BILL OF QUANTITY

BANGUNAN : BUNCH RECEPTION SATION


NO. GBR :
HARGA : #N/A

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)

1. 0 PEKERJAAN TANAH
1. 1 Bowplank
Bowplank m' #N/A #N/A

2. 0 PEKERJAAN KONSTRUKSI BETON


2. 1 PONDASI JEMBATAN TIMBANG 2 unit
2. 1A Pile Cap 3500x1200x1000 4 unit
Galian Tanah m3 10.36 10.36 #N/A #N/A
Urugan Tanah & Pemadatan m3 1.96 1.96 #N/A #N/A
Buang Tanah Sisa m3 8.40 8.40 #N/A #N/A
Lantai Kerja m2 16.80 16.80 #N/A #N/A
Bekisting Setempat m2 37.60 37.60 #N/A #N/A
Besi Beton Deform D 13 mm kg 1,447.22 1,447.22 #N/A #N/A
Beton K225 m3 16.80 16.80 #N/A #N/A
Mini Pile 250x250 mm m 288.00 288.00 #N/A #N/A
2. 1B Pile Cap 700x700x700 16 unit
Galian Tanah m3 3.24 3.24 #N/A #N/A
Urugan Tanah & Pemadatan m3 1.28 1.28 #N/A #N/A
Buang Tanah Sisa m3 1.96 1.96 #N/A #N/A
Lantai Kerja m2 3.92 3.92 #N/A #N/A
Bekisting Setempat m2 15.68 15.68 #N/A #N/A
Besi Beton Deform D 13 mm kg 279.41 279.41 #N/A #N/A
Beton K225 m3 2.74 2.74 #N/A #N/A
Mini Pile 250x250 mm m 576.00 576.00 #N/A #N/A
2. 1C Balok 300X600 (di bawah jembatan timbang)
Galian Tanah m3 5.21 5.21 #N/A #N/A
Urugan Tanah & Pemadatan m3 1.30 1.30 #N/A #N/A
Buang Tanah Sisa m3 3.91 3.91 #N/A #N/A
Lantai kerja m2 8.69 8.69 #N/A #N/A
Bekisting Balok & Kolom m2 31.86 31.86 #N/A #N/A

1(75) 01.Bunch Reception Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Besi Beton Deform D 22 mm kg 689.77 689.77 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 183.68 183.68 #N/A #N/A
Beton K225 m3 3.48 3.48 #N/A #N/A
2. 1D Balok 300X600 (sloof pile cap 700x700x700)
Galian Tanah m3 3.74 3.74 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.94 0.94 #N/A #N/A
Buang Tanah Sisa m3 2.81 2.81 #N/A #N/A
Lantai kerja m2 6.24 6.24 #N/A #N/A
Bekisting Balok & Kolom m2 22.88 22.88 #N/A #N/A
Besi Beton Deform D 22 mm kg 459.54 459.54 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 187.43 187.43 #N/A #N/A
Beton K225 vol dikurangi tebal pelat lantai & m3 2.50 2.50 #N/A #N/A
2. 1E Balok Canstin
Galian Tanah m3 8.64 8.64 #N/A #N/A
Urugan Tanah & Pemadatan m3 2.88 2.88 #N/A #N/A
Buang Tanah Sisa m3 5.76 5.76 #N/A #N/A
Lantai kerja m2 12.80 12.80 #N/A #N/A
Bekisting Balok & Kolom m2 115.20 115.20 #N/A #N/A
Besi Beton Deform D 13 mm kg 700.19 700.19 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 627.39 627.39 #N/A #N/A
Beton K225 vol dikurangi tebal pelat lantai & m3 10.24 10.24 #N/A #N/A
2. 1F Lantai Ramp
Lantai Kerja m2 112.00 112.00 #N/A #N/A
Wiremesh M 10 m2 224.00 224.00 #N/A #N/A
Beton K225 m3 22.40 22.40 #N/A #N/A
2. 1G Lantai di bawah jembatan timbang
Lantai Kerja m2 50.68 50.68 #N/A #N/A
Bekisting lantai m2 5.79 5.79 #N/A #N/A
Wiremesh M 10 m2 101.36 101.36 #N/A #N/A
Beton K225 m3 10.14 10.14 #N/A #N/A
2. 1H Aksesoris
MS - L 100X100X10 kg 208.60 208.60 #N/A #N/A
Pengecatan Baja kg 208.60 208.60 #N/A #N/A
Pipa PVC Ø 1/2" AW m 20.00 20.00 #N/A #N/A
Arde Copper Rod Ø 22 mm m 46.00 46.00 #N/A #N/A

2. 2 PONDASI STRUKTUR APRON LOADING RAMP, LOADING RAMP HOPPER & FFB CONVEYOR NO.1
2. 2A Pondasi Tipe 1a (Support FFB Conveyor No.1) 15 unit

2(75) 01.Bunch Reception Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Galian Tanah m3 6.08 6.08 #N/A #N/A
Urugan Tanah & Pemadatan m3 2.40 2.40 #N/A #N/A
Buang Tanah Sisa m3 3.68 3.68 #N/A #N/A
Lantai Kerja m2 7.35 7.35 #N/A #N/A
Bekisting Setempat m2 27.84 27.84 #N/A #N/A
Besi Beton Deform D 19 mm kg 157.58 157.58 #N/A #N/A
Besi Beton Deform D 13 mm kg 380.10 380.10 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 17.76 17.76 #N/A #N/A
Beton K225 m3 4.19 4.19 #N/A #N/A
Grouting m3 0.03 0.03 #N/A #N/A
Angkur - Ø 19 - L.300 MM unit 30.00 30.00 #N/A #N/A
Mini Pile 250x250 mm m 540.00 540.00 #N/A #N/A
2. 2B Pondasi Tipe 1b (Support FFB Conveyor No.1) 10 unit
Bekisting Setempat m2 4.56 4.56 #N/A #N/A
Besi Beton Deform D 19 mm kg 105.05 105.05 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 11.84 11.84 #N/A #N/A
Beton K225 m3 0.34 0.34 #N/A #N/A
Grouting m3 0.02 0.02 #N/A #N/A
Angkur - Ø 19 - L.300 MM unit 20.00 20.00 #N/A #N/A
2. 2C Pondasi Tipe 1c (Support FFB Conveyor No.1) 2 unit
Galian Tanah m3 0.81 0.81 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.32 0.32 #N/A #N/A
Buang Tanah Sisa m3 0.49 0.49 #N/A #N/A
Lantai Kerja m2 0.98 0.98 #N/A #N/A
Bekisting Setempat m2 3.71 3.71 #N/A #N/A
Besi Beton Deform D 19 mm kg 21.01 21.01 #N/A #N/A
Besi Beton Deform D 13 mm kg 50.68 50.68 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 2.37 2.37 #N/A #N/A
Beton K225 m3 0.56 0.56 #N/A #N/A
Grouting m3 0.00 0.00 #N/A #N/A
Angkur - Ø 19 - L.300 MM unit 4.00 4.00 #N/A #N/A
Mini Pile 250x250 mm m 72.00 72.00 #N/A #N/A
2. 2D Pondasi Tipe 2 (Loading Ramp Hopper) 34 unit
Galian Tanah m3 48.84 48.84 #N/A #N/A
Urugan Tanah & Pemadatan m3 19.94 19.94 #N/A #N/A
Buang Tanah Sisa m3 28.90 28.90 #N/A #N/A
Lantai Kerja m2 34.00 34.00 #N/A #N/A
Bekisting Setempat m2 131.54 131.54 #N/A #N/A

3(75) 01.Bunch Reception Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Besi Beton Deform D 22 mm kg 718.32 718.32 #N/A #N/A
Besi Beton Deform D 13 mm kg 1,867.67 1,867.67 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 98.10 98.10 #N/A #N/A
Beton K225 m3 29.65 29.65 #N/A #N/A
Grouting m3 0.13 0.13 #N/A #N/A
Angkur - Ø 25 - L.600 MM unit 136.00 136.00 #N/A #N/A
Spun Pile Ø 500 mm m' 1,428.00 1,428.00 #N/A #N/A
2. 2E Pondasi Tipe 3 (Loading Ramp Apron) 43 unit
Galian Tanah m3 61.77 61.77 #N/A #N/A
Urugan Tanah & Pemadatan m3 25.22 25.22 #N/A #N/A
Buang Tanah Sisa m3 36.55 36.55 #N/A #N/A
Lantai Kerja m2 43.00 43.00 #N/A #N/A
Bekisting Setempat m2 170.28 170.28 #N/A #N/A
Besi Beton Deform D 22 mm kg 1,211.28 1,211.28 #N/A #N/A
Besi Beton Deform D 13 mm kg 2,362.06 2,362.06 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 143.16 143.16 #N/A #N/A
Beton K225 m3 38.49 38.49 #N/A #N/A
Grouting m3 0.22 0.22 #N/A #N/A
Angkur - Ø 25 - L.600 MM unit 172.00 172.00 #N/A #N/A
Spun Pile Ø 500 mm m' 1,806.00 1,806.00 #N/A #N/A
2. 2F Pondasi Tipe 4 (Loading Ramp Apron & Ramp) 2 unit
Galian Tanah m3 3.68 3.68 #N/A #N/A
Urugan Tanah & Pemadatan m3 1.36 1.36 #N/A #N/A
Buang Tanah Sisa m3 2.32 2.32 #N/A #N/A
Lantai Kerja m2 2.73 2.73 #N/A #N/A
Bekisting Setempat m2 9.64 9.64 #N/A #N/A
Besi Beton Deform D 22 mm kg 70.42 70.42 #N/A #N/A
Besi Beton Deform D 13 mm kg 134.54 134.54 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 9.36 9.36 #N/A #N/A
Beton K225 m3 2.51 2.51 #N/A #N/A
Grouting m3 0.02 0.02 #N/A #N/A
Angkur - Ø 25 - L.600 MM unit 16.00 16.00 #N/A #N/A
Spun Pile Ø 500 mm m' 84.00 84.00 #N/A #N/A
2. 2G Pondasi Tipe 3 (Ramp menuju Loading Ramp Apron) 46 unit
Galian Tanah m3 66.08 66.08 #N/A #N/A
Urugan Tanah & Pemadatan m3 26.98 26.98 #N/A #N/A
Buang Tanah Sisa m3 39.10 39.10 #N/A #N/A
Lantai Kerja m2 46.00 46.00 #N/A #N/A

4(75) 01.Bunch Reception Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Bekisting Setempat m2 182.16 182.16 #N/A #N/A
Besi Beton Deform D 22 mm kg 1,295.79 1,295.79 #N/A #N/A
Besi Beton Deform D 13 mm kg 2,526.85 2,526.85 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 153.15 153.15 #N/A #N/A
Beton K225 m3 41.17 41.17 #N/A #N/A
Grouting m3 0.23 0.23 #N/A #N/A
Angkur - Ø 25 - L.600 MM unit 184.00 184.00 #N/A #N/A
Spun Pile Ø 500 mm m' 1,932.00 1,932.00 #N/A #N/A
2. 2H Sloof 200x400 (Pondasi Support FFB Conv. No.1)
Galian Tanah m3 8.81 8.81 #N/A #N/A
Urugan Tanah & Pemadatan m3 2.94 2.94 #N/A #N/A
Buang Tanah Sisa m3 5.87 5.87 #N/A #N/A
Lantai Kerja m2 19.58 19.58 #N/A #N/A
Bekisting Balok & Kolom m2 78.30 78.30 #N/A #N/A
Besi Beton Deform D 22 mm kg 1,175.47 1,175.47 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 467.01 467.01 #N/A #N/A
Beton K225 m3 7.83 7.83 #N/A #N/A
2. 2I Sloof 300x600 (Pondasi Apron Loading Ramp)
Galian Tanah m3 65.99 65.99 #N/A #N/A
Urugan Tanah & Pemadatan m3 16.50 16.50 #N/A #N/A
Buang Tanah Sisa m3 49.49 49.49 #N/A #N/A
Lantai Kerja m2 164.97 164.97 #N/A #N/A
Bekisting Balok & Kolom m2 659.88 659.88 #N/A #N/A
Besi Beton Deform D 22 mm kg 10,060.40 10,060.40 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 4,656.68 4,656.68 #N/A #N/A
Beton K225 m3 98.98 98.98 #N/A #N/A
2. 2J Sloof 300x600 (Pondasi Ramp menuju Apron Loading Ramp)
Galian Tanah m3 25.73 25.73 #N/A #N/A
Urugan Tanah & Pemadatan m3 6.43 6.43 #N/A #N/A
Buang Tanah Sisa m3 19.30 19.30 #N/A #N/A
Lantai Kerja m2 64.33 64.33 #N/A #N/A
Bekisting Balok & Kolom m2 257.32 257.32 #N/A #N/A
Besi Beton Deform D 22 mm kg 4,054.06 4,054.06 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 1,551.70 1,551.70 #N/A #N/A
Beton K225 m3 38.60 38.60 #N/A #N/A
2. 2K Balok Pelat Lantai (Pondasi Ramp menuju Apron Loading Ra (As V s/d As AB)
Bekisting Balok & Kolom (As V s/d As AB) m2 91.00 91.00 #N/A #N/A
Besi Beton Deform D 19 mm 13 balok @ 8 m kg 2,817.74 2,817.74 #N/A #N/A

5(75) 01.Bunch Reception Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Besi Beton Polos Ø 10 mm 2 balok @ 18 m kg 595.72 595.72 #N/A #N/A
Beton K225 vol dikurangi tebal pelat lantai m3 7.00 7.00 #N/A #N/A

2. 3 PONDASI SUPPORT FFB CONVEYOR NO. 2 & CATWALK


2. 3A Pondasi Tipe 1a (Support FFB Conveyor No.2) 14 unit
Galian Tanah m3 5.67 5.67 #N/A #N/A
Urugan Tanah & Pemadatan m3 2.24 2.24 #N/A #N/A
Buang Tanah Sisa m3 3.43 3.43 #N/A #N/A
Lantai Kerja m2 6.86 6.86 #N/A #N/A
Bekisting Setempat m2 25.98 25.98 #N/A #N/A
Besi Beton Deform D 19 mm kg 147.07 147.07 #N/A #N/A
Besi Beton Deform D 13 mm kg 354.76 354.76 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 16.57 16.57 #N/A #N/A
Beton K225 m3 3.91 3.91 #N/A #N/A
Grouting m3 0.03 0.03 #N/A #N/A
Angkur - Ø 19 - L.300 MM unit 28.00 28.00 #N/A #N/A
Mini Pile 250x250 mm m 504.00 504.00 #N/A #N/A
2. 3B Pondasi Tipe 1b (Support FFB Conveyor No.2) 12 unit
Bekisting Setempat m2 5.47 5.47 #N/A #N/A
Besi Beton Deform D 19 mm kg 126.06 126.06 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 14.21 14.21 #N/A #N/A
Beton K225 m3 0.41 0.41 #N/A #N/A
Grouting m3 0.02 0.02 #N/A #N/A
Angkur - Ø 19 - L.300 MM unit 24.00 24.00 #N/A #N/A
2. 3C Sloof 200x400
Galian Tanah m3 2.83 2.83 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.94 0.94 #N/A #N/A
Buang Tanah Sisa m3 1.88 1.88 #N/A #N/A
Lantai Kerja m2 6.28 6.28 #N/A #N/A
Bekisting Balok & Kolom m2 25.12 25.12 #N/A #N/A
Besi Beton Deform D 22 mm kg 381.96 381.96 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 150.19 150.19 #N/A #N/A
Beton K225 m3 2.51 2.51 #N/A #N/A

2. 4 Pit Transfer Carriage 2 unit


Galian Tanah m3 300.00 300.00 #N/A #N/A
Urugan Tanah & Pemadatan m3 20.70 20.7 #N/A #N/A
Buang Tanah Sisa m3 279.30 279.30 #N/A #N/A

6(75) 01.Bunch Reception Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Lantai Kerja m2 232.75 232.75 #N/A #N/A
Bekisting Setempat m2 205.75 205.75 #N/A #N/A
Besi Beton Deform D 22 mm kg 793.76 793.76 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 244.15 244.15 #N/A #N/A
Wiremesh M 8 m2 749.00 749.00 #N/A #N/A
Beton K225 m3 85.89 85.89 #N/A #N/A
Mini Pile 250x250 mm m 1,584.00 1,584.00 #N/A #N/A

2. 5 RAIL TRACK & INDEXER TRENCH


2. 5A Rail Track Section A 66.0 m
Galian Tanah m3 66.50 66.50 #N/A #N/A
Urugan Tanah & Pemadatan m3 4.29 4.29 #N/A #N/A
Buang Tanah Sisa m3 62.21 62.21 #N/A #N/A
Lantai Kerja m2 95.70 95.70 #N/A #N/A
Bekisting Setempat m2 99.00 99.00 #N/A #N/A
Besi Beton Polos Ø 12 mm kg 3,820.44 3,820.44 #N/A #N/A
Beton K225 m3 54.95 54.95 #N/A #N/A
2. 5B Rail Track Section B 58.2 m
Galian Tanah m3 27.05 27.05 #N/A #N/A
Urugan Tanah & Pemadatan m3 1.75 1.75 #N/A #N/A
Buang Tanah Sisa m3 25.31 25.306125 #N/A #N/A
Lantai Kerja m2 84.35 84.35 #N/A #N/A
Bekisting Setempat m2 46.54 46.54 #N/A #N/A
Besi Beton Polos Ø 12 mm kg 2,169.73 2,169.73 #N/A #N/A
Beton K225 m3 33.74 33.74 #N/A #N/A
2. 5C Rail Track Section C 9.2 m
Galian Tanah m3 12.14 12.14 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.78 0.78 #N/A #N/A
Buang Tanah Sisa m3 11.36 11.36 #N/A #N/A

7(75) 01.Bunch Reception Station


397160157.xls

BILL OF QUANTITY

BANGUNAN : STERILIZER STATION


NO. GBR :
HARGA : #N/A

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)

1. 0 PEKERJAAN TANAH
1. 1 Bowplank
Bowplank sdh tmsk bowplank MPB

2. 0 PEKERJAAN KONSTRUKSI BETON


2. 1 Dasar Pit Sterilizer
Galian Tanah m3 450.00 450.00 #N/A #N/A
Urugan Tanah & Pemadatan m3 60.00 60.00 #N/A #N/A
Buang Tanah Sisa m3 390.00 390.00 #N/A #N/A
Lantai Kerja m2 300.00 300.00 #N/A #N/A
Bekisting Setempat m2 92.10 92.10 #N/A #N/A
Besi Beton Deform D 16 mm kg 14,777.52 14,777.52 #N/A #N/A
Beton K225 m3 154.12 154.12 #N/A #N/A
Mini Pile 250x250 mm m 1,584.00 1,584.00 #N/A #N/A
2. 2 Dinding Pit Sterilizer
Bekisting Setempat m2 173.02 173.02 #N/A #N/A
Wiremesh M 8 m2 86.51 86.51 #N/A #N/A
Beton K225 m3 12.98 12.98 #N/A #N/A
2. 3 Pedestal Sterilizer - Sliding Sadle (Detail 1) 12 unit
Bekisting Setempat m2 38.88 38.88 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 341.81 341.81 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 99.44 99.44 #N/A #N/A
Beton K225 m3 6.91 6.91 #N/A #N/A
Grouting m3 15.36 15.36 #N/A #N/A
Angkur - Ø 30 - L.400 MM unit 24.00 24.00 #N/A #N/A
2. 4 Pedestal Sterilizer - Fixed Sadle (Detail 2) 2 unit
Bekisting Setempat m2 6.66 6.66 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 56.97 56.97 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 17.05 17.05 #N/A #N/A
Beton K225 m3 1.44 1.44 #N/A #N/A
Grouting m3 3.20 3.20 #N/A #N/A

