REVISION : 1
OB removal (bcm) 78,000,000 10,000,000 13,000,000 15,000,000 20,000,000 20,000,000 10,000,000 13,000,000 15,000,000 20,000,000 20,000,000
haul distance (km) 1.85 1.50 1.50 2.00 2.00 2.00 1.852564103 1.50 1.50 2.00 2.00 2.00
Coal Winning (tonnes) 7,166,667 666,667 1,000,000 1,500,000 2,000,000 2,000,000 666,667 1,000,000 1,500,000 2,000,000 2,000,000
haul distance (km) 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00
Stripping Ratio (bcm/tonne) 10.88 15.00 13.00 10.00 10.00 10.00 15 13 10 10 10
Financial Parameter :
Depreciation Period :
A. PRODUCTION & SUPPORT EQ 5 years
B. AUXILIARIES EQUIPMENT 5 years
B. INFRASTRUCTURES 5 years `
C. FIXTURES AND FURNITURES 5 years
REV
PRODUCTION RATE :
GP IRR
OB removal 2.94 (usd/bcm) 14.20% 18.00%
YEAR
STBY Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Calendar days 31 28 31 30 31 30 31 31 30 31 30 31
OB Removal
Shifts / day Shifts / day 2
Holidays and shutdown Holidays and shutdown (days) 1 0 0 0 0 0 0 3 1 1
Fridays Fridays (days) 4 4 4 5 4 4 5 4 4 5 4 5
Safety Talk Days Safety Talk Days (days) 4 4 4 5 4 4 5 4 4 5 4 5
- Rainy - Rainy hrs/month 43.58 50.50 72.07 71.41 41.46 51.58 64.03 43.99 36.52 37.31 69.41 41.19
- Slippery - Slippery 60% % of rainy 60% 60% 60% 60% 60% 60% 60% 60% 60% 60% 60% 60%
- Holiday and shutdown - Holiday and shutdown hrs/month
- Meal and Rest - Meal and Rest 1.55 hrs/day 1.50 1.50 1.50 1.50 1.50 1.50 1.50 2.00 1.50 1.50 1.50 1.50
- Waiting Blasting - Waiting Blasting 0.50 hrs/day 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
- No job - No job hrs/day
- Shift Change - Shift Change 2.00 hrs/day 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
- Greasing, Refueling, Tire - Greasing, Refueling, Tire Check, etc 0.50 hrs/day 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
- Stop Crusher - Stop Crusher hrs/day
- Friday Pray - Friday Pray 1.50 hrs/Friday 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50
- Safety Talk - Safety Talk 0.50 hrs/Safety Talk Day 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
Coal Winning
Shifts / day Shifts / day 2
- Rainy - Rainy hrs/month 43.58 50.50 72.07 71.41 41.46 51.58 64.03 43.99 36.52 37.31 69.41 41.19
- Slippery - Slippery 60% % of rainy 60% 60% 60% 60% 60% 60% 60% 60% 60% 60% 60% 60%
- Holiday and shutdown - Holiday and shutdown hrs/month
1.55
- Meal and Rest - Meal and Rest hrs/day 1.50 1.50 1.50 1.50 1.50 1.50 1.50 2.00 1.50 1.50 1.50 1.50
- Waiting Blasting - Waiting Blasting 0.50 hrs/day 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
- No job - No job hrs/day
- Shift Change - Shift Change 2.00 hrs/day 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
- Greasing, Refueling, Tire - Greasing, Refueling, Tire Check, etc 0.50 hrs/day 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
- Stop Crusher - Stop Crusher 0.00 hrs/day 0.00
- Friday Pray - Friday Pray 1.50 hrs/Friday 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50
- Safety Talk - Safety Talk 0.50 hrs/Safety Talk Day 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
Support Equipment
Shifts / day Shifts / day 2
- Rainy - Rainy hrs/month 43.58 50.50 72.07 71.41 41.46 51.58 64.03 43.99 36.52 37.31 69.41 41.19
- Slippery - Slippery 30% % of rainy 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30%
- Holiday and shutdown - Holiday and shutdown hrs/month
- Meal and Rest - Meal and Rest 1.55 hrs/day 1.50 1.50 1.50 1.50 1.50 1.50 1.50 2.00 1.50 1.50 1.50 1.50
- Waiting Blasting - Waiting Blasting 0.50 hrs/day 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
- No job - No job 0.00 hrs/day 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
- Shift Change - Shift Change 2.00 hrs/day 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
- Greasing, Refueling, Tire - Greasing, Refueling, Tire Check, etc 0.50 hrs/day 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
- Stop Crusher - Stop Crusher hrs/day
- Friday Pray - Friday Pray 1.50 hrs/Friday 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50
- Safety Talk - Safety Talk 0.50 hrs/Safety Talk Day 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
Auxiliary Equipment
Shifts / day Shifts / day 2
Coal transporting
Shifts / day Shifts / day 2
- Meal and Rest - Meal and Rest 1.00 hrs/day 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Productivity
PRODUCTION
OB Removal :
Drilling Machine
Buldozers DP1100 2,000 (bcm/hr)
D375A-5 394 (bcm/hr) (ripping-dozing)
D155 336 (bcm/hr) (dozing)
D85ESS-2 252 (bcm/hr) (dozing)
Loader
PC800SE-7 300 (bcm/hr) 14.20%
PC1250SP-8 550 (bcm/hr)
PC2000-8 900 (bcm/hr)
Motor Grader (bcm/hr)
GD705A-2 (bcm/hr)
GD825A-2 (bcm/hr)
(bcm/hr)
Coal Winning (bcm/hr)
Loader
PC400LCSE-7 250 (tonnes/hr)
Buldozers PC200-7 125 (tonnes/hr)
D85ESS-2 252 (tonnes/hr)
Coal Transporting
Loader
Err:509 300 (tonnes/hr)
Err:509 675 (tonnes/hr)
Coal Winning :
Loader
PC400LCSE-7 20 0.9
PC200-7 16 0.9
Coal Transporting :
Loader
1 2 3 4 5 6 7 8
V1 V2 speed factor MAX SPEED t1 t2 job efficiency C YCLE
