Anda di halaman 1dari 8

FIELD PERMEABILITY TEST

FALLING HEAD TEST


SNI 03-3968-1995

PROJECT IGMC-STAGE 2 HOLE NO. 01


LOCATION BERENGBENGKEL TEST DEPTH 150 cm
STRUCTURE EMBANKMENT TYPE IA Ground Water level 80 cm Operator PS
HEIGHT OF CASING 50 cm Hole Radius 5 cm D (cm)= 200

No. H ti ti 2 h = D-H(ti) h+r/2 Yi = ti.Yi


(cm) (second) (cm) (cm) log(h(ti)+r/2)
1 5 0 0 195 197.5 2.296 0
2 7 30 900 193 195.5 2.291 68.7
3 9 60 3600 191 193.5 2.287 137.2
4 10.5 90 8100 189.5 192 2.283 205.5
5 12.5 120 14400 187.5 190 2.279 273.5
6 14.5 150 22500 185.5 188 2.274 341.1
7 17 180 32400 183 185.5 2.268 408.3
8 18.5 210 44100 181.5 184 2.265 475.6
9 20.5 240 57600 179.5 182 2.260 542.4
10 22.5 270 72900 177.5 180 2.255 608.9
11 23.5 300 90000 176.5 179 2.253 675.9
12 27.4 360 129600 172.6 175.1 2.243 807.6
13 32 420 176400 168 170.5 2.232 937.3
14 38 480 230400 162 164.5 2.216 1063.8
15 43.5 540 291600 156.5 159 2.201 1188.8
16 48.5 600 360000 151.5 154 2.188 1312.5
17 53.5 660 435600 146.5 149 2.173 1434.3
18 57.5 720 518400 142.5 145 2.161 1556.2
19 60 780 608400 140 142.5 2.154 1680.0
20 63.5 840 705600 136.5 139 2.143 1800.1
21 66.5 900 810000 133.5 136 2.134 1920.2
22 68.5 960 921600 131.5 134 2.127 2042.0
23 70.5 1020 1040400 129.5 132 2.121 2163.0
24 73 1080 1166400 127 129.5 2.112 2281.3
25 74.5 1140 1299600 125.5 128 2.107 2402.2
26 76 1200 1440000 124 126.5 2.102 2522.5
27 77.5 1260 1587600 122.5 125 2.097 2642.1
28 79 1320 1742400 121 123.5 2.092 2761.0
29 81 1380 1904400 119 121.5 2.085 2876.7
30 82 1440 2073600 118 120.5 2.081 2996.6
31 83.5 1500 2250000 116.5 119 2.076 3113.3
32 85 1560 2433600 115 117.5 2.070 3229.3
33 86 1620 2624400 114 116.5 2.066 3347.4
34 87 1680 2822400 113 115.5 2.063 3465.1
35 88.3 1740 3027600 111.7 114.2 2.058 3580.3
36 89.4 1800 3240000 110.6 113.1 2.053 3696.2
37 101 2700 7290000 99 101.5 2.006 5417.5
38 109 3600 12960000 91 93.5 1.971 7094.9
39 128 7200 51840000 72 74.5 1.872 13479.5
40 131 10800 116640000 69 71.5 1.854 20026.5
41 133 14400 207360000 67 69.5 1.842 26524.6
Sti = 67350 Sti = 430276500
2
Shi = 87.711 Sti.Yi = 133100.0
(Sti) = 4536022500
2

V
N= 41
a= 3.44E-05
k=1.15.r.a= 1.98E-04 cm/sec
H D
r= 5 cm
GWL = 100 cm
No. H ti ti 2 h h+r/2 Yi
(cm) (second) (cm) (cm) log(h(ti)+r/2)
1 37 0 0 95 97.5 1.98900462
2 42 47 2209 90 92.5 1.96614173
3 47 126 15876 85 87.5 1.94200805
4 52 174 30276 80 82.5 1.91645395
5 57 270 72900 75 77.5 1.8893017
6 62 380 144400 70 72.5 1.86033801
7 67 500 250000 65 67.5 1.82930377
8 72 628 394384 60 62.5 1.79588002
9 77 785 616225 55 57.5 1.75966784
10 82 960 921600 50 52.5 1.7201593
11 87 1125 1265625 45 47.5 1.67669361
12 92 1310 1716100 40 42.5 1.62838893
13 97 1525 2325625 35 37.5 1.57403127
14 102 1860 3459600 30 32.5 1.51188336
15 107 2100 4410000 25 27.5 1.43933269
16 112 2522 6360484 20 22.5 1.35218252
17 117 2800 7840000 15 17.5 1.24303805
18 122 3240 10497600 10 12.5 1.09691001
19 127 4375 19140625 5 7.5 0.87506126
Sti 24727
(Sti)2 611424529 Sti2 59463529 Shi 31.0657807 Sti.Yi

