DESIGN OF FOOTING - F1

Size of Column ( Bc x Dc) = 0.23 x 0.60 m

Grade of Concrete ( fck ) = M 25

Grade of Steel ( fy ) Fe 500

Load coming to the Column ( P ) = 1207.00 KN

Moment About X-Axis (Mx) = -22.75 KN-m

Moment About Z-Axis (Mz) = -8.10 KN-m

Horizontal reaction(Fx) = 0.00 KN

Horizontal reaction(FZ) = 0.00 KN

Height of excavation ( h ) = 2.00 m

Moment due to horizontal reaction(Fx*h) = 0.00 KN-m

Moment due to horizontal reaction(Fz*h) 0.00 KN-m

Total Moment Mx -22.75 KN-m

Total Moment Mz -8.10 KN-m

Total load on footing ( W = 1.1P ) = 1327.70 KN

Safe bearing capacity of soil ( gsafe ) = 100 KN/m2

Area of Footing required (Areq = W /g safe) = 13.28 m2

Size of Footing Required (Bf x Df) = 3.64 x 3.64 m

Provided size of the footing = 3.8 x 4.1 m

Check for Bearing = 80.21 < 100


(P/A) + (6*Mx/Bf x Df ) + (6*Mz/Bf x Df )
2 2

Hence, the Footing is SAFE in bearing

Area of footing ( A ) = 15.58 m2

Projection beyond the column = 0 m

Size of Pedestal( Bp x Dp ) = 0.23 x 0.60 m

Net upward pressure due to fac. Load ( p ) = 116.21 KN/m2

Moment Mu = p Bf ( Bf - Bc)2/ 8 = 703.49 KN-m

Depth of footing required for B.M ( Dreq ) 231.65 mm


Dreq = SMu / 0.138 fck Bf

Provided depth of footing ( D ) = 750 mm B.M


Assume Cover for Footing (dc) = 50 mm Shear
:
Effective Depth ( d ) = 700 mm Punching
:
Edge depth of footing ( De ) = 750 mm

Mu / Bf d2 = 0.38

% of Steel Pt required from SP: 16 = 0.12

Required Steel (Ast req) = 3192 mm2

Dia Of Bars Provided ( f ) = 16 mm

Area Of each 16 mm dia bar = 201.06 mm2

No: Of 16 mm dia bars (required) = 16 no.s

Spacing of main bars required ( Sreq ) = 238 mm

Provided @ Spacing ( S ) = 100 mm

Provided % of steel = 0.29

Provided Area of Steel = 7640.28

No: Of 16 mm dia bars (provided) = 38.00

Hence Provide 16 tor @ 100 c/c Both ways

CHECK FOR ONE WAY SHEAR :

Shear force at critcle section ( Vu ) = 479.11 KN


Vu = p Bf [0.5 ( Bf - Bc )-d ]

Effective width at criticle section ( B'f ) = 3800 mm

Effective depth at criticle section ( d' ) = 700 mm

Nominal shear stress ( tv = Vu / B'f d' ) = 0.36 N/mm2

Permissible shear stress in concrete ( tc ) = 0.39 N/mm2 > 0.36

Hence, Footing is Safe in One way Shear.

CHECK FOR TWO WAY SHEAR :

Max. shear force ( VU ) 1577.49 KN


p* [ L^2 - (Ped+d)*(Ped+d) ]
Perimeter of the Footing @ criticle section = 4460.00 mm
Bo = [ 2(Bc+ Dc)+4d]

Effective depth at criticle section ( d'' ) = 700.00 mm

Shear Stress (t v) = 0.51 N/mm2


Max allowble punching Shear stress ( t'c ) = 1.25 N/mm2 > 0.51
t'c = 0.25sqrt fck

Hence, Footing is Safe in Punching.