8(75) 02.Steriliser Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Angkur - Ø 30 - L.400 MM unit 8.00 8.00 #N/A #N/A
2. 5 Pedestal Support Catwalk (Detail 3) 1 unit
Bekisting Setempat m2 1.01 1.01 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 10.51 10.51 #N/A #N/A
Beton K225 m3 0.08 0.08 #N/A #N/A
Grouting m3 0.00 0.00 #N/A #N/A
Angkur - Ø 16 - L.300 MM unit 2.00 2.00 #N/A #N/A
2. 6 Pedestal Support Catwalk (Detail 4) 5 unit
Bekisting Setempat m2 5.04 5.04 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 52.53 52.53 #N/A #N/A
Beton K225 m3 0.38 0.38 #N/A #N/A
Grouting m3 0.02 0.02 #N/A #N/A
Angkur - Ø 16 - L.300 MM unit 10.00 10.00 #N/A #N/A
2. 7 Pondasi Support Pipa (Detail 5) 1 unit
Galian Tanah m3 - - #N/A #N/A
Urugan Tanah & Pemadatan m3 - - #N/A #N/A
Buang Tanah Sisa m3 - - #N/A #N/A
Lantai Kerja m2 0.33 0.33 #N/A #N/A
Bekisting Setempat m2 0.78 0.78 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 3.40 3.40 #N/A #N/A
Besi Beton Polos Ø 6 mm kg 1.54 1.54 #N/A #N/A
Beton K225 m3 0.09 0.09 #N/A #N/A
Grouting m3 0.01 0.01 #N/A #N/A
Angkur - Ø 16 - L.300 MM unit 2.00 2.00 #N/A #N/A
2. 8 Pondasi Support Pipa (Detail 6) 5 unit
Galian Tanah m3 1.93 1.93 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.99 0.99 #N/A #N/A
Buang Tanah Sisa m3 0.94 0.94 #N/A #N/A
Lantai Kerja m2 2.31 2.31 #N/A #N/A
Bekisting Setempat m2 5.47 5.47 #N/A #N/A
Besi Beton Deform D 13 mm kg 73.64 73.64 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 24.56 24.56 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 6.16 6.16 #N/A #N/A
Beton K225 m3 0.90 0.90 #N/A #N/A
Grouting m3 0.03 0.03 #N/A #N/A
Angkur - Ø 16 - L.300 MM unit 10.00 10.00 #N/A #N/A
Tiang Kayu Ø 150 - 4 m btg 30.00 30.00 #N/A #N/A
2. 9 Pondasi Steam Exhaust Chamber (Detail 7) 1 unit

9(75) 02.Steriliser Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Galian Tanah m3 1.23 1.23 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.17 0.17 #N/A #N/A
Buang Tanah Sisa m3 1.06 1.06 #N/A #N/A
Lantai Kerja m2 5.31 5.31 #N/A #N/A
Bekisting Setempat m2 3.68 3.68 #N/A #N/A
Besi Beton Deform D 13 mm kg 162.03 162.03 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 6.17 6.17 #N/A #N/A
Beton K225 m3 2.39 2.39 #N/A #N/A
Angkur - Ø 16 - L.400 MM Bh 4.00 4.00 #N/A #N/A
Mini Pile 250x250 mm m 108.00 108.00 #N/A #N/A
2. 10 Pondasi Steam Condensate Chamber (Detail 8) 1 unit
Galian Tanah m3 28.26 28.26 #N/A #N/A
Urugan Tanah & Pemadatan m3 6.43 6.43 #N/A #N/A
Buang Tanah Sisa m3 21.83 21.83 #N/A #N/A
Lantai Kerja m2 20.79 20.79 #N/A #N/A
Bekisting Setempat m2 28.40 28.40 #N/A #N/A
Besi Beton Deform D 13 mm kg 780.84 780.84 #N/A #N/A
Beton K225 m3 11.34 11.34 #N/A #N/A
Angkur - Ø 16 - L.400 MM Bh 16.00 16.00 #N/A #N/A
Mini Pile 250x250 mm m 288.00 288.00 #N/A #N/A
2. 11 Pondasi Tangga Catwalk Sterilizer (Detail 9) 5 unit
Galian Tanah m3 - - #N/A #N/A
Urugan Tanah & Pemadatan m3 - - #N/A #N/A
Buang Tanah Sisa m3 - - #N/A #N/A
Lantai Kerja m2 1.50 1.50 #N/A #N/A
Bekisting Setempat m2 3.64 3.64 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 15.78 15.78 #N/A #N/A
Besi Beton Polos Ø 6 mm kg 7.72 7.72 #N/A #N/A
Beton K225 m3 0.42 0.42 #N/A #N/A
Grouting m3 0.03 0.03 #N/A #N/A
Angkur - Ø 12 - L.200 MM unit 10.00 10.00 #N/A #N/A
2. 12 Condensate Pit (Detail 10) 1 unit
Galian Tanah m3 65.47 65.47 #N/A #N/A
Urugan Tanah & Pemadatan m3 27.28 27.28 #N/A #N/A
Buang Tanah Sisa m3 38.19 38.19 #N/A #N/A
Lantai Kerja m2 12.32 12.32 #N/A #N/A
Bekisting Setempat m2 106.36 106.36 #N/A #N/A
Besi Beton Deform D 13 mm kg 1,395.79 1,395.79 #N/A #N/A

10(75) 02.Steriliser Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Besi Beton Polos Ø 8 mm kg 22.93 22.93 #N/A #N/A
Beton K225 + ADDITIVE BetonTahan Asam m2 13.99 13.99 #N/A #N/A
Mini Pile 250x250 mm m 216.00 216.00 #N/A #N/A
Lantai level + 0.1, Pondasi Pompa & Priming Tank
Galian Tanah m3 0.57 0.57 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.09 0.09 #N/A #N/A
Buang Tanah Sisa m3 0.47 0.47 #N/A #N/A
Lantai Kerja m2 4.73 4.73 #N/A #N/A
Bekisting Setempat m2 3.25 3.25 #N/A #N/A
Besi Beton Deform D 13 mm kg 172.18 172.18 #N/A #N/A
Beton K225 m3 1.55 1.55 #N/A #N/A
Angkur - Ø 16 - L.200 MM u/ priming tank dan pompa unit 16.00 16.00 #N/A #N/A
Mini Pile 250x250 mm m 72.00 72.00 #N/A #N/A
2. 13 Pipe Trench utk 2 unit pipa condensate Sterilizer 1 unit
Galian Tanah m3 15.07 15.07 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.74 0.74 #N/A #N/A
Buang Tanah Sisa m3 14.33 14.33 #N/A #N/A
Lantai Kerja m2 20.48 20.48 #N/A #N/A
Bekisting Menerus m2 31.50 31.50 #N/A #N/A
Wiremesh M 8 m2 34.65 34.65 #N/A #N/A
Beton K225 m3 4.25 4.25 #N/A #N/A
Pipe Trench utk pipa drain Pit Sterilizer 1 unit
Galian Tanah m3 14.44 14.44 #N/A #N/A
Urugan Tanah & Pemadatan m3 1.31 1.31 #N/A #N/A
Buang Tanah Sisa m3 13.13 13.13 #N/A #N/A
Lantai Kerja m2 10.50 10.50 #N/A #N/A
Bekisting Menerus m2 54.60 54.60 #N/A #N/A
Wiremesh M 8 m2 36.23 36.23 #N/A #N/A
Beton K225 m3 4.99 4.99 #N/A #N/A

3. 0 PEKERJAAN KONSTRUKSI BAJA


3. 1 Penutup Pipe Trench (Pipa Condensate ke Condensate Chamber)
MS - L 50X50X5 kg 130.63 130.63 #N/A #N/A
MS - L 65X65X6 kg 124.11 124.11 #N/A #N/A
MS - PELAT BORDES 4.5 mm kg 654.29 654.29 #N/A #N/A
Pengecatan Baja kg 909.03 909.03 #N/A #N/A
Penutup Pipe Trench (Pipa drain Pit Sterilizer)
MS - L 50X50X5 kg 55.42 55.42 #N/A #N/A

11(75) 02.Steriliser Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
MS - L 65X65X6 kg 124.11 124.11 #N/A #N/A
MS - PELAT BORDES 4.5 mm kg 307.86 307.86 #N/A #N/A
Pengecatan Baja kg 487.39 487.39 #N/A #N/A
3. 2 Sterilizer Door Bumper
MS - WF 150X150X7X10 Kg 165.69 165.69 #N/A #N/A
MS - PELAT 10 mm Kg 28.26 28.26 #N/A #N/A
Pengecatan Baja Kg 165.69 165.69 #N/A #N/A
3. 3 Struktur Atap & Hand Rail Condensate Pit (tdk termasuk priming tank)
MS - PELAT 6 mm kg 9.08 9.08 #N/A #N/A
MS - PELAT 10 mm kg 26.69 26.69 #N/A #N/A
MS - PELAT 12 mm kg 8.48 8.48 #N/A #N/A
MS - CNP 100X50X20X2.3 kg 61.31 61.31 #N/A #N/A
MS - L 50X50X5 kg 64.09 64.09 #N/A #N/A
Pipa Hitam Medium - Ø 1" kg 36.11 36.11 #N/A #N/A
Pipa Hitam Medium - Ø 1-1/4" kg 84.15 84.15 #N/A #N/A
Pipa Hitam STK 41 - Ø 3" - 3.2 mm kg 83.78 83.78 #N/A #N/A
Pengecatan Baja kg 373.69 373.69 #N/A #N/A
BOLT & NUT HTB A325 - Ø 5/8" X 2" unit 8.00 8.00 #N/A #N/A
BOLT & NUT M 12 X 30 unit 16.00 16.00 #N/A #N/A
Angkur - Ø 16 - L.400 MM unit 16.00 16.00 #N/A #N/A

4. 0 PEKERJAAN ATAP
4. 1 Atap Condensate Pit
Penutup Atap Spandek m2 12.5934 12.59 #N/A #N/A
Rabung Spandek m' 3.775 3.78 #N/A #N/A

TOTAL #N/A
ROUNDED #N/A

12(75) 02.Steriliser Station


397160157.xls

BILL OF QUANTITY

BANGUNAN : THRESING PRESSING STATION


NO. GBR :
HARGA : #N/A

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)

1. 0 PEKERJAAN TANAH
1. 1 Bowplank
Bowplank sdh tmsk bowplank MPB

2. 0 PEKERJAAN KONSTRUKSI BETON


2. 1 Pondasi Tipe 1 (Bunch Conveyor) & Pit Tippler 1 lot
Galian Tanah m3 480.00 480.00 #N/A #N/A
Urugan Tanah & Pemadatan m3 50.00 50.00 #N/A #N/A
Buang Tanah Sisa m3 430.00 430.00 #N/A #N/A
Lantai Kerja m2 85.00 85.00 #N/A #N/A
Dinding Vertikal
Bekisting Dinding m2 403.73 403.73 #N/A #N/A
Besi Beton Deform D 13 mm kg 6,641.34 6,641.34 #N/A #N/A
Beton K225 m3 112.97 112.97 #N/A #N/A
Lantai Horizontal
Bekisting Lantai m2 16.37 16.37 #N/A #N/A
Besi Beton Deform D 13 mm kg 1,283.68 1,283.68 #N/A #N/A
Beton K225 m3 18.31 18.31 #N/A #N/A
Dinding / Lantai Miring
Bekisting Lantai m2 6.86 6.86 #N/A #N/A
Besi Beton Deform D 13 mm kg 549.10 549.10 #N/A #N/A
Wiremesh M 8 m2 10.64 10.64 #N/A #N/A
Beton K225 m3 6.84 6.84 #N/A #N/A
Tangga Beton
Bekisting Setempat m2 17.00 17.00 #N/A #N/A
Besi Beton Deform D 13 mm kg 107.11 107.11 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 38.84 38.84 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 34.08 34.08 #N/A #N/A
Beton K225 m3 1.95 1.95 #N/A #N/A
Pondasi Tippler Drive Foundation
Bekisting Setempat m2 3.75 3.75 #N/A #N/A

13(75) 03.Threshing Pressing Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Besi Beton Deform D 13 mm kg 60.87 60.87 #N/A #N/A
Beton K225 m3 0.70 0.70 #N/A #N/A
Angkur
Angkur - Ø 32 - L.1150 MM Tippler bh 20.00 20.00 #N/A #N/A
Angkur - Ø 25 - L.600 MM Tippler Drive bh 6.00 6.00 #N/A #N/A
Angkur - Ø 16 - L.200 MM Bunch Hopper bh 10.00 10.00 #N/A #N/A
Mini Pile
Mini Pile 250x250 mm m 648.00 648.00 #N/A #N/A
2. 3a Pondasi Tipe A (Thresher) 18 unit
Galian Tanah m3 2.05 52.02 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.90 40.93 #N/A #N/A
Buang Tanah Sisa m3 1.15 11.09 #N/A #N/A
Lantai Kerja m2 2.88 25.92 #N/A #N/A
Bekisting Setempat m2 11.90 53.57 #N/A #N/A
Besi Beton Deform D 16 mm kg 98.99 365.17 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 13.81 439.56 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 381.38 #N/A #N/A
Beton K225 m3 1.67 11.09 #N/A #N/A
Grouting m3 0.03 #N/A #N/A
Angkur - Ø 19 - L.400 MM unit 8.00 #N/A #N/A
Mini Pile 250x250 mm m 288.00 #N/A #N/A
2. 3b Sloof Pondasi Tipe A (200x300)
Galian Tanah m3 3.60 40.50 #N/A #N/A
Urugan Tanah & Pemadatan m3 1.20 36.29 #N/A #N/A
Buang Tanah Sisa m3 2.40 4.21 #N/A #N/A
Lantai Kerja m2 8.00 14.04 #N/A #N/A
Bekisting Balok & Kolom m2 32.00 56.16 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 191.67 173.16 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 369.72 #N/A #N/A
Beton K225 m3 3.20 4.21 #N/A #N/A
2. 7a Pondasi Tipe B (Pressing Platform) 6 unit
Galian Tanah m3 4.86 17.34 #N/A #N/A
Urugan Tanah & Pemadatan m3 2.13 13.98 #N/A #N/A
Buang Tanah Sisa m3 2.74 3.36 #N/A #N/A
Lantai Kerja m2 6.84 8.64 #N/A #N/A
Bekisting Setempat m2 28.27 16.32 #N/A #N/A
Besi Beton Deform D 16 mm kg 235.11 47.51 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 32.80 146.52 #N/A #N/A

14(75) 03.Threshing Pressing Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Besi Beton Polos Ø 8 mm kg 127.13 #N/A #N/A
Beton K225 m3 3.97 3.36 #N/A #N/A
Grouting m3 0.06 #N/A #N/A
Angkur - Ø 19 - L.400 MM unit 38.00 #N/A #N/A
Mini Pile 250x250 mm m 684.00 #N/A #N/A
2. 7b Sloof Pondasi Tipe B
Galian Tanah m3 8.15 6.48 #N/A #N/A
Urugan Tanah & Pemadatan m3 2.72 2.60 #N/A #N/A
Buang Tanah Sisa m3 5.43 3.88 #N/A #N/A
Lantai Kerja m2 18.11 12.96 #N/A #N/A
Bekisting Balok & Kolom m2 72.46 51.84 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 908.84 159.84 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 435.55 170.64 #N/A #N/A
Beton K225 m3 7.25 3.88 #N/A #N/A
2. 7a Pondasi Tipe C (Pressing Platform) 6 unit
Galian Tanah m3 4.86 35.70 #N/A #N/A
Urugan Tanah & Pemadatan m3 2.13 28.12 #N/A #N/A
Buang Tanah Sisa m3 2.74 7.58 #N/A #N/A
Lantai Kerja m2 6.84 3.36 #N/A #N/A
Bekisting Setempat m2 28.27 22.08 #N/A #N/A
Besi Beton Deform D 16 mm kg 235.11 242.31 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 32.80 280.61 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 246.01 #N/A #N/A
Beton K225 m3 3.97 7.58 #N/A #N/A
Grouting m3 0.06 #N/A #N/A
Angkur - Ø 19 - L.400 MM unit 38.00 #N/A #N/A
Mini Pile 250x250 mm m 684.00 #N/A #N/A
2. 7a Pondasi Tipe D (Sand Trap Tank) 6 unit
Galian Tanah m3 4.86 6.00 #N/A #N/A
Urugan Tanah & Pemadatan m3 2.13 4.98 #N/A #N/A
Buang Tanah Sisa m3 2.74 1.02 #N/A #N/A
Lantai Kerja m2 6.84 2.94 #N/A #N/A
Bekisting Setempat m2 28.27 9.12 #N/A #N/A
Besi Beton Polos Ø 12 mm kg 235.11 33.90 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 32.80 67.49 #N/A #N/A
Beton K225 m3 3.97 1.02 #N/A #N/A
Grouting m3 0.06 #N/A #N/A
Angkur - Ø 19 - L.400 MM unit 38.00 #N/A #N/A

15(75) 03.Threshing Pressing Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Mini Pile 250x250 mm m 684.00 #N/A #N/A
2. 7b Sloof Pondasi Tipe D
Galian Tanah m3 8.15 1.21 #N/A #N/A
Urugan Tanah & Pemadatan m3 2.72 0.61 #N/A #N/A
Buang Tanah Sisa m3 5.43 0.60 #N/A #N/A
Lantai Kerja m2 18.11 8.05 #N/A #N/A
Bekisting Balok & Kolom m2 72.46 8.05 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 908.84 24.79 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 435.55 26.87 #N/A #N/A
Beton K225 m3 7.25 0.60 #N/A #N/A
2. 7a Pondasi Tipe E (Horizontal EFB Conveyor) 8 unit
Galian Tanah m3 4.86 18.00 #N/A #N/A
Urugan Tanah & Pemadatan m3 2.13 16.21 #N/A #N/A
Buang Tanah Sisa m3 2.74 1.79 #N/A #N/A
Lantai Kerja m2 6.84 5.12 #N/A #N/A
Bekisting Setempat m2 28.27 12.80 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 32.80 148.00 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 15.17 #N/A #N/A
Beton K225 m3 3.97 1.79 #N/A #N/A
Grouting m3 0.06 #N/A #N/A
Angkur - Ø 19 - L.400 MM unit 38.00 #N/A #N/A
Mini Pile 250x250 mm m 684.00 #N/A #N/A
2. 7a Pondasi Tipe F (Inclined SFB Conveyor) 14 unit
Galian Tanah m3 4.86 35.00 #N/A #N/A
Urugan Tanah & Pemadatan m3 2.13 31.19 #N/A #N/A
Buang Tanah Sisa m3 2.74 3.81 #N/A #N/A
Lantai Kerja m2 6.84 15.12 #N/A #N/A
Bekisting Setempat m2 28.27 21.28 #N/A #N/A
Besi Beton Polos Ø 12 mm kg 138.79 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 32.80 296.30 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 53.09 #N/A #N/A
Beton K225 m3 3.97 3.81 #N/A #N/A
Grouting m3 0.06 #N/A #N/A
Angkur - Ø 19 - L.400 MM unit 38.00 #N/A #N/A
Mini Pile 250x250 mm m 684.00 #N/A #N/A
2. 5 Pondasi Tipe 5 (Bottom Cross Conveyor) 10 unit
Galian Tanah m3 1.47 1.47 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.72 0.72 #N/A #N/A

16(75) 03.Threshing Pressing Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Buang Tanah Sisa m3 0.75 0.75 #N/A #N/A
Lantai Kerja m2 2.50 2.50 #N/A #N/A
Bekisting Setempat m2 9.44 9.44 #N/A #N/A
Besi Beton Deform D 13 mm kg 162.13 162.13 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 16.77 16.77 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 4.74 4.74 #N/A #N/A
Beton K225 m3 1.07 1.07 #N/A #N/A
Grouting m3 0.01 0.01 #N/A #N/A
Angkur - Ø 16 - L.400 MM unit 10.00 10.00 #N/A #N/A
Mini Pile 250x250 mm m 300.00 300.00 #N/A #N/A
2. 6 Pondasi Tipe 6 (Fruit Elevator) 2 unit
Galian Tanah m3 0.82 0.82 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.22 0.22 #N/A #N/A
Buang Tanah Sisa m3 0.60 0.60 #N/A #N/A
Lantai Kerja m2 3.00 3.00 #N/A #N/A
Bekisting Setempat m2 4.00 4.00 #N/A #N/A
Besi Beton Deform D 13 mm kg 115.70 115.70 #N/A #N/A
Beton K225 m3 1.20 1.20 #N/A #N/A
Angkur - Ø 19 - L.200 MM unit 12.00 12.00 #N/A #N/A
Mini Pile 250x250 mm m 72.00 72.00 #N/A #N/A
2. 8 Pondasi Tipe 8 (Tangga) 3 unit
Lantai Kerja m2 0.90 0.90 #N/A #N/A
Bekisting Setempat m2 2.18 2.18 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 9.47 9.47 #N/A #N/A
Besi Beton Polos Ø 6 mm kg 8.29 8.29 #N/A #N/A
Beton K225 m3 0.25 0.25 #N/A #N/A
Grouting m3 0.02 0.02 #N/A #N/A
Angkur - Ø 12 - L.200 MM unit 6.00 6.00 #N/A #N/A
2. 9 Pondasi Tipe 9 (Vertical ladder) 2 unit
Galian Tanah m3 0.15 0.15 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.08 0.08 #N/A #N/A
Buang Tanah Sisa m3 0.07 0.07 #N/A #N/A
Lantai Kerja m2 0.72 0.72 #N/A #N/A
Bekisting Setempat m2 1.97 1.97 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 8.10 8.10 #N/A #N/A
Besi Beton Polos Ø 6 mm kg 6.16 6.16 #N/A #N/A
Beton K225 m3 0.21 0.21 #N/A #N/A
2. 13 Pondasi Tipe 14 (MCC-3) 1 unit

