Anda di halaman 1dari 10

APPENDIX 2

Status of Culverts

Chainage Cell Size Bottom Slab Wall+Top Slab Wing Wall


Sr.
Description Excavation Lean Remarks
No. Form Form Form
KM No. M M Steel Concrete Steel Concrete Side Steel Concrete
work work work
Left OK OK OK
1 BC 0+160 1 2 2 OK OK OK OK OK OK OK OK
Right OK OK OK
Left OK OK OK
2 BC 0+693 1 2 2 OK OK OK OK OK OK OK OK
Right OK OK OK
Left OK OK OK
3 BC 0+747 1 2.5 2.5 OK OK OK OK OK OK OK OK
Right OK OK OK
Left OK OK OK
4 BC 1+084 1 4 4 OK OK OK OK OK OK OK OK
Right OK OK OK
Left OK OK OK
5 BC 2+405 1 4.5 4.5 OK OK OK OK OK OK OK OK
Right OK OK OK
Left OK OK OK
6 BC 2+925 3 4 6 OK OK OK OK OK OK OK OK
Right OK OK OK
BC Left OK OK OK
7 (SUI GAS 3+314 1 6 5.6 OK OK OK OK OK OK OK OK
CULVERT) Right OK OK OK
Left OK OK OK
8 BC 4+230 1 2 2 OK OK OK OK OK OK OK OK
Right OK OK OK
Left OK OK OK
9 BC 4+392 1 2 2 OK OK OK OK OK OK OK OK
Right OK OK OK
Left OK OK OK
10 BC 4+502 1 2 2 OK OK OK OK OK OK OK OK
Right OK OK OK
Left
11 BC 4+789 2 2.5 2.5 OK OK OK OK OK OK OK OK
Right
Chainage Cell Size Bottom Slab Wall+Top Slab Wing Wall
Sr.
Description Excavation Lean Remarks
No. Form Form Form
KM No. M M Steel Concrete Steel Concrete Side Steel Concrete
work work work

Left OK OK OK
12 BC 4+935 1 2 2 OK OK OK OK OK OK OK OK
Right OK OK OK
Left OK OK OK
13 BC 5+740 1 4 4 OK OK OK OK OK OK OK OK
Right OK OK OK
Left OK OK OK
14 BC 5+892 1 2 2 OK OK OK OK OK OK OK OK
Right OK OK OK
Left OK OK OK
15 BC 6+090 1 2 2 OK OK OK OK OK OK OK OK
Right OK OK OK
Left OK OK OK
16 BC 6+325 1 4 4 OK OK OK OK OK OK OK OK
Right OK OK OK
Left OK OK OK
17 BC 6+575 1 2 2 OK OK OK OK OK OK OK OK
Right OK OK OK
Left OK OK OK
18 BC 6+715 1 2 2 OK OK OK OK OK OK OK OK
Right OK OK OK
Left OK OK OK
19 BC 6+900 1 4 4 OK OK OK OK OK OK OK OK
Right OK OK OK
Left OK OK OK
20 BC 7+040 1 2 2 OK OK OK OK OK OK OK OK
Right OK OK OK
Left OK OK OK
21 BC 7+344 1 2 2 OK OK OK OK OK OK OK OK
Right OK OK OK
Left OK OK OK
22 BC 7+575 1 2 2 OK OK OK OK OK OK OK OK
Right OK OK OK
Left OK OK OK
23 BC 7+765 1 2 2 OK OK OK OK OK OK OK OK
Right OK OK OK
Chainage Cell Size Bottom Slab Wall+Top Slab Wing Wall
Sr.
Description Excavation Lean Remarks
No. Form Form Form
KM No. M M Steel Concrete Steel Concrete Side Steel Concrete
work work work
Left OK OK OK
24 BC 7+979 1 2 2 OK OK OK OK OK OK OK OK
Right OK OK OK
Left OK OK OK
25 BC 8+150 1 2 2 OK OK OK OK OK OK OK OK
Right OK OK OK
Left OK OK OK
26 BC 08+761 1 2 2 OK OK OK OK OK OK OK OK
Right OK OK OK
Left OK OK OK
27 BC 8+875 3 4 4 OK OK OK OK OK OK OK OK
Right OK OK OK
Left OK OK OK Basin
28 BC 9+223 1 3 3 OK OK OK OK OK OK OK OK
Right OK OK OK
Left OK OK OK Basin
29 BC 9+498 1 3 3 OK OK OK OK OK OK OK OK
Right OK OK OK
Left
30 BC 9+649 3 4 6 OK OK OK OK OK OK OK OK
Right OK OK OK
Left OK OK OK
31 BC 9+777 1 2 2 OK OK OK OK OK OK OK OK
Right OK OK OK
Left OK OK OK
32 BC 10+146 2 3 3 OK OK OK OK OK OK OK OK
Right OK OK OK
Left Ok OK OK
33 BC 10+305 1 3 3 OK OK OK OK OK OK OK OK
Right Ok OK OK
Left OK OK OK
34 BC 11+010 1 4 6 OK OK OK OK OK OK OK OK
Right OK OK OK
Left OK OK OK
35 BC 11+525 1 4 4 OK OK OK OK OK OK OK OK
Right OK OK OK
Left
36 BC 12+185 1 4 4 OK OK OK OK OK OK OK OK
Right
Chainage Cell Size Bottom Slab Wall+Top Slab Wing Wall
Sr.
Description Excavation Lean Remarks
No. Form Form Form
KM No. M M Steel Concrete Steel Concrete Side Steel Concrete
work work work

