Anda di halaman 1dari 116

CONTENTS

SHEET NO.

1. INTRODUCTION 1

2. DESIGN DATA 2

3. IDEALIZATION OF STRUCTURE 3

4. SECTION PROPERTIES 7

5. SECTIONS CONSIDERED IN DESIGN 12

6. CALCULATION OF MOMENTS AND SHEARS


DUE TO DL AND SIDL 13

7. GRID ANALYSIS FOR DEAD LOAD AND SIDL 17

8. GRID ANALYSIS FOR LIVE LOADS 33

9. SUMMARY FOR DL ,SIDL & LIVE LOAD EFFECTS 62

10. CALCULATION FOR FRICTION AND SLIP LOSSES 66

11. STRESS CHECK AT VARIOUS SECTIONS 69

12. SUMMARY OF MAXIMUM BENDING MOMENT & SHEAR FORCE 96

13. DESIGN OF SHEAR CONNECTOR 99

14. CHECK FOR THERMAL EFFECTS 101

15. EFFECTS OF DIFFERENTIAL SHRINKAGE 106

16. DESIGN OF DECK SLAB 108

17. DESIGN OF DIAPHRAGM 124


NOTE NO. 201/DN - 01/R-1 SHEET NO.

50
CRASH BARRIER 50 250 200

MULTIPLYING WIDTH HEIGHT AREA 600


S.NO. FACTOR
(m) (m) (m2) 1450 2
3
1 0.5 0.05 1.45 0.036
2 1 0.25 0.6 0.150
3 0.5 0.05 0.6 0.015 5 365
4 1 0.3 0.85 0.255 1 4
485
5 0.5 0.2 0.365 0.037 6

6 1 0.2 0.485 0.097 550


TOTAL AREA 0.590
Weight = 0.590 x 2.400 = 1.415 t/m
Weight of 60 NB pipe = 6.5 kg/m = 0.0065 t/m
Pipe support 16 mm thick vertical plate @ 1 m c/c (200 x 150 x 20 mm)
= 0.2 x 0.15 x 0.016 x 7.85 = 0.0038 t/m
20 mm thick base plate (150 x 150 mm)
= 0.15 x 0.15 x 0.02 x 7.85 = 0.0035 t/m
16 mm dia anchor bolts (2 nos.) = 0.42 x 2 0.0025 = 0.0021 t/m
@' 2.5 kg/m

Total weight of hand rail assembly


= 0.0065 + 0.0038 + 0.0035 + 0.0021 = 0.0159 t/m

Total weight of crash barrier


= 1.4154 + 0.0159 = 1.431 t/m ~ 1.45 t/m

MEDIAN 250

285
Area = 0.25 x 0.285 = 0.0713 m2

Weight = 0.07125 x 2.4 = 0.171 ~ 0.2 t/m


C/C distance between members = 3.931 m
Conc. load = 3.931 x 0.2 = 0.79 t

SUPERIMPOSED DEAD LOAD (SIDL)

Crash Barrier @ 1.45 t/m


Member 38, 42, 46, 50, 54, 58, 62
Width = 0.550 m
C/C distance between members = 3.931 m
Length of member = 3.300 m
Conc. load = 1.45 ( 3.931 + 3.931 ) = 5.70 t Distance = 3.30 - 0.550
NOTE NO. 201/DN - 01/R-1 SHEET NO.

2 2 (from start) 2
= 3.025 m
Member 34 and 66
Conc. load = 1.45 ( 0.350 + 3.931 ) = 3.36 t Distance = 3.025 m
2 (from start)

Wearing coat 56 mm thick


= 0.056 x 2.2 = 0.1232 ~ 0.15 t/m2
C/C distance between transeverse members = 3.931 m
Cantilever portion in longitudinal direction = 0.35 m

Member 31 to 34 and 63 to 66
UDL = 0.15 x ( 3.931 + 0.350 ) = 0.347 t/m
2
Member 35 to 62
UDL = 0.15 x 3.931 = 0.590 t/m

FOOTPATH SLAB DEAD LOAD (FPDL)


Width of footpath = 2.25 m
Height of footpath = 0.10 m
Intensity of FPDL at end members -
Member 34 and 66
Intensity of UDL = ( 0.35 + 3.931 ) x ( 0.100 x 2.4 ) = 0.56 t/m
###
Member 38, 42, 46, 50, 54, 58 and 62
UDL = 2.4 x ( 3.931 + 3.931 ) x 0.10 = 0.94 t/m
### ###

Inner road kerb :


###

150

100
285

Cross-sectional area;
0.100 x 0.150 = 0.015 m2
0.185 x 0.250 = 0.046 m2
0.061 m2

Weight = 0.061 @ 2.4 t/m3 = 0.15 t/m

Member 38, 42, 46, 50, 54, 58, 62


Width = 0.250 m
C/C distance between members = 3.931 m
Length of member = 3.300 m
Conc. load = 0.15 ( 3.931 + 3.931 ) = 0.58 t Distance = 3.30 - 0.250 - 2.80
2 2 (from start) 2
= 0.375 m
Member 34 and 66
Conc. load = 0.15 ( 0.350 + 3.931 ) = 0.34 t Distance = 0.375 m
NOTE NO. 201/DN - 01/R-1 SHEET NO.

2 (from start)
NOTE NO. 201/DN - 01/R-1 SHEET NO.

FOOTPATH LIVE LOAD (FPLL) @ 500 kg/m2


Width of footpath = 2.50 m
Intensity of FPLL = ( 500 - 260 + 4800 ) x ( 16.5 - 2.5 )
31.45 15
= 366.45 kg/m2 = 0.37 t/m2
Member 34 and 66
C/C distance between transeverse members = 3.931 m
Cantilever portion in longitudinal direction = 0.35 m
UDL = 0.37 x ( 0.35 + 3.931 ) = 0.857 t/m
###
Member 38, 42, 46, 50, 54, 58, 62
UDL = 0.37 x ( 3.931 + 3.931 ) = 1.454 t/m
### ###
NOTE NO. 201/DN - 01/R-1 SHEET NO.

SECTION PROPERTIES
LONGITUDINAL GIRDER (G2)
Self Composite
Depth (mm) 2250 Depth (mm) 2500
Area (mm )
2
1004375 Deck slab Area (mm )
2
1754375
Iz (mm4) 6.32E+11 250 Iz (mm4) 1239720642991.97
Yb(mm) 1188.78 + mm Yb(mm) 1695.9
Yt(mm) 1061.22 thick and Yt(mm) 804.1
Zb(mm )3
5.313E+08 3000 Zb(mm )3
7.310E+08
Zt(mm3) 5.952E+08 mm Zt(mm3) 1.542E+09
Concrete M- 40 wide. Concrete M- 40
Iy Y
3000
Element Iself = bd3/12 Az2 1500 1500
mm4 mm4
1 2.441E+10 0 250 1250
2 9.655E+08 6.581E+09 1 150
3 3.206E+09 0 1 150
4 1.488E+08 2.230E+09 2
5 8.789E+09 0 22 275
3.752E+10 8.810E+09 z 2250 z 1500
3
Iy(self) = 4.633E+10 mm4
4
zL = 1500.0 22 200
5 250
Iy(slab) = 5.625E+11 4
750
Iy(comp) = 6.0883E+11
Y
Ix
3000

Tav = 225.0 mm 250


1
Bav = 350.0 mm 1
12
Portion no. b d 3.b3.d3
mm mm 10(b2+d2) 1250 2 Tav
1 3000 250 7.81E+09
2 1250 225 4.14E+09 2250 3 275
3 275 1675 1.02E+10
4 750 350 7.92E+09 Bav

Ix (mm4) = 3.00E+10
4

for deck slab Ix = b x d3 / 6 750


NOTE NO. 201/DN - 01/R-1 SHEET NO.

CROSS MEMBER AT END SUPPORT

Iz
2316
Area (Ax) = 2316 x 250
+ 2250 x 300 350 1966

= 1254000 mm2
250 1
1
yb = 1702 mm 1
2500
2
yt = 798 mm 2250
2

Element Iself = bd3/12 Az2


mm4 mm4
1 3.016E+09 2.6213E+11 300
2 2.848E+11 2.2485E+11
2.878E+11 4.8697E+11

Iz = 7.748E+11 mm4

Iy

yl = 723 mm

yr = 1593 mm

Element Iself = bd3/12 Ay2


mm4 mm4
1 2.588E+11 1.10E+11
2 5.063E+09 9.39E+10
2.639E+11 2.03E+11

Iy = 4.673E+11 mm4

Ix

Element b d 3.b3.d3
mm mm 10*(b2+d2)
1 2316 250 6.031E+09
2 300 2250 1.791E+10

Ix = 2.394E+10 mm4
NOTE NO. 201/DN - 01/R-1 SHEET NO.

FOR MEMBERS 35 TO 62
1966 1966

250

Area Ax =
3.932 x 0.25 = 0.983 m2

Ix = 3.932 x 0.25 3
= 0.010240 m4
6

Iy = 0.25 x 3.932 3
= 1.266483 m4
12

Iz = 3.932 x 0.25 3
= 0.005120 m4
12
NOTE NO. 201/DN - 01/R-1 SHEET NO.

SECTION PROPERTIES
GIRDER (G1)
AT MID SPAN
Self Composite
Depth (mm) 2250 Depth (mm) 2500
Area (mm2) 1004375 Deck slab Area (mm2) 2204375
Iz (mm4) 6.32E+11 250 Iz (mm4) 1407233245641.76
Yb(mm) 1188.78 + mm Yb(mm) 1834.5
Yt(mm) 1061.22 thick and Yt(mm) 665.5
Zb(mm3) 5.313E+08 4800 Zb(mm3) 7.671E+08
Zt(mm3) 5.952E+08 mm wide. Zt(mm3) 2.115E+09
Concrete M- 40 Concrete M- 40

Iy Y
4800
Element Iself = bd3/12 Az2 3300 1500
mm4 mm4
1 2.441E+10 0 250 1250
1
2 9.655E+08 6.581E+09 1 150
3 3.206E+09 0 1 150
4 1.488E+08 2.230E+09 2
5 8.789E+09 0 22 275
3.752E+10 8.810E+09 z 2250 z 1500
3
3
Iy(self) = 4.633E+10 mm4
3
4
zL = 2810.1 22 200
5 250
Iy(slab) = 2.304E+12 4
750
Iy(comp) = 2.7932E+12
Y
Ix
4800

Tav = 225.0 mm 250


1
Bav = 350.0 mm 1
12
Portion no. b d 3.b3.d3
mm mm 10(b2+d2) 1250 2 Tav
1 4800 250 1.25E+10
2 1250 225 4.14E+09 2250 3 275
3 275 1675 1.02E+10
4 750 350 7.92E+09 Bav

Ix (mm4) = 3.47E+10
4

for deck slab Ix = b x d3 / 6 750


NOTE NO. 201/DN - 01/R-1 SHEET NO.

AT DISTANCE "d" FROM SUPPORT

Iz
Self Composite
Depth (mm) 2250 Depth (mm) 2500
Area (mm2) 1486939.92 Deck slab Area (mm2) 2686940
Iz (mm4) 7.33E+11 250 Iz (mm4) 1678892967537
Yb(mm) 1185.71 + mm Yb(mm) 1716.9
Yt(mm) 1064.29 thick and Yt(mm) 783.1
Zb(mm3) 6.185E+08 4800 Zb(mm3) 9.779E+08
Zt(mm3) 6.891E+08 mm Zt(mm3) 2.144E+09
W (kN/m) 37.2 wide.
Concrete M- 40 Concrete M- 40
Iy Y
4800
Element Iself = bd3/12 Az2 3300 1500
mm4 mm4
1 2.441E+10 0 250 1250
2 2.166E+08 5.578E+09 1 150
3 2.992E+10 0 103
4 2.500E+06 6.225E+08 2
5 8.789E+09 0 22 579
6.335E+10 6.201E+09 z z 1675
2250 3
Iy(self) = 6.955E+10 mm4
4
zL = 2898.1 22 72
5 250
Iy(slab) = 2.304E+12 4
750

Iy(comp) = 2.9114E+12 Y

Ix
4800

Tav = 201.6 mm 250 1


Bav = 286.0 mm 1
1 2
Portion no. b d 3.b3.d3
mm mm 10(b2+d2) 1250 Tav
1 4800 250 1.25E+10
2 1250 202 3.00E+09 2250 3 579
3 579 1762 9.26E+10
4 750 286 4.60E+09 Bav

Ix (mm4) = 1.13E+11
4

for deck slab Ix = b x d / 6 3

750
NOTE NO. 201 /DN - 01 SHEET NO.

SECTION PROPERTIES
GIRDER (G3)
AT MID SPAN
Self Composite
Depth (mm) 2250 Depth (mm) 2500
Area (mm2) 1004375 Deck slab Area (mm2) 2204375
Iz (mm4) 6.32E+11 250 Iz (mm4) 1407233245641.76
Yb(mm) 1188.78 + mm Yb(mm) 1834.5
Yt(mm) 1061.22 thick and Yt(mm) 665.5
Zb(mm3) 5.313E+08 4800 Zb(mm3) 7.671E+08
Zt(mm3) 5.952E+08 mm wide. Zt(mm3) 2.115E+09
Concrete M- 40 Concrete M- 40

Iy Y
4800
Element Iself = bd3/12 Az2 3300 1500
mm4 mm 4

1 2.441E+10 0 250 1250


1
2 9.655E+08 6.581E+09 1 150
3 3.206E+09 0 1 150
4 1.488E+08 2.230E+09 2
5 8.789E+09 0 22 275
3.752E+10 8.810E+09 z 2250 z 1500
3
3
Iy(self) = 4.633E+10 mm4
3
4
zL = 2810.1 22 200
5 250
Iy(slab) = 2.304E+12 4
750
Iy(comp) = 2.7932E+12
Y
Ix
4800

Tav = 225.0 mm 250


1
Bav = 350.0 mm 1
12
Portion no. b d 3.b3.d3
mm mm 10(b2+d2) 1250 2 Tav
1 4800 250 1.25E+10
2 1250 225 4.14E+09 2250 3 275
3 275 1675 1.02E+10
4 750 350 7.92E+09 Bav

Ix (mm4) = 3.47E+10
4

for deck slab Ix = b x d3 / 6 750


AT DISTANCE "d" FROM SUPPORT

Iz
Self Composite
Depth (mm) 2250 Depth (mm) 2500
Area (mm )
2
1486939.92 Deck slab Area (mm )
2
2686940
Iz (mm4) 7.33E+11 250 Iz (mm4) 1678892967537
Yb(mm) 1185.71 + mm Yb(mm) 1716.9
Yt(mm) 1064.29 thick and Yt(mm) 783.1
Zb(mm )3
6.185E+08 4800 Zb(mm )3
9.779E+08
Zt(mm )3
6.891E+08 mm Zt(mm )3
2.144E+09
W (kN/m) 37.2 wide.
Concrete M- 40 Concrete M- 40
Iy Y
4800
Element Iself = bd3/12 Az2 3300 1500
mm4 mm4
1 2.441E+10 0 250 1250
2 2.166E+08 5.578E+09 1 150
3 2.992E+10 0 103
4 2.500E+06 6.225E+08 2
5 8.789E+09 0 22 579
6.335E+10 6.201E+09 z z 1675
2250 3
Iy(self) = 6.955E+10 mm4
4
zL = 2898.1 22 72
5 250
Iy(slab) = 2.304E+12 4
750

Iy(comp) = 2.9114E+12 Y

Ix
4800

Tav = 201.6 mm 250 1


Bav = 286.0 mm 1
1 2
Portion no. b d 3.b3.d3
mm mm 10(b2+d2) 1250 Tav
1 4800 250 1.25E+10
2 1250 202 3.00E+09 2250 3 579
3 579 1762 9.26E+10
4 750 286 4.60E+09 Bav
Ix (mm4) = 1.13E+11
4

for deck slab Ix = b x d3 / 6


750
Girder comp.
AX AX IX IY IZ

OUTER/INNER 1.0044 2.2044 0.0347 2.7932 1.4072


AT MID SPAN
OUTER/INNER #REF! #REF! #REF! #REF! #REF!
NEAR SUPPORT

Cross Member #REF! #REF! #REF! #REF!


at END SUP

Between Supp

Cross Cant. Member #REF! #REF! #REF! #REF!


at END SUP
NOTE NO. 201/DN - 01/R-1 SHEET NO.
0

SECTIONS CONSIDERED IN DESIGN

C.L. OF
GIRDER
C. L. OF EXP. JOINT

C. L. OF EXP. JOINT
5 4 3 2 1

0.000 L = 31.45 m ( Dist. Between temporary bearing )


L1 = 31.45 m ( Dist. Between permanent bearing )

32.19 m

SEC. DISTANCE FROM PERMANENT BEARING DISTANCE FROM TEMPORARY BEARING

1--1 0.5L = 0.5 X 31.45 = 15.73 m 15.73 - 0 = 15.73 m

15.73 / 31.45 = 0.5 L1

2--2 3/8 L = 0.375 X 31.45 = 11.79 m 11.79 - 0 = 11.79 m

11.79 / 31.45 = 0.375 L1

3--3 1/4 L = 0.25 X 31.45 = 7.863 m 7.863 - 0 = 7.86 m

7.86 / 31.45 = 0.25 L1

4--4 1/8 L = 0.125 X 31.45 = 3.931 m 3.931 - 0 = 3.93 m

3.93 / 31.45 = 0.125 L1

5--5 At effective depth d = 2.50 m 2.50 - 0 = 2.500 m

= 2.50 / 31.45 = 0.079 L 2.500 / 31.45 = 0.079 L1


P.S.C.

P.S.C.

P.S.C.

P.S.C.

P.S.C.
NOTE NO. 201/DN - 01/R-1 SHEET NO.

CALCULATION OF MOMENTS AND SHEARS

Analysis for dead load is done by taking it as an individual girder while analysis for SIDL,
FPLL and LL are done by GRID analysis using STAAD-III.

DEAD LOAD
1. Under self weight of the precast Girder

Length of the girder = 32.15 m

1.850 2.5

w2 t/m w1 t/m w t/m

0.35 Temp. supp. 31.45 M Temp. supp. 0.35


32.150 M ( GIRDER LENGTH )
d = 2.4

Distance Between Temp. Support, L = 31.45 m


Overhang = 0.35 m

UDL , w = 2.51 t/m


Avg. , w1 = 3.48 t/m
UDL , w2 = 4.45 t/m
Supp. Reaction , R = 46.37 t

a) Moment at x = 0.500 L ( Sec. 1-1 )

= 319.02 tm Corresp. Shear = 0.00 t

b) Moment at x = 0.375 L ( sec. 2-2 )

= 299.62 tm Corresp. Shear = 9.87 t

c) Moment at x = 0.250 L ( sec. 3-3 )

= 241.41 tm Corresp. Shear = 19.74 t

d) Moment at x = 0.125 L ( sec. 4-4 )

= 144.39 tm Corresp. Shear = 29.68 t

e) Moment at x = 0.079 L ( sec. 5-5 )

= 98.35 tm Corresp. Shear = 34.66 t

2. Under self-weight of cast-in-situ deck slab (FOR END GIRDER G3)

UDL , w = 2.880 t/m ( On entire length of girder )

Supp. Reaction , R = 46.296 t

a) Moment at x = 0.500 L ( Sec. 1-1 )

= 355.90 tm Corresp. Shear = 0.00 t

b) Moment at x = 0.375 L ( sec. 2-2 )


NOTE NO. 201/DN - 01/R-1 SHEET NO.

CALCULATION OF MOMENTS AND SHEARS

Analysis for dead load is done by taking it as an individual girder while analysis for SIDL,
FPLL and LL are done by GRID analysis using STAAD-III.

DEAD LOAD
1. Under self weight of the precast Girder

Length of the girder = 32.15 m

1.850 2.5

w2 t/m w1 t/m w t/m

0.35 Temp. supp. 31.45 M Temp. supp. 0.35


32.150 M ( GIRDER LENGTH )
d = 2.4

Distance Between Temp. Support, L = 31.45 m


Overhang = 0.35 m

UDL , w = 2.51 t/m


Avg. , w1 = 3.48 t/m
UDL , w2 = 4.45 t/m
Supp. Reaction , R = 46.37 t

a) Moment at x = 0.500 L ( Sec. 1-1 )

= 319.02 tm Corresp. Shear = 0.00 t

b) Moment at x = 0.375 L ( sec. 2-2 )

= 299.62 tm Corresp. Shear = 9.87 t

c) Moment at x = 0.250 L ( sec. 3-3 )

= 241.41 tm Corresp. Shear = 19.74 t

d) Moment at x = 0.125 L ( sec. 4-4 )

= 144.39 tm Corresp. Shear = 29.68 t

e) Moment at x = 0.079 L ( sec. 5-5 )

= 98.35 tm Corresp. Shear = 34.66 t


NOTE NO. 201/DN - 01/R-1 SHEET NO.

3. Under self-weight of cast-in-situ deck slab (FOR END GIRDER G1)

UDL , w = 2.880 t/m ( On entire length of girder )

Supp. Reaction , R = 46.296 t

a) Moment at x = 0.500 L ( Sec. 1-1 )

= 355.90 tm Corresp. Shear = 0.00 t

b) Moment at x = 0.375 L ( sec. 2-2 )

= 333.65 tm Corresp. Shear = 11.32 t

c) Moment at x = 0.250 L ( sec. 3-3 )

= 266.88 tm Corresp. Shear = 22.64 t

d) Moment at x = 0.125 L ( sec. 4-4 )

= 155.61 tm Corresp. Shear = 33.97 t

e) Moment at x = 0.079 L ( sec. 5-5 )

= 104.04 tm Corresp. Shear = 38.09 t


NOTE NO. 201/DN - 01/R-1 SHEET NO.

CALCULATION OF MOMENTS AND SHEARS

Analysis for dead load is done by taking it as an individual girder while analysis for SIDL,
FPLL and LL are done by GRID analysis using STAAD-III.

DEAD LOAD
1. Under self weight of the precast Girder

Length of the girder = 32.15 m

1.850 2.5

w2 t/m w1 t/m w t/m

0.35 Temp. supp. 31.45 M Temp. supp. 0.35


32.150 M ( GIRDER LENGTH )
d = 2.4

Distance Between Temp. Support, L = 31.45 m


Overhang = 0.35 m

UDL , w = 2.51 t/m


Avg. , w1 = 3.48 t/m
UDL , w2 = 4.45 t/m
Supp. Reaction , R = 46.37 t

a) Moment at x = 0.500 L ( Sec. 1-1 )

= 319.02 tm Corresp. Shear = 0.00 t

b) Moment at x = 0.375 L ( sec. 2-2 )

= 299.62 tm Corresp. Shear = 9.87 t

c) Moment at x = 0.250 L ( sec. 3-3 )

= 241.41 tm Corresp. Shear = 19.74 t

d) Moment at x = 0.125 L ( sec. 4-4 )

= 144.39 tm Corresp. Shear = 29.68 t

e) Moment at x = 0.079 L ( sec. 5-5 )

= 98.35 tm Corresp. Shear = 34.66 t


NOTE NO. 201/DN - 01/R-1 SHEET NO.

4. Under self-weight of cast-in-situ deck slab (FOR INTERMEDIATE GIRDER G2)

UDL , w = 1.800 t/m ( On entire length of girder )

Supp. Reaction , R = 28.935 t

a) Moment at x = 0.500 L ( Sec. 1-1 )

= 222.44 tm Corresp. Shear = 0.00 t

b) Moment at x = 0.375 L ( sec. 2-2 )

= 208.53 tm Corresp. Shear = 7.08 t

c) Moment at x = 0.250 L ( sec. 3-3 )

= 166.80 tm Corresp. Shear = 14.15 t

d) Moment at x = 0.125 L ( sec. 4-4 )

= 97.25 tm Corresp. Shear = 21.23 t

e) Moment at x = 0.079 L ( sec. 5-5 )

= 65.03 tm Corresp. Shear = 23.81 t


NOTE NO. 201/DN - 01/R-1 SHEET NO.