OB Removal : (km/hr) (km/hr) (km/hr) (min) (min) SPEED
Hauler
CAT740 18 25 0.8 40 0.5 1.0 0.75
HD465 20 30 0.8 40 0.5 1.0 0.75
HM400-1 18 25 0.8 40 0.5 1.0 0.75
HD785-7 22 32 0.8 40 0.5 1.0 0.75
Coal Winning :
Hauler
FM440 20 35 0.8 60 0.5 1.0 0.75
KERAX 350 20 35 0.8 60 0.5 1.0 0.75
FM380 20 35 0.8 60 0.5 1.0 0.75
Coal Transporting :
Hauler
MANP0WER :
OPRT
SHIFT FACTOR
2 1.32
2 1.32
MECH
EQUIPMENT MECH FACTOR
BBNKB 0.75%
PKB 0.10%
GENERAL ASSUMPTIONS KONTRAKTOR
MATERIAL PROPERTIES
Over Burden :
FINANCIAL PARAMETERS :
Fuel Contingency :
OB removal 0%
Coal winning 0%
Coal transport 0%
DESCRIPTION TOTAL/AVG Jan Feb Mar Apr May Jun Jul Aug Sep Oct Oct Oct
30% 27% 19% 23% 14% 16% 9% 5% 6% 18% 18% 18%
TOTAL DAYS AND SHIFTS :
Calender days days 365 31 28 31 30 31 30 31 31 30 31 30 31
Holidays and shutdown days 6 1 0 0 0 0 0 0 3 0 0 1 1
Fridays days 52 4 4 4 5 4 4 5 4 4 5 4 5
Safety Talk Schedule days 52 4 4 4 5 4 4 5 4 4 5 4 5
Shifts/day 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Hrs/shift 12 12 12 12 12 12 12 12 12 12 12 12 12 12
0 0 0 0 0 0 0 0 0 0 0 0
TOTAL HOURS :
MOHH (hrs) 8,760 744 672 744 720 744 720 744 744 720 744 720 744
a. Uncontrollable lost time :
- Rainy (hrs) 623.1 44 51 72 71 41 52 64 44 37 37 69 41
Total lost time (S) (hrs) 2,874.4 237 215 263 259 214 226 252 290 201 209 274 235
USABLE HOURS (hrs) 5,885.6 507 457 481 461 530 494 492 454 519 535 446 509
DESCRIPTION TOTAL/AVG Jan Feb Mar Apr May Jun Jul Aug Sep Oct Oct Oct
Total lost time (S) (hrs) 2,874.4 237 215 263 259 214 226 252 290 201 209 274 235
USABLE HOURS (hrs) 5,885.6 507 457 481 461 530 494 492 454 519 535 446 509
DESCRIPTION TOTAL/AVG Jan Feb Mar Apr May Jun Jul Aug Sep Oct Oct Oct
0 0 0 0 0 0 0 0 0 0 0 0
TOTAL DAYS AND SHIFTS :
Calender days days 365 31 28 31 30 31 30 31 31 30 31 30 31
Holidays and shutdown days 6 1 0 0 0 0 0 0 3 0 0 1 1
Fridays days 52 4 4 4 5 4 4 5 4 4 5 4 5
Safety Talk Schedule days 52 4 4 4 5 4 4 5 4 4 5 4 5
Shifts/day 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Hrs/shift 12 12 12 12 12 12 12 12 12 12 12 12 12 12
0 0 0 0 0 0 0 0 0 0 0 0
TOTAL HOURS :
MOHH (hrs) 8,760 744 672 744 720 744 720 744 744 720 744 720 744
a. Uncontrollable lost time :
- Rainy (hrs) 623.1 44 51 72 71 41 52 64 44 37 37 69 41
Total lost time (S) (hrs) 2,687.5 224 200 241 238 201 210 233 277 190 198 253 223
USABLE HOURS (hrs) 6,072.5 520 472 503 482 543 510 511 467 530 546 467 521
DESCRIPTION TOTAL/AVG Jan Feb Mar Apr May Jun Jul Aug Sep Oct Oct Oct
0 0 0 0 0 0 0 0 0 0 0 0
TOTAL DAYS AND SHIFTS :
Calender days days 365 31 28 31 30 31 30 31 31 30 31 30 31
Holidays and shutdown days 6 1 0 0 0 0 0 0 3 0 0 1 1
Fridays days 52 4 4 4 5 4 4 5 4 4 5 4 5
Safety Talk Schedule days 52 4 4 4 5 4 4 5 4 4 5 4 5
Shifts/day 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Hrs/shift 12 12 12 12 12 12 12 12 12 12 12 12 12 12
0 0 0 0 0 0 0 0 0 0 0 0
TOTAL HOURS :
MOHH (hrs) 8,760 744 672 744 720 744 720 744 744 720 744 720 744
a. Uncontrollable lost time :
- Rainy (hrs) - 0 0 0 0 0 0 0 0 0 0 0 0
Total lost time (S) (hrs) 4,811.0 414 364 403 390 403 390 403 436 390 403 401 414
USABLE HOURS (hrs) 3,949.0 330 308 341 330 341 330 341 308 330 341 319 330
DESCRIPTION TOTAL/AVG Jan Feb Mar Apr May Jun Jul Aug Sep Oct Oct Oct
0 0 0 0 0 0 0 0 0 0 0 0
TOTAL DAYS AND SHIFTS :
Calender days days 365 31 28 31 30 31 30 31 31 30 31 30 31
Holidays and shutdown days 6 1 0 0 0 0 0 0 3 0 0 1 1
Fridays days 52 4 4 4 5 4 4 5 4 4 5 4 5
Safety Talk Schedule days 52 4 4 4 5 4 4 5 4 4 5 4 5
Shifts/day 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Hrs/shift 12 12 12 12 12 12 12 12 12 12 12 12 12 12
0 0 0 0 0 0 0 0 0 0 0 0
TOTAL HOURS :
MOHH (hrs) 8,760 744 672 744 720 744 720 744 744 720 744 720 744
a. Uncontrollable lost time :
- Rainy (hrs) - 0 0 0 0 0 0 0 0 0 0 0 0
Total lost time (S) (hrs) 1,710.0 154 122 134 133 134 130 137 194 130 137 150 157
USABLE HOURS (hrs) 7,050.0 590 550 610 588 610 590 608 550 590 608 570 588
EQUIPMENT SPECIFICATION
1 2 3 4 5 6 7 8
B COAL WINNING
9 Hydraulic Excavators KOMATSU PC400LCSE-7 1.62 CUM bucket 331,000 35.00 42.00 60,000
10 Hydraulic Excavators KOMATSU PC200-7 0.85 CUM bucket 114,000 18.00 24.42 60,000
11 Rigid dumptruck KOMATSU FM440 30.00 cum rear dump 30.0 170,000 18.00 35.0 60,000
12 Rigid dumptruck VOLVO KERAX 350 20.00 TON rear dump 20.0 152,000 18.00 21.0 60,000
13 Rigid dumptruck VOLVO FM380 20.00 TON rear dump 16.0 150,000 15.00 20.00 60,000
C SUPPORT EQUIPMENT
14 Bulldozers KOMATSU D375A-5 525 HP blade and ripper 670,000 80.00 60,000
15 Bulldozers KOMATSU D155 320 HP blade and ripper 415,000 38.00 60,000
16 Bulldozers KOMATSU D85ESS-2 225 HP blade 235,000 26.00 32.00 60,000
17 Motor Grader KOMATSU GD705A-2 225 HP blade 305,000 18.00 60,000
18 Motor Grader KOMATSU GD825A-2 280 HP blade 490,000 22.00 60,000
19 Compactor BOMAG BW212 9.08 TONNES drum 75,000 13.00 21.00 60,000
20 Hydraulic Excavators KOMATSU PC200-7 0.80 CUM bucket 114,000 18.00 22.00 60,000
21 Water Truck VOLVO FM9WT 20,000 litres water tank 135,000 15.00 60,000