17(75) 03.Threshing Pressing Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Galian Tanah m3 1.78 1.78 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.48 0.48 #N/A #N/A
Buang Tanah Sisa m3 1.30 1.30 #N/A #N/A
Lantai Kerja m2 2.17 2.17 #N/A #N/A
Bekisting Setempat m2 9.28 9.28 #N/A #N/A
Besi Beton Deform D 13 mm kg 129.58 129.58 #N/A #N/A
Beton K225 m3 1.18 1.18 #N/A #N/A
Mini Pile 250x250 mm m 60.00 60.00 #N/A #N/A
2. 14 Pondasi Tipe 15 (Support Bordes) 1 unit
Lantai Kerja m2 0.30 0.30 #N/A #N/A
Bekisting Setempat m2 0.73 0.73 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 3.16 3.16 #N/A #N/A
Besi Beton Polos Ø 6 mm kg 1.55 1.55 #N/A #N/A
Beton K225 m3 0.08 0.08 #N/A #N/A
Grouting m3 0.01 0.01 #N/A #N/A
Angkur - Ø 12 - L.200 MM unit 2.00 2.00 #N/A #N/A

3. 0 PEKERJAAN LANTAI
3. 1 Lantai
Lantai Kerja m2 953.68 720.00 #N/A #N/A
Wiremesh M 8 m2 953.68 720.00 #N/A #N/A
Beton K225 m3 95.37 108.00 #N/A #N/A

4. 0 PEKERJAAN EMPTY BUNCH AREA (Tipe 13)


4. 1 Pile Cap
Galian Tanah m3 37.91 37.91 #N/A #N/A
Urugan Tanah & Pemadatan m3 14.98 14.98 #N/A #N/A
Buang Tanah Sisa m3 22.93 22.93 #N/A #N/A
Lantai Kerja m2 38.22 38.22 #N/A #N/A
Bekisting Setempat m2 152.88 152.88 #N/A #N/A
Besi Beton Deform D 13 mm kg 2,301.62 2,301.62 #N/A #N/A
Beton K225 vol dikurangi tebal pelat lantai m3 19.11 19.11 #N/A #N/A
Mini Pile 250x250 mm m 2,808.00 2,808.00 #N/A #N/A
4. 2 Balok
Galian Tanah m3 57.13 57.13 #N/A #N/A
Urugan Tanah & Pemadatan m3 14.28 14.28 #N/A #N/A
Buang Tanah Sisa m3 42.85 42.85 #N/A #N/A
Lantai kerja m2 95.22 95.22 #N/A #N/A

18(75) 03.Threshing Pressing Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Bekisting Balok & Kolom m2 253.92 253.92 #N/A #N/A
Besi Beton Deform D 22 mm kg 6,745.25 6,745.25 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 3,124.22 3,124.22 #N/A #N/A
Beton K225 vol dikurangi tebal pelat lantai & m3 38.09 38.09 #N/A #N/A
4. 3 Lantai
Lantai Kerja m2 635.00 635.00 #N/A #N/A
Bekisting lantai m2 20.00 20.00 #N/A #N/A
Wiremesh M 10 m2 1,270.00 1,270.00 #N/A #N/A
Beton K225 m3 127.00 127.00 #N/A #N/A
4. 4 Dinding tinggi 3 m
Bekisting dinding m2 52.80 52.80 #N/A #N/A
Besi Beton Deform D 16 mm kg 719.72 719.72 #N/A #N/A
Besi Beton Polos Ø 12 mm kg 337.37 337.37 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 37.49 37.49 #N/A #N/A
Beton K225 m3 7.65 7.65 #N/A #N/A
4. 5 Rib Dinding tinggi 3 m
Bekisting dinding m2 14.53 14.53 #N/A #N/A
Besi Beton Polos Ø 12 mm kg 247.61 247.61 #N/A #N/A
Beton K225 m3 1.20 1.20 #N/A #N/A
4. 6 Dinding tinggi 2 m
Bekisting dinding m2 133.20 133.20 #N/A #N/A
Besi Beton Deform D 16 mm kg 2,083.40 2,083.40 #N/A #N/A
Besi Beton Polos Ø 12 mm kg 845.20 845.20 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 116.80 116.80 #N/A #N/A
Beton K225 m3 19.80 19.80 #N/A #N/A
4. 7 Rib Dinding tinggi 2 m
Bekisting dinding m2 26.92 26.92 #N/A #N/A
Besi Beton Polos Ø 12 mm kg 500.72 500.72 #N/A #N/A
Beton K225 m3 2.20 2.20 #N/A #N/A

5. 0 PEKERJAAN KONSTRUKSI BAJA


5. 1 Hand Rail Pit Tippler (Sekeliling Bagian Atas Pit)
Pipa Hitam Medium - Ø 1" kg 83.936 83.94 #N/A #N/A
Pipa Hitam Medium - Ø 1-1/4" kg 236.756 236.76 #N/A #N/A
MS - PELAT 6 mm kg 19.311 19.31 #N/A #N/A
Pengecatan Baja kg 340.003 340.00 #N/A #N/A
5. 2 Hand Rail Tangga Pit Tippler
Pipa Hitam Medium - Ø 1" kg 24.4 24.40 #N/A #N/A
Pipa Hitam Medium - Ø 1-1/4" kg 56.52 56.52 #N/A #N/A

19(75) 03.Threshing Pressing Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
MS - PELAT 6 mm kg 3.297 3.30 #N/A #N/A
Pengecatan Baja kg 84.217 84.22 #N/A #N/A

TOTAL #N/A
ROUNDED #N/A

20(75) 03.Threshing Pressing Station


397160157.xls

BILL OF QUANTITY

BANGUNAN : CLARIFICATION STATION


NO. GBR :
HARGA : #N/A

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)

1. 0 PEKERJAAN TANAH
1. 1 Bowplank
Bowplank sdh tmsk bowplank MPB

2. 0 PEKERJAAN KONSTRUKSI BETON


2. 1 Pondasi Tipe F 1 (Sterilizer Condensate Tank) 4 unit
Galian Tanah m3 1.54 3.38 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.67 1.65 #N/A #N/A
Buang Tanah Sisa m3 0.86 1.73 #N/A #N/A
Lantai Kerja m2 2.16 5.76 #N/A #N/A
Bekisting Setempat m2 9.14 21.76 #N/A #N/A
Besi Beton Deform D 16 mm kg 111.37 106.18 #N/A #N/A
Besi Beton Deform D 13 mm kg 119.78 75.48 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 11.84 80.20 #N/A #N/A
Beton K225 m3 1.30 1.73 #N/A #N/A
Grouting m3 0.02 0.05 #N/A #N/A
Angkur - Ø 16 - L.200 MM unit 12.00 16.00 #N/A #N/A
Mini Pile 250x250 mm m 216.00 #N/A #N/A
Tie Beam
Besi Beton Deform D 13 mm kg 49.92 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 46.62 #N/A #N/A
Beton K225 m3 0.72 #N/A #N/A
2. 2 Pondasi Tipe F1 (Sludge Tank No.1) 4 unit
Galian Tanah m3 1.02 3.38 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.45 1.65 #N/A #N/A
Buang Tanah Sisa m3 0.58 1.73 #N/A #N/A
Lantai Kerja m2 1.44 5.76 #N/A #N/A
Bekisting Setempat m2 5.95 21.76 #N/A #N/A
Besi Beton Deform D 16 mm kg 49.50 106.18 #N/A #N/A
Besi Beton Deform D 13 mm kg 79.85 75.48 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 6.91 80.20 #N/A #N/A

21(75) 04.Clarification Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Beton K225 m3 0.84 1.73 #N/A #N/A
Grouting m3 0.01 0.05 #N/A #N/A
Angkur - Ø 16 - L.200 MM unit 8.00 16.00 #N/A #N/A
Mini Pile 250x250 mm m 144.00 #N/A #N/A
Tie Beam
Besi Beton Deform D 13 mm kg 49.92 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 46.62 #N/A #N/A
Beton K225 m3 0.72 #N/A #N/A
2. 3 Pondasi Tipe F1 (Pure Oil Tank No.1) 4 unit
Galian Tanah m3 1.02 3.38 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.45 1.65 #N/A #N/A
Buang Tanah Sisa m3 0.58 1.73 #N/A #N/A
Lantai Kerja m2 1.44 5.76 #N/A #N/A
Bekisting Setempat m2 5.95 21.76 #N/A #N/A
Besi Beton Deform D 16 mm kg 49.50 106.18 #N/A #N/A
Besi Beton Deform D 13 mm kg 79.85 75.48 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 6.91 80.20 #N/A #N/A
Beton K225 m3 0.84 1.73 #N/A #N/A
Grouting m3 0.01 0.05 #N/A #N/A
Angkur - Ø 16 - L.200 MM unit 8.00 16.00 #N/A #N/A
Mini Pile 250x250 mm m 144.00 #N/A #N/A
Tie Beam
Besi Beton Deform D 13 mm kg 49.92 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 46.62 #N/A #N/A
Beton K225 m3 0.72 #N/A #N/A
2. 3 Pondasi Tipe F1 (Pure Oil Tank No.2) 4 unit
Galian Tanah m3 1.02 3.38 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.45 1.65 #N/A #N/A
Buang Tanah Sisa m3 0.58 1.73 #N/A #N/A
Lantai Kerja m2 1.44 5.76 #N/A #N/A
Bekisting Setempat m2 5.95 21.76 #N/A #N/A
Besi Beton Deform D 16 mm kg 49.50 106.18 #N/A #N/A
Besi Beton Deform D 13 mm kg 79.85 75.48 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 6.91 80.20 #N/A #N/A
Beton K225 m3 0.84 1.73 #N/A #N/A
Grouting m3 0.01 0.05 #N/A #N/A
Angkur - Ø 16 - L.200 MM unit 8.00 16.00 #N/A #N/A
Mini Pile 250x250 mm m 144.00 #N/A #N/A
Tie Beam

22(75) 04.Clarification Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Besi Beton Deform D 13 mm kg 49.92 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 46.62 #N/A #N/A
Beton K225 m3 0.72 #N/A #N/A
2. 17 Pondasi Tipe F2 (Plaform Decanter) 9 unit
Galian Tanah m3 8.18 64.80 #N/A #N/A
Urugan Tanah & Pemadatan m3 3.08 51.68 #N/A #N/A
Buang Tanah Sisa m3 5.10 13.12 #N/A #N/A
Lantai Kerja m2 9.28 29.16 #N/A #N/A
Bekisting Setempat m2 79.20 59.94 #N/A #N/A
Besi Beton Deform D 16 mm kg 211.16 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 382.28 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 1,430.39 305.66 #N/A #N/A
Beton K225 m3 27.84 13.12 #N/A #N/A
Angkur - Ø 19 - L.400 MM Struktur Chain Block Decanter unit 24.00 #N/A #N/A
Mini Pile 250x250 mm m 180.00 #N/A #N/A
Sloof
Bekisting Balok & Kolom m2 31.76 228.00 #N/A #N/A
Besi Beton Deform D 13 mm kg 258.19 237.12 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 150.05 165.90 #N/A #N/A
Beton K225 m3 1.91 4.56 #N/A #N/A
2. 5 Pondasi Tipe F3 (Hot Water Tank) 2 unit
Galian Tanah m3 1.97 5.00 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.62 0.70 #N/A #N/A
Buang Tanah Sisa m3 1.35 2.11 #N/A #N/A
Lantai Kerja m2 4.50 7.04 #N/A #N/A
Bekisting Setempat m2 13.64 3.24 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 61.16 90.13 #N/A #N/A
Beton K225 m3 2.34 2.11 #N/A #N/A
Mini Pile 250x250 mm m 180.00 #N/A #N/A
2. 6 Pondasi Tipe F4 (Collection Oil Tank) 2 unit
Galian Tanah m3 0.71 22.75 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.26 8.86 #N/A #N/A
Buang Tanah Sisa m3 0.45 13.89 #N/A #N/A
Lantai Kerja m2 1.50 19.84 #N/A #N/A
Bekisting Setempat m2 5.24 13.16 #N/A #N/A
Besi Beton Deform D 13 mm kg 62.35 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 23.68 347.80 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 7.58 270.18 #N/A #N/A

23(75) 04.Clarification Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Beton K225 m3 0.78 13.89 #N/A #N/A
Mini Pile 250x250 mm m 120.00 #N/A #N/A
2. 16 Pondasi Tipe F5 (Struktur Vibrating Screen) 5 unit
Galian Tanah m3 0.88 22.50 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.43 20.82 #N/A #N/A
Buang Tanah Sisa m3 0.45 1.68 #N/A #N/A
Lantai Kerja m2 1.50 6.30 #N/A #N/A
Bekisting Setempat m2 5.66 15.90 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 121.78 50.88 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 2.84 55.22 #N/A #N/A
Beton K225 m3 0.64 1.68 #N/A #N/A
Grouting m3 0.00 #N/A #N/A
Angkur - Ø 19 - L.400 MM unit 6.00 10.00 #N/A #N/A
Mini Pile 250x250 mm m 180.00 #N/A #N/A
2. 16 Pondasi Tipe F6 (Platform Digester) 5 unit
Galian Tanah m3 0.88 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.43 #N/A #N/A
Buang Tanah Sisa m3 0.45 #N/A #N/A
Lantai Kerja m2 1.50 #N/A #N/A
Bekisting Setempat m2 5.66 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 121.78 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 2.84 #N/A #N/A
Beton K225 m3 0.64 #N/A #N/A
Grouting m3 0.00 #N/A #N/A
Angkur - Ø 19 - L.400 MM unit 6.00 #N/A #N/A
Mini Pile 250x250 mm m 180.00 #N/A #N/A
Sloof
Bekisting Balok & Kolom m2 31.76 #N/A #N/A
Besi Beton Deform D 13 mm kg 258.19 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 150.05 #N/A #N/A
Beton K225 m3 1.91 #N/A #N/A
2. 16 Pondasi Tipe F7 (EFB Liquor Tank) 5 unit
Galian Tanah m3 0.88 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.43 #N/A #N/A
Buang Tanah Sisa m3 0.45 #N/A #N/A
Lantai Kerja m2 1.50 #N/A #N/A
Bekisting Setempat m2 5.66 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 121.78 #N/A #N/A

24(75) 04.Clarification Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Besi Beton Polos Ø 8 mm kg 2.84 #N/A #N/A
Beton K225 m3 0.64 #N/A #N/A
Grouting m3 0.00 #N/A #N/A
Angkur - Ø 19 - L.400 MM unit 6.00 #N/A #N/A
Mini Pile 250x250 mm m 180.00 #N/A #N/A
2. 16 Pondasi Tipe F8 (Inclined EFB Conveyor) 5 unit
Galian Tanah m3 0.88 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.43 #N/A #N/A
Buang Tanah Sisa m3 0.45 #N/A #N/A
Lantai Kerja m2 1.50 #N/A #N/A
Bekisting Setempat m2 5.66 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 121.78 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 2.84 #N/A #N/A
Beton K225 m3 0.64 #N/A #N/A
Grouting m3 0.00 #N/A #N/A
Angkur - Ø 19 - L.400 MM unit 6.00 #N/A #N/A
Mini Pile 250x250 mm m 180.00 #N/A #N/A
2. 16 Pondasi Tipe F9 (Sludge Separator) 5 unit
Galian Tanah m3 0.88 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.43 #N/A #N/A
Buang Tanah Sisa m3 0.45 #N/A #N/A
Lantai Kerja m2 1.50 #N/A #N/A
Bekisting Setempat m2 5.66 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 121.78 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 2.84 #N/A #N/A
Beton K225 m3 0.64 #N/A #N/A
Grouting m3 0.00 #N/A #N/A
Angkur - Ø 19 - L.400 MM unit 6.00 #N/A #N/A
Mini Pile 250x250 mm m 180.00 #N/A #N/A
2. 7 Pondasi Tipe 7 (Crude Oil Pump) 2 unit
Galian Tanah m3 0.25 0.25 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.09 0.09 #N/A #N/A
Buang Tanah Sisa m3 0.16 0.16 #N/A #N/A
Lantai Kerja m2 1.26 1.26 #N/A #N/A
Bekisting Setempat m2 2.56 2.56 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 35.91 35.91 #N/A #N/A
Beton K225 m3 0.50 0.50 #N/A #N/A
Angkur - Ø 16 - L.200 MM unit 8.00 8.00 #N/A #N/A

25(75) 04.Clarification Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Tiang Kayu Ø 150 - 4 m btg 8.00 8.00 #N/A #N/A
2. 8 Pondasi Tipe 8 (Reclaimed Oil Pump) 1 unit
Galian Tanah m3 0.23 0.23 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.07 0.07 #N/A #N/A
Buang Tanah Sisa m3 0.16 0.16 #N/A #N/A
Lantai Kerja m2 1.19 1.19 #N/A #N/A
Bekisting Setempat m2 1.92 1.92 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 32.01 32.01 #N/A #N/A
Beton K225 m3 0.48 0.48 #N/A #N/A
Angkur - Ø 16 - L.200 MM unit 8.00 8.00 #N/A #N/A
Tiang Kayu Ø 150 - 4 m btg 8.00 8.00 #N/A #N/A
Pondasi Tipe 8 (Collection Oil Pump) 1 unit
Galian Tanah m3 0.23 0.23 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.07 0.07 #N/A #N/A
Buang Tanah Sisa m3 0.16 0.16 #N/A #N/A
Lantai Kerja m2 1.19 1.19 #N/A #N/A
Bekisting Setempat m2 1.92 1.92 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 32.01 32.01 #N/A #N/A
Beton K225 m3 0.48 0.48 #N/A #N/A
Angkur - Ø 16 - L.200 MM unit 8.00 8.00 #N/A #N/A
Tiang Kayu Ø 150 - 4 m btg 8.00 8.00 #N/A #N/A
Pondasi Tipe 8 (Feed Pump for Single Desanding Cyclo 1 unit
Galian Tanah m3 0.23 0.23 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.07 0.07 #N/A #N/A
Buang Tanah Sisa m3 0.16 0.16 #N/A #N/A
Lantai Kerja m2 1.19 1.19 #N/A #N/A
Bekisting Setempat m2 1.92 1.92 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 32.01 32.01 #N/A #N/A
Beton K225 m3 0.48 0.48 #N/A #N/A
Angkur - Ø 16 - L.200 MM unit 8.00 8.00 #N/A #N/A
Tiang Kayu Ø 150 - 4 m btg 8.00 8.00 #N/A #N/A
Pondasi Tipe 8 (Feed Pump for Twin Desanding Cyclone1 unit
Galian Tanah m3 0.23 0.23 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.07 0.07 #N/A #N/A
Buang Tanah Sisa m3 0.16 0.16 #N/A #N/A
Lantai Kerja m2 1.19 1.19 #N/A #N/A
Bekisting Setempat m2 1.92 1.92 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 32.01 32.01 #N/A #N/A

26(75) 04.Clarification Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Beton K225 m3 0.48 0.48 #N/A #N/A
Angkur - Ø 16 - L.200 MM unit 8.00 8.00 #N/A #N/A
Tiang Kayu Ø 150 - 4 m btg 8.00 8.00 #N/A #N/A
Pondasi Tipe 8 (Sludge Pump to Decanter Feed Tank) 1 unit
Galian Tanah m3 0.23 0.23 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.07 0.07 #N/A #N/A
Buang Tanah Sisa m3 0.16 0.16 #N/A #N/A
Lantai Kerja m2 1.19 1.19 #N/A #N/A
Bekisting Setempat m2 1.92 1.92 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 32.01 32.01 #N/A #N/A
Beton K225 m3 0.48 0.48 #N/A #N/A
Angkur - Ø 16 - L.200 MM unit 8.00 8.00 #N/A #N/A
Tiang Kayu Ø 150 - 4 m btg 8.00 8.00 #N/A #N/A
2. 9 Pondasi Tipe 9 (Hot Water Pump) 1 unit
Galian Tanah m3 0.31 0.31 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.07 0.07 #N/A #N/A
Buang Tanah Sisa m3 0.24 0.24 #N/A #N/A
Lantai Kerja m2 2.40 2.40 #N/A #N/A
Bekisting Setempat m2 2.48 2.48 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 63.70 63.70 #N/A #N/A
Beton K225 m3 0.96 0.96 #N/A #N/A
Angkur - Ø 16 - L.200 MM unit 12.00 12.00 #N/A #N/A
Tiang Kayu Ø 150 - 4 m btg 16.00 16.00 #N/A #N/A
2. 10 Pondasi Tipe 10 (Oil Transfer Pump) 2 unit
Galian Tanah m3 0.34 0.34 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.10 0.10 #N/A #N/A
Buang Tanah Sisa m3 0.24 0.24 #N/A #N/A
Lantai Kerja m2 2.40 2.40 #N/A #N/A
Bekisting Setempat m2 3.68 3.68 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 65.99 65.99 #N/A #N/A
Beton K225 m3 0.96 0.96 #N/A #N/A
Angkur - Ø 16 - L.200 MM unit 12.00 12.00 #N/A #N/A
Tiang Kayu Ø 150 - 4 m btg 16.00 16.00 #N/A #N/A
2. 4 Pondasi Tipe 4 (Reclaimed Oil Tank) 3 unit
Galian Tanah m3 1.07 1.07 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.40 0.40 #N/A #N/A
Buang Tanah Sisa m3 0.68 0.68 #N/A #N/A
Lantai Kerja m2 2.25 2.25 #N/A #N/A

