: Sheet :
Cont'd :
Verified by : Date : Revision Notes :
Project :
Subject : Description :
Design of Strap Footing
CALCULATION
Pa Note : Enter Data in Cells marked only Pb
S
Ha Ma 9000
Aa (Soil level)
da Strap Beam
Ta 75 mm (min)
x e La / 2 5650 600
250 1500 S'
1250 Ra = 3143 kn 7750 Rb = -136 kn
Data Strap Beam Data
Steel Strength fy' 410 Mpa b 1000 mm
Concrete Strength fc' 30 Mpa d 1000 mm
Soil Bearing Capacity pbc 200 kn/m2 cover 75 mm
d' 925 mm
Loading Data kn kn.m kn kn Spacing between footings S
Pa Ma Ha Pb 9.00 m
Dead Load 2500.00 0.00 0.00 100.00
wind load 0.00 0.00 0.00 22.00 * N.B : Loads above are service.
1.00 Total 2500.00 0.00 0.00 234.80 Side Beam and wall loads
Footing Data - A Footing Data - B beam
Soil level Aa 0.00 m Soil level Ab 0.00 m b 300 mm
Depth of soil Da 1.00 m Depth of soil Db 1.00 m d 500 mm
Col dist from edge Xa 0.250 m L 8000 mm
Length of footing La 3.00 m Length of footing Lb 1.20 m wt 30.0 kn
Width of footing Wa 3.20 m Width of footing Wb 1.20 m wall
Eccentricity Ea 1.25 m L 8000 mm
Depth of footing Ta 1.00 m Depth of footing Tb 0.40 m ht 3000 mm
Ftg wt + soil wt 240.00 kn Ftg wt + soil wt 29.95 kn wt / lin mt / 3.45 kn/m
Brdth of pedestal Bp 0.50 m Brdth of pedestal Bp 0.40 m lin ht
Depth of pedestal Dp 0.50 m Depth of pedestal Dp 0.40 m wt 82.80 kn
Wt of pedestal Wp 0.00 kn Wt of pedestal Wp 2.40 kn others
Total axial load Pa 2500.00 kn Total axial load Pb 237.20 kn wt 0 kn
Ra 3143.23 kn Rb -136.07 kn
Wa(Reqd) 5.24 m not ok Wb(Reqd) -0.57 m ok total wt 112.80 kn
pbca' 327.42 kn/m2 pbcb' -94.50 kn/m2 others
pbca' / m 1047.74 kn/m pbcb' / m -113.39 kn/m
Project :
Subject : Description :
CALCULATION
DESIGN OF EXTERNAL FOOTING DESIGN OF INTERNAL FOOTING
qu Mu r As rq Reinf. Per Meter As pr qu Mu r As rq Reinf. Per Meter As pr
Kn/m2 Kn.m (%) (mm2) (each way) (mm2) Kn/m2 Kn.m (%) (mm2) (each way) (mm2)
327 477 0.18 1665 6 Ø 20 1885 -94.5 -12.1 0.18 585 6 Ø 12 679
20 @ c/c 189 12 @ c/c 193
Shear & Moment Diagram
2500 Kn 237 Kn
Weightless
V5 335.2
V1 241.9 V3 403.2 V4
403.2
Shear Diagram - kn
V2 -2258.1 V6 68.0
xcg = 2.333 m
M4 -20.4
M1 30.2
M2 -2520.2 M3 -241.9
Mm -1381.0
Mmax =
-2597.2 kn.m Moment Diagram-kn.m
Prep by : Ahmad Basha Quadri - Abq Consultants - 12-2-826/2 Royal residency, flat no 503, besides Amba Theatre, Mehdipatnam, Hyderabad 500028, A.P India, - www.abqconsultants.com -9959010210
Prepared by : Date : Job No. : Sheet :
Cont'd :
Verified by : Date : Revision Notes :
Project :
Subject : Description :
CALCULATION
19 Ø 32 @ top 7 Ø 32 rest
2880 A
A
stirrups 11 Ø 20 @ bottom For reinforcement
Ø 10 / 184 and stirrups refer
d = 1000
Beam details.
b =1000
SECT A-A
Strap Beam
1000 400
75 mm (min)
500 20 Ø 20 9 Ø 12 400
12 Ø 25
9 Ø 12
3200
1200
Strap Beam
1000
400
500
250 2750
1200
3000 PLAN Internal Footing Fb
External footing Fa
Prep by : Ahmad Basha Quadri - Abq Consultants - 12-2-826/2 Royal residency, flat no 503, besides Amba Theatre, Mehdipatnam, Hyderabad 500028, A.P India, - www.abqconsultants.com -9959010210