Anda di halaman 1dari 1

JURUSAN

+ 50.50
ARSITEKTUR
PUNCAK
+ 49.50
TEMBOK PEMBATAS
FTSP ITN MALANG
+ 48.00 SEMESTER GENAP 2017/2018
LANTAI TERATAS

CEILING
+ 45.90 JUDUL TUGAS

+ 44.00
LANTAI 11
APARTEMENT DAN SHOPPING
CEILING
Balok 80/90
CENTRE
+ 42.90

COLUMN Ø 80
PERANCANGAN ARSITEKTUR 5
+ 40.00
LANTAI 10 NAMA MAHASISWA
Balok 80/90
CEILING
+ 38.90

NUGROHO TRIPUTRA
+ 36.00
LANTAI 9
15 22 048
CEILING
+ 34.90
DOSEN PEMBINA
+ 32.00
LANTAI 8

CEILING
+ 30.90
DAIM TRIWAHYONO, Ir, MSA
DOSEN PEMBINA 1

+ 28.00 BANBANG JOKO WIJI UTOMO, Ir, M


LANTAI 7 DOSEN PEMBINA 2
CEILING
+ 26.90

+ 24.00 DOSEN PEMBIMBING


LANTAI 6

CEILING
+ 22.90

CORE
DAIM TRIWAHYONO, Ir, MSA
DOSEN PEMBIMBING 1
+ 20.00
LANTAI 5

CEILING
+ 18.90

+ 15.00
LANTAI 4
Balok 80/90 Balok 80/90
CEILING
+ 13.90
JUDUL GAMBAR SKALA
COLUMN Ø 80

POTONGAN 1 : 200
+ 10.00
LANTAI 3
Balok 60/90
CEILING
+ 8.90 A-A
COLUMN Ø 60

+ 5.00
LANTAI 2

CEILING
+ 3.90

+ 0.00
LANTAI 1
Balok 80/90

COLUMN Ø 80

- 5.00
BASEMENT
NO LEMBAR

11

JUMLAH LEMBAR

11

Anda mungkin juga menyukai