27(75) 04.Clarification Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Bekisting Setempat m2 7.86 7.86 #N/A #N/A
Besi Beton Deform D 13 mm kg 93.53 93.53 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 35.51 35.51 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 11.36 11.36 #N/A #N/A
Beton K225 m3 1.17 1.17 #N/A #N/A
Mini Pile 250x250 mm m 180.00 180.00 #N/A #N/A
2. 12 Pondasi Tipe 12 (Purifier & Pump) 1 unit
Galian Tanah m3 0.42 0.42 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.08 0.08 #N/A #N/A
Buang Tanah Sisa m3 0.34 0.34 #N/A #N/A
Lantai Kerja m2 3.36 3.36 #N/A #N/A
Bekisting Setempat m2 3.20 3.20 #N/A #N/A
Besi Beton Deform D 13 mm kg 121.41 121.41 #N/A #N/A
Beton K225 m3 1.34 1.34 #N/A #N/A
Angkur - Ø 16 - L.200 MM unit 8.00 8.00 #N/A #N/A
Mini Pile 250x250 mm m 60.00 60.00 #N/A #N/A
2. 13 Pondasi Tipe 13 (Crude Oil Tank) 3 unit
Galian Tanah m3 2.02 2.02 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.67 0.67 #N/A #N/A
Buang Tanah Sisa m3 1.35 1.35 #N/A #N/A
Lantai Kerja m2 4.50 4.50 #N/A #N/A
Bekisting Setempat m2 14.25 14.25 #N/A #N/A
Besi Beton Deform D 13 mm kg 174.67 174.67 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 62.15 62.15 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 22.37 22.37 #N/A #N/A
Beton K225 m3 2.48 2.48 #N/A #N/A
Mini Pile 250x250 mm m 180.00 180.00 #N/A #N/A
2. 14 Pondasi Tipe 14 (Oil Recovery Tank) 6 unit
Galian Tanah m3 1.54 1.54 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.67 0.67 #N/A #N/A
Buang Tanah Sisa m3 0.86 0.86 #N/A #N/A
Lantai Kerja m2 2.16 2.16 #N/A #N/A
Bekisting Setempat m2 8.93 8.93 #N/A #N/A
Besi Beton Deform D 16 mm kg 74.24 74.24 #N/A #N/A
Besi Beton Deform D 13 mm kg 119.78 119.78 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 10.36 10.36 #N/A #N/A
Beton K225 m3 1.25 1.25 #N/A #N/A
Grouting m3 0.02 0.02 #N/A #N/A

28(75) 04.Clarification Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Angkur - Ø 16 - L.200 MM unit 12.00 12.00 #N/A #N/A
Mini Pile 250x250 mm m 216.00 216.00 #N/A #N/A
2. 15 Pondasi Tipe 15 (Oil Recovery Tank) 1 unit
Galian Tanah m3 1.16 1.16 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.26 0.26 #N/A #N/A
Buang Tanah Sisa m3 0.90 0.90 #N/A #N/A
Lantai Kerja m2 2.25 2.25 #N/A #N/A
Bekisting Setempat m2 4.70 4.70 #N/A #N/A
Besi Beton Deform D 16 mm kg 22.73 22.73 #N/A #N/A
Besi Beton Deform D 13 mm kg 68.48 68.48 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 7.60 7.60 #N/A #N/A
Beton K225 m3 1.70 1.70 #N/A #N/A
Mini Pile 250x250 mm m 144.00 144.00 #N/A #N/A
Sloof Pondasi Tipe 14&15 (Oil Recovery Tank)
Galian Tanah m3 5.47 5.47 #N/A #N/A
Urugan Tanah & Pemadatan m3 1.82 1.82 #N/A #N/A
Buang Tanah Sisa m3 3.65 3.65 #N/A #N/A
Lantai Kerja m2 9.12 9.12 #N/A #N/A
Bekisting Setempat m2 36.48 36.48 #N/A #N/A
Besi Beton Deform D 16 mm kg 454.56 454.56 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 223.14 223.14 #N/A #N/A
Beton K225 m3 3.65 3.65 #N/A #N/A
2. 18 Pondasi Tipe 18 (Solid Cake Hopper) 8 unit
Galian Tanah m3 2.05 2.05 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.90 0.90 #N/A #N/A
Buang Tanah Sisa m3 1.15 1.15 #N/A #N/A
Lantai Kerja m2 2.88 2.88 #N/A #N/A
Bekisting Setempat m2 11.30 11.30 #N/A #N/A
Besi Beton Deform D 16 mm kg 74.24 74.24 #N/A #N/A
Besi Beton Deform D 13 mm kg 159.71 159.71 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 9.67 9.67 #N/A #N/A
Beton K225 m3 1.56 1.56 #N/A #N/A
Grouting m3 0.01 0.01 #N/A #N/A
Angkur - Ø 19 - L.400 MM unit 32.00 32.00 #N/A #N/A
Mini Pile 250x250 mm m 288.00 288.00 #N/A #N/A
Sloof Solid Cake Hopper
Galian Tanah m3 4.56 4.56 #N/A #N/A
Urugan Tanah & Pemadatan m3 1.52 1.52 #N/A #N/A

29(75) 04.Clarification Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Buang Tanah Sisa m3 3.04 3.04 #N/A #N/A
Lantai Kerja m2 6.76 6.76 #N/A #N/A
Bekisting Setempat m2 27.04 27.04 #N/A #N/A
Besi Beton Deform D 16 mm kg 331.45 331.45 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 163.06 163.06 #N/A #N/A
Beton K225 m3 2.70 2.70 #N/A #N/A
2. 19 Pondasi Tipe 19 (Vertical Ladder) 1 unit
Galian Tanah m3 0.02 0.02 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.01 0.01 #N/A #N/A
Buang Tanah Sisa m3 0.01 0.01 #N/A #N/A
Lantai Kerja m2 0.16 0.16 #N/A #N/A
Bekisting Setempat m2 0.60 0.60 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 1.74 1.74 #N/A #N/A
Besi Beton Polos Ø 6 mm kg 1.12 1.12 #N/A #N/A
Beton K225 m3 0.05 0.05 #N/A #N/A
2. 20 Pondasi Tipe 20 (Support Solid Cake Conveyor) 10 unit
Galian Tanah m3 1.47 1.47 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.72 0.72 #N/A #N/A
Buang Tanah Sisa m3 0.75 0.75 #N/A #N/A
Lantai Kerja m2 2.50 2.50 #N/A #N/A
Bekisting Setempat m2 9.80 9.80 #N/A #N/A
Besi Beton Deform D 13 mm kg 202.97 202.97 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 6.31 6.31 #N/A #N/A
Beton K225 m3 1.11 1.11 #N/A #N/A
Grouting m3 0.01 0.01 #N/A #N/A
Angkur - Ø 16 - L.200 MM unit 10.00 10.00 #N/A #N/A
Mini Pile 250x250 mm m 300.00 300.00 #N/A #N/A
2. 21 Pondasi Tipe 21 (Support Platform Clarifikasi) 8 unit
Galian Tanah m3 2.05 2.05 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.90 0.90 #N/A #N/A
Buang Tanah Sisa m3 1.15 1.15 #N/A #N/A
Lantai Kerja m2 2.88 2.88 #N/A #N/A
Bekisting Setempat m2 11.90 11.90 #N/A #N/A
Besi Beton Deform D 16 mm kg 98.99 98.99 #N/A #N/A
Besi Beton Deform D 13 mm kg 159.71 159.71 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 13.81 13.81 #N/A #N/A
Beton K225 m3 1.67 1.67 #N/A #N/A
Grouting m3 0.03 0.03 #N/A #N/A

30(75) 04.Clarification Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Angkur - Ø 16 - L.200 MM unit 16.00 16.00 #N/A #N/A
Mini Pile 250x250 mm m 288.00 288.00 #N/A #N/A
2. 22 Pondasi Tipe 22 (Tangga) 2 unit
Galian Tanah m3 - - #N/A #N/A
Urugan Tanah & Pemadatan m3 - - #N/A #N/A
Buang Tanah Sisa m3 - - #N/A #N/A
Lantai Kerja m2 0.60 0.60 #N/A #N/A
Bekisting Setempat m2 1.46 1.46 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 6.31 6.31 #N/A #N/A
Besi Beton Polos Ø 6 mm kg 2.66 2.66 #N/A #N/A
Beton K225 m3 0.17 0.17 #N/A #N/A
Grouting m3 0.01 0.01 #N/A #N/A
Angkur - Ø 12 - L.200 MM unit 4.00 4.00 #N/A #N/A
2. 23 Pondasi Tipe 23 (Tangga) 3 unit
Galian Tanah m3 - - #N/A #N/A
Urugan Tanah & Pemadatan m3 - - #N/A #N/A
Buang Tanah Sisa m3 - - #N/A #N/A
Lantai Kerja m2 0.90 0.90 #N/A #N/A
Bekisting Setempat m2 2.18 2.18 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 9.47 9.47 #N/A #N/A
Besi Beton Polos Ø 6 mm kg 4.00 4.00 #N/A #N/A
Beton K225 m3 0.25 0.25 #N/A #N/A
Grouting m3 0.02 0.02 #N/A #N/A
Angkur - Ø 12 - L.200 MM unit 6.00 6.00 #N/A #N/A
2. 24 Pondasi Tipe 24 (Support Bordes) 2 unit
Galian Tanah m3 - - #N/A #N/A
Urugan Tanah & Pemadatan m3 - - #N/A #N/A
Buang Tanah Sisa m3 - - #N/A #N/A
Lantai Kerja m2 0.40 0.40 #N/A #N/A
Bekisting Setempat m2 1.18 1.18 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 5.35 5.35 #N/A #N/A
Besi Beton Polos Ø 6 mm kg 2.40 2.40 #N/A #N/A
Beton K225 m3 0.11 0.11 #N/A #N/A
Grouting m3 4.00 4.00 #N/A #N/A
Angkur - Ø 16 - L.200 MM unit 0.01 0.01 #N/A #N/A
2. 25 Pondasi Tipe 25 (Struktur Platform Desanding Cyclone) 6 unit
Galian Tanah m3 0.88 0.88 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.43 0.43 #N/A #N/A

31(75) 04.Clarification Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Buang Tanah Sisa m3 0.45 0.45 #N/A #N/A
Lantai Kerja m2 1.50 1.50 #N/A #N/A
Bekisting Setempat m2 5.66 5.66 #N/A #N/A
Besi Beton Deform D 13 mm kg 121.78 121.78 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 2.84 2.84 #N/A #N/A
Beton K225 m3 0.64 0.64 #N/A #N/A
Grouting m3 0.00 0.00 #N/A #N/A
Angkur - Ø 19 - L.400 MM unit 6.00 6.00 #N/A #N/A
Mini Pile 250x250 mm m 180.00 180.00 #N/A #N/A
Sloof
Galian Tanah m3 1.35 1.35 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.45 0.45 #N/A #N/A
Buang Tanah Sisa m3 0.90 0.90 #N/A #N/A
Lantai Kerja m2 3.00 3.00 #N/A #N/A
Bekisting Setempat m2 11.98 11.98 #N/A #N/A
Besi Beton Deform D 16 mm kg 66.58 66.58 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 47.14 47.14 #N/A #N/A
Beton K225 m3 1.20 1.20 #N/A #N/A
2. 26 Pondasi Tipe 26 (Sludge Tank No. 2) 2 unit
Galian Tanah m3 0.63 0.63 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.24 0.24 #N/A #N/A
Buang Tanah Sisa m3 0.39 0.39 #N/A #N/A
Lantai Kerja m2 1.30 1.30 #N/A #N/A
Bekisting Setempat m2 4.68 4.68 #N/A #N/A
Besi Beton Deform D 13 mm kg 51.85 51.85 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 17.76 17.76 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 6.63 6.63 #N/A #N/A
Beton K225 m3 0.68 0.68 #N/A #N/A
Mini Pile 250x250 mm m 120.00 120.00 #N/A #N/A
2. 27 Pondasi Tipe 27 (Panel MCC-5) 1 unit
Galian Tanah m3 2.86 2.86 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.72 0.72 #N/A #N/A
Buang Tanah Sisa m3 2.14 2.14 #N/A #N/A
Lantai Kerja m2 3.57 3.57 #N/A #N/A
Bekisting Setempat m2 14.48 14.48 #N/A #N/A
Besi Beton Deform D 13 mm kg 209.01 209.01 #N/A #N/A
Beton K225 m3 1.90 1.90 #N/A #N/A
Mini Pile 250x250 mm m 60.00 #N/A #N/A

32(75) 04.Clarification Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
2. 24 Pondasi Tipe 23 (Fat Pit)
Galian Tanah 1 unit m3 127.22 127.22 #N/A #N/A
Urugan Tanah & Pemadatan m3 37.20 37.20 #N/A #N/A
Buang Tanah Sisa m3 90.02 90.02 #N/A #N/A
Lantai Kerja m2 29.04 29.04 #N/A #N/A
Bekisting Setempat m2 186.60 186.60 #N/A #N/A
Besi Beton Deform D 13 mm kg 2,567.15 2,567.15 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 34.80 34.80 #N/A #N/A
Beton K225 + ADDITIVE BetonTahan Asam m2 26.86 26.86 #N/A #N/A
Mini Pile 250x250 mm m 432.00 432.00 #N/A #N/A
Lantai level + 0.1, Pondasi Pompa & Priming Tank
Galian Tanah m3 2.18 2.18 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.20 0.20 #N/A #N/A
Buang Tanah Sisa m3 1.98 1.98 #N/A #N/A
Lantai Kerja m2 19.80 19.80 #N/A #N/A
Bekisting Setempat m2 7.04 7.04 #N/A #N/A
Besi Beton Deform D 13 mm kg 638.50 638.50 #N/A #N/A
Beton K225 m3 6.19 6.19 #N/A #N/A
Angkur - Ø 16 - L.200 MM u/ priming tank dan pompa unit 16.00 16.00 #N/A #N/A
Mini Pile 250x250 mm m 144.00 144.00 #N/A #N/A
2. 25 Internal Drain S20 18 m
Galian Tanah m3 0.63 0.63 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.13 0.13 #N/A #N/A
Buang Tanah Sisa m3 0.50 0.50 #N/A #N/A
Lantai Kerja m2 7.20 7.20 #N/A #N/A
Bekisting Menerus m2 19.44 19.44 #N/A #N/A
Wiremesh M 8 m2 15.12 15.12 #N/A #N/A
Beton K225 m3 1.51 1.51 #N/A #N/A
2. 26 Internal Drain S30 142 m
Galian Tanah m3 8.52 8.52 #N/A #N/A
Urugan Tanah & Pemadatan m3 1.42 1.42 #N/A #N/A
Buang Tanah Sisa m3 7.10 7.10 #N/A #N/A
Lantai Kerja m2 71.00 71.00 #N/A #N/A
Bekisting Menerus m2 170.40 170.40 #N/A #N/A
Wiremesh M 8 m2 142.00 142.00 #N/A #N/A
Beton K225 m3 14.20 14.20 #N/A #N/A
2. 27 Lantai Stasiun Klarifikasi Termasuk selasar
Lantai Kerja m2 403.52 648.00 #N/A #N/A

33(75) 04.Clarification Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Wiremesh M 8 m2 403.52 648.00 #N/A #N/A
Beton K225 m3 40.35 97.20 #N/A #N/A

3. 0 PEKERJAAN KONSTRUKSI BAJA


3. 1 Penutup Internal Drain S-20 18 m
MS - L 50X50X5 kg 158.34 158.34 #N/A #N/A
MS - PELAT BORDES 4.5 mm kg 181.22 181.22 #N/A #N/A
Pengecatan Baja kg 339.56 339.56 #N/A #N/A
Penutup Internal Drain S-30 142 m
MS - L 50X50X5 kg 1,339.86 1,339.86 #N/A #N/A
MS - PELAT BORDES 4.5 mm kg 1,931.22 1,931.22 #N/A #N/A
Pengecatan Baja kg 3,271.08 3,271.08 #N/A #N/A
3. 2 Portal Fat Pit
MS - PELAT 6 mm kg 8.97 8.97 #N/A #N/A
MS - PELAT 8 mm kg 19.07 19.07 #N/A #N/A
MS - PELAT 10 mm kg 16.74 16.74 #N/A #N/A
MS - PELAT 12 mm kg 10.85 10.85 #N/A #N/A
MS - CNP 125X50X20X2.3 kg 227.30 227.30 #N/A #N/A
MS - WF 150X75X5X7 kg 486.70 486.70 #N/A #N/A
BESI BETON POLOS Ø 12 mm kg 10.65 10.65 #N/A #N/A
Pengecatan Baja kg 780.28 780.28 #N/A #N/A
BOLT & NUT HTB A325 - Ø 5/8" X 1-3/4" unit 28.00 28.00 #N/A #N/A
BOLT & NUT HTB A325 - Ø 5/8" X 2-1/4" unit 16.00 16.00 #N/A #N/A
BOLT & NUT M 12 X 30 unit 48.00 48.00 #N/A #N/A
3. 3 Handrail Fat Pit
MS - PELAT 6 mm kg 13.56 13.56 #N/A #N/A
Pipa Hitam Medium - Ø 1" kg 52.22 52.22 #N/A #N/A
Pipa Hitam Medium - Ø 1-1/4" kg 136.28 136.28 #N/A #N/A
Pengecatan Baja kg 202.06 202.06 #N/A #N/A

4. 0 PEKERJAAN ATAP
4. 1 Atap Fat Pit
Penutup Atap Spandek m2 50.40 50.40 #N/A #N/A
4. 2 Rabung Atap Fat Pit
Rabung Spandek m' 8.40 8.40 #N/A #N/A

5. 0 PEKERJAAN KERAMIK
5. 1 Lantai Keramik
Keramik Lantai 33 x 33 cm m2 324.00 648.00 #N/A #N/A

34(75) 04.Clarification Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)

TOTAL #N/A
ROUNDED #N/A

35(75) 04.Clarification Station


397160157.xls

BILL OF QUANTITY

BANGUNAN : PONDASI TANGKI CPO


NO. GBR :
HARGA : #N/A

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)

1. 0 PEKERJAAN TANAH
1. 1 Bowplank
Bowplank m' 172.00 88.00 #N/A #N/A

2. 0 PEKERJAAN KONSTRUKSI BETON


2. 1 Pondasi Tangki CPO 2500 Ton unit 2.00 2.00
Galian Tanah m3 408.20 642.60 #N/A #N/A
Urugan Tanah & Pemadatan m3 20.15 577.88 #N/A #N/A
Urug Pasir m3 21.15 393.60 #N/A #N/A
Buang Tanah Sisa m3 388.05 64.72 #N/A #N/A
Lantai Kerja m2 597.30 535.60 #N/A #N/A
Bekisting Setempat m2 118.24 133.44 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 1,680.42 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 22.68 #N/A #N/A
Besi Beton Polos Ø 12 mm kg 787.14 #N/A #N/A
Besi Beton Deform D 16 mm kg 26,763.34 2,833.30 #N/A #N/A
Beton K225 m3 488.52 64.72 #N/A #N/A
Pasangan Batu Kali m3 40.16 66.72 #N/A #N/A
Spun Pile Ø 500 mm 2 x 48 x 42m m' 4,032.00 #N/A #N/A

TOTAL #N/A
ROUNDED #N/A

36(75) 05.Tangki CPO


397160157.xls

BILL OF QUANTITY

BANGUNAN : KERNEL RECOVERY STATION


NO. GBR :
HARGA : #N/A

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)