SUMMARY FOR DL ,SIDL & LIVE LOAD EFFECTS

SUMMARY OF MAX. BENDING MOMENTS AT MIDSPAN


B.M. due to SIDL Girder G1 = 12.07 t-m
B.M. due to SIDL Girder G2 = 48.11 t-m
B.M. due to SIDL Girder G3 = 394.96 t-m
B.M. due to FPLL Girder G1 = 29.40 t-m
B.M. due to FPLL Girder G2 = 8.32 t-m
B.M. due to FPLL Girder G3 = 133.89 t-m

MID SPAN B.M. (t-m)


LIVE LOAD
GIRDER G1 GIRDER G2 GIRDER G3
CLASS A (TWO LANE ) 360.01 227.70 214.72
CLASS 70R WHEELED 436.78 279.14 237.68

TOTAL MID SPAN B.M.(SIDL + LL + FPLL) (t-m)


LIVE LOAD
GIRDER G1 GIRDER G2 GIRDER G3
CLASS A (TWO LANE) 401.48 284.13 743.57
CLASS 70R WHEELED 478.25 335.57 766.53

GIRDER G1 AT MEDIAN SIDE


For Class A Loading (Two Lane)

Max B.M. and corresp. S.F. Max S.F. and corresp. B.M.
SEC. L.C. B.M. S.F. SEC. L.C. S.F. B.M.
1-1 147 360.01 4.54 1-1 176 15.67 232.65
2-2 128 357.26 13.10 2-2 156 23.24 263.98
3-3 114 294.12 28.38 3-3 137 31.35 240.24
4-4 95 168.42 30.10 4-4 117 37.12 153.18
5-5 100 26.32 44.03 5-5 95 45.45 25.90

For Class 70R wheeled Loading

Max B.M. and corresp. S.F. Max S.F. and corresp. B.M.
SEC. L.C. B.M. S.F. SEC. L.C. S.F. B.M.
1-1 104 436.78 8.25 1-1 62 17.01 235.14
2-2 91 409.18 23.81 2-2 129 25.99 290.96
3-3 82 323.91 37.15 3-3 82 37.15 323.91
4-4 62 184.61 28.38 4-4 90 39.87 164.18
5-5 62 28.41 49.40 5-5 62 49.40 28.41
NOTE NO. 201/DN - 01/R-1 SHEET NO.

GIRDER G2 AT MID
For Class A Loading (Two Lane)

Max B.M. and corresp. S.F. Max S.F. and corresp. B.M.
SEC. L.C. B.M. S.F. SEC. L.C. S.F. B.M.
1-1 388 227.70 3.05 1-1 394 13.61 217.59
2-2 368 226.04 2.67 2-2 375 18.29 220.05
3-3 354 187.90 11.38 3-3 355 23.39 187.04
4-4 335 110.78 29.21 4-4 335 29.21 110.78
5-5 319 21.61 34.20 5-5 319 34.20 21.61

For Class 70R wheeled Loading

Max B.M. and corresp. S.F. Max S.F. and corresp. B.M.
SEC. L.C. B.M. S.F. SEC. L.C. S.F. B.M.
1-1 340 279.14 5.74 1-1 316 26.82 230.84
2-2 326 266.00 11.87 2-2 344 27.00 234.06
3-3 306 219.06 5.50 3-3 325 30.87 201.94
4-4 297 135.42 24.51 4-4 305 37.63 128.68
5-5 288 26.38 36.82 5-5 289 45.24 26.22

GIRDER G3 AT FOOTPATH SIDE


For Class A Loading (Two Lane)

Max B.M. and corresp. S.F. Max S.F. and corresp. B.M.
SEC. L.C. B.M. S.F. SEC. L.C. S.F. B.M.
1-1 376 214.72 1.04 1-1 394 9.31 203.76
2-2 368 211.90 0.62 2-2 375 14.42 207.09
3-3 354 171.79 11.72 3-3 355 19.54 171.30
4-4 335 96.28 23.45 4-4 335 23.45 96.28
5-5 340 18.28 24.73 5-5 319 26.53 18.10

For Class 70R wheeled Loading

Max B.M. and corresp. S.F. Max S.F. and corresp. B.M.
SEC. L.C. B.M. S.F. SEC. L.C. S.F. B.M.
1-1 340 237.68 2.40 1-1 316 10.16 202.55
2-2 330 219.29 7.09 2-2 344 14.56 210.91
3-3 324 170.08 13.98 3-3 325 19.50 169.12
4-4 317 93.08 20.24 4-4 325 21.30 92.24
5-5 308 17.67 22.55 5-5 309 24.30 17.65
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Governing Forces at Girder G1 due to Live Load


Max B.M. and Corresponding Shear Max Shear and Corresponding B.M.
SEC. S.F. B.M. SEC. S.F. B.M.
1-1 8.25 436.78 1-1 17.01 235.14
2-2 23.81 409.18 2-2 25.99 290.96
3-3 37.15 323.91 3-3 37.15 323.91
4-4 28.38 184.61 4-4 39.87 164.18
5-5 49.40 28.41 5-5 49.40 28.41

SIDL FPLL
SEC. S.F. B.M. SEC. S.F. B.M.
1-1 0.11 15.84 1-1 0.40 17.91
2-2 0.11 16.27 2-2 1.12 16.52
3-3 0.83 16.18 3-3 1.63 12.42
4-4 0.83 12.53 4-4 1.63 6.13
5-5 2.75 7.73 5-5 1.84 3.59

FORCE DUE TO DECK SLAB + SELF WEIGHT OF GIRDER G1


Deck Slab S.W. of Girder
SEC. Tor. Due to S.W.
S.F. B.M. S.F. B.M. Girder+ Deck slab
1-1 0.00 355.90 0.00 319.02 0.11
2-2 11.32 333.65 9.87 299.62 0.31
3-3 22.64 266.88 19.74 241.41 0.46
4-4 33.97 155.61 29.68 144.39 0.46
5-5 38.09 104.04 34.66 98.35 0.54

Total Forces at Girder G1


Max B.M. and Corresponding Shear Max Shear and Corresponding B.M.
SEC. S.F. B.M. SEC. S.F. B.M.
1-1 8.76 1145.5 1-1 17.52 943.8
2-2 46.23 1075.2 2-2 48.41 957.0
3-3 82.00 860.80 3-3 82.00 860.80
4-4 94.49 503.27 4-4 105.98 482.84
5-5 126.74 242.12 5-5 126.74 242.12
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Governing Forces at Girder G2 due to Live Load


Max B.M. and Corresponding Shear Max Shear and Corresponding B.M.
SEC. S.F. B.M. SEC. S.F. B.M.
1-1 5.74 279.14 1-1 26.82 230.84
2-2 11.87 266.00 2-2 27.00 234.06
3-3 5.50 219.06 3-3 30.87 201.94
4-4 24.51 135.42 4-4 37.63 128.68
5-5 36.82 26.38 5-5 45.24 26.22

SIDL FPLL
SEC. S.F. B.M. SEC. S.F. B.M.
1-1 1.53 66.19 1-1 0.39 15.18
2-2 3.96 60.17 2-2 0.99 13.64
3-3 4.68 43.58 3-3 1.06 9.47
4-4 4.68 23.53 4-4 1.06 4.79
5-5 3.77 14.77 5-5 0.58 3.06

FORCE DUE TO DECK SLAB + SELF WEIGHT OF GIRDER G2


Deck Slab S.W. of Girder
SEC. Tor. Due to S.W.
S.F. B.M. S.F. B.M. Girder+ Deck slab
1-1 0.00 222.44 0.00 319.02 0.17
2-2 7.08 208.53 9.87 299.62 0.49
3-3 14.15 166.80 19.74 241.41 0.75
4-4 21.23 97.25 29.68 144.39 0.75
5-5 23.81 65.03 34.66 98.35 0.89

Total Forces at Girder G2


Max B.M. and Corresponding Shear Max Shear and Corresponding B.M.
SEC. S.F. B.M. SEC. S.F. B.M.
1-1 7.66 902.0 1-1 28.74 853.7
2-2 33.77 848.0 2-2 48.90 816.0
3-3 45.13 680.32 3-3 70.50 663.20
4-4 81.16 405.39 4-4 94.28 398.65
5-5 99.64 207.59 5-5 108.06 207.43
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Governing Forces at Girder G3 due to Live Load


Max B.M. and Corresponding Shear Max Shear and Corresponding B.M.
SEC. S.F. B.M. SEC. S.F. B.M.
1-1 2.40 237.68 1-1 10.16 202.55
2-2 7.09 219.29 2-2 14.56 210.91
3-3 11.72 171.79 3-3 19.54 171.30
4-4 23.45 96.28 4-4 23.45 96.28
5-5 24.73 18.28 5-5 26.53 18.10

SIDL FPLL
SEC. S.F. B.M. SEC. S.F. B.M.
1-1 6.04 394.96 1-1 2.08 133.89
2-2 18.54 372.80 2-2 6.36 126.28
3-3 32.29 302.92 3-3 11.00 102.37
4-4 32.29 178.15 4-4 11.00 59.87
5-5 48.00 106.64 5-5 16.20 35.82

FORCE DUE TO DECK SLAB + SELF WEIGHT OF GIRDER G3


Deck Slab S.W. of Girder
SEC.
S.F. B.M. S.F. B.M.
1-1 0.00 355.90 0.00 319.02
2-2 11.32 333.65 9.87 299.62
3-3 22.64 266.88 19.74 241.41
4-4 33.97 155.61 29.68 144.39
5-5 38.09 104.04 34.66 98.35

Total Forces at Girder G3


Max B.M. and Corresponding Shear Max Shear and Corresponding B.M.
SEC. S.F. B.M. SEC. S.F. B.M.
1-1 10.52 1441.5 1-1 18.28 1406.3
2-2 53.18 1351.6 2-2 60.65 1343.3
3-3 97.40 1085.4 3-3 105.22 1084.9
4-4 130.39 634.30 4-4 130.39 634.30
5-5 161.68 363.13 5-5 163.48 362.95
CALCULATION FOR FRICTION AND SLIP LOSSES

The cable is assumed to have a straight portion near ends followed by a parabolic profile. The
parabolic profile is followed by plan bending. Cable profile for plan bending is assumed to be made up of
two parabola. Near midspan it has a small horizontal.

The Cable no 6 is dummy cable.

No of Prestressing Cables = 8
Type of cable = 12 -T-13
Type of Sheathing = Bright Metal
X-sectional area of each cable, As = 11.844 cm2
Modulus of elasticity of prestressing steel, Es = 1.988E+07 t/m2
= (1.95x105 MPa)
Span length (c/c bearing) = 32.15 m
Wobble coefficient k = 0.0046
Friction coefficient m = 0.2500
Expected slip, s = 6.0 mm
Half slip area (= 0.5 x As x Es x s) = 70.64 tm
Grip length inside the jack = 0.350 m
Extra length of cable required for jack attachment = 0.750 m
UTS of Cable = 224.71 t
Jacking End Force = 72.5 % of UTS
Dia of Duct = 75 mm

CABLE PROFILE

Horizontal Profile Vertical Profile


Cable End of Vertical Start of Mid pt. Of End of
End of straight
Jacking End Parabolic Plan Plan Straight
No. segment
Bending Bending bending Segment Length
A B C D E F h1 h2 h3 k2
1 0 1.000 7.425 15.425 23.425 24.425 32.850 0.050 0.0313
2 0 1.000 3.425 3.425 3.425 16.425 32.850 0.036 0.0000
3 0 1.000 10.425 10.425 10.425 16.425 32.850 0.276 0.0000
4 0 1.000 10.425 10.425 10.425 16.425 32.850 0.375 0.0000
5 0 1.000 11.425 11.425 11.425 16.425 32.850 0.482 0.0000
6 0 1.000 11.425 11.425 11.425 16.425 32.850 0.583 0.0000
7 0 1.000 12.425 12.425 12.425 16.425 32.850 0.694 0.0000
8 0 1.000 12.425 12.425 12.425 16.425 32.850 0.796 0.0000
9 0 1.000 12.425 12.425 12.425 16.425 32.850 0.8978 0.0000
10 0 1.000 3.425 3.425 3.425 16.425 32.850 0.1288 0.0000
11 0 1.000 3.425 3.425 3.425 16.425 32.850 0.1288 0.0000
12 0 1.000 3.425 3.425 3.425 16.425 32.850 0.1288 0.0000
13 0 1.000 3.425 3.425 3.425 16.425 32.850 0.1288 0.0000
14 0 1.000 3.425 3.425 3.425 16.425 32.850 0.1288 0.0000
15 0 1.000 3.425 3.425 3.425 16.425 32.850 0.1288 0.0000
16 0 1.000 3.425 3.425 3.425 16.425 32.850 0.1288 0.0000
17 0 1.000 3.425 3.425 3.425 16.425 32.850 0.1288 0.0000
18 0 1.000 3.425 3.425 3.425 16.425 32.850 0.1288 0.0000
19 0 1.000 3.425 3.425 3.425 16.425 32.850 0.1288 0.0000
20 0 1.000 3.425 3.425 3.425 16.425 32.850 0.1288 0.0000

CALCULATION FOR LENGTHS AND CUMULATIVE ANGLES

CABLE q1 q2 ac ad ae
(rad) (rad) (rad) (rad) (rad)
1 0.0154 0.245 0.0154 0.2604 0.5054
2 0.0294 0.000 0.0294 0.0294 0.0294
3 0.0586 0.000 0.0586 0.0586 0.0586
4 0.0795 0.000 0.0795 0.0795 0.0795
5 0.0923 0.000 0.0923 0.0923 0.0923
6 0.1114 0.000 0.1114 0.1114 0.1114
7 0.1208 0.000 0.1208 0.1208 0.1208
8 0.1384 0.000 0.1384 0.1384 0.1384
9 0.1559 0.000 0.1559 0.1559 0.1559
10 0.1058 0.000 0.1058 0.1058 0.1058
11 0.1058 0.000 0.1058 0.1058 0.1058
12 0.1058 0.000 0.1058 0.1058 0.1058
13 0.1058 0.000 0.1058 0.1058 0.1058
14 0.1058 0.000 0.1058 0.1058 0.1058
15 0.1058 0.000 0.1058 0.1058 0.1058
16 0.1058 0.000 0.1058 0.1058 0.1058
17 0.1058 0.000 0.1058 0.1058 0.1058
18 0.1058 0.000 0.1058 0.1058 0.1058
19 0.1058 0.000 0.1058 0.1058 0.1058
20 0.1058 0.000 0.1058 0.1058 0.1058
* Total length of cable includes 750mm extra gripping length required for jack attachment.
a is total angular change w.r.t. node A

FORCES IN CABLES AFTER FRICTION ONLY

CABLE k F6-6 F5-5 F4-4 F3-3 F2-2 F1-1 Average


(t) (t) (t) (t) (t) (t) Force (t)
1 1.20E-03 162.91 162.17 156.84 142.19 128.91 128.32 147.25
2 6.06E-03 162.91 162.17 159.19 159.19 159.19 149.95 155.96
3 3.11E-03 162.91 162.17 153.03 153.03 153.03 148.86 155.47
4 4.23E-03 162.91 162.17 152.23 152.23 152.23 148.09 154.95
5 4.44E-03 162.91 162.17 151.05 151.05 151.05 147.61 154.75
6 5.37E-03 162.91 162.17 150.33 150.33 150.33 146.91 154.31
7 5.31E-03 162.91 162.17 149.29 149.29 149.29 146.56 154.24
8 6.10E-03 162.91 162.17 148.63 148.63 148.63 145.92 153.86
9 6.88E-03 162.91 162.17 147.98 147.98 147.98 145.28 153.47
10 2.19E-02 162.91 162.17 156.18 156.18 156.18 147.12 153.42
11 2.19E-02 162.91 162.17 156.18 156.18 156.18 147.12 153.42
12 2.19E-02 162.91 162.17 156.18 156.18 156.18 147.12 153.42
13 2.19E-02 162.91 162.17 156.18 156.18 156.18 147.12 153.42
14 2.19E-02 162.91 162.17 156.18 156.18 156.18 147.12 153.42
15 2.19E-02 162.91 162.17 156.18 156.18 156.18 147.12 153.42
16 2.19E-02 162.91 162.17 156.18 156.18 156.18 147.12 153.42
17 2.19E-02 162.91 162.17 156.18 156.18 156.18 147.12 153.42
18 2.19E-02 162.91 162.17 156.18 156.18 156.18 147.12 153.42
19 2.19E-02 162.91 162.17 156.18 156.18 156.18 147.12 153.42
20 2.19E-02 162.91 162.17 156.18 156.18 156.18 147.12 153.42
k is coefficient of parabolic equation y = k x2 (in vertical plane)

SLIP DISTANCE CALCULATION


Total Slip Fp (t)
CABLE AB BC CD DE EF F2 F1 d Ls
distance
1 -70.26 -47.82 119.53 377.48 391.64 156.84 142.19 8.00 2.937 10.362 151.46
2 -70.26 -63.69 -63.69 -63.69 28.03 159.19 149.95 13.00 10.393 13.818 151.81
3 -70.26 -18.06 -18.06 -18.06 37.86 153.03 148.86 6.00 2.252 12.677 151.46
4 -70.26 -13.51 -13.51 -13.51 42.13 152.23 148.09 6.00 1.732 12.157 151.03
5 -70.26 -1.19 -1.19 -1.19 46.64 151.05 147.61 5.00 0.150 11.575 150.94
6 -70.26 3.29 3.29 3.29 50.88 162.17 150.33 10.43 10.169 11.169 150.62
7 -70.26 16.20 16.20 16.20 55.46 162.17 149.29 11.43 10.209 11.209 150.66
8 -70.26 20.59 20.59 20.59 59.68 162.17 148.63 11.43 9.937 10.937 150.39
9 -70.26 24.95 24.95 24.95 63.86 162.17 147.98 11.43 9.686 10.686 150.14
10 -70.26 -57.02 -57.02 -57.02 32.96 156.18 147.12 13.00 9.814 13.239 149.34
11 -70.26 -57.02 -57.02 -57.02 32.96 156.18 147.12 13.00 9.814 13.239 149.34
12 -70.26 -57.02 -57.02 -57.02 32.96 156.18 147.12 13.00 9.814 13.239 149.34
13 -70.26 -57.02 -57.02 -57.02 32.96 156.18 147.12 13.00 9.814 13.239 149.34
14 -70.26 -57.02 -57.02 -57.02 32.96 156.18 147.12 13.00 9.814 13.239 149.34
15 -70.26 -57.02 -57.02 -57.02 32.96 156.18 147.12 13.00 9.814 13.239 149.34
16 -70.26 -57.02 -57.02 -57.02 32.96 156.18 147.12 13.00 9.814 13.239 149.34
17 -70.26 -57.02 -57.02 -57.02 32.96 156.18 147.12 13.00 9.814 13.239 149.34
18 -70.26 -57.02 -57.02 -57.02 32.96 156.18 147.12 13.00 9.814 13.239 149.34
19 -70.26 -57.02 -57.02 -57.02 32.96 156.18 147.12 13.00 9.814 13.239 149.34
20 -70.26 -57.02 -57.02 -57.02 32.96 156.18 147.12 13.00 9.814 13.239 149.34
FORCES IN CABLES AFTER SLIP
Cable F6-6 (t) F5-5 (t) F4-4 (t) F3-3 (t) F2-2 (t) F1-1 (t) Avg. Elongatio
Force (t) n (mm)
1 140.01 140.76 146.08 142.19 128.91 128.32 140.35 155.17
2 140.70 141.45 144.42 144.42 144.42 149.95 146.19 111.22
3 140.02 140.76 149.90 149.90 149.90 148.86 146.51 110.87
4 139.16 139.90 149.84 149.84 149.84 148.09 146.04 110.51
5 138.97 139.72 150.84 150.84 150.84 147.61 146.12 110.37
6 138.32 139.07 150.33 150.33 150.33 146.91 145.53 110.06
7 138.40 139.15 149.29 149.29 149.29 146.56 144.79 110.02
8 137.87 138.62 148.63 148.63 148.63 145.92 144.19 109.75
9 137.37 138.12 147.98 147.98 147.98 145.28 143.60 109.48
10 135.76 136.51 142.49 142.49 142.49 147.12 143.49 109.45
11 135.76 136.51 142.49 142.49 142.49 147.12 143.49 109.45
12 135.76 136.51 142.49 142.49 142.49 147.12 143.49 109.45
13 135.76 136.51 142.49 142.49 142.49 147.12 143.49 109.45
14 135.76 136.51 142.49 142.49 142.49 147.12 143.49 109.45
15 135.76 136.51 142.49 142.49 142.49 147.12 143.49 109.45
16 135.76 136.51 142.49 142.49 142.49 147.12 143.49 109.45
17 135.76 136.51 142.49 142.49 142.49 147.12 143.49 109.45
18 135.76 136.51 142.49 142.49 142.49 147.12 143.49 109.45
19 135.76 136.51 142.49 142.49 142.49 147.12 143.49 109.45
20 135.76 136.51 142.49 142.49 142.49 147.12 143.49 109.45

FORCES IN CABLES AT SECTION 1-1 (MIDSPAN) AFTER SLIP


Cable no Stage Length of j f Co-ord P Pcosj Psinj M
cable from (rad) (rad) from (t) (t) (t) (tm)
midspan bottom
1 2 0.00 0.00 0.00 0.115 128.32 128.32 0.00 14.757
2 2 0.00 0.00 0.00 0.115 149.95 149.95 0.00 17.245
3 1 0.00 0.00 0.00 0.115 148.86 148.86 0.00 17.119
4 1 0.00 0.00 0.00 0.265 148.09 148.09 0.00 39.243
5 1 0.00 0.00 0.00 0.415 147.61 147.61 0.00 61.260
6 1 0.00 0.00 0.00 0.565 146.91 146.91 0.00 83.004
7 2 0.00 0.00 0.00 0.715 146.56 146.56 0.00 104.793
8 2 0.00 0.00 0.00 0.865 145.92 145.92 0.00 126.222
9 0 0.00 0.00 0.00 0.000 145.28 145.28 0.00 0.000
10 0 0.00 0.00 0.00 0.000 147.12 147.12 0.00 0.000
11 0 0.00 0.00 0.00 0.000 147.12 147.12 0.00 0.000
12 0 0.00 0.00 0.00 0.000 147.12 147.12 0.00 0.000
13 0 0.00 0.00 0.00 0.000 147.12 147.12 0.00 0.000
14 0 0.00 0.00 0.00 0.000 147.12 147.12 0.00 0.000
15 0 0.00 0.00 0.00 0.000 147.12 147.12 0.00 0.000
16 0 0.00 0.00 0.00 0.000 147.12 147.12 0.00 0.000
17 0 0.00 0.00 0.00 0.000 147.12 147.12 0.00 0.000
18 0 0.00 0.00 0.00 0.000 147.12 147.12 0.00 0.000
19 0 0.00 0.00 0.00 0.000 147.12 147.12 0.00 0.000
20 0 0.00 0.00 0.00 0.000 147.12 147.12 0.00 0.000
j is angle of cable in vertical plane w.r.t. soffit slab
f is angle of cable in horizontal plane

Stage 1 Total horizontal force = 591.5 t


ecc wrt bottom = 0.339 m
Total vertical force = 0.000 t

Stage 2 Total horizontal force = 570.8 t


ecc wrt bottom = 0.461 m
Total vertical force = 0.00 t

FORCES IN CABLES AT SECTION 2-2 (THREE EIGHTH SECTION) AFTER SLIP


4.019 m (From Midspan) & 12.406 m (From Support)

Cable no Stage Length j f Co-ord P Pcosj Psinj M


from (rad) (rad) from (t) (t) (t) (tm)
midspan bottom
1 2 4.019 0.0000 0.302 0.115 140.96 140.96 0.00 16.210
2 2 4.019 0.0000 0.000 0.115 150.86 150.86 0.00 17.349
3 1 4.019 0.0000 0.000 0.115 151.29 151.29 0.00 17.398
4 1 4.019 0.0000 0.000 0.265 150.85 150.85 0.00 39.975
5 1 4.019 0.0000 0.000 0.415 150.37 150.37 0.00 62.403
6 1 4.019 0.0000 0.000 0.565 149.65 149.65 0.00 84.553
7 2 4.019 0.0002 0.000 0.715 149.31 149.31 0.03 106.754
8 2 4.019 0.0002 0.000 0.865 148.65 148.65 0.03 128.585
9 0 4.019 0.0003 0.000 0.000 148.01 148.01 0.04 0.000
10 0 4.019 0.0000 0.000 0.000 148.81 148.81 0.00 0.000
11 0 4.019 0.0000 0.000 0.000 148.81 148.81 0.00 0.000
12 0 4.019 0.0000 0.000 0.000 148.81 148.81 0.00 0.000
13 0 4.019 0.0000 0.000 0.000 148.81 148.81 0.00 0.000
14 0 4.019 0.0000 0.000 0.000 148.81 148.81 0.00 0.000
15 0 4.019 0.0000 0.000 0.000 148.81 148.81 0.00 0.000
16 0 4.019 0.0000 0.000 0.000 148.81 148.81 0.00 0.000
17 0 4.019 0.0000 0.000 0.000 148.81 148.81 0.00 0.000
18 0 4.019 0.0000 0.000 0.000 148.81 148.81 0.00 0.000
19 0 4.019 0.0000 0.000 0.000 148.81 148.81 0.00 0.000
20 0 4.019 0.0000 0.000 0.000 148.81 148.81 0.00 0.000