-2.543E-04

100

80
f(x) = - 0.0215468877x + 78.0415733037
60

40

20

0
0 500 100015002000250030003500400045005000
ti.Yi

0
92.40866
244.693
333.463
510.1115
706.9284
914.6519
1127.813
1381.339
1651.353
1886.28
2133.189
2400.398
2812.103
3022.599
3410.204
3480.507
3553.988
3828.393

33490.42
FIELD PERMEABILITY TEST
FALLING HEAD TEST
SNI 03-3968-1995

PROJECT IGMC-STAGE 2 HOLE NO. 01


LOCATION BERENGBENGKEL TEST DEPTH 150 cm
STRUCTURE EMBANKMENT TYPE IB Ground Water level 80 cm Operator PS
HEIGHT OF CASING 50 cm Hole Radius 5 cm D (cm)= 200

No. H ti ti 2 h = D-H(ti) h+r/2 Yi = ti.Yi


(cm) (second) (cm) (cm) log(h(ti)+r/2)
1 75 0 0 125 127.5 2.106 0.0
2 96.5 120 14400 103.5 106 2.025 243.0
3 99 150 22500 101 103.5 2.015 302.2
4 101 180 32400 99 101.5 2.006 361.2
5 103 210 44100 97 99.5 1.998 419.5
6 104.5 240 57600 95.5 98 1.991 477.9
7 105 270 72900 95 97.5 1.989 537.0
8 106.5 300 90000 93.5 96 1.982 594.7
9 107.5 330 108900 92.5 95 1.978 652.6
10 108.5 360 129600 91.5 94 1.973 710.3
11 109 390 152100 91 93.5 1.971 768.6
12 110.5 420 176400 89.5 92 1.964 824.8
13 110.5 450 202500 89.5 92 1.964 883.7
14 110.5 480 230400 89.5 92 1.964 942.6
15 111 510 260100 89 91.5 1.961 1000.3
16 112 540 291600 88 90.5 1.957 1056.6
17 112 570 324900 88 90.5 1.957 1115.3
18 112 600 360000 88 90.5 1.957 1174.0
19 115 1800 3240000 85 87.5 1.942 3495.6
20 117 3600 12960000 83 85.5 1.932 6955.1
21 125 7200 51840000 75 77.5 1.889 13603.0
22 126 9000 81000000 74 76.5 1.884 16953.0
23 120 10800 116640000 80 82.5 1.916 20697.7
Sti = 38520 Sti = 268250400
2
Shi = 45.320 Sti.Yi = 73768.8
(Sti) = 1483790400
2

V
N= 23
a= 1.05E-05
k=1.15.r.a= 6.02E-05 cm/sec
H D
FIELD PERMEABILITY TEST
FALLING HEAD TEST
SNI 03-3968-1995

PROJECT IGMC-STAGE 2 HOLE NO. 01


LOCATION BERENGBENGKEL TEST DEPTH 150 cm
STRUCTURE EMBANKMENT TYPE IIB Ground Water level 80 cm Operator PS
HEIGHT OF CASING 50 cm Hole Radius 5 cm D (cm)= 200

No. H ti ti2 h = D-H(ti) h+r/2 Yi = ti.Yi


(cm) (second) (cm) (cm) log(h(ti)+r/2)
1 20 0 0 180 182.5 2.261 0
2 56 60 3600 144 146.5 2.166 130.0
3 62 120 14400 138 140.5 2.148 257.7
4 66 180 32400 134 136.5 2.135 384.3
5 69 240 57600 131 133.5 2.125 510.1
6 76 300 90000 124 126.5 2.102 630.6
7 81.5 360 129600 118.5 121 2.083 749.8
8 88 420 176400 112 114.5 2.059 864.7
9 98 480 230400 102 104.5 2.019 969.2
10 100 540 291600 100 102.5 2.011 1085.8
11 102 600 360000 98 100.5 2.002 1201.3
12 102.8 660 435600 97.2 99.7 1.999 1319.1
13 104.7 720 518400 95.3 97.8 1.990 1433.0
14 106.2 780 608400 93.8 96.3 1.984 1547.2
15 107 840 705600 93 95.5 1.980 1663.2
16 107.6 900 810000 92.4 94.9 1.977 1779.5
17 108.3 1800 3240000 91.7 94.2 1.974 3553.3
18 113.2 2700 7290000 86.8 89.3 1.951 5267.3
19 113.8 3600 12960000 86.2 88.7 1.948 7012.5
20 115 7200 51840000 85 87.5 1.942 13982.5
21 114.5 10800 116640000 85.5 88 1.944 21000.4
22 114 14400 207360000 86 88.5 1.947 28036.0
23 113.5 18000 324000000 86.5 89 1.949 35089.0
24 113.5 21600 466560000 86.5 89 1.949 42106.8
25 113 25200 635040000 87 89.5 1.952 49185.9
26 113 28800 829440000 87 89.5 1.952 56212.5
Sti = 141300 Sti2 = 2658834000 Shi = 52.550 Sti.Yi = 275971.9
(Sti)2 = 19965690000
V
N= 26
a= 5.09E-06
k=1.15.r.a= 2.92E-05 cm/sec
H D
FIELD PERMEABILITY TEST
FALLING HEAD TEST
SNI 03-3968-1995