F12 SVPCL

15.58 12.47537754

Hence Safe

safe
safe

safe.
N/mm2
DESIGN OF FOOTING - F2

Size of Column ( Bc x Dc) = 0.23 x 0.60 m

Grade of Concrete ( fck ) = M 25

Grade of Steel ( fy ) Fe 500

Load coming to the Column ( P ) = 968.00 KN

Moment About X-Axis (Mx) = -0.51 KN-m

Moment About Z-Axis (Mz) = 6.60 KN-m

Horizontal reaction(Fx) = 0.00 KN

Horizontal reaction(FZ) = 0.00 KN

Height of excavation ( h ) = 2.00 m

Moment due to horizontal reaction(Fx*h) = 0.00 KN-m

Moment due to horizontal reaction(Fz*h) 0.00 KN-m

Total Moment Mx -0.51 KN-m

Total Moment Mz 6.60 KN-m

Total load on footing ( W = 1.1P ) = 1064.80 KN

Safe bearing capacity of soil ( gsafe ) = 100 KN/m2

Area of Footing required (Areq = W /g safe) = 10.65 m2

Size of Footing Required (Bf x Df) = 3.26 x 3.26 m

Provided size of the footing = 3.4 x 3.7 m

Check for Bearing = 84.67 < 100


(P/A) + (6*Mx/Bf x Df ) + (6*Mz/Bf x Df )
2 2

Hence, the Footing is SAFE in bearing

Area of footing ( A ) = 12.58 m2

Projection beyond the column = 0 m

Size of Pedestal( Bp x Dp ) = 0.23 x 0.60 m

Net upward pressure due to fac. Load ( p ) = 115.43 KN/m2

Moment Mu = p Bf ( Bf - Bc)2/ 8 = 492.96 KN-m

Depth of footing required for B.M ( Dreq ) 205 mm


Dreq = SMu / 0.138 fck Bf

Provided depth of footing ( D ) = 650 mm B.M


Assume Cover for Footing (dc) = 50 mm Shear
:
Effective Depth ( d ) = 600 mm Punching
:
Edge depth of footing ( De ) = 650 mm

Mu / Bf d2 = 0.40

% of Steel Pt required from SP: 16 = 0.12

Required Steel (Ast req) = 2448 mm2

Dia Of Bars Provided ( f ) = 16 mm

Area Of each 16 mm dia bar = 201.06 mm2

No: Of 16 mm dia bars (required) = 13 no.s

Spacing of main bars required ( Sreq ) = 262 mm

Provided @ Spacing ( S ) = 100 mm

Provided % of steel = 0.34

Provided Area of Steel = 6836.04

No: Of 16 mm dia bars (provided) = 34.00

Hence Provide 16 tor @ 100 c/c Both ways

CHECK FOR ONE WAY SHEAR :

Shear force at critcle section ( Vu ) = 386.56 KN


Vu = p Bf [0.5 ( Bf - Bc )-d ]

Effective width at criticle section ( B'f ) = 3400 mm

Effective depth at criticle section ( d' ) = 600 mm

Nominal shear stress ( tv = Vu / B'f d' ) = 0.38 N/mm2

Permissible shear stress in concrete ( tc ) = 0.42 N/mm2 > 0.38

Hence, Footing is Safe in One way Shear.

CHECK FOR TWO WAY SHEAR :

Max. shear force ( VU ) 1254.80 KN


p* [ L^2 - (Ped+d)*(Ped+d) ]
Perimeter of the Footing @ criticle section = 4060.00 mm
Bo = [ 2(Bc+ Dc)+4d]

Effective depth at criticle section ( d'' ) = 600.00 mm

Shear Stress (t v) = 0.52 N/mm2


Max allowble punching Shear stress ( t'c ) = 1.25 N/mm2 > 0.52
t'c = 0.25sqrt fck

Hence, Footing is Safe in Punching.


