I DIVISI 1. UMUM
1 Mobilisasi Ls 1.00 60,900,000.00 60,900,000.00 0.63 38,367,000.00 - - 0.37 60,900,000.00 22,533,000.00 1.06
IV DIVISI 7. STRUKTUR
1 Perkerasan Jalan Beton M3 960.00 2,135,622.70 2,050,197,792.00 958.80 2,047,635,044.76 - - 1.20 2,135,622.70 2,562,747.24 0.12
2 Perkerasan Jalan Beton (K-175) M3 - 1,814,945.91 - - - 964.00 1,749,607,855.95 964.00 1,814,945.91 1,749,607,855.95 82.62
3 Baja Tulangan U 24 Polos Kg - 18,353.50 - - - 201.75 3,702,884.70 201.75 18,353.50 3,702,884.70 0.17
4 Pasangan Batu M3 - 1,576,186.95 - - - 192.56 303,516,863.84 192.56 1,576,186.95 303,516,863.84 14.33
2. ANGGOTA
ISHAK SAPAN RUMAPAK, ST 2. ............
NIP. 19750429 200909 1 001
ROBI SUHERMAN. P.ST, MT ABDUL RAHIM TATA, ST. AZWAR, ST
Nip. 19691028 200212 1 009 Site Engineer Direktur