PROJECT IGMC-STAGE 2 HOLE NO. 01


LOCATION BERENGBENGKEL TEST DEPTH 400 cm
STRUCTURE EMBANKMENT TYPE IIB Ground Water level 80 cm Operator PS
HEIGHT OF CASING 0 cm Hole Radius 5 cm D (cm)= 400

No. H ti ti2 h = D-H(ti) h+r/2 Yi = ti.Yi


(cm) (second) (cm) (cm) log(h(ti)+r/2)
1 0 0 0 400 402.5 2.605 0
2 0.5 60 3600 399.5 402 2.604 156.3
3 1 120 14400 399 401.5 2.604 312.4
4 2.5 180 32400 397.5 400 2.602 468.4
5 3.9 240 57600 396.1 398.6 2.601 624.1
6 4.2 300 90000 395.8 398.3 2.600 780.1
7 4.8 360 129600 395.2 397.7 2.600 935.8
8 6.5 420 176400 393.5 396 2.598 1091.0
9 7.4 480 230400 392.6 395.1 2.597 1246.4
10 7.7 540 291600 392.3 394.8 2.596 1402.0
11 8 600 360000 392 394.5 2.596 1557.6
12 8.6 660 435600 391.4 393.9 2.595 1713.0
13 9 720 518400 391 393.5 2.595 1868.4
14 9.5 780 608400 390.5 393 2.594 2023.6
15 10 840 705600 390 392.5 2.594 2178.8
16 9.5 900 810000 390.5 393 2.594 2335.0
17 11 1800 3240000 389 391.5 2.593 4666.9
18 16.8 2700 7290000 383.2 385.7 2.586 6982.9
19 20.8 3600 12960000 379.2 381.7 2.582 9294.2
20 41 7200 51840000 359 361.5 2.558 18418.4
21 56.8 10800 1.17E+08 343.2 345.7 2.539 27418.0
22 68 14400 2.07E+08 332 334.5 2.524 36351.3
23 83.7 18000 3.24E+08 316.3 318.8 2.504 45063.3
24 85 21600 4.67E+08 315 317.5 2.502 54037.7
25 84.5 25200 6.35E+08 315.5 318 2.502 63061.2
26 84.5 28800 8.29E+08 315.5 318 2.502 72069.9
Sti = 141300 Sti = 2.66E+09
2
Shi = 66.967 Sti.Yi = 356056.6
(Sti)2 = 2E+10
V
N= 26
a= 4.17E-06
k=1.15.r.a= 2.40E-05 cm/sec
H D
FIELD PERMEABILITY TEST
FALLING HEAD TEST
SNI 03-3968-1995

PROJECT IGMC-STAGE 2 HOLE NO. 01


LOCATION BERENGBENGKEL TEST DEPTH 150 cm
STRUCTURE EMBANKMENT TYPE V Ground Water level 80 cm Operator PS
HEIGHT OF CASING 50 cm Hole Radius 5 cm D (cm)= 200