22 Washing Truck VOLVO FM9WST 20,000 litres water tank 135,000 15.00 60,000
23 Fuel Truck VOLVO FM9FT 20,000 litres fuel tank 135,000 15.00 60,000
24 Lubetruck VOLVO FM9LT lube tank 135,000 15.00 60,000
25 Mobile Crane Truck VOLVO FM9CT 50 tonnes Crane 135,000 15.00 60,000
26 Crane Truck TADANO ATF110 90 tonnes 800,000 12.00 60,000
27 Tire Handler Manitou MLB625 136,000 17.00 60,000
D AUXILIARY EQUIPMENT
28 Genset PL30 30 KVA 18,500 5.00 60,000
29 Genset PL250 250 KVA 40,000 8.00 60,000
30 Mega Tower Lamp LS4-6000 43,500 5.00 60,000
31 Tower lamp L8 39,000 3.00 60,000
32 Water pump MULTIFLOW MFV-420CS 150 litres/sec suction pump 435,000 60.00 60,000
33 Water pump MFV290 20 litres/sec suction pump 277,216 20.00 9,000 60,000
PHYSICAL OF AVAILABILITY 0
1 2 3 4 5 6 7 8 9 10 11 14.20%
PHYSICAL OF AVAILABILITY
EQUIPMENT TYPE BRAND MODEL CAPACITY ATTACHMENT YEAR 112.23%
Y1 #VALUE! #VALUE! #VALUE! #VALUE! MAX
112.23% 134.07% 121.88% 121.88%
A OVERBURDEN REMOVAL EQUIPMENT
1 1 Drilling Machine SANDVIK DP1100 5 INCHES rod and bit 93% 90% 87% 83% 83% 93% 1 1 2 2 2
2 2 Hydraulic Excavators KOMATSU PC800SE-7 3.4 CUM bucket 93% 90% 87% 83% 83% 93% 1 1 2 2 2
3 3 Hydraulic Excavators KOMATSU PC1250SP-8 6.7 CUM bucket 93% 90% 87% 83% 83% 93% - - - - -
4 4 Hydraulic Excavators KOMATSU PC2000-8 12.5 CUM bucket 93% 90% 87% 83% 83% 93% 4 5 5
5 5 Articulated dumptruck CATERPILLAR CAT740 40 TONNES rear dump 90% 89% 87% 83% 83% 90% 6 5 10 11 11
6 6 Rigid dumptruck KOMATSU HD465 54.2 TONNES rear dump 93% 90% 87% 83% 83% 93% - - - - - Bulldozer D375 Unit 3 9 9 9 9
7 7 Rigid dumptruck VOLVO HD785-7 91 TONNES rear dump 93% 90% 87% 83% 83% 93% 10 14 19 28 28 Bulldozer D155 Unit 2 2 2 2 2
8 8 Articulated dumptruck KOMATSU HM400-1 40 TONNES rear dump 90% 89% 87% 83% 83% 90% - - - - - Bulldozer D85ESS Unit 2 2 2 2 2
0 Drill Machine DP1100 Unit 0 0 3 3 3
B B COAL WINNING Excavator PC2000 Unit 2 2 2 2 2
9 9 Hydraulic Excavators KOMATSU PC400LCSE-7 1.62 CUM bucket 93% 90% 87% 83% 83% 93% 1 1 2 2 2 Excavator PC1250 Unit 4 4 4 4 4
10 10 Hydraulic Excavators KOMATSU PC200-7 0.85 CUM bucket 90% 85% 87% 83% 83% 90% - - - - - Excavator PC750 Unit 1 1 1 1 1
11 11 Rigid dumptruck KOMATSU FM440 30 cum rear dump 92% 90% 87% 83% 83% 92% 3 5 7 10 10 Excavator PC400 Unit 3 3 3 3 3
12 12 Rigid dumptruck VOLVO KERAX 350 20 TON rear dump 92% 90% 87% 83% 83% 92% - - - - - Excavator PC200 Unit 1 2 2 2 2
13 13 Rigid dumptruck VOLVO FM380 20 TON rear dump 92% 90% 87% 83% 83% 92% - - - - - Whell Loader WA500 Unit 1 1 1 1 1
0 Dump Truck HD785 Unit 7 10 10 10 10
C C SUPPORT EQUIPMENT Dump Truck HD465 Unit 15 15 15 15 15
14 14 Bulldozers KOMATSU D375A-5 525 HP blade and ripper 90% 87% 85% 83% 85% 90% 1 2 2 3 4 Dump Truck BMA40E Unit 4 4 4 4 4
15 15 Bulldozers KOMATSU D155 320 HP blade and ripper 90% 87% 85% 83% 85% 90% - - - - - Dump Truck FM380 Unit 12 12 12 12 12
16 16 Bulldozers KOMATSU D85ESS-2 225 HP blade 90% 87% 85% 83% 85% 90% 6 8 10 14 13 Dump Truck FM440 Unit 20 20 20 20 20
17 17 Motor Grader KOMATSU GD705A-2 225 HP blade 90% 87% 85% 83% 85% 90% 3 3 4 4 4 Motor Grader CAT16M Unit 4 6 6 6 6
18 18 Motor Grader KOMATSU GD825A-2 280 HP blade 90% 87% 85% 83% 85% 90% - - - - - Compactor 10 ton Unit 1 2 2 2 2
19 19 Compactor BOMAG BW212 9.08 TONNES drum 90% 87% 85% 83% 85% 90% 1 1 1 1 1
20 20 Hydraulic Excavators KOMATSU PC200-7 0.8 CUM bucket 90% 87% 85% 83% 85% 90% 1 1 2 2 2
21 21 Water Truck VOLVO FM9WT 20000 litres water tank 90% 87% 85% 83% 85% 90% 2 2 2 2 2
22 22 Washing Truck VOLVO FM9WST 20000 litres water tank 90% 87% 85% 83% 85% 90% 1 1 1 1 1
23 23 Fuel Truck VOLVO FM9FT 20000 litres fuel tank 90% 87% 85% 83% 85% 90% 2 2 2 2 2
24 24 Lubetruck VOLVO FM9LT 0 0 lube tank 90% 87% 85% 83% 85% 90% 1 1 1 1 1
25 25 Mobile Crane Truck VOLVO FM9CT 50 tonnes Crane 90% 87% 85% 83% 85% 90% 1 1 1 1 1
26 26 Crane Truck TADANO ATF110 90 tonnes Crane 90% 87% 85% 83% 85% 90% - - - - -
27 27 Tire Handler Manitou MLB625 0 0 Tire handler 90% 87% 85% 83% 85% 90% 1 1 1 1 1
D D AUXILIARY EQUIPMENT
28 28 Genset 0 PL30 30 KVA power 90% 87% 85% 83% 85% 90% 2 2 2 2 2
29 29 Genset 0 PL250 250 KVA power 90% 87% 85% 83% 85% 90% 2 2 2 2 2
30 30 Mega Tower Lamp 0 LS4-6000 0 0 Lamp 90% 87% 85% 83% 85% 90% 2 2 2 2 2
31 31 Tower lamp 0 L8 0 0 Lamp 90% 87% 85% 83% 85% 90% 4 4 9 9 9
32 32 Water pump MULTIFLOW MFV-420CS 150 litres/sec suction pump 90% 87% 85% 83% 85% 90% - - - - -
33 33 Water pump 0 MFV290 20 litres/sec suction pump 90% 87% 85% 83% 85% 90% 2 2 2 2 2
B COAL WINNING
9 Hydraulic Excavators KOMATSU PC400LCSE-7 1.62 CUM bucket 64.7% 63.5% 62.3% 60.5% 60.5%
10 Hydraulic Excavators KOMATSU PC200-7 0.85 CUM bucket 63.5% 61.4% 62.3% 60.5% 60.5%
11 Rigid dumptruck KOMATSU FM440 30 cum rear dump 64.3% 63.5% 62.3% 60.5% 60.5%
12 Rigid dumptruck VOLVO KERAX 350 20 TON rear dump 64.3% 63.5% 62.3% 60.5% 60.5%
13 Rigid dumptruck VOLVO FM380 20 TON rear dump 64.3% 63.5% 62.3% 60.5% 60.5%
C SUPPORT EQUIPMENT