Stage 1 Total horizontal force = 602.2 t


ecc wrt bottom = 0.339 m
Total vertical force = 0.000 t

Stage 2 Total horizontal force = 589.8 t


ecc wrt bottom = 0.456 m
Total vertical force = 0.06 t

FORCES IN CABLES AT SECTION 3-3 (ONE FOURTH SECTION) AFTER SLIP


8.038 m (From Midspan) & 8.388 m (From Support)

Cable Stage Length j f Co-ord P Pcosj Psinj M


from (rad) (rad) from (t) (t) (t) (tm)
midspan bottom
1 2 5.000 0.000 0.433 0.115 146.30 146.30 0.00 16.825
2 2 8.038 0.000 0.000 0.115 148.01 148.01 0.00 17.021
3 1 8.038 0.013 0.000 0.128 147.97 147.96 1.88 18.926
4 1 8.038 0.017 0.000 0.283 147.74 147.72 2.54 41.737
5 1 8.038 0.027 0.000 0.456 147.68 147.63 3.98 67.311
6 1 8.038 0.033 0.000 0.615 147.55 147.47 4.81 90.620
7 2 8.038 0.043 0.000 0.802 147.59 147.45 6.33 118.202
8 2 8.038 0.049 0.000 0.964 147.50 147.32 7.25 142.071
9 0 8.038 0.055 0.000 0.000 147.42 147.19 8.18 0.000
10 0 8.038 0.000 0.000 0.000 152.66 152.66 0.00 0.000
11 0 8.038 0.000 0.000 0.000 152.66 152.66 0.00 0.000
12 0 8.038 0.000 0.000 0.000 152.66 152.66 0.00 0.000
13 0 8.038 0.000 0.000 0.000 152.66 152.66 0.00 0.000
14 0 8.038 0.000 0.000 0.000 152.66 152.66 0.00 0.000
15 0 8.038 0.000 0.000 0.000 152.66 152.66 0.00 0.000
16 0 8.038 0.000 0.000 0.000 152.66 152.66 0.00 0.000
17 0 8.038 0.000 0.000 0.000 152.66 152.66 0.00 0.000
18 0 8.038 0.000 0.000 0.000 152.66 152.66 0.00 0.000
19 0 8.038 0.000 0.000 0.000 152.66 152.66 0.00 0.000
20 0 8.038 0.000 0.000 0.000 152.66 152.66 0.00 0.000

Stage 1 Total horizontal force = 590.8 t


ecc wrt bottom = 0.370 m
Total vertical force = 13.21 t

Stage 2 Total horizontal force = 589.1 t


ecc wrt bottom = 0.499 m
Total vertical force = 6.33 t
FORCES IN CABLES AT SECTION 4-4 (ONE EIGHTH SECTION) AFTER SLIP
12.056 m (From Midspan) & 4.369 m (From Support)

Cable Stage Length j f Co-ord P Pcosj Psinj M


from (rad) (rad) from (t) (t) (tm)
midspan bottom
1 2 12.056 0.0073 0.490 0.126 149.33 149.325 1.096 18.8
2 2 12.056 0.0000 0.000 0.115 145.11 145.110 0.000 16.7
3 1 12.056 0.0377 0.000 0.229 144.09 143.987 5.426 33.0
4 1 12.056 0.0511 0.000 0.420 143.52 143.336 7.336 60.2
5 1 12.056 0.0626 0.000 0.636 143.40 143.118 8.966 91.0
6 1 12.056 0.0756 0.000 0.832 142.99 142.580 10.796 118.6
7 2 12.056 0.0854 0.000 1.060 143.05 142.526 12.202 151.1
8 2 12.056 0.0979 0.000 1.261 142.72 142.040 13.951 179.1
9 0 12.056 0.1104 0.000 0.000 142.42 141.550 15.688 0.0
10 0 12.056 0.0000 0.000 0.000 155.50 155.504 0.000 0.0
11 0 12.056 0.0000 0.000 0.000 155.50 155.504 0.000 0.0
12 0 12.056 0.0000 0.000 0.000 155.50 155.504 0.000 0.0
13 0 12.056 0.0000 0.000 0.000 155.50 155.504 0.000 0.0
14 0 12.056 0.0000 0.000 0.000 155.50 155.504 0.000 0.0
15 0 12.056 0.0000 0.000 0.000 155.50 155.504 0.000 0.0
16 0 12.056 0.0000 0.000 0.000 155.50 155.504 0.000 0.0
17 0 12.056 0.0000 0.000 0.000 155.50 155.504 0.000 0.0
18 0 12.056 0.0000 0.000 0.000 155.50 155.504 0.000 0.0
19 0 12.056 0.0000 0.000 0.000 155.50 155.504 0.000 0.0
20 0 12.056 0.0000 0.000 0.000 155.50 155.504 0.000 0.0

Stage 1 Total horizontal force = 573.02 t


ecc wrt bottom = 0.529 m
Total vertical force = 32.524 t

Stage 2 Total horizontal force = 579.0 t


ecc wrt bottom = 0.632 m
Total vertical force = 27.250 t

FORCES IN CABLES AT SECTION 5-5 (AT SUPPORT) AFTER SLIP


16.075 m (From Midspan) & 0.350 m (From Support)

Cable no Stage Length j f Co-ord P Pcosj Psinj M


from (rad) (rad) from (t) (t) (t) (tm)
midspan bottom
1 2 16.075 0.015 0.490 0.175 146.15 146.13 2.25 25.5
2 2 16.075 0.029 0.000 0.170 140.96 140.90 4.14 23.9
3 1 16.075 0.059 0.000 0.429 140.28 140.04 8.21 60.1
4 1 16.075 0.079 0.000 0.692 139.42 138.98 11.07 96.2
5 1 16.075 0.092 0.000 0.958 139.24 138.64 12.83 132.8
6 1 16.075 0.111 0.000 1.221 138.58 137.73 15.41 168.1
7 2 16.075 0.121 0.000 1.488 138.66 137.65 16.71 204.8
8 2 16.075 0.138 0.000 1.751 138.14 136.82 19.06 239.6
9 0 16.075 0.156 0.000 0.000 137.63 135.96 21.37 0.0
10 0 16.075 0.106 0.000 0.000 162.65 161.74 17.18 0.0
11 0 16.075 0.106 0.000 0.000 162.65 161.74 17.18 0.0
12 0 16.075 0.106 0.000 0.000 162.65 161.74 17.18 0.0
13 0 16.075 0.106 0.000 0.000 162.65 161.74 17.18 0.0
14 0 16.075 0.106 0.000 0.000 162.65 161.74 17.18 0.0
15 0 16.075 0.106 0.000 0.000 162.65 161.74 17.18 0.0
16 0 16.075 0.106 0.000 0.000 162.65 161.74 17.18 0.0
17 0 16.075 0.106 0.000 0.000 162.65 161.74 17.18 0.0
18 0 16.075 0.106 0.000 0.000 162.65 161.74 17.18 0.0
19 0 16.075 0.106 0.000 0.000 162.65 161.74 17.18 0.0
20 0 16.075 0.106 0.000 0.000 162.65 161.74 17.18 0.0

Stage 1 Total horiontal force = 555.4 t


ecc wrt bottom = 0.823 m
Total vertical force = 47.52 t

Stage 2 Total horiontal force = 561.5 t


ecc wrt bottom = 0.879 m
Total vertical force = #REF! t
FORCES IN CABLES AT SECTION 6-6 (JACKING END) AFTER SLIP
16.425 m (From Midspan)

Cable Stage Length j f Co-ord P Pcosj Psinj M


from (rad) (rad) from (t) (t) (t) (tm)
midspan bottom
1 2 16.425 0.015 0.490 0.180 145.89 145.88 2.25 26.3
2 2 16.425 0.029 0.000 0.180 140.70 140.64 4.13 25.3
3 1 16.425 0.059 0.000 0.450 140.02 139.78 8.20 62.9
4 1 16.425 0.079 0.000 0.720 139.16 138.72 11.05 99.9
5 1 16.425 0.092 0.000 0.990 138.97 138.38 12.81 137.0
6 1 16.425 0.111 0.000 1.260 138.32 137.47 15.38 173.2
7 2 16.425 0.121 0.000 1.530 138.40 137.39 16.68 210.2
8 2 16.425 0.138 0.000 1.800 137.87 136.56 19.02 245.8
9 0 16.425 0.156 0.000 0.000 137.37 135.70 21.33 0.0
10 0 16.425 0.106 0.000 0.000 135.76 135.00 14.34 0.0
11 0 16.425 0.106 0.000 0.000 135.76 135.00 14.34 0.0
12 0 16.425 0.106 0.000 0.000 135.76 135.00 14.34 0.0
13 0 16.425 0.106 0.000 0.000 135.76 135.00 14.34 0.0
14 0 16.425 0.106 0.000 0.000 135.76 135.00 14.34 0.0
15 0 16.425 0.106 0.000 0.000 135.76 135.00 14.34 0.0
16 0 16.425 0.106 0.000 0.000 135.76 135.00 14.34 0.0
17 0 16.425 0.106 0.000 0.000 135.76 135.00 14.34 0.0
18 0 16.425 0.106 0.000 0.000 135.76 135.00 14.34 0.0
19 0 16.425 0.106 0.000 0.000 135.76 135.00 14.34 0.0
20 0 16.425 0.106 0.000 0.000 135.76 135.00 14.34 0.0

Stage 1 Total horizontal force = 554.34 t


ecc wrt bottom = 0.853 m
Total vertical force = 47.432 t
Stage 2 Total horizontal force = 560.46 t
ecc wrt bottom = 0.906 m
Total vertical force = 42.085 t
e = 0.880 m
CABLE PROFILE CO-ORDINATES
a = Horr. b = Horr. c = Horr.
d= h3 = Y
Length Length Length angle
Length H = Y co- co- m = plan
Cable of of of plan
je=jf
inclined parabolic bend.
of strait ordinate At ordinate bending k (degre
No. Port- ion jacking end At mid in m.
Portion Portion Portion e)
in m. span
in m. in m. in m.
1 1.000 6.425 8.000 1.000 0.180 0.115 1.000 1.2E-03 0.260 14.920
2 1.000 2.425 0.000 13.000 0.180 0.115 0.000 6.1E-03 0.029 1.683
3 1.000 9.425 0.000 6.000 0.450 0.115 0.000 3.1E-03 0.059 3.356
4 1.000 9.425 0.000 6.000 0.720 0.265 0.000 4.2E-03 0.079 4.554
5 1.000 10.425 0.000 5.000 0.990 0.415 0.000 4.4E-03 0.092 5.288
6 1.000 10.425 0.000 5.000 1.260 0.565 0.000 5.4E-03 0.111 6.383
7 1.000 11.425 0.000 4.000 1.530 0.715 0.000 5.3E-03 0.121 6.923
8 1.000 11.425 0.000 4.000 1.800 0.865 0.000 6.1E-03 0.138 7.930
9 1.000 11.425 0.000 4.000 2.070 1.015 0.000 6.9E-03 0.156 8.932

Y- ORDINATES CORRESPONDING VALUE OF X

X= 0.000 1.000 2.000 3.000 4.000 5.000 6.000 7.000 8.000 9.000 10.000 11.000 12.000 13.000 14.000 14.945 15.945
1 0.115 0.115 0.116 0.120 0.126 0.134 0.145 0.158 0.308 0.718 1.389 2.320 3.511 4.963 6.675 8.633 10.85
2 0.115 0.115 0.115 0.115 0.115 0.115 0.115 0.115 0.115 0.115 0.115 0.115 0.115 0.115 0.121 0.138 0.15
3 0.115 0.115 0.115 0.115 0.115 0.115 0.115 0.118 0.127 0.143 0.165 0.193 0.227 0.267 0.314 0.364 0.39
4 0.265 0.265 0.265 0.265 0.265 0.265 0.265 0.269 0.282 0.303 0.333 0.371 0.417 0.472 0.535 0.603 0.64
5 0.415 0.415 0.415 0.415 0.415 0.415 0.419 0.433 0.455 0.486 0.526 0.575 0.633 0.699 0.775 0.854 0.90
6 0.565 0.565 0.565 0.565 0.565 0.565 0.570 0.586 0.613 0.651 0.699 0.758 0.828 0.908 1.000 1.096 1.15
7 0.715 0.715 0.715 0.715 0.715 0.720 0.736 0.763 0.800 0.848 0.906 0.975 1.055 1.145 1.246 1.352 1.41
8 0.865 0.865 0.865 0.865 0.865 0.871 0.889 0.920 0.963 1.017 1.084 1.164 1.255 1.359 1.475 1.595 1.67
9 1.015 1.015 1.015 1.015 1.015 1.022 1.043 1.077 1.125 1.187 1.263 1.352 1.455 1.572 1.703 1.839 1.92

straghit parabola straghit end ht. mid ht. angle


1 1.000 6.425 1.000 0.180 0.115 14.920
2 1.000 2.425 13.000 0.180 0.115 1.683
3 1.000 9.425 6.000 0.450 0.115 3.356
4 1.000 9.425 6.000 0.720 0.265 4.554
5 1.000 10.425 5.000 0.990 0.415 5.288
NOTE NO. 201/DN - 01/R-1 SHEET NO.

STRESS CHECK AT VARIOUS SECTIONS

Type of cable = 12-T-13


Area of each cable = 1184.4 sq.mm
UTS of one cable = 224.7 t
Jacking stress = 72.5% of UTS
Jacking force = 162.91 t
Modulus of Elasticity of =
HTS, Es = 1.95E+05 MPa = 1.99E+07 t/m2
Grade of concrete = M - 40
fck = 40 N/mm2
Modulus of Elasticity of = 5700x(fck)1/2
Concrete, Ec
= 3.22E+04 MPa = 3.29E+06 t/m2 (At 4th Day)
3.60E+04 MPa = 3.68E+06 t/m2 (At 28th Day)

The girders shall be cast on the ground near bridge site. The stressing shall be done when cube
strength of concrete reached 32 MPa. Thereafter the girders will be launched / shifted to the bridge
location and placed on permanent bearings and deck slab & diaphragm shall be casted.

fcj at release = 32 MPa


Maturity of concrete at the time of release as % of f ck = 80.00 %
Ec = 5700x(fcj)1/2 = 3.22E+04 MPa = 3.29E+06 t/m2

Creep strain (per 10MPa) as per Table 2 of IRC:18 - 2000


From 4th day (80% maturity) to 28th day (100% maturity)
Creep strain for 80% maturity 0.000510
Creep strain for 100% maturity 0.000400
Differential Creep strain between 4th and 28th day = 0.000110
Residual Creep strain 28th day onward = 0.000400

Residual shrinkage strain as per Table 3 of IRC:18 - 2000


Residual Shrinkage strain (es) at 4th day = 0.00041
Residual Shrinkage strain (es) at 28th day = 0.00019
Therefore, Shrinkage strain (es)between 4th & 28th day 0.00022
Residual Shrinkage strain 28th day onward 0.00019

Loss due to Relaxation for low Relaxation steel as per Table 4A of IRC:18 - 2000
at average initial force of 0.5 fp is 0 MPa
at average initial force of 0.7 fp is 97 MPa
at average initial force of 0.8 fp is 200 MPa
NOTE NO. 201/DN - 01/R-1 SHEET NO.

STRESS CHECK AT MID SPAN (SEC. 1-1)

No. of cables in first layer = 3 at 115 mm from bottom


No. of cables in second layer = 1 at 265 mm from bottom
No. of cables in third layer = 1 at 415 mm from bottom
No. of cables in Fourth layer = 1 at 565 mm from bottom
No. of cables in Fifth layer = 1 at 715 mm from bottom
No. of cables in sixth layer = 1 at 865 mm from bottom
Total No. of cables in 1st stage = 4
Total No. of cables in 2nd stage = 4

At first stage 4 cables has been stressed and rest are stressed in second stage.

STAGE-I (4 TH DAY)

Net ecc. of cables from bottom, eb = 0.339 m


Eccentricity of cables from c.g., e = 0.850 m
Sectional Modulus at C.G. of cables, Zc = 0.743 m3
(for precast girder only)

B.M. due to S.Wt. of the girder Md = 319.02 tm


B.M.due to Cast in Situ slab Mc = 355.90 tm
Prestressing force ( after friction and slip losses ) , P = 591.47 t
Moment due to P, Mp = P x e = 502.50 tm

Stresses due to self weight of the girder


st = 319.02 = 535.99 t/m2
0.595
sc = 319.02 = -429.10 t/m2
0.743
sb = 319.02 = -600.42 t/m2
0.531

Stresses due to prestress at transfer stage


st = 591.47 - 502.50 = -255.4 t/m2
1.004 0.595
sc = 591.47 + 502.50 = 1264.79 t/m2
1.004 0.743
sb = 591.47 + 502.50 = 1534.6 t/m2
1.004 0.531

Losses due to Elastic Shortening


Loss due to Elastic Shortening = 0.5 x s x Es/Ec

Stresses due to initial prestress & self weight of the girder


st = 536.0 + -255.4 = 280.6 t/m2
sc = -429.1 + 1264.8 = 835.7 t/m2
sb = -600.4 + 1534.6 = 934.2 t/m2

mid
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Therefore, initial loss = 2525 t/m2


(i.e. Elastic Shortening loss) = 11.96 t = 1.84 % of Jacking Force

Prestressing force after initial losses Pi = 579.51 t


Moment due to Pi = Mpi = Pi x e = 492.34 tm

Loss due to Shrinkage of Concrete = e s x Es


= 4373.1 t/m2
= 20.72 t = 3.18 % of Jacking Force

Loss due to relaxation of steel


The loss due to relaxation of steel depends on the stress in HTS after initial losses.
Ratio of average force to UTS = 0.712
Loss due to friction & slip = 651.643 - 591.5 = 60.2 t
% friction and slip loss = 60.2 x 100 = 9.23356 %
651.6427
Ratio of average force to UTS = 0.712 - 0.09234 = 0.619

Corresponding Relaxation Loss = 5904.4 t/m2


= 27.97 t 4.29 % of Jacking Force

Loss due to Relaxation & Shrinkage = 48.69 t


Moment due to Relaxation & Shrinkage loss = 41.367 tm

Loss due to Creep of concrete


Stresses due to Prestress after initial losses
st = 579.51 - 492.34 = -250.21 t/m2
1.004 0.595
sc = 579.51 + 492.34 = 1239.2 t/m2
1.004 0.743
sb = 579.51 + 492.34 = 1503.6 t/m2
1.004 0.531

Stresses due to prestress after initial losses & self weight of the girder
st = 536.0 + -250.2 = 285.8 t/m2
sc = -429.1 + 1239.2 = 810.1 t/m2
sb = -600.4 + 1503.6 = 903.2 t/m2

Stresses after Shrinkage and Relaxation losses


st = 285.79 - 48.69 + 41.367 = 306.81 t/m2
1.004 0.595
sc = 810.1 - 48.69 - 41.367 = 705.99 t/m2
1.004 0.743
sb = 903.18 - 48.69 - 41.367 = 776.85 t/m2
1.004 0.531
Airthmetic mean of initial and final stress between 4th = 758.05 t/m2
and 28 days at C.G. of cables
Creep loss = (s/10) x ec x Es = 1625.0 t/m2
= 7.70 t = 1.181 % of Jacking Force

Total Initial & Intermediate losses = 68.35 t = 8.34 % of Jacking Force


(i.e. losses upto 28th day)
Force after intermediate losses, Pint = 523.1 t
Moment due to Pint = Mpint = Pint x e = 444.43 tm
mid
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Effect of prestress after Intermediate loss


st = 523.1 - 444.43 = -225.9 t/m2
1.004 0.595
sc = 523.1 + 444.43 = 1118.6 t/m2
1.004 0.743
sb = 523.1 + 444.43 = 1357.3 t/m2
1.004 0.531

Stresses Due to cast-in-situ slab


st = 355.9 = 597.96 t/m2
0.595
sc = 355.9 = -478.70 t/m2
0.743
sb = 355.9 = -669.83 t/m2
0.531

RESULTANT STRESSES
Just after initial loss
536.0 -250.2 285.8 > -163.2 t/m2 (O.K.)
+ -

+ =

+
-
-600.4 1503.6 903.2 < 1632 t/m2 (O.K.)
Self wt. prestress after initial loss Refer cl. 7.1. Of IRC : 18 - 2000

After intermediate loss


536.0 -225.9 310.1 > -163.2 t/m2 (O.K.)
+ -

+ =
+ +
-
-600.4 1357.3 757 < 1632 t/m2 (O.K.)
Self weight prestress after Net effect
intermediate loss

After casting of Deck Slab


310.1 598.0 908.1
- +

+ =
+
+
-
756.9 -669.8 87.0
After Inter. Losses Cast in situ slab > -163.2 t/m2 (O.K.)

mid
NOTE NO. 201/DN - 01/R-1 SHEET NO.

STAGE-II (28 TH DAY ONWARD)

Section Modulus at top of composite section = 2.11463 m3


Section Modulus at junction of deck slab & girder Z j = 3.3870 m3
Section Modulus at C.G. of cables Zc = 0.983 m3
Section Modulus at bottom of composite section = 0.7671 m3
Composite area of deck slab + outer girder = 2.2044 m2
first stage cables
Prestressing force ( after 1st stage ) , P1 = 523.12 t
ecc. of cables from bottom, eb (Ist stage) = 0.339 m
Eccentricity of cables from c.g., e (Ist stage) = 1.495 m
second stage cables
Prestressing force ( after friction and slip losses ) , P = 570.76 t
ecc. of cables from bottom, eb (2nd stage) = 0.461 m
Eccentricity of cables from c.g., e (2nd stage) = 1.374 m

Net eccentricity of cables of 1st and 2nd stages, eb' = 0.403 m (from bottom)
Net eccentricity of cables of 1st and 2nd stages, e' = 1.432 m (from c.g.)

