KENDALI RALISASI PROGRESS FISIK

PAKET PEKERJAAN . . . .

1. SATKER :
2. KEGIATAN :
3. PEKERJAAN :
4. LOKASI :
5. KONTRAK NO. :

Periode Minggu Ke : I ( Satu ) Tgl. 24 April S/d Tgl. 30 April 2015

Friday Saturday Sunday Monday Tuesday Wednesday Thursday


NO. URAIAN PEKERJAAN SAT. VOLUME KET.
24-Apr-15 25-Apr-15 26-Apr-15 27-Apr-15 28-Apr-15 29-Apr-15 30-Apr-15

Tanggal :
Jumlah Hari : 8 8 1 8 8 8 8 8

PEKERJAAN TANGGUL
1 Galian Tanah Lumpur (A) M3 - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - -
3 Timbunan Tanah Pilihan M3 - - - - - - - -
4 Matras Bambu Takik / Belah (man) M2 - - - - - - - -
5 Lapisan Geotekstil M2 - - - - - - - -
6 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - -
7 Pasangan GCL M2 - - - - - - - -
8 Gebalan Rumput M2 - - - - - - - -

PEKERJAAN JEMBATAN TANGGUL


1 Galian Tanah Lumpur (A) M3 - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - -
3 Pasangan Batu Kali 1 : 4 M3 - - - - - - - -
4 Siaran 1 : 2 M2 - - - - - - - -
5 Plesteran 1 : 3 M2 - - - - - - - -
6 Jembatan Armco Type Multiplate A M1 - - - - - - - -
7 Beton Bertulang K-225 (untuk jem M3 - - - - - - - -
8 Timbunan Tanah Piihan M3 - - - - - - - -
9 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - -
10 Lapisan Geotekstil M2 - - - - - - - -

Volume Semen Pasir Kerikil Batu Kali


Beton K.225 - x 7.42 - 0.50 - 0.78 -
Pas. Batu Kali 1 : 4 = - x 3.31 - 0.57 - 1.20 -
Plesteran 1 : 3 = - x 0.12 - 0.02 -
Siaran 1 : 2 = - x 0.13 - 0.01 -

Total : - - - -

Vol Besi Beton Kawat Beton Kayu Bekisting Paku


Tulangan Beton K.225 = - x 110.0 - 2.00 -
Bekisting Beton K.225 = - x 0.40 - 2.00 -

Total : - - - -

Vol Bambu Bambu Takik Rumput Gebal Tanah Timb.


Cerucuk Bambu = - x 1.00 -
Matras Bambu = - x 1.60 -
Gebalan Rumput = - 1.10 -
Timbunan Tanah Pilihan = - 1.00 -

Total : - - - -

Vol Bronjong Batu Kali Geotex NW GCL


Bronjong Kawat Pabrikasi = - x 1.00 - 1.10 -
Lapisan Geotex NW = - x 1.02 -
Lapisan GCL = - x 1.05 -

Total : - - - -
Estimasi
BAHAN Friday Saturday Sunday Monday Tuesday Wednesday Thursday
Penggunaan :
JUMLAH
JUMLAH / HARI KEBUTUHAN
BAHAN
- - 1 Cement - - - - - - - -
- - 2 Pasir - - - - - - - -
- - 3 Kerikil/Splite - - - - - - - -
- - 4 Batu Kali/Belah - - - - - - - -
- - 5 Tanah Timb. - - - - - - - -
- - 6 Bambu - - - - - - - -
- - 7 Bambu Takik - - - - - - - -
- - 8 Geotex NW - - - - - - - -
- - 9 Geo GCL - - - - - - - -
- - 10 Kawat Bronjong - - - - - - - -
- - 11 Rumput Gebal - - - - - - - -
- - 12 Armco Plate - - - - - - - -
- - 13
- - 14

Estimasi Penggunaan : ALAT BERAT Friday Saturday Sunday Monday Tuesday Wednesday Thursday

JUMLAH
JUMLAH / HARI
KEBUTUHAN ALAT
- - 1 Excavator - - - - - - - -
- - 2 Dump Truck - - - - - - - -
- - 3 Buldozer - - - - - - - -
- - 4 Vibro Roller - - - - - - - -
- - 5 Concrete Mixer - - - - - - - -
- - 6 Vibrator Beton - - - - - - - -
- - 7 Pompa Air - - - - - - - -
- - 8 Waterpass
- - 9 Theodolite
- - 10 Chain Saw
- - 11 Alat Bantu
- - 12 Truck Kayu
- - 13
- - 14
- - 15

Total Estimasi Penggunaan : TENAGA Friday Saturday Sunday Monday Tuesday Wednesday Thursday -

Per Hari :
- - Pelaksana Utama
- - Pelaksana Lap.
- - Mandor - - - - - - - -
- Kepala Tukang - - - - - - - -
- - Tukang Batu - - - - - - - -
- - Tukang Besi - - - - - - - -
- - Tukang Kayu - - - - - - - -
- - Pekerja - - - - - - - -
- - Mandor Alat - - - - - - - -
- - Operator - - - - - - - -
- - Pemb. Operator - - - - - - - -
- - Sopir - - - - - - - -
- - Pembantu Sopir - - - - - - - -
- - Surveyor - - - - - - - -
- - Pemb. Surveyor - - - - - - - -
- - Mekanik
- - Pembantu Mekanik - - - - - - - -
- - Penjaga
KENDALI RALISASI PROGRESS FISIK
PAKET PEKERJAAN . . . .

1. SATKER :
2. KEGIATAN :
3. PEKERJAAN :
4. LOKASI :
5. KONTRAK NO. :

Periode Minggu Ke : II ( Dua ) Tgl. 01 Mei S/d Tgl. 07 Mei 2015

Friday Saturday Sunday Monday Tuesday Wednesday Thursday


NO. URAIAN PEKERJAAN SAT. VOLUME KET.
1-May-15 2-May-15 3-May-15 4-May-15 5-May-15 6-May-15 7-May-15
Tanggal :
Jumlah Hari : 8 8 8 8 8 8 8 8

PEKERJAAN TANGGUL
1 Galian Tanah Lumpur (A) M3 - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - -
3 Timbunan Tanah Pilihan M3 - - - - - - - -
4 Matras Bambu Takik / Belah (man) M2 - - - - - - - -
5 Lapisan Geotekstil M2 - - - - - - - -
6 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - -
7 Pasangan GCL M2 - - - - - - - -
8 Gebalan Rumput M2 - - - - - - - -

PEKERJAAN JEMBATAN TANGGUL


1 Galian Tanah Lumpur (A) M3 - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - -
3 Pasangan Batu Kali 1 : 4 M3 - - - - - - - -
4 Siaran 1 : 2 M2 - - - - - - - -
5 Plesteran 1 : 3 M2 - - - - - - - -
6 Jembatan Armco Type Multiplate A M1 - - - - - - - -
7 Beton Bertulang K-225 (untuk jem M3 - - - - - - - -
8 Timbunan Tanah Piihan M3 - - - - - - - -
9 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - -
10 Lapisan Geotekstil M2 - - - - - - - -

Volume Semen Pasir Kerikil Batu Kali


Beton K.225 - x 7.42 - 0.50 - 0.78 -
Pas. Batu Kali 1 : 4 = - x 3.31 - 0.57 - 1.20 -
Plesteran 1 : 3 = - x 0.12 - 0.02 -
Siaran 1 : 2 = - x 0.13 - 0.01 -

Total : - - - -

Vol Besi Beton Kawat Beton Kayu Bekisting Paku


Tulangan Beton K.225 = - x 110.0 - 2.00 -
Bekisting Beton K.225 = - x 0.40 - 2.00 -

Total : - - - -

Vol Bambu Bambu Takik Rumput Gebal Tanah Timb.


Cerucuk Bambu = - x 1.00 -
Matras Bambu = - x 1.60 -
Gebalan Rumput = - 1.10 -
Timbunan Tanah Pilihan = - 1.00 -

Total : - - - -

Vol Bronjong Batu Kali Geotex NW GCL


Bronjong Kawat Pabrikasi = - x 1.00 - 1.10 -
Lapisan Geotex NW = - x 1.02 -
Lapisan GCL = - x 1.05 -

Total : - - - -
Estimasi
BAHAN Friday Saturday Sunday Monday Tuesday Wednesday Thursday -
Penggunaan :
JUMLAH
JUMLAH / HARI KEBUTUHAN
BAHAN
- - 1 Cement - - - - - - - -
- - 2 Pasir - - - - - - - -
- - 3 Kerikil/Splite - - - - - - - -
- - 4 Batu Kali/Belah - - - - - - - -
- - 5 Tanah Timb. - - - - - - - -
- - 6 Bambu - - - - - - - -
- - 7 Bambu Takik - - - - - - - -
- - 8 Geotex NW - - - - - - - -
- - 9 Geo GCL - - - - - - - -
- - 10 Kawat Bronjong - - - - - - - -
- - 11 Rumput Gebal - - - - - - - -
- - 12 Armco Plate - - - - - - - -
- - 13
- - 14

Estimasi Penggunaan : ALAT BERAT Friday Saturday Sunday Monday Tuesday Wednesday Thursday -

JUMLAH
JUMLAH / HARI
KEBUTUHAN ALAT
- - 1 Excavator - - - - - - - -
- - 2 Dump Truck - - - - - - - -
- - 3 Buldozer - - - - - - - -
- - 4 Vibro Roller - - - - - - - -
- - 5 Concrete Mixer - - - - - - - -
- - 6 Vibrator Beton - - - - - - - -
- - 7 Pompa Air - - - - - - - -
- - 8 Waterpass
- - 9 Theodolite
- - 10 Chain Saw
- - 11 Alat Bantu
- - 12 Truck Kayu
- - 13
- - 14
- - 15

Total Estimasi Penggunaan : TENAGA Friday Saturday Sunday Monday Tuesday Wednesday Thursday -

Per Hari :
- - Pelaksana Utama
0.57 4.00 Pelaksana Lap. 1.00 1.00 1.00 1.00
- - Mandor - - - - - - - -
- Kepala Tukang - - - - - - - -
- - Tukang Batu - - - - - - - -
- - Tukang Besi - - - - - - - -
- - Tukang Kayu - - - - - - - -
- - Pekerja - - - - - - - -
- - Mandor Alat - - - - - - - -
- - Operator - - - - - - - -
- - Pemb. Operator - - - - - - - -
- - Sopir - - - - - - - -
- - Pembantu Sopir - - - - - - - -
- - Surveyor - - - - - - - -
- - Pemb. Surveyor - - - - - - - -
- - Mekanik
- - Pembantu Mekanik - - - - - - - -
- - Penjaga
KENDALI RALISASI PROGRESS FISIK
PAKET PEKERJAAN . . . .

1. SATKER :
2. KEGIATAN :
3. PEKERJAAN :
4. LOKASI :
5. KONTRAK NO. :

Periode Minggu Ke : III ( Tiga ) Tgl. 08 Mei S/d Tgl. 15 Mei 2015

NO. URAIAN PEKERJAAN SAT. VOLUME Friday Saturday Sunday Monday Tuesday Wednesday Thursday Friday KET.

Tanggal : 8-May-15 9-May-15 10-May-15 11-May-15 12-May-15 13-May-15 14-May-15 15-May-15


Jumlah Hari : 8 8 8 8 8 8 8 8

PEKERJAAN TANGGUL
1 Galian Tanah Lumpur (A) M3 - - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - - -
3 Timbunan Tanah Pilihan M3 - - - - - - - - -
4 Matras Bambu Takik / Belah (man) M2 - - - - - - - - -
5 Lapisan Geotekstil M2 - - - - - - - - -
6 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - - -
7 Pasangan GCL M2 - - - - - - - - -
8 Gebalan Rumput M2 - - - - - - - - -

PEKERJAAN JEMBATAN TANGGUL


1 Galian Tanah Lumpur (A) M3 - - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - - -
3 Pasangan Batu Kali 1 : 4 M3 - - - - - - - - -
4 Siaran 1 : 2 M2 - - - - - - - - -
5 Plesteran 1 : 3 M2 - - - - - - - - -
6 Jembatan Armco Type Multiplate A M1 - - - - - - - - -
7 Beton Bertulang K-225 (untuk jem M3 - - - - - - - - -
8 Timbunan Tanah Piihan M3 - - - - - - - - -
9 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - - -
10 Lapisan Geotekstil M2 - - - - - - - - -

Volume Semen Pasir Kerikil Batu Kali


Beton K.225 - x 7.42 - 0.50 - 0.78 -
Pas. Batu Kali 1 : 4 = - x 3.31 - 0.57 - 1.20 -
Plesteran 1 : 3 = - x 0.12 - 0.02 -
Siaran 1 : 2 = - x 0.13 - 0.01 -

Total : - - - -

Vol Besi Beton Kawat Beton Kayu Bekisting Paku


Tulangan Beton K.225 = - x 110.0 - 2.00 -
Bekisting Beton K.225 = - x 0.40 - 2.00 -

Total : - - - -

Vol Bambu Bambu Takik Rumput Gebal Tanah Timb.


Cerucuk Bambu = - x 1.00 -
Matras Bambu = - x 1.60 -
Gebalan Rumput = - 1.10 -
Timbunan Tanah Pilihan = - 1.00 -

Total : - - - -

Vol Bronjong Batu Kali Geotex NW GCL


Bronjong Kawat Pabrikasi = - x 1.00 - 1.10 -
Lapisan Geotex NW = - x 1.02 -
Lapisan GCL = - x 1.05 -

Total : - - - -
Estimasi
BAHAN Friday Saturday Sunday Monday Tuesday Wednesday Thursday Friday
Penggunaan :
JUMLAH
JUMLAH / HARI KEBUTUHAN
BAHAN
- - 1 Cement - - - - - - - -
- - 2 Pasir - - - - - - - -
- - 3 Kerikil/Splite - - - - - - - -
- - 4 Batu Kali/Belah - - - - - - - -
- - 5 Tanah Timb. - - - - - - - -
- - 6 Bambu - - - - - - - -
- - 7 Bambu Takik - - - - - - - -
- - 8 Geotex NW - - - - - - - -
- - 9 Geo GCL - - - - - - - -
- - 10 Kawat Bronjong - - - - - - - -
- - 11 Rumput Gebal - - - - - - - -
- - 12 Armco Plate - - - - - - - -
- - 13
- - 14

Estimasi Penggunaan : ALAT BERAT Friday Saturday Sunday Monday Tuesday Wednesday Thursday Friday

JUMLAH
JUMLAH / HARI
KEBUTUHAN ALAT
- - 1 Excavator - - - - - - - -
- - 2 Dump Truck - - - - - - - -
- - 3 Buldozer - - - - - - - -
- - 4 Vibro Roller - - - - - - - -
- - 5 Concrete Mixer - - - - - - - -
- - 6 Vibrator Beton - - - - - - - -
- - 7 Pompa Air - - - - - - - -
- - 8 Waterpass
- - 9 Theodolite
- - 10 Chain Saw
- - 11 Alat Bantu
- - 12 Truck Kayu
- - 13
- - 14
- - 15

Total Estimasi Penggunaan : TENAGA Friday Saturday Sunday Monday Tuesday Wednesday Thursday Friday

Per Hari :
0.63 5.00 Pelaksana Utama 1.00 1.00 1.00 1.00 1.00
0.88 7.00 Pelaksana Lap. 1.00 1.00 1.00 1.00 1.00 1.00 1.00
- - Mandor - - - - - - - -
- Kepala Tukang - - - - - - - -
- - Tukang Batu - - - - - - - -
- - Tukang Besi - - - - - - - -
- - Tukang Kayu - - - - - - - -
- - Pekerja - - - - - - - -
- - Mandor Alat - - - - - - - -
- - Operator - - - - - - - -
- - Pemb. Operator - - - - - - - -
- - Sopir - - - - - - - -
- - Pembantu Sopir - - - - - - - -
- - Surveyor - - - - - - - -
- - Pemb. Surveyor - - - - - - - -
- - Mekanik
- - Pembantu Mekanik - - - - - - - -
- - Penjaga
KENDALI RALISASI PROGRESS FISIK
PAKET PEKERJAAN . . . .

1. SATKER :
2. KEGIATAN :
3. PEKERJAAN :
4. LOKASI :
5. KONTRAK NO. :

Periode Minggu Ke : IV ( Empat ) Tgl. 16 Mei S/d Tgl. 23 Mei 2015

NO. URAIAN PEKERJAAN SAT. VOLUME Saturday Sunday Monday Tuesday Wednesday Thursday Friday Saturday KET.

Tanggal : 16-May-15 17-May-15 18-May-15 19-May-15 20-May-15 21-May-15 22-May-15 23-May-15


Jumlah Hari : 8 8 8 8 8 8 8 8

PEKERJAAN TANGGUL
1 Galian Tanah Lumpur (A) M3 - - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - - -
3 Timbunan Tanah Pilihan M3 - - - - - - - - -
4 Matras Bambu Takik / Belah (man) M2 - - - - - - - - -
5 Lapisan Geotekstil M2 - - - - - - - - -
6 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - - -
7 Pasangan GCL M2 - - - - - - - - -
8 Gebalan Rumput M2 - - - - - - - - -

PEKERJAAN JEMBATAN TANGGUL


1 Galian Tanah Lumpur (A) M3 - - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - - -
3 Pasangan Batu Kali 1 : 4 M3 - - - - - - - - -
4 Siaran 1 : 2 M2 - - - - - - - - -
5 Plesteran 1 : 3 M2 - - - - - - - - -
6 Jembatan Armco Type Multiplate A M1 - - - - - - - - -
7 Beton Bertulang K-225 (untuk jem M3 - - - - - - - - -
8 Timbunan Tanah Piihan M3 - - - - - - - - -
9 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - - -
10 Lapisan Geotekstil M2 - - - - - - - - -

Volume Semen Pasir Kerikil Batu Kali


Beton K.225 - x 7.42 - 0.50 - 0.78 -
Pas. Batu Kali 1 : 4 = - x 3.31 - 0.57 - 1.20 -
Plesteran 1 : 3 = - x 0.12 - 0.02 -
Siaran 1 : 2 = - x 0.13 - 0.01 -

Total : - - - -

Vol Besi Beton Kawat Beton Kayu Bekisting Paku


Tulangan Beton K.225 = - x 110.0 - 2.00 -
Bekisting Beton K.225 = - x 0.40 - 2.00 -

Total : - - - -

Vol Bambu Bambu Takik Rumput Gebal Tanah Timb.


Cerucuk Bambu = - x 1.00 -
Matras Bambu = - x 1.60 -
Gebalan Rumput = - 1.10 -
Timbunan Tanah Pilihan = - 1.00 -

Total : - - - -

Vol Bronjong Batu Kali Geotex NW GCL


Bronjong Kawat Pabrikasi = - x 1.00 - 1.10 -
Lapisan Geotex NW = - x 1.02 -
Lapisan GCL = - x 1.05 -

Total : - - - -
Estimasi
BAHAN Saturday Sunday Monday Tuesday Wednesday Thursday Friday Saturday
Penggunaan :
JUMLAH
JUMLAH / HARI KEBUTUHAN
BAHAN
- - 1 Cement - - - - - - - -
- - 2 Pasir - - - - - - - -
- - 3 Kerikil/Splite - - - - - - - -
- - 4 Batu Kali/Belah - - - - - - - -
- - 5 Tanah Timb. - - - - - - - -
- - 6 Bambu - - - - - - - -
- - 7 Bambu Takik - - - - - - - -
- - 8 Geotex NW - - - - - - - -
- - 9 Geo GCL - - - - - - - -
- - 10 Kawat Bronjong - - - - - - - -
- - 11 Rumput Gebal - - - - - - - -
- - 12 Armco Plate - - - - - - - -
- - 13
- - 14

Estimasi Penggunaan : ALAT BERAT Saturday Sunday Monday Tuesday Wednesday Thursday Friday Saturday

JUMLAH
JUMLAH / HARI
KEBUTUHAN ALAT
- - 1 Excavator - - - - - - - -
- - 2 Dump Truck - - - - - - - -
- - 3 Buldozer - - - - - - - -
- - 4 Vibro Roller - - - - - - - -
- - 5 Concrete Mixer - - - - - - - -
- - 6 Vibrator Beton - - - - - - - -
- - 7 Pompa Air - - - - - - - -
- - 8 Waterpass
1.00 8.00 9 Theodolite 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
- - 10 Chain Saw
- - 11 Alat Bantu
- - 12 Truck Kayu
- - 13
- - 14
- - 15

Total Estimasi Penggunaan : TENAGA Saturday Sunday Monday Tuesday Wednesday Thursday Friday Saturday

Per Hari :
0.63 5.00 Pelaksana Utama 1.00 1.00 1.00 1.00 1.00
1.25 10.00 Pelaksana Lap. 1.00 2.00 2.00 1.00 1.00 1.00 2.00
- - Mandor - - - - - - - -
- Kepala Tukang - - - - - - - -
- - Tukang Batu - - - - - - - -
- - Tukang Besi - - - - - - - -
- - Tukang Kayu - - - - - - - -
- - Pekerja - - - - - - - -
- - Mandor Alat - - - - - - - -
- - Operator - - - - - - - -
- - Pemb. Operator - - - - - - - -
- - Sopir - - - - - - - -
- - Pembantu Sopir - - - - - - - -
1.00 8.00 Surveyor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
2.00 16.00 Pemb. Surveyor 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
- - Mekanik
- - Pembantu Mekanik - - - - - - - -
1.00 8.00 Penjaga 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
DONT TOUCH

94,652.44
39,503.32
117,515.40
31,658.00
33,009.40
754,122.90
118,951.30
17,692.90
-
-
94,652.44
39,503.32
927,035.07
51,277.38
55,611.48
43,256,331.89
5,108,625.41
117,515.40
754,122.88
33,009.38
DONT TOUCH

8992.3592752097
26,301.8
43,943.9
18,970.0
13,683.0
412,246.8
107,915.3
9,038.0
-
-
8,992.4
26,301.8
507,550.5
24,794.5
29,620.0
36,775,068.5
3,326,774.0
43,943.9
412,246.8
13,683.0
DONT TOUCH

8992.3592752097
26,301.8
43,943.9
18,970.0
13,683.0
412,246.8
107,915.3
9,038.0
-
-
8,992.4
26,301.8
507,550.5
24,794.5
29,620.0
36,775,068.5
3,326,774.0
43,943.9
412,246.8
13,683.0
KENDALI RALISASI PROGRESS FISIK
PAKET PEKERJAAN . . . .

1. SATKER :
2. KEGIATAN :
3. PEKERJAAN :
4. LOKASI :
5. KONTRAK NO. :

Periode Minggu Ke : V ( Lima ) Tgl. 24 Mei S/d Tgl. 31 Mei 2015

NO. URAIAN PEKERJAAN SAT. VOLUME Sunday Monday Tuesday Wednesday Thursday Friday Saturday Sunday KET.

Tanggal : 24-May-15 25-May-15 26-May-15 27-May-15 28-May-15 29-May-15 30-May-15 31-May-15


Jumlah Hari : 8 8 8 8 8 8 8 8

PEKERJAAN TANGGUL
1 Galian Tanah Lumpur (A) M3 - - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - - -
3 Timbunan Tanah Pilihan M3 - - - - - - - - -
4 Matras Bambu Takik / Belah (man) M2 - - - - - - - - -
5 Lapisan Geotekstil M2 - - - - - - - - -
6 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - - -
7 Pasangan GCL M2 - - - - - - - - -
8 Gebalan Rumput M2 - - - - - - - - -

PEKERJAAN JEMBATAN TANGGUL


1 Galian Tanah Lumpur (A) M3 - - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - - -
3 Pasangan Batu Kali 1 : 4 M3 - - - - - - - - -
4 Siaran 1 : 2 M2 - - - - - - - - -
5 Plesteran 1 : 3 M2 - - - - - - - - -
6 Jembatan Armco Type Multiplate A M1 - - - - - - - - -
7 Beton Bertulang K-225 (untuk jem M3 - - - - - - - - -
8 Timbunan Tanah Piihan M3 - - - - - - - - -
9 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - - -
10 Lapisan Geotekstil M2 - - - - - - - - -

Volume Semen Pasir Kerikil Batu Kali


Beton K.225 - x 7.42 - 0.50 - 0.78 -
Pas. Batu Kali 1 : 4 = - x 3.31 - 0.57 - 1.20 -
Plesteran 1 : 3 = - x 0.12 - 0.02 -
Siaran 1 : 2 = - x 0.13 - 0.01 -

Total : - - - -

Vol Besi Beton Kawat Beton Kayu Bekisting Paku


Tulangan Beton K.225 = - x 110.0 - 2.00 -
Bekisting Beton K.225 = - x 0.40 - 2.00 -

Total : - - - -

Vol Bambu Bambu Takik Rumput Gebal Tanah Timb.


Cerucuk Bambu = - x 1.00 -
Matras Bambu = - x 1.60 -
Gebalan Rumput = - 1.10 -
Timbunan Tanah Pilihan = - 1.00 -

Total : - - - -

Vol Bronjong Batu Kali Geotex NW GCL


Bronjong Kawat Pabrikasi = - x 1.00 - 1.10 -
Lapisan Geotex NW = - x 1.02 -
Lapisan GCL = - x 1.05 -

Total : - - - -
Estimasi
BAHAN Sunday Monday Tuesday Wednesday Thursday Friday Saturday Sunday
Penggunaan :
JUMLAH
JUMLAH / HARI KEBUTUHAN
BAHAN
- - 1 Cement - - - - - - - -
- - 2 Pasir - - - - - - - -
- - 3 Kerikil/Splite - - - - - - - -
- - 4 Batu Kali/Belah - - - - - - - -
- - 5 Tanah Timb. - - - - - - - -
- - 6 Bambu - - - - - - - -
- - 7 Bambu Takik - - - - - - - -
- - 8 Geotex NW - - - - - - - -
- - 9 Geo GCL - - - - - - - -
- - 10 Kawat Bronjong - - - - - - - -
- - 11 Rumput Gebal - - - - - - - -
- - 12 Armco Plate - - - - - - - -
- - 13
- - 14

Estimasi Penggunaan : ALAT BERAT Sunday Monday Tuesday Wednesday Thursday Friday Saturday Sunday

JUMLAH
JUMLAH / HARI
KEBUTUHAN ALAT
- - 1 Excavator - - - - - - - -
- - 2 Dump Truck - - - - - - - -
- - 3 Buldozer - - - - - - - -
- - 4 Vibro Roller - - - - - - - -
- - 5 Concrete Mixer - - - - - - - -
- - 6 Vibrator Beton - - - - - - - -
- - 7 Pompa Air - - - - - - - -
0.75 6.00 8 Waterpass 1.00 1.00 1.00 1.00 1.00 1.00
0.75 6.00 9 Theodolite 1.00 1.00 1.00 1.00 1.00 1.00
- - 10 Chain Saw
- - 11 Alat Bantu
1.50 12.00 12 Truck Kayu 2.00 2.00 2.00 2.00 2.00 2.00
- - 13
- - 14
- - 15

Total Estimasi Penggunaan : TENAGA Sunday Monday Tuesday Wednesday Thursday Friday Saturday Sunday

Per Hari :
0.75 6.00 Pelaksana Utama 1.00 1.00 1.00 1.00 1.00 1.00
1.00 8.00 Pelaksana Lap. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
- - Mandor - - - - - - - -
- Kepala Tukang - - - - - - - -
- - Tukang Batu - - - - - - - -
- - Tukang Besi - - - - - - - -
- - Tukang Kayu - - - - - - - -
- - Pekerja - - - - - - - -
- - Mandor Alat - - - - - - - -
- - Operator - - - - - - - -
- - Pemb. Operator - - - - - - - -
1.50 12.00 Sopir - 2.00 2.00 2.00 2.00 2.00 2.00 -
1.50 12.00 Pembantu Sopir - 2.00 2.00 2.00 2.00 2.00 2.00 -
1.50 12.00 Surveyor - 2.00 2.00 2.00 2.00 2.00 2.00 -
3.00 24.00 Pemb. Surveyor - 4.00 4.00 4.00 4.00 4.00 4.00 -
- - Mekanik
- - Pembantu Mekanik - - - - - - - -
1.00 8.00 Penjaga 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
KENDALI RALISASI PROGRESS FISIK
PAKET PEKERJAAN . . . .

1. SATKER :
2. KEGIATAN :
3. PEKERJAAN :
4. LOKASI :
5. KONTRAK NO. :

Periode Minggu Ke : VI ( Enam ) Tgl. 01 Juni S/d Tgl. 07 Juni 2015

NO. URAIAN PEKERJAAN SAT. VOLUME Monday Tuesday Wednesday Thursday Friday Saturday Sunday KET.

Tanggal : 1-Jun-15 2-Jun-15 3-Jun-15 4-Jun-15 5-Jun-15 6-Jun-15 7-Jun-15


Jumlah Hari : 8 8 8 8 8 8 8 8

PEKERJAAN TANGGUL
1 Galian Tanah Lumpur (A) M3 - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - -
3 Timbunan Tanah Pilihan M3 2,739.54 389.12 397.04 385.85 375.28 380.49 402.87 408.89
4 Matras Bambu Takik / Belah (man) M2 - - - - - - - -
5 Lapisan Geotekstil M2 - - - - - - - -
6 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - -
7 Pasangan GCL M2 - - - - - - - -
8 Gebalan Rumput M2 - - - - - - - -

PEKERJAAN JEMBATAN TANGGUL


1 Galian Tanah Lumpur (A) M3 - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - -
3 Pasangan Batu Kali 1 : 4 M3 - - - - - - - -
4 Siaran 1 : 2 M2 - - - - - - - -
5 Plesteran 1 : 3 M2 - - - - - - - -
6 Jembatan Armco Type Multiplate A M1 - - - - - - - -
7 Beton Bertulang K-225 (untuk jem M3 - - - - - - - -
8 Timbunan Tanah Piihan M3 - - - - - - - -
9 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - -
10 Lapisan Geotekstil M2 - - - - - - - -

Volume Semen Pasir Kerikil Batu Kali


Beton K.225 - x 7.42 - 0.50 - 0.78 -
Pas. Batu Kali 1 : 4 = - x 3.31 - 0.57 - 1.20 -
Plesteran 1 : 3 = - x 0.12 - 0.02 -
Siaran 1 : 2 = - x 0.13 - 0.01 -

Total : - - - -

Vol Besi Beton Kawat Beton Kayu Bekisting Paku


Tulangan Beton K.225 = - x 110.0 - 2.00 -
Bekisting Beton K.225 = - x 0.40 - 2.00 -

Total : - - - -

Vol Bambu Bambu Takik Rumput Gebal Tanah Timb.


