -200 101-150 701-1800 1921-4630
Condition 4 >1 400 >1 000 >1 0000 >80 >200 >1 50 >1 800 >4630
36569
^l 24310
0.0 3-2 6_5 9.7 13.0
Time: [minl
TCD channel: uvl
58279
54867
51455
48043
44632
0.0 3.2 6.5 9.7 13.0
Time: [mint
Assistanh PASARANDIR
Sam$e volume:
- Totalquantityofoil: 40.0mI
- Total quantity of gas: 3.8 ml
- Dosed quantity of gas: 0.20 ml
eombustible
DATE c0 cH4 coa CZHZ C2H4 ezH5 H2 Remarks
Gae {lnnfpnf
Standard
3so 120 2500 35 so 65 100 Condition using
720 ppm
ppm ppm ppm ppm ppm ppm ppm IEEE Standard
SUMMARY
Based on the analysis result, gas Carbon Dioxide (CO2) & Hydrogen (H2) exceed the standard value
according to IEEE C.57.104-1991, which indicate degradation of cellulose & electrical fault,
not necessary occuring at present time.
We suggest :
* Purification &.reconditioning transformer oil, in order to remove sludge (oxidation product htween
cellulose & oil) on winding & to maintain the quality of transformer oil.
ftResampling within 12 (twelve) months.
,l\.