B.M. due to S.Wt. of the girder Md = 319.02 tm


B.M.due to Cast in Situ slab Mc = 355.90 tm
B.M. due to SIDL Ms = 394.96 tm
B.M. due to Live loads ML = 237.68 tm
B.M. due to FPLL = 133.89 tm

Prestressing force ( after 1st stage ) , P1 = 523.12 t


Moment due to Pint = Mpint = P1 x e = 782.23 tm
for second stage prestressing
Prestressing force ( after friction and slip losses ) , P = 570.76 t
Moment due to P, Mp = P x e = 784.05 tm
Total Moment = 1566.29 tm
Stresses due to self weight of the girder + cast in situ slab
st = 674.92 = 319.2 t/m2
2.115
sj = 674.92 = 199.3 t/m2
3.387
sc = 674.92 = -686.7 t/m2
0.983
sb = 674.92 = -879.9 t/m2
0.767

Stresses due to prestress ( first stage cables)


st = 523.12 - 782.23 = -132.6 t/m2
2.204 2.115
sj = 523.12 - 782.23 = 6.36026 t/m2
2.204 3.387
sc = 523.12 + 782.23 = 1033.24 t/m2
2.204 0.983
sb = 523.12 + 782.23 = 1257.1 t/m2
2.204 0.767

mid
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Stresses due to prestress (second stage cables)


st = 570.76 - 784.05 = -111.9 t/m2
2.204 2.115
sj = 570.76 - 784.05 = 27.4345 t/m2
2.204 3.387
sc = 570.76 + 784.05 = 1056.7 t/m2
2.204 0.983
sb = 570.76 + 784.05 = 1281.0 t/m2
2.204 0.767

Total Stresses due to prestress


st = 1093.88 - 1566.29 = -244.5 t/m2
2.204 2.115
sj = 1093.88 - 1566.29 = 33.7947 t/m2
2.204 3.387
sc = 1093.88 + 1566.29 = 2089.94 t/m2
2.204 0.983
sb = 1093.88 + 1566.29 = 2538.1 t/m2
2.204 0.767

Stresses due to prestress & self weight of the girder+deck slab


st = 319.2 + -244.5 = 74.7 t/m2
sj = 199.3 + 33.8 = 233.1 t/m3
sc = -686.7 + 2089.9 = 1403.2 t/m2
sb = -879.9 + 2538.1 = 1658.3 t/m2

Losses due to Elastic Shortening


Loss due to Elastic Shortening = 0.5 x s x Es/Ec
Therefore, initial loss = 3793 t/m2
(i.e. Elastic Shortening loss) = 35.94 t = 2.76 % of Jacking Force

For first stage cables


Prestressing force after initial losses Pii = 505.15 t
Moment due to Pi = Mpii = Pii x e = 755.37 tm
For second stage cables
Prestressing force after initial losses Pi = 552.79 t
Moment due to Pi = Mpi = Pi x e = 759.37 tm

Loss due to Shrinkage of Concrete = es x Es


= 3776.8 t/m2
= 35.79 t = 2.75 % of Jacking Force

mid
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Loss due to Shrinkage = 17.89 t


Moment due to Shrinkage loss = 26.756 tm

For second stage cables:


The loss due to relaxation of steel depends on the stress in HTS after initial losses.
Ratio of average force to UTS = 0.715
Loss due to friction and slip = 651.643 - 570.8 = 80.9 t
% friction and slip loss = 80.9 x 100 = 12.4123 %
651.6427
Ratio of average force to UTS = 0.715 - 0.12412 = 0.591

Corresponding Relaxation Loss = 4495.9 t/m2


= 21.30 t 3.27 % of Jacking Force

Loss due to Relaxation & Shrinkage = 39.19 t


Moment due to Relaxation & Shrinkage loss = 53.839 tm

Loss due to Creep of concrete


Stresses due to Prestress after initial losses (for first stage cable)
st = 505.15 - 755.37 = -128.05 t/m2
2.204 2.115
sj = 505.15 - 755.37 = 6.14 t/m2
2.204 3.387
sc = 505.15 + 755.37 = 997.75 t/m2
2.204 0.983
sb = 505.15 + 755.37 = 1213.88 t/m2
2.204 0.767

Stresses due to Prestress after initial losses (for second stage cable)
st = 552.79 - 759.37 = -108.33 t/m2
2.204 2.115
sj = 552.79 - 759.37 = 26.57 t/m2
2.204 3.387
sc = 552.79 + 759.37 = 1023.43 t/m2
2.204 0.983
sb = 552.79 + 759.37 = 1240.72 t/m2
2.204 0.767

mid
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Total Prestress after initial lossess


st = -128.052 + -108.334 = -236.39 t/m2
sj = 6.142 + 26.571 = 32.71 t/m2
sc = 997.75 + 1023.43 = 2021.18 t/m2
sb = 1213.88 + 1240.72 = 2454.60 t/m2

Shrinkage losses (for first stage cables)


st = -17.89 + 26.756 = 4.54 t/m2
2.204 2.115
sj = -17.89 + 26.756 = -0.22 t/m2
2.204 3.387
sc = -17.89 - 26.756 = -35.34 t/m2
2.204 0.983
sb = -17.89 - 26.756 = -43.00 t/m2
2.204 0.767

Shrinkage and Relaxation losses (for second stage cables)


st = -39.19 + 53.839 = 7.68 t/m2
2.204 2.115
sj = -39.19 + 53.839 = -1.88 t/m2
2.204 3.387
sc = -39.19 - 53.839 = -72.56 t/m2
2.204 0.983
sb = -39.19 - 53.839 = -87.97 t/m2
2.204 0.767

Total Shrinkage and Relaxation losses


st = 4.54 + 7.68 = 12.22 t/m2
sj = -0.22 + -1.88 = -2.10 t/m2
sc = -35.34 + -72.56 = -107.90 t/m2
sb = -43.00 + -87.97 = -130.96 t/m2

Stresses due to prestress after shrinkage & relaxation losses & self weight of the girder
+cast insitu deck slab
st = 319.2 + -236.4 + 12.2 = 95.00 t/m2
sj = 199.3 + 32.7 + -2.1 = 229.88 t/m2
sc = -686.7 + 2021.2 + -107.9 = 1226.54 t/m2
sb = -879.9 + 2454.6 + -131.0 = 1443.78 t/m2

Airthmetic mean of initial and final stress after 28 days = 1226.54 t/m2

Creep loss = (s/10) x ec x Es = 9561.1 t/m2


= 90.59 t = 6.951 % of Jacking Force
For first stage cables -
Total Initial & Intermediate losses = 81.16 t = 12.45 % of Jacking Force
For second stage cables -
Total Initial & Intermediate losses = 102.46 t = 15.72 % of Jacking Force

mid
NOTE NO. 201/DN - 01/R-1 SHEET NO.

For first stage cables -


Force after intermediate losses, Pint = 442.0 t
Moment due to Pint = Mpint = Pint x e = 660.88 tm
For second stage cables -
Force after intermediate losses, Pint = 468.3 t
Moment due to Pint = Mpint = Pint x e = 643.31 tm

Total prestressing force P = 910.26 t


Total moment = 1304.18 tm

Total stresses due to prestress (Just before applying SIDL)


st = 910.26 - 1304.18 = -203.8 t/m2
2.204 2.115
sj = 910.26 - 1304.18 = 27.88 t/m2
2.204 3.387
sc = 910.26 + 1304.18 = 1739.95 t/m2
2.204 0.983
sb = 910.26 + 1304.18 = 2113.1 t/m2
2.204 0.767

Stresses Due to SIDL


st = 394.96 = 186.8 t/m2
2.115
sj = 394.96 = 116.6 t/m2
3.387
sc = 394.96 = -401.9 t/m2
0.983
sb = 394.96 = -514.9 t/m2
0.767

Stresses due to prestress + DL (Girder+deck slab) + SIDL

st = 319.2 + -203.81 + 186.8 = 302.1 t/m2


sj = 199.3 + 27.88 + 116.6 = 343.8 t/m2
sc = -686.7 + 1739.95 + -401.9 = 651.3 t/m2
sb = -879.9 + 2113.12 + -514.9 = 718.4 t/m2

After laying of SIDL


-203.8 186.8 319.2 302.1
+ +
27.8832 116.6 199.3 343.8

+ + = +
+

- -

2113.1 -514.9 -879.9 718.4


SIDL DL+DECK SLAB

mid
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Stresses due to FPLL


st = 133.89 = 63.32 t/m2
2.115
sj = 133.89 = 39.53 t/m2
3.387
sc = 133.89 = -136.23 t/m2
0.983
sb = 133.89 = -174.54 t/m2
0.767

Stresses due to Live load


st = 237.68 = 112.40 t/m2
2.115
sj = 237.68 = 70.17 t/m2
3.387
sc = 237.68 = -241.84 t/m2
0.983
sb = 237.68 = -309.85 t/m2
0.767

Stresses due to Prestress + DL + SIDL + FPLL + LL


st = 302.13 + 63.32 + 112.4 = 477.8 t/m2
sj = 343.76 + 39.53 + 70.2 = 453.5 t/m2
sc = 651.34 + -136.23 + -241.8 = 273.3 t/m2
sb = 718.38 + -174.54 + -309.8 = 234.0 t/m2

302.13 63.32 112.4 477.8

343.76 + 39.53 + 70.17 453.5

+ + + = +

- -

718.38 -174.54 -309.8 234.0


Prestress + SIDL FPLL Live Load

Time dependant losses (i.e. due to relaxation of steel, shrinkage of concrete & creep of concrete)
= 204.07 t
20% extra time dependant losses = 40.81 t
Stress due to 20% extra time dependant losses at top = 9.1 t/m2
Stress due to 20% extra time dependant losses at bottom = -94.7 t/m2

477.8 9.1 487.0

453.5 +

+ + =

234.0 -94.7 139.29

mid
NOTE NO. 201/DN - 01/R-1 SHEET NO.

STRESS CHECK AT SECTION. 2-2

No. of cables in first layer = 3 at 115 mm from bottom


No. of cables in second layer = 1 at 265 mm from bottom
No. of cables in third layer = 1 at 415 mm from bottom
No. of cables in Fourth layer = 1 at 565 mm from bottom
No. of cables in Fifth layer = 1 at 715 mm from bottom
No. of cables in sixth layer = 1 at 865 mm from bottom
Total No. of cables in 1st stage = 4
Total No. of cables in 2nd stage = 4

At first stage 4 cables has been stressed and rest are stressed in second stage.

STAGE-I (4 TH DAY)

Net ecc. of cables from bottom, eb = 0.339 m


Eccentricity of cables from c.g., e = 0.849 m
Sectional Modulus at C.G. of cables, Zc = 0.744 m3
(for precast girder only)
B.M. due to S.Wt. of the girder Md = 299.62 tm
B.M.due to Cast in Situ slab Mc = 333.65 tm
Prestressing force ( after friction and slip losses ) , P = 602.16 t
Moment due to P, Mp = P x e = 511.50 tm

Stresses due to self weight of the girder


st = 299.62 = 503.39 t/m2
0.595
sc = 299.62 = -402.94 t/m2
0.744
sb = 299.62 = -563.90 t/m2
0.531

Stresses due to prestress at transfer stage


st = 602.16 - 511.50 = -259.9 t/m2
1.004 0.595
sc = 602.16 + 511.50 = 1287.43 t/m2
1.004 0.744
sb = 602.16 + 511.50 = 1562.2 t/m2
1.004 0.531

Losses due to Elastic Shortening


Loss due to Elastic Shortening = 0.5 x s x Es/Ec

Stresses due to initial prestress & self weight of the girder


st = 503.4 + -259.9 = 243.5 t/m2
sc = -402.9 + 1287.4 = 884.5 t/m2
sb = -563.9 + 1562.2 = 998.3 t/m2
Therefore, initial loss = 2673 t/m 2

(i.e. Elastic Shortening loss) = 12.66 t = 1.94 % of Jacking Force

Prestressing force after initial losses Pi = 589.49 t


Moment due to Pi = Mpi = Pi x e = 500.75 tm
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Loss due to Shrinkage of Concrete = es x E s


= 4373.1 t/m2
= 20.72 t = 3.18 % of Jacking Force

Loss due to relaxation of steel


The loss due to relaxation of steel depends on the stress in HTS after initial losses.
Ratio of average force to UTS = 0.711
Loss due to friction & slip = 651.643 - 602.2 = 49.5 t
% friction and slip loss = 49.5 x 100 = 7.59387 %
651.6427
Ratio of average force to UTS = 0.711 - 0.07594 = 0.635

Corresponding Relaxation Loss = 6677.1 t/m2


= 31.63 t 4.85 % of Jacking Force

Loss due to Relaxation & Shrinkage = 52.35 t


Moment due to Relaxation & Shrinkage loss = 44.470 tm

Loss due to Creep of concrete


Stresses due to Prestress after initial losses
st = 589.49 - 500.75 = -254.39 t/m2
1.004 0.595
sc = 589.49 + 500.75 = 1260.4 t/m2
1.004 0.744
sb = 589.49 + 500.75 = 1529.4 t/m2
1.004 0.531

Stresses due to prestress after initial losses & self weight of the girder
st = 503.4 + -254.4 = 249.0 t/m2
sc = -402.9 + 1260.4 = 857.4 t/m2
sb = -563.9 + 1529.4 = 965.5 t/m2

Stresses after Shrinkage and Relaxation losses


st = 249.01 - 52.35 + 44.470 = 271.60 t/m2
1.004 0.595
sc = 857.4 - 52.35 - 44.470 = 745.49 t/m2
1.004 0.744
sb = 965.46 - 52.35 - 44.470 = 829.65 t/m2
1.004 0.531
Airthmetic mean of initial and final stress between 4th = 801.45 t/m2
and 28 days at C.G. of cables
Creep loss = (s/10) x ec x Es = 1718.0 t/m2
= 8.14 t = 1.249 % of Jacking Force

Total Initial & Intermediate losses = 73.15 t = 11.23 % of Jacking Force


(i.e. losses upto 28th day)
Force after intermediate losses, Pint = 529.0 t
Moment due to Pint = Mpint = Pint x e = 449.36 tm
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Effect of prestress after Intermediate loss


st = 529.0 - 449.36 = -228.3 t/m2
1.004 0.595
sc = 529.0 + 449.36 = 1131.0 t/m2
1.004 0.744
sb = 529.0 + 449.36 = 1372.4 t/m2
1.004 0.531

Stresses Due to cast-in-situ slab


st = 333.6 = 560.57 t/m2
0.595
sc = 333.6 = -448.70 t/m2
0.744
sb = 333.6 = -627.94 t/m2
0.531

RESULTANT STRESSES
Just after initial loss
503.4 -254.4 249.0 > -163.2 t/m2 (O.K.)
+ -

+ =

+
-
-563.9 1529.4 965.5 < 1632 t/m2 (O.K.)
Self wt. prestress after initial loss Refer cl. 7.1. Of IRC : 18 - 2000

After intermediate loss


503.4 -228.3 275.1 > -163.2 t/m2 (O.K.)
+ -

+ =
+ +
-
-563.9 1372.4 809 < 1632 t/m2 (O.K.)
Self weight prestress after Net effect
intermediate loss

After casting of Deck Slab


275.1 560.6 835.7
- +

+ =
+
+
-
808.5 -627.9 180.6
After Inter. Losses Cast in situ slab < 1632 t/m2 (O.K.)
NOTE NO. 201/DN - 01/R-1 SHEET NO.

STAGE-II (28 TH DAY ONWARD)

Section Modulus at top of composite section = 2.11463 m3


Section Modulus at junction of deck slab & girder Zj = 3.3870 m3
Section Modulus at C.G. of cables Zc = 0.982 m3
Section Modulus at bottom of composite section = 0.7671 m3
Composite area of deck slab + outer girder = 2.2044 m2
first stage cables
Prestressing force ( after 1st stage ) , P1 = 529.00 t
ecc. of cables from bottom, eb (Ist stage) = 0.339 m
Eccentricity of cables from c.g., e (Ist stage) = 1.495 m
second stage cables
Prestressing force ( after friction and slip losses ) , P = 589.78 t
ecc. of cables from bottom, eb (2nd stage) = 0.456 m
Eccentricity of cables from c.g., e (2nd stage) = 1.379 m

Net eccentricity of cables of 1st and 2nd stages, eb' = 0.401 m (from bottom)
Net eccentricity of cables of 1st and 2nd stages, e' = 1.434 m (from c.g.)

B.M. due to S.Wt. of the girder Md = 299.62 tm


B.M.due to Cast in Situ slab Mc = 333.65 tm
B.M. due to SIDL Ms = 372.80 tm
B.M. due to Live loads ML = 219.29 tm
B.M. due to FPLL = 126.28 tm

Prestressing force ( after 1st stage ) , P1 = 529.00 t


Moment due to Pint = Mpint = P1 x e = 790.96 tm
for second stage prestressing
Prestressing force ( after friction and slip losses ) , P = 589.78 t
Moment due to P, Mp = P x e = 813.07 tm
Total prestressing force = = 1118.78 t
Total Moment = 1604.03 tm
Stresses due to self weight of the girder + cast insitu slab
st = 633.26 = 299.5 t/m2
2.115
sj = 633.26 = 187.0 t/m2
3.387
sc = 633.26 = -645.2 t/m2
0.982
sb = 633.26 = -825.5 t/m2
0.767

Stresses due to prestress ( first stage cables)


st = 529.00 - 790.96 = -134.1 t/m2
2.204 2.115
sj = 529.00 - 790.96 = 6.45221 t/m2
2.204 3.387
sc = 529.00 + 790.96 = 1045.84 t/m2
2.204 0.982
sb = 529.00 + 790.96 = 1271.1 t/m2
2.204 0.767
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Stresses due to prestress (second stage cables)


st = 589.78 - 813.07 = -116.9 t/m2
2.204 2.115
sj = 589.78 - 813.07 = 27.4973 t/m2
2.204 3.387
sc = 589.78 + 813.07 = 1095.93 t/m2
2.204 0.982
sb = 589.78 + 813.07 = 1327.5 t/m2
2.204 0.767

Total Stresses due to prestress


st = 1118.78 - 1604.03 = -251.0 t/m2
2.204 2.115
sj = 1118.78 - 1604.03 = 33.9496 t/m2
2.204 3.387
sc = 1118.78 + 1604.03 = 2141.76 t/m2
2.204 0.982
sb = 1118.78 + 1604.03 = 2598.6 t/m2
2.204 0.767

Stresses due to prestress & self weight of the girder+deck slab


st = 299.5 + -251.0 = 48.5 t/m2
sj = 187.0 + 33.9 = 220.9 t/m3
sc = -645.2 + 2141.8 = 1496.6 t/m2
sb = -825.5 + 2598.6 = 1773.1 t/m2

Losses due to Elastic Shortening


Loss due to Elastic Shortening = 0.5 x s x Es/Ec
Therefore, initial loss = 4045 t/m2
(i.e. Elastic Shortening loss) = 38.33 t = 2.94 % of Jacking Force

Prestressing force after initial losses Pii = 509.84 t


Moment due to Pi = Mpii = Pii x e = 762.31 tm
Prestressing force after initial losses Pi = 570.62 t
Moment due to Pi = Mpi = Pi x e = 786.65 tm

Loss due to Shrinkage of Concrete = es x E s


= 3776.8 t/m2
= 35.79 t = 2.75 % of Jacking Force

Loss due to relaxation of steel


For first stage cable:
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Loss due to Shrinkage = 17.89 t


Moment due to Shrinkage loss = 26.753 tm

For second stage cables:


The loss due to relaxation of steel depends on the stress in HTS after initial losses.
Ratio of average force to UTS = 0.714
Loss due to friction and slip = 651.643 - 589.8 = 61.9 t
% friction and slip loss = 61.9 x 100 = 9.49333 %
651.6427
Ratio of average force to UTS = 0.714 - 0.09493 = 0.619

Corresponding Relaxation Loss = 5907.0 t/m2


= 27.99 t 4.29 % of Jacking Force

Loss due to Relaxation & Shrinkage = 45.88 t


Moment due to Relaxation & Shrinkage loss = 63.247 tm

Loss due to Creep of concrete


Stresses due to Prestress after initial losses (for first stage cable)
st = 509.84 - 762.31 = -129.21 t/m2
2.204 2.115
sj = 509.84 - 762.31 = 6.22 t/m2
2.204 3.387
sc = 509.84 + 762.31 = 1007.95 t/m2
2.204 0.982
sb = 509.84 + 762.31 = 1225.06 t/m2
2.204 0.767

Stresses due to Prestress after initial losses (for second stage cable)
st = 570.62 - 786.65 = -113.15 t/m2
2.204 2.115
sj = 570.62 - 786.65 = 26.60 t/m2
2.204 3.387
sc = 570.62 + 786.65 = 1060.31 t/m2
2.204 0.982
sb = 570.62 + 786.65 = 1284.36 t/m2
2.204 0.767

Total Prestress after initial lossess


st = -129.209 + -113.147 = -242.36 t/m2
sj = 6.218 + 26.604 = 32.82 t/m2
sc = 1007.95 + 1060.31 = 2068.26 t/m2
sb = 1225.06 + 1284.36 = 2509.42 t/m2

Shrinkage losses (for first stage cables)


st = -17.89 + 26.753 = 4.53 t/m2
2.204 2.115
sj = -17.89 + 26.753 = -0.22 t/m2
2.204 3.387
sc = -17.89 - 26.753 = -35.37 t/m2
2.204 0.982
sb = -17.89 - 26.753 = -42.99 t/m2
2.204 0.767
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Shrinkage and Relaxation losses (for second stage cables)


st = -45.88 + 63.247 = 9.10 t/m2
2.204 2.115
sj = -45.88 + 63.247 = -2.14 t/m2
2.204 3.387
sc = -45.88 - 63.247 = -85.25 t/m2
2.204 0.982
sb = -45.88 - 63.247 = -103.26 t/m2
2.204 0.767

Total Shrinkage and Relaxation losses


st = 4.53 + 9.10 = 13.63 t/m2
sj = -0.22 + -2.14 = -2.36 t/m2
sc = -35.37 + -85.25 = -120.62 t/m2
sb = -42.99 + -103.26 = -146.26 t/m2

Stresses due to prestress after shrinkage & relaxation losses & self weight of the girder
+cast insitu deck slab
st = 299.5 + -242.4 + 13.6 = 70.74 t/m2
sj = 187.0 + 32.8 + -2.4 = 217.43 t/m2
sc = -645.2 + 2068.3 + -120.6 = 1302.45 t/m2
sb = -825.5 + 2509.4 + -146.3 = 1537.62 t/m2

Airthmetic mean of initial and final stress after 28 days = 1302.45 t/m2

Creep loss = (s/10) x ec x Es = 10152.8 t/m2


= 96.20 t = 7.381 % of Jacking Force
For first stage cables -
Total Initial & Intermediate losses = 85.16 t = 13.07 % of Jacking Force
For second stage cables -
Total Initial & Intermediate losses = 113.14 t = 17.36 % of Jacking Force

For first stage cables -


Force after intermediate losses, Pint = 443.8 t
Moment due to Pint = Mpint = Pint x e = 663.64 tm
For second stage cables -
Force after intermediate losses, Pint = 476.6 t
Moment due to Pint = Mpint = Pint x e = 657.09 tm

Total prestressing force P = 920.49 t


Total moment = 1320.73 tm

Total stresses due to prestress (Just before applying SIDL)


st = 920.49 - 1320.73 = -207.0 t/m2
2.204 2.115
sj = 920.49 - 1320.73 = 27.64 t/m2
2.204 3.387
sc = 920.49 + 1320.73 = 1763.17 t/m2
2.204 0.982
sb = 920.49 + 1320.73 = 2139.3 t/m2
2.204 0.767
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Stresses Due to SIDL


st = 372.80 = 176.3 t/m2
2.115
sj = 372.80 = 110.1 t/m2
3.387
sc = 372.80 = -379.8 t/m2
0.982
sb = 372.80 = -486.0 t/m2
0.767

Stresses due to prestress + DL (Girder+deck slab) + SIDL

st = 299.5 + -207.00 + 176.3 = 268.8 t/m2


sj = 187.0 + 27.64 + 110.1 = 324.7 t/m2
sc = -645.2 + 1763.17 + -379.8 = 738.2 t/m2
sb = -825.5 + 2139.33 + -486.0 = 827.8 t/m2

After laying of SIDL


-207.0 176.3 299.5 268.8
+ +
27.6359 110.1 187.0 324.7

+ + = +
+

- -

2139.3 -486.0 -825.5 827.8


SIDL DL+DECK SLAB

Stresses due to FPLL


st = 126.28 = 59.72 t/m2
2.115
sj = 126.28 = 37.28 t/m2
3.387
sc = 126.28 = -128.66 t/m2
0.982
sb = 126.28 = -164.62 t/m2
0.767

Stresses due to Live load


st = 219.29 = 103.70 t/m2
2.115
sj = 219.29 = 64.74 t/m2
3.387
sc = 219.29 = -223.42 t/m2
0.982
sb = 219.29 = -285.87 t/m2
0.767

Stresses due to Prestress + DL + SIDL + FPLL + LL


st = 268.77 + 59.72 + 103.7 = 432.2 t/m2
sj = 324.67 + 37.28 + 64.7 = 426.7 t/m2
sc = 738.16 + -128.66 + -223.4 = 386.1 t/m2
sb = 827.78 + -164.62 + -285.9 = 377.3 t/m2
NOTE NO. 201/DN - 01/R-1 SHEET NO.

268.77 59.72 103.7 432.2

324.67 + 37.28 + 64.74 426.7

+ + + = +

- -

827.78 -164.62 -285.9 377.3


Prestress + SIDL FPLL Live Load

Time dependant losses (i.e. due to relaxation of steel, shrinkage of concrete& creep of concrete)
= 223.00 t
20% extra time dependant losses = 44.60 t
Stress due to 20% extra time dependant losses at top = 10.0 t/m2
Stress due to 20% extra time dependant losses at bottom = -103.6 t/m2

432.2 10.0 442.2

426.7 +

+ + =

377.3 -103.6 273.69


NOTE NO. 201/DN - 01/R-1 SHEET NO.

STRESS CHECK AT SECTION. 3-3

No. of cables in first layer = 2 at 115 mm from bottom


No. of cables in second layer = 1 at 128 mm from bottom
No. of cables in third layer = 1 at 283 mm from bottom
No. of cables in Fourth layer = 1 at 456 mm from bottom
No. of cables in Fifth layer = 1 at 615 mm from bottom
No. of cables in sixth layer = 1 at 802 mm from bottom
No. of cables in seventh layer = 1 at 964 mm from bottom
Total No. of cables in 1st stage = 4
Total No. of cables in 2nd stage = 4

At first stage 4 cables has been stressed and rest are stressed in second stage.

