MENCARI CEP COST INDEX (CEPCI)

Data CEP didapat dari sumber http://folk.ntnu.no/magnehi/cepci_2011_py.pdf (diakses tanggal 8 Mei 2018 jam 16.38 WIB)
Peters M. S. and Timmerhaus, 1991, “Plant Design and Economics for CE, 4th edition”, Mc-Graw Hill International Edition. Halaman 163
Aries, N., 1955, Chemical Engineering Cost Estimation, McGraw Hill Book Company: New York, halaman 18

Tahun CEP Cost Index


Chemical Engineering Plant Cost Index Tahun 1957 - 2011
1957 100
800 y = 13,761(x) - 27111
1958 100

CEP Cost Index


600 R² = 0,8582
1959 100
1975 182 400
1976 192 200
1977 204 0
1978 219 1950 1960 1970 1980 1990 2000 2010 2020
1979 239 Tahun
1980 261
1981 297 Chemical Engineering Plant Cost Index pada Tahun 2018 sebesar = 658,698
1982 314 Chemical Engineering Plant Cost Index pada Tahun 1955 sebesar = 100 (Tahun Terbit dari Literatur Aries Newton)
1983 317 Chemical Engineering Plant Cost Index pada Tahun 1989 sebesar = 355 (Tahun Terbit dari Literatur Donald Garret)
1984 323
1985 325 Kurs Dollar Amerika Tahun 2018 sebesar (US$ 1) pada tanggal 8 Mei 2018 = Rp 13.680 http://kurs.dollar.web.id/
1986 318
1987 324
1988 343
1989 355
1990 356
1995 381,1
1996 381,7
1997 386,5
1998 389,5
1999 390,6
2000 394,1
2001 394,3
2002 395,6
2003 402
2004 444,2
2005 468,2
2006 499,6
2007 525,4
2008 575,4
2009 521,9
2010 550,8
2011 585,7
2017 644,937
DAFTAR HARGA ALAT UTILITAS

Based Literature:
1. Aries, N., 1955, Chemical Engineering Cost Estimation, McGraw Hill Book Company: New York
2. Garret, Donald, E., 1989, Chemical Engineering Economics, Van Nostralt Reinhold: Australia
3. Untuk Harga Konstruksi Bak Beton Bertulang Tebal 100 - 125 mm (K100-K125) (Update Tahun 2018): Rp796.500 /m3 (satuan volume) https://www.rumahmaterial.com/2014/09/analisa-harga-

Faktor Harga Purchase Equipment Cost ($)


