Anda di halaman 1dari 2

Simulasi Teamwork and Leadership

Role

 BOD/Government > Instruktur


 Project Manager > Student
 Design Engineer > Student
 Manufacturing/Production/Process Engineer > Student
 Marketing/citizen > Student

Jumlah mahasiswa di dalam kelas ada 24 anak. Dibagi dalam 4 tim yang terdiri dari 6 orang. Masih
memikirkan role apalagi yang diperlukan

Untuk project: Product Development (Company)

Role

 BOD > Instruktur


 Project Manager > Student
 Design Engineer 1> Student
 Design Engineer 2 > Student
 Manufacturing/Production/Process Engineer 1 > Student
 Manufacturing/Production/Process Engineer 2 > Student
 Marketing > Student

Untuk project: Product Development (Related to Government)

Role

 Government > Instruktur


 Project Manager > Student
 Design Engineer 1> Student
 Design Engineer 2 > Student
 Manufacturing/Production/Process Engineer 1 > Student
 Manufacturing/Production/Process Engineer 2 > Student
 Citizen Council > Student

Instruktur/dosen memberikan arahan proyek apa yang harus dikerjakan. Dan dalam berjalannya diskusi
aka nada instruksi lain yang disruptive jalannya proyek. Misal: ada pemotongan budget untuk projek dan
projek harus selesai lebih cepat dari waktu yang ditentukan.

Output project: bagaimana tim menyelesaikan permasalahan tersebut dan apakah setiap role sudah
mampu berjalan dengan semestinya. Output projek jelas.

Anda mungkin juga menyukai