Availability / Break-down of equipments of Blast Furnace

STATUS AS ON 22.03.17
Date of
AREA EQUIPMENT OKAY PROBLEM Completion
ELECT MECH
Reservoir Reservoir Pump-1 NOT OK Motor Pump
GCP PUMP HOUSE Saturator Pump-1 NOT OK Motor pump
SHELL COOLING TOWER Fan NO-1 OK
TUYERE COOL. TOWER Fan NO-1 OK

SGP Pump-1 OK

SGP Pump-2 OK
Pump House
SGP Pump-3 OK

Hot Sump Pump-1 OK


Rake mechanism OK
Thickener-2 Underflow Pump-1 OK
Underflow Pump-2 OK
Vibro Motor-1 OK
RMHS ( Screen-1/1)
Vibro Motor-2 OK
Vibro Motor-1 OK
RMHS ( Screen-1/2)
Vibro Motor-2 OK
Vibro Motor-1 OK
RMHS ( Screen-1/3)
Vibro Motor-2 OK
Vibro Motor-1 OK
RMHS ( Screen-2/1)
Vibro Motor-2 OK
Vibro Motor-1 OK
RMHS ( Screen-2/2)
Vibro Motor-2 OK
Vibro Motor-1 OK
RMHS ( Screen-2/3)
Vibro Motor-2 OK
Crane-1(LT Drive1 ) OK
Crane-1(LT Drive2 ) OK
Crane-1(LT Drive3 ) OK
Crane-1(LT Drive4 ) OK
Hot Metal Bay Crane
Crane-2(LT Drive1 ) OK
Crane-2(LT Drive2 ) OK
Crane-2(LT Drive3 ) OK
Crane-2(LT Drive4 ) NOT OK Motor 23.03.17
Blower-1 NOT OK Blower
Blower-2 Bypass V/V Not OK Valve
MBF-1 Blower-5 Bypass V/V Not OK Valve

REBD Not OK Base


assembly
Blower-3 OK

Blower-5 Not OK
MBF-2
Stove-2 Not OK

Stock rod-2 OK

Cast House(Flap
MBF-1 & 2 cover rope)

PLC System( BF-1 & BF-2) PLC


of Blast Furnace

REMARKS

New set of pump & motor reqired


New set of pump & motor reqired

vibration, work is on progress

OK, Running

OK

Motor is available, job will be


completed by 23.03.17
Complete set is required
mech work is in progress
mech work in progress
New assembly required to replace the
exiting system
Vibration over limit, kept for
emergancy
Refractory work is running.

should be used copper gasket instead


of graphite rope
System upgradation
required.Procurement under progress