14 Bulldozers KOMATSU D375A-5 525 HP blade and ripper 65.9% 64.7% 63.9% 63.0% 63.9%
15 Bulldozers KOMATSU D155 320 HP blade and ripper 65.9% 64.7% 63.9% 63.0% 63.9%
16 Bulldozers KOMATSU D85ESS-2 225 HP blade 65.9% 64.7% 63.9% 63.0% 63.9%
17 Motor Grader KOMATSU GD705A-2 225 HP blade 65.9% 64.7% 63.9% 63.0% 63.9%
18 Motor Grader KOMATSU GD825A-2 280 HP blade 65.9% 64.7% 63.9% 63.0% 63.9%
19 Compactor BOMAG BW212 9.08 TONNES drum 65.9% 64.7% 63.9% 63.0% 63.9%
20 Hydraulic Excavators KOMATSU PC200-7 0.8 CUM bucket 65.9% 64.7% 63.9% 63.0% 63.9%
21 Water Truck VOLVO FM9WT 20000 litres water tank 65.9% 64.7% 63.9% 63.0% 63.9%
22 Washing Truck VOLVO FM9WST 20000 litres water tank 65.9% 64.7% 63.9% 63.0% 63.9%
23 Fuel Truck VOLVO FM9FT 20000 litres fuel tank 65.9% 64.7% 63.9% 63.0% 63.9%
24 Lubetruck VOLVO FM9LT 0 0 lube tank 65.9% 64.7% 63.9% 63.0% 63.9%
25 Mobile Crane Truck VOLVO FM9CT 50 tonnes Crane 65.9% 64.7% 63.9% 63.0% 63.9%
26 Crane Truck TADANO ATF110 90 tonnes Crane 65.9% 64.7% 63.9% 63.0% 63.9%
27 Tire Handler Manitou MLB625 0 0 Tire handler 65.9% 64.7% 63.9% 63.0% 63.9%
D AUXILIARY EQUIPMENT
28 Genset 0 PL30 30 KVA power 39.0% 36.9% 35.4% 33.8% 35.4%
29 Genset 0 PL250 250 KVA power 39.0% 36.9% 35.4% 33.8% 35.4%
30 Mega Tower Lamp 0 LS4-6000 0 0 Lamp 39.0% 36.9% 35.4% 33.8% 35.4%
31 Tower lamp 0 L8 0 0 Lamp 39.0% 36.9% 35.4% 33.8% 35.4%
32 Water pump MULTIFLOW MFV-420CS 150 litres/sec suction pump 39.0% 36.9% 35.4% 33.8% 35.4%
33 Water pump 0 MFV290 20 litres/sec suction pump 39.0% 36.9% 35.4% 33.8% 35.4%
B COAL WINNING
9 Hydraulic Excavators KOMATSU PC400LCSE-7 1.62 CUM bucket 5,272 5,010 4,747 4,396 4,396
10 Hydraulic Excavators KOMATSU PC200-7 0.85 CUM bucket 5,010 4,572 4,747 4,396 4,396
11 Rigid dumptruck KOMATSU FM440 30 cum rear dump 5,185 5,010 4,747 4,396 4,396
12 Rigid dumptruck VOLVO KERAX 350 20 TON rear dump 5,185 5,010 4,747 4,396 4,396
13 Rigid dumptruck VOLVO FM380 20 TON rear dump 5,185 5,010 4,747 4,396 4,396
C SUPPORT EQUIPMENT
14 Bulldozers KOMATSU D375A-5 525 HP blade and ripper 5,197 4,934 4,759 4,583 4,759
15 Bulldozers KOMATSU D155 320 HP blade and ripper 5,197 4,934 4,759 4,583 4,759
16 Bulldozers KOMATSU D85ESS-2 225 HP blade 5,197 4,934 4,759 4,583 4,759
17 Motor Grader KOMATSU GD705A-2 225 HP blade 5,197 4,934 4,759 4,583 4,759
18 Motor Grader KOMATSU GD825A-2 280 HP blade 5,197 4,934 4,759 4,583 4,759
19 Compactor BOMAG BW212 9.08 TONNES drum 5,197 4,934 4,759 4,583 4,759
20 Hydraulic Excavators KOMATSU PC200-7 0.8 CUM bucket 5,197 4,934 4,759 4,583 4,759
21 Water Truck VOLVO FM9WT 20000 litres water tank 5,197 4,934 4,759 4,583 4,759
22 Washing Truck VOLVO FM9WST 20000 litres water tank 5,197 4,934 4,759 4,583 4,759
23 Fuel Truck VOLVO FM9FT 20000 litres fuel tank 5,197 4,934 4,759 4,583 4,759
24 Lubetruck VOLVO FM9LT 0 0 lube tank 5,197 4,934 4,759 4,583 4,759
25 Mobile Crane Truck VOLVO FM9CT 50 tonnes Crane 5,197 4,934 4,759 4,583 4,759
26 Crane Truck TADANO ATF110 90 tonnes 0 5,197 4,934 4,759 4,583 4,759
27 Tire Handler Manitou MLB625 0 0 0 5,197 4,934 4,759 4,583 4,759
D AUXILIARY EQUIPMENT
28 Genset 0 PL30 30 KVA 0 3,073 2,810 2,635 2,460 2,635
29 Genset 0 PL250 250 KVA 0 3,073 2,810 2,635 2,460 2,635
30 Mega Tower Lamp 0 LS4-6000 0 0 0 3,073 2,810 2,635 2,460 2,635
31 Tower lamp 0 L8 0 0 0 3,073 2,810 2,635 2,460 2,635
32 Water pump MULTIFLOW MFV-420CS 150 litres/sec suction pump 3,073 2,810 2,635 2,460 2,635
33 Water pump 0 MFV290 20 litres/sec suction pump 3,073 2,810 2,635 2,460 2,635
CROSSCEK :
2012 2013 2014 2015 2016
14 II PRODUCTION SCHEDULE
15
16 YEAR
17 DESCRIPTION TOTAL Y1 Y2 Y3 Y4 Y5
18
19 Over Burden (bcm) 78,000,000 10,000,000 13,000,000 15,000,000 20,000,000 20,000,000
20
21 Blasted Material (bcm) 62,400,000 80% 8,000,000 10,400,000 12,000,000 16,000,000 16,000,000
22 Direct Digging (bcm) 15,600,000 20% 2,000,000 2,600,000 3,000,000 4,000,000 4,000,000
23 hauling dist (km) 1.85 1.50 1.50 2.00 2.00 2.00
24
25 99.5% Coal winning (tonnes) 7,202,680 670,017 1,005,025 1,507,538 2,010,050 2,010,050
26 hauling dist (km) 4.00 4.00 4.00 4.00 4.00 4.00
ROAD AREA TOBE MAINTAINED (m2) 116,000 110,000 110,000 120,000 120,000 120,000
1.5
TOPSOIL REMOVAL
1.50
Dumptruck Model : CAT740 1.00
DESCRIPTION UNIT ITEM 0.50 0.60 0.70 0.80 0.90 1.00 1.10 1.20 1.30 1.40 1.50 1.60 1.70 1.80 1.90 2.00 2.10 2.20 2.30 2.40 2.50 2.60 2.70 2.80 2.90 3.00 3.10 3.20 3.30 3.40 3.50 3.60 3.70 3.80 3.90 4.00 4.10 4.20 4.30 4.40 4.50 4.60 4.70 4.80 4.90 5.00 5.10 5.20 5.30 5.40 5.50 5.60 5.70 5.80 5.90 6.00 6.10 6.20 6.30 6.40 6.50 6.60 6.70 6.80 6.90 7.00 7.10 7.20 7.30 7.40 7.50 7.60 7.70 7.80 7.90 8.00 8.10 8.20 8.30 8.40 8.50 8.60 8.70 8.80 8.90 9.00 9.10 9.20 9.30 9.40 9.50 9.60 9.70 9.80 9.90 10.00 10.10 10.20 10.30 10.40 10.50 10.60 10.70 10.80 10.90 11.00 11.10 11.20 11.30 11.40 11.50 11.60 11.70 11.80 11.90