Cerucuk Bambu = - x 1.00 -
Matras Bambu = - x 1.60 -
Gebalan Rumput = - 1.10 -
Timbunan Tanah Pilihan = 2,739.54 1.00 2,739.54

Total : - - - 2,740

Vol Bronjong Batu Kali Geotex NW GCL


Bronjong Kawat Pabrikasi = - x 1.00 - 1.10 -
Lapisan Geotex NW = - x 1.02 -
Lapisan GCL = - x 1.05 -

Total : - - - -
Estimasi
BAHAN Monday Tuesday Wednesday Thursday Friday Saturday Sunday
Penggunaan :
JUMLAH
JUMLAH / HARI KEBUTUHAN
BAHAN
- - 1 Cement - - - - - - - -
- - 2 Pasir - - - - - - - -
- - 3 Kerikil/Splite - - - - - - - -
- - 4 Batu Kali/Belah - - - - - - - -
391.36 2,739.54 5 Tanah Timb. 389.12 397.04 385.85 375.28 380.49 402.87 408.89 -
- - 6 Bambu - - - - - - - -
- - 7 Bambu Takik - - - - - - - -
- - 8 Geotex NW - - - - - - - -
- - 9 Geo GCL - - - - - - - -
- - 10 Kawat Bronjong - - - - - - - -
- - 11 Rumput Gebal - - - - - - - -
- - 12 Armco Plate - - - - - - - -
- - 13
- - 14

Estimasi Penggunaan : ALAT BERAT Monday Tuesday Wednesday Thursday Friday Saturday Sunday

JUMLAH
JUMLAH / HARI
KEBUTUHAN ALAT
1.01 7.10 1 Excavator 1.01 1.03 1.00 0.97 0.99 1.04 1.06 -
11.71 81.98 2 Dump Truck 11.64 11.88 11.55 11.23 11.39 12.06 12.24 -
0.32 2.25 3 Buldozer 0.32 0.33 0.32 0.31 0.31 0.33 0.34 -
0.15 1.07 4 Vibro Roller 0.15 0.16 0.15 0.15 0.15 0.16 0.16 -
- - 5 Concrete Mixer - - - - - - - -
- - 6 Vibrator Beton - - - - - - - -
1.76 12.33 7 Pompa Air 1.75 1.79 1.74 1.69 1.71 1.81 1.84 -
0.57 4.00 8 Waterpass 1.00 1.00 1.00 1.00
0.86 6.00 9 Theodolite 1.00 1.00 1.00 1.00 1.00 1.00
- - 10 Chain Saw
- - 11 Alat Bantu
1.71 12.00 12 Truck Kayu 2.00 2.00 2.00 2.00 2.00 2.00
- - 13
- - 14
- - 15

Total Estimasi Penggunaan : TENAGA Monday Tuesday Wednesday Thursday Friday Saturday Sunday

Per Hari :
0.71 5.00 Pelaksana Utama 1.00 1.00 1.00 1.00 1.00
1.00 7.00 Pelaksana Lap. 1.00 1.00 1.00 1.00 1.00 1.00 1.00
- - Mandor - - - - - - - -
- Kepala Tukang - - - - - - - -
- - Tukang Batu - - - - - - - -
- - Tukang Besi - - - - - - - -
- - Tukang Kayu - - - - - - - -
3.04 21.29 Pekerja 3.02 3.09 3.00 2.92 2.96 3.13 3.18 -
0.76 5.32 Mandor Alat 0.76 0.77 0.75 0.73 0.74 0.78 0.79 -
1.49 10.42 Operator 1.48 1.51 1.47 1.43 1.45 1.53 1.56 -
1.49 10.42 Pemb. Operator 1.48 1.51 1.47 1.43 1.45 1.53 1.56 -
13.43 93.98 Sopir 13.64 13.88 13.55 13.23 13.39 14.06 12.24 -
13.43 93.98 Pembantu Sopir 13.64 13.88 13.55 13.23 13.39 14.06 12.24 -
1.43 10.00 Surveyor 2.00 2.00 2.00 2.00 1.00 1.00 - -
2.86 20.00 Pemb. Surveyor 4.00 4.00 4.00 4.00 2.00 2.00 - -
- - Mekanik
- - Pembantu Mekanik - - - - - - -
1.00 7.00 Penjaga 1.00 1.00 1.00 1.00 1.00 1.00 1.00
KENDALI RALISASI PROGRESS FISIK
PAKET PEKERJAAN . . . .

1. SATKER :
2. KEGIATAN :
3. PEKERJAAN :
4. LOKASI :
5. KONTRAK NO. :

Periode Minggu Ke : VII ( Tujuh ) Tgl. 08 Juni S/d Tgl. 15 Juni 2015

NO. URAIAN PEKERJAAN SAT. VOLUME Monday Tuesday Wednesday Thursday Friday Saturday Sunday Monday KET.

Tanggal : 8-Jun-15 9-Jun-15 10-Jun-15 11-Jun-15 12-Jun-15 13-Jun-15 14-Jun-15 15-Jun-15


Jumlah Hari : 8 8 8 8 8 8 1 8

PEKERJAAN TANGGUL
1 Galian Tanah Lumpur (A) M3 - - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - - -
3 Timbunan Tanah Pilihan M3 2,753.47 350.97 344.18 355.29 344.18 339.94 353.01 312.89 353.01
4 Matras Bambu Takik / Belah (man) M2 - - - - - - - - -
5 Lapisan Geotekstil M2 - - - - - - - - -
6 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - - -
7 Pasangan GCL M2 - - - - - - - - -
8 Gebalan Rumput M2 - - - - - - - - -

PEKERJAAN JEMBATAN TANGGUL


1 Galian Tanah Lumpur (A) M3 - - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - - -
3 Pasangan Batu Kali 1 : 4 M3 - - - - - - - - -
4 Siaran 1 : 2 M2 - - - - - - - - -
5 Plesteran 1 : 3 M2 - - - - - - - - -
6 Jembatan Armco Type Multiplate A M1 - - - - - - - - -
7 Beton Bertulang K-225 (untuk jem M3 - - - - - - - - -
8 Timbunan Tanah Piihan M3 - - - - - - - - -
9 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - - -
10 Lapisan Geotekstil M2 - - - - - - - - -

Volume Semen Pasir Kerikil Batu Kali


Beton K.225 - x 7.42 - 0.50 - 0.78 -
Pas. Batu Kali 1 : 4 = - x 3.31 - 0.57 - 1.20 -
Plesteran 1 : 3 = - x 0.12 - 0.02 -
Siaran 1 : 2 = - x 0.13 - 0.01 -

Total : - - - -

Vol Besi Beton Kawat Beton Kayu Bekisting Paku


Tulangan Beton K.225 = - x 110.0 - 2.00 -
Bekisting Beton K.225 = - x 0.40 - 2.00 -

Total : - - - -

Vol Bambu Bambu Takik Rumput Gebal Tanah Timb.


Cerucuk Bambu = - x 1.00 -
Matras Bambu = - x 1.60 -
Gebalan Rumput = - 1.10 -
Timbunan Tanah Pilihan = 2,753.47 1.00 2,753.47

Total : - - - 2,753

Vol Bronjong Batu Kali Geotex NW GCL


Bronjong Kawat Pabrikasi = - x 1.00 - 1.10 -
Lapisan Geotex NW = - x 1.02 -
Lapisan GCL = - x 1.05 -

Total : - - - -
Estimasi
BAHAN Monday Tuesday Wednesday Thursday Friday Saturday Sunday Monday
Penggunaan :
JUMLAH
JUMLAH / HARI KEBUTUHAN
BAHAN
- - 1 Cement - - - - - - - -
- - 2 Pasir - - - - - - - -
- - 3 Kerikil/Splite - - - - - - - -
- - 4 Batu Kali/Belah - - - - - - - -
344.18 2,753.47 5 Tanah Timb. 350.97 344.18 355.29 344.18 339.94 353.01 312.89 353.01
- - 6 Bambu - - - - - - - -
- - 7 Bambu Takik - - - - - - - -
- - 8 Geotex NW - - - - - - - -
- - 9 Geo GCL - - - - - - - -
- - 10 Kawat Bronjong - - - - - - - -
- - 11 Rumput Gebal - - - - - - - -
- - 12 Armco Plate - - - - - - - -
- - 13
- - 14

Estimasi Penggunaan : ALAT BERAT Monday Tuesday Wednesday Thursday Friday Saturday Sunday Monday

JUMLAH
JUMLAH / HARI
KEBUTUHAN ALAT
0.67 5.35 1 Excavator 0.68 0.67 0.69 0.67 0.66 0.69 0.61 0.69
10.30 82.39 2 Dump Truck 10.50 10.30 10.63 10.30 10.17 10.56 9.36 10.56
0.28 2.26 3 Buldozer 0.29 0.28 0.29 0.28 0.28 0.29 0.26 0.29
0.13 1.08 4 Vibro Roller 0.14 0.13 0.14 0.13 0.13 0.14 0.12 0.14
- - 5 Concrete Mixer - - - - - - - -
- - 6 Vibrator Beton - - - - - - - -
1.55 12.39 7 Pompa Air 1.58 1.55 1.60 1.55 1.53 1.59 1.41 1.59
0.75 6.00 8 Waterpass 1.00 1.00 1.00 1.00 1.00 1.00
0.88 7.00 9 Theodolite 1.00 1.00 1.00 1.00 1.00 1.00 1.00
- - 10 Chain Saw
- - 11 Alat Bantu
1.75 14.00 12 Truck Kayu 2.00 2.00 2.00 2.00 2.00 2.00 2.00
- - 13
- - 14
- - 15

Total Estimasi Penggunaan : TENAGA Monday Tuesday Wednesday Thursday Friday Saturday Sunday Monday

Per Hari :
0.88 7.00 Pelaksana Utama 1.00 1.00 1.00 1.00 1.00 1.00 1.00
1.00 8.00 Pelaksana Lap. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
- - Mandor - - - - - - - -
- Kepala Tukang - - - - - - - -
- - Tukang Batu - - - - - - - -
- - Tukang Besi - - - - - - - -
- - Tukang Kayu - - - - - - - -
2.68 21.40 Pekerja 2.73 2.68 2.76 2.68 2.64 2.74 2.43 2.74
0.67 5.35 Mandor Alat 0.68 0.67 0.69 0.67 0.66 0.69 0.61 0.69
1.09 8.69 Operator 1.11 1.09 1.12 1.09 1.07 1.11 0.99 1.11
1.09 8.69 Pemb. Operator 1.11 1.09 1.12 1.09 1.07 1.11 0.99 1.11
12.05 96.39 Sopir 12.50 12.30 12.63 12.30 12.17 12.56 9.36 12.56
12.05 96.39 Pembantu Sopir 12.50 12.30 12.63 12.30 12.17 12.56 9.36 12.56
1.63 13.00 Surveyor 2.00 2.00 2.00 2.00 2.00 1.00 - 2.00
3.25 26.00 Pemb. Surveyor 4.00 4.00 4.00 4.00 4.00 2.00 - 4.00
0.75 6.00 Mekanik 1.00 1.00 1.00 1.00 1.00 1.00
1.50 12.00 Pembantu Mekanik 2.00 2.00 - 2.00 2.00 2.00 2.00
0.88 7.00 Penjaga 1.00 1.00 1.00 1.00 1.00 1.00 1.00
KENDALI RALISASI PROGRESS FISIK
PAKET PEKERJAAN . . . .

1. SATKER :
2. KEGIATAN :
3. PEKERJAAN :
4. LOKASI :
5. KONTRAK NO. :

Periode Minggu Ke : VIII ( Delapan ) Tgl. 16 Juni S/d Tgl. 22 Juni 2015

NO. URAIAN PEKERJAAN SAT. VOLUME Tuesday Wednesday Thursday Friday Saturday Sunday Monday KET.

Tanggal : 16-Jun-15 17-Jun-15 18-Jun-15 19-Jun-15 20-Jun-15 21-Jun-15 22-Jun-15


Jumlah Hari : 8 8 8 8 8 8 8 8

PEKERJAAN TANGGUL
1 Galian Tanah Lumpur (A) M3 - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - -
3 Timbunan Tanah Pilihan M3 2,732.81 388.17 396.06 384.90 374.36 379.56 401.88 407.88
4 Matras Bambu Takik / Belah (man) M2 - - - - - - - -
5 Lapisan Geotekstil M2 - - - - - - - -
6 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - -
7 Pasangan GCL M2 - - - - - - - -
8 Gebalan Rumput M2 - - - - - - - -

PEKERJAAN JEMBATAN TANGGUL


1 Galian Tanah Lumpur (A) M3 - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - -
3 Pasangan Batu Kali 1 : 4 M3 - - - - - - - -
4 Siaran 1 : 2 M2 - - - - - - - -
5 Plesteran 1 : 3 M2 - - - - - - - -
6 Jembatan Armco Type Multiplate A M1 - - - - - - - -
7 Beton Bertulang K-225 (untuk jem M3 - - - - - - - -
8 Timbunan Tanah Piihan M3 - - - - - - - -
9 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - -
10 Lapisan Geotekstil M2 - - - - - - - -

Volume Semen Pasir Kerikil Batu Kali


Beton K.225 - x 7.42 - 0.50 - 0.78 -
Pas. Batu Kali 1 : 4 = - x 3.31 - 0.57 - 1.20 -
Plesteran 1 : 3 = - x 0.12 - 0.02 -
Siaran 1 : 2 = - x 0.13 - 0.01 -

Total : - - - -

Vol Besi Beton Kawat Beton Kayu Bekisting Paku


Tulangan Beton K.225 = - x 110.0 - 2.00 -
Bekisting Beton K.225 = - x 0.40 - 2.00 -

Total : - - - -

Vol Bambu Bambu Takik Rumput Gebal Tanah Timb.


Cerucuk Bambu = - x 1.00 -
Matras Bambu = - x 1.60 -
Gebalan Rumput = - 1.10 -
Timbunan Tanah Pilihan = 2,732.81 1.00 2,732.81

Total : - - - 2,733

Vol Bronjong Batu Kali Geotex NW GCL


Bronjong Kawat Pabrikasi = - x 1.00 - 1.10 -
Lapisan Geotex NW = - x 1.02 -
Lapisan GCL = - x 1.05 -

Total : - - - -
Estimasi
BAHAN Tuesday Wednesday Thursday Friday Saturday Sunday Monday Saturday
Penggunaan :
JUMLAH
JUMLAH / HARI KEBUTUHAN
BAHAN
- - 1 Cement - - - - - - - -
- - 2 Pasir - - - - - - - -
- - 3 Kerikil/Splite - - - - - - - -
- - 4 Batu Kali/Belah - - - - - - - -
390.40 2,732.81 5 Tanah Timb. 388.17 396.06 384.90 374.36 379.56 401.88 407.88 -
- - 6 Bambu - - - - - - - -
- - 7 Bambu Takik - - - - - - - -
- - 8 Geotex NW - - - - - - - -
- - 9 Geo GCL - - - - - - - -
- - 10 Kawat Bronjong - - - - - - - -
- - 11 Rumput Gebal - - - - - - - -
- - 12 Armco Plate - - - - - - - -
- - 13
- - 14

Estimasi Penggunaan : ALAT BERAT Tuesday Wednesday Thursday Friday Saturday Sunday Monday Saturday

JUMLAH
JUMLAH / HARI
KEBUTUHAN ALAT
0.76 5.31 1 Excavator 0.75 0.77 0.75 0.73 0.74 0.78 0.79 -
11.68 81.77 2 Dump Truck 11.62 11.85 11.52 11.20 11.36 12.03 12.21 -
0.32 2.25 3 Buldozer 0.32 0.33 0.32 0.31 0.31 0.33 0.34 -
0.15 1.07 4 Vibro Roller 0.15 0.16 0.15 0.15 0.15 0.16 0.16 -
- - 5 Concrete Mixer - - - - - - - -
- - 6 Vibrator Beton - - - - - - - -
1.76 12.30 7 Pompa Air 1.75 1.78 1.73 1.68 1.71 1.81 1.84 -
1.00 7.00 8 Waterpass 1.00 1.00 1.00 1.00 1.00 1.00 1.00
1.00 7.00 9 Theodolite 1.00 1.00 1.00 1.00 1.00 1.00 1.00
- - 10 Chain Saw
- - 11 Alat Bantu
1.86 13.00 12 Truck Kayu 2.00 2.00 2.00 2.00 1.00 2.00 2.00
- - 13
- - 14
- - 15

Total Estimasi Penggunaan : TENAGA Tuesday Wednesday Thursday Friday Saturday Sunday Monday Saturday

Per Hari :
0.71 5.00 Pelaksana Utama 1.00 1.00 1.00 1.00 1.00
1.86 13.00 Pelaksana Lap. 2.00 2.00 2.00 2.00 2.00 1.00 2.00
- - Mandor - - - - - - - -
- Kepala Tukang - - - - - - - -
- - Tukang Batu - - - - - - - -
- - Tukang Besi - - - - - - - -
- - Tukang Kayu - - - - - - - -
3.03 21.24 Pekerja 3.02 3.08 2.99 2.91 2.95 3.12 3.17 -
0.76 5.31 Mandor Alat 0.75 0.77 0.75 0.73 0.74 0.78 0.79 -
1.23 8.63 Operator 1.23 1.25 1.22 1.18 1.20 1.27 1.29 -
1.23 8.63 Pemb. Operator 1.23 1.25 1.22 1.18 1.20 1.27 1.29 -
13.54 94.77 Sopir 13.62 13.85 13.52 13.20 12.36 14.03 14.21 -
13.54 94.77 Pembantu Sopir 13.62 13.85 13.52 13.20 12.36 14.03 14.21 -
2.00 14.00 Surveyor 2.00 2.00 2.00 2.00 2.00 2.00 2.00 -
4.00 28.00 Pemb. Surveyor 4.00 4.00 4.00 4.00 4.00 4.00 4.00 -
0.86 6.00 Mekanik 1.00 1.00 1.00 1.00 1.00 1.00
1.71 12.00 Pembantu Mekanik 2.00 2.00 - 2.00 2.00 2.00 2.00
1.00 7.00 Penjaga 1.00 1.00 1.00 1.00 1.00 1.00 1.00
KENDALI RALISASI PROGRESS FISIK
PAKET PEKERJAAN . . . .

1. SATKER :
2. KEGIATAN :
3. PEKERJAAN :
4. LOKASI :
5. KONTRAK NO. :

Periode Minggu Ke : IX ( Sembilan ) Tgl. 23 Juni S/d Tgl. 30 Juni 2015

NO. URAIAN PEKERJAAN SAT. VOLUME Tuesday Wednesday Thursday Friday Saturday Sunday Monday Tuesday KET.

Tanggal : 23-Jun-15 24-Jun-15 25-Jun-15 26-Jun-15 27-Jun-15 28-Jun-15 29-Jun-15 30-Jun-15


Jumlah Hari : 8 8 8 8 8 8 8 8

PEKERJAAN TANGGUL
1 Galian Tanah Lumpur (A) M3 673.77 86.04 84.22 82.17 84.22 83.18 86.38 86.38 81.18
2 Cerucuk Bambu Bh 289.67 36.99 36.21 35.33 36.21 35.76 37.14 37.14 34.90
3 Timbunan Tanah Pilihan M3 2,730.53 348.69 341.32 332.99 341.32 337.10 350.07 350.07 328.98
4 Matras Bambu Takik / Belah (man) M2 372.98 47.63 46.62 45.49 46.62 46.05 47.82 47.82 44.94
5 Lapisan Geotekstil M2 - - - - - - - - -
6 Bronjong Pabrikasi 2,70 mm M3 172.37 22.01 21.55 21.02 21.55 21.28 22.10 22.10 20.77
7 Pasangan GCL M2 189.46 24.19 23.68 23.10 23.68 23.39 24.29 24.29 22.83
8 Gebalan Rumput M2 - - - - - - - - -

PEKERJAAN JEMBATAN TANGGUL


1 Galian Tanah Lumpur (A) M3 - - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - - -
3 Pasangan Batu Kali 1 : 4 M3 - - - - - - - - -
4 Siaran 1 : 2 M2 - - - - - - - - -
5 Plesteran 1 : 3 M2 - - - - - - - - -
6 Jembatan Armco Type Multiplate A M1 - - - - - - - - -
7 Beton Bertulang K-225 (untuk jem M3 - - - - - - - - -
8 Timbunan Tanah Piihan M3 - - - - - - - - -
9 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - - -
10 Lapisan Geotekstil M2 - - - - - - - - -

Volume Semen Pasir Kerikil Batu Kali


Beton K.225 - x 7.42 - 0.50 - 0.78 -
Pas. Batu Kali 1 : 4 = - x 3.31 - 0.57 - 1.20 -
Plesteran 1 : 3 = - x 0.12 - 0.02 -
Siaran 1 : 2 = - x 0.13 - 0.01 -

Total : - - - -

Vol Besi Beton Kawat Beton Kayu Bekisting Paku


Tulangan Beton K.225 = - x 110.0 - 2.00 -
Bekisting Beton K.225 = - x 0.40 - 2.00 -

Total : - - - -

Vol Bambu Bambu Takik Rumput Gebal Tanah Timb.


Cerucuk Bambu = 289.67 x 1.00 289.7
Matras Bambu = 372.98 x 1.60 596.8
Gebalan Rumput = - 1.10 -
Timbunan Tanah Pilihan = 2,730.53 1.00 2,730.53

Total : 290 597 - 2,731

Vol Bronjong Batu Kali Geotex NW GCL


Bronjong Kawat Pabrikasi = 172.37 x 1.00 172.4 1.10 189.61
Lapisan Geotex NW = - x 1.02 -
Lapisan GCL = 189.46 x 1.05 198.93

Total : 172.4 189.61 - 198.93


Estimasi
BAHAN Tuesday Wednesday Thursday Friday Saturday Sunday Monday Tuesday
Penggunaan :
JUMLAH
JUMLAH / HARI KEBUTUHAN
BAHAN
- - 1 Cement - - - - - - - -
- - 2 Pasir - - - - - - - -
- - 3 Kerikil/Splite - - - - - - - -
23.70 189.61 4 Batu Kali/Belah 24.21 23.70 23.12 23.70 23.41 24.31 24.31 22.84
341.32 2,730.53 5 Tanah Timb. 348.69 341.32 332.99 341.32 337.10 350.07 350.07 328.98
36.21 289.67 6 Bambu 36.99 36.21 35.33 36.21 35.76 37.14 37.14 34.90
74.60 596.77 7 Bambu Takik 76.21 74.60 72.78 74.60 73.67 76.51 76.51 71.90
- - 8 Geotex NW - - - - - - - -
24.87 198.93 9 Geo GCL 25.40 24.87 24.26 24.87 24.56 25.50 25.50 23.97
21.55 172.37 10 Kawat Bronjong 22.01 21.55 21.02 21.55 21.28 22.10 22.10 20.77
- - 11 Rumput Gebal - - - - - - - -
- - 12 Armco Plate - - - - - - - -
- - 13
- - 14

Estimasi Penggunaan : ALAT BERAT Tuesday Wednesday Thursday Friday Saturday Sunday Monday Tuesday

JUMLAH
JUMLAH / HARI
KEBUTUHAN ALAT
0.88 7.01 1 Excavator 0.90 0.88 0.85 0.88 0.87 0.90 0.90 0.84
10.21 81.71 2 Dump Truck 10.43 10.21 9.96 10.21 10.09 10.48 10.48 9.84
0.28 2.24 3 Buldozer 0.29 0.28 0.27 0.28 0.28 0.29 0.29 0.27
0.13 1.07 4 Vibro Roller 0.14 0.13 0.13 0.13 0.13 0.14 0.14 0.13
- - 5 Concrete Mixer - - - - - - - -
- - 6 Vibrator Beton - - - - - - - -
1.63 13.06 7 Pompa Air 1.67 1.63 1.59 1.63 1.61 1.67 1.67 1.57
1.00 8.00 8 Waterpass 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
0.88 7.00 9 Theodolite 1.00 1.00 1.00 1.00 1.00 1.00 1.00
- - 10 Chain Saw
- - 11 Alat Bantu
- - 12 Truck Kayu
- - 13
- - 14
- - 15

Total Estimasi Penggunaan : TENAGA Tuesday Wednesday Thursday Friday Saturday Sunday Monday Tuesday

Per Hari :
1.00 8.00 Pelaksana Utama 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
1.88 15.00 Pelaksana Lap. 2.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00
0.11 0.92 Mandor 0.12 0.11 0.11 0.11 0.11 0.12 0.12 0.11
- Kepala Tukang - - - - - - - -
0.35 2.83 Tukang Batu 0.36 0.35 0.34 0.35 0.35 0.36 0.36 0.34
- - Tukang Besi - - - - - - - -
0.07 0.56 Tukang Kayu 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07
4.13 33.04 Pekerja 4.22 4.13 4.03 4.13 4.08 4.24 4.24 3.98
0.95 7.63 Mandor Alat 0.97 0.95 0.93 0.95 0.94 0.98 0.98 0.92
1.29 10.33 Operator 1.32 1.29 1.26 1.29 1.27 1.32 1.32 1.24
1.29 10.33 Pemb. Operator 1.32 1.29 1.26 1.29 1.27 1.32 1.32 1.24
10.21 81.71 Sopir 10.43 10.21 9.96 10.21 10.09 10.48 10.48 9.84
10.21 81.71 Pembantu Sopir 10.43 10.21 9.96 10.21 10.09 10.48 10.48 9.84
1.88 15.00 Surveyor 2.00 2.00 2.00 2.00 2.00 1.00 2.00 2.00
3.75 30.00 Pemb. Surveyor 4.00 4.00 4.00 4.00 4.00 2.00 4.00 4.00
0.88 7.00 Mekanik 1.00 1.00 1.00 1.00 1.00 1.00 1.00
1.75 14.00 Pembantu Mekanik 2.00 2.00 - 2.00 2.00 2.00 2.00 2.00
1.00 8.00 Penjaga 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
KENDALI RALISASI PROGRESS FISIK
PAKET PEKERJAAN . . . .

1. SATKER :
2. KEGIATAN :
3. PEKERJAAN :
4. LOKASI :
5. KONTRAK NO. :

Periode Minggu Ke : X ( Sepuluh ) Tgl. 01 Juli S/d Tgl. 07 Juli 2015

NO. URAIAN PEKERJAAN SAT. VOLUME Wednesday Thursday Friday Saturday Sunday Monday Tuesday KET.

Tanggal : 1-Jul-15 2-Jul-15 3-Jul-15 4-Jul-15 5-Jul-15 6-Jul-15 7-Jul-15


Jumlah Hari : 8 8 8 8 8 8 8 8

PEKERJAAN TANGGUL
1 Galian Tanah Lumpur (A) M3 723.14 102.71 104.80 101.85 99.06 100.44 106.34 107.93
2 Cerucuk Bambu Bh 310.90 44.16 45.06 43.79 42.59 43.18 45.72 46.40
3 Timbunan Tanah Pilihan M3 2,874.24 408.26 416.56 404.82 393.73 399.20 422.68 428.99
4 Matras Bambu Takik / Belah (man) M2 400.31 56.86 58.02 56.38 54.84 55.60 58.87 59.75
5 Lapisan Geotekstil M2 428.92 60.92 62.16 60.41 58.76 59.57 63.08 64.02
6 Bronjong Pabrikasi 2,70 mm M3 185.00 26.28 26.81 26.06 25.34 25.69 27.21 27.61
7 Pasangan GCL M2 203.34 28.88 29.47 28.64 27.86 28.24 29.90 30.35
8 Gebalan Rumput M2 - - - - - - - -

PEKERJAAN JEMBATAN TANGGUL


1 Galian Tanah Lumpur (A) M3 - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - -
3 Pasangan Batu Kali 1 : 4 M3 - - - - - - - -
4 Siaran 1 : 2 M2 - - - - - - - -
5 Plesteran 1 : 3 M2 - - - - - - - -
6 Jembatan Armco Type Multiplate A M1 - - - - - - - -
7 Beton Bertulang K-225 (untuk jem M3 - - - - - - - -
8 Timbunan Tanah Piihan M3 - - - - - - - -
9 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - -
10 Lapisan Geotekstil M2 - - - - - - - -

Volume Semen Pasir Kerikil Batu Kali


Beton K.225 - x 7.42 - 0.50 - 0.78 -
Pas. Batu Kali 1 : 4 = - x 3.31 - 0.57 - 1.20 -
Plesteran 1 : 3 = - x 0.12 - 0.02 -
Siaran 1 : 2 = - x 0.13 - 0.01 -

Total : - - - -

Vol Besi Beton Kawat Beton Kayu Bekisting Paku


Tulangan Beton K.225 = - x 110.0 - 2.00 -
Bekisting Beton K.225 = - x 0.40 - 2.00 -

Total : - - - -

Vol Bambu Bambu Takik Rumput Gebal Tanah Timb.