Left
37 BC 13+034 1 4 6 OK OK OK OK OK OK OK OK
Right
Left
38 BC 14+535 1 2.5 2.5 OK OK OK OK OK OK OK OK
Right
Left OK OK OK
39 BC 14+666 1 4 6 OK OK OK OK OK OK OK OK
Right OK OK OK
Left OK OK OK
40 BC 15+082 2 4 6 OK OK OK OK OK OK OK OK
Right OK OK OK
Left OK OK OK
41 BC 15+357 1 4 4 OK OK OK OK OK OK OK OK
Right OK OK OK
Left OK OK OK
42 BC 15+504 2 4 6 OK OK OK OK OK OK OK OK
Right OK OK Ok
Left
43 BC 16+176 1 2 2 OK OK OK OK OK OK OK OK
Right OK OK OK
Left OK OK OK
44 BC 16+976 1 4 4 OK OK OK OK OK OK OK OK
Right OK OK OK

SHAH MAQSOOD

Left
45 BC 0+180 1 2 2 OK OK OK OK OK OK OK OK
Right
Left OK OK OK
46 BC 1+200 2 2 2 OK OK OK OK OK OK OK OK
Right OK OK OK
Left 39 39 39
Completed Total Quantity 46
Right 41 41 41
Status of Pipe Culverts

Chainage Cell Size Bedding & Wing Wall


Sr. Encashment of
Description Excavation Lean R.C.C.Pipe Remarks
No. Concrete
KM NO M M Side Steel Formwork Concrete
Class-B
PIPE LEFT
1 2+741 1 0.46-DIA OK OK OK OK
CULVERT RIGHT
PIPE LEFT
2 3+111 1 0.46-DIA OK OK OK OK
CULVERT RIGHT
PIPE LEFT
3 5+862 1 1.2-DIA OK OK OK OK
CULVERT RIGHT
PIPE LEFT
4 6+313 1 1.2-DIA - OK OK OK OK
CULVERT RIGHT
PIPE LEFT
5 7+410 1 1.2-DIA - OK OK OK OK
CULVERT RIGHT
OK OK OK
PIPE LEFT
6 7+979 1 1.2-DIA - OK OK OK OK
CULVERT RIGHT
OK OK OK

OK OK OK
PIPE LEFT
7 08+401 1 1.2-DIA - OK OK OK OK
CULVERT RIGHT
OK OK OK

PIPE LEFT
8 08+492 1 1.2-DIA - OK OK OK OK
CULVERT RIGHT
PIPE LEFT
9 8+600 1 1.2-DIA - OK OK OK OK
CULVERT RIGHT
OK OK OK
PIPE LEFT
10 10+718 1 1.2-DIA OK OK OK OK
CULVERT RIGHT
OK OK OK