F12 SVPCL

Hence Safe

safe
safe

safe.
N/mm2
DESIGN OF FOOTING - F3

Size of Column ( Bc x Dc) = 0.23 x 0.45 m

Grade of Concrete ( fck ) = M 25

Grade of Steel ( fy ) Fe 500

Load coming to the Column ( P ) = 683.00 KN

Moment About X-Axis (Mx) = 4.33 KN-m

Moment About Z-Axis (Mz) = -4.51 KN-m

Horizontal reaction(Fx) = 0.00 KN

Horizontal reaction(FZ) = 0.00 KN

Height of excavation ( h ) = 2.00 m

Moment due to horizontal reaction(Fx*h) = 0.00 KN-m

Moment due to horizontal reaction(Fz*h) 0.00 KN-m

Total Moment Mx 4.33 KN-m

Total Moment Mz -4.51 KN-m

Total load on footing ( W = 1.1P ) = 751.30 KN

Safe bearing capacity of soil ( gsafe ) = 100 KN/m2

Area of Footing required (Areq = W /g safe) = 7.51 m2

Size of Footing Required (Bf x Df) = 2.74 x 2.74 m

Provided size of the footing = 3.2 x 2.9 m

Check for Bearing = 66.67 < 100


(P/A) + (6*Mx/Bf x Df ) + (6*Mz/Bf x Df )
2 2

Hence, the Footing is SAFE in bearing

Area of footing ( A ) = 9.28 m2

Projection beyond the column = 0 m

Size of Pedestal( Bp x Dp ) = 0.23 x 0.45 m

Net upward pressure due to fac. Load ( p ) = 110.40 KN/m2

Moment Mu = p Bf ( Bf - Bc)2/ 8 = 389.53 KN-m

Depth of footing required for B.M ( Dreq ) 187.84 mm


Dreq = SMu / 0.138 fck Bf

Provided depth of footing ( D ) = 600 mm B.M


Assume Cover for Footing (dc) = 75 mm Shear
:
Effective Depth ( d ) = 525 mm Punching
:
Edge depth of footing ( De ) = 600 mm

Mu / Bf d2 = 0.44

% of Steel Pt required from SP: 16 = 0.12

Required Steel (Ast req) = 2016 mm2

Dia Of Bars Provided ( f ) = 16 mm

Area Of each 16 mm dia bar = 201.06 mm2

No: Of 16 mm dia bars (required) = 11 no.s

Spacing of main bars required ( Sreq ) = 291 mm

Provided @ Spacing ( S ) = 100 mm

Provided % of steel = 0.38

Provided Area of Steel = 6433.92

No: Of 16 mm dia bars (provided) = 32.00

Hence Provide 16 tor @ 100 c/c Both ways

CHECK FOR ONE WAY SHEAR :

Shear force at critcle section ( Vu ) = 339.15 KN


Vu = p Bf [0.5 ( Bf - Bc )-d ]

Effective width at criticle section ( B'f ) = 3200 mm

Effective depth at criticle section ( d' ) = 525 mm

Nominal shear stress ( tv = Vu / B'f d' ) = 0.4 N/mm2

Permissible shear stress in concrete ( tc ) = 0.44 N/mm2 > 0.4

Hence, Footing is Safe in One way Shear.

CHECK FOR TWO WAY SHEAR :

Max. shear force ( VU ) 1067.57 KN


p* [ L^2 - (Ped+d)*(Ped+d) ]
Perimeter of the Footing @ criticle section = 3460.00 mm
Bo = [ 2(Bc+ Dc)+4d]

Effective depth at criticle section ( d'' ) = 525.00 mm

Shear Stress (t v) = 0.59 N/mm2


Max allowble punching Shear stress ( t'c ) = 1.25 N/mm2 > 0.59
t'c = 0.25sqrt fck

Hence, Footing is Safe in Punching.


F12 SVPCL

Hence Safe

safe
safe

safe.

F13SVPCL
N/mm2
DESIGN OF FOOTING - F4

Size of Column ( Bc x Dc) = 0.23 x 0.45 m

Grade of Concrete ( fck ) = M 25

Grade of Steel ( fy ) Fe 500

Load coming to the Column ( P ) = 593.00 KN

Moment About X-Axis (Mx) = 3.99 KN-m

Moment About Z-Axis (Mz) = -0.44 KN-m

Horizontal reaction(Fx) = 0.00 KN

Horizontal reaction(FZ) = 0.00 KN

Height of excavation ( h ) = 2.00 m

Moment due to horizontal reaction(Fx*h) = 0.00 KN-m

Moment due to horizontal reaction(Fz*h) 0.00 KN-m

Total Moment Mx 3.99 KN-m

Total Moment Mz -0.44 KN-m

Total load on footing ( W = 1.1P ) = 652.30 KN

Safe bearing capacity of soil ( gsafe ) = 100 KN/m2

Area of Footing required (Areq = W /g safe) = 6.52 m2

Size of Footing Required (Bf x Df) = 2.55 x 2.55 m

Provided size of the footing = 2.6 x 2.9 m

Check for Bearing = 88.93 < 100


(P/A) + (6*Mx/Bf x Df ) + (6*Mz/Bf x Df )
2 2

Hence, the Footing is SAFE in bearing

Area of footing ( A ) = 7.54 m2

Projection beyond the column = 0 m

Size of Pedestal( Bp x Dp ) = 0.23 x 0.45 m

Net upward pressure due to fac. Load ( p ) = 117.98 KN/m2

Moment Mu = p Bf ( Bf - Bc)2/ 8 = 215.36 KN-m

Depth of footing required for B.M ( Dreq ) 154.95 mm


Dreq = SMu / 0.138 fck Bf

Provided depth of footing ( D ) = 550 mm B.M


Assume Cover for Footing (dc) = 75 mm Shear
:
Effective Depth ( d ) = 475 mm Punching
:
Edge depth of footing ( De ) = 550 mm