Cerucuk Bambu = 310.90 x 1.00 310.9
Matras Bambu = 400.31 x 1.60 640.5
Gebalan Rumput = - 1.10 -
Timbunan Tanah Pilihan = 2,874.24 1.00 2,874.24

Total : 311 640 - 2,874

Vol Bronjong Batu Kali Geotex NW GCL


Bronjong Kawat Pabrikasi = 185.00 x 1.00 185.0 1.10 203.50
Lapisan Geotex NW = 428.92 x 1.02 437.50
Lapisan GCL = 203.34 x 1.05 213.51

Total : 185.0 203.50 437.50 213.51


Estimasi
BAHAN Wednesday Thursday Friday Saturday Sunday Monday Tuesday
Penggunaan :
JUMLAH
JUMLAH / HARI KEBUTUHAN
BAHAN
- - 1 Cement - - - - - - - -
- - 2 Pasir - - - - - - - -
- - 3 Kerikil/Splite - - - - - - - -
29.07 203.50 4 Batu Kali/Belah 28.91 29.49 28.66 27.88 28.26 29.93 30.37 -
410.61 2,874.24 5 Tanah Timb. 408.26 416.56 404.82 393.73 399.20 422.68 428.99 -
44.41 310.90 6 Bambu 44.16 45.06 43.79 42.59 43.18 45.72 46.40 -
91.50 640.49 7 Bambu Takik 90.98 92.83 90.21 87.74 88.96 94.19 95.60 -
62.50 437.50 8 Geotex NW 62.14 63.41 61.62 59.93 60.76 64.34 65.30 -
30.50 213.51 9 Geo GCL 30.33 30.94 30.07 29.25 29.65 31.40 31.87 -
26.43 185.00 10 Kawat Bronjong 26.28 26.81 26.06 25.34 25.69 27.21 27.61 -
- - 11 Rumput Gebal - - - - - - - -
- - 12 Armco Plate - - - - - - - -
- - 13
- - 14

Estimasi Penggunaan : ALAT BERAT Wednesday Thursday Friday Saturday Sunday Monday Tuesday

JUMLAH
JUMLAH / HARI
KEBUTUHAN ALAT
1.06 7.41 1 Excavator 1.05 1.07 1.04 1.02 1.03 1.09 1.11 -
12.29 86.01 2 Dump Truck 12.22 12.46 12.11 11.78 11.95 12.65 12.84 -
0.34 2.36 3 Buldozer 0.34 0.34 0.33 0.32 0.33 0.35 0.35 -
0.16 1.13 4 Vibro Roller 0.16 0.16 0.16 0.15 0.16 0.17 0.17 -
- - 5 Concrete Mixer - - - - - - - -
- - 6 Vibrator Beton - - - - - - - -
1.97 13.77 7 Pompa Air 1.96 2.00 1.94 1.89 1.91 2.02 2.05 -
1.00 7.00 8 Waterpass 1.00 1.00 1.00 1.00 1.00 1.00 1.00
1.00 7.00 9 Theodolite 1.00 1.00 1.00 1.00 1.00 1.00 1.00
- - 10 Chain Saw
2.86 20.00 11 Alat Bantu 2.00 3.00 3.00 3.00 3.00 3.00 3.00
- - 12 Truck Kayu
- - 13
- - 14
- - 15

Total Estimasi Penggunaan : TENAGA Wednesday Thursday Friday Saturday Sunday Monday Tuesday -

Per Hari :
0.57 4.00 Pelaksana Utama 1.00 1.00 1.00 1.00
1.86 13.00 Pelaksana Lap. 2.00 2.00 2.00 2.00 1.00 2.00 2.00
0.20 1.40 Mandor 0.20 0.20 0.20 0.19 0.19 0.21 0.21 -
- Kepala Tukang - - - - - - - -
0.52 3.65 Tukang Batu 0.52 0.53 0.51 0.50 0.51 0.54 0.55 -
- - Tukang Besi - - - - - - - -
0.09 0.60 Tukang Kayu 0.09 0.09 0.08 0.08 0.08 0.09 0.09 -
5.24 36.67 Pekerja 5.21 5.31 5.16 5.02 5.09 5.39 5.47 -
1.15 8.08 Mandor Alat 1.15 1.17 1.14 1.11 1.12 1.19 1.21 -
1.56 10.90 Operator 1.55 1.58 1.54 1.49 1.51 1.60 1.63 -
1.56 10.90 Pemb. Operator 1.55 1.58 1.54 1.49 1.51 1.60 1.63 -
12.29 86.01 Sopir 12.22 12.46 12.11 11.78 11.95 12.65 12.84 -
12.29 86.01 Pembantu Sopir 12.22 12.46 12.11 11.78 11.95 12.65 12.84 -
2.00 14.00 Surveyor 2.00 2.00 2.00 2.00 2.00 2.00 2.00 -
4.00 28.00 Pemb. Surveyor 4.00 4.00 4.00 4.00 4.00 4.00 4.00 -
0.86 6.00 Mekanik 1.00 1.00 1.00 1.00 1.00 1.00
1.71 12.00 Pembantu Mekanik 2.00 2.00 - 2.00 2.00 2.00 2.00
1.00 7.00 Penjaga 1.00 1.00 1.00 1.00 1.00 1.00 1.00
KENDALI RALISASI PROGRESS FISIK
PAKET PEKERJAAN . . . .

1. SATKER :
2. KEGIATAN :
3. PEKERJAAN :
4. LOKASI :
5. KONTRAK NO. :

Periode Minggu Ke : XI ( Sebelas ) Tgl. 08 Juli S/d Tgl. 15 Juli 2015

NO. URAIAN PEKERJAAN SAT. VOLUME Wednesday Thursday Friday Saturday Sunday Monday Tuesday Wednesday KET.

Tanggal : 8-Jul-15 9-Jul-15 10-Jul-15 11-Jul-15 12-Jul-15 13-Jul-15 14-Jul-15 15-Jul-15


Jumlah Hari : 8 8 8 8 8 8 8 8

PEKERJAAN TANGGUL
1 Galian Tanah Lumpur (A) M3 739.77 94.47 92.47 90.22 92.47 91.33 94.84 94.84 89.13
2 Cerucuk Bambu Bh 318.05 40.61 39.76 38.79 39.76 39.26 40.78 40.78 38.32
3 Timbunan Tanah Pilihan M3 2,899.68 370.29 362.46 353.62 362.46 357.98 371.75 371.75 349.36
4 Matras Bambu Takik / Belah (man) M2 409.51 52.29 51.19 49.94 51.19 50.56 52.50 52.50 49.34
5 Lapisan Geotekstil M2 450.98 57.59 56.37 55.00 56.37 55.68 57.82 57.82 54.34
6 Bronjong Pabrikasi 2,70 mm M3 189.25 24.17 23.66 23.08 23.66 23.36 24.26 24.26 22.80
7 Pasangan GCL M2 208.02 26.56 26.00 25.37 26.00 25.68 26.67 26.67 25.06
8 Gebalan Rumput M2 - - - - - - - - -

PEKERJAAN JEMBATAN TANGGUL


1 Galian Tanah Lumpur (A) M3 - - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - - -
3 Pasangan Batu Kali 1 : 4 M3 - - - - - - - - -
4 Siaran 1 : 2 M2 - - - - - - - - -
5 Plesteran 1 : 3 M2 - - - - - - - - -
6 Jembatan Armco Type Multiplate A M1 - - - - - - - - -
7 Beton Bertulang K-225 (untuk jem M3 - - - - - - - - -
8 Timbunan Tanah Piihan M3 - - - - - - - - -
9 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - - -
10 Lapisan Geotekstil M2 - - - - - - - - -

Volume Semen Pasir Kerikil Batu Kali


Beton K.225 - x 7.42 - 0.50 - 0.78 -
Pas. Batu Kali 1 : 4 = - x 3.31 - 0.57 - 1.20 -
Plesteran 1 : 3 = - x 0.12 - 0.02 -
Siaran 1 : 2 = - x 0.13 - 0.01 -

Total : - - - -

Vol Besi Beton Kawat Beton Kayu Bekisting Paku


Tulangan Beton K.225 = - x 110.0 - 2.00 -
Bekisting Beton K.225 = - x 0.40 - 2.00 -

Total : - - - -

Vol Bambu Bambu Takik Rumput Gebal Tanah Timb.


Cerucuk Bambu = 318.05 x 1.00 318.0
Matras Bambu = 409.51 x 1.60 655.2
Gebalan Rumput = - 1.10 -
Timbunan Tanah Pilihan = 2,899.68 1.00 2,899.68

Total : 318 655 - 2,900

Vol Bronjong Batu Kali Geotex NW GCL


Bronjong Kawat Pabrikasi = 189.25 x 1.00 189.3 1.10 208.18
Lapisan Geotex NW = 450.98 x 1.02 460.00
Lapisan GCL = 208.02 x 1.05 218.42

Total : 189.3 208.18 460.00 218.42


Estimasi
BAHAN Wednesday Thursday Friday Saturday Sunday Monday Tuesday Wednesday
Penggunaan :
JUMLAH
JUMLAH / HARI KEBUTUHAN
BAHAN
- - 1 Cement - - - - - - - -
- - 2 Pasir - - - - - - - -
- - 3 Kerikil/Splite - - - - - - - -
29.74 208.18 4 Batu Kali/Belah 26.58 26.02 25.39 26.02 25.70 26.69 26.69 25.08
414.24 2,899.68 5 Tanah Timb. 370.29 362.46 353.62 362.46 357.98 371.75 371.75 349.36
45.44 318.05 6 Bambu 40.61 39.76 38.79 39.76 39.26 40.78 40.78 38.32
93.60 655.22 7 Bambu Takik 83.67 81.90 79.90 81.90 80.89 84.00 84.00 78.94
65.71 460.00 8 Geotex NW 58.74 57.50 56.10 57.50 56.79 58.97 58.97 55.42
31.20 218.42 9 Geo GCL 27.89 27.30 26.64 27.30 26.97 28.00 28.00 26.32
27.04 189.25 10 Kawat Bronjong 24.17 23.66 23.08 23.66 23.36 24.26 24.26 22.80
- - 11 Rumput Gebal - - - - - - - -
- - 12 Armco Plate - - - - - - - -
- - 13
- - 14

Estimasi Penggunaan : ALAT BERAT Wednesday Thursday Friday Saturday Sunday Monday Tuesday Wednesday

JUMLAH
JUMLAH / HARI
KEBUTUHAN ALAT
1.07 7.51 1 Excavator 0.96 0.94 0.92 0.94 0.93 0.96 0.96 0.90
12.40 86.77 2 Dump Truck 11.08 10.85 10.58 10.85 10.71 11.12 11.12 10.45
0.34 2.38 3 Buldozer 0.30 0.30 0.29 0.30 0.29 0.31 0.31 0.29
0.16 1.14 4 Vibro Roller 0.15 0.14 0.14 0.14 0.14 0.15 0.15 0.14
- - 5 Concrete Mixer - - - - - - - -
- - 6 Vibrator Beton - - - - - - - -
1.99 13.90 7 Pompa Air 1.78 1.74 1.70 1.74 1.72 1.78 1.78 1.67
1.14 8.00 8 Waterpass 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
1.00 7.00 9 Theodolite 1.00 1.00 1.00 1.00 1.00 1.00 1.00
- - 10 Chain Saw
- - 11 Alat Bantu
2.86 20.00 12 Truck Kayu 2.00 3.00 3.00 2.00 3.00 3.00 2.00 2.00
- - 13
- - 14
- - 15

Total Estimasi Penggunaan : TENAGA Wednesday Thursday Friday Saturday Sunday Monday Tuesday Wednesday

Per Hari :
1.14 8.00 Pelaksana Utama 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
2.14 15.00 Pelaksana Lap. 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
0.21 1.44 Mandor 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.17
- Kepala Tukang - - - - - - - -
0.54 3.75 Tukang Batu 0.48 0.47 0.46 0.47 0.46 0.48 0.48 0.45
- - Tukang Besi - - - - - - - -
0.09 0.61 Tukang Kayu 0.08 0.08 0.07 0.08 0.08 0.08 0.08 0.07
5.32 37.24 Pekerja 4.76 4.66 4.54 4.66 4.60 4.77 4.77 4.49
1.17 8.19 Mandor Alat 1.05 1.02 1.00 1.02 1.01 1.05 1.05 0.99
1.58 11.03 Operator 1.41 1.38 1.34 1.38 1.36 1.41 1.41 1.33
1.58 11.03 Pemb. Operator 1.41 1.38 1.34 1.38 1.36 1.41 1.41 1.33
15.25 106.77 Sopir 13.08 13.85 13.58 12.85 13.71 14.12 13.12 12.45
15.25 106.77 Pembantu Sopir 13.08 13.85 13.58 12.85 13.71 14.12 13.12 12.45
2.14 15.00 Surveyor 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00
4.29 30.00 Pemb. Surveyor 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.00
1.14 8.00 Mekanik 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
2.29 16.00 Pembantu Mekanik 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
1.14 8.00 Penjaga 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
KENDALI RALISASI PROGRESS FISIK
PAKET PEKERJAAN . . . .

1. SATKER :
2. KEGIATAN :
3. PEKERJAAN :
4. LOKASI :
5. KONTRAK NO. :

Periode Minggu Ke : XII ( Dua Belas ) Tgl. 16 Juli S/d Tgl. 23 Juli 2015

NO. URAIAN PEKERJAAN SAT. VOLUME Thursday Friday Saturday Sunday Monday Tuesday Wednesday Thursday KET.

Tanggal : 16-Jul-15 17-Jul-15 18-Jul-15 19-Jul-15 20-Jul-15 21-Jul-15 22-Jul-15 23-Jul-15


Jumlah Hari : 8 8 8 8 8 8 8 8

PEKERJAAN TANGGUL
1 Galian Tanah Lumpur (A) M3 1,361.17 173.82 170.15 166.00 170.15 168.05 174.51 174.51 164.00
2 Cerucuk Bambu Bh 585.20 74.73 73.15 71.37 73.15 72.25 75.03 75.03 70.51
3 Timbunan Tanah Pilihan M3 4,415.13 563.81 551.89 538.43 551.89 545.08 566.04 566.04 531.94
4 Matras Bambu Takik / Belah (man) M2 655.22 83.67 81.90 79.90 81.90 80.89 84.00 84.00 78.94
5 Lapisan Geotekstil M2 693.90 88.61 86.74 84.62 86.74 85.67 88.96 88.96 83.60
6 Bronjong Pabrikasi 2,70 mm M3 325.51 41.57 40.69 39.70 40.69 40.19 41.73 41.73 39.22
7 Pasangan GCL M2 382.75 48.88 47.84 46.68 47.84 47.25 49.07 49.07 46.11
8 Gebalan Rumput M2 - - - - - - - - -

PEKERJAAN JEMBATAN TANGGUL


1 Galian Tanah Lumpur (A) M3 - - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - - -
3 Pasangan Batu Kali 1 : 4 M3 - - - - - - - - -
4 Siaran 1 : 2 M2 - - - - - - - - -
5 Plesteran 1 : 3 M2 - - - - - - - - -
6 Jembatan Armco Type Multiplate A M1 - - - - - - - - -
7 Beton Bertulang K-225 (untuk jem M3 - - - - - - - - -
8 Timbunan Tanah Piihan M3 - - - - - - - - -
9 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - - -
10 Lapisan Geotekstil M2 - - - - - - - - -

Volume Semen Pasir Kerikil Batu Kali


Beton K.225 - x 7.42 - 0.50 - 0.78 -
Pas. Batu Kali 1 : 4 = - x 3.31 - 0.57 - 1.20 -
Plesteran 1 : 3 = - x 0.12 - 0.02 -
Siaran 1 : 2 = - x 0.13 - 0.01 -

Total : - - - -

Vol Besi Beton Kawat Beton Kayu Bekisting Paku


Tulangan Beton K.225 = - x 110.0 - 2.00 -
Bekisting Beton K.225 = - x 0.40 - 2.00 -

Total : - - - -

Vol Bambu Bambu Takik Rumput Gebal Tanah Timb.


Cerucuk Bambu = 585.20 x 1.00 585.2
Matras Bambu = 655.22 x 1.60 1,048.3
Gebalan Rumput = - 1.10 -
Timbunan Tanah Pilihan = 4,415.13 1.00 4,415.13

Total : 585 1,048 - 4,415

Vol Bronjong Batu Kali Geotex NW GCL


Bronjong Kawat Pabrikasi = 325.51 x 1.00 325.5 1.10 358.07
Lapisan Geotex NW = 693.90 x 1.02 707.77
Lapisan GCL = 382.75 x 1.05 401.89

Total : 325.5 358.07 707.77 401.89


Estimasi
BAHAN Thursday Friday Saturday Sunday Monday Tuesday Wednesday Thursday
Penggunaan :
JUMLAH
JUMLAH / HARI KEBUTUHAN
BAHAN
- - 1 Cement - - - - - - - -
- - 2 Pasir - - - - - - - -
- - 3 Kerikil/Splite - - - - - - - -
51.15 358.07 4 Batu Kali/Belah 45.73 44.76 43.67 44.76 44.21 45.91 45.91 43.14
630.73 4,415.13 5 Tanah Timb. 563.81 551.89 538.43 551.89 545.08 566.04 566.04 531.94
83.60 585.20 6 Bambu 74.73 73.15 71.37 73.15 72.25 75.03 75.03 70.51
149.76 1,048.35 7 Bambu Takik 133.87 131.04 127.85 131.04 129.43 134.40 134.40 126.31
101.11 707.77 8 Geotex NW 90.38 88.47 86.31 88.47 87.38 90.74 90.74 85.27
57.41 401.89 9 Geo GCL 51.32 50.24 49.01 50.24 49.62 51.52 51.52 48.42
46.50 325.51 10 Kawat Bronjong 41.57 40.69 39.70 40.69 40.19 41.73 41.73 39.22
- - 11 Rumput Gebal - - - - - - - -
- - 12 Armco Plate - - - - - - - -
- - 13
- - 14

Estimasi Penggunaan : ALAT BERAT Thursday Friday Saturday Sunday Monday Tuesday Wednesday Thursday

JUMLAH
JUMLAH / HARI
KEBUTUHAN ALAT
1.72 12.02 1 Excavator 1.54 1.50 1.47 1.50 1.48 1.54 1.54 1.45
18.87 132.11 2 Dump Truck 16.87 16.51 16.11 16.51 16.31 16.94 16.94 15.92
0.52 3.63 3 Buldozer 0.46 0.45 0.44 0.45 0.45 0.47 0.47 0.44
0.25 1.73 4 Vibro Roller 0.22 0.22 0.21 0.22 0.21 0.22 0.22 0.21
- - 5 Concrete Mixer - - - - - - - -
- - 6 Vibrator Beton - - - - - - - -
3.05 21.33 7 Pompa Air 2.72 2.67 2.60 2.67 2.63 2.73 2.73 2.57
1.14 8.00 8 Waterpass 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
1.00 7.00 9 Theodolite 1.00 1.00 1.00 1.00 1.00 1.00 1.00
- - 10 Chain Saw
- - 11 Alat Bantu
3.43 24.00 12 Truck Kayu 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
- - 13
- - 14
- - 15

Total Estimasi Penggunaan : TENAGA Thursday Friday Saturday Sunday Monday Tuesday Wednesday Thursday

Per Hari :
1.00 7.00 Pelaksana Utama 1.00 1.00 1.00 1.00 1.00 1.00 1.00
2.29 16.00 Pelaksana Lap. 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
0.34 2.37 Mandor 0.30 0.30 0.29 0.30 0.29 0.30 0.30 0.29
- Kepala Tukang - - - - - - - -
0.91 6.34 Tukang Batu 0.81 0.79 0.77 0.79 0.78 0.81 0.81 0.76
- - Tukang Besi - - - - - - - -
0.14 0.98 Tukang Kayu 0.13 0.12 0.12 0.12 0.12 0.13 0.13 0.12
8.57 60.01 Pekerja 7.66 7.50 7.32 7.50 7.41 7.69 7.69 7.23
1.90 13.28 Mandor Alat 1.70 1.66 1.62 1.66 1.64 1.70 1.70 1.60
2.48 17.38 Operator 2.22 2.17 2.12 2.17 2.15 2.23 2.23 2.09
2.48 17.38 Pemb. Operator 2.22 2.17 2.12 2.17 2.15 2.23 2.23 2.09
22.30 156.11 Sopir 19.87 19.51 19.11 19.51 19.31 19.94 19.94 18.92
22.30 156.11 Pembantu Sopir 19.87 19.51 19.11 19.51 19.31 19.94 19.94 18.92
2.14 15.00 Surveyor 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00
4.29 30.00 Pemb. Surveyor 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.00
1.00 7.00 Mekanik 1.00 1.00 1.00 1.00 1.00 1.00 1.00
2.00 14.00 Pembantu Mekanik 2.00 2.00 - 2.00 2.00 2.00 2.00 2.00
1.14 8.00 Penjaga 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
KENDALI RALISASI PROGRESS FISIK
PAKET PEKERJAAN . . . .

1. SATKER :
2. KEGIATAN :
3. PEKERJAAN :
4. LOKASI :
5. KONTRAK NO. :

Periode Minggu Ke : XIII ( Tiga Belas ) Tgl. 24 Juli S/d Tgl. 31 Juli 2015

NO. URAIAN PEKERJAAN SAT. VOLUME Friday Saturday Sunday Monday Tuesday Wednesday Thursday Friday KET.

Tanggal : 24-Jul-15 25-Jul-15 26-Jul-15 27-Jul-15 28-Jul-15 29-Jul-15 30-Jul-15 31-Jul-15


Jumlah Hari : 8 8 8 8 8 8 8 8

PEKERJAAN TANGGUL
1 Galian Tanah Lumpur (A) M3 2,207.40 281.88 275.93 269.20 275.93 272.52 283.00 283.00 265.95
2 Cerucuk Bambu Bh 643.61 82.19 80.45 78.49 80.45 79.46 82.51 82.51 77.54
3 Timbunan Tanah Pilihan M3 4,351.47 555.68 543.93 530.67 543.93 537.22 557.88 557.88 524.27
4 Matras Bambu Takik / Belah (man) M2 771.71 98.55 96.46 94.11 96.46 95.27 98.94 98.94 92.98
5 Lapisan Geotekstil M2 698.39 89.18 87.30 85.17 87.30 86.22 89.54 89.54 84.14
6 Bronjong Pabrikasi 2,70 mm M3 313.22 40.00 39.15 38.20 39.15 38.67 40.16 40.16 37.74
7 Pasangan GCL M2 380.07 48.53 47.51 46.35 47.51 46.92 48.73 48.73 45.79
8 Gebalan Rumput M2 - - - - - - - - -

PEKERJAAN JEMBATAN TANGGUL


1 Galian Tanah Lumpur (A) M3 - - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - - -
3 Pasangan Batu Kali 1 : 4 M3 - - - - - - - - -
4 Siaran 1 : 2 M2 - - - - - - - - -
5 Plesteran 1 : 3 M2 - - - - - - - - -
6 Jembatan Armco Type Multiplate A M1 - - - - - - - - -
7 Beton Bertulang K-225 (untuk jem M3 - - - - - - - - -
8 Timbunan Tanah Piihan M3 - - - - - - - - -
9 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - - -
10 Lapisan Geotekstil M2 - - - - - - - - -

Volume Semen Pasir Kerikil Batu Kali


Beton K.225 - x 7.42 - 0.50 - 0.78 -
Pas. Batu Kali 1 : 4 = - x 3.31 - 0.57 - 1.20 -
Plesteran 1 : 3 = - x 0.12 - 0.02 -
Siaran 1 : 2 = - x 0.13 - 0.01 -

Total : - - - -

Vol Besi Beton Kawat Beton Kayu Bekisting Paku


Tulangan Beton K.225 = - x 110.0 - 2.00 -
Bekisting Beton K.225 = - x 0.40 - 2.00 -

Total : - - - -

Vol Bambu Bambu Takik Rumput Gebal Tanah Timb.


Cerucuk Bambu = 643.61 x 1.00 643.6
Matras Bambu = 771.71 x 1.60 1,234.7
Gebalan Rumput = - 1.10 -
Timbunan Tanah Pilihan = 4,351.47 1.00 4,351.47

Total : 644 1,235 - 4,351

Vol Bronjong Batu Kali Geotex NW GCL


Bronjong Kawat Pabrikasi = 313.22 x 1.00 313.2 1.10 344.54
Lapisan Geotex NW = 698.39 x 1.02 712.36
Lapisan GCL = 380.07 x 1.05 399.07

Total : 313.2 344.54 712.36 399.07


Estimasi
BAHAN Friday Saturday Sunday Monday Tuesday Wednesday Thursday Friday
Penggunaan :
JUMLAH
JUMLAH / HARI KEBUTUHAN
BAHAN
- - 1 Cement - - - - - - - -
- - 2 Pasir - - - - - - - -
- - 3 Kerikil/Splite - - - - - - - -
49.22 344.54 4 Batu Kali/Belah 44.00 43.07 42.02 43.07 42.54 44.17 44.17 41.51
621.64 4,351.47 5 Tanah Timb. 555.68 543.93 530.67 543.93 537.22 557.88 557.88 524.27
91.94 643.61 6 Bambu 82.19 80.45 78.49 80.45 79.46 82.51 82.51 77.54
176.39 1,234.74 7 Bambu Takik 157.68 154.34 150.58 154.34 152.44 158.30 158.30 148.76
101.77 712.36 8 Geotex NW 90.97 89.04 86.87 89.04 87.95 91.33 91.33 85.83
57.01 399.07 9 Geo GCL 50.96 49.88 48.67 49.88 49.27 51.16 51.16 48.08
44.75 313.22 10 Kawat Bronjong 40.00 39.15 38.20 39.15 38.67 40.16 40.16 37.74
- - 11 Rumput Gebal - - - - - - - -
- - 12 Armco Plate - - - - - - - -
- - 13
- - 14

Estimasi Penggunaan : ALAT BERAT Friday Saturday Sunday Monday Tuesday Wednesday Thursday Friday

JUMLAH
JUMLAH / HARI
KEBUTUHAN ALAT
1.95 13.62 1 Excavator 1.74 1.70 1.66 1.70 1.68 1.75 1.75 1.64
18.60 130.21 2 Dump Truck 16.63 16.28 15.88 16.28 16.08 16.69 16.69 15.69
0.51 3.58 3 Buldozer 0.46 0.45 0.44 0.45 0.44 0.46 0.46 0.43
0.24 1.71 4 Vibro Roller 0.22 0.21 0.21 0.21 0.21 0.22 0.22 0.21
- - 5 Concrete Mixer - - - - - - - -
- - 6 Vibrator Beton - - - - - - - -
3.00 20.99 7 Pompa Air 2.68 2.62 2.56 2.62 2.59 2.69 2.69 2.53
1.14 8.00 8 Waterpass 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
1.14 8.00 9 Theodolite 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
- - 10 Chain Saw
- - 11 Alat Bantu
3.43 24.00 12 Truck Kayu 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
- - 13
- - 14
- - 15

Total Estimasi Penggunaan : TENAGA Friday Saturday Sunday Monday Tuesday Wednesday Thursday Friday

Per Hari :
1.14 8.00 Pelaksana Utama 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
2.14 15.00 Pelaksana Lap. 2.00 2.00 1.00 2.00 2.00 2.00 2.00 2.00
0.36 2.51 Mandor 0.32 0.31 0.31 0.31 0.31 0.32 0.32 0.30
- Kepala Tukang - - - - - - - -
0.88 6.14 Tukang Batu 0.78 0.77 0.75 0.77 0.76 0.79 0.79 0.74
- - Tukang Besi - - - - - - - -
0.17 1.16 Tukang Kayu 0.15 0.14 0.14 0.14 0.14 0.15 0.15 0.14
9.25 64.74 Pekerja 8.27 8.09 7.90 8.09 7.99 8.30 8.30 7.80
2.24 15.69 Mandor Alat 2.00 1.96 1.91 1.96 1.94 2.01 2.01 1.89
2.70 18.91 Operator 2.41 2.36 2.31 2.36 2.33 2.42 2.42 2.28
2.70 18.91 Pemb. Operator 2.41 2.36 2.31 2.36 2.33 2.42 2.42 2.28
22.03 154.21 Sopir 19.63 19.28 18.88 19.28 19.08 19.69 19.69 18.69
22.03 154.21 Pembantu Sopir 19.63 19.28 18.88 19.28 19.08 19.69 19.69 18.69
2.29 16.00 Surveyor 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
4.57 32.00 Pemb. Surveyor 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00
1.00 7.00 Mekanik 1.00 1.00 1.00 1.00 1.00 1.00 1.00
2.00 14.00 Pembantu Mekanik 2.00 2.00 - 2.00 2.00 2.00 2.00 2.00
1.14 8.00 Penjaga 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
KENDALI RALISASI PROGRESS FISIK
PAKET PEKERJAAN . . . .

1. SATKER :
2. KEGIATAN :
3. PEKERJAAN :
4. LOKASI :
5. KONTRAK NO. :

Periode Minggu Ke : XIV ( Empat Belas ) Tgl. 01 Agustus S/d Tgl. 07 Agustus 2015

NO. URAIAN PEKERJAAN SAT. VOLUME Saturday Sunday Monday Tuesday Wednesday Thursday Friday KET.

Tanggal : 1-Aug-15 2-Aug-15 3-Aug-15 4-Aug-15 5-Aug-15 6-Aug-15 7-Aug-15


Jumlah Hari : 8 8 8 8 8 8 8 8

PEKERJAAN TANGGUL
1 Galian Tanah Lumpur (A) M3 414.27 414.27
2 Cerucuk Bambu Bh 178.11 178.11
3 Timbunan Tanah Pilihan M3 1,092.21 1,092.21
4 Matras Bambu Takik / Belah (man) M2 163.80 163.80
5 Lapisan Geotekstil M2 161.94 161.94
6 Bronjong Pabrikasi 2,70 mm M3 90.84 90.84
7 Pasangan GCL M2 116.49 116.49
8 Gebalan Rumput M2 - - - - - - - -

PEKERJAAN JEMBATAN TANGGUL


1 Galian Tanah Lumpur (A) M3 - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - -
3 Pasangan Batu Kali 1 : 4 M3 - - - - - - - -
4 Siaran 1 : 2 M2 - - - - - - - -
5 Plesteran 1 : 3 M2 - - - - - - - -
6 Jembatan Armco Type Multiplate A M1 - - - - - - - -
7 Beton Bertulang K-225 (untuk jem M3 - - - - - - - -
8 Timbunan Tanah Piihan M3 - - - - - - - -
9 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - -
10 Lapisan Geotekstil M2 - - - - - - - -

Volume Semen Pasir Kerikil Batu Kali


Beton K.225 - x 7.42 - 0.50 - 0.78 -
Pas. Batu Kali 1 : 4 = - x 3.31 - 0.57 - 1.20 -
Plesteran 1 : 3 = - x 0.12 - 0.02 -
Siaran 1 : 2 = - x 0.13 - 0.01 -

Total : - - - -

Vol Besi Beton Kawat Beton Kayu Bekisting Paku


Tulangan Beton K.225 = - x 110.0 - 2.00 -
Bekisting Beton K.225 = - x 0.40 - 2.00 -

Total : - - - -

Vol Bambu Bambu Takik Rumput Gebal Tanah Timb.