PIPE LEFT
11 12+046 1 1.22 DIA OK OK OK OK
CULVERT RIGHT
PIPE LEFT
12 12+796 1 1.22 DIA Deleted
CULVERT RIGHT
PIPE LEFT
13 12+897 1 1.22 DIA OK OK OK OK
CULVERT RIGHT
Chainage Cell Size Bedding & Wing Wall
Sr. Encashment of
Description Excavation Lean R.C.C.Pipe Remarks
No. Concrete
KM NO M M Side Steel Formwork Concrete
Class-B
PIPE LEFT
14 12+910 1 1.22 DIA Deleted
CULVERT RIGHT
PIPE LEFT
15 14+533 2 1.22 DIA Deleted
CULVERT RIGHT
PIPE LEFT
16 14+763 1 1.22 DIA Deleted
CULVERT RIGHT
PIPE LEFT OK OK OK
17 15+243 2 1.22 DIA OK OK OK OK
CULVERT RIGHT OK OK OK
PIPE LEFT OK OK OK
18 15+778 1 1.22 DIA OK OK OK OK
CULVERT RIGHT OK OK OK
PIPE LEFT OK OK OK
19 15+885 2 1.22 DIA OK OK OK OK
CULVERT RIGHT OK OK OK
PIPE LEFT OK OK OK
20 15+971 2 1.22 DIA OK OK OK OK
CULVERT RIGHT OK OK OK
PIPE LEFT OK OK OK
21 16+602 1 1.22 DIA OK OK OK OK
CULVERT RIGHT OK OK OK
PIPE LEFT OK OK OK
22 16+725 2 1.22 DIA OK OK OK OK
CULVERT RIGHT OK OK OK

SHAH MAQSOOD INTERCHANGE

PIPE LEFT
23 0+010 1 0.750 DIA OK OK OK OK
CULVERT RIGHT
PIPE LEFT OK OK OK
24 0+149 1 1.22 DIA OK OK OK OK
CULVERT RIGHT OK OK OK
PIPE LEFT OK OK OK
25 0+281 1 1.22 DIA OK OK OK OK
CULVERT RIGHT OK OK OK
PIPE LEFT OK OK OK
26 0+375 1 0.750 DIA OK OK OK OK
CULVERT RIGHT OK OK OK
PIPE LEFT OK OK OK
27 0+440 1 0.750 DIA OK OK OK OK
CULVERT RIGHT OK OK OK
Chainage Cell Size Bedding & Wing Wall
Sr. Encashment of
Description Excavation Lean R.C.C.Pipe Remarks
No. Concrete
KM NO M M Side Steel Formwork Concrete
Class-B
PIPE LEFT OK OK OK
28 0+496 2 1.22 DIA OK OK OK OK
CULVERT RIGHT OK OK OK
PIPE LEFT OK OK OK
29 0+572 1 1.22 DIA OK OK OK OK
CULVERT RIGHT OK OK OK
PIPE LEFT OK OK OK
30 0+708 1 0.750 DIA OK OK OK OK
CULVERT RIGHT OK OK OK
PIPE OK OK OK OK LEFT OK OK OK
31 0+735 2 1.22 DIA
CULVERT RIGHT OK OK OK
PIPE LEFT OK OK OK
32 0+976 2 1.22 DIA OK OK OK OK OK OK OK
CULVERT RIGHT
PIPE LEFT OK OK OK
33 0+107 2 1.22 DIA OK OK OK OK
CULVERT RIGHT OK OK OK
PIPE LEFT OK OK OK
34 1+110 1 1.22 DIA OK OK OK OK
CULVERT RIGHT OK OK OK
LEFT 20 20 20
Completed Total Quantity 30
RIGHT 20 20 20
Status of Walk Way

Cell Size Bottom Slab Wall+Top Slab Wing Wall


Sr.
No.
Description Chainage Excavation Lean Remarks
Form Form Form
NO M M Steel Concrete Steel Concrete Side Steel Concrete
work work work

