Working alread target
项目名称 施工项目Construction Starting Completion time y Up to date Total Qty. Cumulativ
location/room name Unit
Name item time time limitation alread Qty e%
(Day) y
air duct with flange 24/Nov/13 30/Nov/13 7 % 30 40 70 100 70%
1 roof fabrication
fire damper 24/Nov/13 30/Nov/13 7 % 0 60 60 100 60%
2 roof installation
air duct supports
3 roof fabrication and 24/Nov/13 30/Nov/13 7 % 10 40 50 100 50%
installation
12.6m wash
exhaust fan
4 and installation fan with 24/Nov/13 25/Nov/13 2 % 0 100 100 100 100%
cleaner's duct joint
room
CCB fire damper
5 12.6m CCR installation
24/Nov/13 28/Nov/13 5 % 0 100 100 100 100%
6 12.6m CCR duct test 26/Nov/13 30/Nov/13 5 % 0 100 100 100 100%
and corridor
battery room
main duct &fire
7 to AC damper fabrication 25/Nov/13 30/Nov/13 6 % 0 25 25 100 25%
equipment and installation
room
total 5 NO.S
total 24 piece
1 NO
to AC
equipment
room total 24m
2*12m up
to roor
320m
next week
all
complete
Saturday
arrive