Nama Alat Tipe Jumlah Size Exponent Keterangan Lain Figure Source
Material Installation Tahun Referensi Tahun 2018
Tangki Penampung Air Bersih (TU-01) Vertical Vessel 1 2,3 65000 428153,7 Cap. = 1.211.216,67 gallon; CS Mat.
fig. 46 (No. 4)
Tangki Air Demine (TU-02) Vertical Vessel 1 3000,00 19760,94 Cap = 5587,7 gallon; CS Material
A-01) +BFW Tank (T-03) +Pressure Vertical
Hydrazine Vessel
64% Tank & Horizontal Vessel1(1 set)
(TU-07) 132116,1 244451,2088 Cap. = 337.872,8 gallon, CS Mat. fig. 46 (No. 4) Aries Newton
Cation Exchanger (KE-01 A/B) Sodium Cycle Cation Exc. 2 5200 34252,30 Resin Cap. = 84 ft3 fig. 32 (No. 3)
Anion Exchanger (AE-01 A/B) General Anion Exchanger 2 5100 33593,60 Resin Cap. = 77,1 ft3 fig. 32 (No. 1)
Menara PendinginInduced Draft Cooling Tower (Incl. Cold Basin1 & Fan)
(CT-01) 5500Jennifer &9157,83367
Lyons, Water Equipment
White, C., 2002, Process Rate = 232,4 GPM
Cost Estimation Final Report, US Department of Energy, EG&G Techn
-
Adsorber (TS-01 A/B) Packed Column with Silica Gel 2 55295,22024 92069,90
Lyons, Jennifer & White, C., 2002,Tinggi Silica
Process = 14 ft; Cost
Equipment IDs =Estimation
4,6 ft Final Report, US Department of Energy, EG&G Techn
Fire Tube Boiler (BO-01) Small Package Boiler 1 1,8 1,53 0,65 31620 58670,50918
Steam Load = 31505,81 lb/jam, Multiple 1,02 for oil fired Garret, Donald, E., 1989, Chemical Engi
NaCl Screw Conveyor (SC-01) 1 280 1844,35
NaOH Screw Conveyor (SC-02) Screw Conveyer 1 1,72 0,78 280 1844,35 Distance = 9 ft fig. 8 (No. 1) Aries Newton
NaOH Screw Conveyor (SC-02) 1 280 1844,35
Blower (BL-01) Centrifugal Blower 1 21000,00 138326,58 Cap. = 10914 ft3/min fig. 2 (No. 3) Aries Newton
Tangki Pelarut NaCl 25% 1 1000 6586,98 Cap. = 44 gallon; CS Mat.; IDs = 0,6 m
Tangki Pelarut NaOH 4% Mixing Tank (Agitated) 1 1450 9551,12 Cap. = 178 gallon; CS Mat.; IDs = 1 mfig. 44 (No.1) Aries Newton
Tangki Pelarut NaOH 3M 1 1750 11527,21 Cap. = 281 gallon; CS Mat.; IDs = 1,12 m
Tangki Kondensat (TU-04) 1 7050 11738,68
Cap. = 321 gallon; Steel Mat.;IDs = 2,7 ft; Hs = 8 ft
Tangki Bahan Bakar Boiler (TU-05) Horizontal Vessel 1 Lyons,
55000Jennifer &91578,34
White,
Cap.C., 2002, Process
= 47831,37 Equipment
gallon; Cost Estimation
Steel Mat.;IDs = 4 m; Hs =Final
fig.m6Report, US Department of Energy, EG&G Tech
20
Buffer Tank (TU-06) 1 50000 83253,03
Cap. = 10778,5 gallon; Steel Mat.;IDs = 2,7 m; Hs = 8 m
After Cooler (CL-01) Shell & Tube HE 1 1,61 0,68 6000 39521,88 Heat. Surface = 1311 sq.ft; Steel Mat fig. 30 (No. 2) Aries Newton
Pompa - 01 (P-01) 1 310 2041,96 Cap. = 86 GPM
Pompa - 02 (P-02) 1 420 2766,53 Cap. = 256 GPM
Pompa - 03 (P-03) 1 590 3886,32 Cap. = 258 GPM
Pompa - 04 (P-04) 1 360 2371,31 Cap. = 97 GPM
Pompa - 05 (P-05) 1 280 305,53 Cap. = 41 GPM
Pompa - 06 (P-06) Centrifugal Single Stage (Iron Casing)1 2,8 245 1613,81 Cap. = 26 GPM fig. 35 (No.1) Aries Newton
Pompa - 07 (P-07) 1 245 1613,81 Cap. = 26 GPM
Pompa - 09 (P-08) 1 245 1613,81 Cap. = 26 GPM
Pompa - 09 (P-09) 1 330 2173,70 Cap. = 75 GPM
Pompa - 10 (P-10) 1 238 259,70 Cap. = 16 GPM
Pompa - 11 (P-11) 1 240 261,88 Cap. = 17 GPM
Filter Udara (FL-01) Air Bag Filter 1 3 1,9 37000 68653,03 Cap. Udara = 11022 ft3/menit Garret, Donald, E., 1989, Chemical Engi
Centrifugal Compressor (CP-01) Centrifugal Compressor 1 5 1,49 0,8 21000 38965,2 Daya (P) = 25 HP Garret, Donald, E., 1989, Chemical Engi
Feeder Hopper (FH-01 &FH-02) Feeder Hopper 2 500 1021,3 Under 100 kilograms
Generator Set 250 kW (GS-01) Diesel Engine GS IW250WS 1 33433,41 Power Gen. = 250 kW https://www.indotara.co.id/product/1143/
Hot Basin (BU-02) 100 mm Bak Beton Bertulang 1 4483,22
Volume Bak = 77 m3 (p = 8,8 m; l = 2,9 m; t = 3 m) https://www.rumahmaterial.com/2014/09
Total Harga Alat Utilitas 1483191,479
Newton)
Garret)
014/09/analisa-harga-satuan-beton.html

Energy, EG&G Technical Services Inc., Morgantown (WV 26505), halaman 20


Energy, EG&G Technical Services Inc., Morgantown (WV 26505), halaman 13
1989, Chemical Engineering Economics, Van Nostralt Reinhold: Australia, halaman 262; Peters M. S. and Timmerhaus, 1991, “Plant Design and Economics for CE, 4th edition”, Mc-Graw Hill International Edition. Halaman 809 (fig. B4)

1989, Chemical Engineering Economics, Van Nostralt Reinhold: Australia, halaman 279
1989, Chemical Engineering Economics, Van Nostralt Reinhold: Australia, halaman 272

a.co.id/product/1143/jual-genset-250kw