Hauling Distance km J 0.50 0.60 0.70 0.80 0.90 1.00 1.10 1.20 1.30 1.40 1.50 1.60 1.70 1.80 1.90 2.00 2.10 2.20 2.30 2.40 2.50 2.60 2.70 2.80 2.90 3.00 3.10 3.20 3.30 3.40 3.50 3.60 3.70 3.80 3.90 4.00 4.10 4.20 4.30 4.40 4.50 4.60 4.70 4.80 4.90 5.00 5.10 5.20 5.30 5.40 5.50 5.60 5.70 5.80 5.90 6.00 6.10 6.20 6.30 6.40 6.50 6.60 6.70 6.80 6.90 7.00 7.10 7.20 7.30 7.40 7.50 7.60 7.70 7.80 7.90 8.00 8.10 8.20 8.30 8.40 8.50 8.60 8.70 8.80 8.90 9.00 9.10 9.20 9.30 9.40 9.50 9.60 9.70 9.80 9.90 10.00 10.10 10.20 10.30 10.40 10.50 10.60 10.70 10.80 10.90 11.00 11.10 11.20 11.30 11.40 11.50 11.60 11.70 11.80 11.90
Unit Cost/bcm $/bcm 0.50 0.54 0.59 0.63 0.68 0.71 0.76 0.80 0.84 0.89 0.92 0.96 1.00 1.05 1.09 1.12 1.16 1.20 1.24 1.29 1.31 1.33 1.35 1.37 1.39 1.41 1.43 1.45 1.46 1.48 1.50 1.51 1.53 1.54 1.56 1.57 1.58 1.60 1.61 1.62 1.63 1.64 1.66 1.67 1.68 1.69 1.70 1.71 1.72 1.73 1.74 1.75 1.75 1.76 1.77 1.78 1.79 1.80 1.80 1.81 1.82 1.83 1.83 1.84 1.85 1.85 1.86 1.87 1.89 1.90 1.91 1.92 1.94 1.95 1.96 1.97 1.99 2.00 2.01 2.02 2.04 2.05 2.06 2.07 2.09 2.10 2.11 2.12 2.13 2.14 2.16 2.17 2.18 2.19 2.20 2.22 2.23 2.24 2.25 2.26 2.27 2.28 2.30 2.31 2.32 2.33 2.35 2.37 2.39 2.41 2.42 2.44 2.46 2.48 2.50
Hauling Productivity lcm/hr HP 125 115 106 99 92 88 83 78 74 70 68 65 62 60 57 56 54 52 50 49 48 47 46 46 45 44 44 43 43 42 42 41 41 41 40 40 40 39 39 39 38 38 38 38 37 37 37 37 36 36 36 36 36 35 35 35 35 35 35 35 34 34 34 34 34 34 34 33 33 33 33 32 32 32 32 32 31 31 31 31 31 31 30 30 30 30 30 29 29 29 29 29 29 29 28 28 28 28 28 28 27 27 27 27 27 27 27 26 26 26 26 26 25 25 25
bcm/hr HP 100 92 85 79 74 70 66 62 59 56 54 52 50 48 46 45 43 42 40 39 38 38 37 36 36 35 35 35 34 34 33 33 33 32 32 32 32 31 31 31 31 30 30 30 30 30 29 29 29 29 29 29 29 28 28 28 28 28 28 28 27 27 27 27 27 27 27 27 27 26 26 26 26 26 25 25 25 25 25 25 25 24 24 24 24 24 24 24 23 23 23 23 23 23 23 23 22 22 22 22 22 22 22 22 22 21 21 21 21 21 21 20 20 20 20
Payload capacity cum C 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22
Number of Cicle n 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0
Cicle Time Loader minutes Ct 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42
18 Loaded Truck Speed km/hour V1 14.4 14.4 14.4 14.4 14.4 14.7 14.7 14.7 14.7 14.7 15.0 15.0 15.0 15.0 15.0 15.3 15.3 15.3 15.3 15.3 15.6 15.8 16.1 16.4 16.7 17.0 17.3 17.6 17.9 18.1 18.4 18.7 19.0 19.3 19.6 19.9 20.2 20.4 20.7 21.0 21.3 21.6 21.9 22.2 22.5 22.8 23.0 23.3 23.6 23.9 24.2 24.5 24.8 25.1 25.3 25.6 25.9 26.2 26.5 26.8 27.1 27.4 27.6 27.9 28.2 28.5 28.8 29.1 29.4 29.7 30.0 30.2 30.5 30.8 31.1 31.4 31.7 32.0 32.3 32.5 32.8 33.1 33.4 33.7 34.0 34.3 34.6 34.8 35.1 35.4 35.7 36.0 36.3 36.6 36.9 37.2 37.4 37.7 38.0 38.3 38.6 38.9 39.2 39.5 39.7 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0
25 Empty Truck Speed km/hour V2 20.0 20.0 20.0 20.0 20.0 20.4 20.4 20.4 20.4 20.4 20.8 20.8 20.8 20.8 20.8 21.2 21.2 21.2 21.2 21.2 21.6 22.0 22.4 22.8 23.2 23.6 24.0 24.4 24.8 25.2 25.6 26.0 26.4 26.8 27.2 27.6 28.0 28.4 28.8 29.2 29.6 30.0 30.4 30.8 31.2 31.6 32.0 32.4 32.8 33.2 33.6 34.0 34.4 34.8 35.2 35.6 36.0 36.4 36.8 37.2 37.6 38.0 38.4 38.8 39.2 39.6 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0
40 Dumping Time minutes T1 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
Positioned Time minutes T2 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Job Efficiency 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75
- Speed Factor 0.8 0.80 0.80 0.80 0.80 0.82 0.82 0.82 0.82 0.82 0.83 0.83 0.83 0.83 0.83 0.85 0.85 0.85 0.85 0.85 0.86 0.88 0.90 0.91 0.93 0.94 0.96 0.98 0.99 1.01 1.02 1.04 1.06 1.07 1.09 1.10 1.12 1.14 1.15 1.17 1.18 1.20 1.22 1.23 1.25 1.26 1.28 1.30 1.31 1.33 1.34 1.36 1.38 1.39 1.41 1.42 1.44 1.46 1.47 1.49 1.50 1.52 1.54 1.55 1.57 1.58 1.60 1.62 1.63 1.65 1.66 1.68 1.70 1.71 1.73 1.74 1.76 1.78 1.79 1.81 1.82 1.84 1.86 1.87 1.89 1.90 1.92 1.94 1.95 1.97 1.98 2.00 2.02 2.03 2.05 2.06 2.08 2.10 2.11 2.13 2.14 2.16 2.18 2.19 2.21 2.22 2.24 2.26 2.27 2.29 2.30 2.32 2.34 2.35 2.37
Cycle Time DT CTdt 8.00 8.72 9.43 10.15 10.87 11.44 12.15 12.85 13.55 14.25 14.75 15.44 16.13 16.82 17.51 17.94 18.61 19.29 19.97 20.64 21.01 21.36 21.69 22.02 22.33 22.64 22.93 23.21 23.49 23.76 24.01 24.26 24.51 24.74 24.97 25.19 25.40 25.61 25.82 26.01 26.21 26.39 26.58 26.75 26.93 27.10 27.26 27.42 27.58 27.73 27.88 28.02 28.17 28.31 28.44 28.57 28.70 28.83 28.95 29.08 29.20 29.31 29.43 29.54 29.65 29.75 29.86 30.07 30.28 30.48 30.69 30.90 31.10 31.30 31.51 31.71 31.91 32.11 32.31 32.50 32.70 32.90 33.09 33.29 33.48 33.67 33.87 34.06 34.25 34.44 34.63 34.82 35.01 35.19 35.38 35.57 35.75 35.94 36.12 36.31 36.49 36.67 36.86 37.04 37.22 37.42 37.72 38.02 38.32 38.62 38.92 39.22 39.52 39.82 40.12
Trips per hour tph 5.63 5.16 4.77 4.43 4.14 3.93 3.71 3.50 3.32 3.16 3.05 2.91 2.79 2.68 2.57 2.51 2.42 2.33 2.25 2.18 2.14 2.11 2.07 2.04 2.01 1.99 1.96 1.94 1.92 1.89 1.87 1.85 1.84 1.82 1.80 1.79 1.77 1.76 1.74 1.73 1.72 1.70 1.69 1.68 1.67 1.66 1.65 1.64 1.63 1.62 1.61 1.61 1.60 1.59 1.58 1.57 1.57 1.56 1.55 1.55 1.54 1.54 1.53 1.52 1.52 1.51 1.51 1.50 1.49 1.48 1.47 1.46 1.45 1.44 1.43 1.42 1.41 1.40 1.39 1.38 1.38 1.37 1.36 1.35 1.34 1.34 1.33 1.32 1.31 1.31 1.30 1.29 1.29 1.28 1.27 1.27 1.26 1.25 1.25 1.24 1.23 1.23 1.22 1.21 1.21 1.20 1.19 1.18 1.17 1.17 1.16 1.15 1.14 1.13 1.12