LEFT OK OK OK
WALK
1 1+158 1 4 4 OK OK OK OK OK OK OK OK
WAY
RIGHT OK OK
OK

LEFT OK OK OK
WALK
2 8+308 1 3 3 OK OK OK OK OK OK OK OK
WAY
RIGHT OK OK OK

LEFT 2 2 2
COMPLETED TOTAL QUANTITY 2
RIGHT 2 2 2
Status of Underpasses

Cell Size Bottom Slab Wall+Top Slab Wing Wall


Sr.
Description Chainage Excavation Lean Remarks
No. Form Form Form
No. M M Steel Concrete Steel Concrete Side Steel Concrete
work work work
LEFT OK OK OK
1 UP 2+162 1 6 4.5 OK OK OK OK OK OK OK OK
RIGHT OK OK OK
LEFT OK OK OK
2 UP 2+981 1 6 4.5 OK OK OK OK OK OK OK OK
RIGHT OK OK OK
LEFT OK OK OK
3 UP 4+619 2 10 5.1 OK OK OK OK OK OK OK OK
RIGHT OK OK OK
LEFT OK OK OK
4 UP 8+050 1 6 4.5 OK OK OK OK OK OK OK OK
RIGHT OK OK OK
LEFT OK OK OK
5 UP 16+853 1 6 4.5 OK OK OK OK OK OK OK OK
RIGHT OK OK OK
LEFT OK OK OK
6 UP 16+976 1 6 4.5 OK OK OK OK OK OK OK OK
RIGHT OK OK OK
SHAH MAQSOOD INTERCHANGE
LEFT OK OK OK
7 UP 1+180 1 6 4.5 OK OK OK OK OK OK OK OK
RIGHT OK OK OK
LEFT 7 7 7
COMPLETED TOTAL QUANTITY 7
RIGHT 7 7 7
Status of Bridges/Flyovers

span Length Test Piles Piles Piles Cap Pier/Colmn Transom Girders Deck slab Barrier
Sr.
Description Chain age
No.
No M Nos Com Nos Com Nos Com Nos Com Nos Com Nos Man Ins Nos Com Nos Com

1 BRIDGE-1 0+333 5x30 150 1 1 96 96 8 8 24 24 12 12 50 50 50 5 5 4 4

2 BRIDGE-2 1+450 3x30 90 1 1 60 60 4 4 12 12 8 8 30 30 30 3 3 4 4

25+35*2+19
3 BRIDGE-3 3+816
+43+9*30
427 2 2 292 292 26 26 26 26 30 30 140 140 140 14 14 4 4

4 BRIDGE-4 5+360 21x30 637 2 2 340 340 40 40 40 40 44 44 210 210 210 21 21 4 4

5 BRIDGE-5 11+540 7x30 210 1 1 213 213 12 4 36 - 16 - 70 58 - 7 - 4 -

6 BRIDGE-6 12+456 6x30 180 2 2 160 150 10 10 30 12 14 2 60 60 - 6 - 4 -

7 BRIDGE-7 13+381 7x30+2x18 246 3 3 180 180 16 16 48 42 20 9 90 90 - 9 - 4 -

8 BRIDGE-8 16+418 3x30 90 1 1 68 68 4 4 12 - 8 3 30 30 - 3 - 4 -

FLY OVER
9 0+004 2X30 60 1 1 28 28 3 3 1 1 1 1 8 8 8 2 2 2 2
FLY OVER
10 11+100 2X30 60 1 16 - 3 - 1 - 1 - 4 - - 2 - 2 -
FLY OVER
11 12+725 2X30 60 1 16 2 3 - 1 - 1 - 4 - - 2 - 2 -
FLY OVER
12 14+250 2X30 60 1 16 - 3 - 1 - 1 - 4 - - 2 - 2 -

FLY OVER
13 16+258 2x25 50 0 11 11 0 - 11 8 3 2 8 6 - 2 - 2 -

Total 2,320 17 15 1496 1440 132 8115 243 165 159 111 708 682 438 78 45 42 18