STAGE-I (4 TH DAY)

Net ecc. of cables from bottom, eb = 0.370 m


Eccentricity of cables from c.g., e = 0.819 m
Sectional Modulus at C.G. of cables, Zc = 0.771 m3
(for precast girder only)
B.M. due to S.Wt. of the girder Md = 241.41 tm
B.M.due to Cast in Situ slab Mc = 266.88 tm
Prestressing force ( after friction and slip losses ) , P = 590.77 t
Moment due to P, Mp = P x e = 483.70 tm

Stresses due to self weight of the girder


st = 241.41 = 405.60 t/m2
0.595
sc = 241.41 = -312.93 t/m2
0.771
sb = 241.41 = -454.35 t/m2
0.531

Stresses due to prestress at transfer stage


st = 590.77 - 483.70 = -224.5 t/m2
1.004 0.595
sc = 590.77 + 483.70 = 1215.2 t/m2
1.004 0.771
sb = 590.77 + 483.70 = 1498.6 t/m2
1.004 0.531

Losses due to Elastic Shortening


Loss due to Elastic Shortening = 0.5 x s x Es/Ec

Stresses due to initial prestress & self weight of the girder


st = 405.6 + -224.5 = 181.1 t/m2
sc = -312.9 + 1215.2 = 902.3 t/m2
sb = -454.3 + 1498.6 = 1044.2 t/m2

Therefore, initial loss = 2727 t/m2


(i.e. Elastic Shortening loss) = 12.92 t = 1.98 % of Jacking Force

Prestressing force after initial losses P i = 577.86 t


Moment due to Pi = Mpi = Pi x e = 473.13 tm
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Loss due to Shrinkage of Concrete = es x E s


= 4373.1 t/m2
= 20.72 t = 3.18 % of Jacking Force
Loss due to relaxation of steel
The loss due to relaxation of steel depends on the stress in HTS after initial losses.
Ratio of average force to UTS = 0.711
Loss due to friction & slip = 651.643 - 590.8 = 60.9 t
% friction and slip loss = 60.9 x 100 = 9.34084 %
651.6427
Ratio of average force to UTS = 0.711 - 0.09341 = 0.617

Corresponding Relaxation Loss = 5798.9 t/m2


= 27.47 t 4.22 % of Jacking Force

Loss due to Relaxation & Shrinkage = 48.19 t


Moment due to Relaxation & Shrinkage loss = 39.457 tm

Loss due to Creep of concrete


Stresses due to Prestress after initial losses
st = 577.86 - 473.13 = -219.57 t/m2
1.004 0.595
sc = 577.86 + 473.13 = 1188.6 t/m2
1.004 0.771
sb = 577.86 + 473.13 = 1465.8 t/m2
1.004 0.531

Stresses due to prestress after initial losses & self weight of the girder
st = 405.6 + -219.6 = 186.0 t/m2
sc = -312.9 + 1188.6 = 875.7 t/m2
sb = -454.3 + 1465.8 = 1011.4 t/m2

Stresses after Shrinkage and Relaxation losses


st = 186.02 - 48.19 + 39.457 = 204.34 t/m2
1.004 0.595
sc = 875.7 - 48.19 - 39.457 = 776.58 t/m2
1.004 0.771
sb = 1011.45 - 48.19 - 39.457 = 889.21 t/m2
1.004 0.531
Airthmetic mean of initial and final stress between 4th = 826.14 t/m2
and 28 days at C.G. of cables
Creep loss = (s/10) x ec x Es = 1771.0 t/m2
= 8.39 t = 1.288 % of Jacking Force

Total Initial & Intermediate losses = 69.50 t = 10.67 % of Jacking Force


(i.e. losses upto 28th day)
Force after intermediate losses, Pint = 521.3 t
Moment due to Pint = Mpint = Pint x e = 426.80 tm
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Effect of prestress after Intermediate loss


st = 521.3 - 426.80 = -198.1 t/m2
1.004 0.595
sc = 521.3 + 426.80 = 1072.3 t/m2
1.004 0.771
sb = 521.3 + 426.80 = 1322.3 t/m2
1.004 0.531

Stresses Due to cast-in-situ slab


st = 266.9 = 448.39 t/m2
0.595
sc = 266.9 = -345.95 t/m2
0.771
sb = 266.9 = -502.29 t/m2
0.531

RESULTANT STRESSES
Just after initial loss
405.6 -219.6 186.0 > -163.2 t/m2 (O.K.)
+ -

+ =

+
-
-454.3 1465.8 1011.4 < 1632 t/m2 (O.K.)
Self wt. prestress after initial loss Refer cl. 7.1. Of IRC : 18 - 2000

After intermediate loss


405.6 -198.1 207.5 > -163.2 t/m2 (O.K.)
+ -

+ =
+ +
-
-454.3 1322.3 868 < 1632 t/m2 (O.K.)
Self weight prestress after Net effect
intermediate loss

After casting of Deck Slab


207.5 448.4 655.9
- +

+ =
+
+
-
867.9 -502.3 365.6
After Inter. Losses Cast in situ slab < 1632 t/m2 (O.K.)
NOTE NO. 201/DN - 01/R-1 SHEET NO.

STAGE-II (28 TH DAY ONWARD)

Section Modulus at top of composite section = 2.11463 m3


Section Modulus at junction of deck slab & girder Z j = 3.3870 m3
Section Modulus at C.G. of cables Zc = 1.008 m3
Section Modulus at bottom of composite section = 0.7671 m3
Composite area of deck slab + outer girder = 2.2044 m2

Prestressing force ( after 1st stage ) , P 1 = 521.28 t


ecc. of cables from bottom, eb (Ist stage) = 0.370 m
Eccentricity of cables from c.g., e (Ist stage) = 1.465 m

Prestressing force ( after friction and slip losses ) , P = 589.09 t


ecc. of cables from bottom, eb (2nd stage) = 0.499 m
Eccentricity of cables from c.g., e (2nd stage) = 1.335 m

Net eccentricity of cables of 1st and 2nd stages, eb' = 0.439 m (from bottom)
Net eccentricity of cables of 1st and 2nd stages, e' = 1.396 m (from c.g.)

B.M. due to S.Wt. of the girder Md = 241.41 tm


B.M.due to Cast in Situ slab Mc = 266.88 tm
B.M. due to SIDL Ms = 302.92 tm
B.M. due to Live loads ML = 171.79 tm
B.M. due to FPLL = 102.37 tm

Prestressing force ( after 1st stage ) , P 1 = 521.28 t


Moment due to Pint = Mpint = P1 x e = 763.41 tm
for second stage prestressing
Prestressing force ( after friction and slip losses ) , P = 589.09 t
Moment due to P, Mp = P x e = 786.58 tm
Total Moment = 1549.99 tm
Stresses due to self weight of the girder + cast insitu slab
st = 508.29 = 240.4 t/m2
2.115
sj = 508.29 = 150.1 t/m2
3.387
sc = 508.29 = -504.2 t/m2
1.008
sb = 508.29 = -662.6 t/m2
0.767

Stresses due to prestress ( first stage cables)


st = 521.28 - 763.41 = -124.5 t/m2
2.204 2.115
sj = 521.28 - 763.41 = 11.0808 t/m2
2.204 3.387
sc = 521.28 + 763.41 = 993.754 t/m2
2.204 1.008
sb = 521.28 + 763.41 = 1231.7 t/m2
2.204 0.767
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Stresses due to prestress (second stage cables)


st = 589.09 - 786.58 = -104.7 t/m2
2.204 2.115
sj = 589.09 - 786.58 = 35.0043 t/m2
2.204 3.387
sc = 589.09 + 786.58 = 1047.49 t/m2
2.204 1.008
sb = 589.09 + 786.58 = 1292.6 t/m2
2.204 0.767

Total Stresses due to prestress


st = 1110.36 - 1549.99 = -229.3 t/m2
2.204 2.115
sj = 1110.36 - 1549.99 = 46.0851 t/m2
2.204 3.387
sc = 1110.36 + 1549.99 = 2041.25 t/m2
2.204 1.008
sb = 1110.36 + 1549.99 = 2524.3 t/m2
2.204 0.767

Stresses due to prestress & self weight of the girder+deck slab


st = 240.4 + -229.3 = 11.1 t/m2
sj = 150.1 + 46.1 = 196.2 t/m3
sc = -504.2 + 2041.2 = 1537.0 t/m2
sb = -662.6 + 2524.3 = 1861.7 t/m2

Losses due to Elastic Shortening


Loss due to Elastic Shortening = 0.5 x s x Es/Ec
Therefore, initial loss = 4154 t/m2
(i.e. Elastic Shortening loss) = 39.36 t = 3.02 % of Jacking Force

Prestressing force after initial losses P ii = 501.59 t


Moment due to Pi = Mpii = Pii x e = 734.59 tm
Prestressing force after initial losses P i = 569.41 t
Moment due to Pi = Mpi = Pi x e = 760.30 tm

Loss due to Shrinkage of Concrete = es x E s


= 3776.8 t/m2
= 35.79 t = 2.75 % of Jacking Force

Loss due to relaxation of steel


For first stage cable:
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Loss due to Shrinkage = 17.89 t


Moment due to Shrinkage loss = 26.204 tm

For second stage cables:


The loss due to relaxation of steel depends on the stress in HTS after initial losses.
Ratio of average force to UTS = 0.703
Loss due to friction and slip = 651.643 - 589.1 = 62.6
% friction and slip loss = 62.6 x 100 = 9.6 %
651.6427
Ratio of average force to UTS = 0.703 - 0.096 = 0.607

Corresponding Relaxation Loss = 5298.5 t/m2


= 25.10 t 3.85 % of Jacking Force

Loss due to Relaxation & Shrinkage = 43.00 t


Moment due to Relaxation & Shrinkage loss = 57.409 tm

Loss due to Creep of concrete


Stresses due to Prestress after initial losses (for first stage cable)
st = 501.59 - 734.59 = -119.84 t/m2
2.204 2.115
sj = 501.59 - 734.59 = 10.66 t/m2
2.204 3.387
sc = 501.59 + 734.59 = 956.23 t/m2
2.204 1.008
sb = 501.59 + 734.59 = 1185.18 t/m2
2.204 0.767

Stresses due to Prestress after initial losses (for second stage cable)
st = 569.41 - 760.30 = -101.23 t/m2
2.204 2.115
sj = 569.41 - 760.30 = 33.83 t/m2
2.204 3.387
sc = 569.41 + 760.30 = 1012.50 t/m2
2.204 1.008
sb = 569.41 + 760.30 = 1249.46 t/m2
2.204 0.767

Total Prestress after initial lossess


st = -119.840 + -101.235 = -221.07 t/m2
sj = 10.662 + 33.835 = 44.50 t/m2
sc = 956.23 + 1012.50 = 1968.73 t/m2
sb = 1185.18 + 1249.46 = 2434.64 t/m2

Shrinkage loss (for first stage cables)


st = -17.89 + 26.204 = 4.27 t/m2
2.204 2.115
sj = -17.89 + 26.204 = -0.38 t/m2
2.204 3.387
sc = -17.89 - 26.204 = -34.11 t/m2
2.204 1.008
sb = -17.89 - 26.204 = -42.28 t/m2
2.204 0.767
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Shrinkage and Relaxation losses (for second stage cables)


st = -43.00 + 57.409 = 7.64 t/m2
2.204 2.115
sj = -43.00 + 57.409 = -2.55 t/m2
2.204 3.387
sc = -43.00 - 57.409 = -76.45 t/m2
2.204 1.008
sb = -43.00 - 57.409 = -94.35 t/m2
2.204 0.767

Total Shrinkage and Relaxation losses


st = 4.27 + 7.64 = 11.92 t/m2
sj = -0.38 + -2.55 = -2.94 t/m2
sc = -34.11 + -76.45 = -110.56 t/m2
sb = -42.28 + -94.35 = -136.62 t/m2

Stresses due to prestress after initial losses & self weight of the girder+cast insitu deck slab
st = 240.4 + -221.1 + 11.9 = 31.21 t/m2
sj = 150.1 + 44.5 + -2.9 = 191.63 t/m2
sc = -504.2 + 1968.7 + -110.6 = 1353.96 t/m2
sb = -662.6 + 2434.6 + -136.6 = 1635.39 t/m2

final stress after 28th days = 1353.96 t/m2


Creep loss = (s/10) x ec x Es = 10554.3 t/m 2

= 100.00 t = 7.673 % of Jacking Force


For first stage cables -
Total Initial & Intermediate losses = 87.58 t = 13.44 % of Jacking Force
For second stage cables -
Total Initial & Intermediate losses = 112.68 t = 17.29 % of Jacking Force

For first stage cables -


Force after intermediate losses, Pint = 433.7 t
Moment due to Pint = Mpint = Pint x e = 635.16 tm
For second stage cables -
Force after intermediate losses, Pint = 476.4 t
Moment due to Pint = Mpint = Pint x e = 636.12 tm

Total prestressing force P = 910.11 t


Total moment = 1271.28 tm

Total stresses due to prestress (Just before applying SIDL)


st = 910.11 - 1271.28 = -188.3 t/m2
2.204 2.115
sj = 910.11 - 1271.28 = 37.53 t/m2
2.204 3.387
sc = 910.11 + 1271.28 = 1673.93 t/m2
2.204 1.008
sb = 910.11 + 1271.28 = 2070.1 t/m2
2.204 0.767
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Stresses Due to SIDL


st = 302.92 = 143.2 t/m2
2.115
sj = 302.92 = 89.4 t/m2
3.387
sc = 302.92 = -300.5 t/m2
1.008
sb = 302.92 = -394.9 t/m2
0.767

Stresses due to prestress + DL (Girder+deck slab) + SIDL

st = 240.4 + -188.32 + 143.2 = 195.3 t/m2


sj = 150.1 + 37.53 + 89.4 = 277.0 t/m2
sc = -504.2 + 1673.93 + -300.5 = 869.2 t/m2
sb = -662.6 + 2070.15 + -394.9 = 1012.6 t/m2

After laying of SIDL


-188.3 143.2 240.4 195.3
+ +
37.5279 89.4 150.1 277.0

+ + = +
+

- -

2070.1 -394.9 -662.6 1012.6


SIDL DL+DECK SLAB

Stresses due to FPLL


st = 102.37 = 48.41 t/m2
2.115
sj = 102.37 = 30.22 t/m2
3.387
sc = 102.37 = -101.55 t/m2
1.008
sb = 102.37 = -133.45 t/m2
0.767

Stresses due to Live load


st = 171.79 = 81.24 t/m2
2.115
sj = 171.79 = 50.72 t/m2
3.387
sc = 171.79 = -170.41 t/m2
1.008
sb = 171.79 = -223.95 t/m2
0.767

Stresses due to Prestress + DL + SIDL + FPLL + LL


st = 195.30 + 48.41 + 81.2 = 324.9 t/m2
sj = 277.03 + 30.22 + 50.7 = 358.0 t/m2
sc = 869.23 + -101.55 + -170.4 = 597.3 t/m2
sb = 1012.62 + -133.45 + -224.0 = 655.2 t/m2
NOTE NO. 201/DN - 01/R-1 SHEET NO.

195.30 48.41 81.2 324.9

277.03 + 30.22 + 50.72 358.0

+ + + = +

- -

1012.62 -133.45 -224.0 655.2


Prestress + SIDL FPLL Live Load

Time dependant losses (i.e. due to relaxation of steel, shrinkage of concrete& creep of concrete)
= 256.84 t
20% extra time dependant losses = 51.37 t
Stress due to 20% extra time dependant losses at top = 10.6 t/m2
Stress due to 20% extra time dependant losses at bottom = -116.8 t/m2

324.9 10.6 335.6

358.0 +

+ + =

655.2 -116.8 538.44


NOTE NO. 201/DN - 01/R-1 SHEET NO.

STRESS CHECK AT SECTION. 4-4

No. of cables in first layer = 2 at 115 mm from bottom


No. of cables in second layer = 1 at 229 mm from bottom
No. of cables in third layer = 1 at 420 mm from bottom
No. of cables in Fourth layer = 1 at 636 mm from bottom
No. of cables in Fifth layer = 1 at 832 mm from bottom
No. of cables in sixth layer = 1 at 1060 mm from bottom
No. of cables in seventh layer = 1 at 1261 mm from bottom
Total No. of cables in 1st stage = 4
Total No. of cables in 2nd stage = 4

At first stage 4 cables has been stressed and rest are stressed in second stage.

STAGE-I (4 TH DAY)

Net ecc. of cables from bottom, eb = 0.529 m


Eccentricity of cables from c.g., e = 0.660 m
Sectional Modulus at C.G. of cables, Zc = 0.957 m3
(for precast girder only)
B.M. due to S.Wt. of the girder Md = 144.39 tm
B.M.due to Cast in Situ slab Mc = 155.61 tm
Prestressing force ( after friction and slip losses ) , P = 573.02 t
Moment due to P, Mp = P x e = 378.33 tm

Stresses due to self weight of the girder


st = 144.39 = 242.60 t/m2
0.595
sc = 144.39 = -150.93 t/m2
0.957
sb = 144.39 = -271.76 t/m2
0.531

Stresses due to prestress at transfer stage


st = 573.02 - 378.33 = -65.1 t/m2
1.004 0.595
sc = 573.02 + 378.33 = 965.994 t/m2
1.004 0.957
sb = 573.02 + 378.33 = 1282.6 t/m2
1.004 0.531

Losses due to Elastic Shortening


Loss due to Elastic Shortening = 0.5 x s x Es/Ec

Stresses due to initial prestress & self weight of the girder


st = 242.6 + -65.1 = 177.5 t/m2
sc = -150.9 + 966.0 = 815.1 t/m2
sb = -271.8 + 1282.6 = 1010.8 t/m2

Therefore, initial loss = 2463 t/m2 (in cable)


(i.e. Elastic Shortening loss) = 11.67 t = 1.79 % of Jacking Force
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Prestressing force after initial losses Pi = 561.35 t


Moment due to Pi = Mpi = Pi x e = 370.63 tm

Loss due to Shrinkage of Concrete = e s x Es


= 4373.1 t/m2
= 20.72 t = 3.18 % of Jacking Force
Loss due to relaxation of steel
The loss due to relaxation of steel depends on the stress in HTS after initial losses.
Ratio of average force to UTS = 0.712
Loss due to friction & slip = 651.643 - 573.0 = 78.6 t
% friction and slip loss = 78.6 x 100 = 12.0651 %
651.6427
Ratio of average force to UTS = 0.712 - 0.12065 = 0.591

Corresponding Relaxation Loss = 4519.9 t/m2


= 21.41 t 3.29 % of Jacking Force

Loss due to Relaxation & Shrinkage = 42.13 t


Moment due to Relaxation & Shrinkage loss = 27.817 tm

Loss due to Creep of concrete


Stresses due to Prestress after initial losses
st = 561.35 - 370.63 = -63.79 t/m2
1.004 0.595
sc = 561.35 + 370.63 = 946.3 t/m2
1.004 0.957
sb = 561.35 + 370.63 = 1256.5 t/m2
1.004 0.531

Stresses due to prestress after initial losses & self weight of the girder
st = 242.6 + -63.8 = 178.8 t/m2
sc = -150.9 + 946.3 = 795.4 t/m2
sb = -271.8 + 1256.5 = 984.7 t/m2

Stresses after Shrinkage and Relaxation losses


st = 178.80 - 42.13 + 27.817 = 183.59 t/m2
1.004 0.595
sc = 795.4 - 42.13 - 27.817 = 724.37 t/m2
1.004 0.957
sb = 984.70 - 42.13 - 27.817 = 890.40 t/m2
1.004 0.531
Airthmetic mean of initial and final stress between 4th = 759.88 t/m2
and 28 days at C.G. of cables
Creep loss = (s/10) x ec x Es = 1628.9 t/m2
= 7.72 t = 1.184 % of Jacking Force
Total Initial & Intermediate losses = 61.52 t = 9.44 % of Jacking Force
(i.e. losses upto 28th day)
Force after intermediate losses, P int = 511.5 t
Moment due to Pint = Mpint = Pint x e = 337.72 tm
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Effect of prestress after Intermediate loss


st = 511.5 - 337.72 = -58.1 t/m2
1.004 0.595
sc = 511.5 + 337.72 = 862.3 t/m2
1.004 0.957
sb = 511.5 + 337.72 = 1144.9 t/m2
1.004 0.531

Stresses Due to cast-in-situ slab


st = 155.6 = 261.44 t/m2
0.595
sc = 155.6 = -162.66 t/m2
0.957
sb = 155.6 = -292.86 t/m2
0.531

RESULTANT STRESSES
Just after initial loss
242.6 -63.8 178.8 > -163.2 t/m2 (O.K.)
+ -

+ =

+
-
-271.8 1256.5 984.7 < 1632 t/m2 (O.K.)
Self wt. prestress after initial loss Refer cl. 7.1. Of IRC : 18 - 2000

After intermediate loss


242.6 -58.1 184.5 > -163.2 t/m2 (O.K.)
+ -

+ =
+ +
-
-271.8 1144.9 873 < 1632 t/m2 (O.K.)
Self weight prestress after Net effect
intermediate loss

After casting of Deck Slab


184.5 261.4 445.9
- +

+ =
+
+
-
873.1 -292.9 580.3
After Inter. Losses Casting of deck slab < 1632 t/m2 (O.K.)
NOTE NO. 201/DN - 01/R-1 SHEET NO.

STAGE-II (28 TH DAY ONWARD)

Section Modulus at top of composite section = 2.115 m3


Section Modulus at junction of deck slab & girder Zj = 3.387 m3
Section Modulus at C.G. of cables Zc = 1.125 m3
Section Modulus at bottom of composite section = 0.7671 m3
Composite area of deck slab + outer girder = 2.2044 m2

Prestressing force ( after 1st stage ) , P 1 = 511.50 t


ecc. of cables from bottom, eb (Ist stage) = 0.529 m
Eccentricity of cables from c.g., e (Ist stage) = 1.306 m

Prestressing force ( after friction and slip losses ) , P = 579.00 t


ecc. of cables from bottom, eb (2nd stage) = 0.632 m
Eccentricity of cables from c.g., e (2nd stage) = 1.203 m

Net eccentricity of cables of 1st and 2nd stages, eb' = 0.583 m (from bottom)
Net eccentricity of cables of 1st and 2nd stages, e' = 1.251 m (from c.g.)