Cycle Speed kph 7.50 8.26 8.90 9.46 9.94 10.49 10.87 11.21 11.51 11.79 12.20 12.43 12.65 12.84 13.02 13.38 13.54 13.69 13.82 13.95 14.28 14.61 14.94 15.26 15.58 15.90 16.22 16.54 16.86 17.18 17.49 17.81 18.12 18.43 18.74 19.06 19.37 19.68 19.99 20.30 20.61 20.91 21.22 21.53 21.84 22.14 22.45 22.76 23.06 23.37 23.67 23.98 24.28 24.59 24.89 25.20 25.50 25.81 26.11 26.41 26.72 27.02 27.32 27.63 27.93 28.23 28.53 28.73 28.93 29.13 29.32 29.52 29.71 29.90 30.09 30.28 30.46 30.65 30.83 31.01 31.19 31.37 31.55 31.72 31.90 32.07 32.25 32.42 32.59 32.75 32.92 33.09 33.25 33.42 33.58 33.74 33.90 34.06 34.22 34.37 34.53 34.68 34.84 34.99 35.14 35.28 35.32 35.35 35.39 35.43 35.46 35.50 35.53 35.56 35.60
OVERBURDEN REMOVAL
DESCRIPTION UNIT ITEM 0.50 0.60 0.70 0.80 0.90 1.00 1.10 1.20 1.30 1.40 1.50 1.60 1.70 1.80 1.90 2.00 2.10 2.20 2.30 2.40 2.50 2.60 2.70 2.80 2.90 3.00 3.10 3.20 3.30 3.40 3.50 3.60 3.70 3.80 3.90 4.00 4.10 4.20 4.30 4.40 4.50 4.60 4.70 4.80 4.90 5.00 5.10 5.20 5.30 5.40 5.50 5.60 5.70 5.80 5.90 6.00 6.10 6.20 6.30 6.40 6.50 6.60 6.70 6.80 6.90 7.00 7.10 7.20 7.30 7.40 7.50 7.60 7.70 7.80 7.90 8.00 8.10 8.20 8.30 8.40 8.50 8.60 8.70 8.80 8.90 9.00 9.10 9.20 9.30 9.40 9.50 9.60 9.70 9.80 9.90 10.00 10.10 10.20 10.30 10.40 10.50 10.60 10.70 10.80 10.90 11.00 11.10 11.20 11.30 11.40 11.50 11.60 11.70 11.80 11.90
Hauling Distance km J 0.50 0.60 0.70 0.80 0.90 1.00 1.10 1.20 1.30 1.40 1.50 1.60 1.70 1.80 1.90 2.00 2.10 2.20 2.30 2.40 2.50 2.60 2.70 2.80 2.90 3.00 3.10 3.20 3.30 3.40 3.50 3.60 3.70 3.80 3.90 4.00 4.10 4.20 4.30 4.40 4.50 4.60 4.70 4.80 4.90 5.00 5.10 5.20 5.30 5.40 5.50 5.60 5.70 5.80 5.90 6.00 6.10 6.20 6.30 6.40 6.50 6.60 6.70 6.80 6.90 7.00 7.10 7.20 7.30 7.40 7.50 7.60 7.70 7.80 7.90 8.00 8.10 8.20 8.30 8.40 8.50 8.60 8.70 8.80 8.90 9.00 9.10 9.20 9.30 9.40 9.50 9.60 9.70 9.80 9.90 10.00 10.10 10.20 10.30 10.40 10.50 10.60 10.70 10.80 10.90 11.00 11.10 11.20 11.30 11.40 11.50 11.60 11.70 11.80 11.90
Unit Cost/bcm $/bcm 0.30 0.32 0.35 0.37 0.39 0.41 0.44 0.46 0.48 0.49 0.51 0.53 0.55 0.56 0.58 0.59 0.61 0.62 0.64 0.65 0.66 0.68 0.69 0.70 0.71 0.73 0.74 0.75 0.76 0.77 0.78 0.79 0.80 0.81 0.82 0.83 0.84 0.86 0.87 0.88 0.89 0.90 0.92 0.93 0.94 0.95 0.96 0.97 0.98 0.99 1.00 1.01 1.02 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.21 1.22 1.23 1.24 1.25 1.27 1.28 1.29 1.31 1.32 1.34 1.35 1.36 1.38 1.39 1.40 1.42 1.43 1.45 1.46 1.47 1.49 1.50 1.51 1.53 1.54 1.56 1.57 1.58 1.60 1.61 1.62 1.64 1.65 1.66 1.68 1.69 1.71 1.72 1.73 1.75 1.76 1.77 1.79
Hauling Productivity lcm/hr HP 209 193 180 169 159 151 143 137 132 127 122 118 114 111 108 105 103 100 98 96 94 92 91 89 88 86 85 84 82 81 80 79 78 77 76 75 74 73 72 71 70 69 68 67 67 66 65 64 64 63 62 62 61 60 60 59 59 58 57 57 56 56 55 55 54 54 54 53 53 52 52 51 51 51 50 50 49 49 48 48 47 47 46 46 45 45 45 44 44 43 43 42 42 42 41 41 41 40 40 39 39 39 38 38 38 38 37 37 37 36 36 36 35 35 35
bcm/hr HP 167 155 144 135 127 121 115 110 105 101 98 94 92 89 86 84 82 80 78 77 75 74 72 71 70 69 68 67 66 65 64 63 63 62 61 60 59 58 58 57 56 55 55 54 53 53 52 51 51 50 50 49 49 48 48 47 47 46 46 46 45 45 44 44 44 43 43 43 42 42 41 41 41 41 40 40 39 39 39 38 38 37 37 37 36 36 36 35 35 35 34 34 34 33 33 33 32 32 32 32 31 31 31 31 30 30 30 30 29 29 29 29 28 28 28
Payload capacity cum C 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30
Number of Cicle n 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Cicle Time Loader minutes Ct 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38
20 Loaded Truck Speed km/hour V1 16.0 16.4 16.7 17.0 17.4 17.7 18.0 18.3 18.6 19.0 19.3 19.6 19.9 20.2 20.6 20.9 21.2 21.5 21.8 22.2 22.5 22.8 23.1 23.4 23.8 24.1 24.4 24.7 25.0 25.4 25.7 26.0 26.3 26.6 27.0 27.3 27.6 27.9 28.2 28.6 28.9 29.2 29.5 29.8 30.2 30.5 30.8 31.1 31.4 31.8 32.1 32.4 32.7 33.0 33.4 33.7 34.0 34.3 34.6 35.0 35.3 35.6 35.9 36.2 36.6 36.9 37.2 37.5 37.8 38.2 38.5 38.8 39.1 39.4 39.8 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0
30 Empty Truck Speed km/hour V2 24.0 24.6 25.1 25.6 26.0 26.5 27.0 27.5 28.0 28.4 28.9 29.4 29.9 30.4 30.8 31.3 31.8 32.3 32.8 33.2 33.7 34.2 34.7 35.2 35.6 36.1 36.6 37.1 37.6 38.0 38.5 39.0 39.5 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0
40 Dumping Time minutes T1 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
Positioned Time minutes T2 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Job Efficiency 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75
- Speed Factor 0.8 0.82 0.84 0.85 0.87 0.88 0.90 0.92 0.93 0.95 0.96 0.98 1.00 1.01 1.03 1.04 1.06 1.08 1.09 1.11 1.12 1.14 1.16 1.17 1.19 1.20 1.22 1.24 1.25 1.27 1.28 1.30 1.32 1.33 1.35 1.36 1.38 1.40 1.41 1.43 1.44 1.46 1.48 1.49 1.51 1.52 1.54 1.56 1.57 1.59 1.60 1.62 1.64 1.65 1.67 1.68 1.70 1.72 1.73 1.75 1.76 1.78 1.80 1.81 1.83 1.84 1.86 1.88 1.89 1.91 1.92 1.94 1.96 1.97 1.99 2.00 2.02 2.04 2.05 2.07 2.08 2.10 2.12 2.13 2.15 2.16 2.18 2.20 2.21 2.23 2.24 2.26 2.28 2.29 2.31 2.32 2.34 2.36 2.37 2.39 2.40 2.42 2.44 2.45 2.47 2.48 2.50 2.52 2.53 2.55 2.56 2.58 2.60 2.61 2.63
