1. ELECTRICAL
2. INSTRUMENT
ELECTRICAL
Electrical Contents
Recommendation
The vender inspection should be performed every STA.
According to vender instruction manual, periodical
replacement of parts (e.g. cooling fan, battery, etc.)
should be performed.
Recomendamos realizar una inspeccion por el fabricante
cada STA. De acuerdo al manual de instrucción del
vendedor, considerar el reemplazo periodico de las partes.
1.Maintenance work of Electrical
1-4. Maintenance Master-list
The list contains equipment ranking, remaining life, maintenance cycle,
etc. It’s marvelous!! Please continue the facility management.
La lista contiene la clasificacion de los equipos, la vida remanente, ciclos de
mantenimiento, etc. ¡Es una maravilla! Por favor, continuen con la implementacion del
facility management
1.Maintenance work of Electrical
1-5.Spare-Parts of Electrical
Common electrical device should be stored as spare parts.
For example, MCC of the magnet switch, thermal relay, contactors, etc.
・ A few days, maintained electric equipment was put on the floor. But it
was dirty. Insulation performance is degraded.
Los equipos electricos bajo mantenimiento se colocaron en el piso sucio por
algunos días. Esto degrada el aislamiento.
1.Maintenance work of Electrical
1-6. Others
・ The charging equipment was divided by red tape. Good be safe.
Los equipos con carga fueron divididos con una cinta roja de precaucion.
2.Replace work of Electrical
2-1.Switch gear
Switch gear on/off test unit is located in the
electrical room. The new switch gear (VCS)
and the existing switch gear (VCS) were
different in cable wiring. It cannot be used
for the test of the new switch gear.
•The VCS which was replaced this STA must be reused next STA
•Los contactores que fueron reemplazados en esta STA, deberían se
reinstalados en la próxima STA (con el tablero nuevo)
2.Replace work of Electrical
2-2.Concern for next STA
•Replacement all MCC and MS-101 will be planned at the same time. It’s
hard to work isn’t it? Please consider the work volume or budget in all STA
work.
•Se planifica reemplazar todos los MCC’s y el MS-101 al mismo tiempo. Es un
trabajo duro ¿No es así? Por favor consideren el volumen de trabajo y el
presupuesto para todos los trabajos de STA.
•If you plan to replace about MS or MCC, Please don’t forget to replace the
cable and bus duct between MS and MCC.
•Si se va reemplazar el MS o los MCC´s, por favor no olviden
reemplazar los cables y el ducto de barras junto a los tableros.
2.Replace work of Electrical
2-2.Concern for next STA
•The test items of all equipment are different between TMEIC and METOR.
Required test items should be contained in work pack.
•El protocolo de chequeo de todos los equipos presenta diferencias entre
TMEIC y METOR. Los puntos requeridos de chequeo deben estar incluidos en
el alcance de trabajo.
Thank you for your
kind attention.
Muchas gracias!!
INSTRUMENT
FINDINGS & RECOMMENDATIONS
・Valves
・SS tubes
・Local transmitters
・DCS equipments
・XV-111
・XV-203
・HV-204
・XV-302
・HV-205
XV-111
BEFORE AFTER
写真
XV-203
SIG.
from E/P transmitter
XV-203
Solenoid valve;
SUP.
Air
① ②
SIG.
from E/P transmitter
XV-203
Solenoid valve;
The temporary repairs was good. It was damaged, when dismantled actuator in this
STA. It doesn’t influence to control.
HV-205
We made a hole in this STA because the screw to We didn't dismantle feedback lever.
fixed a lever part.
HV-205
The housing cover was come off because Cover still come off after maintenance. We
housing was corroded. recommend to replace new actuator in next
STA.
XV-302
Actuator was replaced and disk was not bad, continuation usable.
We request to prepare two test flanges by each size for all size in next STA.
After the sample brought back to MGC in 2014 was analyzed, it was judged as pitting corrosion
by chloride concentration.
Additional information
Generally,
High PRE stainless steel have good properties for Localized corrosion-resistant by the environment
including the chloride ion.
Temperature[℃]
℃.
Austenitic
Tubes don’t touch with each other, Because crevice
corrosion happens even if it's colder than pitting
corrosion.
Sorry,
NO INFORMATION
Alloy of previous page
Other situation;
Painted part,
・Flush periodically
・Paint
・Replace periodically
LOCAL TRANSMITTERS
Pneumatic - Electric converter needs overhaul and calibration same as pneumatic transmitters.
Filter
Filter
Control
relay
DCS EQUIPMENTS
I think that it was good that might be possible to minimize the cost by replacing partially, not to whole.
When if whole replace, Windows XP can't be installed into current model PC, that means so also to have
to replace YOKOGAWA software(CENTUM CS3000→CENTUM VP), It’s a large amount of cost.
It could make remainning life longer in this STA, We recommend to improve the installation environment
so that dust doesn't enter in PC.(Desk modification example is already introduced in 2014.)
Even if it can be clean periodically in the desk, it can't be clean to the inside of a PC.
When dust collects on a electrical-board, internal temperature rises and may shorten the life of the PC.
DCS EQUIPMENTS
Actually, spare parts quantity isn’t sometimes equal to input value of SAP system.
Everyone think enough spare parts and dismantle instrumentation, If don’t have that actually, it can't be
restored.
We recommend to decide who manages clearly, and input person and a quantity of spare parts
confirmation person are same.
- Time open
DATA UTILIZATION
Offline Diagnostics
Online Diagnostics
Friction (requires ValVue OVD) *Valvue OVD;online valve diagnostics software by DRESSER
DATA UTILIZATION
For example,
DATA UTILIZATION
Days
DATA UTILIZATION