1. 0 PEKERJAAN TANAH
1. 1 Bowplank
Bowplank sdh tmsk bowplank MPB #N/A #N/A

2. 0 PEKERJAAN KONSTRUKSI BETON


2. 17a Pondasi Tipe F 1 (Kernel Bunker) 4 unit
Galian Tanah m3 3.47 16.20 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.77 6.32 #N/A #N/A
Buang Tanah Sisa m3 2.70 9.80 #N/A #N/A
Lantai Kerja m2 4.50 23.04 #N/A #N/A
Bekisting Setempat m2 11.28 28.56 #N/A #N/A
Besi Beton Deform D 16 mm kg 166.15 151.68 #N/A #N/A
Besi Beton Polos Ø 12 mm kg 188.92 784.58 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 17.76 31.28 #N/A #N/A
Beton K225 m3 3.51 9.88 #N/A #N/A
Grouting m3 0.04 #N/A #N/A
Angkur - Ø 19 - L.400 MM Bh 32.00 16.00 #N/A #N/A
Mini Pile 250x250 mm m 1,152.00 #N/A #N/A
2. 17b Sloof Kernel Bunker
Galian Tanah m3 11.49 3.60 #N/A #N/A
Urugan Tanah & Pemadatan m3 2.87 0.65 #N/A #N/A
Buang Tanah Sisa m3 8.62 2.95 #N/A #N/A
Lantai Kerja m2 19.16 7.20 #N/A #N/A
Bekisting Balok & Kolom m2 39.20 33.60 #N/A #N/A
Besi Beton Polos Ø 12 mm kg 1,875.77 127.92 #N/A #N/A
Besi Beton Polos Ø 6 mm kg 318.13 49.64 #N/A #N/A
Beton K225 m3 5.88 2.95 #N/A #N/A
2. 14 Pondasi Tipe F 2 (Kernel Silo) 6 unit
Galian Tanah m3 5.34 56.70 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.69 47.89 #N/A #N/A
Buang Tanah Sisa m3 4.65 8.81 #N/A #N/A

37(75) 06.Kernel Recovery Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Lantai Kerja m2 15.50 29.38 #N/A #N/A
Bekisting Setempat m2 11.21 31.85 #N/A #N/A
Besi Beton Polos Ø 12 mm kg 58.59 92.10 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 366.90 423.58 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 8.84 271.32 #N/A #N/A
Beton K225 m3 6.43 8.81 #N/A #N/A
Grouting m3 0.03 #N/A #N/A
Angkur - Ø 25 - L.300 MM Bh 8.00 48.00 #N/A #N/A
Mini Pile 250x250 mm m 288.00 #N/A #N/A
2. 7 Pondasi Tipe F 4 (Support Cracked Mixture Conveyor) 12 unit
Galian Tanah m3 0.10 33.75 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.06 24.97 #N/A #N/A
Buang Tanah Sisa m3 0.04 8.78 #N/A #N/A
Lantai Kerja m2 0.18 27.00 #N/A #N/A
Bekisting Setempat m2 1.15 37.44 #N/A #N/A
Besi Beton Polos Ø 12 mm kg 111.29 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 3.85 293.04 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 3.50 68.26 #N/A #N/A
Beton K225 m3 0.09 8.78 #N/A #N/A
Grouting m3 0.00 #N/A #N/A
Angkur - Ø 19 - L.500 MM Bh 2.00 48.00 #N/A #N/A
Sloof
Galian Tanah m3 1.57 4.14 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.52 1.38 #N/A #N/A
Buang Tanah Sisa m3 1.04 2.76 #N/A #N/A
Lantai Kerja m2 3.48 13.80 #N/A #N/A
Bekisting Balok & Kolom m2 13.92 46.00 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 113.64 113.44 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 53.10 121.25 #N/A #N/A
Beton K225 m3 1.39 2.76 #N/A #N/A
2. 6a Pondasi Tipe F 5 (Nut Silo) 6 unit
Galian Tanah m3 1.02 16.88 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.45 12.49 #N/A #N/A
Buang Tanah Sisa m3 0.58 4.39 #N/A #N/A
Lantai Kerja m2 1.44 13.50 #N/A #N/A
Bekisting Setempat m2 5.66 18.72 #N/A #N/A
Besi Beton Polos Ø 12 mm kg 49.50 55.65 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 79.85 146.52 #N/A #N/A

38(75) 06.Kernel Recovery Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Besi Beton Polos Ø 8 mm kg 3.16 34.13 #N/A #N/A
Beton K225 m3 0.78 4.39 #N/A #N/A
Grouting m3 0.01 #N/A #N/A
Angkur - Ø 16 - L.500 MM Bh 4.00 24.00 #N/A #N/A
Mini Pile 250x250 mm m 144.00 #N/A #N/A
2. 6b Sloof Nut Silo
Galian Tanah m3 1.57 1.61 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.52 0.41 #N/A #N/A
Buang Tanah Sisa m3 1.04 1.20 #N/A #N/A
Lantai Kerja m2 3.48 6.02 #N/A #N/A
Bekisting Balok & Kolom m2 13.92 12.04 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 113.64 49.51 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 53.10 52.90 #N/A #N/A
Beton K225 m3 1.39 1.20 #N/A #N/A
2. 1 Pondasi Tipe F 6 (Cake Breaker Conveyor) 4 unit
Galian Tanah m3 0.59 4.00 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.29 2.68 #N/A #N/A
Buang Tanah Sisa m3 0.30 1.32 #N/A #N/A
Lantai Kerja m2 1.00 1.96 #N/A #N/A
Bekisting Setempat m2 3.92 11.20 #N/A #N/A
Besi Beton Polos Ø 12 mm kg 97.53 31.98 #N/A #N/A
Besi Beton Polos Ø 6 mm kg 2.53 15.96 #N/A #N/A
Beton K225 m3 0.45 1.32 #N/A #N/A
Grouting m3 0.01 #N/A #N/A
Angkur - Ø 16 - L.500 MM Bh 8.00 8.00 #N/A #N/A
Mini Pile 250x250 mm m 120.00 #N/A #N/A
2. 1 Pondasi Tipe F 6 (Cake Breaker Conveyor) 4 unit
Galian Tanah m3 0.59 4.00 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.29 2.68 #N/A #N/A
Buang Tanah Sisa m3 0.30 1.32 #N/A #N/A
Lantai Kerja m2 1.00 1.96 #N/A #N/A
Bekisting Setempat m2 3.92 11.20 #N/A #N/A
Besi Beton Polos Ø 12 mm kg 97.53 31.98 #N/A #N/A
Besi Beton Polos Ø 6 mm kg 2.53 15.96 #N/A #N/A
Beton K225 m3 0.45 1.32 #N/A #N/A
Grouting m3 0.01 #N/A #N/A
Angkur - Ø 16 - L.500 MM Bh 8.00 8.00 #N/A #N/A
Mini Pile 250x250 mm m 120.00 #N/A #N/A

39(75) 06.Kernel Recovery Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
2. 1 Pondasi Tipe F 6 (Cake Breaker Conveyor) 4 unit
Galian Tanah m3 0.59 4.00 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.29 2.68 #N/A #N/A
Buang Tanah Sisa m3 0.30 1.32 #N/A #N/A
Lantai Kerja m2 1.00 1.96 #N/A #N/A
Bekisting Setempat m2 3.92 11.20 #N/A #N/A
Besi Beton Polos Ø 12 mm kg 97.53 31.98 #N/A #N/A
Besi Beton Polos Ø 6 mm kg 2.53 15.96 #N/A #N/A
Beton K225 m3 0.45 1.32 #N/A #N/A
Grouting m3 0.01 #N/A #N/A
Angkur - Ø 16 - L.500 MM Bh 8.00 8.00 #N/A #N/A
Mini Pile 250x250 mm m 120.00 #N/A #N/A
2. 2 Pondasi Tipe F 9 (Depericarper) 1 unit
Galian Tanah m3 1.43 5.00 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.25 3.42 #N/A #N/A
Buang Tanah Sisa m3 1.18 1.58 #N/A #N/A
Lantai Kerja m2 3.92 2.00 #N/A #N/A
Bekisting Setempat m2 4.03 13.54 #N/A #N/A
Besi Beton Polos Ø 12 mm kg 29.29 21.96 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 105.86 17.76 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 3.16 13.27 #N/A #N/A
Besi Beton Polos Ø 6 mm kg 7.45 #N/A #N/A
Beton K225 m3 1.63 1.58 #N/A #N/A
Grouting m3 0.01 #N/A #N/A
Angkur - Ø 16 - L.350 MM Bh 4.00 4.00 #N/A #N/A
Mini Pile 250x250 mm m 120.00 #N/A #N/A
2. 16a Pondasi Tipe F 10 (Cyclone Structure) 8 unit
Galian Tanah m3 3.58 32.40 #N/A #N/A
Urugan Tanah & Pemadatan m3 1.57 26.27 #N/A #N/A
Buang Tanah Sisa m3 2.02 6.13 #N/A #N/A
Lantai Kerja m2 5.04 13.52 #N/A #N/A
Bekisting Setempat m2 20.83 29.56 #N/A #N/A
Besi Beton Deform D 16 mm kg 173.24 197.18 #N/A #N/A
Besi Beton Polos Ø 12 mm kg 279.49 243.05 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 15.47 48.54 #N/A #N/A
Beton K225 m3 2.92 6.13 #N/A #N/A
Grouting m3 0.04 #N/A #N/A
Angkur - Ø 19 - L.600 MM Bh 14.00 32.00 #N/A #N/A

40(75) 06.Kernel Recovery Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Mini Pile 250x250 mm m 504.00 #N/A #N/A
2. 16b Sloof Cyclone Structure
Galian Tanah m3 4.60 3.85 #N/A #N/A
Urugan Tanah & Pemadatan m3 1.53 1.54 #N/A #N/A
Buang Tanah Sisa m3 3.07 2.31 #N/A #N/A
Lantai Kerja m2 10.23 7.70 #N/A #N/A
Bekisting Balok & Kolom m2 40.92 38.50 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 326.72 96.20 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 156.08 104.28 #N/A #N/A
Beton K225 m3 4.09 2.31 #N/A #N/A
2. 12 Pondasi Hydrocyclone 2 unit
Galian Tanah m3 2.65 4.78 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.88 3.90 #N/A #N/A
Buang Tanah Sisa m3 1.77 0.88 #N/A #N/A
Lantai Kerja m2 5.90 0.15 #N/A #N/A
Bekisting Setempat m2 16.16 2.77 #N/A #N/A
Besi Beton Polos Ø 12 mm kg 51.79 125.57 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 19.57 #N/A #N/A
Beton K225 m3 2.95 1.75 #N/A #N/A
Angkur - Ø 16 - L.200 MM Bh 20.00 24.00 #N/A #N/A
Mini Pile 250x250 mm m 240.00 #N/A #N/A
2. 3 Pondasi Tipe 3 (Support Nut Auger Conveyor) 1 unit
Galian Tanah m3 0.05 0.05 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.03 0.03 #N/A #N/A
Buang Tanah Sisa m3 0.02 0.02 #N/A #N/A
Lantai Kerja m2 0.09 0.09 #N/A #N/A
Bekisting Setempat m2 0.58 0.58 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 1.92 1.92 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 1.75 1.75 #N/A #N/A
Beton K225 m3 0.04 0.04 #N/A #N/A
Grouting m3 0.00 0.00 #N/A #N/A
Angkur - Ø 16 - L.200 MM Bh 1.00 1.00 #N/A #N/A
Pondasi Tipe 3 (Support Wet Shell Conveyor) 1 unit
Galian Tanah m3 0.05 0.05 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.03 0.03 #N/A #N/A
Buang Tanah Sisa m3 0.02 0.02 #N/A #N/A
Lantai Kerja m2 0.09 0.09 #N/A #N/A
Bekisting Setempat m2 0.58 0.58 #N/A #N/A

41(75) 06.Kernel Recovery Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Besi Beton Polos Ø 10 mm kg 1.92 1.92 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 1.75 1.75 #N/A #N/A
Beton K225 m3 0.04 0.04 #N/A #N/A
Grouting m3 0.00 0.00 #N/A #N/A
Angkur - Ø 16 - L.200 MM Bh 1.00 1.00 #N/A #N/A
2. 4 Pondasi Tipe 4 (Nut Polishing Drum) 1 unit
Galian Tanah m3 1.57 1.57 #N/A #N/A
Urug Pasir m3 0.55 0.55 #N/A #N/A
Buang Tanah Sisa m3 1.15 1.15 #N/A #N/A
Lantai Kerja m2 2.56 2.56 #N/A #N/A
Bekisting Setempat m2 9.33 9.33 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 128.24 128.24 #N/A #N/A
Beton K225 m3 2.70 2.70 #N/A #N/A
Angkur - Ø 19 - L.300 MM Bh 10.00 10.00 #N/A #N/A
Mini Pile 250x250 mm m 72.00 72.00 #N/A #N/A
2. 5 Pondasi Tipe 5 (Nut Polishing Drum) 1 unit
Galian Tanah m3 0.86 0.86 #N/A #N/A
Urug Pasir m3 0.27 0.27 #N/A #N/A
Buang Tanah Sisa m3 0.59 0.59 #N/A #N/A
Lantai Kerja m2 1.32 1.32 #N/A #N/A
Bekisting Setempat m2 5.81 5.81 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 77.04 77.04 #N/A #N/A
Beton K225 m3 1.37 1.37 #N/A #N/A
Angkur - Ø 19 - L.300 MM Bh 6.00 6.00 #N/A #N/A
Mini Pile 250x250 mm m 72.00 72.00 #N/A #N/A
2. 8 Pondasi Tipe 8 (Cracked Mixture Elevator) 1 unit
Galian Tanah m3 0.30 0.30 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.10 0.10 #N/A #N/A
Buang Tanah Sisa m3 0.20 0.20 #N/A #N/A
Lantai Kerja m2 0.79 0.79 #N/A #N/A
Bekisting Setempat m2 1.42 1.42 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 22.65 22.65 #N/A #N/A
Beton K225 m3 0.32 0.32 #N/A #N/A
Angkur - Ø 16 - L.200 MM Bh 4.00 4.00 #N/A #N/A
Mini Pile 250x250 mm m 30.00 30.00 #N/A #N/A
2. 9 Pondasi Tipe 9 (Wet Kernel Elevator) 1 unit
Galian Tanah m3 0.25 0.25 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.09 0.09 #N/A #N/A

42(75) 06.Kernel Recovery Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Buang Tanah Sisa m3 0.16 0.16 #N/A #N/A
Lantai Kerja m2 0.64 0.64 #N/A #N/A
Bekisting Setempat m2 1.28 1.28 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 18.02 18.02 #N/A #N/A
Beton K225 m3 0.26 0.26 #N/A #N/A
Angkur - Ø 16 - L.200 MM Bh 4.00 4.00 #N/A #N/A
Mini Pile 250x250 mm m 30.00 30.00 #N/A #N/A
2. 10 Pondasi Tipe 10 (LTDS Platform) 4 unit
Galian Tanah m3 0.59 0.59 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.29 0.29 #N/A #N/A
Buang Tanah Sisa m3 0.30 0.30 #N/A #N/A
Lantai Kerja m2 1.00 1.00 #N/A #N/A
Bekisting Setempat m2 4.06 4.06 #N/A #N/A
Besi Beton Deform D 16 mm kg 49.50 49.50 #N/A #N/A
Besi Beton Deform D 13 mm kg 64.85 64.85 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 3.16 3.16 #N/A #N/A
Beton K225 m3 0.46 0.46 #N/A #N/A
Grouting m3 0.01 0.01 #N/A #N/A
Angkur - Ø 19 - L.300 MM Bh 4.00 4.00 #N/A #N/A
Mini Pile 250x250 mm m 120.00 120.00 #N/A #N/A
2. 13 Pondasi Tipe 13 (Support Wet Kernel Conveyor) 1 unit
Galian Tanah m3 0.15 0.15 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.05 0.05 #N/A #N/A
Buang Tanah Sisa m3 0.11 0.11 #N/A #N/A
Lantai Kerja m2 1.05 1.05 #N/A #N/A
Bekisting Setempat m2 1.46 1.46 #N/A #N/A
Besi Beton Deform D 13 mm kg 29.76 29.76 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 10.88 10.88 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 2.37 2.37 #N/A #N/A
Beton K225 m3 0.28 0.28 #N/A #N/A
Grouting m3 0.01 0.01 #N/A #N/A
Angkur - Ø 16 - L.400 MM Bh 2.00 2.00 #N/A #N/A
Tiang Kayu Ø 150 - 4 m btg 8.00 8.00 #N/A #N/A
Pondasi Tipe 13 (Support Wet Shell Conveyor) 1 unit
Galian Tanah m3 0.15 0.15 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.05 0.05 #N/A #N/A
Buang Tanah Sisa m3 0.11 0.11 #N/A #N/A
Lantai Kerja m2 1.05 1.05 #N/A #N/A

43(75) 06.Kernel Recovery Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Bekisting Setempat m2 1.46 1.46 #N/A #N/A
Besi Beton Deform D 13 mm kg 29.76 29.76 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 10.88 10.88 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 2.37 2.37 #N/A #N/A
Beton K225 m3 0.28 0.28 #N/A #N/A
Grouting m3 0.01 0.01 #N/A #N/A
Angkur - Ø 16 - L.200 MM Bh 2.00 2.00 #N/A #N/A
Tiang Kayu Ø 150 - 4 m btg 8.00 8.00 #N/A #N/A
2. 15 Pondasi Tipe 15 (Fan HeaterKernel Silo) 2 unit
Galian Tanah m3 4.36 4.36 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.99 0.99 #N/A #N/A
Buang Tanah Sisa m3 3.37 3.37 #N/A #N/A
Lantai Kerja m2 8.43 8.43 #N/A #N/A
Bekisting Setempat m2 9.95 9.95 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 210.58 210.58 #N/A #N/A
Beton K225 m3 4.70 4.70 #N/A #N/A
Tiang Kayu Ø 150 - 4 m btg 50.00 50.00 #N/A #N/A
2. 18 Pondasi Tipe 18 (Crack Mix Blower) 1 unit
Galian Tanah m3 0.29 0.29 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.09 0.09 #N/A #N/A
Buang Tanah Sisa m3 0.20 0.20 #N/A #N/A
Lantai Kerja m2 0.99 0.99 #N/A #N/A
Bekisting Setempat m2 1.60 1.60 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 26.22 26.22 #N/A #N/A
Beton K225 m3 0.40 0.40 #N/A #N/A
Angkur - Ø 16 - L.200 MM Bh 4.00 4.00 #N/A #N/A
Mini Pile 250x250 mm m 30.00 30.00 #N/A #N/A
Pondasi Tipe 18 (Dried Kernel Blower) 1 unit
Galian Tanah m3 0.29 0.29 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.09 0.09 #N/A #N/A
Buang Tanah Sisa m3 0.20 0.20 #N/A #N/A
Lantai Kerja m2 0.99 0.99 #N/A #N/A
Bekisting Setempat m2 1.60 1.60 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 26.22 26.22 #N/A #N/A
Beton K225 m3 0.40 0.40 #N/A #N/A
Angkur - Ø 16 - L.200 MM Bh 4.00 4.00 #N/A #N/A
Mini Pile 250x250 mm m 30.00 30.00 #N/A #N/A
2. 19 Pondasi Tipe 19 (Tangga) 3 unit

44(75) 06.Kernel Recovery Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Galian Tanah Tangga platform LTDS, m3 - - #N/A #N/A
Urugan Tanah & Pemadatan Tangga platform Cyclone m3 - - #N/A #N/A
Buang Tanah Sisa Tangga platform Ripple Mill m3 - - #N/A #N/A
Lantai Kerja m2 0.90 0.90 #N/A #N/A
Bekisting Setempat m2 2.18 2.18 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 9.47 9.47 #N/A #N/A
Besi Beton Polos Ø 6 mm kg 4.66 4.66 #N/A #N/A
Beton K225 m3 0.25 0.25 #N/A #N/A
Grouting m3 0.02 0.02 #N/A #N/A
Angkur - Ø 12 - L.200 MM Bh 6.00 6.00 #N/A #N/A
2. 20 Pondasi Tipe 20 (Tangga) 2 unit
Galian Tanah Tangga claybath m3 - - #N/A #N/A
Urugan Tanah & Pemadatan m3 - - #N/A #N/A
Buang Tanah Sisa m3 - - #N/A #N/A
Lantai Kerja m2 0.60 0.60 #N/A #N/A
Bekisting Setempat m2 1.46 1.46 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 6.31 6.31 #N/A #N/A
Besi Beton Polos Ø 6 mm kg 3.11 3.11 #N/A #N/A
Beton K225 m3 0.17 0.17 #N/A #N/A
Grouting m3 0.01 0.01 #N/A #N/A
Angkur - Ø 12 - L.200 MM Bh 4.00 4.00 #N/A #N/A
2. 21 Pondasi Tipe 21 (Vertical Ladder) 1 unit
Galian Tanah Tangga Depericarper m3 - - #N/A #N/A
Urugan Tanah & Pemadatan m3 - - #N/A #N/A
Buang Tanah Sisa m3 - - #N/A #N/A
Lantai Kerja m2 0.24 0.24 #N/A #N/A
Bekisting Setempat m2 0.44 0.44 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 2.47 2.47 #N/A #N/A
Besi Beton Polos Ø 6 mm kg 1.12 1.12 #N/A #N/A
Beton K225 m3 0.05 0.05 #N/A #N/A
2. 22 Pondasi Tipe 22 (Support Bordes Tangga Platform LTDS) 1 unit
Galian Tanah m3 0.08 0.08 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.03 0.03 #N/A #N/A
Buang Tanah Sisa m3 0.05 0.05 #N/A #N/A
Lantai Kerja m2 0.50 0.50 #N/A #N/A
Bekisting Setempat m2 0.89 0.89 #N/A #N/A
Besi Beton Deform D 13 mm kg 2.86 2.86 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 17.92 17.92 #N/A #N/A