Mu / Bf d2 = 0.37

% of Steel Pt required from SP: 16 = 0.12

Required Steel (Ast req) = 1482 mm2

Dia Of Bars Provided ( f ) = 16 mm

Area Of each 16 mm dia bar = 201.06 mm2

No: Of 16 mm dia bars (required) = 8 no.s

Spacing of main bars required ( Sreq ) = 325 mm

Provided @ Spacing ( S ) = 150 mm

Provided % of steel = 0.28

Provided Steel (Ast req) = 3485.04

Dia Of Bars Provided ( f ) = 16.00

No: Of 16 mm dia bars (PROVIDED) = 18.00

Hence Provide 16 tor @ 150 c/c Both ways

CHECK FOR ONE WAY SHEAR :

Shear force at critcle section ( Vu ) = 217.78 KN


Vu = p Bf [0.5 ( Bf - Bc )-d ]

Effective width at criticle section ( B'f ) = 2600 mm

Effective depth at criticle section ( d' ) = 475 mm

Nominal shear stress ( tv = Vu / B'f d' ) = 0.35 N/mm2

Permissible shear stress in concrete ( tc ) = 0.39 N/mm2 > 0.35

Hence, Footing is Safe in One way Shear.

CHECK FOR TWO WAY SHEAR :

Max. shear force ( VU ) 738.87 KN


p* [ L^2 - (Ped+d)*(Ped+d) ]
Perimeter of the Footing @ criticle section = 3260.00 mm
Bo = [ 2(Bc+ Dc)+4d]

Effective depth at criticle section ( d'' ) = 475.00 mm

Shear Stress (t v) = 0.48 N/mm2

Max allowble punching Shear stress ( t'c ) = 1.25 N/mm2 > 0.48
t'c = 0.25sqrt fck

Hence, Footing is Safe in Punching.


Hence Safe

safe
safe

safe.
N/mm2
DESIGN OF FOOTING - F5

Size of Column ( Bc x Dc) = 0.23 x 0.45 m

Grade of Concrete ( fck ) = M 25

Grade of Steel ( fy ) Fe 500

Load coming to the Column ( P ) = 499.00 KN

Moment About X-Axis (Mx) = -5.97 KN-m

Moment About Z-Axis (Mz) = -0.34 KN-m

Horizontal reaction(Fx) = 0.00 KN

Horizontal reaction(FZ) = 0.00 KN

Height of excavation ( h ) = 2.00 m

Moment due to horizontal reaction(Fx*h) = 0.00 KN-m

Moment due to horizontal reaction(Fz*h) 0.00 KN-m

Total Moment Mx -5.97 KN-m

Total Moment Mz -0.34 KN-m

Total load on footing ( W = 1.1P ) = 548.90 KN

Safe bearing capacity of soil ( gsafe ) = 100 KN/m2

Area of Footing required (Areq = W /g safe) = 5.49 m2

Size of Footing Required (Bf x Df) = 2.34 x 2.34 m

Provided size of the footing = 2.4 x 2.7 m

Check for Bearing = 83.9 < 100


(P/A) + (6*Mx/Bf x Df ) + (6*Mz/Bf x Df )
2 2

Hence, the Footing is SAFE in bearing

Area of footing ( A ) = 6.48 m2

Projection beyond the column = 0 m

Size of Pedestal( Bp x Dp ) = 0.23 x 0.45 m

Net upward pressure due to fac. Load ( p ) = 115.52 KN/m2

Moment Mu = p Bf ( Bf - Bc)2/ 8 = 163.18 KN-m

Depth of footing required for B.M ( Dreq ) 140.38 mm


Dreq = SMu / 0.138 fck Bf

Provided depth of footing ( D ) = 500 mm B.M


Assume Cover for Footing (dc) = 75 mm Shear
:
Effective Depth ( d ) = 425 mm Punching
:
Edge depth of footing ( De ) = 500 mm

Mu / Bf d2 = 0.38

% of Steel Pt required from SP: 16 = 0.12

Required Steel (Ast req) = 1224 mm2

Dia Of Bars Provided ( f ) = 12 mm

Area Of each 12 mm dia bar = 113.1 mm2

No: Of 12 mm dia bars (required) = 11 no.s

Spacing of main bars required ( Sreq ) = 218 mm

Provided @ Spacing ( S ) = 100 mm

Provided % of steel = 0.27

Provided Area of Steel = 2714.40

No: Of 12 mm dia bars (provided) = 24.00

Hence Provide 12 tor @ 100 c/c Both ways

CHECK FOR ONE WAY SHEAR :