Cerucuk Bambu = 178.11 x 1.00 178.1
Matras Bambu = 163.80 x 1.60 262.1
Gebalan Rumput = - 1.10 -
Timbunan Tanah Pilihan = 1,092.21 1.00 1,092.21

Total : 178 262 - 1,092

Vol Bronjong Batu Kali Geotex NW GCL


Bronjong Kawat Pabrikasi = 90.84 x 1.00 90.8 1.10 99.93
Lapisan Geotex NW = 161.94 x 1.02 165.18
Lapisan GCL = 116.49 x 1.05 122.31

Total : 90.8 99.93 165.18 122.31


Estimasi
BAHAN Saturday Sunday Monday Tuesday Wednesday Thursday Friday -
Penggunaan :
JUMLAH
JUMLAH / HARI KEBUTUHAN
BAHAN
- - 1 Cement - - - - - - - -
- - 2 Pasir - - - - - - - -
- - 3 Kerikil/Splite - - - - - - - -
14.28 99.93 4 Batu Kali/Belah 99.93 - - - - - - -
156.03 1,092.21 5 Tanah Timb. 1,092.21 - - - - - - -
25.44 178.11 6 Bambu 178.11 - - - - - - -
37.44 262.09 7 Bambu Takik 262.09 - - - - - - -
23.60 165.18 8 Geotex NW 165.18 - - - - - - -
17.47 122.31 9 Geo GCL 122.31 - - - - - - -
12.98 90.84 10 Kawat Bronjong 90.84 - - - - - - -
- - 11 Rumput Gebal - - - - - - - -
- - 12 Armco Plate - - - - - - - -
- - 13
- - 14

Estimasi Penggunaan : ALAT BERAT Saturday Sunday Monday Tuesday Wednesday Thursday Friday -

JUMLAH
JUMLAH / HARI
KEBUTUHAN ALAT
0.45 3.17 1 Excavator 3.17 - - - - - - -
4.67 32.68 2 Dump Truck 32.68 - - - - - - -
0.13 0.90 3 Buldozer 0.90 - - - - - - -
0.06 0.43 4 Vibro Roller 0.43 - - - - - - -
- - 5 Concrete Mixer - - - - - - - -
- - 6 Vibrator Beton - - - - - - - -
0.76 5.32 7 Pompa Air 5.32 - - - - - - -
0.14 1.00 8 Waterpass 1.00
0.14 1.00 9 Theodolite 1.00
- - 10 Chain Saw
- - 11 Alat Bantu
0.29 2.00 12 Truck Kayu 2.00
- - 13
- - 14
- - 15

Total Estimasi Penggunaan : TENAGA Saturday Sunday Monday Tuesday Wednesday Thursday Friday -

Per Hari :
0.14 1.00 Pelaksana Utama 1.00
0.29 2.00 Pelaksana Lap. 2.00
0.09 0.62 Mandor 0.62 - - - - - - -
- Kepala Tukang - - - - - - - -
0.25 1.72 Tukang Batu 1.72 - - - - - - -
- - Tukang Besi - - - - - - - -
0.04 0.25 Tukang Kayu 0.25 - - - - - - -
2.26 15.81 Pekerja 15.81 - - - - - - -
0.51 3.55 Mandor Alat 3.55 - - - - - - -
0.64 4.50 Operator 4.50 - - - - - - -
0.64 4.50 Pemb. Operator 4.50 - - - - - - -
4.95 34.68 Sopir 34.68 - - - - - - -
4.95 34.68 Pembantu Sopir 34.68 - - - - - - -
0.29 2.00 Surveyor 2.00 - - - - - - -
0.57 4.00 Pemb. Surveyor 4.00 - - - - - - -
0.14 1.00 Mekanik 1.00
0.29 2.00 Pembantu Mekanik 2.00 - - - - - -
0.29 2.00 Penjaga 2.00
KENDALI RALISASI PROGRESS FISIK
PAKET PEKERJAAN . . . .

1. SATKER :
2. KEGIATAN :
3. PEKERJAAN :
4. LOKASI :
5. KONTRAK NO. :

Periode Minggu Ke : XV ( Lima Belas ) Tgl. 08 Agustus S/d Tgl. 15 Agustus 2015

NO. URAIAN PEKERJAAN SAT. VOLUME Saturday Sunday Monday Tuesday Wednesday Thursday Friday Saturday KET.

Tanggal : 8-Aug-15 9-Aug-15 10-Aug-15 11-Aug-15 12-Aug-15 13-Aug-15 14-Aug-15 15-Aug-15


Jumlah Hari : 8 8 8 8 8 8 8 8

PEKERJAAN TANGGUL
1 Galian Tanah Lumpur (A) M3 565.80 565.80
2 Cerucuk Bambu Bh 121.63 121.63
3 Timbunan Tanah Pilihan M3 1,125.02 1,125.02
4 Matras Bambu Takik / Belah (man) M2 250.57 250.57
5 Lapisan Geotekstil M2 175.94 175.94
6 Bronjong Pabrikasi 2,70 mm M3 86.85 86.85
7 Pasangan GCL M2 119.32 119.32
8 Gebalan Rumput M2 - - - - - - - - -

PEKERJAAN JEMBATAN TANGGUL


1 Galian Tanah Lumpur (A) M3 - - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - - -
3 Pasangan Batu Kali 1 : 4 M3 - - - - - - - - -
4 Siaran 1 : 2 M2 - - - - - - - - -
5 Plesteran 1 : 3 M2 - - - - - - - - -
6 Jembatan Armco Type Multiplate A M1 - - - - - - - - -
7 Beton Bertulang K-225 (untuk jem M3 - - - - - - - - -
8 Timbunan Tanah Piihan M3 - - - - - - - - -
9 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - - -
10 Lapisan Geotekstil M2 - - - - - - - - -

Volume Semen Pasir Kerikil Batu Kali


Beton K.225 - x 7.42 - 0.50 - 0.78 -
Pas. Batu Kali 1 : 4 = - x 3.31 - 0.57 - 1.20 -
Plesteran 1 : 3 = - x 0.12 - 0.02 -
Siaran 1 : 2 = - x 0.13 - 0.01 -

Total : - - - -

Vol Besi Beton Kawat Beton Kayu Bekisting Paku


Tulangan Beton K.225 = - x 110.0 - 2.00 -
Bekisting Beton K.225 = - x 0.40 - 2.00 -

Total : - - - -

Vol Bambu Bambu Takik Rumput Gebal Tanah Timb.


Cerucuk Bambu = 121.63 x 1.00 121.6
Matras Bambu = 250.57 x 1.60 400.9
Gebalan Rumput = - 1.10 -
Timbunan Tanah Pilihan = 1,125.02 1.00 1,125.02

Total : 122 401 - 1,125

Vol Bronjong Batu Kali Geotex NW GCL


Bronjong Kawat Pabrikasi = 86.85 x 1.00 86.8 1.10 95.53
Lapisan Geotex NW = 175.94 x 1.02 179.46
Lapisan GCL = 119.32 x 1.05 125.29

Total : 86.8 95.53 179.46 125.29


Estimasi
BAHAN Saturday Sunday Monday Tuesday Wednesday Thursday Friday Saturday
Penggunaan :
JUMLAH
JUMLAH / HARI KEBUTUHAN
BAHAN
- - 1 Cement - - - - - - - -
- - 2 Pasir - - - - - - - -
- - 3 Kerikil/Splite - - - - - - - -
13.65 95.53 4 Batu Kali/Belah - - - - - - - 95.53
160.72 1,125.02 5 Tanah Timb. - - - - - - - 1,125.02
17.38 121.63 6 Bambu - - - - - - - 121.63
57.27 400.91 7 Bambu Takik - - - - - - - 400.91
25.64 179.46 8 Geotex NW - - - - - - - 179.46
17.90 125.29 9 Geo GCL - - - - - - - 125.29
12.41 86.85 10 Kawat Bronjong - - - - - - - 86.85
- - 11 Rumput Gebal - - - - - - - -
- - 12 Armco Plate - - - - - - - -
- - 13
- - 14

Estimasi Penggunaan : ALAT BERAT Saturday Sunday Monday Tuesday Wednesday Thursday Friday Saturday

JUMLAH
JUMLAH / HARI
KEBUTUHAN ALAT
0.49 3.45 1 Excavator - - - - - - - 3.45
4.81 33.66 2 Dump Truck - - - - - - - 33.66
0.13 0.92 3 Buldozer - - - - - - - 0.92
0.06 0.44 4 Vibro Roller - - - - - - - 0.44
- - 5 Concrete Mixer - - - - - - - -
- - 6 Vibrator Beton - - - - - - - -
0.78 5.45 7 Pompa Air - - - - - - - 5.45
0.14 1.00 8 Waterpass 1.00
- - 9 Theodolite
0.14 1.00 10 Chain Saw 1.00
- - 11 Alat Bantu
0.43 3.00 12 Truck Kayu 3.00
- - 13
- - 14
- - 15

Total Estimasi Penggunaan : TENAGA Saturday Sunday Monday Tuesday Wednesday Thursday Friday Saturday

Per Hari :
0.14 1.00 Pelaksana Utama 1.00
0.29 2.00 Pelaksana Lap. 2.00
0.11 0.74 Mandor - - - - - - - 0.74
- Kepala Tukang - - - - - - - -
0.24 1.68 Tukang Batu - - - - - - - 1.68
- - Tukang Besi - - - - - - - -
0.05 0.38 Tukang Kayu - - - - - - - 0.38
2.39 16.75 Pekerja - - - - - - - 16.75
0.57 3.99 Mandor Alat - - - - - - - 3.99
0.69 4.82 Operator - - - - - - - 4.82
0.69 4.82 Pemb. Operator - - - - - - - 4.82
5.24 36.66 Sopir - - - - - - - 36.66
5.24 36.66 Pembantu Sopir - - - - - - - 36.66
0.14 1.00 Surveyor - - - - - - - 1.00
0.29 2.00 Pemb. Surveyor - - - - - - - 2.00
0.14 1.00 Mekanik 1.00
0.29 2.00 Pembantu Mekanik - - - - - - - 2.00
0.14 1.00 Penjaga 1.00
KENDALI RALISASI PROGRESS FISIK
PAKET PEKERJAAN . . . .

1. SATKER :
2. KEGIATAN :
3. PEKERJAAN :
4. LOKASI :
5. KONTRAK NO. :

Periode Minggu Ke : XVI ( Enam Belas ) Tgl. 16 Agustus S/d Tgl. 23 Agustus 2015

NO. URAIAN PEKERJAAN SAT. VOLUME Sunday Monday Tuesday Wednesday Thursday Friday Saturday Sunday KET.

Tanggal : 16-Aug-15 17-Aug-15 18-Aug-15 19-Aug-15 20-Aug-15 21-Aug-15 22-Aug-15 23-Aug-15


Jumlah Hari : 8 8 8 8 8 8 8 8

PEKERJAAN TANGGUL
1 Galian Tanah Lumpur (A) M3 1,414.50 180.63 176.81 172.50 176.81 174.63 181.35 181.35 170.42
2 Cerucuk Bambu Bh 355.76 45.43 44.47 43.39 44.47 43.92 45.61 45.61 42.86
3 Timbunan Tanah Pilihan M3 2,567.89 327.92 320.99 313.16 320.99 317.02 329.22 329.22 309.38
4 Matras Bambu Takik / Belah (man) M2 430.66 55.00 53.83 52.52 53.83 53.17 55.21 55.21 51.89
5 Lapisan Geotekstil M2 459.71 58.70 57.46 56.06 57.46 56.75 58.94 58.94 55.39
6 Bronjong Pabrikasi 2,70 mm M3 180.93 23.11 22.62 22.07 22.62 22.34 23.20 23.20 21.80
7 Pasangan GCL M2 198.87 25.40 24.86 24.25 24.86 24.55 25.50 25.50 23.96
8 Gebalan Rumput M2 - - - - - - - - -

PEKERJAAN JEMBATAN TANGGUL


1 Galian Tanah Lumpur (A) M3 - - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - - -
3 Pasangan Batu Kali 1 : 4 M3 - - - - - - - - -
4 Siaran 1 : 2 M2 - - - - - - - - -
5 Plesteran 1 : 3 M2 - - - - - - - - -
6 Jembatan Armco Type Multiplate A M1 - - - - - - - - -
7 Beton Bertulang K-225 (untuk jem M3 - - - - - - - - -
8 Timbunan Tanah Piihan M3 - - - - - - - - -
9 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - - -
10 Lapisan Geotekstil M2 - - - - - - - - -

Volume Semen Pasir Kerikil Batu Kali


Beton K.225 - x 7.42 - 0.50 - 0.78 -
Pas. Batu Kali 1 : 4 = - x 3.31 - 0.57 - 1.20 -
Plesteran 1 : 3 = - x 0.12 - 0.02 -
Siaran 1 : 2 = - x 0.13 - 0.01 -

Total : - - - -

Vol Besi Beton Kawat Beton Kayu Bekisting Paku


Tulangan Beton K.225 = - x 110.0 - 2.00 -
Bekisting Beton K.225 = - x 0.40 - 2.00 -

Total : - - - -

Vol Bambu Bambu Takik Rumput Gebal Tanah Timb.


Cerucuk Bambu = 355.76 x 1.00 355.8
Matras Bambu = 430.66 x 1.60 689.1
Gebalan Rumput = - 1.10 -
Timbunan Tanah Pilihan = 2,567.89 1.00 2,567.89

Total : 356 689 - 2,568

Vol Bronjong Batu Kali Geotex NW GCL


Bronjong Kawat Pabrikasi = 180.93 x 1.00 180.9 1.10 199.03
Lapisan Geotex NW = 459.71 x 1.02 468.90
Lapisan GCL = 198.87 x 1.05 208.82

Total : 180.9 199.03 468.90 208.82


Estimasi
BAHAN Sunday Monday Tuesday Wednesday Thursday Friday Saturday Sunday
Penggunaan :
JUMLAH
JUMLAH / HARI KEBUTUHAN
BAHAN
- - 1 Cement - - - - - - - -
- - 2 Pasir - - - - - - - -
- - 3 Kerikil/Splite - - - - - - - -
28.43 199.03 4 Batu Kali/Belah 25.42 24.88 24.27 24.88 24.57 25.52 25.52 23.98
366.84 2,567.89 5 Tanah Timb. 327.92 320.99 313.16 320.99 317.02 329.22 329.22 309.38
50.82 355.76 6 Bambu 45.43 44.47 43.39 44.47 43.92 45.61 45.61 42.86
98.44 689.06 7 Bambu Takik 87.99 86.13 84.03 86.13 85.07 88.34 88.34 83.02
66.99 468.90 8 Geotex NW 59.88 58.61 57.18 58.61 57.89 60.12 60.12 56.49
29.83 208.82 9 Geo GCL 26.67 26.10 25.47 26.10 25.78 26.77 26.77 25.16
25.85 180.93 10 Kawat Bronjong 23.11 22.62 22.07 22.62 22.34 23.20 23.20 21.80
- - 11 Rumput Gebal - - - - - - - -
- - 12 Armco Plate - - - - - - - -
- - 13
- - 14

Estimasi Penggunaan : ALAT BERAT Sunday Monday Tuesday Wednesday Thursday Friday Saturday Sunday

JUMLAH
JUMLAH / HARI
KEBUTUHAN ALAT
1.17 8.22 1 Excavator 1.05 1.03 1.00 1.03 1.02 1.05 1.05 0.99
10.98 76.84 2 Dump Truck 9.81 9.60 9.37 9.60 9.49 9.85 9.85 9.26
0.30 2.11 3 Buldozer 0.27 0.26 0.26 0.26 0.26 0.27 0.27 0.25
0.14 1.01 4 Vibro Roller 0.13 0.13 0.12 0.13 0.12 0.13 0.13 0.12
- - 5 Concrete Mixer - - - - - - - -
- - 6 Vibrator Beton - - - - - - - -
1.77 12.37 7 Pompa Air 1.58 1.55 1.51 1.55 1.53 1.59 1.59 1.49
1.00 7.00 8 Waterpass 1.00 1.00 1.00 1.00 1.00 1.00 1.00
1.14 8.00 9 Theodolite 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
- - 10 Chain Saw
- - 11 Alat Bantu
3.57 25.00 12 Truck Kayu 3.00 3.00 3.00 3.00 4.00 4.00 3.00 2.00
- - 13
- - 14
- - 15

Total Estimasi Penggunaan : TENAGA Sunday Monday Tuesday Wednesday Thursday Friday Saturday Sunday

Per Hari :
0.86 6.00 Pelaksana Utama 1.00 1.00 1.00 1.00 1.00 1.00
1.86 13.00 Pelaksana Lap. 1.00 2.00 2.00 2.00 2.00 2.00 1.00 1.00
0.21 1.45 Mandor 0.19 0.18 0.18 0.18 0.18 0.19 0.19 0.18
- Kepala Tukang - - - - - - - -
0.52 3.63 Tukang Batu 0.46 0.45 0.44 0.45 0.45 0.47 0.47 0.44
- - Tukang Besi - - - - - - - -
0.09 0.65 Tukang Kayu 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08
5.52 38.66 Pekerja 4.94 4.83 4.71 4.83 4.77 4.96 4.96 4.66
1.36 9.55 Mandor Alat 1.22 1.19 1.17 1.19 1.18 1.22 1.22 1.15
1.62 11.34 Operator 1.45 1.42 1.38 1.42 1.40 1.45 1.45 1.37
1.62 11.34 Pemb. Operator 1.45 1.42 1.38 1.42 1.40 1.45 1.45 1.37
14.55 101.84 Sopir 12.81 12.60 12.37 12.60 13.49 13.85 12.85 11.26
14.55 101.84 Pembantu Sopir 12.81 12.60 12.37 12.60 13.49 13.85 12.85 11.26
2.14 15.00 Surveyor 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00
4.29 30.00 Pemb. Surveyor 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.00
1.00 7.00 Mekanik 1.00 1.00 1.00 1.00 1.00 1.00 1.00
2.00 14.00 Pembantu Mekanik 2.00 2.00 - 2.00 2.00 2.00 2.00 2.00
2.00 14.00 Penjaga 1.00 2.00 1.00 2.00 2.00 2.00 2.00 2.00
KENDALI RALISASI PROGRESS FISIK
PAKET PEKERJAAN . . . .

1. SATKER :
2. KEGIATAN :
3. PEKERJAAN :
4. LOKASI :
5. KONTRAK NO. :

Periode Minggu Ke : XVIIa ( Tujuh Belas ) Tgl. 24 Agustus S/d Tgl. 25 Agustus 2015

NO. URAIAN PEKERJAAN SAT. VOLUME Monday Tuesday KET.

Tanggal : 24-Aug-15 25-Aug-15


Jumlah Hari : 8 8 8 8 8 8 8 8

PEKERJAAN TANGGUL
1 Galian Tanah Lumpur (A) M3 197.42 103.41 94.01
2 Cerucuk Bambu Bh 84.88 44.46 40.42
3 Timbunan Tanah Pilihan M3 1,340.14 701.98 638.16
4 Matras Bambu Takik / Belah (man) M2 109.29 57.25 52.04
5 Lapisan Geotekstil M2 109.29 57.25 52.04
6 Bronjong Pabrikasi 2,70 mm M3 50.51 26.46 24.05
7 Pasangan GCL M2 55.51 29.08 26.44
8 Gebalan Rumput M2 - - -

PEKERJAAN JEMBATAN TANGGUL


1 Galian Tanah Lumpur (A) M3 - - -
2 Cerucuk Bambu Bh - - -
3 Pasangan Batu Kali 1 : 4 M3 - - -
4 Siaran 1 : 2 M2 - - -
5 Plesteran 1 : 3 M2 - - -
6 Jembatan Armco Type Multiplate A M1 - - -
7 Beton Bertulang K-225 (untuk jem M3 - - -
8 Timbunan Tanah Piihan M3 - - -
9 Bronjong Pabrikasi 2,70 mm M3 - - -
10 Lapisan Geotekstil M2 - - -

Volume Semen Pasir Kerikil Batu Kali


Beton K.225 - x 7.42 - 0.50 - 0.78 -
Pas. Batu Kali 1 : 4 = - x 3.31 - 0.57 - 1.20 -
Plesteran 1 : 3 = - x 0.12 - 0.02 -
Siaran 1 : 2 = - x 0.13 - 0.01 -

Total : - - - -

Vol Besi Beton Kawat Beton Kayu Bekisting Paku


Tulangan Beton K.225 = - x 110.0 - 2.00 -
Bekisting Beton K.225 = - x 0.40 - 2.00 -

Total : - - - -

Vol Bambu Bambu Takik Rumput Gebal Tanah Timb.


Cerucuk Bambu = 84.88 x 1.00 84.9
Matras Bambu = 109.29 x 1.60 174.9
Gebalan Rumput = - 1.10 -
Timbunan Tanah Pilihan = 1,340.14 1.00 1,340.14

Total : 85 175 - 1,340

Vol Bronjong Batu Kali Geotex NW GCL


Bronjong Kawat Pabrikasi = 50.51 x 1.00 50.5 1.10 55.56
Lapisan Geotex NW = 109.29 x 1.02 111.47
Lapisan GCL = 55.51 x 1.05 58.29

Total : 50.5 55.56 111.47 58.29


Estimasi
BAHAN Monday Tuesday - - - - - -
Penggunaan :
JUMLAH
JUMLAH / HARI KEBUTUHAN
BAHAN
- - 1 Cement - -
- - 2 Pasir - -
- - 3 Kerikil/Splite - -
7.94 55.56 4 Batu Kali/Belah 29.10 26.46
191.45 1,340.14 5 Tanah Timb. 701.98 638.16
12.13 84.88 6 Bambu 44.46 40.42
24.98 174.86 7 Bambu Takik 91.59 83.27
15.92 111.47 8 Geotex NW 58.39 53.08
8.33 58.29 9 Geo GCL 30.53 27.76
7.22 50.51 10 Kawat Bronjong 26.46 24.05
- - 11 Rumput Gebal - -
- - 12 Armco Plate - -
- - 13
- - 14

Estimasi Penggunaan : ALAT BERAT 42,240 42,241 - - - - - -

JUMLAH
JUMLAH / HARI
KEBUTUHAN ALAT
0.44 3.10 1 Excavator 1.63 1.48
5.73 40.10 2 Dump Truck 21.01 19.10
0.16 1.10 3 Buldozer 0.58 0.52
0.08 0.53 4 Vibro Roller 0.28 0.25
- - 5 Concrete Mixer - -
- - 6 Vibrator Beton - -
0.89 6.26 7 Pompa Air 3.28 2.98
0.29 2.00 8 Waterpass 1.00 1.00
0.29 2.00 9 Theodolite 1.00 1.00
- - 10 Chain Saw
- - 11 Alat Bantu
1.00 7.00 12 Truck Kayu 4.00 3.00
- - 13
- - 14
- - 15

Total Estimasi Penggunaan : TENAGA Monday Tuesday - - - - - -

Per Hari :
0.29 2.00 Pelaksana Utama 1.00 1.00
0.57 4.00 Pelaksana Lap. 2.00 2.00
0.05 0.37 Mandor 0.20 0.18
- Kepala Tukang - -
0.14 0.99 Tukang Batu 0.52 0.47
- - Tukang Besi - -
0.02 0.16 Tukang Kayu 0.09 0.08
2.04 14.30 Pekerja 7.49 6.81
0.47 3.29 Mandor Alat 1.72 1.56
0.68 4.73 Operator 2.48 2.25
0.68 4.73 Pemb. Operator 2.48 2.25
6.73 47.10 Sopir 25.01 22.10
6.73 47.10 Pembantu Sopir 25.01 22.10
0.57 4.00 Surveyor 2.00 2.00
1.14 8.00 Pemb. Surveyor 4.00 4.00
0.29 2.00 Mekanik 1.00 1.00
0.57 4.00 Pembantu Mekanik 2.00 2.00
0.57 4.00 Penjaga 2.00 2.00
KENDALI RALISASI PROGRESS FISIK
PAKET PEKERJAAN . . . .

1. SATKER :
2. KEGIATAN :
3. PEKERJAAN :
4. LOKASI :
5. KONTRAK NO. :

Periode Minggu Ke : XVIIb ( Tujuh Belas ) Tgl. 26 Agustus S/d Tgl. 31 Agustus 2015

NO. URAIAN PEKERJAAN SAT. VOLUME Wednesday Thursday Friday Saturday Sunday Monday KET.

Tanggal : 26-Aug-15 27-Aug-15 28-Aug-15 29-Aug-15 30-Aug-15 31-Aug-15


Jumlah Hari : 8 8 8 8 8 8 8 8

PEKERJAAN TANGGUL
1 Galian Tanah Lumpur (A) M3 1,907.76 337.17 312.75 310.20 305.24 307.70 334.69
2 Cerucuk Bambu Bh 1,635.48 289.05 268.11 265.93 261.68 263.79 286.93
3 Timbunan Tanah Pilihan M3 4,658.29 823.28 763.65 757.45 745.33 751.34 817.24
4 Matras Bambu Takik / Belah (man) M2 897.53 158.62 147.14 145.94 143.60 144.76 157.46
5 Lapisan Geotekstil M2 624.94 110.45 102.45 101.62 99.99 100.80 109.64
6 Bronjong Pabrikasi 2,70 mm M3 308.03 54.44 50.50 50.09 49.28 49.68 54.04
7 Pasangan GCL M2 283.85 50.17 46.53 46.15 45.42 45.78 49.80
8 Gebalan Rumput M2 - - - - - - -

PEKERJAAN JEMBATAN TANGGUL


1 Galian Tanah Lumpur (A) M3 - - - - - - -
2 Cerucuk Bambu Bh - - - - - - -
3 Pasangan Batu Kali 1 : 4 M3 - - - - - - -
4 Siaran 1 : 2 M2 - - - - - - -
5 Plesteran 1 : 3 M2 - - - - - - -
6 Jembatan Armco Type Multiplate A M1 - - - - - - -
7 Beton Bertulang K-225 (untuk jem M3 - - - - - - -
8 Timbunan Tanah Piihan M3 - - - - - - -
9 Bronjong Pabrikasi 2,70 mm M3 - - - - - - -
10 Lapisan Geotekstil M2 - - - - - - -

Volume Semen Pasir Kerikil Batu Kali


Beton K.225 - x 7.42 - 0.50 - 0.78 -
Pas. Batu Kali 1 : 4 = - x 3.31 - 0.57 - 1.20 -
Plesteran 1 : 3 = - x 0.12 - 0.02 -
Siaran 1 : 2 = - x 0.13 - 0.01 -

Total : - - - -

Vol Besi Beton Kawat Beton Kayu Bekisting Paku


Tulangan Beton K.225 = - x 110.0 - 2.00 -
Bekisting Beton K.225 = - x 0.40 - 2.00 -

Total : - - - -

Vol Bambu Bambu Takik Rumput Gebal Tanah Timb.


Cerucuk Bambu = 1,635.48 x 1.00 1,635.5
Matras Bambu = 897.53 x 1.60 1,436.0
Gebalan Rumput = - 1.10 -
Timbunan Tanah Pilihan = 4,658.29 1.00 4,658.29

Total : 1,635 1,436 - 4,658

Vol Bronjong Batu Kali Geotex NW GCL


Bronjong Kawat Pabrikasi = 308.03 x 1.00 308.0 1.10 338.83
Lapisan Geotex NW = 624.94 x 1.02 637.44
Lapisan GCL = 283.85 x 1.05 298.04

Total : 308.0 338.83 637.44 298.04


Estimasi
BAHAN 42,242 42,243 42,244 42,245 42,246 42,247 - -
Penggunaan :
JUMLAH
JUMLAH / HARI KEBUTUHAN
BAHAN
- - 1 Cement - - - - - - - -
- - 2 Pasir - - - - - - - -
- - 3 Kerikil/Splite - - - - - - - -
48.40 338.83 4 Batu Kali/Belah 59.88 55.55 55.09 54.21 54.65 59.44 - -
665.47 4,658.29 5 Tanah Timb. 823.28 763.65 757.45 745.33 751.34 817.24 - -
233.64 1,635.48 6 Bambu 289.05 268.11 265.93 261.68 263.79 286.93 - -
205.15 1,436.05 7 Bambu Takik 253.80 235.42 233.50 229.77 231.62 251.94 - -
91.06 637.44 8 Geotex NW 112.66 104.50 103.65 101.99 102.81 111.83 - -
42.58 298.04 9 Geo GCL 52.67 48.86 48.46 47.69 48.07 52.29 - -
44.00 308.03 10 Kawat Bronjong 54.44 50.50 50.09 49.28 49.68 54.04 - -
- - 11 Rumput Gebal - - - - - - - -
- - 12 Armco Plate - - - - - - - -
- - 13
- - 14

Estimasi Penggunaan : ALAT BERAT Wednesday Thursday Friday Saturday Sunday Monday - -

JUMLAH
JUMLAH / HARI
KEBUTUHAN ALAT
2.14 14.99 1 Excavator 2.65 2.46 2.44 2.40 2.42 2.63 - -
19.91 139.39 2 Dump Truck 24.64 22.85 22.67 22.30 22.48 24.45 - -
0.55 3.83 3 Buldozer 0.68 0.63 0.62 0.61 0.62 0.67 - -
0.26 1.83 4 Vibro Roller 0.32 0.30 0.30 0.29 0.29 0.32 - -
- - 5 Concrete Mixer - - - - - - - -
- - 6 Vibrator Beton - - - - - - - -
3.19 22.35 7 Pompa Air 3.95 3.66 3.63 3.58 3.60 3.92 - -
0.86 6.00 8 Waterpass 1.00 1.00 1.00 1.00 1.00 1.00
0.86 6.00 9 Theodolite 1.00 1.00 1.00 1.00 1.00 1.00
- - 10 Chain Saw
- - 11 Alat Bantu
3.57 25.00 12 Truck Kayu 5.00 4.00 4.00 4.00 4.00 4.00
- - 13
- - 14
- - 15

Total Estimasi Penggunaan : TENAGA Wednesday Thursday Friday Saturday Sunday Monday - -

Per Hari :
0.71 5.00 Pelaksana Utama 1.00 1.00 1.00 1.00 1.00
1.57 11.00 Pelaksana Lap. 2.00 2.00 2.00 2.00 2.00 1.00
0.35 2.45 Mandor 0.43 0.40 0.40 0.39 0.40 0.43 - -
- Kepala Tukang - - - - - - - -
0.85 5.95 Tukang Batu 1.05 0.98 0.97 0.95 0.96 1.04 - -
- - Tukang Besi - - - - - - - -
0.19 1.35 Tukang Kayu 0.24 0.22 0.22 0.22 0.22 0.24 - -
10.17 71.17 Pekerja 12.58 11.67 11.57 11.39 11.48 12.49 - -
2.38 16.65 Mandor Alat 2.94 2.73 2.71 2.66 2.69 2.92 - -
2.95 20.65 Operator 3.65 3.38 3.36 3.30 3.33 3.62 - -
2.95 20.65 Pemb. Operator 3.65 3.38 3.36 3.30 3.33 3.62 - -
23.48 164.39 Sopir 29.64 26.85 26.67 26.30 26.48 28.45 - -
23.48 164.39 Pembantu Sopir 29.64 26.85 26.67 26.30 26.48 28.45 - -
1.71 12.00 Surveyor 2.00 2.00 2.00 2.00 2.00 2.00 - -
3.43 24.00 Pemb. Surveyor 4.00 4.00 4.00 4.00 4.00 4.00 - -
0.57 4.00 Mekanik 1.00 1.00 1.00 1.00
1.14 8.00 Pembantu Mekanik 2.00 2.00 - 2.00 - 2.00
1.71 12.00 Penjaga 2.00 2.00 2.00 2.00 2.00 2.00
KENDALI RALISASI PROGRESS FISIK
PAKET PEKERJAAN . . . .