45(75) 06.Kernel Recovery Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Besi Beton Polos Ø 8 mm kg 0.95 0.95 #N/A #N/A
Beton K225 m3 0.11 0.11 #N/A #N/A
Grouting m3 0.00 0.00 #N/A #N/A
Angkur - Ø 16 - L.400 MM Bh 2.00 2.00 #N/A #N/A
Tiang Kayu Ø 150 - 4 m btg 3.00 3.00 #N/A #N/A
2. 23 Pondasi Tipe 23 (Wet & Dry Shell Area) 1 unit
Pile Cap
Galian Tanah m3 2.92 2.92 #N/A #N/A
Urugan Tanah & Pemadatan m3 1.15 1.15 #N/A #N/A
Buang Tanah Sisa m3 1.76 1.76 #N/A #N/A
Lantai Kerja m2 2.94 2.94 #N/A #N/A
Bekisting Setempat m2 11.76 11.76 #N/A #N/A
Besi Beton Deform D 13 mm kg 177.05 177.05 #N/A #N/A
Beton K225 vol beton dikurangi tebal pelat m3 1.47 1.47 #N/A #N/A
Mini Pile 250x250 mm m 216.00 216.00 #N/A #N/A
Balok
Galian Tanah m3 2.64 2.64 #N/A #N/A
Urugan Tanah & Pemadatan m3 1.79 1.79 #N/A #N/A
Buang Tanah Sisa m3 0.86 0.86 #N/A #N/A
Lantai kerja m2 9.52 9.52 #N/A #N/A
Bekisting Balok & Kolom m2 25.88 25.88 #N/A #N/A
Besi Beton Deform D 22 mm kg 983.66 983.66 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 294.53 294.53 #N/A #N/A
Beton K225 vol beton dikurangi tebal pelat m3 3.66 3.66 #N/A #N/A
Lantai
Lantai Kerja m2 63.00 63.00 #N/A #N/A
Bekisting lantai m2 7.04 7.04 #N/A #N/A
Wiremesh M 10 m2 126.00 126.00 #N/A #N/A
Beton K225 m3 12.60 12.60 #N/A #N/A
Dinding
Bekisting dinding m2 133.80 133.80 #N/A #N/A
Besi Beton Deform D 16 mm kg 1,856.12 1,856.12 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 567.21 567.21 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 52.56 52.56 #N/A #N/A
Beton K225 m3 19.80 19.80 #N/A #N/A
Rib Dinding
Bekisting dinding m2 25.43 25.43 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 300.91 300.91 #N/A #N/A

46(75) 06.Kernel Recovery Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Beton K225 m3 2.10 2.10 #N/A #N/A
2. 24 Pondasi Tipe 24 (Support Pipa) 1 unit
Galian Tanah m3 - - #N/A #N/A
Urugan Tanah & Pemadatan m3 - - #N/A #N/A
Buang Tanah Sisa m3 - - #N/A #N/A
Lantai Kerja m2 0.27 0.27 #N/A #N/A
Bekisting Setempat m2 0.67 0.67 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 2.91 2.91 #N/A #N/A
Besi Beton Polos Ø 6 mm kg 1.33 1.33 #N/A #N/A
Beton K225 m3 0.08 0.08 #N/A #N/A
Grouting m3 0.01 0.01 #N/A #N/A
Angkur - Ø 12 - L.200 MM Bh 2.00 2.00 #N/A #N/A
2. 25 Pondasi Tipe 25 (Bak CaCO3)
Galian Tanah m3 10.00 10.00 #N/A #N/A
Urugan Tanah & Pemadatan m3 6.00 6.00 #N/A #N/A
Buang Tanah Sisa m3 4.00 4.00 #N/A #N/A
Lantai Kerja m2 6.00 6.00 #N/A #N/A
Bekisting Setempat m2 16.50 16.50 #N/A #N/A
Wiremesh M 8 m2 24.00 24.00 #N/A #N/A
Beton K225 m3 1.85 1.85 #N/A #N/A
Parit ke Bak CaCO3
Bekisting Setempat m2 48.00 48.00 #N/A #N/A
Wiremesh M 8 m2 41.60 41.60 #N/A #N/A
Beton K225 m3 5.76 5.76 #N/A #N/A
Parit Lantai Claybath ke saluran drainase MPB
Lantai Kerja m2 4.00 4.00 #N/A #N/A
Bekisting Setempat m2 10.00 10.00 #N/A #N/A
Wiremesh M 8 m2 10.00 10.00 #N/A #N/A
Beton K225 m3 1.00 1.00 #N/A #N/A
2. 26 Pondasi Tipe 26 (Panel MCC-4) 1 unit
Galian Tanah m3 3.13 3.13 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.78 0.78 #N/A #N/A
Buang Tanah Sisa m3 2.35 2.35 #N/A #N/A
Lantai Kerja m2 3.92 3.92 #N/A #N/A
Bekisting Setempat m2 15.78 15.78 #N/A #N/A
Besi Beton Deform D 13 mm kg 223.94 223.94 #N/A #N/A
Beton K225 m3 2.08 2.08 #N/A #N/A

47(75) 06.Kernel Recovery Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Mini Pile 250x250 mm m 60.00 60.00 #N/A #N/A

3. 0 PEKERJAAN LANTAI
3. 1 Lantai Dari As 11 s/d
Lantai Kerja lantai di bawah struktur cyclone m2 551.20 1,158.00 #N/A #N/A

48(75) 06.Kernel Recovery Station


397160157.xls

BILL OF QUANTITY

BANGUNAN : BOILER STATION


NO. GBR :
HARGA : #N/A

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)

1. 0 PEKERJAAN TANAH
1. 1 Bowplank
Bowplank sdh tmsk bowplank MPB

2. 0 PEKERJAAN KONSTRUKSI BETON


2. 1 Pondasi Boiler (Pondasi Tipe 1) 2 unit
Galian Tanah m3 69.39 69.39 #N/A #N/A
Urugan Tanah & Pemadatan m3 3.94 3.94 #N/A #N/A
Buang Tanah Sisa m3 65.45 65.45 #N/A #N/A
Lantai Kerja m2 96.97 96.97 #N/A #N/A
Bekisting Setempat m2 51.81 51.81 #N/A #N/A
Besi Beton Deform D 16 mm kg 7,316.48 7,316.48 #N/A #N/A
Beton K225 m3 87.27 87.27 #N/A #N/A
Mini Pile 250x250 mm m 1,728.00 #N/A #N/A
2. 2 Pondasi Fuel Feeder Fan (Pondasi Tipe 2) 2 unit
Galian Tanah m3 0.64 0.64 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.25 0.25 #N/A #N/A
Buang Tanah Sisa m3 0.39 0.39 #N/A #N/A
Lantai Kerja m2 1.05 1.05 #N/A #N/A
Bekisting Setempat m2 3.48 3.48 #N/A #N/A
Besi Beton Deform D 16 mm kg 116.02 116.02 #N/A #N/A
Beton K225 m3 0.63 0.63 #N/A #N/A
Mini Pile 250x250 mm m 72.00 #N/A #N/A
2. 3 Pondasi Secondary Air Fan (Pondasi Tipe 3) 2 unit
Galian Tanah m3 1.49 1.49 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.40 0.40 #N/A #N/A
Buang Tanah Sisa m3 1.09 1.09 #N/A #N/A
Lantai Kerja m2 2.91 2.91 #N/A #N/A
Bekisting Setempat m2 5.95 5.95 #N/A #N/A
Besi Beton Deform D 16 mm kg 259.81 259.81 #N/A #N/A

49(75) 07.Boiler Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Beton K225 m3 1.75 1.75 #N/A #N/A
Mini Pile 250x250 mm m 72.00 #N/A #N/A
2. 4 Pondasi Dust Collector (Pondasi Tipe 4) 4 unit
Galian Tanah m3 0.74 0.74 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.36 0.36 #N/A #N/A
Buang Tanah Sisa m3 0.38 0.38 #N/A #N/A
Lantai Kerja m2 1.00 1.00 #N/A #N/A
Bekisting Setempat m2 4.80 4.80 #N/A #N/A
Besi Beton Deform D 13 mm kg 73.35 73.35 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 16.97 16.97 #N/A #N/A
Beton K225 m3 0.60 0.60 #N/A #N/A
2. 5 Pondasi ID Fan (Pondasi Tipe 5) 2 unit
Galian Tanah m3 14.97 14.97 #N/A #N/A
Urugan Tanah & Pemadatan m3 1.98 1.98 #N/A #N/A
Buang Tanah Sisa m3 13.00 13.00 #N/A #N/A
Lantai Kerja m2 16.77 16.77 #N/A #N/A
Bekisting Setempat m2 24.70 24.70 #N/A #N/A
Besi Beton Deform D 13 mm kg 1,170.53 1,170.53 #N/A #N/A
Beton K225 m3 16.77 16.77 #N/A #N/A
Urug Pasir m3 2.66 2.66 #N/A #N/A
Aspal m3 0.06 0.06 #N/A #N/A
Mini Pile 250x250 mm m 144.00 #N/A #N/A
2. 6 Pondasi Chimney (Pondasi Tipe 6) 2 unit
Galian Tanah m3 127.50 127.50 #N/A #N/A
Urugan Tanah & Pemadatan m3 66.54 66.54 #N/A #N/A
Buang Tanah Sisa m3 60.96 60.96 #N/A #N/A
Lantai Kerja m2 32.00 32.00 #N/A #N/A
Bekisting Setempat m2 85.67 85.67 #N/A #N/A
Besi Beton Deform D 16 mm kg 2,350.72 2,350.72 #N/A #N/A
Beton K225 m3 62.50 62.50 #N/A #N/A
Mini Pile 250x250 mm m 648.00 #N/A #N/A
2. 7 Blowdown Pit (Pondasi Tipe 7) 2 unit
Galian Tanah m3 9.99 9.99 #N/A #N/A
Urugan Tanah & Pemadatan m3 2.07 2.07 #N/A #N/A
Buang Tanah Sisa m3 7.92 7.92 #N/A #N/A
Lantai Kerja m2 5.28 5.28 #N/A #N/A
Bekisting Setempat m2 37.19 37.19 #N/A #N/A
Besi Beton Deform D 13 mm kg 721.05 721.05 #N/A #N/A

50(75) 07.Boiler Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Beton K225 m3 3.87 3.87 #N/A #N/A
Angkur - Ø 16 - L.200 MM Bh 16.00 16.00 #N/A #N/A
Mini Pile 250x250 mm m 60.00 #N/A #N/A
2. 8 Pondasi Booster Pump for Deaerator & Softened Water Pump (Pondasi1 unit
Galian Tanah m3 1.03 1.03 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.17 0.17 #N/A #N/A
Buang Tanah Sisa m3 0.86 0.86 #N/A #N/A
Lantai Kerja m2 4.91 4.91 #N/A #N/A
Bekisting Setempat m2 3.74 3.74 #N/A #N/A
Besi Beton Deform D 13 mm kg 180.74 180.74 #N/A #N/A
Beton K225 m3 1.96 1.96 #N/A #N/A
Angkur - Ø 19 - L.200 MM Bh 12.00 12.00 #N/A #N/A
Mini Pile 250x250 mm m 72.00 #N/A #N/A
2. 9 Pondasi Feed Water Pump (Pondasi Tipe 9) 1 unit
Galian Tanah m3 1.28 1.28 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.20 0.20 #N/A #N/A
Buang Tanah Sisa m3 1.08 1.08 #N/A #N/A
Lantai Kerja m2 6.16 6.16 #N/A #N/A
Bekisting Setempat m2 4.36 4.36 #N/A #N/A
Besi Beton Deform D 13 mm kg 226.75 226.75 #N/A #N/A
Beton K225 m3 2.46 2.46 #N/A #N/A
Mini Pile 250x250 mm m 72.00 #N/A #N/A
2. 10 Pondasi Panel (Pondasi Tipe 10) 2 unit
Galian Tanah m3 3.00 3.00 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.76 0.76 #N/A #N/A
Buang Tanah Sisa m3 2.24 2.24 #N/A #N/A
Lantai Kerja m2 4.48 4.48 #N/A #N/A
Bekisting Setempat m2 15.20 15.20 #N/A #N/A
Besi Beton Deform D 13 mm kg 346.59 346.59 #N/A #N/A
Beton K225 m3 2.43 2.43 #N/A #N/A
Mini Pile 250x250 mm m 120.00 #N/A #N/A
2. 11 Pondasi Boiler Feed Water Tank (Pondasi Tipe 11) 1 unit
Galian Tanah m3 1.81 8.48 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.15 1.35 #N/A #N/A
Urug Pasir m3 3.57 #N/A #N/A
Buang Tanah Sisa m3 1.66 7.13 #N/A #N/A
Lantai Kerja m2 16.62 28.29 #N/A #N/A
Bekisting Setempat m2 5.78 5.19 #N/A #N/A

51(75) 07.Boiler Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Besi Beton Polos Ø 10 mm kg 20.72 879.34 #N/A #N/A
Beton K225 m3 6.65 7.13 #N/A #N/A
Mini Pile 250x250 mm m 144.00 #N/A #N/A
Pondasi Softened Water Tank (Pondasi Tipe 11) 1 unit
Galian Tanah m3 1.81 1.81 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.15 0.15 #N/A #N/A
Buang Tanah Sisa m3 1.66 1.66 #N/A #N/A
Lantai Kerja m2 16.62 16.62 #N/A #N/A
Bekisting Setempat m2 5.78 5.78 #N/A #N/A
Besi Beton Deform D 13 mm kg 505.58 505.58 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 20.72 20.72 #N/A #N/A
Beton K225 m3 6.65 6.65 #N/A #N/A
Mini Pile 250x250 mm m 144.00 #N/A #N/A
2. 12 Pondasi Water Feed Pump (Pondasi Tipe 12) 1 unit
Galian Tanah m3 0.32 0.32 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.07 0.07 #N/A #N/A
Buang Tanah Sisa m3 0.26 0.26 #N/A #N/A
Lantai Kerja m2 2.56 2.56 #N/A #N/A
Bekisting Setempat m2 2.56 2.56 #N/A #N/A
Besi Beton Deform D 13 mm kg 98.07 98.07 #N/A #N/A
Beton K225 m3 1.02 1.02 #N/A #N/A
Angkur - Ø 19 - L.200 MM Bh 8.00 8.00 #N/A #N/A
Tiang Kayu Ø 150 - 4 m btg 16.00 16.00 #N/A #N/A
2. 13 Pondasi Water Feed Pump (Pondasi Tipe 13) 2 unit
Galian Tanah m3 1.97 1.97 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.62 0.62 #N/A #N/A
Buang Tanah Sisa m3 1.35 1.35 #N/A #N/A
Lantai Kerja m2 4.50 4.50 #N/A #N/A
Bekisting Setempat m2 13.64 13.64 #N/A #N/A
Besi Beton Deform D 13 mm kg 171.67 171.67 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 61.16 61.16 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 21.78 21.78 #N/A #N/A
Beton K225 m3 2.34 2.34 #N/A #N/A
Mini Pile 250x250 mm m 180.00 #N/A #N/A
2. 14 Pondasi Boiler WTP (Pondasi Tipe 14) 2 unit
Galian Tanah m3 6.26 6.26 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.31 0.31 #N/A #N/A
Buang Tanah Sisa m3 5.95 5.95 #N/A #N/A

52(75) 07.Boiler Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Lantai Kerja m2 59.50 59.50 #N/A #N/A
Bekisting Setempat m2 12.40 12.40 #N/A #N/A
Besi Beton Deform D 13 mm kg 1,861.25 1,861.25 #N/A #N/A
Beton K225 m3 23.80 23.80 #N/A #N/A
Mini Pile 250x250 mm m 720.00 #N/A #N/A
2. 15 Bak Fiber (Tipe 15)
Pile Cap
Galian Tanah m3 4.37 4.37 #N/A #N/A
Urugan Tanah & Pemadatan m3 1.73 1.73 #N/A #N/A
Buang Tanah Sisa m3 2.65 2.65 #N/A #N/A
Lantai Kerja m2 4.41 4.41 #N/A #N/A
Bekisting Setempat m2 17.64 17.64 #N/A #N/A
Besi Beton Deform D 13 mm kg 265.57 265.57 #N/A #N/A
Beton K225 vol beton dikurangi tebal pelat m3 2.21 2.21 #N/A #N/A
Mini Pile 250x250 mm m 324.00 #N/A #N/A
Balok
Galian Tanah m3 3.67 3.67 #N/A #N/A
Urugan Tanah & Pemadatan m3 2.68 2.68 #N/A #N/A
Buang Tanah Sisa m3 0.99 0.99 #N/A #N/A
Lantai kerja m2 16.71 16.71 #N/A #N/A
Bekisting Balok & Kolom m2 42.96 42.96 #N/A #N/A
Besi Beton Deform D 22 mm kg 1,718.33 1,718.33 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 501.64 501.64 #N/A #N/A
Beton K225 vol beton dikurangi tebal pelat m3 6.20 6.20 #N/A #N/A
Lantai
Lantai Kerja m2 91.98 91.98 #N/A #N/A
Bekisting lantai m2 7.96 7.96 #N/A #N/A
Wiremesh M 10 m2 183.96 183.96 #N/A #N/A
Beton K225 m3 18.40 18.40 #N/A #N/A
Dinding
Bekisting dinding m2 91.60 91.60 #N/A #N/A
Besi Beton Deform D 16 mm kg 1,160.08 1,160.08 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 383.24 383.24 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 52.09 52.09 #N/A #N/A
Beton K225 m3 13.56 13.56 #N/A #N/A
Rib Dinding
Bekisting dinding m2 17.13 17.13 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 137.86 137.86 #N/A #N/A

53(75) 07.Boiler Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Beton K225 m3 1.40 1.40 #N/A #N/A
2. 16a Pondasi Struktur Platform Dearator (Pondasi Tipe 16) 7 unit
Galian Tanah m3 1.79 1.79 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.78 0.78 #N/A #N/A
Buang Tanah Sisa m3 1.01 1.01 #N/A #N/A
Lantai Kerja m2 2.52 2.52 #N/A #N/A
Bekisting Setempat m2 9.91 9.91 #N/A #N/A
Besi Beton Deform D 16 mm kg 43.31 43.31 #N/A #N/A
Besi Beton Deform D 13 mm kg 139.75 139.75 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 5.52 5.52 #N/A #N/A
Beton K225 m3 1.37 1.37 #N/A #N/A
Grouting m3 0.01 0.01 #N/A #N/A
Angkur - Ø 19 - L.300 MM Bh 14.00 14.00 #N/A #N/A
Mini Pile 250x250 mm m 252.00 #N/A #N/A
2. 16b Sloof Pondasi Struktur Platform Dearator (Pondasi Tipe 16)
Galian Tanah m3 0.68 0.68 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.27 0.27 #N/A #N/A
Buang Tanah Sisa m3 0.41 0.41 #N/A #N/A
Lantai Kerja m2 1.37 1.37 #N/A #N/A
Bekisting Balok & Kolom m2 5.46 5.46 #N/A #N/A
Besi Beton Deform D 16 mm kg 61.24 61.24 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 20.70 20.70 #N/A #N/A
Beton K225 m3 0.41 0.41 #N/A #N/A
2. 17 Pondasi Struktur Platfrom Boiler (Pondasi Tipe 17) 5 unit
Galian Tanah m3 1.28 1.28 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.56 0.56 #N/A #N/A
Buang Tanah Sisa m3 0.72 0.72 #N/A #N/A
Lantai Kerja m2 1.80 1.80 #N/A #N/A
Bekisting Setempat m2 7.26 7.26 #N/A #N/A
Besi Beton Deform D 16 mm kg 46.40 46.40 #N/A #N/A
Besi Beton Deform D 13 mm kg 99.82 99.82 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 4.74 4.74 #N/A #N/A
Beton K225 m3 1.01 1.01 #N/A #N/A
Grouting m3 0.01 0.01 #N/A #N/A
Angkur - Ø 22 - L.600 MM Bh 20.00 20.00 #N/A #N/A
Mini Pile 250x250 mm m 180.00 #N/A #N/A
2. 18 Pondasi Tangga (Pondasi Tipe 18) 4 unit
Galian Tanah m3 - 0.00 #N/A #N/A