B.M. due to S.Wt. of the girder Md = 144.39 tm


B.M.due to Cast in Situ slab Mc = 155.61 tm
B.M. due to SIDL Ms = 178.15 tm
B.M. due to Live loads ML = 96.28 tm
B.M. due to FPLL = 59.87 tm

Prestressing force ( after 1st stage ) , P 1 = 511.50 t


Moment due to Pint = Mpint = P1 x e = 668.02 tm
for second stage prestressing
Prestressing force ( after friction and slip losses ) , P = 579.00 t
Moment due to P, Mp = P x e = 696.54 tm
Total Moment = 1364.55 tm
Stresses due to self weight of the girder + cast in situ slab
st = 300.00 = 141.9 t/m2
2.115
sj = 300.00 = 88.6 t/m2
3.387
sc = 300.00 = -266.8 t/m2
1.125
sb = 300.00 = -391.1 t/m2
0.767

Stresses due to prestress ( first stage cables)


st = 511.50 - 668.02 = -83.9 t/m2
2.204 2.115
sj = 511.50 - 668.02 = 34.8126 t/m2
2.204 3.387
sc = 511.50 + 668.02 = 826.038 t/m2
2.204 1.125
sb = 511.50 + 668.02 = 1102.9 t/m2
2.204 0.767
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Stresses due to prestress (second stage cables)


st = 579.00 - 696.54 = -66.7 t/m2
2.204 2.115
sj = 579.00 - 696.54 = 57.0128 t/m2
2.204 3.387
sc = 579.00 + 696.54 = 882.016 t/m2
2.204 1.125
sb = 579.00 + 696.54 = 1170.7 t/m2
2.204 0.767

Total Stresses due to prestress


st = 1090.51 - 1364.55 = -150.6 t/m2
2.204 2.115
sj = 1090.51 - 1364.55 = 91.8254 t/m2
2.204 3.387
sc = 1090.51 + 1364.55 = 1708.05 t/m2
2.204 1.125
sb = 1090.51 + 1364.55 = 2273.6 t/m2
2.204 0.767

Stresses due to prestress & self weight of the girder+deck slab


st = 141.9 + -150.6 = -8.7 t/m2
sj = 88.6 + 91.8 = 180.4 t/m3
sc = -266.8 + 1708.1 = 1441.3 t/m2
sb = -391.1 + 2273.6 = 1882.5 t/m2

Losses due to Elastic Shortening


Loss due to Elastic Shortening = 0.5 x s x Es/Ec
Therefore, initial loss = 3896 t/m2
(i.e. Elastic Shortening loss) = 36.91 t = 2.83 % of Jacking Force

Prestressing force after initial losses Pii = 493.05 t


Moment due to Pi = Mpii = Pii x e = 643.91 tm
Prestressing force after initial losses Pi = 560.55 t
Moment due to Pi = Mpi = Pi x e = 674.33 tm

Loss due to Shrinkage of Concrete = e s x Es


= 3776.8 t/m2
= 35.79 t = 2.75 % of Jacking Force

Loss due to relaxation of steel


For first stage cable:
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Loss due to Shrinkage = 17.89 t


Moment due to Shrinkage loss = 23.368 tm

For second stage cables:


The loss due to relaxation of steel depends on the stress in HTS after initial losses.
Ratio of average force to UTS = 0.704
Loss after Ist stage & 2nd stage initial losses = 651.643 - 579.0 = 72.6 t
% friction and slip loss = 72.6 x 100 = 11.1474 %
651.6427
Ratio of average force to UTS = 0.704 - 0.11147 = 0.593

Corresponding Relaxation Loss = 4600.3 t/m2


= 21.79 t 3.34 % of Jacking Force

Loss due to Relaxation & Shrinkage = 39.69 t


Moment due to Relaxation & Shrinkage loss = 47.744 tm

Loss due to Creep of concrete


Stresses due to Prestress after initial losses (for first stage cable)
st = 493.05 - 643.91 = -80.84 t/m2
2.204 2.115
sj = 493.05 - 643.91 = 33.56 t/m2
2.204 3.387
sc = 493.05 + 643.91 = 796.23 t/m2
2.204 1.125
sb = 493.05 + 643.91 = 1063.10 t/m2
2.204 0.767

Stresses due to Prestress after initial losses (for second stage cable)
st = 560.55 - 674.33 = -64.60 t/m2
2.204 2.115
sj = 560.55 - 674.33 = 55.20 t/m2
2.204 3.387
sc = 560.55 + 674.33 = 853.90 t/m2
2.204 1.125
sb = 560.55 + 674.33 = 1133.37 t/m2
2.204 0.767

Total Prestress after initial lossess


st = -80.837 + -64.6022 = -145.44 t/m2
sj = 33.556 + 55.196 = 88.75 t/m2
sc = 796.23 + 853.90 = 1650.13 t/m2
sb = 1063.10 + 1133.37 = 2196.47 t/m2

Shrinkage loss (for first stage cables)


st = -17.89 + 23.368 = 2.93 t/m2
2.204 2.115
sj = -17.89 + 23.368 = -1.22 t/m2
2.204 3.387
sc = -17.89 - 23.368 = -28.90 t/m2
2.204 1.125
sb = -17.89 - 23.368 = -38.58 t/m2
2.204 0.767
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Shrinkage and Relaxation losses (for second stage cables)


st = -39.69 + 47.744 = 4.57 t/m2
2.204 2.115
sj = -39.69 + 47.744 = -3.91 t/m2
2.204 3.387
sc = -39.69 - 47.744 = -60.46 t/m2
2.204 1.125
sb = -39.69 - 47.744 = -80.24 t/m2
2.204 0.767

Total Shrinkage and Relaxation losses


st = 2.93 + 4.57 = 7.51 t/m2
sj = -1.22 + -3.91 = -5.13 t/m2
sc = -28.90 + -60.46 = -89.35 t/m2
sb = -38.58 + -80.24 = -118.82 t/m2

Stresses due to prestress after initial losses & self weight of the girder+cast insitu deck slab
st = 141.9 + -145.4 + 7.5 = 3.94 t/m2
sj = 88.6 + 88.8 + -5.1 = 172.20 t/m2
sc = -266.8 + 1650.1 + -89.4 = 1294.02 t/m2
sb = -391.1 + 2196.5 + -118.8 = 1686.56 t/m2

final stress after 28th days = 1294.02 t/m2

Creep loss = (s/10) x ec x Es = 10087.1 t/m2


= 95.58 t = 7.334 % of Jacking Force
For first stage cables -
Total Initial & Intermediate losses = 84.14 t = 12.91 % of Jacking Force
For second stage cables -
Total Initial & Intermediate losses = 105.93 t = 16.26 % of Jacking Force

For first stage cables -


Force after intermediate losses, P int = 427.4 t
Moment due to Pint = Mpint = Pint x e = 558.13 tm
For second stage cables -
Force after intermediate losses, P int = 473.1 t
Moment due to Pint = Mpint = Pint x e = 569.10 tm

Total prestressing force P = 900.44 t


Total moment = 1127.23 tm

Total stresses due to prestress (Just before applying SIDL)


st = 900.44 - 1127.23 = -124.6 t/m2
2.204 2.115
sj = 900.44 - 1127.23 = 75.67 t/m2
2.204 3.387
sc = 900.44 + 1127.23 = 1410.81 t/m2
2.204 1.125
sb = 900.44 + 1127.23 = 1878.0 t/m2
2.204 0.767
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Stresses Due to SIDL


st = 178.15 = 84.2 t/m2
2.115
sj = 178.15 = 52.6 t/m2
3.387
sc = 178.15 = -158.4 t/m2
1.125
sb = 178.15 = -232.2 t/m2
0.767

Stresses due to prestress + DL (Girder+deck slab) + SIDL

st = 141.9 + -124.59 + 84.2 = 101.5 t/m2


sj = 88.6 + 75.67 + 52.6 = 216.8 t/m2
sc = -266.8 + 1410.81 + -158.4 = 985.6 t/m2
sb = -391.1 + 1877.98 + -232.2 = 1254.6 t/m2

After laying of SIDL


-124.6 84.2 141.9 101.5
+ +
75.6682 52.6 88.6 216.8

+ + = +
+

- -

1878.0 -232.2 -391.1 1254.6


SIDL DL+DECK SLAB

Stresses due to FPLL


st = 59.87 = 28.31 t/m2
2.115
sj = 59.87 = 17.68 t/m2
3.387
sc = 59.87 = -53.236 t/m2
1.125
sb = 59.87 = -78.05 t/m2
0.767

Stresses due to Live load


st = 96.28 = 45.53 t/m2
2.115
sj = 96.28 = 28.43 t/m2
3.387
sc = 96.28 = -85.612 t/m2
1.125
sb = 96.28 = -125.51 t/m2
0.767

Stresses due to Prestress + DL + SIDL + FPLL + LL


st = 101.53 + 28.31 + 45.5 = 175.4 t/m2
sj = 216.84 + 17.68 + 28.4 = 262.9 t/m2
sc = 985.64 + -53.236 + -85.6 = 846.8 t/m2
sb = 1254.65 + -78.05 + -125.5 = 1051.1 t/m2
NOTE NO. 201/DN - 01/R-1 SHEET NO.

101.53 28.31 45.5 175.4

216.84 + 17.68 + 28.43 262.9

+ + + = +

- -

1254.65 -78.05 -125.5 1051.1


Prestress + SIDL FPLL Live Load

Time dependant losses (i.e. due to relaxation of steel, shrinkage of concrete& creep of concrete)
= 203.01 t
20% extra time dependant losses = 40.60 t
Stress due to 20% extra time dependant losses at top = 5.6 t/m2
Stress due to 20% extra time dependant losses at bottom = -84.6 t/m2

175.4 5.6 181.0

262.9 +

+ + =

1051.1 -84.6 966.44


NOTE NO. 201/DN - 01/R-1 SHEET NO.

STRESS CHECK AT SECTION. 5-5 ("d" distance from support)

No. of cables in first layer = 2 at 170 mm from bottom


No. of cables in second layer = 1 at 429 mm from bottom
No. of cables in third layer = 1 at 692 mm from bottom
No. of cables in Fourth layer = 1 at 958 mm from bottom
No. of cables in Fifth layer = 1 at 1221 mm from bottom
No. of cables in sixth layer = 1 at 1488 mm from bottom
No. of cables in seventh layer = 1 at 1751 mm from bottom
Total No. of cables in 1st stage = 4
Total No. of cables in 2nd stage = 4

At first stage 4 cables has been stressed and rest are stressed in second stage.

STAGE-I (4 TH DAY)

Net ecc. of cables from bottom, eb = 0.823 m


Eccentricity of cables from c.g., e = 0.362 m
Sectional Modulus at C.G. of cables, Zc = 2.024 m3
(for precast girder only)
B.M. due to S.Wt. of the girder Md = 98.35 tm
B.M.due to Cast in Situ slab Mc = 104.04 tm
Prestressing force ( after friction and slip losses ) , P = 555.38 t
Moment due to P, Mp = P x e = 201.28 tm

Stresses due to self weight of the girder


st = 98.35 = 142.73 t/m2
0.689
sc = 98.35 = -48.60 t/m2
2.024
sb = 98.35 = -159.01 t/m2
0.619

Stresses due to prestress at transfer stage


st = 555.38 - 201.28 = 81.4 t/m2
1.487 0.689
sc = 555.38 + 201.28 = 472.981 t/m2
1.487 2.024
sb = 555.38 + 201.28 = 698.9 t/m2
1.487 0.619

Losses due to Elastic Shortening


Loss due to Elastic Shortening = 0.5 x s x Es/Ec

Stresses due to initial prestress & self weight of the girder


st = 142.7 + 81.4 = 224.1 t/m2
sc = -48.6 + 473.0 = 424.4 t/m2
sb = -159.0 + 698.9 = 539.9 t/m2

Therefore, initial loss = 1282 t/m2


(i.e. Elastic Shortening loss) = 6.08 t = 0.93 % of Jacking Force
Prestressing force after initial losses Pi = 549.31 t
Moment due to Pi = Mpi = Pi x e = 199.08 tm
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Loss due to Shrinkage of Concrete = e s x Es


= 4373.1 t/m2
= 20.72 t = 3.18 % of Jacking Force

Loss due to relaxation of steel


The loss due to relaxation of steel depends on the stress in HTS after initial losses.
Ratio of average force to UTS = 0.718
Loss due to friction & slip = 651.643 - 555.4 = 96.3 t
% friction and slip loss = 96.3 x 100 = 14.7717 %
651.6427
Ratio of average force to UTS = 0.718 - 0.14772 = 0.571

Corresponding Relaxation Loss = 3488.8 t/m2


= 16.53 t 2.54 % of Jacking Force

Loss due to Relaxation & Shrinkage = 37.25 t


Moment due to Relaxation & Shrinkage loss = 13.499 tm

Loss due to Creep of concrete


Stresses due to Prestress after initial losses
st = 549.31 - 199.08 = 80.51 t/m2
1.487 0.689
sc = 549.31 + 199.08 = 467.8 t/m2
1.487 2.024
sb = 549.31 + 199.08 = 691.3 t/m2
1.487 0.619

Stresses due to prestress after initial losses & self weight of the girder
st = 142.7 + 80.5 = 223.2 t/m2
sc = -48.6 + 467.8 = 419.2 t/m2
sb = -159.0 + 691.3 = 532.3 t/m2

Stresses after Shrinkage and Relaxation losses


st = 223.23 - 37.25 + 13.499 = 217.77 t/m2
1.487 0.689
sc = 419.2 - 37.25 - 13.499 = 387.48 t/m2
1.487 2.024
sb = 532.29 - 37.25 - 13.499 = 485.41 t/m2
1.487 0.619
Airthmetic mean of initial and final stress between 4th = 403.34 t/m2
and 28 days at C.G. of cables
Creep loss = (s/10) x ec x Es = 864.6 t/m2
= 4.10 t = 0.629 % of Jacking Force

Total Initial & Intermediate losses = 47.42 t = 7.28 % of Jacking Force


(i.e. losses upto 28th day)
Force after intermediate losses, Pint = 508.0 t
Moment due to Pint = Mpint = Pint x e = 184.10 tm
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Effect of prestress after Intermediate loss


st = 508.0 - 184.10 = 74.4 t/m2
1.487 0.689
sc = 508.0 + 184.10 = 432.6 t/m2
1.487 2.024
sb = 508.0 + 184.10 = 639.3 t/m2
1.487 0.619

Stresses Due to cast-in-situ slab


st = 104.0 = 150.99 t/m2
0.689
sc = 104.0 = -51.42 t/m2
2.024
sb = 104.0 = -168.22 t/m2
0.619

RESULTANT STRESSES
a) Transfer stage
142.7 81.4 224.1
-
+
+ =

+ +
-
-159.0 698.9 539.9
Self weight Jacking Stress

Just after initial loss


142.7 80.5 223.2 > -163.2 t/m2 (O.K.)
+ -

+ =

+
-
-159.0 691.3 532.3 < 1632 t/m2 (O.K.)
Self wt. prestress after initial loss Refer cl. 7.1. Of IRC : 18 - 2000

After intermediate loss


142.7 74.4 217.2 > -163.2 t/m2 (O.K.)
+ -

+ =
+ +
-
-159.0 639.3 480 < 1632 t/m2 (O.K.)
Self weight prestress after Net effect
intermediate loss

After casting of Deck Slab


217.2 151.0 368.2
- +

+ =
+
+
-
480.3 -168.2 312.0
After Inter. Losses Cast in situ slab < 1632 t/m2 (O.K.)
NOTE NO. 201/DN - 01/R-1 SHEET NO.

STAGE-II (28 TH DAY ONWARD)

Section Modulus at top of composite section = 2.144 m3


Section Modulus at junction of deck slab & girder Zj = 3.149 m3
Section Modulus at C.G. of cables Zc = 1.943 m3
Section Modulus at bottom of composite section = 0.978 m3
Composite area of deck slab + outer girder = 2.6869 m2

Prestressing force ( after 1st stage ) , P1 = 507.97 t


ecc. of cables from bottom, eb (Ist stage) = 0.823 m
Eccentricity of cables from c.g., e (Ist stage) = 0.894 m

Prestressing force ( after friction and slip losses ) , P = 561.50 t


ecc. of cables from bottom, eb (2nd stage) = 0.879 m
Eccentricity of cables from c.g., e (2nd stage) = 0.837 m

Net eccentricity of cables of 1st and 2nd stages, eb' = 0.853 m (from bottom)
Net eccentricity of cables of 1st and 2nd stages, e' = 0.864 m (from c.g.)

B.M. due to S.Wt. of the girder Md = 98.35 tm


B.M.due to Cast in Situ slab Mc = 104.04 tm
B.M. due to SIDL Ms = 106.64 tm
B.M. due to Live loads ML = 18.28 tm
B.M. due to FPLL = 35.82 tm

Prestressing force ( after 1st stage ) , P1 = 507.97 t


Moment due to Pint = Mpint = P1 x e = 453.90 tm
for second stage prestressing
Prestressing force ( after friction and slip losses ) , P = 561.50 t
Moment due to P, Mp = P x e = 470.23 tm
Total Moment = 924.13 tm
Stresses due to self weight of the girder + cast in situ slab
st = 202.39 = 94.4 t/m2
2.144
sj = 202.39 = 64.3 t/m2
3.149
sc = 202.39 = -104.2 t/m2
1.943
sb = 202.39 = -207.0 t/m2
0.978

Stresses due to prestress ( first stage cables)


st = 507.97 - 453.90 = -22.7 t/m2
2.687 2.144
sj = 507.97 - 453.90 = 44.9094 t/m2
2.687 3.149
sc = 507.97 + 453.90 = 422.667 t/m2
2.687 1.943
sb = 507.97 + 453.90 = 653.2 t/m2
2.687 0.978
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Stresses due to prestress (second stage cables)


st = 561.50 - 470.23 = -10.4 t/m2
2.687 2.144
sj = 561.50 - 470.23 = 59.6478 t/m2
2.687 3.149
sc = 561.50 + 470.23 = 450.992 t/m2
2.687 1.943
sb = 561.50 + 470.23 = 689.8 t/m2
2.687 0.978

Total Stresses due to prestress


st = 1069.46 - 924.13 = -33.1 t/m2
2.687 2.144
sj = 1069.46 - 924.13 = 104.557 t/m2
2.687 3.149
sc = 1069.46 + 924.13 = 873.658 t/m2
2.687 1.943
sb = 1069.46 + 924.13 = 1343.0 t/m2
2.687 0.978

Stresses due to prestress & self weight of the girder+deck slab


st = 94.4 + -33.1 = 61.4 t/m2
sj = 64.3 + 104.6 = 168.8 t/m3
sc = -104.2 + 873.7 = 769.5 t/m2
sb = -207.0 + 1343.0 = 1136.1 t/m2

Losses due to Elastic Shortening


Loss due to Elastic Shortening = 0.5 x s x Es/Ec
Therefore, initial loss = 2080 t/m2
(i.e. Elastic Shortening loss) = 19.71 t = 1.51 % of Jacking Force

Prestressing force after initial losses Pii = 498.11 t


Moment due to Pi = Mpii = Pii x e = 445.10 tm
Prestressing force after initial losses Pi = 551.64 t
Moment due to Pi = Mpi = Pi x e = 461.97 tm

Loss due to Shrinkage of Concrete = e s x Es


= 3776.8 t/m2
= 35.79 t = 2.75 % of Jacking Force

Loss due to relaxation of steel


For first stage cable:
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Loss due to Shrinkage = 17.89 t


Moment due to Shrinkage loss = 15.988 tm

For second stage cables:


The loss due to relaxation of steel depends on the stress in HTS after initial losses.
Ratio of average force to UTS = 0.714
Loss due to friction and slip = 651.643 - 551.6 = 100.0 t
% friction and slip loss = 100.0 x 100 = 15.3458 %
651.6427
Ratio of average force to UTS = 0.714 - 0.15346 = 0.561

Corresponding Relaxation Loss = 2996.9 t/m2


= 14.20 t 2.18 % of Jacking Force

Loss due to Relaxation & Shrinkage = 32.09 t


Moment due to Relaxation & Shrinkage loss = 26.874 tm

Loss due to Creep of concrete


Stresses due to Prestress after initial losses (for first stage cable)
st = 498.11 - 445.10 = -22.24 t/m2
2.687 2.144
sj = 498.11 - 445.10 = 44.04 t/m2
2.687 3.149
sc = 498.11 + 445.10 = 414.47 t/m2
2.687 1.943
sb = 498.11 + 445.10 = 640.54 t/m2
2.687 0.978

Stresses due to Prestress after initial losses (for second stage cable)
st = 551.64 - 461.97 = -10.19 t/m2
2.687 2.144
sj = 551.64 - 461.97 = 58.60 t/m2
2.687 3.149
sc = 551.64 + 461.97 = 443.08 t/m2
2.687 1.943
sb = 551.64 + 461.97 = 677.72 t/m2
2.687 0.978

Total Prestress after initial lossess


st = -22.240 + -10.1904 = -32.43 t/m2
sj = 44.038 + 58.601 = 102.64 t/m2
sc = 414.47 + 443.08 = 857.55 t/m2
sb = 640.54 + 677.72 = 1318.27 t/m2

Shrinkage and Relaxation losses (for first stage cables)


st = -17.89 + 15.988 = 0.80 t/m2
2.687 2.144
sj = -17.89 + 15.988 = -1.58 t/m2
2.687 3.149
sc = -17.89 - 15.988 = -14.89 t/m2
2.687 1.943
sb = -17.89 - 15.988 = -23.01 t/m2
2.687 0.978
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Shrinkage and Relaxation losses (for second stage cables)


st = -32.09 + 26.874 = 0.59 t/m2
2.687 2.144
sj = -32.09 + 26.874 = -3.41 t/m2
2.687 3.149
sc = -32.09 - 26.874 = -25.78 t/m2
2.687 1.943
sb = -32.09 - 26.874 = -39.43 t/m2
2.687 0.978

Total Shrinkage and Relaxation losses


st = 0.80 + 0.59 = 1.39 t/m2
sj = -1.58 + -3.41 = -4.99 t/m2
sc = -14.89 + -25.78 = -40.66 t/m2
sb = -23.01 + -39.43 = -62.43 t/m2

Stresses due to prestress after initial losses & self weight of the girder+cast in situ deck slab
st = 94.4 + -32.4 + 1.4 = 63.37 t/m2
sj = 64.3 + 102.6 + -5.0 = 161.92 t/m2
sc = -104.2 + 857.5 + -40.7 = 712.71 t/m2
sb = -207.0 + 1318.3 + -62.4 = 1048.86 t/m2

final stress after 28th days = 712.71 t/m2

Creep loss = (s/10) x ec x Es = 5555.7 t/m2


= 52.64 t = 4.039 % of Jacking Force
For first stage cables -
Total Initial & Intermediate losses = 54.07 t = 8.30 % of Jacking Force
For second stage cables -
Total Initial & Intermediate losses = 68.27 t = 10.48 % of Jacking Force

For first stage cables -


Force after intermediate losses, Pint = 453.9 t
Moment due to Pint = Mpint = Pint x e = 405.59 tm
For second stage cables -
Force after intermediate losses, Pint = 493.2 t
Moment due to Pint = Mpint = Pint x e = 413.06 tm

Total prestressing force P = 947.13 t


Total moment = 818.65 tm

Total stresses due to prestress (Just before applying SIDL)


st = 947.13 - 818.65 = -29.4 t/m2
2.687 2.144
sj = 947.13 - 818.65 = 92.53 t/m2
2.687 3.149
sc = 947.13 + 818.65 = 773.84 t/m2
2.687 1.943
sb = 947.13 + 818.65 = 1189.6 t/m2
2.687 0.978
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Stresses Due to SIDL


st = 106.64 = 49.7 t/m2
2.144
sj = 106.64 = 33.9 t/m2
3.149
sc = 106.64 = -54.9 t/m2
1.943
sb = 106.64 = -109.1 t/m2
0.978

Stresses due to prestress + DL (Girder+deck slab) + SIDL

st = 94.4 + -29.38 + 49.7 = 114.8 t/m2


sj = 64.3 + 92.53 + 33.9 = 190.7 t/m2
sc = -104.2 + 773.84 + -54.9 = 614.8 t/m2
sb = -207.0 + 1189.65 + -109.1 = 873.6 t/m2

After laying of SIDL


-29.4 49.7 94.4 114.8
+ +
92.5253 33.9 64.3 190.7

+ + = +
+

- -

1189.6 -109.1 -207.0 873.6


SIDL DL+DECK SLAB

Stresses due to FPLL


st = 35.82 = 16.71 t/m2
2.144
sj = 35.82 = 11.37 t/m2
3.149
sc = 35.82 = -18.436 t/m2
1.943
sb = 35.82 = -36.63 t/m2
0.978

Stresses due to Live load


st = 18.28 = 8.53 t/m2
2.144
sj = 18.28 = 5.80 t/m2
3.149
sc = 18.28 = -9.4085 t/m2
1.943
sb = 18.28 = -18.69 t/m2
0.978

Stresses due to Prestress + DL + SIDL + FPLL + LL


st = 114.78 + 16.71 + 8.5 = 140.0 t/m2
sj = 190.66 + 11.37 + 5.8 = 207.8 t/m2
sc = 614.79 + -18.436 + -9.4 = 586.9 t/m2
sb = 873.63 + -36.63 + -18.7 = 818.3 t/m2
NOTE NO. 201/DN - 01/R-1 SHEET NO.

114.78 16.71 8.5 140.0

190.66 + 11.37 + 5.80 207.8

+ + + = +

- -

873.63 -36.63 -18.7 818.3


Prestress + SIDL FPLL Live Load

Time dependant losses (i.e. due to relaxation of steel, shrinkage of concrete& creep of concrete)
= 143.97 t
20% extra time dependant losses = 28.79 t
Stress due to 20% extra time dependant losses at top = 0.9 t/m2
Stress due to 20% extra time dependant losses at bottom = -36.2 t/m2

140.0 0.9 140.9

207.8 +

+ + =

818.3 -36.2 782.15


NOTE NO. 201/DN - 01/R-1 SHEET NO.

SUMMARY OF MAXIMUM BENDING MOMENT & SHEAR FORCE

GIRDER G3 :

a) BENDING MOMENT (tm)


LOADING SECTIONS
1-1 2-2 3-3 4-4 5-5
a) Self Weight of Girder 319.02 299.62 241.41 144.39 98.35
b) Deck Slab 355.90 333.65 266.88 155.61 104.04
c) SIDL 394.96 372.80 302.92 178.15 106.64
d)FPLL 133.89 126.28 102.37 59.87 35.82
e) LL 237.68 219.29 171.79 96.28 18.28
f) TOTAL 1441.45 1351.63 1085.37 634.30 363.13
g) LL BM corresponding to Max 202.55 210.91 171.30 96.28 18.10
S.F.case

b) SHEAR FORCE (t)


LOADING SECTIONS
1-1 2-2 3-3 4-4 5-5
a) Self Weight of Girder 0.00 9.87 19.74 29.68 34.66
b) Deck Slab 0.00 11.32 22.64 33.97 38.09
c) SIDL 6.04 18.54 32.29 32.29 48.00
d)FPLL 2.08 6.36 11.00 11.00 16.20
e) LL 10.16 14.56 19.54 23.45 26.53
f) TOTAL 18.28 60.65 105.22 130.39 163.48
g) LL Shear corresponding to max 2.40 7.09 11.72 23.45 24.73
BM case

ULTIMATE BENDING MOMENT AND SHEAR FORCE


a) Maximum Bending Moment & corressponding Shear Force
Section 1-1 2-2 3-3 4-4 5-5
1.25DL 843.7 791.6 635.4 375.0 253.0
Bending Moment (tm) 2SIDL 789.9 745.6 605.8 356.3 213.3
2.5LL 928.9 863.9 685.4 390.4 135.3
TOTAL Mu 2562.5 2401.1 1926.6 1121.7 601.5

1.25DL 0.0 26.5 53.0 79.6 90.9


Shear Force corresponding to 2SIDL 12.1 37.1 64.6 64.6 96.0
Max Bending Moment (t) 2.5LL 11.2 33.6 56.8 86.1 102.3
TOTAL Vu 23.3 97.2 174.4 230.3 289.3

b) Maximum Shear force and Corressponding Bending Moment


Section 1-1 2-2 3-3 4-4 5-5
1.25DL 0.0 26.5 53.0 79.6 90.9
SHEAR FORCE (t) 2SIDL 12.08 37.08 64.58 64.58 96.00
2.5LL 30.6 52.3 76.4 86.1 106.8
TOTAL Vu 42.7 115.9 193.9 230.3 293.8

1.25DL 843.7 791.6 635.4 375.0 253.0


BENDING MOMENTS 2SIDL 789.9 745.6 605.8 356.3 213.3
CORRESSPONDING TO MAX
2.5LL 841.1 843.0 684.2 390.4 134.8
SHEAR (tm)
TOTAL Mu 2474.7 2380.2 1925.4 1121.7 601.1
NOTE NO. 201/DN - 01/R-1 SHEET NO.