Shear force at critcle section ( Vu ) = 182.98 KN


Vu = p Bf [0.5 ( Bf - Bc )-d ]

Effective width at criticle section ( B'f ) = 2400 mm

Effective depth at criticle section ( d' ) = 425 mm

Nominal shear stress ( tv = Vu / B'f d' ) = 0.36 N/mm2

Permissible shear stress in concrete ( tc ) = 0.38 N/mm2 > 0.36

Hence, Footing is Safe in One way Shear.

CHECK FOR TWO WAY SHEAR :

Max. shear force ( VU ) 615.81 KN


p* [ L^2 - (Ped+d)*(Ped+d) ]
Perimeter of the Footing @ criticle section = 3060.00 mm
Bo = [ 2(Bc+ Dc)+4d]

Effective depth at criticle section ( d'' ) = 425.00 mm

Shear Stress (t v) = 0.47 N/mm2


Max allowble punching Shear stress ( t'c ) = 1.25 N/mm2 > 0.47
t'c = 0.25sqrt fck

Hence, Footing is Safe in Punching.


F12 SVPCL

Hence Safe

safe
safe

safe.

12
N/mm2
DESIGN OF FOOTING - F6

Size of Column ( Bc x Dc) = 0.23 x 0.45 m

Grade of Concrete ( fck ) = M 25

Grade of Steel ( fy ) Fe 500

Load coming to the Column ( P ) = 398.00 KN

Moment About X-Axis (Mx) = 4.58 KN-m

Moment About Z-Axis (Mz) = 12.00 KN-m

Horizontal reaction(Fx) = 0.00 KN

Horizontal reaction(FZ) = 0.00 KN

Height of excavation ( h ) = 2.00 m

Moment due to horizontal reaction(Fx*h) = 0.00 KN-m

Moment due to horizontal reaction(Fz*h) 0.00 KN-m

Total Moment Mx 4.58 KN-m

Total Moment Mz 12.00 KN-m

Total load on footing ( W = 1.1P ) = 437.80 KN

Safe bearing capacity of soil ( gsafe ) = 100 KN/m2

Area of Footing required (Areq = W /g safe) = 4.38 m2

Size of Footing Required (Bf x Df) = 2.09 x 2.09 m

Provided size of the footing = 2.1 x 2.4 m

Check for Bearing = 100.99 > 100


(P/A) + (6*Mx/Bf x Df ) + (6*Mz/Bf x Df )
2 2

Hence, the Footing is SAFE in bearing

Area of footing ( A ) = 5.04 m2

Projection beyond the column = 0 m

Size of Pedestal( Bp x Dp ) = 0.23 x 0.45 m

Net upward pressure due to fac. Load ( p ) = 118.46 KN/m2

Moment Mu = p Bf ( Bf - Bc)2/ 8 = 108.73 KN-m

Depth of footing required for B.M ( Dreq ) 122.51 mm


Dreq = SMu / 0.138 fck Bf

Provided depth of footing ( D ) = 400 mm B.M


Assume Cover for Footing (dc) = 75 mm Shear
:
Effective Depth ( d ) = 325 mm Punching
:
Edge depth of footing ( De ) = 400 mm

Mu / Bf d2 = 0.49

% of Steel Pt required from SP: 16 = 0.12

Required Steel (Ast req) = 819 mm2

Dia Of Bars Provided ( f ) = 16 mm

Area Of each 16 mm dia bar = 201.06 mm2

No: Of 16 mm dia bars (required) = 5 no.s

Spacing of main bars required ( Sreq ) = 420 mm

Provided @ Spacing ( S ) = 150 mm

Provided % of steel = 0.41

Provided Area of Steel = 2814.84

No: Of 16 mm dia bars (provided) = 14.00

Hence Provide 16 tor @ 150 c/c Both ways

CHECK FOR ONE WAY SHEAR :

Shear force at critcle section ( Vu ) = 151.74 KN


Vu = p Bf [0.5 ( Bf - Bc )-d ]

Effective width at criticle section ( B'f ) = 2100 mm

Effective depth at criticle section ( d' ) = 325 mm

Nominal shear stress ( tv = Vu / B'f d' ) = 0.44 N/mm2

Permissible shear stress in concrete ( tc ) = 0.46 N/mm2 > 0.44

Hence, Footing is Safe in One way Shear.