1. SATKER :
2. KEGIATAN :
3. PEKERJAAN :
4. LOKASI :
5. KONTRAK NO. :

Periode Minggu Ke : XVIII ( Delapan Belas ) Tgl. 01 September S/d Tgl. 07 September 2015

NO. URAIAN PEKERJAAN SAT. VOLUME Tuesday Wednesday Thursday Friday Saturday Sunday Monday KET.

Tanggal : 1-Sep-15 2-Sep-15 3-Sep-15 4-Sep-15 5-Sep-15 6-Sep-15 7-Sep-15


Jumlah Hari : 8 8 8 8 8 8 8 8

PEKERJAAN TANGGUL
1 Galian Tanah Lumpur (A) M3 3,839.86 545.41 556.50 540.82 526.01 533.31 564.68 573.11
2 Cerucuk Bambu Bh 2,499.55 355.04 362.25 352.05 342.40 347.16 367.58 373.07
3 Timbunan Tanah Pilihan M3 4,504.46 639.81 652.82 634.43 617.05 625.62 662.42 672.31
4 Matras Bambu Takik / Belah (man) M2 1,078.56 153.20 156.31 151.91 147.75 149.80 158.61 160.98
5 Lapisan Geotekstil M2 1,086.80 154.37 157.51 153.07 148.88 150.94 159.82 162.21
6 Bronjong Pabrikasi 2,70 mm M3 347.77 49.40 50.40 48.98 47.64 48.30 51.14 51.91
7 Pasangan GCL M2 372.07 52.85 53.92 52.40 50.97 51.68 54.72 55.53
8 Gebalan Rumput M2 - - - - - - - -

PEKERJAAN JEMBATAN TANGGUL


1 Galian Tanah Lumpur (A) M3 - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - -
3 Pasangan Batu Kali 1 : 4 M3 - - - - - - - -
4 Siaran 1 : 2 M2 - - - - - - - -
5 Plesteran 1 : 3 M2 - - - - - - - -
6 Jembatan Armco Type Multiplate A M1 - - - - - - - -
7 Beton Bertulang K-225 (untuk jem M3 - - - - - - - -
8 Timbunan Tanah Piihan M3 - - - - - - - -
9 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - -
10 Lapisan Geotekstil M2 - - - - - - - -

Volume Semen Pasir Kerikil Batu Kali


Beton K.225 - x 7.42 - 0.50 - 0.78 -
Pas. Batu Kali 1 : 4 = - x 3.31 - 0.57 - 1.20 -
Plesteran 1 : 3 = - x 0.12 - 0.02 -
Siaran 1 : 2 = - x 0.13 - 0.01 -

Total : - - - -

Vol Besi Beton Kawat Beton Kayu Bekisting Paku


Tulangan Beton K.225 = - x 110.0 - 2.00 -
Bekisting Beton K.225 = - x 0.40 - 2.00 -

Total : - - - -

Vol Bambu Bambu Takik Rumput Gebal Tanah Timb.


Cerucuk Bambu = 2,499.55 x 1.00 2,499.6
Matras Bambu = 1,078.56 x 1.60 1,725.7
Gebalan Rumput = - 1.10 -
Timbunan Tanah Pilihan = 4,504.46 1.00 4,504.46

Total : 2,500 1,726 - 4,504

Vol Bronjong Batu Kali Geotex NW GCL


Bronjong Kawat Pabrikasi = 347.77 x 1.00 347.8 1.10 382.55
Lapisan Geotex NW = 1,086.80 x 1.02 1,108.53
Lapisan GCL = 372.07 x 1.05 390.67

Total : 347.8 382.55 1,108.53 390.67


Estimasi
BAHAN Tuesday Wednesday Thursday Friday Saturday Sunday Monday -
Penggunaan :
JUMLAH
JUMLAH / HARI KEBUTUHAN
BAHAN
- - 1 Cement - - - - - - - -
- - 2 Pasir - - - - - - - -
- - 3 Kerikil/Splite - - - - - - - -
54.65 382.55 4 Batu Kali/Belah 54.34 55.44 53.88 52.40 53.13 56.26 57.10 -
643.49 4,504.46 5 Tanah Timb. 639.81 652.82 634.43 617.05 625.62 662.42 672.31 -
357.08 2,499.55 6 Bambu 355.04 362.25 352.05 342.40 347.16 367.58 373.07 -
246.53 1,725.70 7 Bambu Takik 245.12 250.10 243.06 236.40 239.68 253.78 257.57 -
158.36 1,108.53 8 Geotex NW 157.46 160.66 156.13 151.85 153.96 163.02 165.45 -
55.81 390.67 9 Geo GCL 55.49 56.62 55.02 53.52 54.26 57.45 58.31 -
49.68 347.77 10 Kawat Bronjong 49.40 50.40 48.98 47.64 48.30 51.14 51.91 -
- - 11 Rumput Gebal - - - - - - - -
- - 12 Armco Plate - - - - - - - -
- - 13
- - 14

Estimasi Penggunaan : ALAT BERAT Tuesday Wednesday Thursday Friday Saturday Sunday Monday -

JUMLAH
JUMLAH / HARI
KEBUTUHAN ALAT
2.80 19.63 1 Excavator 2.79 2.84 2.76 2.69 2.73 2.89 2.93 -
19.26 134.79 2 Dump Truck 19.15 19.53 18.98 18.46 18.72 19.82 20.12 -
0.53 3.70 3 Buldozer 0.53 0.54 0.52 0.51 0.51 0.54 0.55 -
0.25 1.77 4 Vibro Roller 0.25 0.26 0.25 0.24 0.25 0.26 0.26 -
- - 5 Concrete Mixer - - - - - - - -
- - 6 Vibrator Beton - - - - - - - -
3.12 21.84 7 Pompa Air 3.10 3.16 3.08 2.99 3.03 3.21 3.26 -
1.00 7.00 8 Waterpass 1.00 1.00 1.00 1.00 1.00 1.00 1.00
0.86 6.00 9 Theodolite 1.00 1.00 1.00 1.00 1.00 1.00
- - 10 Chain Saw
- - 11 Alat Bantu
3.29 23.00 12 Truck Kayu 4.00 4.00 4.00 3.00 3.00 2.00 3.00
- - 13
- - 14
- - 15

Total Estimasi Penggunaan : TENAGA Tuesday Wednesday Thursday Friday Saturday Sunday Monday

Per Hari :
0.86 6.00 Pelaksana Utama 1.00 1.00 1.00 1.00 1.00 1.00
2.00 14.00 Pelaksana Lap. 2.00 2.00 2.00 2.00 2.00 2.00 2.00
0.47 3.29 Mandor 0.47 0.48 0.46 0.45 0.46 0.48 0.49 -
- Kepala Tukang - - - - - - - -
1.04 7.27 Tukang Batu 1.03 1.05 1.02 1.00 1.01 1.07 1.09 -
- - Tukang Besi - - - - - - - -
0.23 1.62 Tukang Kayu 0.23 0.23 0.23 0.22 0.22 0.24 0.24 -
12.88 90.14 Pekerja 12.80 13.06 12.70 12.35 12.52 13.26 13.45 -
3.29 23.06 Mandor Alat 3.28 3.34 3.25 3.16 3.20 3.39 3.44 -
3.58 25.09 Operator 3.56 3.64 3.53 3.44 3.49 3.69 3.75 -
3.58 25.09 Pemb. Operator 3.56 3.64 3.53 3.44 3.49 3.69 3.75 -
22.54 157.79 Sopir 23.15 23.53 22.98 21.46 21.72 21.82 23.12 -
22.54 157.79 Pembantu Sopir 23.15 23.53 22.98 21.46 21.72 21.82 23.12 -
1.86 13.00 Surveyor 2.00 2.00 2.00 2.00 2.00 1.00 2.00 -
3.71 26.00 Pemb. Surveyor 4.00 4.00 4.00 4.00 4.00 2.00 4.00 -
0.86 6.00 Mekanik 1.00 1.00 1.00 1.00 1.00 1.00
1.71 12.00 Pembantu Mekanik 2.00 2.00 2.00 2.00 2.00 - 2.00
1.00 7.00 Penjaga 1.00 1.00 1.00 1.00 1.00 1.00 1.00
KENDALI RALISASI PROGRESS FISIK
PAKET PEKERJAAN . . . .

1. SATKER :
2. KEGIATAN :
3. PEKERJAAN :
4. LOKASI :
5. KONTRAK NO. :

Periode Minggu Ke : XIX ( Sembilan Belas ) Tgl. 08 September S/d Tgl. 15 September 2015

NO. URAIAN PEKERJAAN SAT. VOLUME Tuesday Wednesday Thursday Friday Saturday Sunday Monday Tuesday KET.

Tanggal : 8-Sep-15 9-Sep-15 10-Sep-15 11-Sep-15 12-Sep-15 13-Sep-15 14-Sep-15 15-Sep-15


Jumlah Hari : 8 8 8 8 8 8 8 8

PEKERJAAN TANGGUL
1 Galian Tanah Lumpur (A) M3 1,421.44 448.88 473.81 498.75
2 Cerucuk Bambu Bh 814.82 257.31 271.61 285.90
3 Timbunan Tanah Pilihan M3 3,216.33 1,015.68 1,072.11 1,128.54
4 Matras Bambu Takik / Belah (man) M2 262.29 82.83 87.43 92.03
5 Lapisan Geotekstil M2 262.29 82.83 87.43 92.03
6 Bronjong Pabrikasi 2,70 mm M3 157.58 49.76 52.53 55.29
7 Pasangan GCL M2 133.23 42.07 44.41 46.75
8 Gebalan Rumput M2 - - - - - - - - -

PEKERJAAN JEMBATAN TANGGUL


1 Galian Tanah Lumpur (A) M3 - - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - - -
3 Pasangan Batu Kali 1 : 4 M3 - - - - - - - - -
4 Siaran 1 : 2 M2 - - - - - - - - -
5 Plesteran 1 : 3 M2 - - - - - - - - -
6 Jembatan Armco Type Multiplate A M1 - - - - - - - - -
7 Beton Bertulang K-225 (untuk jem M3 - - - - - - - - -
8 Timbunan Tanah Piihan M3 - - - - - - - - -
9 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - - -
10 Lapisan Geotekstil M2 - - - - - - - - -

Volume Semen Pasir Kerikil Batu Kali


Beton K.225 - x 7.42 - 0.50 - 0.78 -
Pas. Batu Kali 1 : 4 = - x 3.31 - 0.57 - 1.20 -
Plesteran 1 : 3 = - x 0.12 - 0.02 -
Siaran 1 : 2 = - x 0.13 - 0.01 -

Total : - - - -

Vol Besi Beton Kawat Beton Kayu Bekisting Paku


Tulangan Beton K.225 = - x 110.0 - 2.00 -
Bekisting Beton K.225 = - x 0.40 - 2.00 -

Total : - - - -

Vol Bambu Bambu Takik Rumput Gebal Tanah Timb.


Cerucuk Bambu = 814.82 x 1.00 814.8
Matras Bambu = 262.29 x 1.60 419.7
Gebalan Rumput = - 1.10 -
Timbunan Tanah Pilihan = 3,216.33 1.00 3,216.33

Total : 815 420 - 3,216

Vol Bronjong Batu Kali Geotex NW GCL


Bronjong Kawat Pabrikasi = 157.58 x 1.00 157.6 1.10 173.34
Lapisan Geotex NW = 262.29 x 1.02 267.53
Lapisan GCL = 133.23 x 1.05 139.89

Total : 157.6 173.34 267.53 139.89


Estimasi
BAHAN Tuesday Wednesday Thursday Friday Saturday Sunday Monday Tuesday
Penggunaan :
JUMLAH
JUMLAH / HARI KEBUTUHAN
BAHAN
- - 1 Cement - - - - - - - -
- - 2 Pasir - - - - - - - -
- - 3 Kerikil/Splite - - - - - - - -
24.76 173.34 4 Batu Kali/Belah 54.74 57.78 60.82 - - - - -
459.48 3,216.33 5 Tanah Timb. 1,015.68 1,072.11 1,128.54 - - - - -
116.40 814.82 6 Bambu 257.31 271.61 285.90 - - - - -
59.95 419.66 7 Bambu Takik 132.52 139.89 147.25 - - - - -
38.22 267.53 8 Geotex NW 84.48 89.18 93.87 - - - - -
19.98 139.89 9 Geo GCL 44.18 46.63 49.09 - - - - -
22.51 157.58 10 Kawat Bronjong 49.76 52.53 55.29 - - - - -
- - 11 Rumput Gebal - - - - - - - -
- - 12 Armco Plate - - - - - - - -
- - 13
- - 14

Estimasi Penggunaan : ALAT BERAT Tuesday Wednesday Thursday Friday Saturday Sunday Monday Tuesday

JUMLAH
JUMLAH / HARI
KEBUTUHAN ALAT
1.45 10.12 1 Excavator 3.20 3.37 3.55 - - - - -
13.75 96.24 2 Dump Truck 30.39 32.08 33.77 - - - - -
0.38 2.64 3 Buldozer 0.83 0.88 0.93 - - - - -
0.18 1.26 4 Vibro Roller 0.40 0.42 0.44 - - - - -
- - 5 Concrete Mixer - - - - - - - -
- - 6 Vibrator Beton - - - - - - - -
2.17 15.18 7 Pompa Air 4.79 5.06 5.33 - - - - -
0.43 3.00 8 Waterpass 1.00 1.00 1.00
0.43 3.00 9 Theodolite 1.00 1.00 1.00
- - 10 Chain Saw
- - 11 Alat Bantu
1.29 9.00 12 Truck Kayu 3.00 3.00 3.00
- - 13
- - 14
- - 15

Total Estimasi Penggunaan : TENAGA Tuesday Wednesday Thursday Friday Saturday Sunday Monday Tuesday

Per Hari :
0.43 3.00 Pelaksana Utama 1.00 1.00 1.00
0.86 6.00 Pelaksana Lap. 2.00 2.00 2.00
0.13 0.94 Mandor 0.30 0.31 0.33 - - - - -
- Kepala Tukang - - - - - - - -
0.42 2.96 Tukang Batu 0.94 0.99 1.04 - - - - -
- - Tukang Besi - - - - - - - -
0.06 0.39 Tukang Kayu 0.12 0.13 0.14 - - - - -
6.38 44.65 Pekerja 14.10 14.88 15.67 - - - - -
1.63 11.41 Mandor Alat 3.60 3.80 4.00 - - - - -
2.00 14.03 Operator 4.43 4.68 4.92 - - - - -
2.00 14.03 Pemb. Operator 4.43 4.68 4.92 - - - - -
15.03 105.24 Sopir 33.39 35.08 36.77 - - - - -
15.03 105.24 Pembantu Sopir 33.39 35.08 36.77 - - - - -
0.86 6.00 Surveyor 2.00 2.00 2.00 - - - - -
1.71 12.00 Pemb. Surveyor 4.00 4.00 4.00 - - - - -
0.29 2.00 Mekanik 1.00 1.00
0.57 4.00 Pembantu Mekanik 2.00 2.00 - - - - - -
0.86 6.00 Penjaga 2.00 2.00 2.00
KENDALI RALISASI PROGRESS FISIK
PAKET PEKERJAAN . . . .

1. SATKER :
2. KEGIATAN :
3. PEKERJAAN :
4. LOKASI :
5. KONTRAK NO. :

Periode Minggu Ke : XX ( Dua Puluh ) Tgl. 16 September S/d Tgl. 22 September 2015

NO. URAIAN PEKERJAAN SAT. VOLUME Wednesday Thursday Friday Saturday Sunday Monday Tuesday KET.

Tanggal : 16-Sep-15 17-Sep-15 18-Sep-15 19-Sep-15 20-Sep-15 21-Sep-15 22-Sep-15


Jumlah Hari : 8 8 8 8 8 8 8 8

PEKERJAAN TANGGUL
1 Galian Tanah Lumpur (A) M3 1,315.97 480.22 424.50 411.24
2 Cerucuk Bambu Bh 978.17 356.95 315.54 305.68
3 Timbunan Tanah Pilihan M3 2,446.36 892.72 789.15 764.49
4 Matras Bambu Takik / Belah (man) M2 632.59 230.85 204.06 197.69
5 Lapisan Geotekstil M2 638.36 232.95 205.92 199.49
6 Bronjong Pabrikasi 2,70 mm M3 169.91 62.00 54.81 53.10
7 Pasangan GCL M2 198.27 72.35 63.96 61.96
8 Gebalan Rumput M2 - - - - - - - -

PEKERJAAN JEMBATAN TANGGUL


1 Galian Tanah Lumpur (A) M3 - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - -
3 Pasangan Batu Kali 1 : 4 M3 - - - - - - - -
4 Siaran 1 : 2 M2 - - - - - - - -
5 Plesteran 1 : 3 M2 - - - - - - - -
6 Jembatan Armco Type Multiplate A M1 - - - - - - - -
7 Beton Bertulang K-225 (untuk jem M3 - - - - - - - -
8 Timbunan Tanah Piihan M3 - - - - - - - -
9 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - -
10 Lapisan Geotekstil M2 - - - - - - - -

Volume Semen Pasir Kerikil Batu Kali


Beton K.225 - x 7.42 - 0.50 - 0.78 -
Pas. Batu Kali 1 : 4 = - x 3.31 - 0.57 - 1.20 -
Plesteran 1 : 3 = - x 0.12 - 0.02 -
Siaran 1 : 2 = - x 0.13 - 0.01 -

Total : - - - -

Vol Besi Beton Kawat Beton Kayu Bekisting Paku


Tulangan Beton K.225 = - x 110.0 - 2.00 -
Bekisting Beton K.225 = - x 0.40 - 2.00 -

Total : - - - -

Vol Bambu Bambu Takik Rumput Gebal Tanah Timb.


Cerucuk Bambu = 978.17 x 1.00 978.2
Matras Bambu = 632.59 x 1.60 1,012.1
Gebalan Rumput = - 1.10 -
Timbunan Tanah Pilihan = 2,446.36 1.00 2,446.36

Total : 978 1,012 - 2,446

Vol Bronjong Batu Kali Geotex NW GCL


Bronjong Kawat Pabrikasi = 169.91 x 1.00 169.9 1.10 186.90
Lapisan Geotex NW = 638.36 x 1.02 651.12
Lapisan GCL = 198.27 x 1.05 208.19

Total : 169.9 186.90 651.12 208.19


Estimasi
BAHAN Wednesday Thursday Friday Saturday Sunday Monday Tuesday
Penggunaan :
JUMLAH
JUMLAH / HARI KEBUTUHAN
BAHAN
- - 1 Cement - - - - - - - -
- - 2 Pasir - - - - - - - -
- - 3 Kerikil/Splite - - - - - - - -
26.70 186.90 4 Batu Kali/Belah - - - 68.20 60.29 58.40 - -
349.48 2,446.36 5 Tanah Timb. - - - 892.72 789.15 764.49 - -
139.74 978.17 6 Bambu - - - 356.95 315.54 305.68 - -
144.59 1,012.15 7 Bambu Takik - - - 369.35 326.50 316.30 - -
93.02 651.12 8 Geotex NW - - - 237.61 210.04 203.48 - -
29.74 208.19 9 Geo GCL - - - 75.97 67.16 65.06 - -
24.27 169.91 10 Kawat Bronjong - - - 62.00 54.81 53.10 - -
- - 11 Rumput Gebal - - - - - - - -
- - 12 Armco Plate - - - - - - - -
- - 13
- - 14

Estimasi Penggunaan : ALAT BERAT Wednesday Thursday Friday Saturday Sunday Monday Tuesday

JUMLAH
JUMLAH / HARI
KEBUTUHAN ALAT
1.24 8.65 1 Excavator - - - 3.15 2.79 2.70 - -
10.46 73.20 2 Dump Truck - - - 26.71 23.61 22.88 - -
0.29 2.01 3 Buldozer - - - 0.73 0.65 0.63 - -
0.14 0.96 4 Vibro Roller - - - 0.35 0.31 0.30 - -
- - 5 Concrete Mixer - - - - - - - -
- - 6 Vibrator Beton - - - - - - - -
1.68 11.77 7 Pompa Air - - - 4.30 3.80 3.68 - -
0.43 3.00 8 Waterpass 1.00 1.00 1.00
0.29 2.00 9 Theodolite 1.00 1.00
- - 10 Chain Saw
0.71 5.00 11 Alat Bantu 3.00 1.00 1.00
- - 12 Truck Kayu
- - 13
- - 14
- - 15

Total Estimasi Penggunaan : TENAGA Wednesday Thursday Friday Saturday Sunday Monday Tuesday

Per Hari :
0.29 2.00 Pelaksana Utama 1.00 1.00
0.86 6.00 Pelaksana Lap. 2.00 2.00 2.00
0.27 1.86 Mandor - - - 0.68 0.60 0.58 - -
- Kepala Tukang - - - - - - - -
0.53 3.71 Tukang Batu - - - 1.35 1.20 1.16 - -
- - Tukang Besi - - - - - - - -
0.14 0.95 Tukang Kayu - - - 0.35 0.31 0.30 - -
5.98 41.86 Pekerja - - - 15.28 13.50 13.08 - -
1.40 9.81 Mandor Alat - - - 3.58 3.16 3.07 - -
1.66 11.62 Operator - - - 4.24 3.75 3.63 - -
1.66 11.62 Pemb. Operator - - - 4.24 3.75 3.63 - -
10.46 73.20 Sopir - - - 26.71 23.61 22.88 - -
10.46 73.20 Pembantu Sopir - - - 26.71 23.61 22.88 - -
0.71 5.00 Surveyor - - - 2.00 1.00 2.00 - -
1.43 10.00 Pemb. Surveyor - - - 4.00 2.00 4.00 - -
0.43 3.00 Mekanik 1.00 1.00 1.00
0.86 6.00 Pembantu Mekanik 2.00 2.00 2.00 -
0.43 3.00 Penjaga 1.00 1.00 1.00
KENDALI RALISASI PROGRESS FISIK
PAKET PEKERJAAN . . . .

1. SATKER :
2. KEGIATAN :
3. PEKERJAAN :
4. LOKASI :
5. KONTRAK NO. :

Periode Minggu Ke : XXI ( Dua Puluh Satu ) Tgl. 23 September S/d Tgl. 30 September 2015

NO. URAIAN PEKERJAAN SAT. VOLUME Wednesday Thursday Friday Saturday Sunday Monday Tuesday Wednesday KET.

Tanggal : 23-Sep-15 24-Sep-15 25-Sep-15 26-Sep-15 27-Sep-15 28-Sep-15 29-Sep-15 30-Sep-15


Jumlah Hari : 8 8 8 8 8 8 8 8

PEKERJAAN TANGGUL
1 Galian Tanah Lumpur (A) M3 963.49 456.39 507.10
2 Cerucuk Bambu Bh 665.02 315.01 350.01
3 Timbunan Tanah Pilihan M3 1,778.09 842.25 935.84
4 Matras Bambu Takik / Belah (man) M2 430.07 203.72 226.35
5 Lapisan Geotekstil M2 433.99 205.58 228.42
6 Bronjong Pabrikasi 2,70 mm M3 132.01 62.53 69.48
7 Pasangan GCL M2 134.80 63.85 70.95
8 Gebalan Rumput M2 - - -

PEKERJAAN JEMBATAN TANGGUL


1 Galian Tanah Lumpur (A) M3 - - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - - -
3 Pasangan Batu Kali 1 : 4 M3 - - - - - - - - -
4 Siaran 1 : 2 M2 - - - - - - - - -
5 Plesteran 1 : 3 M2 - - - - - - - - -
6 Jembatan Armco Type Multiplate A M1 - - - - - - - - -
7 Beton Bertulang K-225 (untuk jem M3 - - - - - - - - -
8 Timbunan Tanah Piihan M3 - - - - - - - - -
9 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - - -
10 Lapisan Geotekstil M2 - - - - - - - - -

Volume Semen Pasir Kerikil Batu Kali


Beton K.225 - x 7.42 - 0.50 - 0.78 -
Pas. Batu Kali 1 : 4 = - x 3.31 - 0.57 - 1.20 -
Plesteran 1 : 3 = - x 0.12 - 0.02 -
Siaran 1 : 2 = - x 0.13 - 0.01 -

Total : - - - -

Vol Besi Beton Kawat Beton Kayu Bekisting Paku


Tulangan Beton K.225 = - x 110.0 - 2.00 -
Bekisting Beton K.225 = - x 0.40 - 2.00 -

Total : - - - -

Vol Bambu Bambu Takik Rumput Gebal Tanah Timb.


Cerucuk Bambu = 665.02 x 1.00 665.0
Matras Bambu = 430.07 x 1.60 688.1
Gebalan Rumput = - 1.10 -
Timbunan Tanah Pilihan = 1,778.09 1.00 1,778.09

Total : 665 688 - 1,778

Vol Bronjong Batu Kali Geotex NW GCL


Bronjong Kawat Pabrikasi = 132.01 x 1.00 132.0 1.10 145.21
Lapisan Geotex NW = 433.99 x 1.02 442.67
Lapisan GCL = 134.80 x 1.05 141.54

Total : 132.0 145.21 442.67 141.54


Estimasi
BAHAN Wednesday Thursday Friday Saturday Sunday Monday Tuesday Wednesday
Penggunaan :
JUMLAH
JUMLAH / HARI KEBUTUHAN
BAHAN
- - 1 Cement - - - - - - - -
- - 2 Pasir - - - - - - - -
- - 3 Kerikil/Splite - - - - - - - -
20.74 145.21 4 Batu Kali/Belah - - - - - - 68.79 76.43
254.01 1,778.09 5 Tanah Timb. - - - - - - 842.25 935.84
95.00 665.02 6 Bambu - - - - - - 315.01 350.01
98.30 688.12 7 Bambu Takik - - - - - - 325.95 362.17
63.24 442.67 8 Geotex NW - - - - - - 209.69 232.99
20.22 141.54 9 Geo GCL - - - - - - 67.04 74.49
18.86 132.01 10 Kawat Bronjong - - - - - - 62.53 69.48
- - 11 Rumput Gebal - - - - - - - -
- - 12 Armco Plate - - - - - - - -
- - 13
- - 14

Estimasi Penggunaan : ALAT BERAT Wednesday Thursday Friday Saturday Sunday Monday Tuesday Wednesday

JUMLAH
JUMLAH / HARI
KEBUTUHAN ALAT
0.89 6.23 1 Excavator - - - - - - 2.95 3.28
7.60 53.21 2 Dump Truck - - - - - - 25.20 28.00
0.21 1.46 3 Buldozer - - - - - - 0.69 0.77
0.10 0.70 4 Vibro Roller - - - - - - 0.33 0.37
- - 5 Concrete Mixer - - - - - - - -
- - 6 Vibrator Beton - - - - - - - -
1.23 8.60 7 Pompa Air - - - - - - 4.07 4.52
0.29 2.00 8 Waterpass 1.00 1.00
0.29 2.00 9 Theodolite 1.00 1.00
- - 10 Chain Saw
- - 11 Alat Bantu
0.57 4.00 12 Truck Kayu 2.00 2.00
- - 13
- - 14
- - 15

Total Estimasi Penggunaan : TENAGA Wednesday Thursday Friday Saturday Sunday Monday Tuesday Wednesday

Per Hari :
0.29 2.00 Pelaksana Utama 1.00 1.00
0.57 4.00 Pelaksana Lap. 2.00 2.00
0.18 1.29 Mandor - - - - - - 0.61 0.68
- Kepala Tukang - - - - - - - -
0.40 2.79 Tukang Batu - - - - - - 1.32 1.47
- - Tukang Besi - - - - - - - -
0.09 0.65 Tukang Kayu - - - - - - 0.31 0.34
4.32 30.21 Pekerja - - - - - - 14.31 15.90
1.01 7.09 Mandor Alat - - - - - - 3.36 3.73
1.20 8.39 Operator - - - - - - 3.98 4.42
1.20 8.39 Pemb. Operator - - - - - - 3.98 4.42
8.17 57.21 Sopir - - - - - - 27.20 30.00
8.17 57.21 Pembantu Sopir - - - - - - 27.20 30.00
0.57 4.00 Surveyor - - - - - - 2.00 2.00
1.14 8.00 Pemb. Surveyor - - - - - - 4.00 4.00
0.29 2.00 Mekanik 1.00 1.00
0.57 4.00 Pembantu Mekanik - - - - - - 2.00 2.00
0.57 4.00 Penjaga 2.00 2.00
KENDALI RALISASI PROGRESS FISIK
PAKET PEKERJAAN . . . .

1. SATKER :
2. KEGIATAN :
3. PEKERJAAN :
4. LOKASI :
5. KONTRAK NO. :

Periode Minggu Ke : XXII ( Dua Puluh Dua ) Tgl. 01 Oktober S/d Tgl. 07 Oktober 2015

NO. URAIAN PEKERJAAN SAT. VOLUME Thursday Friday Saturday Sunday Monday Tuesday Wednesday KET.

Tanggal : 1-Oct-15 2-Oct-15 3-Oct-15 4-Oct-15 5-Oct-15 6-Oct-15 7-Oct-15


Jumlah Hari : 8 8 8 8 8 8 8 8

PEKERJAAN TANGGUL
1 Galian Tanah Lumpur (A) M3 2,647.14 376.00 383.64 372.84 362.62 367.66 389.29 395.10
2 Cerucuk Bambu Bh 2,427.51 344.80 351.81 341.90 332.54 337.15 356.99 362.31
3 Timbunan Tanah Pilihan M3 5,368.25 762.50 778.01 756.09 735.38 745.59 789.45 801.23
4 Matras Bambu Takik / Belah (man) M2 1,306.86 185.63 189.40 184.06 179.02 181.51 192.19 195.05
5 Lapisan Geotekstil M2 1,318.77 187.32 191.13 185.74 180.65 183.16 193.94 196.83
6 Bronjong Pabrikasi 2,70 mm M3 384.33 54.59 55.70 54.13 52.65 53.38 56.52 57.36
7 Pasangan GCL M2 409.61 58.18 59.36 57.69 56.11 56.89 60.24 61.14
8 Gebalan Rumput M2 - - - - - - - -

PEKERJAAN JEMBATAN TANGGUL


1 Galian Tanah Lumpur (A) M3 - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - -
3 Pasangan Batu Kali 1 : 4 M3 - - - - - - - -
4 Siaran 1 : 2 M2 - - - - - - - -
5 Plesteran 1 : 3 M2 - - - - - - - -
6 Jembatan Armco Type Multiplate A M1 - - - - - - - -
7 Beton Bertulang K-225 (untuk jem M3 - - - - - - - -
8 Timbunan Tanah Piihan M3 - - - - - - - -
9 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - -
10 Lapisan Geotekstil M2 - - - - - - - -

Volume Semen Pasir Kerikil Batu Kali


Beton K.225 - x 7.42 - 0.50 - 0.78 -
Pas. Batu Kali 1 : 4 = - x 3.31 - 0.57 - 1.20 -
Plesteran 1 : 3 = - x 0.12 - 0.02 -
Siaran 1 : 2 = - x 0.13 - 0.01 -

Total : - - - -

Vol Besi Beton Kawat Beton Kayu Bekisting Paku


Tulangan Beton K.225 = - x 110.0 - 2.00 -
Bekisting Beton K.225 = - x 0.40 - 2.00 -

Total : - - - -

Vol Bambu Bambu Takik Rumput Gebal Tanah Timb.


