Tarif Makan 2018
Tarif Makan 2018
Kelas Perawatan
Saat Ini Baru Saat Ini dari tarif kamar
(%) ase rata-rata tarif makan dari tarif kamar adalah 19.31
Kelas Perawatan
Keterangan Unit RUMUS Jumlah
P. Suite VVIP VIP IA/IB II III A III B
Jumlah Porsi Makan/Bulan Porsi A RERATA 115.43 112.69 1,219.41 7,698.45 8,285.21 2,918.86 795.16 21,145.21
Harga Bahan Baku / hari Rp. B 130,730 128,920 116,910 98,200 57,250 43,450 41,550
Harga Bahan Baku / porsi Rp. C C = B/3 43,577 42,973 38,970 32,733 19,083 14,483 13,850
Total Harga Bahan baku/ Bulan Rp. D D =Ax C 5,030,238 4,842,803 47,520,562 251,995,827 158,109,380 42,274,782 11,012,918 520,786,511
Persentase % E E = (D/TOTAL D) x 100 0.97 0.93 9.12 48.39 30.36 8.12 2.11 100.00
Kapasitas Normal Porsi G G = 0,65x (368 x 30.4 x 3 178 119 1,008 6,402 9,722 3,201 1,186 21,815
OH cost / porsi Rp. I I = (G/A) x H 38,146 26,049 20,463 20,591 29,054 27,155 36,918
Total OH cost per bulan Rp. J J =Ax I 4,403,393 2,935,595 24,952,561 158,522,152 240,718,823 79,261,076 29,355,954 540,149,554
HPP/ Porsi Rp. K K=C+I 81,723 69,023 59,433 53,325 48,137 41,638 50,768
Biaya Produksi per hari Rp. L L=Kx3 245,169 207,068 178,298 159,974 144,412 124,914 152,305
Profit Vendor 6% Rp. M M = 6% x L 14,710 12,424 10,698 9,598 8,665 7,495 9,138
Biaya Demobilisasi 1% Demobilisasi (1%) 2,452 2,071 1,783 1,600 1,444 1,249 1,523
Total Biaya Produksi per hari Rp. N N=L+M 262,331 221,563 190,779 171,173 154,521 133,659 162,967
Biaya produksi per bulan Rp. O O = A x (N/3) 10,093,986 8,322,886 77,546,242 439,254,237 426,746,177 130,043,368 43,194,693 1,135,201,589
Biaya Produksi per bulan Rp. 11,232,620 9,461,521 100,318,936 471,136,009 394,928,232 121,619,052 26,505,219 1,135,201,589
PERHITUNGAN PERKIRAAN BIAYA MAKAN TAHUN 2018
Kelas Perawatan
Keterangan Unit RUMUS Jumlah
P. Suite VVIP VIP Executive Superior Standar Plus
Jumlah Porsi Makan/Bulan Porsi A RERATA 74.54 103.27 1,260.06 7,351.81 7,263.01 3,658.74 19,711.43
Harga Bahan Baku / hari Rp. B 135,930 132,930 122,070 97,320 62,370 46,870
Harga Bahan Baku / porsi Rp. C C = B/3 45,310 44,310 40,690 32,440 20,790 15,623
Total Harga Bahan baku/ Bulan Rp. D D =Ax C 3,377,549 4,576,044 51,271,706 238,492,616 150,997,938 57,161,701 505,877,554
Persentase % E E = (D/TOTAL D) x 100 0.67 0.90 10.14 47.14 29.85 11.30 100.00
Kapasitas Normal Porsi G G = 0,61x (352 x 30.4 x 3 167 111 1,113 6,064 8,011 4,117 21,637
OH cost / porsi Rp. I I = (G/A) x H 58,829 28,308 23,201 21,672 28,981 29,565
Total OH cost per bulan Rp. J J =Ax I 4,385,263 2,923,509 29,235,087 159,331,223 210,492,625 108,169,821 514,537,527
HPP/ Porsi Rp. K K=C+I 104,139 72,618 63,891 54,112 49,771 45,188
Biaya Produksi per hari Rp. L L=Kx3 312,416 217,855 191,674 162,337 149,314 135,564
Biaya Demobilisasi 1% Demobilisasi (1%) 3,124 2,179 1,917 1,623 1,493 1,356
Total Biaya Produksi per hari Rp. N N=L+M 331,161 230,927 203,175 172,077 158,273 143,698
Biaya produksi per bulan Rp. O O = A x (N/3) 8,228,581 7,949,525 85,337,201 421,693,269 383,179,997 175,251,413 1,081,639,986
Biaya Produksi per bulan Rp. 9,696,524 9,417,469 104,909,777 448,116,247 363,150,404 146,349,564 1,081,639,986