CHECK FOR TWO WAY SHEAR :

Max. shear force ( VU ) 485.90 KN


p* [ L^2 - (Ped+d)*(Ped+d) ]
Perimeter of the Footing @ criticle section = 2660.00 mm
Bo = [ 2(Bc+ Dc)+4d]

Effective depth at criticle section ( d'' ) = 325.00 mm

Shear Stress (t v) = 0.56 N/mm2


Max allowble punching Shear stress ( t'c ) = 1.25 N/mm2 > 0.56
t'c = 0.25sqrt fck

Hence, Footing is Safe in Punching.


Hence UnSafe

safe
safe

safe.
N/mm2
DESIGN OF FOOTING - F7

Size of Column ( Bc x Dc) = 0.23 x 0.30 m

Grade of Concrete ( fck ) = M 25

Grade of Steel ( fy ) Fe 500

Load coming to the Column ( P ) = 71.00 KN

Moment About X-Axis (Mx) = 4.08 KN-m

Moment About Z-Axis (Mz) = 12.90 KN-m

Horizontal reaction(Fx) = 0.00 KN

Horizontal reaction(FZ) = 0.00 KN

Height of excavation ( h ) = 2.00 m

Moment due to horizontal reaction(Fx*h) = 0.00 KN-m

Moment due to horizontal reaction(Fz*h) 0.00 KN-m

Total Moment Mx 4.08 KN-m

Total Moment Mz 12.90 KN-m

Total load on footing ( W = 1.1P ) = 78.10 KN

Safe bearing capacity of soil ( gsafe ) = 100 KN/m2

Area of Footing required (Areq = W /g safe) = 0.78 m2

Size of Footing Required (Bf x Df) = 0.88 x 0.88 m

Provided size of the footing = 1 x 1 m

Check for Bearing = 172.88 > 100


(P/A) + (6*Mx/Bf x Df ) + (6*Mz/Bf x Df )
2 2

Hence, the Footing is SAFE in bearing

Area of footing ( A ) = 1 m2

Projection beyond the column = 0 m

Size of Pedestal( Bp x Dp ) = 0.23 x 0.30 m

Net upward pressure due to fac. Load ( p ) = 106.50 KN/m2

Moment Mu = p Bf ( Bf - Bc)2/ 8 = 7.89 KN-m

Depth of footing required for B.M ( Dreq ) 47.82 mm


Dreq = SMu / 0.138 fck Bf

Provided depth of footing ( D ) = 300 mm B.M


Assume Cover for Footing (dc) = 50 mm Shear
:
Effective Depth ( d ) = 250 mm Punching
:
Edge depth of footing ( De ) = 300 mm

Mu / Bf d2 = 0.13

% of Steel Pt required from SP: 16 = 0.12

Required Steel (Ast req) = 300 mm2

Dia Of Bars Provided ( f ) = 10 mm

Area Of each 10 mm dia bar = 78.54 mm2

No: Of 10 mm dia bars (required) = 4 no.s

Spacing of main bars required ( Sreq ) = 250 mm

Provided @ Spacing ( S ) = 150 mm

Provided % of steel = 0.21

Provided Area of Steel = 523.60

No: Of 10 mm dia bars (provided) = 7.00

Hence Provide 10 tor @ 150 c/c Both ways

CHECK FOR ONE WAY SHEAR :

Shear force at critcle section ( Vu ) = 14.38 KN


Vu = p Bf [0.5 ( Bf - Bc )-d ]

Effective width at criticle section ( B'f ) = 1000 mm

Effective depth at criticle section ( d' ) = 250 mm

Nominal shear stress ( tv = Vu / B'f d' ) = 0.12 N/mm2

Permissible shear stress in concrete ( tc ) = 0.34 N/mm2 > 0.12

Hence, Footing is Safe in One way Shear.

CHECK FOR TWO WAY SHEAR :

Max. shear force ( VU ) 81.96 KN


p* [ L^2 - (Ped+d)*(Ped+d) ]
Perimeter of the Footing @ criticle section = 2060.00 mm
Bo = [ 2(Bc+ Dc)+4d]

Effective depth at criticle section ( d'' ) = 250.00 mm

Shear Stress (t v) = 0.16 N/mm2


Max allowble punching Shear stress ( t'c ) = 1.25 N/mm2 > 0.16
t'c = 0.25sqrt fck

Hence, Footing is Safe in Punching.


Hence UnSafe

safe
safe

safe.