Kelas : 3D
Semester : 5
Grup : 1
Disusun oleh:
Nama : Jannati Syifa
NIM : 151734015
Anggota grup:
1. Afif Fadhillah (151734001)
2. Geraldy Faiq P. (151734012)
3. Ilham Nurrofik (151734014)
4. Jannati Syifa (151734015)
5. Putri Hanifah S. (151734018)
6. Tika Faradita A. (151734031)
Disusun oleh:
Nama : Jannati Syifa
NIM : 151734015
Anggota grup:
1. Afif Fadhillah (151734001)
2. Geraldy Faiq P. (151734012)
3. Ilham Nurrofik (151734014)
4. Jannati Syifa (151734015)
5. Putri Hanifah S. (151734018)
6. Tika Faradita A. (151734031)
Disusun oleh:
Nama : Jannati Syifa
NIM : 151734015
Anggota grup:
1. Afif Fadhillah (151734001)
2. Geraldy Faiq P. (151734012)
3. Ilham Nurrofik (151734014)
4. Jannati Syifa (151734015)
5. Putri Hanifah S. (151734018)
6. Tika Faradita A. (151734031)
Disusun oleh:
Nama : Jannati Syifa
NIM : 151734015
Anggota grup:
1. Afif Fadhillah (151734001)
2. Geraldy Faiq P. (151734012)
3. Ilham Nurrofik (151734014)
4. Jannati Syifa (151734015)
5. Putri Hanifah S. (151734018)
6. Tika Faradita A. (151734031)
Disusun oleh:
Nama : Jannati Syifa
NIM : 151734015
Anggota grup:
1. Afif Fadhillah (151734001)
2. Geraldy Faiq P. (151734012)
3. Ilham Nurrofik (151734014)
4. Jannati Syifa (151734015)
5. Putri Hanifah S. (151734018)
6. Tika Faradita A. (151734031)
Kelas : 3D
Semester : V
Grup : 2
Disusun oleh:
Nama : Jannati Syifa
NIM : 151734015
Anggota grup:
1. Cipta Tri Satria Bakti (151734006)
2. Ilham Nurrofik (151734014)
3. Jannati Syifa (151734015)
4. Tika Faradita A. (151734030)
Disusun oleh:
Nama : Jannati Syifa
NIM : 151734015
Anggota grup:
1. Cipta Tri Satria Bakti (151734006)
2. Ilham Nurrofik (151734014)
3. Jannati Syifa (151734015)
4. Tika Faradita A. (151734030)
Tanggal/Jam Praktikum :
Dosen Pembimbing : Ir. Kholiq Hernawan, M.T.
Teknisi Pengawas :
Disusun oleh:
Nama : Jannati Syifa
NIM : 151734015
Anggota grup:
1. Cipta Tri Satria Bakti (151734006)
2. Ilham Nurrofik (151734014)
3. Jannati Syifa (151734015)
4. Tika Faradita A. (151734030)
Tanggal/Jam Praktikum :
Dosen Pembimbing : Ir. Kholiq Hernawan, M.T.
Teknisi Pengawas :
Disusun oleh:
Nama : Jannati Syifa
NIM : 151734015
Anggota grup:
1. Cipta Tri Satria Bakti (151734006)
2. Ilham Nurrofik (151734014)
3. Jannati Syifa (151734015)
4. Tika Faradita A. (151734030)
Tanggal/Jam Praktikum :
Dosen Pembimbing : Ir. Kholiq Hernawan, M.T.
Teknisi Pengawas :
1.75
1.7
1.65
1.6
1.55
1.5
0 0.5 1 1.5 2 2.5 3 3.5
Tekanan (bar)
4. Grafik efisiensi terhadap pembebanan.
η TERHADAP PEMBEBANAN
80
79.5
79
η (%)
78.5
78
77.5
77
0 0.5 1 1.5 2 2.5 3 3.5
Tekanan (bar)
\
5. Pengaruh pembebanan terhadap tegangan, arus, daya nyata, daya semu, faktor
daya, dan faktor beban.
PEMBEBANAN TERHADAP BEBERAPA PARAMETER
16
14
13.656
12 12.689
12.067
10
I (A)
S (kVA)
8
P (kW)
pf
6 THD Tegangan (%)
THD Arus (%)
5.1
4 4.833 4.733
3.91
3.492 3.653
2 2.541
2.249 2.373
1.63 1.82
1.52
0 0.68 0.69 0.72
1 1.5 2 2.5 3
Tekanan (bar)
215.5
215
214.5
214
0 0.5 1 1.5 2 2.5 3 3.5
Tekanan (bar)
1.) Grafik karakteristik
DAYA MASUKAN TERHADAP PEMBEBANAN
3.45
3.25
P input (Watt)
3.05
2.85
2.65
2.45
2.25
1.5 2.5 3.5 4.5 5.5 6.5
Tekanan (bar)
4.) Grafik
EFISIENSI MOTOR TERHADAP PEMBEBANAN
77
76.5
76
75.5
75
η (%)
74.5
74
73.5
73
72.5
72
71.5
1.5 2 2.5 3 3.5 4 4.5 5 5.5 6 6.5
Tekanan (bar)
KARTU PRAKTIKUM PENGGUNAAN MESIN LISTRIK
PRAKTEK LAPORAN
NO. MODUL NILAI Ket.