SECTION PROPERTIES
Section 1-1 2-2 3-3 4-4 5-5
Sectional area, A m 2
2.204 2.204 2.204 2.204 2.687
Moment of Inertia, Iz m4 1.407 1.407 1.407 1.407 1.679
C.G. of section from top,Yt m 0.665 0.665 0.665 0.665 0.783
C.G. of section from bottom, Yb m 1.835 1.835 1.835 1.835 1.717
Sectional modulus at top, Zt m3 2.115 2.115 2.115 2.115 2.144
Sectional modulus at bottom, Zb m3 0.767 0.767 0.767 0.767 0.978
Width of the web, b m 0.275 0.275 0.275 0.288 0.579
Overall Depth of Section, d m 2.5

Section 1-1 2-2 3-3 4-4 5-5


Total No. of cables 8 8 8 8 8
Final prestressing force, Pf t 910.26 920.49 910.11 900.44 947.13
Eccentricity from bottom, eb m 0.403 0.401 0.439 0.583 0.853
db = D - e b m 2.097 2.099 2.061 1.917 1.647

Average thickness of compression flange, t = 0.313 m Bf = 4800 mm

ULTIMATE MOMENT CAPACITY


As per Clause 13 of IRC:18 - 2000 1-1 2-2 3-3 4-4 5-5
Mults* = 0.9 db As fp 3393.2 3396.2 3335.1 3101.1 2665.0
Multc** = 0.176 b d f +
2
b ck Part1 868.6 870.2 839.1 759.8 1128.2
2/3 x 0.8 (Bf - b)(db - t/2) x t x fck Part2 5979.6 5985.3 5868.9 5407.7 4284.4
Total 6848.3 6855.5 6708.0 6167.6 5412.5
Mult = min(Mults and Multc) 3393.2 3396.2 3335.1 3101.1 2665.0
Mu 2562.5 2401.1 1926.6 1121.7 601.5
Remarks O.K. O.K. O.K. O.K. O.K.
* Mults Moment capacity due to yield of steel.
** Multc Moment capacity due to crushing of concrete.

CALCULATION OF DEPTH OF TENSILE ZONE


Section 1-1 2-2 3-3 4-4 5-5
st = 0.8 x (Pf/A - Mf/Zt) + Mult/Zt t/m 2
1441.9 1440.9 1426.8 1367.0 1219.7
sb = 0.8 x (Pf/A+Mf/Zb)- Mult/Zb t/m 2
-2733.9 -2717.1 -2692.5 -2540.9 -1773.8
Depth of tensile zone, z m 1.637 1.634 1.634 1.625 1.481
C.G. of cables in tensile zone from
bottom, eb m 0.396 0.396 0.314 0.583 0.860
db = (D - emax), but not < 0.8D m 2.104 2.104 2.186 2.000 2.000
NOTE NO. 201/DN - 01/R-1 SHEET NO.

SHEAR CAPACITY AND SHEAR REINFORCEMENT


ft = Maximum principal tensile stress
= 0.24Öfck = 154.83 t/m2 (As per Clause 14.1.2 of IRC:18)

fcp = Stress due to prestress only at centroidal axis of composite section


fpt = Stress due to prestress only at tensile fibre of composite section
dt = Depth from extreme compression fibre either to the longitudinal bars or to
the centroid of the tendons whichever is greater)
= d - 0.060 = 2.440 m
Maximum Ultimate shear stress = 479.4 t/m2 (As per Table 6 of IRC:18)
units 1-1 2-2 3-3 4-4 5-5
b = web thickness = 275 - 75 x 2/3 m 0.225 0.225 0.225 0.255 0.529
fcp t/m2 1739.95 1763.17 1673.93 1410.81 773.84
Vco* = 0.67bdÖ (f + 0.8fcpft)
t
2
t 184.4 185.5 181.3 190.4 306.7
db = d - e b m 2.104 2.104 2.186 2.000 2.000
fpt t/m 2
2113.1 2139.3 2070.1 1878.0 1189.6
Mt = (0.37Öfck + 0.8fpt)I/y tm 1479.8 1495.9 1453.5 1335.6 1164.1
Vcr = 0.037bdbÖfck + (Mt/Mu) t 36.8 84.1 158.1 286.3 594.2
Vcrmin = 0.1 bdÖfck t 36.3 36.3 36.3 41.1 85.3
Vcr = max (Vcr, Vcrmin) t 36.8 84.1 158.1 286.3 594.2
Vc = min (Vco,Vcr) t 36.8 84.1 158.1 190.4 306.7
Vu t 42.7 115.9 193.9 230.3 293.8
Remarks Vu>Vc Vu>Vc Vu>Vc Vu>Vc Vc>Vu>Vc/2
(Asv/Sv)min = 0.4b/(0.87fyv) (cm /m)
2
2.493 2.493 2.493 2.825 5.86
Asv/Sv = (V-Vc)/(0.87fyvdt) (cm /m)
2
0.67 3.604 4.062 4.525 5.86
Provide Asv/Sv = (cm2/m) 2.49 3.60 4.06 4.52 5.86
vu = Vu/bdb where, b = 225mm t/m 2
90.2 244.8 394.3 451.5 277.7
Remarks O.K. O.K. O.K. O.K. O.K.
Vco Uncracked shear capacity of the section.
Vcr Cracked shear capacity
Vc Shear capacity
Vu Ultimate shear
S Shear reinforcement
fyv Yield strength of shear reinforcement
vu Shear stress
NOTE NO. 201/DN - 01/R-1 SHEET NO.

ULTIMATE T0RSION & SHEAR


GIRDER G3
CASE 1 MAX. TORSIONAL MOMENT (t.m) & CORR. SHEAR FORCE(t)
MAXIMUM TORSIONAL MOMENT 2.5 (LL*I.F. CORRESPONDING SHEAR FORCE 2.5 (LL*I.F.
SEC. DL 1.25 DL SIDL 2.0 SIDL LL FPLL + FPLL) ULT DL 1.25 DL SIDL 2.0 SIDL LL FPLL + FPLL) ULT
1-1 0.24 0.30 0.00 0.00 1.57 0.00 3.93 4.23 0.00 0.00 6.04 12.08 19.54 2.08 54.05 66.13
2- 2 0.68 0.85 0.00 0.00 2.28 0.00 5.70 6.55 21.19 26.49 18.54 37.08 14.56 6.36 52.30 115.87
3- 3 1.02 1.28 0.00 0.00 3.17 0.00 7.93 9.20 42.39 52.98 32.29 64.58 19.50 11.00 76.25 193.81
4- 4 1.02 1.28 0.00 0.00 3.17 0.00 7.93 9.21 63.65 79.56 32.29 64.58 21.30 11.00 80.75 224.89
5- 5 1.19 1.48 0.00 0.00 3.84 0.00 9.59 11.07 72.75 90.94 48.00 96.00 24.30 16.20 101.25 288.19

CASE 2 MAXIMUM SHEAR FORCE (t) & CORR. TORSIONAL MOMENT(t.m)


MAXIMUM SHEAR FORCE 2.5 (LL*I.F. CORRESPONDING TORSIONAL MOMENT 2.5 (LL*I.F.
SEC. DL 1.25 DL SIDL 2.0 SIDL LL FPLL + FPLL) ULT DL 1.25 DL SIDL 2.0 SIDL LL FPLL + FPLL) ULT
1-1 0.00 0.00 6.04 12.08 10.16 2.08 30.60 42.68 0.24 0.30 0.00 0.00 1.57 0.00 3.93 4.23
2- 2 21.19 26.49 18.54 37.08 14.56 6.36 52.30 115.87 0.68 0.85 0.00 0.00 2.28 0.00 5.70 6.55
3- 3 42.39 52.98 32.29 64.58 19.54 11.00 76.35 193.91 1.02 1.28 0.00 0.00 1.57 0.00 3.93 5.20
4- 4 63.65 79.56 32.29 64.58 23.45 11.00 86.13 230.26 1.02 1.28 0.00 0.00 1.27 0.00 3.18 4.45
5- 5 72.75 90.94 48.00 96.00 26.53 16.20 106.83 293.76 1.19 1.48 0.00 0.00 1.27 0.00 3.18 4.66

CHECK FOR TOTAL ULTIMATE SHEAR STRESS


Each component Rectangle will be subjected to a Torque = T(hmax * hmin^3)/(Shmax *hmin^3)=
= TxC (say)
Comp
onent
Recta hmax *
ngle hmax hmin hmin ^3 C
1 4800 250 7.50E+10 0.48
2 1250 225 1.42E+10 0.09
3 1675 275 3.48E+10 0.22
4 750 350 3.22E+10 0.21
S 1.56E+11
Torsional Shear Stress= 2 T / (hmin ^2)/(hmax-hmin/3)
NOTE NO. 201/DN - 01/R-1 SHEET NO.

CASE 1 MAX. TORSIONAL MOMENT & CORR. SHEAR FORCE


MOMENT IN RECTANGULAR TOR. SHEAR STRESS IN ULTIMATE TOTAL
MAX. COMPONENT (t.m) COMPONENT RECTANGLES OF CORR.
SHEAR STRESS ULTIMATE
TOR. GIRDER S.F. (t)
SEC. DUE TO S.F. SHEAR STRESS
MOM. V
(t.m) Vtu (t/m^2) V + Vtu (t/m^2)
(t/m^2) b d
1 2 3 4 1 2 3 4 b

1-1 4.23 2.03 0.39 0.94 0.87 13.8 12.9 15.7 22.4 66.13 139.7 155
2-2 6.55 3.14 0.60 1.46 1.35 21.3 20.1 24.4 34.8 115.87 244.8 269
3-3 9.20 4.42 0.84 2.05 1.89 30.0 28.2 34.3 48.8 193.81 394.1 428
4-4 9.21 4.42 0.84 2.05 1.90 30.0 28.2 34.3 48.9 224.89 441.0 475
5-5 11.07 5.31 1.01 2.47 2.28 36.1 33.9 41.2 58.7 288.19 272.4 314

PERMISSIBLE VALUE OF TOTAL ULT. SHEAR ST 484.5 t/m^2

COMPONENT RECTANGLES
1 2 3 4
Hmax 4.8 1.25 1.675 0.75
Hmin 0.25 0.225 0.275 0.35

CASE 2 MAX. SHEAR FORCE & CORR. TORSIONAL MOMENT


MOMENT IN COMPONENT TOR. SHEAR STRESS IN ULTIMATE TOTAL
CORR. MAX. S.F.
RECTANGLES (t.m]) COMPONENT RECTANGLES OF SHEAR STRESS ULTIMATE
TOR. (t)
SEC GIRDER DUE TO S.F. SHEAR STRESS
MOM.
(t.m) Vtu (t/m^2) V (t/m^2) V + Vtu (t/m^2)
1 2 3 4 1 2 3 4
1-1 4.23 2.03 0.39 0.94 0.87 13.76 12.95 15.74 22.42 42.68 90.2 106
2-2 6.55 3.14 0.60 1.46 1.35 21.33 20.07 24.39 34.75 115.87 244.8 269
3-3 5.20 2.50 0.47 1.16 1.07 16.94 15.93 19.37 27.59 193.91 394.3 414
4-4 4.45 2.14 0.41 0.99 0.92 14.50 13.64 16.58 23.62 230.26 451.5 468
5-5 4.66 2.24 0.42 1.04 0.96 15.17 14.27 17.34 24.71 293.76 277.7 295
NOTE NO. 201/DN - 01/R-1 SHEET NO.

CALCULATION OF TORSION REINFORCEMENT


AS PER CLAUSE 14.2.3.1 OF IRC : 18 - 2000
REINFORCEMENT FOR TORSION Asv/Sv >= T / (0.8 * X1 * Y1 * 0.87 * Fyv )
AREA OR LONG. REINFORCEMENT Asl >= Asv/Sv * (X1 + Y1 ) * ( Fyv / Fyl )
Fyv (t/m^2) = 42330 X1 is the smaller dimension of the link measured between centres of legs
Y1 is the larger dimension of the link measured between centres of legs
According to clause 14.2.2 of IRC-18:2000 , torsion reinforcement is not required if Vtu < 42.75 t/m^2

COMPONENT RECTANGLES
1 2 3 4
Hmax 4.8 1.25 1.675 0.75
Hmin 0.25 0.225 0.275 0.35

CASE 1 MAX. TORSIONAL MOMENT & CORR. SHEAR FORCE


MOMENT IN COMPONENT TORSIONAL REINFORCEMENT AREA OF LONG. REINFORCEMENT
MAX. RECTANGLES (t.m)
SEC TOR. Asv / Sv (cm^2/m)
MOM.(t) Asv / Sv (cm^2)
1 2 3 4 1 2 3 4 1 2 3 4
1-1 4.23 2.03 0.39 0.94 0.87 N.R. N.R. N.R. NOT REQ. - - - -
2-2 6.55 3.14 0.60 1.46 1.35 NOT REQ.NOT REQ.
NOT REQ.NOT REQ. - - - -
3-3 9.20 4.42 0.84 2.05 1.89 NOT REQ.NOT REQ.
NOT REQ. 3.8 - - - 3.47
4-4 9.21 4.42 0.84 2.05 1.90 NOT REQ.NOT REQ.
NOT REQ. 3.8 - - - 3.47
5-5 11.07 5.31 1.01 2.47 2.28 NOT REQ.NOT REQ.
NOT REQ. 4.6 - - - 4.17

CASE 2 MAX. SHEAR FORCE & CORR. TORSIONAL MOMENT


MOMENT IN COMPONENT TORSIONAL REINFORCEMENT AREA OF LONG. REINFORCEMENT
TOR. RECTANGLES (t.m)
SEC
MOM.(t) Asv / Sv (cm^2/m) Asv / Sv (cm^2)
1 2 3 4 1 2 3 4 1 2 3 4
1-1 4.23 2.03 0.39 0.94 0.87 NOT REQ.NOT REQ.
NOT REQ.NOT REQ. - - - -
2-2 6.55 3.14 0.60 1.46 1.35 NOT REQ.NOT REQ.
NOT REQ.NOT REQ. - - - -
3-3 5.20 2.50 0.47 1.16 1.07 NOT REQ.NOT REQ.
NOT REQ.NOT REQ. - - - -
4-4 4.45 2.14 0.41 0.99 0.92 NOT REQ.NOT REQ.
NOT REQ.NOT REQ. - - - -
NOTE NO. 201/DN - 01/R-1 SHEET NO.

5-5 4.66 2.24 0.42 1.04 0.96 NOT REQ.NOT REQ.


NOT REQ.NOT REQ. - - - -
NOTE NO. 201/DN - 01/R-1 SHEET NO.

TOTAL R/F IN WEB


CASE 1 CASE 2
SEC SHEAR TORSION TOTAL SHEAR TORSION TOTAL
cm /mm cm2/mm
2
cm2/mm cm2/mm cm2/mm cm2/mm
1-1 2.49 N.R. 2.49 2.49 NOT REQ. 2.49
2-2 3.60 NOT REQ. #VALUE! 3.60 NOT REQ. ###
3-3 4.06 NOT REQ. #VALUE! 4.06 NOT REQ. ###
4-4 4.52 NOT REQ. #VALUE! 4.52 NOT REQ. ###
5-5 5.86 NOT REQ. #VALUE! 5.86 NOT REQ. ###

GIRDER G1
CASE 1 MAX. TORSIONAL MOMENT (t.m) & CORR. SHEAR FORCE(t)
MAXIMUM TORSIONAL MOMENT 2.5 (LL*I.F. CORRESPONDING SHEAR FORCE 2.5 (LL*I.F.
SEC. DL 1.25 DL SIDL 2.0 SIDL LL FPLL + FPLL) ULT DL 1.25 DL SIDL 2.0 SIDL LL FPLL + FPLL) ULT

1-1 0.11 0.14 0.04 0.08 3.19 0.15 8.35 8.57 0.00 0.00 0.11 0.22 4.54 0.40 12.35 12.57
2- 2 0.31 0.39 0.10 0.20 5.29 0.42 14.28 14.86 21.19 26.49 0.11 0.22 13.10 1.12 35.55 62.26
3- 3 0.46 0.58 0.12 0.24 7.43 0.64 20.18 20.99 42.39 52.98 0.83 1.66 28.38 1.63 75.03 129.67
4- 4 0.46 0.57 0.13 0.25 7.29 0.64 19.82 20.64 63.65 79.56 0.83 1.66 37.12 1.63 96.88 178.09
5- 5 0.54 0.67 0.01 0.02 9.08 0.79 24.67 25.36 72.75 90.94 2.75 5.50 45.45 1.84 118.23 214.66

CASE 2 MAXIMUM SHEAR FORCE (t) & CORR. TORSIONAL MOMENT(t.m)


MAXIMUM SHEAR FORCE 2.5 (LL*I.F. CORRESPONDING TORSIONAL MOMENT 2.5 (LL*I.F.
SEC. DL 1.25 DL SIDL 2.0 SIDL LL FPLL + FPLL) ULT DL 1.25 DL SIDL 2.0 SIDL LL FPLL + FPLL) ULT
1-1 0.00 0.00 0.11 0.22 17.01 0.40 43.53 43.75 0.11 0.14 0.04 0.08 0.07 0.15 0.55 0.77
2- 2 21.19 26.49 0.11 0.22 25.99 1.12 67.78 94.49 0.31 0.39 0.10 0.20 3.94 0.42 10.90 11.49
3- 3 42.39 52.98 0.83 1.66 37.15 1.63 96.95 151.59 0.46 0.58 0.12 0.24 5.69 0.64 15.83 16.64
4- 4 63.65 79.56 0.83 1.66 39.87 1.63 103.75 184.97 0.46 0.57 0.13 0.25 5.97 0.64 16.54 17.36
5- 5 72.75 90.94 2.75 5.50 49.40 1.84 128.10 224.54 0.54 0.67 0.01 0.02 5.53 0.79 15.81 16.50
NOTE NO. 201/DN - 01/R-1 SHEET NO.

CHECK FOR TOTAL ULTIMATE SHEAR STRESS


Each component Rectangle will be subjected to a Torque = T(hmax * hmin^3)/(Shmax *hmin^3)=
= TxC (say)
Rect. hmax *
Comp hmax hmin hmin ^3 C
1 4800 250 7.50E+10 0.48
2 1250 225 1.42E+10 0.09
3 1675 275 3.48E+10 0.22
4 750 350 3.22E+10 0.21
S 1.56E+11

Torsional Shear Stress = 2 T / (hmin ^2)/(hmax-hmin/3)


CASE 1 MAX. TORSIONAL MOMENT & CORR. SHEAR FORCE
MOMENT IN RECTANGULAR TOR. SHEAR STRESS IN ULTIMATE TOTAL
MAX. COMPONENT (t.m) COMPONENT RECTANGLES OF CORR.
SHEAR STRESS ULTIMATE
TOR. GIRDER S.F. (t)
SEC. DUE TO S.F. SHEAR STRESS
MOM. V
(t.m) Vtu (t/m^2) V + Vtu (t/m^2)
(t/m^2) b d
1 2 3 4 1 2 3 4 b

1-1 8.57 4.11 0.78 1.91 1.76 27.9 26.3 31.9 45.5 12.57 26.6 58
2-2 14.86 7.13 1.35 3.31 3.06 48.4 45.5 55.4 78.9 62.26 131.5 187
3-3 20.99 10.08 1.91 4.68 4.32 68.4 64.3 78.2 111.4 129.67 263.6 342
4-4 20.64 9.91 1.88 4.60 4.25 67.2 63.2 76.9 109.5 178.09 349.2 426
5-5 25.36 12.17 2.31 5.65 5.22 82.6 77.7 94.4 134.6 214.66 202.9 297
NOTE NO. 201/DN - 01/R-1 SHEET NO.

PERMISSIBLE VALUE OF TOTAL ULT. SHEAR ST 484.5 t/m^2

COMPONENT RECTANGLES
1 2 3 4
Hmax 4.8 1.25 1.675 0.75
Hmin 0.25 0.225 0.275 0.35

CASE 2 MAX. SHEAR FORCE & CORR. TORSIONAL MOMENT


MOMENT IN COMPONENT TOR. SHEAR STRESS IN ULTIMATE TOTAL
CORR. MAX. S.F.
RECTANGLES (t.m]) COMPONENT RECTANGLES OF SHEAR STRESS ULTIMATE
TOR. (t)
SEC GIRDER DUE TO S.F. SHEAR STRESS
MOM.
(t.m) Vtu (t/m^2) V (t/m^2) V + Vtu (t/m^2)
1 2 3 4 1 2 3 4
1-1 0.77 0.37 0.07 0.17 0.16 2.50 2.35 2.86 4.07 43.75 92.4 95
2-2 11.49 5.51 1.05 2.56 2.36 37.41 35.20 42.78 60.95 94.49 199.6 242
3-3 16.64 7.99 1.52 3.71 3.42 54.20 50.99 61.97 88.29 151.59 308.2 370
4-4 17.36 8.34 1.58 3.87 3.57 56.55 53.20 64.66 92.12 184.97 362.7 427
5-5 16.50 7.92 1.50 3.68 3.40 53.73 50.55 61.44 87.54 224.54 212.2 274

CALCULATION OF TORSION REINFORCEMENT


AS PER CLAUSE 14.2.3.1 OF IRC : 18 - 2000
REINFORCEMENT FOR TORSION Asv/Sv >= T / (0.8 * X1 * Y1 * 0.87 * Fyv )
AREA OR LONG. REINFORCEMENT Asl >= Asv/Sv * (X1 + Y1 ) * ( Fyv / Fyl )
Fyv (t/m^2) = 42330 X1 is the smaller dimension of the link measured between centres of legs
Y1 is the larger dimension of the link measured between centres of legs
According to clause 14.2.2 of IRC-18:2000 , torsion reinforcement is not required 42.75 t/m^2

COMPONENT RECTANGLES
1 2 3 4
Hmax 4.8 1.25 1.675 0.75
Hmin 0.25 0.225 0.275 0.35
NOTE NO. 201/DN - 01/R-1 SHEET NO.

CASE 1 MAX. TORSIONAL MOMENT & CORR. SHEAR FORCE


MOMENT IN COMPONENT TORSIONAL REINFORCEMENT AREA OF LONG. REINFORCEMENT
MAX. RECTANGLES (t.m)
SEC TOR. Asv / Sv (cm^2/m)
MOM.(t) Asv / Sv (cm^2)
1 2 3 4 1 2 3 4 1 2 3 4
1-1 8.57 4.11 0.78 1.91 1.76 N.R. N.R. N.R. 3.5 - - - 3.23
2-2 14.86 7.13 1.35 3.31 3.06 3.3 3.0 3.9 6.1 15.84 3.85 6.86 5.60
3-3 20.99 10.08 1.91 4.68 4.32 4.6 4.2 5.5 8.6 22.37 5.44 9.68 7.91
4-4 20.64 9.91 1.88 4.60 4.25 4.5 4.1 5.4 8.5 22.00 5.35 9.52 7.78
5-5 25.36 12.17 2.31 5.65 5.22 5.6 5.1 6.6 10.4 27.03 6.58 11.70 9.56

CASE 2 MAX. SHEAR FORCE & CORR. TORSIONAL MOMENT


MOMENT IN COMPONENT TORSIONAL REINFORCEMENT AREA OF LONG. REINFORCEMENT
TOR. RECTANGLES (t.m)
SEC
MOM.(t) Asv / Sv (cm^2/m) Asv / Sv (cm^2)
1 2 3 4 1 2 3 4 1 2 3 4
1-1 0.77 0.37 0.07 0.17 0.16 N.R. N.R. N.R. N.R. - - - -
2-2 11.49 5.51 1.05 2.56 2.36 N.R. N.R. 3.0 4.7 - - 5.30 4.33
3-3 16.64 7.99 1.52 3.71 3.42 3.6 3.3 4.3 6.8 17.74 4.31 7.68 6.27
4-4 17.36 8.34 1.58 3.87 3.57 3.8 3.5 4.5 7.1 18.51 4.50 8.01 6.54
5-5 16.50 7.92 1.50 3.68 3.40 3.6 3.3 4.3 6.8 17.59 4.28 7.61 6.22

TOTAL R/F IN WEB


CASE 1 CASE 2
SEC SHEAR TORSION TOTAL SHEAR TORSION TOTAL
cm2/mm cm2/mm cm2/mm cm2/mm cm2/mm cm2/mm
1-1 2.49 N.R. 2.49 2.49 N.R. 2.49
2-2 3.21 3.88 7.09 3.21 3.00 3.65
3-3 4.94 5.48 10.42 4.94 4.35 9.29
4-4 2.83 5.39 8.22 2.83 4.54 7.36
5-5 5.86 6.63 12.49 5.86 4.31 10.17
NOTE NO. 201/DN - 01/R-1 SHEET NO.

