Date:
Diameters & No. of Bars Each Section As per Structural Drawings Structural Drawings
Cover Each Section Min. 2 no. Cover blocks per m2 Structural Specification
Structural Drawings/
Dimensions Each Section ± 3mm
Specification
Structural Drawings/
D Shuttering Works Verticality Each Section ± 3mm IR
Specification
Each truck on
Workability (Slump test) As per Approved Mix Design Structural Specification -
Arrival
F Concrete
Each truck on
Temperature Max. 32°C Structural Specification -
Arrival
Compression Strength Cube test
Each location Not less than the specified values Structural Specification
(Cube test at 7 & 28 days) results
Delivery less than 2 hours from As per Approved Method Delivery
Concrete Duration Each truck
batching time Statement Tickets
LEGEND : LA - LOCAL AUTHORITY H - HOLD W- WITNESS INSPECTION S - SURVEILLANCE INSPECTION R - REVIEW A - PPROVAL