Cycle Time DT CTdt 6.54 7.08 7.60 8.11 8.60 9.07 9.53 9.97 10.39 10.80 11.20 11.58 11.95 12.31 12.66 13.00 13.32 13.64 13.95 14.25 14.54 14.82 15.09 15.36 15.62 15.88 16.12 16.36 16.60 16.82 17.05 17.26 17.47 17.68 17.95 18.21 18.48 18.74 19.00 19.26 19.52 19.77 20.02 20.27 20.51 20.76 21.00 21.24 21.48 21.72 21.95 22.19 22.42 22.65 22.88 23.11 23.33 23.56 23.78 24.00 24.22 24.44 24.66 24.87 25.09 25.30 25.52 25.73 25.94 26.15 26.36 26.57 26.78 26.98 27.19 27.42 27.72 28.02 28.32 28.62 28.92 29.22 29.52 29.82 30.12 30.42 30.72 31.02 31.32 31.62 31.92 32.22 32.52 32.82 33.12 33.42 33.72 34.02 34.32 34.62 34.92 35.22 35.52 35.82 36.12 36.42 36.72 37.02 37.32 37.62 37.92 38.22 38.52 38.82 39.12
Trips per hour tph 6.88 6.36 5.92 5.55 5.23 4.96 4.72 4.51 4.33 4.17 4.02 3.89 3.77 3.66 3.56 3.46 3.38 3.30 3.23 3.16 3.10 3.04 2.98 2.93 2.88 2.83 2.79 2.75 2.71 2.67 2.64 2.61 2.58 2.55 2.51 2.47 2.44 2.40 2.37 2.34 2.31 2.28 2.25 2.22 2.19 2.17 2.14 2.12 2.09 2.07 2.05 2.03 2.01 1.99 1.97 1.95 1.93 1.91 1.89 1.87 1.86 1.84 1.82 1.81 1.79 1.78 1.76 1.75 1.73 1.72 1.71 1.69 1.68 1.67 1.66 1.64 1.62 1.61 1.59 1.57 1.56 1.54 1.52 1.51 1.49 1.48 1.47 1.45 1.44 1.42 1.41 1.40 1.38 1.37 1.36 1.35 1.33 1.32 1.31 1.30 1.29 1.28 1.27 1.26 1.25 1.24 1.23 1.22 1.21 1.20 1.19 1.18 1.17 1.16 1.15
Cycle Speed kph 9.17 10.18 11.05 11.84 12.56 13.23 13.85 14.45 15.01 15.55 16.08 16.58 17.07 17.55 18.01 18.47 18.92 19.36 19.79 20.21 20.64 21.05 21.46 21.87 22.28 22.68 23.07 23.47 23.86 24.25 24.64 25.02 25.41 25.79 26.08 26.35 26.62 26.89 27.15 27.41 27.67 27.92 28.17 28.42 28.66 28.90 29.14 29.38 29.61 29.84 30.06 30.29 30.51 30.73 30.95 31.16 31.37 31.58 31.79 32.00 32.20 32.41 32.61 32.80 33.00 33.20 33.39 33.58 33.77 33.96 34.14 34.33 34.51 34.69 34.87 35.02 35.07 35.12 35.17 35.22 35.27 35.32 35.37 35.42 35.46 35.51 35.55 35.59 35.64 35.68 35.72 35.76 35.80 35.84 35.87 35.91 35.95 35.98 36.02 36.05 36.09 36.12 36.15 36.18 36.22 36.25 36.28 36.31 36.34 36.37 36.40 36.42 36.45 36.48 36.51
OVERBURDEN REMOVAL
DESCRIPTION UNIT ITEM 0.50 0.60 0.70 0.80 0.90 1.00 1.10 1.20 1.30 1.40 1.50 1.60 1.70 1.80 1.90 2.00 2.10 2.20 2.30 2.40 2.50 2.60 2.70 2.80 2.90 3.00 3.10 3.20 3.30 3.40 3.50 3.60 3.70 3.80 3.90 4.00 4.10 4.20 4.30 4.40 4.50 4.60 4.70 4.80 4.90 5.00 5.10 5.20 5.30 5.40 5.50 5.60 5.70 5.80 5.90 6.00 6.10 6.20 6.30 6.40 6.50 6.60 6.70 6.80 6.90 7.00 7.10 7.20 7.30 7.40 7.50 7.60 7.70 7.80 7.90 8.00 8.10 8.20 8.30 8.40 8.50 8.60 8.70 8.80 8.90 9.00 9.10 9.20 9.30 9.40 9.50 9.60 9.70 9.80 9.90 10.00 10.10 10.20 10.30 10.40 10.50 10.60 10.70 10.80 10.90 11.00 11.10 11.20 11.30 11.40 11.50 11.60 11.70 11.80 11.90
Hauling Distance km J 0.50 0.60 0.70 0.80 0.90 1.00 1.10 1.20 1.30 1.40 1.50 1.60 1.70 1.80 1.90 2.00 2.10 2.20 2.30 2.40 2.50 2.60 2.70 2.80 2.90 3.00 3.10 3.20 3.30 3.40 3.50 3.60 3.70 3.80 3.90 4.00 4.10 4.20 4.30 4.40 4.50 4.60 4.70 4.80 4.90 5.00 5.10 5.20 5.30 5.40 5.50 5.60 5.70 5.80 5.90 6.00 6.10 6.20 6.30 6.40 6.50 6.60 6.70 6.80 6.90 7.00 7.10 7.20 7.30 7.40 7.50 7.60 7.70 7.80 7.90 8.00 8.10 8.20 8.30 8.40 8.50 8.60 8.70 8.80 8.90 9.00 9.10 9.20 9.30 9.40 9.50 9.60 9.70 9.80 9.90 10.00 10.10 10.20 10.30 10.40 10.50 10.60 10.70 10.80 10.90 11.00 11.10 11.20 11.30 11.40 11.50 11.60 11.70 11.80 11.90
Unit Cost/bcm $/bcm 0.18 0.19 0.20 0.22 0.23 0.24 0.25 0.26 0.27 0.28 0.29 0.30 0.31 0.32 0.33 0.34 0.35 0.36 0.36 0.37 0.38 0.39 0.39 0.40 0.41 0.41 0.42 0.42 0.43 0.44 0.45 0.45 0.46 0.47 0.47 0.48 0.49 0.49 0.50 0.51 0.52 0.52 0.53 0.53 0.54 0.55 0.55 0.56 0.57 0.57 0.58 0.59 0.59 0.60 0.60 0.61 0.62 0.62 0.63 0.63 0.64 0.64 0.65 0.66 0.66 0.67 0.68 0.69 0.70 0.70 0.71 0.72 0.73 0.74 0.75 0.75 0.76 0.77 0.78 0.79 0.79 0.80 0.81 0.82 0.83 0.84 0.84 0.85 0.86 0.87 0.88 0.88 0.89 0.90 0.91 0.92 0.92 0.93 0.94 0.95 0.96 0.97 0.97 0.98 0.99 1.00 1.01 1.01 1.02 1.03 1.04 1.05 1.06 1.06 1.07
Hauling Productivity lcm/hr HP 351 326 305 287 272 259 247 237 228 219 212 205 199 194 189 184 180 176 172 168 165 162 159 157 154 152 149 147 145 143 140 138 136 134 132 130 128 126 125 123 121 120 118 117 115 114 113 112 110 109 108 107 106 105 104 103 102 101 100 99 98 97 96 95 94 93 92 91 90 89 88 87 86 85 84 83 82 81 80 80 79 78 77 76 76 75 74 73 73 72 71 71 70 69 69 68 68 67 66 66 65 65 64 64 63 63 62 62 61 61 60 60 59 59 58
bcm/hr HP 281 261 244 230 218 207 198 189 182 176 170 164 159 155 151 147 144 140 137 135 132 130 127 125 123 121 120 118 116 114 112 110 109 107 105 104 102 101 100 98 97 96 95 93 92 91 90 89 88 87 86 85 85 84 83 82 81 80 80 79 78 78 77 76 75 74 74 73 72 71 70 69 69 68 67 66 66 65 64 64 63 62 62 61 60 60 59 59 58 58 57 57 56 56 55 55 54 54 53 53 52 52 51 51 50 50 50 49 49 48 48 48 47 47 47
Payload capacity cum C 51.01 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51