DESIGN OF SHEAR CONNECTOR

Reference : clause 611.4.2 of IRC : 22 - 1986 code for composite construction


The ultimate longitudinal shear VL per unit length ,

V . Ac. Y
VL = I
Where ,
V = Vertical shear due to dead load placed after composite section is
effective and working live load with impact.
= 48.00 x 1.5 + 26.5 x 2.5
= 138.33 t

Ac = Area of transformed section on one side of interface


= 0.25 x 4.8 ( refer section property )
= 1.2 m2

Y = Dist. Of centroid of the area under consideration from the neutral axis of
the composite section
= 0.66548 - 0.125 ( refer section property )
= 0.54048 m

I = M . I . of the composite section


= 1407233245642 mm4 ( refer section property )
= 1.40723 m 4

The ultimate longitudinal shear VL per unit length ,


= 138.33 x 1.2 x 0.5405
1.40723
= 63.75 t/m

S Qu = A s fu x 0.001
Where,
Qu = The ultimate shear resisting capacity of anchorage connector in kN
As = The c / s Area of the anchorage connector in sq mm
fu = The ultimate tensile strength of anchorage connector in Mpa

S Qu = [ 4 x 78.5 x 1000 x 415


200

+ 4 x 78.5 x 1000 x 415 ] x 0.001


200

= 1303 kN = 130.3 t > 63.75 t O.K.

Provide 4L - 10 f @ 200 c / c in addition to shear reinforcement .


NOTE NO. 201/DN - 01/R-1 SHEET NO.

CHECK FOR THERMAL EFFECTS

As per sec. 5.2.(iv) of IRC : 18 - 2000, for the combination of loads with diffferential
temperature gradient effects, maximum 50% live load shall be considered .

Effect of temperature rise


F = EC a Dt A
EC = 3.29E+06 t/m2
a = 1.17E-05 /0C
Dt = Temperature differential
A = X sectional Area Where temp. differential is Dt

TEMPERATURE GRADIENT
( FOR CONCRETE SUPERSTRUCTURE )
( Refer IRC : 6 - 2000 ; clause 218.3 )

POSITIVE TEMP. DIFFERENCES REVERSE TEMP. DIFFERENCES


17.8 10.6

250

150 0.7
4.0

250 200

200
0.8
150
250

2.1 6.6
NOTE NO. 201/DN - 01/R-1 SHEET NO.

F2 F1
200
F2 F1
150 F3 50
F4 50
50 F3
F5
100 F4 150

F5
100 h

200
F9
150 F8 125
F6
125
F6 F7

TEMPERATURE RISE TEMPERATURE FALL

Temperature rise case

Sr. no. DT IN 0c b ( in m ) t ( in m ) A ( in m2 ) Force ( F ) Acting at Eccentricity


F1 6.9 4.800 0.150 0.72 191.2 0.05 m from top 0.615
F2 4.0 4.800 0.150 0.72 110.8 0.075 m from top 0.590
F3 3.6 4.800 0.050 0.24000 33.25 0.175 m from top 0.490
F4 2.4 1.250 0.100 0.12500 11.54 0.250 m from top 0.415
F5 0.8 0.763 0.100 0.07625 2.35 0.333 m from top 0.332
F6 1.05 0.750 0.150 0.11250 4.55 0.05 m from bottom -1.810
Total Force 353.7 Moment 196.76

Stress due to temperature gradient in restrained condition =EaT

At top of deck slab = 684.95 t/m2


At depth of 150mm from top of deck slab = 153.92 t/m2
At the bottom = 80.81 t/m2

Direct tension over entire section


= Force / Area = -160.44 t/m2

Bending stress at top = -93.05 t/m2


Bending stress at bottom = 256.50 t/m2

Stress at top 431.46 t/m2


Stress at bottom 176.86 t/m2
NOTE NO. 201/DN - 01/R-1 SHEET NO.

684.95 -160.44 -93.05 431.5


153.92 -65.08 -71.6 150
-37.12 -197.6 250

+ + =

235.53 75.1
150
80.81 256.50 176.9
F/A M/Z
Stresses
due to Net stresses
temp in due to temp
restrained rise.
condition
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Temperature Fall Case

Sr. no. DT IN 0c b ( in m ) t ( in m ) A ( in m2 ) Force ( F ) Acting at Eccentricity


F1 2.68 4.800 0.200 0.96 99.00 0.100 m from top 0.565
F2 3.96 4.800 0.200 0.96 146.29 0.067 m from top 0.599
F3 1.69 1.250 0.050 0.0625 4.06 0.225 m from top 0.440
F4 0.613 1.250 0.050 0.06250 1.47 0.275 m from top 0.390
F5 0.263 0.763 0.150 0.11438 1.16 0.350 m from top 0.315
F6 1.45 0.750 0.125 0.09375 5.23 0.0417 m from bottom -1.793
F7 3.7 0.750 0.125 0.09375 13.35 0.0625 m from bottom -1.772
F8 2.25 0.513 0.125 0.06406 5.55 0.1875 m from bottom -1.647
F9 0.4 0.275 0.200 0.055 0.85 0.317 m from bottom -1.518
Force 276.95 Moment 102.86

Stress due to temperature gradient in restrained condition =EaT

At top of deck slab -407.9 t/m2


At a depth of 250mm from top of deck slab -26.9 t/m2
At 250mm form bottom of sofit slab -30.78 t/m2
At the bottom of soffit slab -253.97 t/m2
Direct Compression over entire section 125.6 t/m2
Bending stress at top 48.6 t/m2
Bending stress at bottom -134.09 t/m2

-407.9 125.6 48.6 -233.6


-26.9 30 129.1
15.7
141.4
+ + =

-101.20 24.44
-30.78 -116 -20.96

-253.97 -134.09 -262.42


Stress
due to F/A M/Z Net stresses due
temp in to temp fall
restrained
condition

RESULTANT STRESS AT MID SPAN WITH 50% LIVE LOAD

After 50 % Live Loads


302.13 56.20 358
343.76 +
35.09 379

+ + = +

718.38 -154.92 563 > 0 t/m2


50% LL
NOTE NO. 201/DN - 01/R-1 SHEET NO.

RESULTANT STRESS AT EFF. DEPTH d WITH 50% LIVE LOAD

After 50 % Live Loads :-


114.8 4.3 119.0
190.66
2.90 193.6 >0 t/m2

+ =

+
+

873.6 -9.3 864.3 < 1346 t/m2 (O.K.)


Due to DL & SIDL 50 % LL
NOTE NO. 201/DN - 01/R-1 SHEET NO.

EFFECTS OF DIFFERENTIAL SHRINKAGE

It is generally assumed that the time lag between transfer of prestress and casting of
deck slab will be about 28 days.

Differential shrinkage strain, esh = 0.0001


Force induced by differential shrinkage, F = h.A.E.esh
where,
A= 1.2 m2
E= 5700 x û 32
= 32244.069 Mpa
= 3288895.1 t/m2
h= 0.43 (As per BS:5400)

Hence, F = 169.7 t
Eccentricity of the above force from top = 0.125 m
Eccentricity of the above force from CA = 0.540 m

Moment due to above force = 91.72 tm

Stresses induced due to differential shrinkage


st = 169.7 + 91.72 = 120.36 t/m2
2.204 2.115
sb = 169.7 - 91.72 = -42.59 t/m2
2.204 0.767
sj = 169.7 + 91.72 = 104.07 t/m2
2.204 3.387

Tensile stress in deck slab = F = -169.7


A 1.2

= -141.4 t/m2

Stresses due to differential shrinkage

-141.4 120.36 -21.06


-
104.07 -37.36 104.07
+ +
+ =

-42.59 -42.59
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Final stresses including differential shrinkage stresses at effective depth d

-21.06 140.0 119.0


-37.36 - 104.07
207.84 170.49 311.91
+

+ =

-
-42.59 818.31 776 > 0 t/m2 (O.K.)

stresses due to ( With LL ) Final stresses


diff. Shrinkage

Final stresses including differential shrinkage stresses at mid span

-21.06 477.85 456.8


-37.4 - 104.07 557.5
453.5 416.11
+
+
+ =

-
-43 234 191 > 0 t/m2 (O.K.)

stresses due to ( With LL ) Final stresses


diff. Shrinkage
NOTE NO. 201/DN - 01/R-1 SHEET NO.

TEMPERATURE RISE CASE :

RESULTANT STRESS AT MID SPAN WITH 50% LIVE LOAD + TEMP. RISE + DIFF. SHRINKAGE

358 431.5 -21.06 768.7


-71.6 150 - ###
379 -97 -37.4 244.7 386.1
-197.6 250 +

+ + + =

75.1
150
563 > 0 t/m2 176.9 -42.59 698 >0 t/m2 (O.K.)

STRESS DUE NET STRESS DUE STRESS DUE TO DL+ SIDL+ 50% LL +
DL+ SIDL+ 50% TO TEMP RISE. DIFF. SHRINKAGE TEMP. RISE + DIFF.
LL SHRINKAGE

TEMPERATURE RISE CASE :

RESULTANT STRESS AT EFF. DEPTH WITH 50% LIVE LOAD + TEMP. RISE + DIFF. SHRINKAGE

119.0 431.5 -21.06 529.4


-71.6 150 - ###
### -97 -37.4 59.4 200.8
-197.6 250 +

+ + + =

75.1
150
864 > 0 t/m2 176.9 -42.59 999 >0 t/m2 (O.K.)

STRESS DUE NET STRESS DUE STRESS DUE TO DL+ SIDL+ 50% LL +
DL+ SIDL+ 50% TO TEMP RISE. DIFF. SHRINKAGE TEMP. RISE + DIFF.
LL SHRINKAGE
NOTE NO. 201/DN - 01/R-1 SHEET NO.

TEMPERATURE FALL CASE :

RESULTANT STRESS AT MID SPAN WITH 50% LIVE LOAD + TEMP. FALL + DIFF. SHRINKAGE

358 -234 -21.06 103.7


56.5 - ###
379 129.1 -37.4 539
+ 398.0

+ + + =

563 > 0 t/m2 -262 -42.59 258.45 >0 t/m2 (O.K.)

STRESS DUE NET STRESS DUE STRESS DUE TO DL+ SIDL+ 50% LL +
DL+ SIDL+ 50% TO TEMP. FALL DIFF. SHRINKAGE TEMP. FALL + DIFF.
LL SHRINKAGE

TEMPERATURE FALL CASE :

RESULTANT STRESS AT EFF. DEPTH WITH 50% LIVE LOAD + TEMP. FALL + DIFF. SHRINKAGE

119.0 -234 -21.06 -135.6


56.5 - ###
193.6 129.1 -37.4 354
+ 212.7

+ + =
+

864 > 0 t/m2 -262 -42.59 559.3 >0 t/m2 (O.K.)

STRESS DUE NET STRESS DUE STRESS DUE TO DL+ SIDL+ 50% LL +
DL+ SIDL+ 50% TO TEMP. FALL DIFF. SHRINKAGE TEMP. FALL + DIFF.
LL SHRINKAGE
NOTE NO. 201/DN - 01/R-1 SHEET NO.

DESIGN OF DIAPHRAGM

Consider half of diaphram at mediasn side because there is more live load intensity.
Hogg. Sagg.
Loading Shear force Torsion
Moment Moment
DL 23.74 3.15 23.67 0.356
SIDL 8.947 0.42 6.66 3.95
FPLL 1.034 0.1 1.326 0.12
Live Load Class A 16.74 2.66 11.33 3.58
Class 70R 4.601 3.96 15.57 0.984
Total 50.461 7.63 47.226 8.006
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Effective depth = 2500 - 100 = 2400 mm


Grade of concrete = M 40
scbc = 13.33 Mpa sst = 200 Mpa = ### t/m2
m = 10 k= 0.400 j = 0.867
Q= 235.7 t/m2
Web width = 350 mm
Top Reinforcement = 50.46 x ###
0.867 x 2.40 ###

= 11.89 cm2

Bottom Reinforcement = 7.63 x ###


0.867 x 2.40 ###

= 1.80 cm2

A zone of depth 0.2 D , adjacent to the tension face shall contain a portion of the
tension steel given by

0.5 ( l / D - 0.5 ) = 0.41

Hence steel in this portion = 4.9 cm2

The remainder of the tension steel shall be evenly distributed in a zone measuring 0.3
D on either side of the beam from mid-depth.

Hence steel in this portion = 7.0 cm2


Max shear force = 47.23 t

Shear stress = 47.23 = 56.22 t/m2


0.35 x 2.4
Ast x 100 = 11.89 x 0 x 100 = 0.142 %
bxd 0.35 x 2.4

Permissible shear stress as per IRC: 21 -2000 = 0.2 Mpa


(Table 12B) = 20.4 t/m2 shear rein. Req.

Design shear = 47.23 - 20.4 x 0.35 x 2.4


= 30.09 t
Asv/sv = 30.09 x ### = 6.146 cm2/m
20400 x 2.4
Torsion reinforcement in web = 2.31 cm2/m (for one leg)
Total web stirrups = 2.31 x 2 + 6.1458 = 10.76 cm2/m
NOTE NO. 201/DN - 01/R-1 SHEET NO.

Torsion reinforcement for diaphragm

The design for torsion is as per BS: 5400 (Part IV) clause 5.3.4.4.

Torsional moment due to DL, SIDL= 0.356 + 3.95


= 4.31 tm
Load factor for DL = 1.15
Torsional moment due to FPLL+LL= 0.12 + 3.58
= 3.70 tm
Load factor for LL = 1.5
Design torsional moment = 10.50 tm

Permissible torsional shear stress = 0.42 N/mm2


(value obtained from BS:5400,part-4,table10)
2316
1 250

350 2 2250

Element hmax hmin hmax.hmin3 Tor.factor torsion Vt


mm mm mm4 tm N/mm2
1 2316 250 3.619E+10 0.273 2.86 0.40
2 2250 350 9.647E+10 0.727 7.64 0.57
Sum(hmax.hmin3) = 1.327E+11
Torsion factor= hmax.hmin3/sum(hmax*hmin3) (BS:5400:part 4,cl:5.3.4.4)
Vt=2xT/(hmin2(hmax-hmin/3))

Calculation for torsion reinforcement:


Ast/sv = T/(1.6*X1*Y1*0.87*fy) (as per BS:5400 Part 4 Cl:5.3.4.3(b))

For element 1
Y1 = 1630 - 80 - 10= 2226 mm
X1 = 160 mm
T = 2.86 tm
Fy = 415 N/mm2
Ast/Sv = 1.36 cm2/m

For element 2
Y1 = 2250-80-10= 2160 mm
X1 = 260 mm
T = 7.64 tm
Fy = 415 N/mm2
Ast/Sv = 2.31 cm2/m
NOTE NO. 201/DN - 01/R-1 SHEET NO.

DESIGN OF DECK SLAB

Assume a strip of width 1.0 m of deck slab.


Thickness of deck slab = 0.25 m

From I.L.D. the maximum sagging moment occurs when a wheel is at 3.6 m from the median edge
Distance of wheel from first girder = 3.6 - 2.11 = 1.49 m

For class A loading -


case (1)calculation for forces in intermidiate span

b1 = 250+ 2x56 = 362 mm


b/lo = 31.45/3.3 = 9.53
a = 2.6
a = 3.3 - 1.49 - 1.8 0.01 m
beff = a x a x (1 - a/lo) + b1
= 0.01 x 2.6 x (1 - 0.01/3.3) + 0.362 = 0.39 m < 1m

Dispersion length = 724 + 500 = 1224 mm


Intensity of load = 5.7 x 1.13 = 5.26 t/m
1.00 x 1.224

1.8

1.49
2.1125 m 3.30 m 3.3 m 2.1125 m

case (2) Calculation of forces for cantilever portion

a = 0.36
beff = 1.2 x a + b1
= 1.2 x 0.36 + 362 = 0.796 m < 1m

Dispersion length = 512 + 500 = 1012 mm


Intensity of load = 5.7 x 1.13 = 6.36 t/m
1.00 x 1.012

1.8

2.1125 m 3.30 m 3.3 m 2.1125 m

For class70R loading -


case (1)calculation for forces in intermidiate span

b1 = 610+ 2x56 = 722 mm


b/lo = 31.45/3.3 = 9.53
a = 2.6
a = 3.3 - 1.49 - 1.93 0.12 m
beff = a x a x (1 - a/lo) + b1
= 0.12 x 2.6 x (1 - 0.12/3.3) + 0.722 = 1.02 m < 1m

Dispersion length = 612 + 860 = 1472 mm


Intensity of load = 8.5 x 1.13 = 6.38 t/m
1.02 x 1.472

1.93
NOTE NO. 201/DN - 01/R-1 SHEET NO.

1.49
2.1125 m 3.30 m 3.3 m 2.1125 m

case (2) Calculation of forces for cantilever portion

a = 0.21
beff = 1.2 x a + b1
= 1.2 x 0.21 + 722 = 0.970 m < 1m

Dispersion length = 612 + 860 = 1472 mm


Intensity of load = 5.7 x 1.13 = 4.38 t/m
1.00 x 1.472

1.93

2.1125 m 3.30 m 3.3 m 2.1125 m


NOTE NO. 201/DN - 01/R-1 SHEET NO.

REINFORCEMENT CALCULATION FOR DECK SLAB

5.78 tm 3.74 tm
4.93 tm
A B C

Hogging moment = 5.78 t-m (at "A")


Hogging moment = 3.74 t-m (at "B")
Sagging moment = 4.93 t-m
Shear force = 6.37 t
Effective depth = 0.2 m

Grade of concrete = M 40
scbc = 13.33333 Mpa sst = 200 Mpa = 20400 t/m2
m = 10 k= 0.400 j= 0.867
Q = 235.7 t/m2
width = 1000 mm
Top Reinforcement = 5.78 x 10000
0.867 x 0.20 20400

= 16.35 cm2

Top Reinforcement = 3.74 x 10000


0.867 x 0.20 20400

= 10.58 cm2

Bottom Reinforcement = 4.93 x 10000


0.867 x 0.20 20400

= 13.94 cm2

Max shear force = 6.37 t

Shear stress = 6.37 = 31.85 t/m2


1 x 0.20
Ast x = 16.35 x 0.0001 x 100 = 0.82 %
bxd 1 x 0.2

Permissible shear stress as per IRC: 21 -2000 = 0.39 Mpa


(Table 12B) = 39.78 t/m2 O.K.
NOTE NO. 201/DN - 01/R-1 SHEET NO.

INTRODUCTION
It is proposed to construct a R.O.B. at Pankha road in lieu of level crossing No.-13-B
at Delhi - Rewari Section.

The bridge is meant for two lanes of traffic with 2.5 m wide footpath on one side and
has a carriageway width of 7.5 m.Total length of span of R.O.B. is 32.19 m. Effective
span is 31.45 m c/c of bearings. The R.O.B. shall be supported on POT & POT cum
PTFE bearings provided under girders. The superstructure for the bridge shall consists
of cast-in-situ deck slab supported on post-tensioned precast girders.For Dimensional
details of superstructure refer drawing no. 201 / E - 01

From analysis it is observed that effects of SIDL are more in footpath side girder G3
while the the girder G1 at median side is much more influenced by live load in
comparision of other girders. But the girder G3 (footpath side girder ) is much more
influenced by total load (DL+SIDL+LL) in comparision to other girders. Sectional
properties are same. Refer the summary for DL, SIDL & Live Load effects presented
both for inner and outer girder in design note.Therefore the design of girder is carried
out for footpath side girder G3 and other girder is kept similar to footpath side girder.
While calculating the losses in prestress, firstly friction and slip losses are calculated
at different sections.Then the other losses are calculated at different stages and
different sections are checked for stresses under service and for ultimate capacity.

The girders will be cast on the ground near bridge site. The stressing shall be
done when cube strength of concrete reached 32 MPa. Thereafter the girders will be
launched / shifted to the bridge location and placed on temporary bearings over pier
caps. After the concrete in deck slab and diaphragms gained strength, the temporary
bearings will be removed and loads gets transferred to main bearings. It is assumed
that by the time temporary bearings will be removed i.e. load due to deck slab will be
transferred to the girder 28 days will be passed since the casting of the girders or
when cube strength of concrete reached at 40 MPa, whichever is later.
NOTE NO. 201/DN - 01/R-1 SHEET NO.

DESIGN DATA
Grade of concrete in precast girder - M- 40

Grade of concrete in deck slab - M- 40

Grade of H.Y.S.D. reinforcement - Fe- 415

Type of High Tensile Steel - Uncoated stress relieved low


relaxation 7-ply 12.7 mm dia strands
conforming to IS : 14268 - 1995

Type of cable - 12 -T-13

Width of carriageway - 7.50 m

Live Loads - Class A Single Lane

Class A Two Lanes

Class 70 R (Wheeled)

Thickness of wearing coat = 56 mm

Depth of precast girder = 2.25 m

Depth of cast-in-situ slab = 0.25 m

C/C distance between bearings = 31.45 m

Unit weight of precast concrete = 2.5 t/m

Unit weight of Reinforced concrete = 2.4 t/m

Stressing of cables after (First Stage) = 4 Days


(Second Stage) = 28 Days

Cube Strength at 4th day = 32 MPa

Permissible compressive stress in concrete at transfer = 1632 t/m

Permissible tensile stress in concrete at transfer = 163.2 t/m

Permissible compressive stress in service stage = 1346.4 t/m

Permissible tensile stress in service stage = 0 t/m


NOTE NO.201/DN-01/R-1 SHEET NO.

10800
7500 2250 550
CARRIAGEWAY FOOTPATH

###
SLAB
###

CAST-IN-SITU

###
56 THK.

###
DECK SLAB
285
WEARING COAT 2.5 % SLOPE
###

250
###

G1 G2 G3
1500 3000 3000 3300

SECTION AT MID SPAN


NOTE NO. 201/DN - 01/R-1 SHEET NO.

759 8 @ 1529 = 12232mm 759

108 11 22 33 44 55 66 77 88 99 117

10 21 32 43 54 65 76 87 98

107 9 20 31 42 53 64 75 86 97 116

106 8 19 30 41 52 63 74 85 96 115

25900 mm
105 7 18 29 40 51 62 73 84 95 114

=
104 6 17 28 39 50 61 72 83 94 113

3237.5
@
103 5 16 27 38 49 60 71 82 93 112
8

102 4 15 26 37 48 59 70 81 92 111

101 3 14 25 36 47 58 69 80 91 110

2 13 24 35 46 57 68 79 90

100 1 12 23 34 45 56 67 78 89 109

IDEALISATION OF THE STRUCTURE


NOTE NO. 201/DN - 01/R-1 SHEET NO.

( SHOWING JOINT NUMBERING )


NOTE NO. 201/DN - 01/R-1 SHEET NO.

759 8 @ 1529 = 12232 759

171 155 156 157 158 159 160 161 162 180
10

20

30

40

50

60

70

80

90
19

29

39

49

59

69

79

89
9

170 147 148 149 150 151 152 153 154 179
18

28

38

48

58

68

78

88
8

169 139 140 141 142 143 144 145 146 178
17

27

37

47

57

67

77

87
7

25900 mm
168 131 132 133 134 135 136 137 138 177
16

26

36

46

56

66

76

86
6

=
167 123 124 125 126 127 128 129 130 176

3237.5
15

25

35

45

55

65

75

85
5

@
166 115 116 117 118 119 120 121 122 175
8
14

24

34

44

54

64

74

84
4

165 107 108 109 110 111 112 113 114 174
13

23

33

43

53

63

73

83
3

164 99 100 101 102 103 104 105 106 173


12

22

32

42

52

62

72

82
2

21

31

41

51

61

71

81
11
1

163 91 92 93 94 95 96 97 98 172

IDEALISATION OF THE STRUCTURE


NOTE NO. 201/DN - 01/R-1 SHEET NO.

( SHOWING MEMBER NUMBERING )

Anda mungkin juga menyukai