Tgl. Ttd. Tgl. Ttd.
1 BLOWER
2 POMPA
3 KOMPRESOR
PRAKTEK LAPORAN
NO. MODUL NILAI Ket.
Tgl. Ttd. Tgl. Ttd.
1 BLOWER
2 POMPA
3 KOMPRESOR
PRAKTEK LAPORAN
NO. MODUL NILAI Ket.
Tgl. Ttd. Tgl. Ttd.
1 BLOWER
2 POMPA
3 KOMPRESOR
POMPA, MOTOR 1
THD THD
Voltage Arus
Tekanan Fasa P (kWh) S (kVA) Cos ɸ Arus Tegangan
(V) (Ampere)
(%) (%)
0.525 0.703 0.743 229.1 3.07 17.7 5.7
R 0.528 0.714 0.740 229.4 3.11 17.7 5.7
0.535 0.719 0.743 229.6 3.13 18.0 5.7
0.399 0.802 0.493 228.6 3.51 13.5 4.3
1 S 0.404 0.796 0.507 229.1 3.48 13.5 4.5
0.400 0.798 0.501 229.1 3.48 13.6 4.4
0.676 0.982 0.688 233.6 4.21 11.5 4.9
T 0.676 0.970 0.697 233.7 4.15 11.2 4.9
0.678 0.984 0.690 233.8 3.21 11.3 4.8
0.598 0.780 0.766 229.9 3.39 16.6 6.1
R 0.568 0.755 0.752 229.5 3.29 15.8 5.8
0.585 0.765 0.765 229.3 3.34 15.8 5.8
0.483 0.856 0.564 230.8 3.71 13.5 4.5
2 S 0.485 0.861 0.563 230.8 3.73 13.6 4.5
0.490 0.871 0.562 231 3.77 13.3 4.6
0.764 1.049 0.728 235.1 4.46 10.2 5
T 0.767 1.058 0.732 235.1 4.46 10.7 5
0.769 1.054 0.729 235.0 4.49 10.5 4.8
0.633 0.800 0.791 228.6 3.5 15.4 6.1
R 0.628 0.798 0.787 228.7 3.49 16.2 5.8
0.620 0.787 0.788 228.2 3.45 15.1 5.7
0.521 0.877 0.594 229.5 3.82 13.4 4.7
3 S 0.526 0.874 0.602 229.9 3.8 13.4 4.6
0.523 0.873 0.599 299.4 3.81 13.3 4.7
0.797 1.077 0.740 234.7 4.59 9.0 4.8
T 0.788 1.080 0.730 234.6 4.6 11.0 4.9
0.797 1.091 0.731 235.3 4.64 10.9 4.9
Pompa, Motor 2
THD THD
Voltage Arus
Tekanan Fasa P (kWh) S (kVA) Cos ɸ Arus Tegangan
(V) (Ampere)
(%) (%)
0.511 0.672 0.761 224.1 3.0 17.5 5.7
R 0.499 0.644 0.751 223.5 2.97 16.7 5.7
0.501 0.665 0.753 223.4 2.98 17.2 5.5
0.405 0.748 0.541 226.4 3.31 15.9 4.3
0,9 S 0.41 0.747 0.548 226 3.31 16.2 4.2
0.412 0.748 0.551 225.9 3.31 16 4.2
0.655 0.92 0.711 231.8 3.97 11.6 5.3
T 0.649 0.915 0.709 231.4 3.95 11.2 5.3
0.651 0.916 0.712 231.1 3.96 11.4 5.3
0.55 0.721 0.763 226.1 3.19 15.1 5.5
R 0.566 0.732 0.734 225.9 3.24 15.5 5.5
0.558 0.727 0.768 225.9 3.22 15.3 5.7
0.483 0.825 0.586 228 3.62 13.9 4.2
2 S 0.481 0.813 0.592 227.9 3.57 14.5 4.2
0.465 0.805 0.577 228 3.53 14.3 4.3
0.793 0.973 0.720 231.1 4.21 10.2 5
T 0.739 0.983 0.752 231.2 4.25 10.4 5.1
0.726 0.974 0.746 231.6 4.21 10.2 5.1
0.652 0.806 0.809 227.1 3.55 15.2 5.9
R 0.645 0.801 0.805 227.2 3.53 15.1 5.9
0.65 0.799 0.813 227 3.52 14.9 5.9
0.555 0.875 0.633 228.4 3.83 13.1 4.2
3 S 0.564 0.878 0.642 228.7 3.84 14 4.2
0.556 0.877 0.634 228.9 3.83 13.1 4.3
0.767 1.034 0.742 234.3 4.41 10 5.1
T 0.764 1.035 0.738 234.4 4.42 9.6 5.2
0.766 1.033 0.741 234.4 4.41 10.1 5.2