Cerucuk Bambu = 2,427.51 x 1.00 2,427.5
Matras Bambu = 1,306.86 x 1.60 2,091.0
Gebalan Rumput = - 1.10 -
Timbunan Tanah Pilihan = 5,368.25 1.00 5,368.25

Total : 2,428 2,091 - 5,368

Vol Bronjong Batu Kali Geotex NW GCL


Bronjong Kawat Pabrikasi = 384.33 x 1.00 384.3 1.10 422.76
Lapisan Geotex NW = 1,318.77 x 1.02 1,345.15
Lapisan GCL = 409.61 x 1.05 430.09

Total : 384.3 422.76 1,345.15 430.09


Estimasi
BAHAN Thursday Friday Saturday Sunday Monday Tuesday Wednesday -
Penggunaan :
JUMLAH
JUMLAH / HARI KEBUTUHAN
BAHAN
- - 1 Cement - - - - - - - -
- - 2 Pasir - - - - - - - -
- - 3 Kerikil/Splite - - - - - - - -
60.39 422.76 4 Batu Kali/Belah 60.05 61.27 59.54 57.91 58.72 62.17 63.10 -
766.89 5,368.25 5 Tanah Timb. 762.50 778.01 756.09 735.38 745.59 789.45 801.23 -
346.79 2,427.51 6 Bambu 344.80 351.81 341.90 332.54 337.15 356.99 362.31 -
298.71 2,090.98 7 Bambu Takik 297.00 303.04 294.50 286.44 290.41 307.50 312.09 -
192.16 1,345.15 8 Geotex NW 191.06 194.95 189.46 184.27 186.83 197.82 200.77 -
61.44 430.09 9 Geo GCL 61.09 62.33 60.58 58.92 59.73 63.25 64.19 -
54.90 384.33 10 Kawat Bronjong 54.59 55.70 54.13 52.65 53.38 56.52 57.36 -
- - 11 Rumput Gebal - - - - - - - -
- - 12 Armco Plate - - - - - - - -
- - 13
- - 14

Estimasi Penggunaan : ALAT BERAT Thursday Friday Saturday Sunday Monday Tuesday Wednesday -

JUMLAH
JUMLAH / HARI
KEBUTUHAN ALAT
2.70 18.89 1 Excavator 2.68 2.74 2.66 2.59 2.62 2.78 2.82 -
22.95 160.63 2 Dump Truck 22.82 23.28 22.62 22.00 22.31 23.62 23.98 -
0.63 4.41 3 Buldozer 0.63 0.64 0.62 0.60 0.61 0.65 0.66 -
0.30 2.11 4 Vibro Roller 0.30 0.31 0.30 0.29 0.29 0.31 0.31 -
- - 5 Concrete Mixer - - - - - - - -
- - 6 Vibrator Beton - - - - - - - -
3.70 25.89 7 Pompa Air 3.68 3.75 3.65 3.55 3.60 3.81 3.86 -
1.00 7.00 8 Waterpass 1.00 1.00 1.00 1.00 1.00 1.00 1.00
0.86 6.00 9 Theodolite 1.00 1.00 1.00 1.00 1.00 1.00
- - 10 Chain Saw
- - 11 Alat Bantu
3.71 26.00 12 Truck Kayu 3.00 4.00 4.00 3.00 4.00 4.00 4.00
- - 13
- - 14
- - 15

Total Estimasi Penggunaan : TENAGA Thursday Friday Saturday Sunday Monday Tuesday Wednesday -

Per Hari :
1.00 7.00 Pelaksana Utama 1.00 1.00 1.00 1.00 1.00 1.00 1.00
2.00 14.00 Pelaksana Lap. 2.00 2.00 2.00 2.00 2.00 2.00 2.00
0.56 3.89 Mandor 0.55 0.56 0.55 0.53 0.54 0.57 0.58 -
- Kepala Tukang - - - - - - - -
1.17 8.20 Tukang Batu 1.17 1.19 1.16 1.12 1.14 1.21 1.22 -
- - Tukang Besi - - - - - - - -
0.28 1.96 Tukang Kayu 0.28 0.28 0.28 0.27 0.27 0.29 0.29 -
13.14 91.97 Pekerja 13.06 13.33 12.95 12.60 12.77 13.52 13.73 -
3.03 21.18 Mandor Alat 3.01 3.07 2.98 2.90 2.94 3.11 3.16 -
3.63 25.40 Operator 3.61 3.68 3.58 3.48 3.53 3.74 3.79 -
3.63 25.40 Pemb. Operator 3.61 3.68 3.58 3.48 3.53 3.74 3.79 -
26.66 186.63 Sopir 25.82 27.28 26.62 25.00 26.31 27.62 27.98 -
26.66 186.63 Pembantu Sopir 25.82 27.28 26.62 25.00 26.31 27.62 27.98 -
1.86 13.00 Surveyor 2.00 2.00 2.00 1.00 2.00 2.00 2.00 -
3.71 26.00 Pemb. Surveyor 4.00 4.00 4.00 2.00 4.00 4.00 4.00 -
0.86 6.00 Mekanik 1.00 1.00 1.00 1.00 1.00 1.00
1.71 12.00 Pembantu Mekanik 2.00 2.00 2.00 - 2.00 2.00 2.00
2.00 14.00 Penjaga 2.00 2.00 2.00 2.00 2.00 2.00 2.00
KENDALI RALISASI PROGRESS FISIK
PAKET PEKERJAAN . . . .

1. SATKER :
2. KEGIATAN :
3. PEKERJAAN :
4. LOKASI :
5. KONTRAK NO. :

Periode Minggu Ke : XXIII ( Dua Puluh Tiga ) Tgl. 08 Oktober S/d Tgl. 15 Oktober 2015

NO. URAIAN PEKERJAAN SAT. VOLUME Thursday Friday Saturday Sunday Monday Tuesday Wednesday Thursday KET.

Tanggal : 8-Oct-15 9-Oct-15 10-Oct-15 11-Oct-15 12-Oct-15 13-Oct-15 14-Oct-15 15-Oct-15


Jumlah Hari : 8 8 8 8 8 8 8 8

PEKERJAAN TANGGUL
1 Galian Tanah Lumpur (A) M3 2,129.64 700.62 686.98 742.03
2 Cerucuk Bambu Bh 1,371.91 451.34 442.55 478.02
3 Timbunan Tanah Pilihan M3 4,036.60 1,327.99 1,302.13 1,406.48
4 Matras Bambu Takik / Belah (man) M2 947.72 311.79 305.72 330.21
5 Lapisan Geotekstil M2 895.32 294.55 288.81 311.96
6 Bronjong Pabrikasi 2,70 mm M3 255.32 84.00 82.36 88.96
7 Pasangan GCL M2 278.09 91.49 89.70 96.89
8 Gebalan Rumput M2 - - - -

PEKERJAAN JEMBATAN TANGGUL


1 Galian Tanah Lumpur (A) M3 - - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - - -
3 Pasangan Batu Kali 1 : 4 M3 - - - - - - - - -
4 Siaran 1 : 2 M2 - - - - - - - - -
5 Plesteran 1 : 3 M2 - - - - - - - - -
6 Jembatan Armco Type Multiplate A M1 - - - - - - - - -
7 Beton Bertulang K-225 (untuk jem M3 - - - - - - - - -
8 Timbunan Tanah Piihan M3 - - - - - - - - -
9 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - - -
10 Lapisan Geotekstil M2 - - - - - - - - -

Volume Semen Pasir Kerikil Batu Kali


Beton K.225 - x 7.42 - 0.50 - 0.78 -
Pas. Batu Kali 1 : 4 = - x 3.31 - 0.57 - 1.20 -
Plesteran 1 : 3 = - x 0.12 - 0.02 -
Siaran 1 : 2 = - x 0.13 - 0.01 -

Total : - - - -

Vol Besi Beton Kawat Beton Kayu Bekisting Paku


Tulangan Beton K.225 = - x 110.0 - 2.00 -
Bekisting Beton K.225 = - x 0.40 - 2.00 -

Total : - - - -

Vol Bambu Bambu Takik Rumput Gebal Tanah Timb.


Cerucuk Bambu = 1,371.91 x 1.00 1,371.9
Matras Bambu = 947.72 x 1.60 1,516.3
Gebalan Rumput = - 1.10 -
Timbunan Tanah Pilihan = 4,036.60 1.00 4,036.60

Total : 1,372 1,516 - 4,037

Vol Bronjong Batu Kali Geotex NW GCL


Bronjong Kawat Pabrikasi = 255.32 x 1.00 255.3 1.10 280.85
Lapisan Geotex NW = 895.32 x 1.02 913.23
Lapisan GCL = 278.09 x 1.05 291.99

Total : 255.3 280.85 913.23 291.99


Estimasi
BAHAN Thursday Friday Saturday Sunday Monday Tuesday Wednesday Thursday
Penggunaan :
JUMLAH
JUMLAH / HARI KEBUTUHAN
BAHAN
- - 1 Cement - - - - - - - -
- - 2 Pasir - - - - - - - -
- - 3 Kerikil/Splite - - - - - - - -
40.12 280.85 4 Batu Kali/Belah 92.40 90.60 97.86 - - - - -
576.66 4,036.60 5 Tanah Timb. 1,327.99 1,302.13 1,406.48 - - - - -
195.99 1,371.91 6 Bambu 451.34 442.55 478.02 - - - - -
216.62 1,516.35 7 Bambu Takik 498.86 489.14 528.34 - - - - -
130.46 913.23 8 Geotex NW 300.44 294.59 318.20 - - - - -
41.71 291.99 9 Geo GCL 96.06 94.19 101.74 - - - - -
36.47 255.32 10 Kawat Bronjong 84.00 82.36 88.96 - - - - -
- - 11 Rumput Gebal - - - - - - - -
- - 12 Armco Plate - - - - - - - -
- - 13
- - 14

Estimasi Penggunaan : ALAT BERAT Thursday Friday Saturday Sunday Monday Tuesday Wednesday Thursday

JUMLAH
JUMLAH / HARI
KEBUTUHAN ALAT
1.76 12.31 1 Excavator 4.05 3.97 4.29 - - - - -
17.26 120.79 2 Dump Truck 39.74 38.96 42.09 - - - - -
0.47 3.32 3 Buldozer 1.09 1.07 1.16 - - - - -
0.23 1.58 4 Vibro Roller 0.52 0.51 0.55 - - - - -
- - 5 Concrete Mixer - - - - - - - -
- - 6 Vibrator Beton - - - - - - - -
2.76 19.31 7 Pompa Air 6.35 6.23 6.73 - - - - -
0.43 3.00 8 Waterpass 1.00 1.00 1.00
0.43 3.00 9 Theodolite 1.00 1.00 1.00
- - 10 Chain Saw
- - 11 Alat Bantu
1.29 9.00 12 Truck Kayu 3.00 3.00 3.00
- - 13
- - 14
- - 15

Total Estimasi Penggunaan : TENAGA Thursday Friday Saturday Sunday Monday Tuesday Wednesday Thursday

Per Hari :
0.43 3.00 Pelaksana Utama 1.00 1.00 1.00
0.86 6.00 Pelaksana Lap. 2.00 2.00 2.00
0.39 2.71 Mandor 0.89 0.87 0.94 - - - - -
- Kepala Tukang - - - - - - - -
0.78 5.48 Tukang Batu 1.80 1.77 1.91 - - - - -
- - Tukang Besi - - - - - - - -
0.20 1.42 Tukang Kayu 0.47 0.46 0.50 - - - - -
9.38 65.68 Pekerja 21.61 21.19 22.88 - - - - -
2.25 15.76 Mandor Alat 5.19 5.08 5.49 - - - - -
2.46 17.22 Operator 5.66 5.55 6.00 - - - - -
2.46 17.22 Pemb. Operator 5.66 5.55 6.00 - - - - -
18.54 129.79 Sopir 42.74 41.96 45.09 - - - - -
18.54 129.79 Pembantu Sopir 42.74 41.96 45.09 - - - - -
0.86 6.00 Surveyor 2.00 2.00 2.00 - - - - -
1.71 12.00 Pemb. Surveyor 4.00 4.00 4.00 - - - - -
0.29 2.00 Mekanik 1.00 1.00
0.57 4.00 Pembantu Mekanik 2.00 2.00 -
0.86 6.00 Penjaga 2.00 2.00 2.00
KENDALI RALISASI PROGRESS FISIK
PAKET PEKERJAAN . . . .

1. SATKER :
2. KEGIATAN :
3. PEKERJAAN :
4. LOKASI :
5. KONTRAK NO. :

Periode Minggu Ke : XXIV ( Dua Puluh Empat ) Tgl. 16 Oktober S/d Tgl. 23 Oktober 2015

NO. URAIAN PEKERJAAN SAT. VOLUME Friday Saturday Sunday Monday Tuesday Wednesday Thursday Friday KET.

Tanggal : 16-Oct-15 17-Oct-15 18-Oct-15 19-Oct-15 20-Oct-15 21-Oct-15 22-Oct-15 23-Oct-15


Jumlah Hari : 8 8 8 8 8 8 8 8

PEKERJAAN TANGGUL
1 Galian Tanah Lumpur (A) M3 1,845.75 446.59 475.71 450.18 473.27
2 Cerucuk Bambu Bh 1,371.91 331.94 353.59 334.61 351.77
3 Timbunan Tanah Pilihan M3 4,036.60 976.68 1,040.36 984.54 1,035.02
4 Matras Bambu Takik / Belah (man) M2 975.96 236.14 251.54 238.04 250.25
5 Lapisan Geotekstil M2 984.85 238.29 253.83 240.21 252.53
6 Bronjong Pabrikasi 2,70 mm M3 249.36 60.33 64.27 60.82 63.94
7 Pasangan GCL M2 389.32 94.20 100.34 94.96 99.83
8 Gebalan Rumput M2 - - - - -

PEKERJAAN JEMBATAN TANGGUL


1 Galian Tanah Lumpur (A) M3 - - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - - -
3 Pasangan Batu Kali 1 : 4 M3 - - - - - - - - -
4 Siaran 1 : 2 M2 - - - - - - - - -
5 Plesteran 1 : 3 M2 - - - - - - - - -
6 Jembatan Armco Type Multiplate A M1 - - - - - - - - -
7 Beton Bertulang K-225 (untuk jem M3 - - - - - - - - -
8 Timbunan Tanah Piihan M3 - - - - - - - - -
9 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - - -
10 Lapisan Geotekstil M2 - - - - - - - - -

Volume Semen Pasir Kerikil Batu Kali


Beton K.225 - x 7.42 - 0.50 - 0.78 -
Pas. Batu Kali 1 : 4 = - x 3.31 - 0.57 - 1.20 -
Plesteran 1 : 3 = - x 0.12 - 0.02 -
Siaran 1 : 2 = - x 0.13 - 0.01 -

Total : - - - -

Vol Besi Beton Kawat Beton Kayu Bekisting Paku


Tulangan Beton K.225 = - x 110.0 - 2.00 -
Bekisting Beton K.225 = - x 0.40 - 2.00 -

Total : - - - -

Vol Bambu Bambu Takik Rumput Gebal Tanah Timb.


Cerucuk Bambu = 1,371.91 x 1.00 1,371.9
Matras Bambu = 975.96 x 1.60 1,561.5
Gebalan Rumput = - 1.10 -
Timbunan Tanah Pilihan = 4,036.60 1.00 4,036.60

Total : 1,372 1,562 - 4,037

Vol Bronjong Batu Kali Geotex NW GCL


Bronjong Kawat Pabrikasi = 249.36 x 1.00 249.4 1.10 274.30
Lapisan Geotex NW = 984.85 x 1.02 1,004.55
Lapisan GCL = 389.32 x 1.05 408.79

Total : 249.4 274.30 1,004.55 408.79


Estimasi
BAHAN Friday Saturday Sunday Monday Tuesday Wednesday Thursday Friday
Penggunaan :
JUMLAH
JUMLAH / HARI KEBUTUHAN
BAHAN
- - 1 Cement - - - - - - - -
- - 2 Pasir - - - - - - - -
- - 3 Kerikil/Splite - - - - - - - -
39.19 274.30 4 Batu Kali/Belah - - - - 66.37 70.70 66.90 70.33
576.66 4,036.60 5 Tanah Timb. - - - - 976.68 1,040.36 984.54 1,035.02
195.99 1,371.91 6 Bambu - - - - 331.94 353.59 334.61 351.77
223.08 1,561.53 7 Bambu Takik - - - - 377.82 402.46 380.86 400.39
143.51 1,004.55 8 Geotex NW - - - - 243.06 258.90 245.01 257.58
58.40 408.79 9 Geo GCL - - - - 98.91 105.36 99.70 104.82
35.62 249.36 10 Kawat Bronjong - - - - 60.33 64.27 60.82 63.94
- - 11 Rumput Gebal - - - - - - - -
- - 12 Armco Plate - - - - - - - -
- - 13
- - 14

Estimasi Penggunaan : ALAT BERAT Friday Saturday Sunday Monday Tuesday Wednesday Thursday Friday

JUMLAH
JUMLAH / HARI
KEBUTUHAN ALAT
2.17 15.20 1 Excavator - - - - 3.68 3.92 3.71 3.90
17.26 120.79 2 Dump Truck - - - - 29.23 31.13 29.46 30.97
0.47 3.32 3 Buldozer - - - - 0.80 0.85 0.81 0.85
0.23 1.58 4 Vibro Roller - - - - 0.38 0.41 0.39 0.41
- - 5 Concrete Mixer - - - - - - - -
- - 6 Vibrator Beton - - - - - - - -
2.76 19.29 7 Pompa Air - - - - 4.67 4.97 4.70 4.95
0.57 4.00 8 Waterpass 1.00 1.00 1.00 1.00
0.57 4.00 9 Theodolite 1.00 1.00 1.00 1.00
- - 10 Chain Saw
- - 11 Alat Bantu
2.29 16.00 12 Truck Kayu 4.00 4.00 4.00 4.00
- - 13
- - 14
- - 15

Total Estimasi Penggunaan : TENAGA Friday Saturday Sunday Monday Tuesday Wednesday Thursday Friday

Per Hari :
0.57 4.00 Pelaksana Utama 1.00 1.00 1.00 1.00
1.14 8.00 Pelaksana Lap. 2.00 2.00 2.00 2.00
0.43 2.98 Mandor - - - - 0.72 0.77 0.73 0.76
- Kepala Tukang - - - - - - - -
0.79 5.51 Tukang Batu - - - - 1.33 1.42 1.34 1.41
- - Tukang Besi - - - - - - - -
0.21 1.46 Tukang Kayu - - - - 0.35 0.38 0.36 0.38
9.23 64.58 Pekerja - - - - 15.62 16.64 15.75 16.56
2.13 14.93 Mandor Alat - - - - 3.61 3.85 3.64 3.83
2.87 20.10 Operator - - - - 4.86 5.18 4.90 5.15
2.87 20.10 Pemb. Operator - - - - 4.86 5.18 4.90 5.15
19.54 136.79 Sopir - - - - 33.23 35.13 33.46 34.97
19.54 136.79 Pembantu Sopir - - - - 33.23 35.13 33.46 34.97
1.14 8.00 Surveyor - - - - 2.00 2.00 2.00 2.00
2.29 16.00 Pemb. Surveyor - - - - 4.00 4.00 4.00 4.00
0.57 4.00 Mekanik 1.00 1.00 1.00 1.00
1.14 8.00 Pembantu Mekanik - - - - 2.00 2.00 2.00 2.00
2.29 16.00 Penjaga 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
KENDALI RALISASI PROGRESS FISIK
PAKET PEKERJAAN . . . .

1. SATKER :
2. KEGIATAN :
3. PEKERJAAN :
4. LOKASI :
5. KONTRAK NO. :

Periode Minggu Ke : XXV ( Dua Puluh Lima ) Tgl. 24 Oktober S/d Tgl. 31 Oktober 2015

NO. URAIAN PEKERJAAN SAT. VOLUME Saturday Sunday Monday Tuesday Wednesday Thursday Friday Saturday KET.

Tanggal : 24-Oct-15 25-Oct-15 26-Oct-15 27-Oct-15 28-Oct-15 29-Oct-15 30-Oct-15 31-Oct-15


Jumlah Hari : 8 8 8 8 8 8 8 8

PEKERJAAN TANGGUL
1 Galian Tanah Lumpur (A) M3 - - - - - - - - -
2 Cerucuk Bambu Bh 1,244.02 158.86 155.50 151.71 155.50 153.58 159.49 159.49 149.88
3 Timbunan Tanah Pilihan M3 1,258.22 160.67 157.28 153.44 157.28 155.34 161.31 161.31 151.59
4 Matras Bambu Takik / Belah (man) M2 884.97 113.01 110.62 107.92 110.62 109.26 113.46 113.46 106.62
5 Lapisan Geotekstil M2 893.04 114.04 111.63 108.91 111.63 110.25 114.49 114.49 107.60
6 Bronjong Pabrikasi 2,70 mm M3 106.11 13.55 13.26 12.94 13.26 13.10 13.60 13.60 12.78
7 Pasangan GCL M2 277.38 35.42 34.67 33.83 34.67 34.24 35.56 35.56 33.42
8 Gebalan Rumput M2 - - - - - - - - -

PEKERJAAN JEMBATAN TANGGUL


1 Galian Tanah Lumpur (A) M3 - - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - - -
3 Pasangan Batu Kali 1 : 4 M3 - - - - - - - - -
4 Siaran 1 : 2 M2 - - - - - - - - -
5 Plesteran 1 : 3 M2 - - - - - - - - -
6 Jembatan Armco Type Multiplate A M1 - - - - - - - - -
7 Beton Bertulang K-225 (untuk jem M3 - - - - - - - - -
8 Timbunan Tanah Piihan M3 - - - - - - - - -
9 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - - -
10 Lapisan Geotekstil M2 - - - - - - - - -

Volume Semen Pasir Kerikil Batu Kali


Beton K.225 - x 7.42 - 0.50 - 0.78 -
Pas. Batu Kali 1 : 4 = - x 3.31 - 0.57 - 1.20 -
Plesteran 1 : 3 = - x 0.12 - 0.02 -
Siaran 1 : 2 = - x 0.13 - 0.01 -

Total : - - - -

Vol Besi Beton Kawat Beton Kayu Bekisting Paku


Tulangan Beton K.225 = - x 110.0 - 2.00 -
Bekisting Beton K.225 = - x 0.40 - 2.00 -

Total : - - - -

Vol Bambu Bambu Takik Rumput Gebal Tanah Timb.


Cerucuk Bambu = 1,244.02 x 1.00 1,244.0
Matras Bambu = 884.97 x 1.60 1,416.0
Gebalan Rumput = - 1.10 -
Timbunan Tanah Pilihan = 1,258.22 1.00 1,258.22

Total : 1,244 1,416 - 1,258

Vol Bronjong Batu Kali Geotex NW GCL


Bronjong Kawat Pabrikasi = 106.11 x 1.00 106.1 1.10 116.72
Lapisan Geotex NW = 893.04 x 1.02 910.90
Lapisan GCL = 277.38 x 1.05 291.25

Total : 106.1 116.72 910.90 291.25


Estimasi
BAHAN Saturday Sunday Monday Tuesday Wednesday Thursday Friday Saturday
Penggunaan :
JUMLAH
JUMLAH / HARI KEBUTUHAN
BAHAN
- - 1 Cement - - - - - - - -
- - 2 Pasir - - - - - - - -
- - 3 Kerikil/Splite - - - - - - - -
16.67 116.72 4 Batu Kali/Belah 14.91 14.59 14.23 14.59 14.41 14.96 14.96 14.06
179.75 1,258.22 5 Tanah Timb. 160.67 157.28 153.44 157.28 155.34 161.31 161.31 151.59
177.72 1,244.02 6 Bambu 158.86 155.50 151.71 155.50 153.58 159.49 159.49 149.88
202.28 1,415.96 7 Bambu Takik 180.82 176.99 172.68 176.99 174.81 181.53 181.53 170.60
130.13 910.90 8 Geotex NW 116.32 113.86 111.09 113.86 112.46 116.78 116.78 109.75
41.61 291.25 9 Geo GCL 37.19 36.41 35.52 36.41 35.96 37.34 37.34 35.09
15.16 106.11 10 Kawat Bronjong 13.55 13.26 12.94 13.26 13.10 13.60 13.60 12.78
- - 11 Rumput Gebal - - - - - - - -
- - 12 Armco Plate - - - - - - - -
- - 13
- - 14

Estimasi Penggunaan : ALAT BERAT Saturday Sunday Monday Tuesday Wednesday Thursday Friday Saturday

JUMLAH
JUMLAH / HARI
KEBUTUHAN ALAT
2.37 16.57 1 Excavator 2.12 2.07 2.02 2.07 2.05 2.12 2.12 2.00
5.38 37.65 2 Dump Truck 4.81 4.71 4.59 4.71 4.65 4.83 4.83 4.54
0.15 1.03 3 Buldozer 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.12
0.07 0.49 4 Vibro Roller 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06
- - 5 Concrete Mixer - - - - - - - -
- - 6 Vibrator Beton - - - - - - - -
0.88 6.14 7 Pompa Air 0.78 0.77 0.75 0.77 0.76 0.79 0.79 0.74
1.14 8.00 8 Waterpass 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
1.00 7.00 9 Theodolite 1.00 1.00 1.00 1.00 1.00 1.00 1.00
- - 10 Chain Saw
- - 11 Alat Bantu
4.00 28.00 12 Truck Kayu 4.00 3.00 4.00 4.00 4.00 3.00 3.00 3.00
- - 13
- - 14
- - 15

Total Estimasi Penggunaan : TENAGA Saturday Sunday Monday Tuesday Wednesday Thursday Friday Saturday

Per Hari :
1.00 7.00 Pelaksana Utama 1.00 1.00 1.00 1.00 1.00 1.00 1.00
2.14 15.00 Pelaksana Lap. 2.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00
0.35 2.46 Mandor 0.31 0.31 0.30 0.31 0.30 0.32 0.32 0.30
- Kepala Tukang - - - - - - - -
0.43 3.03 Tukang Batu 0.39 0.38 0.37 0.38 0.37 0.39 0.39 0.36
- - Tukang Besi - - - - - - - -
0.19 1.33 Tukang Kayu 0.17 0.17 0.16 0.17 0.16 0.17 0.17 0.16
3.81 26.65 Pekerja 3.40 3.33 3.25 3.33 3.29 3.42 3.42 3.21
0.57 4.00 Mandor Alat 0.51 0.50 0.49 0.50 0.49 0.51 0.51 0.48
2.59 18.10 Operator 2.31 2.26 2.21 2.26 2.23 2.32 2.32 2.18
2.59 18.10 Pemb. Operator 2.31 2.26 2.21 2.26 2.23 2.32 2.32 2.18
9.38 65.65 Sopir 8.81 7.71 8.59 8.71 8.65 7.83 7.83 7.54
9.38 65.65 Pembantu Sopir 8.81 7.71 8.59 8.71 8.65 7.83 7.83 7.54
2.14 15.00 Surveyor 2.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00
4.29 30.00 Pemb. Surveyor 4.00 2.00 4.00 4.00 4.00 4.00 4.00 4.00
1.00 7.00 Mekanik 1.00 1.00 1.00 1.00 1.00 1.00 1.00
2.00 14.00 Pembantu Mekanik 2.00 - 2.00 2.00 2.00 2.00 2.00 2.00
2.29 16.00 Penjaga 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
KENDALI RALISASI PROGRESS FISIK
PAKET PEKERJAAN . . . .

1. SATKER :
2. KEGIATAN :
3. PEKERJAAN :
4. LOKASI :
5. KONTRAK NO. :

Periode Minggu Ke : XXVI ( Dua Puluh Enam ) Tgl. 01 Nopember S/d Tgl. 07 Nopember 2015

NO. URAIAN PEKERJAAN SAT. VOLUME Sunday Monday Tuesday Wednesday Thursday Friday Saturday KET.

Tanggal : 1-Nov-15 2-Nov-15 3-Nov-15 4-Nov-15 5-Nov-15 6-Nov-15 7-Nov-15


Jumlah Hari : 8 8 8 8 8 8 8 8

PEKERJAAN TANGGUL
1 Galian Tanah Lumpur (A) M3 - - -
2 Cerucuk Bambu Bh 734.06 384.51 349.55
3 Timbunan Tanah Pilihan M3 - - -
4 Matras Bambu Takik / Belah (man) M2 854.51 447.60 406.91
5 Lapisan Geotekstil M2 862.30 451.68 410.62
6 Bronjong Pabrikasi 2,70 mm M3 117.10 61.34 55.76
7 Pasangan GCL M2 133.91 70.15 63.77
8 Gebalan Rumput M2 - - - - - - - -

PEKERJAAN JEMBATAN TANGGUL


1 Galian Tanah Lumpur (A) M3 - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - -
3 Pasangan Batu Kali 1 : 4 M3 - - - - - - - -
4 Siaran 1 : 2 M2 - - - - - - - -
5 Plesteran 1 : 3 M2 - - - - - - - -
6 Jembatan Armco Type Multiplate A M1 - - - - - - - -
7 Beton Bertulang K-225 (untuk jem M3 - - - - - - - -
8 Timbunan Tanah Piihan M3 - - - - - - - -
9 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - -
10 Lapisan Geotekstil M2 - - - - - - - -

Volume Semen Pasir Kerikil Batu Kali


Beton K.225 - x 7.42 - 0.50 - 0.78 -
Pas. Batu Kali 1 : 4 = - x 3.31 - 0.57 - 1.20 -
Plesteran 1 : 3 = - x 0.12 - 0.02 -
Siaran 1 : 2 = - x 0.13 - 0.01 -

Total : - - - -

Vol Besi Beton Kawat Beton Kayu Bekisting Paku


Tulangan Beton K.225 = - x 110.0 - 2.00 -
Bekisting Beton K.225 = - x 0.40 - 2.00 -

Total : - - - -

Vol Bambu Bambu Takik Rumput Gebal Tanah Timb.