54(75) 07.Boiler Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Urugan Tanah & Pemadatan m3 - 0.00 #N/A #N/A
Buang Tanah Sisa m3 - 0.00 #N/A #N/A
Lantai Kerja m2 1.20 1.20 #N/A #N/A
Bekisting Setempat m2 2.91 2.91 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 12.63 12.63 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 11.05 11.05 #N/A #N/A
Beton K225 m3 0.34 0.34 #N/A #N/A
Grouting m3 0.02 0.02 #N/A #N/A
Angkur - Ø 12 - L.200 MM Bh 8.00 8.00 #N/A #N/A
2. 19 Pondasi Support Recycle Fuel Conveyor (Pondasi Tipe 19) 1 unit
Galian Tanah m3 - 0.00 #N/A #N/A
Urugan Tanah & Pemadatan m3 - 0.00 #N/A #N/A
Buang Tanah Sisa m3 - 0.00 #N/A #N/A
Lantai Kerja m2 0.41 0.41 #N/A #N/A
Bekisting Setempat m2 0.92 0.92 #N/A #N/A
Besi Beton Deform D 13 mm kg 6.79 6.79 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 3.55 3.55 #N/A #N/A
Beton K225 m3 0.11 0.11 #N/A #N/A
Grouting m3 0.01 0.01 #N/A #N/A
Angkur - Ø 16 - L.300 MM Bh 3.00 3.00 #N/A #N/A
2. 20 Pondasi Support Recycle Fuel Conveyor (Pondasi Tipe 20) 1 unit
Galian Tanah m3 - 0.00 #N/A #N/A
Urugan Tanah & Pemadatan m3 - 0.00 #N/A #N/A
Buang Tanah Sisa m3 - 0.00 #N/A #N/A
Lantai Kerja m2 0.30 0.30 #N/A #N/A
Bekisting Setempat m2 0.73 0.73 #N/A #N/A
Besi Beton Deform D 13 mm kg 5.33 5.33 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 2.76 2.76 #N/A #N/A
Beton K225 m3 0.08 0.08 #N/A #N/A
Grouting m3 0.01 0.01 #N/A #N/A
Angkur - Ø 16 - L.300 MM Bh 2.00 2.00 #N/A #N/A
2. 21 Pondasi Support Boiler Fuel Distribution Conveyor (Pondasi Tipe 21) 2 unit
Galian Tanah m3 - 0.00 #N/A #N/A
Urugan Tanah & Pemadatan m3 - 0.00 #N/A #N/A
Buang Tanah Sisa m3 - 0.00 #N/A #N/A
Lantai Kerja m2 1.22 1.22 #N/A #N/A
Bekisting Setempat m2 1.92 1.92 #N/A #N/A
Besi Beton Deform D 13 mm kg 24.92 24.92 #N/A #N/A

55(75) 07.Boiler Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Besi Beton Polos Ø 8 mm kg 9.85 9.85 #N/A #N/A
Beton K225 m3 0.34 0.34 #N/A #N/A
Grouting m3 0.02 0.02 #N/A #N/A
Angkur - Ø 16 - L.300 MM Bh 4.00 4.00 #N/A #N/A
Mini Pile 250x250 mm m 120.00 #N/A #N/A
2. 22 BAK ABU BOILER (Detail 22 & 23)
Bak Penampung Abu Boiler (di bawah Boiler) (Detail 22) 2 unit
Pasangan Bata m2 8.00 8.00 #N/A #N/A
Plesteran 1:4 + Acian m2 16.00 16.00 #N/A #N/A
Bekisting Setempat m2 4.00 4.00 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 23.68 23.68 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 4.26 4.26 #N/A #N/A
Beton K225 m3 0.58 0.58 #N/A #N/A
Saluran dari Bak Penampung ke Bak Penyaring
Bekisting Setempat m2 16.00 16.00 #N/A #N/A
Beton K225 m3 3.80 3.80 #N/A #N/A
Bak Penyaring Abu Boiler (Detail 23)
Lantai
Lantai Kerja m2 38.75 38.75 #N/A #N/A
Bekisting lantai m2 3.12 3.12 #N/A #N/A
Wiremesh M 8 m2 38.75 38.75 #N/A #N/A
Beton K225 m3 3.88 3.88 #N/A #N/A
Tiang Kayu Ø 150 - 4 m btg 217.00 217.00 #N/A #N/A
Dinding
Bekisting dinding m2 81.00 81.00 #N/A #N/A
Wiremesh M 8 m2 40.50 40.50 #N/A #N/A
Beton K225 m3 4.05 4.05 #N/A #N/A
Accessories
Kerikil/koral m3 3.92 3.92 #N/A #N/A
Pasir Urug m3 1.74 1.74 #N/A #N/A
Ijuk m3 0.87 0.87 #N/A #N/A
2. 23 Lantai MPB-C, Boiler House Tmsk selasar
Lantai Kerja m2 852.88 1,440.00 #N/A #N/A
Wiremesh M 8 m2 852.88 1,440.00 #N/A #N/A
Beton K225 m3 85.29 216.00 #N/A #N/A
2. 24 Cable Trench
Galian Tanah m3 6.05 6.05 #N/A #N/A
Urugan Tanah & Pemadatan m3 1.10 1.10 #N/A #N/A

56(75) 07.Boiler Station


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Buang Tanah Sisa m3 4.95 4.95 #N/A #N/A
Lantai Kerja m2 18.00 18.00 #N/A #N/A
Bekisting Menerus m2 54.00 54.00 #N/A #N/A
Wiremesh M 6 m2 60.00 60.00 #N/A #N/A
Beton K225 m3 4.35 4.35 #N/A #N/A
Urug Pasir m3 2.40 2.40 #N/A #N/A
2. 25 Internal Drain
Galian Tanah m3 9.38 9.38 #N/A #N/A
Urugan Tanah & Pemadatan m3 1.71 1.71 #N/A #N/A
Buang Tanah Sisa m3 7.67 7.67 #N/A #N/A
Lantai Kerja m2 27.90 27.90 #N/A #N/A
Bekisting Menerus m2 83.70 83.70 #N/A #N/A
Wiremesh M 6 m2 74.40 74.40 #N/A #N/A
Beton K225 m3 4.88 4.88 #N/A #N/A

3. 0 PEKERJAAN KONSTRUKSI BAJA


3. 1 Penutup Drain
MS - L 50X50X5 kg 467.48 467.48 #N/A #N/A
MS - L 30X30X3 kg 61.20 61.20 #N/A #N/A
MS - PELAT BORDES 4.5 mm kg 876.06 876.06 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 27.74 27.74 #N/A #N/A
Pengecatan Baja kg 1,432.48 1,432.48 #N/A #N/A

TOTAL #N/A
ROUNDED #N/A

57(75) 07.Boiler Station


397160157.xls

BILL OF QUANTITY

BANGUNAN : POWER HOUSE


NO. GBR :
HARGA : #N/A

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)

1. 0 PEKERJAAN TANAH
1. 1 Bowplank
Bowplank sdh tmsk bowplank MPB
1. 2 Urugan Lantai
Urugan Tanah & Pemadatan m3 22.68 22.68 #N/A #N/A

2. 0 PEKERJAAN KONSTRUKSI BETON


2. 1 Pondasi Steam Turbine 2 unit
Galian Tanah m3 5.47 5.47 #N/A #N/A
Urugan Tanah & Pemadatan m3 - - #N/A #N/A
Buang Tanah Sisa m3 5.47 5.47 #N/A #N/A
Lantai Kerja m2 11.64 11.64 #N/A #N/A
Bekisting Setempat m2 13.15 13.15 #N/A #N/A
Besi Beton Deform D 13 mm kg 365.77 365.77 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 8.88 8.88 #N/A #N/A
Beton K225 m3 6.43 6.43 #N/A #N/A
Angkur - Ø 30 - L.500 MM unit 16.00 16.00 #N/A #N/A
Grouting m3 0.43 0.43 #N/A #N/A
Urug Pasir m3 1.98 1.98 #N/A #N/A
Aspal m3 0.07 0.07 #N/A #N/A
Mini Pile 250x250 mm m 144.00 144.00 #N/A #N/A
2. 2 Pondasi Diesel Genset 2 unit
Galian Tanah m3 8.50 8.50 #N/A #N/A
Urugan Tanah & Pemadatan m3 - - #N/A #N/A
Buang Tanah Sisa m3 8.50 8.50 #N/A #N/A
Lantai Kerja m2 22.95 22.95 #N/A #N/A
Bekisting Setempat m2 17.22 17.22 #N/A #N/A
Besi Beton Deform D 13 mm kg 597.37 597.37 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 13.32 13.32 #N/A #N/A
Beton K225 m3 10.40 10.40 #N/A #N/A
Angkur - Ø 22 - L.300 MM unit 16.00 16.00 #N/A #N/A

58(75) 08.Power House


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Grouting m3 0.19 0.19 #N/A #N/A
Urug Pasir m3 2.36 2.36 #N/A #N/A
Aspal m3 0.10 0.10 #N/A #N/A
Mini Pile 250x250 mm m 144.00 144.00 #N/A #N/A
2. 3 Pondasi Diesel Genset 1 unit
Galian Tanah m3 2.20 2.20 #N/A #N/A
Urugan Tanah & Pemadatan m3 - - #N/A #N/A
Buang Tanah Sisa m3 2.20 2.20 #N/A #N/A
Lantai Kerja m2 8.20 8.20 #N/A #N/A
Bekisting Setempat m2 5.76 5.76 #N/A #N/A
Besi Beton Deform D 13 mm kg 197.05 197.05 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 3.95 3.95 #N/A #N/A
Beton K225 m3 2.73 2.73 #N/A #N/A
Angkur - Ø 30 - L.500 MM unit 8.00 8.00 #N/A #N/A
Grouting m3 0.10 0.10 #N/A #N/A
Urug Pasir m3 0.73 0.73 #N/A #N/A
Aspal m3 0.04 0.04 #N/A #N/A
Mini Pile 250x250 mm m 72.00 72.00 #N/A #N/A
2. 4 Pondasi Diesel Day Tank 4 unit
Galian Tanah m3 0.59 0.59 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.29 0.29 #N/A #N/A
Buang Tanah Sisa m3 0.30 0.30 #N/A #N/A
Lantai Kerja m2 1.00 1.00 #N/A #N/A
Bekisting Setempat m2 3.64 3.64 #N/A #N/A
Besi Beton Deform D 13 mm kg 80.02 80.02 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 2.53 2.53 #N/A #N/A
Beton K225 m3 0.43 0.43 #N/A #N/A
Grouting m3 0.01 0.01 #N/A #N/A
Angkur - Ø 16 - L.200 MM unit 4.00 4.00 #N/A #N/A
Mini Pile 250x250 mm m 120.00 120.00 #N/A #N/A
2. 5 Pondasi Steam Condensate Chamber 1 unit
Galian Tanah m3 8.37 8.37 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.84 0.84 #N/A #N/A
Buang Tanah Sisa m3 7.53 7.53 #N/A #N/A
Lantai Kerja m2 13.69 13.69 #N/A #N/A
Bekisting Setempat m2 11.68 11.68 #N/A #N/A
Besi Beton Deform D 13 mm kg 447.66 447.66 #N/A #N/A
Beton K225 m3 5.76 5.76 #N/A #N/A

59(75) 08.Power House


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Angkur - Ø 16 - L.400 MM unit 8.00 8.00 #N/A #N/A
Mini Pile 250x250 mm m 120.00 120.00 #N/A #N/A
2. 6 Pondasi Main Switch Board 1 unit
Galian Tanah m3 9.11 9.11 #N/A #N/A
Urugan Tanah & Pemadatan m3 1.57 1.57 #N/A #N/A
Buang Tanah Sisa m3 7.54 7.54 #N/A #N/A
Lantai Kerja m2 9.79 9.79 #N/A #N/A
Bekisting Setempat m2 33.16 33.16 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 560.99 560.99 #N/A #N/A
Beton K225 m3 4.97 4.97 #N/A #N/A
Mini Pile 250x250 mm m 120.00 120.00 #N/A #N/A
2. 7 Pondasi BPV (Pondasi Tipe F 1) 1 unit
Galian Tanah m3 0.60 5.98 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.29 4.55 #N/A #N/A
Buang Tanah Sisa m3 0.32 1.43 #N/A #N/A
Lantai Kerja m2 1.05 4.07 #N/A #N/A
Bekisting Setempat m2 3.70 11.12 #N/A #N/A
Besi Beton Polos Ø 12 mm kg 106.61 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 5.68 27.63 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 9.48 #N/A #N/A
Besi Beton Polos Ø 6 mm kg 18.62 #N/A #N/A
Beton K225 m3 0.73 1.43 #N/A #N/A
Grouting m3 0.01 #N/A #N/A
Angkur - Ø 19 - L.300 MM unit 8.00 8.00 #N/A #N/A
Mini Pile 250x250 mm m 60.00 #N/A #N/A
2. 9 Pondasi Catwalk dan Tangga BPV 5 unit
Galian Tanah m3 - 0.00 #N/A #N/A
Urugan Tanah & Pemadatan m3 - 0.00 #N/A #N/A
Buang Tanah Sisa m3 - 0.00 #N/A #N/A
Lantai Kerja m2 1.00 1.00 #N/A #N/A
Bekisting Setempat m2 2.21 2.21 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 12.95 12.95 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 9.94 9.94 #N/A #N/A
Beton K225 m3 0.21 0.21 #N/A #N/A
Grouting m3 0.00 0.00 #N/A #N/A
Angkur - Ø 12 - L.200 MM unit 10.00 10.00 #N/A #N/A
2. 10 Pondasi Steam Blow Off Chamber (Pondasi Tipe F 4) 4 unit
Galian Tanah m3 0.59 3.77 #N/A #N/A

60(75) 08.Power House


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Urugan Tanah & Pemadatan m3 0.29 2.76 #N/A #N/A
Buang Tanah Sisa m3 0.30 1.01 #N/A #N/A
Lantai Kerja m2 1.00 1.06 #N/A #N/A
Bekisting Setempat m2 3.84 3.65 #N/A #N/A
Besi Beton Deform D 13 mm kg 81.52 32.88 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 1.89 7.21 #N/A #N/A
Beton K225 m3 0.43 1.01 #N/A #N/A
Grouting m3 0.00 #N/A #N/A
Angkur - Ø 16 - L.400 MM unit 4.00 8.00 #N/A #N/A
Mini Pile 250x250 mm m 120.00 #N/A #N/A
2. 11 Pondasi Vertical Ladder 1 unit
Galian Tanah m3 0.04 0.04 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.02 0.02 #N/A #N/A
Buang Tanah Sisa m3 0.02 0.02 #N/A #N/A
Lantai Kerja m2 0.20 0.20 #N/A #N/A
Bekisting Setempat m2 0.57 0.57 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 2.44 2.44 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 1.77 1.77 #N/A #N/A
Beton K225 m3 0.06 0.06 #N/A #N/A
2. 12 Pondasi Diesel Storage Tank (Pondasi Tipe F3) 4 unit
Galian Tanah m3 4.15 9.00 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.35 8.21 #N/A #N/A
Urug Pasir m3 0.11 #N/A #N/A
Buang Tanah Sisa m3 3.80 0.79 #N/A #N/A
Lantai Kerja m2 15.21 2.25 #N/A #N/A
Bekisting Setempat m2 4.15 2.40 #N/A #N/A
Besi Beton Deform D 13 mm kg 422.55 57.41 #N/A #N/A
Besi Beton Deform D 16 mm kg 11.38 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 34.04 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 11.00 #N/A #N/A
Beton K225 m3 4.56 0.79 #N/A #N/A
Mini Pile 250x250 mm m 144.00 #N/A #N/A
Tie Beam
Besi Beton Deform D 13 mm kg 78.00 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 51.80 #N/A #N/A
Beton K225 m3 0.75 #N/A #N/A
2. 13 Pondasi Diesel Transfer Pump 1 unit
Galian Tanah m3 0.22 0.22 #N/A #N/A

61(75) 08.Power House


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Urugan Tanah & Pemadatan m3 0.08 0.08 #N/A #N/A
Buang Tanah Sisa m3 0.14 0.14 #N/A #N/A
Lantai Kerja m2 0.70 0.70 #N/A #N/A
Bekisting Setempat m2 1.02 1.02 #N/A #N/A
Besi Beton Deform D 13 mm kg 15.36 15.36 #N/A #N/A
Beton K225 m3 0.21 0.21 #N/A #N/A
Angkur - Ø 16 - L.400 MM unit 4.00 4.00 #N/A #N/A
Tiang Kayu Ø 150 - 4 m Btg 4.00 4.00 #N/A #N/A
2. 14 Pondasi Support Steam Separator 4 unit
Galian Tanah m3 1.27 1.27 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.62 0.62 #N/A #N/A
Buang Tanah Sisa m3 0.65 0.65 #N/A #N/A
Lantai Kerja m2 1.00 1.00 #N/A #N/A
Bekisting Setempat m2 5.00 5.00 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 85.69 85.69 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 6.31 6.31 #N/A #N/A
Beton K225 m3 0.51 0.51 #N/A #N/A
Grouting m3 0.01 0.01 #N/A #N/A
Angkur - Ø 16 - L.400 MM unit 4.00 4.00 #N/A #N/A
Mini Pile 250x250 mm m 120.00 120.00 #N/A #N/A
2. 15 Pondasi Sliding Support Pipa Steam 4 unit
Galian Tanah m3 - 0.00 #N/A #N/A
Urugan Tanah & Pemadatan m3 - 0.00 #N/A #N/A
Buang Tanah Sisa m3 - 0.00 #N/A #N/A
Lantai Kerja m2 0.25 0.25 #N/A #N/A
Bekisting Setempat m2 0.72 0.72 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 4.64 4.64 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 2.46 2.46 #N/A #N/A
Beton K225 m3 0.05 0.05 #N/A #N/A
Grouting m3 0.01 0.01 #N/A #N/A
Angkur - Ø 12 - L.200 MM unit 8.00 8.00 #N/A #N/A
2. 16 Cable Trench A
Galian Tanah m3 9.20 9.20 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.74 0.74 #N/A #N/A
Buang Tanah Sisa m3 8.46 8.46 #N/A #N/A
Lantai Kerja m2 14.72 14.72 #N/A #N/A
Bekisting Menerus m2 32.64 32.64 #N/A #N/A
Wiremesh M 8 m2 30.08 30.08 #N/A #N/A

62(75) 08.Power House


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Beton K225 m3 2.26 2.26 #N/A #N/A
Urug Pasir m3 6.40 6.40 #N/A #N/A
2. 17 Cable Trench B
Galian Tanah m3 3.49 3.49 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.41 0.41 #N/A #N/A
Buang Tanah Sisa m3 3.08 3.08 #N/A #N/A
Lantai Kerja m2 5.36 5.36 #N/A #N/A
Bekisting Menerus m2 18.23 18.23 #N/A #N/A
Wiremesh M 8 m2 13.94 13.94 #N/A #N/A
Beton K225 m3 1.05 1.05 #N/A #N/A
Urug Pasir m3 2.15 2.15 #N/A #N/A
2. 18 Cable Trench C
Galian Tanah m3 5.49 5.49 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.85 0.85 #N/A #N/A
Buang Tanah Sisa m3 4.65 4.65 #N/A #N/A
Lantai Kerja m2 8.09 8.09 #N/A #N/A
Bekisting Menerus m2 19.85 19.85 #N/A #N/A
Wiremesh M 8 m2 16.91 16.91 #N/A #N/A
Beton K225 m3 1.27 1.27 #N/A #N/A
Urug Pasir m3 1.18 1.18 #N/A #N/A
2. 19 Pipe Trench
Galian Tanah m3 2.07 2.07 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.12 0.12 #N/A #N/A
Buang Tanah Sisa m3 1.95 1.95 #N/A #N/A
Lantai Kerja m2 27.88 27.88 #N/A #N/A
Bekisting Menerus m2 18.03 18.03 #N/A #N/A
Wiremesh M 8 m2 35.58 35.58 #N/A #N/A
Beton K225 m3 2.67 2.67 #N/A #N/A
2. 20 Pondasi Dinding Bata 2 unit - As 13
Galian Tanah Pondasi dinding bata As 10 m3 0.65 0.65 #N/A #N/A
Urugan Tanah & Pemadatan pada Stasiun Clarifikasi m3 0.26 0.26 #N/A #N/A
Buang Tanah Sisa m3 0.39 0.39 #N/A #N/A
Lantai Kerja m2 0.98 0.98 #N/A #N/A
Bekisting Setempat m2 2.80 2.80 #N/A #N/A
Besi Beton Deform D 13 mm kg 44.10 44.10 #N/A #N/A
Beton K225 m3 0.49 0.49 #N/A #N/A
Mini Pile 250x250 mm m 72.00 72.00 #N/A #N/A