No. H ti t i2 h = D-H(ti) h+r/2 Yi = ti.Yi


(cm) (second) (cm) (cm) log(h(ti)+r/2)
1 50 0 0 150 152.5 2.183 0
2 94 30 900 106 108.5 2.035 61.1
3 107 60 3600 93 95.5 1.980 118.8
4 111 90 8100 89 91.5 1.961 176.5
5 114.2 120 14400 85.8 88.3 1.946 233.5
6 119 150 22500 81 83.5 1.922 288.3
7 128.6 180 32400 71.4 73.9 1.869 336.4
8 130.5 210 44100 69.5 72 1.857 390.0
9 131.2 240 57600 68.8 71.3 1.853 444.7
10 132.1 270 72900 67.9 70.4 1.848 498.8
11 133.8 300 90000 66.2 68.7 1.837 551.1
12 138.7 360 129600 61.3 63.8 1.805 649.7
13 140.2 420 176400 59.8 62.3 1.794 753.7
14 143.5 480 230400 56.5 59 1.771 850.0
15 145.2 540 291600 54.8 57.3 1.758 949.4
16 146.8 600 360000 53.2 55.7 1.746 1047.5
17 147.8 660 435600 52.2 54.7 1.738 1147.1
18 148.5 720 518400 51.5 54 1.732 1247.3
19 149.5 780 608400 50.5 53 1.724 1344.9
20 150.2 840 705600 49.8 52.3 1.719 1443.5
21 150.8 900 810000 49.2 51.7 1.713 1542.1
22 157.7 1800 3240000 42.3 44.8 1.651 2972.3
23 164 2700 7290000 36 38.5 1.585 4280.7
24 168 3600 12960000 32 34.5 1.538 5536.1
25 165 7200 51840000 35 37.5 1.574 11333.0
26 161.3 10800 1.17E+08 38.7 41.2 1.615 17440.9
27 160 14400 2.07E+08 40 42.5 1.628 23448.8
28 160 18000 3.24E+08 40 42.5 1.628 29311.0
29 159 21600 4.67E+08 41 43.5 1.638 35391.4
Sti = 88050 Sti2 = 1.19E+09 Shi = 51.651 Sti.Yi = 143788.9
(Sti)2 = 7.75E+09
V
N= 29
a= 1.41E-05
k=1.15.r.a= 8.08E-05 cm/sec
H D

PENGUKURAN PERMEABILITAS (TIPE V)


KEDALAMAN 1.50 M MAT : - 0.70 M

120

100
FIELD PERMEABILITY TEST
FALLING HEAD TEST
SNI 03-3968-1995

PROJECT IGMC-STAGE 2 HOLE NO. 01


LOCATION BERENGBENGKEL TEST DEPTH 400 cm
STRUCTURE EMBANKMENT TYPE V Ground Water level 80 cm Operator PS
HEIGHT OF CASING 0 cm Hole Radius 5 cm D (cm)= 400

No. H ti t i2 h = D-H(ti) h+r/2 Yi = ti.Yi


(cm) (second) (cm) (cm) log(h(ti)+r/2)
1 10 0 0 390 392.5 2.594 0
2 73.5 30 900 326.5 329 2.517 75.5
3 82 60 3600 318 320.5 2.506 150.3
4 84.5 90 8100 315.5 318 2.502 225.2
5 85.4 120 14400 314.6 317.1 2.501 300.1
6 87.2 150 22500 312.8 315.3 2.499 374.8
7 88.1 180 32400 311.9 314.4 2.497 449.5
8 89.7 210 44100 310.3 312.8 2.495 524.0
9 91 240 57600 309 311.5 2.493 598.4
10 91.1 270 72900 308.9 311.4 2.493 673.2
11 91.8 300 90000 308.2 310.7 2.492 747.7
12 92.3 360 129600 307.7 310.2 2.492 897.0
13 92.5 420 176400 307.5 310 2.491 1046.4
14 92.6 480 230400 307.4 309.9 2.491 1195.8
15 92.7 540 291600 307.3 309.8 2.491 1345.2
16 93 600 360000 307 309.5 2.491 1494.4
17 93 660 435600 307 309.5 2.491 1643.8
18 93 720 518400 307 309.5 2.491 1793.3
19 93 780 608400 307 309.5 2.491 1942.7
20 93 840 705600 307 309.5 2.491 2092.2
21 93 900 810000 307 309.5 2.491 2241.6
22 92 1800 3240000 308 310.5 2.492 4485.7
23 91.3 2700 7290000 308.7 311.2 2.493 6731.2
24 92 3600 12960000 308 310.5 2.492 8971.4
25 92 7200 51840000 308 310.5 2.492 17942.8
26 91 10800 1.17E+08 309 311.5 2.493 26929.3
27 89.5 14400 2.07E+08 310.5 313 2.496 35935.8
28 89 18000 3.24E+08 311 313.5 2.496 44932.3
29 88 21600 4.67E+08 312 314.5 2.498 53948.6
30 87.5 25200 6.35E+08 312.5 315 2.498 62957.4
31 87 28800 8.29E+08 313 315.5 2.499 71971.2
Sti = 142050 Sti2 = 2.66E+09 Shi = 77.450 Sti.Yi = 354617.1
(Sti) = 2.02E+10
2

V
N= 31
a= 1.38E-07
k=1.15.r.a= 7.95E-07 cm/sec
H D

Anda mungkin juga menyukai