Cerucuk Bambu = 734.06 x 1.00 734.1
Matras Bambu = 854.51 x 1.60 1,367.2
Gebalan Rumput = - 1.10 -
Timbunan Tanah Pilihan = - 1.00 -

Total : 734 1,367 - -

Vol Bronjong Batu Kali Geotex NW GCL


Bronjong Kawat Pabrikasi = 117.10 x 1.00 117.1 1.10 128.81
Lapisan Geotex NW = 862.30 x 1.02 879.54
Lapisan GCL = 133.91 x 1.05 140.61

Total : 117.1 128.81 879.54 140.61


Estimasi
BAHAN Sunday Monday Tuesday Wednesday Thursday Friday Saturday -
Penggunaan :
JUMLAH
JUMLAH / HARI KEBUTUHAN
BAHAN
- - 1 Cement - - - - - - - -
- - 2 Pasir - - - - - - - -
- - 3 Kerikil/Splite - - - - - - - -
18.40 128.81 4 Batu Kali/Belah - - - - - 67.47 61.34 -
- - 5 Tanah Timb. - - - - - - - -
104.87 734.06 6 Bambu - - - - - 384.51 349.55 -
195.32 1,367.21 7 Bambu Takik - - - - - 716.16 651.05 -
125.65 879.54 8 Geotex NW - - - - - 460.71 418.83 -
20.09 140.61 9 Geo GCL - - - - - 73.65 66.96 -
16.73 117.10 10 Kawat Bronjong - - - - - 61.34 55.76 -
- - 11 Rumput Gebal - - - - - - - -
- - 12 Armco Plate - - - - - - - -
- - 13
- - 14

Estimasi Penggunaan : ALAT BERAT Sunday Monday Tuesday Wednesday Thursday Friday Saturday -

JUMLAH
JUMLAH / HARI
KEBUTUHAN ALAT
0.29 2.00 1 Excavator - - - - - 1.05 0.95 -
- - 2 Dump Truck - - - - - - - -
- - 3 Buldozer - - - - - - - -
- - 4 Vibro Roller - - - - - - - -
- - 5 Concrete Mixer - - - - - - - -
- - 6 Vibrator Beton - - - - - - - -
0.08 0.53 7 Pompa Air - - - - - 0.28 0.25 -
0.29 2.00 8 Waterpass 1.00 1.00
0.29 2.00 9 Theodolite 1.00 1.00
- - 10 Chain Saw
- - 11 Alat Bantu
0.86 6.00 12 Truck Kayu 3.00 3.00
- - 13
- - 14
- - 15

Total Estimasi Penggunaan : TENAGA Sunday Monday Tuesday Wednesday Thursday Friday Saturday -

Per Hari :
0.29 2.00 Pelaksana Utama 1.00 1.00
0.57 4.00 Pelaksana Lap. 2.00 2.00
0.32 2.21 Mandor - - - - - 1.16 1.05 -
- Kepala Tukang - - - - - - - -
0.45 3.16 Tukang Batu - - - - - 1.66 1.51 -
- - Tukang Besi - - - - - - - -
0.18 1.28 Tukang Kayu - - - - - 0.67 0.61 -
1.91 13.39 Pekerja - - - - - 7.02 6.38 -
0.13 0.92 Mandor Alat - - - - - 0.48 0.44 -
0.29 2.00 Operator - - - - - 1.05 0.95 -
0.29 2.00 Pemb. Operator - - - - - 1.05 0.95 -
0.86 6.00 Sopir - - - - - 3.00 3.00 -
0.86 6.00 Pembantu Sopir - - - - - 3.00 3.00 -
0.57 4.00 Surveyor - - - - - 2.00 2.00 -
1.14 8.00 Pemb. Surveyor - - - - - 4.00 4.00 -
0.29 2.00 Mekanik 1.00 1.00
0.57 4.00 Pembantu Mekanik 2.00 2.00
0.57 4.00 Penjaga 2.00 2.00
KENDALI RALISASI PROGRESS FISIK
PAKET PEKERJAAN . . . .

1. SATKER :
2. KEGIATAN :
3. PEKERJAAN :
4. LOKASI :
5. KONTRAK NO. :

Periode Minggu Ke : XXVII ( Dua Puluh Tujuh ) Tgl. 08 Nopember S/d Tgl. 15 Nopember 2015

NO. URAIAN PEKERJAAN SAT. VOLUME Sunday Monday Tuesday Wednesday Thursday Friday Saturday Sunday KET.

Tanggal : 8-Nov-15 9-Nov-15 10-Nov-15 11-Nov-15 12-Nov-15 13-Nov-15 14-Nov-15 15-Nov-15


Jumlah Hari : 8 8 8 8 8 8 8 8

PEKERJAAN TANGGUL
1 Galian Tanah Lumpur (A) M3 - - - - - - - - -
2 Cerucuk Bambu Bh 992.00 126.68 124.00 120.98 124.00 122.47 127.18 127.18 119.52
3 Timbunan Tanah Pilihan M3 - - - - - - - - -
4 Matras Bambu Takik / Belah (man) M2 834.00 106.50 104.25 101.71 104.25 102.96 106.92 106.92 100.48
5 Lapisan Geotekstil M2 841.60 107.47 105.20 102.63 105.20 103.90 107.90 107.90 101.40
6 Bronjong Pabrikasi 2,70 mm M3 123.08 15.72 15.38 15.01 15.38 15.19 15.78 15.78 14.83
7 Pasangan GCL M2 145.22 18.54 18.15 17.71 18.15 17.93 18.62 18.62 17.50
8 Gebalan Rumput M2 - - - - - - - - -

PEKERJAAN JEMBATAN TANGGUL


1 Galian Tanah Lumpur (A) M3 - - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - - -
3 Pasangan Batu Kali 1 : 4 M3 - - - - - - - - -
4 Siaran 1 : 2 M2 - - - - - - - - -
5 Plesteran 1 : 3 M2 - - - - - - - - -
6 Jembatan Armco Type Multiplate A M1 - - - - - - - - -
7 Beton Bertulang K-225 (untuk jem M3 - - - - - - - - -
8 Timbunan Tanah Piihan M3 - - - - - - - - -
9 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - - -
10 Lapisan Geotekstil M2 - - - - - - - - -

Volume Semen Pasir Kerikil Batu Kali


Beton K.225 - x 7.42 - 0.50 - 0.78 -
Pas. Batu Kali 1 : 4 = - x 3.31 - 0.57 - 1.20 -
Plesteran 1 : 3 = - x 0.12 - 0.02 -
Siaran 1 : 2 = - x 0.13 - 0.01 -

Total : - - - -

Vol Besi Beton Kawat Beton Kayu Bekisting Paku


Tulangan Beton K.225 = - x 110.0 - 2.00 -
Bekisting Beton K.225 = - x 0.40 - 2.00 -

Total : - - - -

Vol Bambu Bambu Takik Rumput Gebal Tanah Timb.


Cerucuk Bambu = 992.00 x 1.00 992.0
Matras Bambu = 834.00 x 1.60 1,334.4
Gebalan Rumput = - 1.10 -
Timbunan Tanah Pilihan = - 1.00 -

Total : 992 1,334 - -

Vol Bronjong Batu Kali Geotex NW GCL


Bronjong Kawat Pabrikasi = 123.08 x 1.00 123.1 1.10 135.38
Lapisan Geotex NW = 841.60 x 1.02 858.43
Lapisan GCL = 145.22 x 1.05 152.48

Total : 123.1 135.38 858.43 152.48


Estimasi
BAHAN Sunday Monday Tuesday Wednesday Thursday Friday Saturday Sunday
Penggunaan :
JUMLAH
JUMLAH / HARI KEBUTUHAN
BAHAN
- - 1 Cement - - - - - - - -
- - 2 Pasir - - - - - - - -
- - 3 Kerikil/Splite - - - - - - - -
19.34 135.38 4 Batu Kali/Belah 17.29 16.92 16.51 16.92 16.71 17.36 17.36 16.31
- - 5 Tanah Timb. - - - - - - - -
141.71 992.00 6 Bambu 126.68 124.00 120.98 124.00 122.47 127.18 127.18 119.52
190.63 1,334.40 7 Bambu Takik 170.40 166.80 162.73 166.80 164.74 171.08 171.08 160.77
122.63 858.43 8 Geotex NW 109.62 107.30 104.69 107.30 105.98 110.06 110.06 103.43
21.78 152.48 9 Geo GCL 19.47 19.06 18.60 19.06 18.83 19.55 19.55 18.37
17.58 123.08 10 Kawat Bronjong 15.72 15.38 15.01 15.38 15.19 15.78 15.78 14.83
- - 11 Rumput Gebal - - - - - - - -
- - 12 Armco Plate - - - - - - - -
- - 13
- - 14

Estimasi Penggunaan : ALAT BERAT Sunday Monday Tuesday Wednesday Thursday Friday Saturday Sunday

JUMLAH
JUMLAH / HARI
KEBUTUHAN ALAT
1.55 10.83 1 Excavator 1.38 1.35 1.32 1.35 1.34 1.39 1.39 1.30
- - 2 Dump Truck - - - - - - - -
- - 3 Buldozer - - - - - - - -
- - 4 Vibro Roller - - - - - - - -
- - 5 Concrete Mixer - - - - - - - -
- - 6 Vibrator Beton - - - - - - - -
0.08 0.55 7 Pompa Air 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07
1.00 7.00 8 Waterpass 1.00 1.00 1.00 1.00 1.00 1.00 1.00
0.86 6.00 9 Theodolite 1.00 1.00 1.00 1.00 1.00 1.00
- - 10 Chain Saw
- - 11 Alat Bantu
3.86 27.00 12 Truck Kayu 2.00 3.00 3.00 4.00 4.00 4.00 4.00 3.00
- - 13
- - 14
- - 15

Total Estimasi Penggunaan : TENAGA Sunday Monday Tuesday Wednesday Thursday Friday Saturday Sunday

Per Hari :
0.86 6.00 Pelaksana Utama 1.00 1.00 1.00 1.00 1.00 1.00
2.00 14.00 Pelaksana Lap. 1.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00
0.31 2.19 Mandor 0.28 0.27 0.27 0.27 0.27 0.28 0.28 0.26
- Kepala Tukang - - - - - - - -
0.46 3.23 Tukang Batu 0.41 0.40 0.39 0.40 0.40 0.41 0.41 0.39
- - Tukang Besi - - - - - - - -
0.18 1.25 Tukang Kayu 0.16 0.16 0.15 0.16 0.15 0.16 0.16 0.15
2.15 15.08 Pekerja 1.93 1.88 1.84 1.88 1.86 1.93 1.93 1.82
0.18 1.24 Mandor Alat 0.16 0.16 0.15 0.16 0.15 0.16 0.16 0.15
1.55 10.83 Operator 1.38 1.35 1.32 1.35 1.34 1.39 1.39 1.30
1.55 10.83 Pemb. Operator 1.38 1.35 1.32 1.35 1.34 1.39 1.39 1.30
3.86 27.00 Sopir 2.00 3.00 3.00 4.00 4.00 4.00 4.00 3.00
3.86 27.00 Pembantu Sopir 2.00 3.00 3.00 4.00 4.00 4.00 4.00 3.00
1.86 13.00 Surveyor 1.00 2.00 2.00 2.00 2.00 2.00 2.00 -
3.71 26.00 Pemb. Surveyor 2.00 4.00 4.00 4.00 4.00 4.00 4.00 -
0.86 6.00 Mekanik 1.00 1.00 1.00 1.00 1.00 1.00
1.71 12.00 Pembantu Mekanik - 2.00 2.00 2.00 2.00 2.00 2.00 -
2.29 16.00 Penjaga 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
KENDALI RALISASI PROGRESS FISIK
PAKET PEKERJAAN . . . .

1. SATKER :
2. KEGIATAN :
3. PEKERJAAN :
4. LOKASI :
5. KONTRAK NO. :

Periode Minggu Ke : XXVIII ( Dua Puluh Delapan ) Tgl. 16 Nopember S/d Tgl. 22 Nopember 2015

NO. URAIAN PEKERJAAN SAT. VOLUME Monday Tuesday Wednesday Thursday Friday Saturday Sunday KET.

Tanggal : 16-Nov-15 17-Nov-15 18-Nov-15 19-Nov-15 20-Nov-15 21-Nov-15 22-Nov-15


Jumlah Hari : 8 8 8 8 8 8 8 8

PEKERJAAN TANGGUL
1 Galian Tanah Lumpur (A) M3 - - - - - - - -
2 Cerucuk Bambu Bh 1,133.61 161.02 164.29 159.66 155.29 157.45 166.71 169.20
3 Timbunan Tanah Pilihan M3 - - - - - - - -
4 Matras Bambu Takik / Belah (man) M2 879.75 124.96 127.50 123.91 120.51 122.19 129.37 131.31
5 Lapisan Geotekstil M2 887.76 126.10 128.66 125.04 121.61 123.30 130.55 132.50
6 Bronjong Pabrikasi 2,70 mm M3 99.28 14.10 14.39 13.98 13.60 13.79 14.60 14.82
7 Pasangan GCL M2 229.78 32.64 33.30 32.36 31.48 31.91 33.79 34.30
8 Gebalan Rumput M2 - - - - - - - -

PEKERJAAN JEMBATAN TANGGUL


1 Galian Tanah Lumpur (A) M3 - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - -
3 Pasangan Batu Kali 1 : 4 M3 - - - - - - - -
4 Siaran 1 : 2 M2 - - - - - - - -
5 Plesteran 1 : 3 M2 - - - - - - - -
6 Jembatan Armco Type Multiplate A M1 - - - - - - - -
7 Beton Bertulang K-225 (untuk jem M3 - - - - - - - -
8 Timbunan Tanah Piihan M3 - - - - - - - -
9 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - -
10 Lapisan Geotekstil M2 - - - - - - - -

Volume Semen Pasir Kerikil Batu Kali


Beton K.225 - x 7.42 - 0.50 - 0.78 -
Pas. Batu Kali 1 : 4 = - x 3.31 - 0.57 - 1.20 -
Plesteran 1 : 3 = - x 0.12 - 0.02 -
Siaran 1 : 2 = - x 0.13 - 0.01 -

Total : - - - -

Vol Besi Beton Kawat Beton Kayu Bekisting Paku


Tulangan Beton K.225 = - x 110.0 - 2.00 -
Bekisting Beton K.225 = - x 0.40 - 2.00 -

Total : - - - -

Vol Bambu Bambu Takik Rumput Gebal Tanah Timb.


Cerucuk Bambu = 1,133.61 x 1.00 1,133.6
Matras Bambu = 879.75 x 1.60 1,407.6
Gebalan Rumput = - 1.10 -
Timbunan Tanah Pilihan = - 1.00 -

Total : 1,134 1,408 - -

Vol Bronjong Batu Kali Geotex NW GCL


Bronjong Kawat Pabrikasi = 99.28 x 1.00 99.3 1.10 109.21
Lapisan Geotex NW = 887.76 x 1.02 905.52
Lapisan GCL = 229.78 x 1.05 241.27

Total : 99.3 109.21 905.52 241.27


Estimasi
BAHAN Monday Tuesday Wednesday Thursday Friday Saturday Sunday -
Penggunaan :
JUMLAH
JUMLAH / HARI KEBUTUHAN
BAHAN
- - 1 Cement - - - - - - - -
- - 2 Pasir - - - - - - - -
- - 3 Kerikil/Splite - - - - - - - -
15.60 109.21 4 Batu Kali/Belah 15.51 15.83 15.38 14.96 15.17 16.06 16.30 -
- - 5 Tanah Timb. - - - - - - - -
161.94 1,133.61 6 Bambu 161.02 164.29 159.66 155.29 157.45 166.71 169.20 -
201.08 1,407.59 7 Bambu Takik 199.93 204.00 198.25 192.82 195.50 207.00 210.09 -
129.36 905.52 8 Geotex NW 128.62 131.23 127.54 124.04 125.77 133.16 135.15 -
34.47 241.27 9 Geo GCL 34.27 34.97 33.98 33.05 33.51 35.48 36.01 -
14.18 99.28 10 Kawat Bronjong 14.10 14.39 13.98 13.60 13.79 14.60 14.82 -
- - 11 Rumput Gebal - - - - - - - -
- - 12 Armco Plate - - - - - - - -
- - 13
- - 14

Estimasi Penggunaan : ALAT BERAT Monday Tuesday Wednesday Thursday Friday Saturday Sunday -

JUMLAH
JUMLAH / HARI
KEBUTUHAN ALAT
1.77 12.37 1 Excavator 1.76 1.79 1.74 1.69 1.72 1.82 1.85 -
- - 2 Dump Truck - - - - - - - -
- - 3 Buldozer - - - - - - - -
- - 4 Vibro Roller - - - - - - - -
- - 5 Concrete Mixer - - - - - - - -
- - 6 Vibrator Beton - - - - - - - -
0.06 0.45 7 Pompa Air 0.06 0.06 0.06 0.06 0.06 0.07 0.07 -
1.00 7.00 8 Waterpass 1.00 1.00 1.00 1.00 1.00 1.00 1.00
1.00 7.00 9 Theodolite 1.00 1.00 1.00 1.00 1.00 1.00 1.00
- - 10 Chain Saw
- - 11 Alat Bantu
3.14 22.00 12 Truck Kayu 4.00 3.00 3.00 3.00 4.00 2.00 3.00
- - 13
- - 14
- - 15

Total Estimasi Penggunaan : TENAGA Monday Tuesday Wednesday Thursday Friday Saturday Sunday -

Per Hari :
0.86 6.00 Pelaksana Utama 1.00 1.00 1.00 1.00 1.00 1.00
2.00 14.00 Pelaksana Lap. 2.00 2.00 2.00 2.00 2.00 2.00 2.00
0.34 2.38 Mandor 0.34 0.34 0.34 0.33 0.33 0.35 0.36 -
- Kepala Tukang - - - - - - - -
0.42 2.91 Tukang Batu 0.41 0.42 0.41 0.40 0.40 0.43 0.43 -
- - Tukang Besi - - - - - - - -
0.19 1.32 Tukang Kayu 0.19 0.19 0.19 0.18 0.18 0.19 0.20 -
2.26 15.82 Pekerja 2.25 2.29 2.23 2.17 2.20 2.33 2.36 -
0.20 1.42 Mandor Alat 0.20 0.21 0.20 0.19 0.20 0.21 0.21 -
1.77 12.37 Operator 1.76 1.79 1.74 1.69 1.72 1.82 1.85 -
1.77 12.37 Pemb. Operator 1.76 1.79 1.74 1.69 1.72 1.82 1.85 -
3.14 22.00 Sopir 4.00 3.00 3.00 3.00 4.00 2.00 3.00 -
3.14 22.00 Pembantu Sopir 4.00 3.00 3.00 3.00 4.00 2.00 3.00 -
2.00 14.00 Surveyor 2.00 2.00 2.00 2.00 2.00 2.00 2.00 -
4.00 28.00 Pemb. Surveyor 4.00 4.00 4.00 4.00 4.00 4.00 4.00 -
0.86 6.00 Mekanik 1.00 1.00 1.00 1.00 1.00 1.00
1.71 12.00 Pembantu Mekanik 2.00 2.00 2.00 2.00 2.00 2.00 -
2.00 14.00 Penjaga 2.00 2.00 2.00 2.00 2.00 2.00 2.00
KENDALI RALISASI PROGRESS FISIK
PAKET PEKERJAAN . . . .

1. SATKER :
2. KEGIATAN :
3. PEKERJAAN :
4. LOKASI :
5. KONTRAK NO. :

Periode Minggu Ke : XXIX ( Dua Puluh Sembilan ) Tgl. 23 Nopember S/d Tgl. 30 Nopember 2015

NO. URAIAN PEKERJAAN SAT. VOLUME Monday Tuesday Wednesday Thursday Friday Saturday Sunday Monday KET.

Tanggal : 23-Nov-15 24-Nov-15 25-Nov-15 26-Nov-15 27-Nov-15 28-Nov-15 29-Nov-15 30-Nov-15


Jumlah Hari : 8 8 8 8 8 8 8 8

PEKERJAAN TANGGUL
1 Galian Tanah Lumpur (A) M3 - - - - - - - - -
2 Cerucuk Bambu Bh 1,506.64 192.40 188.33 183.74 188.33 186.00 193.16 193.16 181.52
3 Timbunan Tanah Pilihan M3 - - - - - - - - -
4 Matras Bambu Takik / Belah (man) M2 854.51 109.12 106.81 104.21 106.81 105.49 109.55 109.55 102.95
5 Lapisan Geotekstil M2 862.30 110.11 107.79 105.16 107.79 106.46 110.55 110.55 103.89
6 Bronjong Pabrikasi 2,70 mm M3 96.43 12.31 12.05 11.76 12.05 11.91 12.36 12.36 11.62
7 Pasangan GCL M2 167.39 21.38 20.92 20.41 20.92 20.67 21.46 21.46 20.17
8 Gebalan Rumput M2 - - - - - - - - -

PEKERJAAN JEMBATAN TANGGUL


1 Galian Tanah Lumpur (A) M3 - - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - - -
3 Pasangan Batu Kali 1 : 4 M3 - - - - - - - - -
4 Siaran 1 : 2 M2 - - - - - - - - -
5 Plesteran 1 : 3 M2 - - - - - - - - -
6 Jembatan Armco Type Multiplate A M1 - - - - - - - - -
7 Beton Bertulang K-225 (untuk jem M3 - - - - - - - - -
8 Timbunan Tanah Piihan M3 - - - - - - - - -
9 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - - -
10 Lapisan Geotekstil M2 - - - - - - - - -

Volume Semen Pasir Kerikil Batu Kali


Beton K.225 - x 7.42 - 0.50 - 0.78 -
Pas. Batu Kali 1 : 4 = - x 3.31 - 0.57 - 1.20 -
Plesteran 1 : 3 = - x 0.12 - 0.02 -
Siaran 1 : 2 = - x 0.13 - 0.01 -

Total : - - - -

Vol Besi Beton Kawat Beton Kayu Bekisting Paku


Tulangan Beton K.225 = - x 110.0 - 2.00 -
Bekisting Beton K.225 = - x 0.40 - 2.00 -

Total : - - - -

Vol Bambu Bambu Takik Rumput Gebal Tanah Timb.


Cerucuk Bambu = 1,506.64 x 1.00 1,506.6
Matras Bambu = 854.51 x 1.60 1,367.2
Gebalan Rumput = - 1.10 -
Timbunan Tanah Pilihan = - 1.00 -

Total : 1,507 1,367 - -

Vol Bronjong Batu Kali Geotex NW GCL


Bronjong Kawat Pabrikasi = 96.43 x 1.00 96.4 1.10 106.08
Lapisan Geotex NW = 862.30 x 1.02 879.54
Lapisan GCL = 167.39 x 1.05 175.76

Total : 96.4 106.08 879.54 175.76


Estimasi
BAHAN Monday Tuesday Wednesday Thursday Friday Saturday Sunday Monday
Penggunaan :
JUMLAH
JUMLAH / HARI KEBUTUHAN
BAHAN
- - 1 Cement - - - - - - - -
- - 2 Pasir - - - - - - - -
- - 3 Kerikil/Splite - - - - - - - -
15.15 106.08 4 Batu Kali/Belah 13.55 13.26 12.94 13.26 13.10 13.60 13.60 12.78
- - 5 Tanah Timb. - - - - - - - -
215.23 1,506.64 6 Bambu 192.40 188.33 183.74 188.33 186.00 193.16 193.16 181.52
195.32 1,367.21 7 Bambu Takik 174.59 170.90 166.73 170.90 168.79 175.28 175.28 164.72
125.65 879.54 8 Geotex NW 112.32 109.94 107.26 109.94 108.59 112.76 112.76 105.97
25.11 175.76 9 Geo GCL 22.44 21.97 21.43 21.97 21.70 22.53 22.53 21.18
13.78 96.43 10 Kawat Bronjong 12.31 12.05 11.76 12.05 11.91 12.36 12.36 11.62
- - 11 Rumput Gebal - - - - - - - -
- - 12 Armco Plate - - - - - - - -
- - 13
- - 14

Estimasi Penggunaan : ALAT BERAT Monday Tuesday Wednesday Thursday Friday Saturday Sunday Monday

JUMLAH
JUMLAH / HARI
KEBUTUHAN ALAT
2.35 16.44 1 Excavator 2.10 2.06 2.01 2.06 2.03 2.11 2.11 1.98
- - 2 Dump Truck - - - - - - - -
- - 3 Buldozer - - - - - - - -
- - 4 Vibro Roller - - - - - - - -
- - 5 Concrete Mixer - - - - - - - -
- - 6 Vibrator Beton - - - - - - - -
0.06 0.43 7 Pompa Air 0.06 0.05 0.05 0.05 0.05 0.06 0.06 0.05
1.14 8.00 8 Waterpass 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
1.00 7.00 9 Theodolite 1.00 1.00 1.00 1.00 1.00 1.00 1.00
- - 10 Chain Saw
- - 11 Alat Bantu
4.29 30.00 12 Truck Kayu 4.00 4.00 4.00 4.00 4.00 3.00 3.00 4.00
- - 13
- - 14
- - 15

Total Estimasi Penggunaan : TENAGA Monday Tuesday Wednesday Thursday Friday Saturday Sunday Monday

Per Hari :
2.14 15.00 Pelaksana Utama 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00
2.29 16.00 Pelaksana Lap. 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
0.32 2.23 Mandor 0.29 0.28 0.27 0.28 0.28 0.29 0.29 0.27
- Kepala Tukang - - - - - - - -
0.40 2.82 Tukang Batu 0.36 0.35 0.34 0.35 0.35 0.36 0.36 0.34
- - Tukang Besi - - - - - - - -
0.18 1.28 Tukang Kayu 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.15
2.54 17.75 Pekerja 2.27 2.22 2.16 2.22 2.19 2.28 2.28 2.14
0.27 1.88 Mandor Alat 0.24 0.24 0.23 0.24 0.23 0.24 0.24 0.23
2.35 16.44 Operator 2.10 2.06 2.01 2.06 2.03 2.11 2.11 1.98
2.35 16.44 Pemb. Operator 2.10 2.06 2.01 2.06 2.03 2.11 2.11 1.98
4.29 30.00 Sopir 4.00 4.00 4.00 4.00 4.00 3.00 3.00 4.00
4.29 30.00 Pembantu Sopir 4.00 4.00 4.00 4.00 4.00 3.00 3.00 4.00
2.14 15.00 Surveyor 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00
4.29 30.00 Pemb. Surveyor 4.00 4.00 4.00 4.00 4.00 4.00 2.00 4.00
1.00 7.00 Mekanik 1.00 1.00 1.00 1.00 1.00 1.00 1.00
2.00 14.00 Pembantu Mekanik 2.00 2.00 2.00 2.00 2.00 2.00 - 2.00
2.14 15.00 Penjaga 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
KENDALI RALISASI PROGRESS FISIK
PAKET PEKERJAAN . . . .

1. SATKER :
2. KEGIATAN :
3. PEKERJAAN :
4. LOKASI :
5. KONTRAK NO. :

Periode Minggu Ke : XXX ( Tiga Puluh ) Tgl. 01 Desember S/d Tgl. 07 Desember 2015

NO. URAIAN PEKERJAAN SAT. VOLUME Tuesday Wednesday Thursday Friday Saturday Sunday Monday KET.

Tanggal : 1-Dec-15 2-Dec-15 3-Dec-15 4-Dec-15 5-Dec-15 6-Dec-15 7-Dec-15


Jumlah Hari : 8 8 8 8 8 8 8 8

PEKERJAAN TANGGUL
1 Galian Tanah Lumpur (A) M3 - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - -
3 Timbunan Tanah Pilihan M3 - - - - - - - -
4 Matras Bambu Takik / Belah (man) M2 844.13 119.90 122.34 118.89 115.63 117.24 124.14 125.99
5 Lapisan Geotekstil M2 851.82 120.99 123.45 119.97 116.69 118.31 125.27 127.14
6 Bronjong Pabrikasi 2,70 mm M3 89.97 12.78 13.04 12.67 12.32 12.50 13.23 13.43
7 Pasangan GCL M2 132.29 18.79 19.17 18.63 18.12 18.37 19.45 19.74
8 Gebalan Rumput M2 - - - - - - - -

PEKERJAAN JEMBATAN TANGGUL


1 Galian Tanah Lumpur (A) M3 - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - -
3 Pasangan Batu Kali 1 : 4 M3 - - - - - - - -
4 Siaran 1 : 2 M2 - - - - - - - -
5 Plesteran 1 : 3 M2 - - - - - - - -
6 Jembatan Armco Type Multiplate A M1 - - - - - - - -
7 Beton Bertulang K-225 (untuk jem M3 - - - - - - - -
8 Timbunan Tanah Piihan M3 - - - - - - - -
9 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - -
10 Lapisan Geotekstil M2 - - - - - - - -

Volume Semen Pasir Kerikil Batu Kali


Beton K.225 - x 7.42 - 0.50 - 0.78 -
Pas. Batu Kali 1 : 4 = - x 3.31 - 0.57 - 1.20 -
Plesteran 1 : 3 = - x 0.12 - 0.02 -
Siaran 1 : 2 = - x 0.13 - 0.01 -

Total : - - - -

Vol Besi Beton Kawat Beton Kayu Bekisting Paku


Tulangan Beton K.225 = - x 110.0 - 2.00 -
Bekisting Beton K.225 = - x 0.40 - 2.00 -

Total : - - - -

Vol Bambu Bambu Takik Rumput Gebal Tanah Timb.