63(75) 08.Power House


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
2. 21 Sloof (Dinding Bata)
Galian Tanah m3 3.24 3.24 #N/A #N/A
Urugan Tanah & Pemadatan m3 1.08 1.08 #N/A #N/A
Buang Tanah Sisa m3 2.16 2.16 #N/A #N/A
Lantai Kerja m2 7.20 7.20 #N/A #N/A
Bekisting Balok & Kolom m2 28.80 28.80 #N/A #N/A
Besi Beton Deform D 22 mm Tulangan Utama kg 434.48 434.48 #N/A #N/A
Besi Beton Polos Ø 10 mm Sengkang kg 171.64 171.64 #N/A #N/A
Beton K225 m3 2.88 2.88 #N/A #N/A
2. 22 Kolom Praktis (Dinding Bata)
Bekisting Balok & Kolom m2 13.50 13.50 #N/A #N/A
Besi Beton Deform D 13 mm Tulangan Utama kg 200.05 200.05 #N/A #N/A
Besi Beton Polos Ø 8 mm Sengkang kg 47.35 47.35 #N/A #N/A
Beton K175 m3 1.01 1.01 #N/A #N/A
2. 23 Ring Balok (Dinding Bata)
Bekisting Balok & Kolom m2 10.80 10.80 #N/A #N/A
Besi Beton Polos Ø 10 mm Tulangan Utama kg 89.77 89.77 #N/A #N/A
Besi Beton Polos Ø 6 mm Sengkang kg 29.83 29.83 #N/A #N/A
Beton K175 m3 0.81 0.81 #N/A #N/A

3. 0 PEKERJAAN KONSTRUKSI BAJA


3. 1 Penutup Pipe Trench
MS - L 50X50X5 kg 252.59 252.59 #N/A #N/A
MS - PELAT BORDES 4.5 mm kg 989.10 989.10 #N/A #N/A
3. 2 Hand Railing + Pintu
Pipa Hitam Medium - Ø 1-1/2" kg 271.13 271.13 #N/A #N/A
Pipa Hitam Medium - Ø 1-1/4" kg 114.92 114.92 #N/A #N/A
MS - PELAT 6 mm kg 24.21 24.21 #N/A #N/A
MS - L 50X50X5 kg 67.86 67.86 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 3.70 3.70 #N/A #N/A
Pengecatan Baja kg 481.82 481.82 #N/A #N/A
Angkur - Ø 10 - L.60 MM Bh 24.00 24.00 #N/A #N/A
Roda Pintu Ø 80 mm Bh 4.00 4.00 #N/A #N/A

4. 0 PEKERJAAN LANTAI & KERAMIK


4. 1 Lantai tmsk selasar
Lantai Kerja m2 310.18 552.00 #N/A #N/A
Wiremesh M 8 m2 310.18 552.00 #N/A #N/A
Beton K225 m3 31.02 82.80 #N/A #N/A

64(75) 08.Power House


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
4. 2 Lantai Keramik
Keramik Lantai 33 x 33 cm m2 259.78 126.00 #N/A #N/A

5. 0 PEKERJAAN PASANGAN & PENGECATAN


5. 1 Pasangan Dinding Bata
Pasangan Bata m2 108.00 241.50 #N/A #N/A
Plesteran 1:4 + Acian m2 216.00 483.00 #N/A #N/A
5. 2 Pengecatan
Pengecatan Dinding m2 216.00 483.00 #N/A #N/A

TOTAL #N/A
ROUNDED #N/A

65(75) 08.Power House


397160157.xls

BILL OF QUANTITY

BANGUNAN : EXTERNAL WATER TREATMENT PLANT


NO. GBR :
HARGA : #N/A

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)

1. 0 PEKERJAAN TANAH
1. 1 Bowplank
Bowplank m' 102.00 100.90 #N/A #N/A

2. 0 PEKERJAAN KONSTRUKSI BETON


2. 1 Pondasi Elevated Water Tank Structure (Tipe A) 6 unit
Galian Tanah m3 7.34 67.50 #N/A #N/A
Urugan Tanah & Pemadatan m3 2.30 52.62 #N/A #N/A
Buang Tanah Sisa m3 5.04 14.88 #N/A #N/A
Lantai Kerja m2 12.60 29.04 #N/A #N/A
Bekisting Setempat m2 29.86 35.16 #N/A #N/A
Besi Beton Deform D 16 mm Tulanganan Utama Pedestal kg 280.74 307.15 #N/A #N/A
Besi Beton Deform D 13 mm Tulangan Telapak kg 549.90 673.92 #N/A #N/A
Besi Beton Polos Ø 10 mm Tulangan Telapak kg 399.60 #N/A #N/A
Besi Beton Polos Ø 10 mm Sengkang Pedestal kg 20.72 60.00 #N/A #N/A
Beton K225 m3 6.65 14.88 #N/A #N/A
Grouting m3 0.04 #N/A #N/A
Angkur - Ø 25 - L.400 MM Bh 48.00 24.00 #N/A #N/A
Mini Pile 250x250 mm m 864.00 #N/A #N/A
2. 2 Sloof Elevated Water Tank Structure
Galian Tanah m3 5.45 2.80 #N/A #N/A
Urugan Tanah & Pemadatan m3 1.82 1.12 #N/A #N/A
Buang Tanah Sisa m3 3.63 1.68 #N/A #N/A
Lantai Kerja m2 12.10 5.60 #N/A #N/A
Bekisting Balok & Kolom m2 48.40 19.20 #N/A #N/A
Besi Beton Polos Ø 10 mm Tulangan Utama kg 755.56 103.60 #N/A #N/A
Besi Beton Polos Ø 6 mm Sengkang kg 288.93 41.90 #N/A #N/A
Beton K225 m3 4.84 1.68 #N/A #N/A
2. 3 Pondasi Tangga (Pondasi Tipe 1B) 1 unit
Galian Tanah m3 - 0.00 #N/A #N/A
Urugan Tanah & Pemadatan m3 - 0.00 #N/A #N/A

66(75) 09.External WTP


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Buang Tanah Sisa m3 - 0.00 #N/A #N/A
Lantai Kerja m2 0.27 0.27 #N/A #N/A
Bekisting Setempat m2 0.43 0.43 #N/A #N/A
Besi Beton Polos Ø 10 mm Tulangan Utama kg 2.66 2.66 #N/A #N/A
Besi Beton Polos Ø 8 mm Sengkang kg 2.21 2.21 #N/A #N/A
Beton K225 m3 0.05 0.05 #N/A #N/A
Grouting m3 0.01 0.01 #N/A #N/A
Angkur - Ø 12 - L.300 MM Bh 2.00 2.00 #N/A #N/A
2. 4 Pondasi Support Catwalk (Pondasi Tipe 2) 1 unit
Galian Tanah m3 0.46 0.46 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.14 0.14 #N/A #N/A
Buang Tanah Sisa m3 0.32 0.32 #N/A #N/A
Lantai Kerja m2 1.05 1.05 #N/A #N/A
Bekisting Setempat m2 1.46 1.46 #N/A #N/A
Besi Beton Polos Ø 10 mm Tulangan Utama kg 21.85 21.85 #N/A #N/A
Besi Beton Polos Ø 8 mm Sengkang kg 1.26 1.26 #N/A #N/A
Beton K225 m3 0.28 0.28 #N/A #N/A
Grouting m3 0.00 0.00 #N/A #N/A
Angkur - Ø 16 - L.400 MM Bh 4.00 4.00 #N/A #N/A
Tiang Kayu Ø 150 - 4 m Btg 6.00 6.00 #N/A #N/A
2. 5 Pondasi Water Clarifier Tank (Pondasi Tipe B) 6 unit
Galian Tanah m3 3.67 27.00 #N/A #N/A
Urugan Tanah & Pemadatan m3 1.15 20.31 #N/A #N/A
Buang Tanah Sisa m3 2.52 6.69 #N/A #N/A
Lantai Kerja m2 6.30 18.00 #N/A #N/A
Bekisting Setempat m2 15.14 30.24 #N/A #N/A
Besi Beton Deform D 16 mm Tulanganan Utama Pedestal kg 140.37 178.22 #N/A #N/A
Besi Beton Polos Ø 12 mm Tulangan Telapak kg 274.95 568.53 #N/A #N/A
Besi Beton Polos Ø 8 mm Sengkang Pedestal kg 11.84 34.29 #N/A #N/A
Beton K225 m3 3.37 6.69 #N/A #N/A
Grouting m3 0.02 0.02 #N/A #N/A
Angkur - Ø 19 - L.500 MM Bh 24.00 24.00 #N/A #N/A
Mini Pile 250x250 mm m 432.00 #N/A #N/A
2. 6 Pondasi Water Clarifier Tank (Pondasi Tipe C) 1 unit
Galian Tanah m3 1.16 6.00 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.26 3.33 #N/A #N/A
Buang Tanah Sisa m3 0.90 2.67 #N/A #N/A
Lantai Kerja m2 2.25 2.25 #N/A #N/A

67(75) 09.External WTP


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Bekisting Setempat m2 6.02 7.11 #N/A #N/A
Besi Beton Deform D 16 mm Tulanganan Utama Pedestal kg 62.07 85.32 #N/A #N/A
Besi Beton Polos Ø 12 mm Tulangan Telapak kg 71.69 81.72 #N/A #N/A
Besi Beton Polos Ø 12 mm Sengkang Pedestal kg 13.46 25.10 #N/A #N/A
Beton K225 m3 2.03 2.67 #N/A #N/A
Mini Pile 250x250 mm m 144.00 #N/A #N/A
2. 7 Sloof Water Clarifier Tank
Galian Tanah m3 2.19 2.19 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.73 0.73 #N/A #N/A
Buang Tanah Sisa m3 1.46 1.46 #N/A #N/A
Lantai Kerja m2 4.87 4.87 #N/A #N/A
Bekisting Balok & Kolom m2 19.49 19.49 #N/A #N/A
Besi Beton Deform D 22 mm Tulangan Utama kg 319.48 319.48 #N/A #N/A
Besi Beton Polos Ø 10 mm Sengkang kg 116.57 116.57 #N/A #N/A
Beton K225 m3 1.95 1.95 #N/A #N/A
2. 9 Pondasi Sand Filter & Support Pipa (Pondasi Tipe 5 & 6) 1 unit
Galian Tanah m3 6.21 6.21 #N/A #N/A
Urugan Tanah & Pemadatan m3 0.51 0.51 #N/A #N/A
Buang Tanah Sisa m3 5.70 5.70 #N/A #N/A
Lantai Kerja m2 28.50 28.50 #N/A #N/A
Bekisting Setempat m2 10.00 10.00 #N/A #N/A
Besi Beton Deform D 13 mm kg 855.40 855.40 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 31.26 31.26 #N/A #N/A
Beton K225 m3 11.40 11.40 #N/A #N/A
Grouting m3 0.01 0.01 #N/A #N/A
Angkur - Ø 19 - L.300 MM Bh 24.00 24.00 #N/A #N/A
Angkur - Ø 12 - L.300 MM Bh 10.00 10.00 #N/A #N/A
Mini Pile 250x250 mm m 216.00 #N/A #N/A
2. 9 Clarified Water Basin 1 unit
Galian Tanah m3 70.70 #N/A #N/A
Urugan Tanah & Pemadatan m3 7.53 #N/A #N/A
Urug Pasir 7.53 #N/A #N/A
Buang Tanah Sisa m3 46.18 #N/A #N/A
Lantai Kerja m2 196.69 #N/A #N/A
Bekisting Setempat m2 244.88 #N/A #N/A
Besi Beton Deform D 16 mm kg 4,898.60 #N/A #N/A
Besi Beton Polos Ø 12 mm kg 2,808.81 #N/A #N/A
Wiremesh M 8 m2 105.00 #N/A #N/A

68(75) 09.External WTP


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Beton K225 m3 70.93 #N/A #N/A
Keramik Lantai 30 x 30 cm m2 116.25 #N/A #N/A
Keramik Dinding 20 x 20 cm m2 99.00 #N/A #N/A

3. 0 PEKERJAAN LANTAI
3. 1 Lantai
Lantai Kerja m2 429.31 616.28 #N/A #N/A
Wiremesh M 8 m2 429.31 616.28 #N/A #N/A
Beton K225 m3 42.93 61.63 #N/A #N/A

TOTAL #N/A
ROUNDED #N/A

69(75) 09.External WTP


397160157.xls

BILL OF QUANTITY

BANGUNAN : PEKERJAAN DINDING PENAHAN TANAH (RETAINING WALL)


NO. GBR :
HARGA : #N/A

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)

1. 0 DINDING PENAHAN TANAH ANTARA MPB-A DENGAN MPB-B & MPB-C


PEKERJAAN TANAH Panjang 132 m
Galian Tanah m3 450.00 450.00 #N/A #N/A
Urugan Tanah & Pemadatan m3 250.00 250.00 #N/A #N/A
Buang Tanah Sisa m3 200.00 200.00 #N/A #N/A
PELAT DASAR RETAINING WALL
Lantai Kerja m2 198.00 198.00 #N/A #N/A
Bekisting Lantai m2 79.20 79.20 #N/A #N/A
Besi Beton Deform D 13 mm kg 4,724.11 4,724.11 #N/A #N/A
Beton K225 m3 59.40 59.40 #N/A #N/A
DINDING RETAINING WALLL
Bekisting Dinding m2 422.40 422.40 #N/A #N/A
Besi Beton Deform D 13 mm kg 5,644.18 5,644.18 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 54.38 54.38 #N/A #N/A
Beton K225 m3 42.24 42.24 #N/A #N/A
RIB / PENGAKU RETAINING WALL 22 unit
Bekisting Dinding m2 26.03 26.03 #N/A #N/A
Besi Beton Polos Ø 10 mm kg 420.62 420.62 #N/A #N/A
Beton K225 m3 1.98 1.98 #N/A #N/A
WHEEP HOLE
Urug Sirtu m3 21.78 21.78 #N/A #N/A
Pipa PVC Ø 2" D m 40.00 40.00 #N/A #N/A
Ijuk kg 35.00 35.00 #N/A #N/A
MINI PILE
Mini Pile 250x250 mm 2 x 68 x 36 m m 4,896.00 4,896.00 #N/A #N/A

2. 0 TANGGA ANTARA MPB-A DENGAN MPB-B & MPB-C 4 unit


Bekisting Setempat m2 13.61 13.61 #N/A #N/A
Besi Beton Deform D 13 mm kg 67.63 67.63 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 97.21 97.21 #REF! #REF!

70(75) 10.Retaining Wall


397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Beton K225 m3 1.32 1.32 #N/A #N/A

3. 0 PEKERJAAN TUTUP SALURAN PADA POSISI TANGGA 3 unit


MS - L 50X50X5 kg 22.62 22.62 #N/A #N/A
MS - PELAT BORDES 4.5 mm kg 42.39 42.39 #N/A #N/A
Pengecatan Baja kg 65.01 65.01 #N/A #N/A

TOTAL #N/A
ROUNDED #N/A

71(75) 10.Retaining Wall


397160157.xls

BILL OF QUANTITY

BANGUNAN : JALAN
NO. GBR :
HARGA : #N/A

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)

1. 0 PEKERJAAN KONSTRUKSI BETON


1. 1 Section A-A +/- 118 m
Lantai
Lantai Kerja m2 1,680.00 1,648.85 #N/A #N/A
Bekisting lantai m2 168.00 165.00 #N/A #N/A
Wiremesh M 8 m2 3,360.00 3,297.70 #N/A #N/A
Beton K225 m3 336.00 247.80 #N/A #N/A

1. 2 Section B-B +/- 450 m


Lantai
Lantai Kerja m2 648.00 2,700.00 #N/A #N/A
Bekisting lantai m2 43.20 300.00 #N/A #N/A
Wiremesh M 8 m2 1,296.00 5,400.00 #N/A #N/A
Beton K225 m3 129.60 405.00 #N/A #N/A

1. 3 Section C-C +/- 65 m


Lantai
Lantai Kerja m2 432.00 520.00 #N/A #N/A
Bekisting lantai m2 21.60 52.00 #N/A #N/A
Wiremesh M 8 m2 864.00 1,040.00 #N/A #N/A
Beton K225 m3 86.40 104.00 #N/A #N/A

1. 4 Section D-D +/- 15 m


Lantai
Lantai Kerja m2 1,512.00 60.00 #N/A #N/A
Bekisting lantai m2 50.40 5.70 #N/A #N/A
Wiremesh M 8 m2 3,024.00 60.00 #N/A #N/A
Beton K225 m3 302.40 9.00 #N/A #N/A

1. 5 Section E-E +/- 285 m

72(75) 11A.Jalan
397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Lantai
Lantai Kerja m2 576.00 1,140.00 #N/A #N/A
Bekisting lantai m2 14.40 86.32 #N/A #N/A
Wiremesh M 8 m2 1,152.00 1,140.00 #N/A #N/A
Beton K225 m3 115.20 171.00 #N/A #N/A

1. 6 Section F-F +/- 290 m


Lantai
Lantai Kerja m2 2,040.00 1,740.00 #N/A #N/A
Bekisting lantai m2 40.80 170.00 #N/A #N/A
Wiremesh M 10 m2 4,080.00 1,740.00 #N/A #N/A
Beton K225 m3 408.00 261.00 #N/A #N/A

1. 7 Section G-G +/- 25 m


Lantai
Lantai Kerja m2 2,040.00 500.00 #N/A #N/A
Bekisting lantai m2 40.80 45.00 #N/A #N/A
Wiremesh M 8 m2 4,080.00 500.00 #N/A #N/A
Beton K225 m3 408.00 75.00 #N/A #N/A

TOTAL #N/A
ROUNDED #N/A

73(75) 11A.Jalan
397160157.xls

BILL OF QUANTITY

BANGUNAN : SALURAN
NO. GBR :
HARGA : #N/A

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)

1. 0 PEKERJAAN KONSTRUKSI BETON


1. 1 Saluran Tipe S-30 1350 m
Galian Tanah m3 364.50 364.50 #N/A #N/A
Urugan Tanah & Pemadatan m3 60.75 60.75 #N/A #N/A
Buang Tanah Sisa m3 303.75 303.75 #N/A #N/A
Lantai Kerja m2 675.00 675.00 #N/A #N/A
Bekisting Setempat m2 1,890.00 1,890.00 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 7,457.64 7,457.64 #N/A #N/A
Beton K225 m3 148.50 148.50 #N/A #N/A
1. 2 Saluran Tipe S-40 1010 m
Galian Tanah m3 424.20 424.20 #N/A #N/A
Urugan Tanah & Pemadatan m3 60.60 60.60 #N/A #N/A
Buang Tanah Sisa m3 363.60 363.60 #N/A #N/A
Lantai Kerja m2 606.00 606.00 #N/A #N/A
Bekisting Setempat m2 2,020.00 2,020.00 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 7,838.18 7,838.18 #N/A #N/A
Beton K225 m3 151.50 151.50 #N/A #N/A
1. 3 Gorong - Gorong Tipe G-30 33 m
Galian Tanah m3 9.90 9.90 #N/A #N/A
Urugan Tanah & Pemadatan m3 1.65 1.65 #N/A #N/A
Buang Tanah Sisa m3 8.25 8.25 #N/A #N/A
Lantai Kerja m2 16.50 16.50 #N/A #N/A
Bekisting Setempat m2 62.70 62.70 #N/A #N/A
Wiremesh M 10 m2 33.00 33.00 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 256.09 256.09 #N/A #N/A
Beton K225 m3 5.61 5.61 #N/A #N/A
2. 4 Gorong - Gorong Tipe G-40 25 m
Galian Tanah m3 10.50 10.50 #N/A #N/A
Urugan Tanah & Pemadatan m3 1.50 1.50 #N/A #N/A

74(75) 11B.Saluran
397160157.xls

VOLUME VOLUME HARGA JUMLAH


NO JENIS PEKERJAAN KETERANGAN SATUAN KONSULTAN KONTRAKTOR SATUAN HARGA
(Rp.) (Rp.)
Buang Tanah Sisa m3 9.00 9.00 #N/A #N/A
Lantai Kerja m2 15.00 15.00 #N/A #N/A
Bekisting Setempat m2 60.00 60.00 #N/A #N/A
Wiremesh M 10 m2 30.00 30.00 #N/A #N/A
Besi Beton Polos Ø 8 mm kg 250.17 250.17 #N/A #N/A
Beton K225 m3 5.25 5.25 #N/A #N/A

TOTAL #N/A