Cerucuk Bambu = - x 1.00 -
Matras Bambu = 844.13 x 1.60 1,350.6
Gebalan Rumput = - 1.10 -
Timbunan Tanah Pilihan = - 1.00 -

Total : - 1,351 - -

Vol Bronjong Batu Kali Geotex NW GCL


Bronjong Kawat Pabrikasi = 89.97 x 1.00 90.0 1.10 98.97
Lapisan Geotex NW = 851.82 x 1.02 868.86
Lapisan GCL = 132.29 x 1.05 138.90

Total : 90.0 98.97 868.86 138.90


Estimasi
BAHAN Tuesday Wednesday Thursday Friday Saturday Sunday Monday -
Penggunaan :
JUMLAH
JUMLAH / HARI KEBUTUHAN
BAHAN
- - 1 Cement - - - - - - - -
- - 2 Pasir - - - - - - - -
- - 3 Kerikil/Splite - - - - - - - -
14.14 98.97 4 Batu Kali/Belah 14.06 14.34 13.94 13.56 13.75 14.55 14.77 -
- - 5 Tanah Timb. - - - - - - - -
- - 6 Bambu - - - - - - - -
192.94 1,350.61 7 Bambu Takik 191.84 195.74 190.23 185.01 187.58 198.62 201.58 -
124.12 868.86 8 Geotex NW 123.41 125.92 122.37 119.02 120.67 127.77 129.68 -
19.84 138.90 9 Geo GCL 19.73 20.13 19.56 19.03 19.29 20.43 20.73 -
12.85 89.97 10 Kawat Bronjong 12.78 13.04 12.67 12.32 12.50 13.23 13.43 -
- - 11 Rumput Gebal - - - - - - - -
- - 12 Armco Plate - - - - - - - -
- - 13
- - 14

Estimasi Penggunaan : ALAT BERAT Tuesday Wednesday Thursday Friday Saturday Sunday Monday -

JUMLAH
JUMLAH / HARI
KEBUTUHAN ALAT
- - 1 Excavator - - - - - - - -
- - 2 Dump Truck - - - - - - - -
- - 3 Buldozer - - - - - - - -
- - 4 Vibro Roller - - - - - - - -
- - 5 Concrete Mixer - - - - - - - -
- - 6 Vibrator Beton - - - - - - - -
0.06 0.40 7 Pompa Air 0.06 0.06 0.06 0.06 0.06 0.06 0.06 -
1.00 7.00 8 Waterpass 1.00 1.00 1.00 1.00 1.00 1.00 1.00
0.86 6.00 9 Theodolite 1.00 1.00 1.00 1.00 1.00 1.00
- - 10 Chain Saw
- - 11 Alat Bantu
3.00 21.00 12 Truck Kayu 3.00 3.00 3.00 4.00 3.00 2.00 3.00
- - 13
- - 14
- - 15

Total Estimasi Penggunaan : TENAGA Tuesday Wednesday Thursday Friday Saturday Sunday Monday -

Per Hari :
0.86 6.00 Pelaksana Utama 1.00 1.00 1.00 1.00 1.00 1.00
1.86 13.00 Pelaksana Lap. 2.00 2.00 2.00 2.00 2.00 1.00 2.00
0.31 2.15 Mandor 0.31 0.31 0.30 0.30 0.30 0.32 0.32 -
- Kepala Tukang - - - - - - - -
0.39 2.70 Tukang Batu 0.38 0.39 0.38 0.37 0.38 0.40 0.40 -
- - Tukang Besi - - - - - - - -
0.18 1.27 Tukang Kayu 0.18 0.18 0.18 0.17 0.18 0.19 0.19 -
1.14 8.00 Pekerja 1.14 1.16 1.13 1.10 1.11 1.18 1.19 -
- - Mandor Alat - - - - - - - -
- - Operator - - - - - - - -
- - Pemb. Operator - - - - - - - -
3.00 21.00 Sopir 3.00 3.00 3.00 4.00 3.00 2.00 3.00 -
3.00 21.00 Pembantu Sopir 3.00 3.00 3.00 4.00 3.00 2.00 3.00 -
1.86 13.00 Surveyor 2.00 2.00 2.00 2.00 2.00 1.00 2.00 -
3.71 26.00 Pemb. Surveyor 4.00 4.00 4.00 4.00 4.00 2.00 4.00 -
1.00 7.00 Mekanik 1.00 1.00 1.00 1.00 1.00 1.00 1.00
2.00 14.00 Pembantu Mekanik 2.00 2.00 2.00 2.00 2.00 2.00 2.00
1.00 7.00 Penjaga 1.00 1.00 1.00 1.00 1.00 1.00 1.00
KENDALI RALISASI PROGRESS FISIK
PAKET PEKERJAAN . . . .

1. SATKER :
2. KEGIATAN :
3. PEKERJAAN :
4. LOKASI :
5. KONTRAK NO. :

Periode Minggu Ke : XXXIa ( Tiga Puluh Satu ) Tgl. 08 Desember S/d Tgl. 10 Desember 2015

NO. URAIAN PEKERJAAN SAT. VOLUME Tuesday Wednesday Thursday KET.

Tanggal : 8-Dec-15 9-Dec-15 10-Dec-15


Jumlah Hari : 8 8 8 8 8 8 8 8

PEKERJAAN TANGGUL
1 Galian Tanah Lumpur (A) M3 - - - -
2 Cerucuk Bambu Bh - - - -
3 Timbunan Tanah Pilihan M3 - - - -
4 Matras Bambu Takik / Belah (man) M2 - - - -
5 Lapisan Geotekstil M2 432.92 143.99 149.28 139.65
6 Bronjong Pabrikasi 2,70 mm M3 82.30 27.37 28.38 26.55
7 Pasangan GCL M2 107.57 35.78 37.09 34.70
8 Gebalan Rumput M2 - - - -

PEKERJAAN JEMBATAN TANGGUL


1 Galian Tanah Lumpur (A) M3 - - - -
2 Cerucuk Bambu Bh - - - -
3 Pasangan Batu Kali 1 : 4 M3 - - - -
4 Siaran 1 : 2 M2 - - - -
5 Plesteran 1 : 3 M2 - - - -
6 Jembatan Armco Type Multiplate A M1 - - - -
7 Beton Bertulang K-225 (untuk jem M3 - - - -
8 Timbunan Tanah Piihan M3 - - - -
9 Bronjong Pabrikasi 2,70 mm M3 - - - -
10 Lapisan Geotekstil M2 - - - -

Volume Semen Pasir Kerikil Batu Kali


Beton K.225 - x 7.42 - 0.50 - 0.78 -
Pas. Batu Kali 1 : 4 = - x 3.31 - 0.57 - 1.20 -
Plesteran 1 : 3 = - x 0.12 - 0.02 -
Siaran 1 : 2 = - x 0.13 - 0.01 -

Total : - - - -

Vol Besi Beton Kawat Beton Kayu Bekisting Paku


Tulangan Beton K.225 = - x 110.0 - 2.00 -
Bekisting Beton K.225 = - x 0.40 - 2.00 -

Total : - - - -

Vol Bambu Bambu Takik Rumput Gebal Tanah Timb.


Cerucuk Bambu = - x 1.00 -
Matras Bambu = - x 1.60 -
Gebalan Rumput = - 1.10 -
Timbunan Tanah Pilihan = - 1.00 -

Total : - - - -

Vol Bronjong Batu Kali Geotex NW GCL


Bronjong Kawat Pabrikasi = 82.30 x 1.00 82.3 1.10 90.53
Lapisan Geotex NW = 432.92 x 1.02 441.58
Lapisan GCL = 107.57 x 1.05 112.95

Total : 82.3 90.53 441.58 112.95


Estimasi
BAHAN Tuesday Wednesday Thursday - - - - -
Penggunaan :
JUMLAH
JUMLAH / HARI KEBUTUHAN
BAHAN
- - 1 Cement - - - - - - - -
- - 2 Pasir - - - - - - - -
- - 3 Kerikil/Splite - - - - - - - -
12.93 90.53 4 Batu Kali/Belah 30.11 31.22 29.20 - - - - -
- - 5 Tanah Timb. - - - - - - - -
- - 6 Bambu - - - - - - - -
- - 7 Bambu Takik - - - - - - - -
63.08 441.58 8 Geotex NW 146.87 152.27 142.45 - - - - -
16.14 112.95 9 Geo GCL 37.57 38.95 36.44 - - - - -
11.76 82.30 10 Kawat Bronjong 27.37 28.38 26.55 - - - - -
- - 11 Rumput Gebal - - - - - - - -
- - 12 Armco Plate - - - - - - - -
- - 13
- - 14

Estimasi Penggunaan : ALAT BERAT Tuesday Wednesday Thursday - - - - -

JUMLAH
JUMLAH / HARI
KEBUTUHAN ALAT
- - 1 Excavator - - - - - - - -
- - 2 Dump Truck - - - - - - - -
- - 3 Buldozer - - - - - - - -
- - 4 Vibro Roller - - - - - - - -
- - 5 Concrete Mixer - - - - - - - -
- - 6 Vibrator Beton - - - - - - - -
0.05 0.37 7 Pompa Air 0.12 0.13 0.12 - - - - -
0.43 3.00 8 Waterpass 1.00 1.00 1.00
0.43 3.00 9 Theodolite 1.00 1.00 1.00
- - 10 Chain Saw
- - 11 Alat Bantu
1.29 9.00 12 Truck Kayu 3.00 3.00 3.00
- - 13
- - 14
- - 15

Total Estimasi Penggunaan : TENAGA Tuesday Wednesday Thursday - - - - -

Per Hari :
0.43 3.00 Pelaksana Utama 1.00 1.00 1.00
0.86 6.00 Pelaksana Lap. 2.00 2.00 2.00
0.09 0.65 Mandor 0.22 0.23 0.21 - - - - -
- Kepala Tukang - - - - - - - -
0.28 1.97 Tukang Batu 0.66 0.68 0.64 - - - - -
- - Tukang Besi - - - - - - - -
- - Tukang Kayu - - - - - - - -
0.60 4.21 Pekerja 1.40 1.45 1.36 - - - - -
- - Mandor Alat - - - - - - - -
- - Operator - - - - - - - -
- - Pemb. Operator - - - - - - - -
1.29 9.00 Sopir 3.00 3.00 3.00 - - - - -
1.29 9.00 Pembantu Sopir 3.00 3.00 3.00 - - - - -
0.86 6.00 Surveyor 2.00 2.00 2.00 - - - - -
1.71 12.00 Pemb. Surveyor 4.00 4.00 4.00 - - - - -
0.43 3.00 Mekanik 1.00 1.00 1.00
0.86 6.00 Pembantu Mekanik 2.00 2.00 2.00
0.86 6.00 Penjaga 2.00 2.00 2.00
KENDALI RALISASI PROGRESS FISIK
PAKET PEKERJAAN . . . .

1. SATKER :
2. KEGIATAN :
3. PEKERJAAN :
4. LOKASI :
5. KONTRAK NO. :

Periode Minggu Ke : XXXIb ( Tiga Puluh Satu ) Tgl. 11 Desember S/d Tgl. 15 Desember 2015

NO. URAIAN PEKERJAAN SAT. VOLUME Friday Saturday Sunday Monday Tuesday KET.

Tanggal : 11-Dec-15 12-Dec-15 13-Dec-15 14-Dec-15 15-Dec-15


Jumlah Hari : 8 8 8 8 8 8 8 8

PEKERJAAN TANGGUL
1 Galian Tanah Lumpur (A) M3 - - - - - -
Galian Tanah Lumpur (A) - - - - - -
2 Cerucuk Bambu Bh - - - - - -
3 Timbunan Tanah Pilihan M3 - - - - - -
Timbunan Tanah Biasa (A) 24,865.39 5,441.86 5,074.57 4,875.57 4,691.58 4,781.81
4 Matras Bambu Takik / Belah (man) M2 - - - - - -
5 Lapisan Geotekstil M2 191.39 41.89 39.06 37.53 36.11 36.80
6 Bronjong Pabrikasi 2,70 mm M3 222.34 48.66 45.37 43.60 41.95 42.76
7 Pasangan GCL M2 303.08 66.33 61.85 59.43 57.18 58.28
8 Gebalan Rumput M2 - - - - - -

PEKERJAAN JEMBATAN TANGGUL


1 Galian Tanah Lumpur (A) M3 - - - - - -
2 Cerucuk Bambu Bh - - - - - -
3 Pasangan Batu Kali 1 : 4 M3 - - - - - -
4 Siaran 1 : 2 M2 - - - - - -
5 Plesteran 1 : 3 M2 - - - - - -
6 Jembatan Armco Type Multiplate A M1 - - - - - -
7 Beton Bertulang K-225 (untuk jem M3 - - - - - -
8 Timbunan Tanah Piihan M3 - - - - - -
9 Bronjong Pabrikasi 2,70 mm M3 - - - - - -
10 Lapisan Geotekstil M2 - - - - - -
PEKERJAAN JEMBATAN TANGGUL
1 Galian Tanah Lumpur (A) M3 1,698.70 371.77 346.67 333.08 320.51 326.67

Volume Semen Pasir Kerikil Batu Kali


Beton K.225 - x 7.42 - 0.50 - 0.78 -
Pas. Batu Kali 1 : 4 = - x 3.31 - 0.57 - 1.20 -
Plesteran 1 : 3 = - x 0.12 - 0.02 -
Siaran 1 : 2 = - x 0.13 - 0.01 -

Total : - - - -

Vol Besi Beton Kawat Beton Kayu Bekisting Paku


Tulangan Beton K.225 = - x 110.00 - 2.00 -
Bekisting Beton K.225 = - x 0.40 - 2.00 -

Total : - - - -

Vol Bambu Bambu Takik Rumput Gebal Tanah Timb.


Cerucuk Bambu = - x 1.00 -
Matras Bambu = - x 1.60 -
Gebalan Rumput = - 1.10 -
Timbunan Tanah Pilihan = 24,865.39 1.00 24,865.4

Total : - - - 24,865

Vol Bronjong Batu Kali Geotex NW GCL


Bronjong Kawat Pabrikasi = 222.34 x 1.00 222.3 1.10 244.57
Lapisan Geotex NW = 191.39 x 1.02 195.21
Lapisan GCL = 303.08 x 1.05 318.23

Total : 222.3 244.57 195.21 318.23


Estimasi
BAHAN Friday Saturday Sunday Monday Tuesday - - -
Penggunaan :
JUMLAH
JUMLAH / HARI KEBUTUHAN
BAHAN
- - 1 Cement - - - - - - - -
- - 2 Pasir - - - - - - - -
- - 3 Kerikil/Splite - - - - - - - -
34.94 244.57 4 Batu Kali/Belah 53.52 49.91 47.95 46.15 47.03 - - -
3,552.20 24,865.39 5 Tanah Timb. 5,441.86 5,074.57 4,875.57 4,691.58 4,781.81 - - -
- - 6 Bambu - - - - - - - -
- - 7 Bambu Takik - - - - - - - -
27.89 195.21 8 Geotex NW 42.72 39.84 38.28 36.83 37.54 - - -
45.46 318.23 9 Geo GCL 69.65 64.94 62.40 60.04 61.20 - - -
31.76 222.34 10 Kawat Bronjong 48.66 45.37 43.60 41.95 42.76 - - -
- - 11 Rumput Gebal - - - - - - - -
- - 12 Armco Plate - - - - - - - -
- - 13
- - 14

Estimasi Penggunaan : ALAT BERAT Friday Saturday Sunday Monday Tuesday - - -

JUMLAH
JUMLAH / HARI
KEBUTUHAN ALAT
7.37 51.62 1 Excavator 11.30 10.53 10.12 9.74 9.93 - - -
106.29 744.05 2 Dump Truck 162.84 151.85 145.89 140.39 143.09 - - -
2.92 20.44 3 Buldozer 4.47 4.17 4.01 3.86 3.93 - - -
1.39 9.75 4 Vibro Roller 2.13 1.99 1.91 1.84 1.88 - - -
- - 5 Concrete Mixer - - - - - - - -
- - 6 Vibrator Beton - - - - - - - -
0.14 1.00 7 Pompa Air 0.22 0.20 0.20 0.19 0.19 - - -
0.71 5.00 8 Waterpass 1.00 1.00 1.00 1.00 1.00
0.71 5.00 9 Theodolite 1.00 1.00 1.00 1.00 1.00
- - 10 Chain Saw
- - 11 Alat Bantu
1.00 7.00 12 Truck Kayu 1.00 1.00 2.00 2.00 1.00
- - 13
- - 14
- - 15

Total Estimasi Penggunaan : TENAGA Friday Saturday Sunday Monday Tuesday - - -

Per Hari :
0.57 4.00 Pelaksana Utama 1.00 1.00 1.00 1.00
1.43 10.00 Pelaksana Lap. 2.00 2.00 2.00 2.00 2.00
0.12 0.85 Mandor 0.19 0.17 0.17 0.16 0.16 - - -
- Kepala Tukang - - - - - - - -
0.56 3.92 Tukang Batu 0.86 0.80 0.77 0.74 0.75 - - -
- - Tukang Besi - - - - - - - -
- - Tukang Kayu - - - - - - - -
2.51 17.55 Pekerja 3.84 3.58 3.44 3.31 3.37 - - -
0.71 4.95 Mandor Alat 1.08 1.01 0.97 0.93 0.95 - - -
11.69 81.81 Operator 17.90 16.70 16.04 15.44 15.73 - - -
11.69 81.81 Pemb. Operator 17.90 16.70 16.04 15.44 15.73 - - -
107.29 751.05 Sopir 163.84 152.85 147.89 142.39 144.09 - - -
107.29 751.05 Pembantu Sopir 163.84 152.85 147.89 142.39 144.09 - - -
1.43 10.00 Surveyor 2.00 2.00 2.00 2.00 2.00
2.86 20.00 Pemb. Surveyor 4.00 4.00 4.00 4.00 4.00
0.57 4.00 Mekanik 1.00 1.00 1.00 1.00
1.14 8.00 Pembantu Mekanik 2.00 2.00 - 2.00 2.00
1.29 9.00 Penjaga 2.00 2.00 1.00 2.00 2.00
KENDALI RALISASI PROGRESS FISIK
PAKET PEKERJAAN . . . .

1. SATKER :
2. KEGIATAN :
3. PEKERJAAN :
4. LOKASI :
5. KONTRAK NO. :

Periode Minggu Ke : XXXII ( Tiga Puluh Dua ) Tgl. 16 Desember S/d Tgl. 23 Desember 2015

NO. URAIAN PEKERJAAN SAT. VOLUME Wednesday Thursday Friday Saturday Sunday Monday Tuesday Wednesday KET.

Tanggal : 16-Dec-15 17-Dec-15 18-Dec-15 19-Dec-15 20-Dec-15 21-Dec-15 22-Dec-15 23-Dec-15


Jumlah Hari : 8 8 8 8 8 8 8 8

PEKERJAAN TANGGUL
1 Galian Tanah Lumpur (A) M3 - - - - - - - - -
Galian Tanah Lumpur (A) - - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - - -
3 Timbunan Tanah Pilihan M3 - - - - - - - - -
Timbunan Tanah Biasa (A) - - - - - - - - -
4 Matras Bambu Takik / Belah (man) M2 - - - - - - - - -
5 Lapisan Geotekstil M2 - - - - - - - - -
6 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - - -
7 Pasangan GCL M2 - - - - - - - - -
8 Gebalan Rumput M2 - - - - - - - - -

PEKERJAAN JEMBATAN TANGGUL


1 Galian Tanah Lumpur (A) M3 - - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - - -
3 Pasangan Batu Kali 1 : 4 M3 - - - - - - - - -
4 Siaran 1 : 2 M2 - - - - - - - - -
5 Plesteran 1 : 3 M2 - - - - - - - - -
6 Jembatan Armco Type Multiplate A M1 - - - - - - - - -
7 Beton Bertulang K-225 (untuk jem M3 - - - - - - - - -
8 Timbunan Tanah Piihan M3 - - - - - - - - -
9 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - - -
10 Lapisan Geotekstil M2 - - - - - - - - -
PEKERJAAN JEMBATAN TANGGUL
1 Galian Tanah Lumpur (A) M3 - - - - - - - - -

Volume Semen Pasir Kerikil Batu Kali


Beton K.225 - x 7.42 - 0.50 - 0.78 -
Pas. Batu Kali 1 : 4 = - x 3.31 - 0.57 - 1.20 -
Plesteran 1 : 3 = - x 0.12 - 0.02 -
Siaran 1 : 2 = - x 0.13 - 0.01 -

Total : - - - -

Vol Besi Beton Kawat Beton Kayu Bekisting Paku


Tulangan Beton K.225 = - x 110.00 - 2.00 -
Bekisting Beton K.225 = - x 0.40 - 2.00 -

Total : - - - -

Vol Bambu Bambu Takik Rumput Gebal Tanah Timb.


Cerucuk Bambu = - x 1.00 -
Matras Bambu = - x 1.60 -
Gebalan Rumput = - 1.10 -
Timbunan Tanah Pilihan = - 1.00 -

Total : - - - -

Vol Bronjong Batu Kali Geotex NW GCL


Bronjong Kawat Pabrikasi = - x 1.00 - 1.10 -
Lapisan Geotex NW = - x 1.02 -
Lapisan GCL = - x 1.05 -

Total : - - - -
Estimasi
BAHAN Wednesday Thursday Friday Saturday Sunday Monday Tuesday Wednesday
Penggunaan :
JUMLAH
JUMLAH / HARI KEBUTUHAN
BAHAN
- - 1 Cement - - - - - - - -
- - 2 Pasir - - - - - - - -
- - 3 Kerikil/Splite - - - - - - - -
- - 4 Batu Kali/Belah - - - - - - - -
- - 5 Tanah Timb. - - - - - - - -
- - 6 Bambu - - - - - - - -
- - 7 Bambu Takik - - - - - - - -
- - 8 Geotex NW - - - - - - - -
- - 9 Geo GCL - - - - - - - -
- - 10 Kawat Bronjong - - - - - - - -
- - 11 Rumput Gebal - - - - - - - -
- - 12 Armco Plate - - - - - - - -
- - 13
- - 14

Estimasi Penggunaan : ALAT BERAT Wednesday Thursday Friday Saturday Sunday Monday Tuesday Wednesday

JUMLAH
JUMLAH / HARI
KEBUTUHAN ALAT
- - 1 Excavator - - - - - - - -
- - 2 Dump Truck - - - - - - - -
- - 3 Buldozer - - - - - - - -
- - 4 Vibro Roller - - - - - - - -
- - 5 Concrete Mixer - - - - - - - -
- - 6 Vibrator Beton - - - - - - - -
- - 7 Pompa Air - - - - - - - -
- - 8 Waterpass
- - 9 Theodolite
- - 10 Chain Saw
- - 11 Alat Bantu
- - 12 Truck Kayu
- - 13
- - 14
- - 15

Total Estimasi Penggunaan : TENAGA Wednesday Thursday Friday Saturday Sunday Monday Tuesday Wednesday

Per Hari :
- - Pelaksana Utama
- - Pelaksana Lap.
- - Mandor - - - - - - - -
- Kepala Tukang - - - - - - - -
- - Tukang Batu - - - - - - - -
- - Tukang Besi - - - - - - - -
- - Tukang Kayu - - - - - - - -
- - Pekerja - - - - - - - -
- - Mandor Alat - - - - - - - -
- - Operator - - - - - - - -
- - Pemb. Operator - - - - - - - -
- - Sopir - - - - - - - -
- - Pembantu Sopir - - - - - - - -
- - Surveyor - - - - - - - -
- - Pemb. Surveyor - - - - - - - -
- - Mekanik
- - Pembantu Mekanik
- - Penjaga
KENDALI RALISASI PROGRESS FISIK
PAKET PEKERJAAN . . . .

1. SATKER :
2. KEGIATAN :
3. PEKERJAAN :
4. LOKASI :
5. KONTRAK NO. :

Periode Minggu Ke : XXXIII ( Tiga Puluh Tiga ) Tgl. 24 Desember S/d Tgl. 31 Desember 2015

NO. URAIAN PEKERJAAN SAT. VOLUME Thursday Friday Saturday Sunday Monday Tuesday Wednesday Thursday KET.

Tanggal : 24-Dec-15 25-Dec-15 26-Dec-15 27-Dec-15 28-Dec-15 29-Dec-15 30-Dec-15 31-Dec-15


Jumlah Hari : 8 8 8 8 8 8 8 8

PEKERJAAN TANGGUL
1 Galian Tanah Lumpur (A) M3 - - - - - - - -
Galian Tanah Lumpur (A) -
2 Cerucuk Bambu Bh - - - - - - - -
3 Timbunan Tanah Pilihan M3 - - - - - - - -
Timbunan Tanah Biasa (A) -
4 Matras Bambu Takik / Belah (man) M2 - - - - - - - -
5 Lapisan Geotekstil M2 - - - - - - - -
6 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - -
7 Pasangan GCL M2 - - - - - - - -
8 Gebalan Rumput M2 - - - - - - - -

PEKERJAAN JEMBATAN TANGGUL


1 Galian Tanah Lumpur (A) M3 - - - - - - - -
2 Cerucuk Bambu Bh - - - - - - - -
3 Pasangan Batu Kali 1 : 4 M3 - - - - - - - -
4 Siaran 1 : 2 M2 - - - - - - - -
5 Plesteran 1 : 3 M2 - - - - - - - -
6 Jembatan Armco Type Multiplate A M1 - - - - - - - -
7 Beton Bertulang K-225 (untuk jem M3 - - - - - - - -
8 Timbunan Tanah Piihan M3 - - - - - - - -
9 Bronjong Pabrikasi 2,70 mm M3 - - - - - - - -
10 Lapisan Geotekstil M2 - - - - - - - -
PEKERJAAN JEMBATAN TANGGUL
1 Galian Tanah Lumpur (A) M3 - - - - - - - -

Volume Semen Pasir Kerikil Batu Kali


Beton K.225 - x 7.42 - 0.50 - 0.78 -
Pas. Batu Kali 1 : 4 = - x 3.31 - 0.57 - 1.20 -
Plesteran 1 : 3 = - x 0.12 - 0.02 -
Siaran 1 : 2 = - x 0.13 - 0.01 -

Total : - - - -

Vol Besi Beton Kawat Beton Kayu Bekisting Paku


Tulangan Beton K.225 = - x 110.00 - 2.00 -
Bekisting Beton K.225 = - x 0.40 - 2.00 -

Total : - - - -

Vol Bambu Bambu Takik Rumput Gebal Tanah Timb.


Cerucuk Bambu = - x 1.00 -
Matras Bambu = - x 1.60 -
Gebalan Rumput = - 1.10 -
Timbunan Tanah Pilihan = - 1.00 -

Total : - - - -

Vol Bronjong Batu Kali Geotex NW GCL


Bronjong Kawat Pabrikasi = - x 1.00 - 1.10 -
Lapisan Geotex NW = - x 1.02 -
Lapisan GCL = - x 1.05 -

Total : - - - -
Estimasi
BAHAN Thursday Friday Saturday Sunday Monday Tuesday Wednesday Thursday
Penggunaan :
JUMLAH
JUMLAH / HARI KEBUTUHAN
BAHAN
- - 1 Cement - - - - - - - -
- - 2 Pasir - - - - - - - -
- - 3 Kerikil/Splite - - - - - - - -
- - 4 Batu Kali/Belah - - - - - - - -
- - 5 Tanah Timb. - - - - - - - -
- - 6 Bambu - - - - - - - -
- - 7 Bambu Takik - - - - - - - -
- - 8 Geotex NW - - - - - - - -
- - 9 Geo GCL - - - - - - - -
- - 10 Kawat Bronjong - - - - - - - -
- - 11 Rumput Gebal - - - - - - - -
- - 12 Armco Plate - - - - - - - -
- - 13
- - 14

Estimasi Penggunaan : ALAT BERAT Thursday Friday Saturday Sunday Monday Tuesday Wednesday Thursday

JUMLAH
JUMLAH / HARI
KEBUTUHAN ALAT
- - 1 Excavator - - - - - - - -
- - 2 Dump Truck - - - - - - - -
- - 3 Buldozer - - - - - - - -
- - 4 Vibro Roller - - - - - - - -
- - 5 Concrete Mixer - - - - - - - -
- - 6 Vibrator Beton - - - - - - - -
- - 7 Pompa Air - - - - - - - -
- - 8 Waterpass
- - 9 Theodolite
- - 10 Chain Saw
- - 11 Alat Bantu
- - 12 Truck Kayu
- - 13
- - 14
- - 15

Total Estimasi Penggunaan : TENAGA Thursday Friday Saturday Sunday Monday Tuesday Wednesday Thursday

Per Hari :
- - Pelaksana Utama
- - Pelaksana Lap.
- - Mandor - - - - - - - -
- Kepala Tukang - - - - - - - -
- - Tukang Batu - - - - - - - -
- - Tukang Besi - - - - - - - -
- - Tukang Kayu - - - - - - - -
- - Pekerja - - - - - - - -
- - Mandor Alat - - - - - - - -
- - Operator - - - - - - - -
- - Pemb. Operator - - - - - - - -
- - Sopir - - - - - - - -
- - Pembantu Sopir - - - - - - - -
- - Surveyor - - - - - - - -
- - Pemb. Surveyor - - - - - - - -
- - Mekanik
- - Pembantu Mekanik
- - Penjaga

Anda mungkin juga menyukai

  • Prinsip 16
    Prinsip 16
    Dokumen2 halaman
    Prinsip 16
    ius
    Belum ada peringkat
  • Prinsip 12
    Prinsip 12
    Dokumen2 halaman
    Prinsip 12
    ius
    Belum ada peringkat
  • Prinsip 13
    Prinsip 13
    Dokumen2 halaman
    Prinsip 13
    ius
    Belum ada peringkat
  • Prinsip 15
    Prinsip 15
    Dokumen2 halaman
    Prinsip 15
    ius
    Belum ada peringkat
  • Prinsip 11
    Prinsip 11
    Dokumen1 halaman
    Prinsip 11
    ius
    Belum ada peringkat
  • Prinsip 14
    Prinsip 14
    Dokumen2 halaman
    Prinsip 14
    ius
    Belum ada peringkat
  • Prinsip 10
    Prinsip 10
    Dokumen3 halaman
    Prinsip 10
    ius
    Belum ada peringkat
  • Prinsip 5
    Prinsip 5
    Dokumen2 halaman
    Prinsip 5
    ius
    Belum ada peringkat
  • Prinsip 9
    Prinsip 9
    Dokumen3 halaman
    Prinsip 9
    ius
    Belum ada peringkat
  • Prinsip 8
    Prinsip 8
    Dokumen3 halaman
    Prinsip 8
    ius
    Belum ada peringkat
  • Prinsip 2
    Prinsip 2
    Dokumen2 halaman
    Prinsip 2
    ius
    Belum ada peringkat
  • Prinsip 7
    Prinsip 7
    Dokumen1 halaman
    Prinsip 7
    ius
    Belum ada peringkat
  • Prinsip 1
    Prinsip 1
    Dokumen2 halaman
    Prinsip 1
    ius
    Belum ada peringkat
  • Prinsip 6
    Prinsip 6
    Dokumen2 halaman
    Prinsip 6
    ius
    Belum ada peringkat
  • Prinsip 3
    Prinsip 3
    Dokumen1 halaman
    Prinsip 3
    ius
    Belum ada peringkat
  • Prinsip 4
    Prinsip 4
    Dokumen2 halaman
    Prinsip 4
    ius
    Belum ada peringkat