Number of Cicle n 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Cicle Time Loader minutes Ct 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43
22 Loaded Truck Speed km/hour V1 17.6 18.0 18.4 18.7 19.1 19.4 19.8 20.2 20.5 20.9 21.2 21.6 21.9 22.3 22.6 23.0 23.3 23.7 24.0 24.4 24.7 25.1 25.4 25.8 26.1 26.5 26.8 27.2 27.5 27.9 28.2 28.6 29.0 29.3 29.7 30.0 30.4 30.7 31.1 31.4 31.8 32.1 32.5 32.8 33.2 33.5 33.9 34.2 34.6 34.9 35.3 35.6 36.0 36.3 36.7 37.0 37.4 37.8 38.1 38.5 38.8 39.2 39.5 39.9 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0
32 Empty Truck Speed km/hour V2 25.6 26.2 26.8 27.3 27.8 28.3 28.8 29.3 29.8 30.3 30.8 31.4 31.9 32.4 32.9 33.4 33.9 34.4 34.9 35.5 36.0 36.5 37.0 37.5 38.0 38.5 39.0 39.6 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0
40 Dumping Time minutes T1 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
Positioned Time minutes T2 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Job Efficiency 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75
- Speed Factor 0.8 0.82 0.84 0.85 0.87 0.88 0.90 0.92 0.93 0.95 0.96 0.98 1.00 1.01 1.03 1.04 1.06 1.08 1.09 1.11 1.12 1.14 1.16 1.17 1.19 1.20 1.22 1.24 1.25 1.27 1.28 1.30 1.32 1.33 1.35 1.36 1.38 1.40 1.41 1.43 1.44 1.46 1.48 1.49 1.51 1.52 1.54 1.56 1.57 1.59 1.60 1.62 1.64 1.65 1.67 1.68 1.70 1.72 1.73 1.75 1.76 1.78 1.80 1.81 1.83 1.84 1.86 1.88 1.89 1.91 1.92 1.94 1.96 1.97 1.99 2.00 2.02 2.04 2.05 2.07 2.08 2.10 2.12 2.13 2.15 2.16 2.18 2.20 2.21 2.23 2.24 2.26 2.28 2.29 2.31 2.32 2.34 2.36 2.37 2.39 2.40 2.42 2.44 2.45 2.47 2.48 2.50 2.52 2.53 2.55 2.56 2.58 2.60 2.61 2.63
Cycle Time DT CTdt 6.54 7.03 7.52 7.99 8.44 8.87 9.29 9.70 10.09 10.46 10.83 11.18 11.52 11.85 12.17 12.48 12.78 13.08 13.36 13.64 13.90 14.16 14.42 14.66 14.90 15.13 15.36 15.58 15.81 16.08 16.35 16.62 16.88 17.15 17.41 17.66 17.92 18.17 18.42 18.67 18.92 19.16 19.40 19.64 19.88 20.11 20.35 20.58 20.81 21.04 21.27 21.49 21.72 21.94 22.16 22.38 22.60 22.82 23.04 23.25 23.47 23.68 23.89 24.10 24.37 24.67 24.97 25.27 25.57 25.87 26.17 26.47 26.77 27.07 27.37 27.67 27.97 28.27 28.57 28.87 29.17 29.47 29.77 30.07 30.37 30.67 30.97 31.27 31.57 31.87 32.17 32.47 32.77 33.07 33.37 33.67 33.97 34.27 34.57 34.87 35.17 35.47 35.77 36.07 36.37 36.67 36.97 37.27 37.57 37.87 38.17 38.47 38.77 39.07 39.37
Trips per hour tph 6.88 6.40 5.98 5.63 5.33 5.07 4.84 4.64 4.46 4.30 4.16 4.02 3.91 3.80 3.70 3.60 3.52 3.44 3.37 3.30 3.24 3.18 3.12 3.07 3.02 2.97 2.93 2.89 2.85 2.80 2.75 2.71 2.67 2.62 2.59 2.55 2.51 2.48 2.44 2.41 2.38 2.35 2.32 2.29 2.26 2.24 2.21 2.19 2.16 2.14 2.12 2.09 2.07 2.05 2.03 2.01 1.99 1.97 1.95 1.94 1.92 1.90 1.88 1.87 1.85 1.82 1.80 1.78 1.76 1.74 1.72 1.70 1.68 1.66 1.64 1.63 1.61 1.59 1.58 1.56 1.54 1.53 1.51 1.50 1.48 1.47 1.45 1.44 1.43 1.41 1.40 1.39 1.37 1.36 1.35 1.34 1.32 1.31 1.30 1.29 1.28 1.27 1.26 1.25 1.24 1.23 1.22 1.21 1.20 1.19 1.18 1.17 1.16 1.15 1.14
Cycle Speed kph 9.17 10.24 11.17 12.02 12.80 13.52 14.21 14.85 15.47 16.06 16.62 17.17 17.71 18.22 18.73 19.23 19.71 20.19 20.66 21.12 21.58 22.03 22.48 22.92 23.35 23.79 24.22 24.64 25.06 25.37 25.69 25.99 26.30 26.59 26.89 27.17 27.46 27.74 28.01 28.28 28.55 28.81 29.07 29.33 29.58 29.83 30.08 30.32 30.56 30.80 31.03 31.26 31.49 31.72 31.94 32.17 32.39 32.60 32.82 33.03 33.24 33.45 33.65 33.86 33.98 34.05 34.13 34.20 34.26 34.33 34.39 34.46 34.52 34.58 34.64 34.70 34.76 34.81 34.87 34.92 34.97 35.02 35.07 35.12 35.17 35.22 35.26 35.31 35.35 35.40 35.44 35.48 35.52 35.56 35.60 35.64 35.68 35.72 35.76 35.79 35.83 35.86 35.90 35.93 35.97 36.00 36.03 36.06 36.10 36.13 36.16 36.19 36.22 36.25 36.27
OVERBURDEN REMOVAL
Dumptruck Model : HM400-1
DESCRIPTION UNIT ITEM 0.50 0.60 0.70 0.80 0.90 1.00 1.10 1.20 1.30 1.40 1.50 1.60 1.70 1.80 1.90 2.00 2.10 2.20 2.30 2.40 2.50 2.60 2.70 2.80 2.90 3.00 3.10 3.20 3.30 3.40 3.50 3.60 3.70 3.80 3.90 4.00 4.10 4.20 4.30 4.40 4.50 4.60 4.70 4.80 4.90 5.00 5.10 5.20 5.30 5.40 5.50 5.60 5.70 5.80 5.90 6.00 6.10 6.20 6.30 6.40 6.50 6.60 6.70 6.80 6.90 7.00 7.10 7.20 7.30 7.40 7.50 7.60 7.70 7.80 7.90 8.00 8.10 8.20 8.30 8.40 8.50 8.60 8.70 8.80 8.90 9.00 9.10 9.20 9.30 9.40 9.50 9.60 9.70 9.80 9.90 10.00 10.10 10.20 10.30 10.40 10.50 10.60 10.70 10.80 10.90 11.00 11.10 11.20 11.30 11.40 11.50 11.60 11.70 11.80 11.90
Hauling Distance km J 0.50 0.60 0.70 0.80 0.90 1.00 1.10 1.20 1.30 1.40 1.50 1.60 1.70 1.80 1.90 2.00 2.10 2.20 2.30 2.40 2.50 2.60 2.70 2.80 2.90 3.00 3.10 3.20 3.30 3.40 3.50 3.60 3.70 3.80 3.90 4.00 4.10 4.20 4.30 4.40 4.50 4.60 4.70 4.80 4.90 5.00 5.10 5.20 5.30 5.40 5.50 5.60 5.70 5.80 5.90 6.00 6.10 6.20 6.30 6.40 6.50 6.60 6.70 6.80 6.90 7.00 7.10 7.20 7.30 7.40 7.50 7.60 7.70 7.80 7.90 8.00 8.10 8.20 8.30 8.40 8.50 8.60 8.70 8.80 8.90 9.00 9.10 9.20 9.30 9.40 9.50 9.60 9.70 9.80 9.90 10.00 10.10 10.20 10.30 10.40 10.50 10.60 10.70 10.80 10.90 11.00 11.10 11.20 11.30 11.40 11.50 11.60 11.70 11.80 11.90
Unit Cost/bcm $/bcm 0.60 0.65 0.71 0.76 0.81 0.86 0.91 0.96 1.01 1.07 1.10 1.15 1.21 1.26 1.31 1.34 1.39 1.44 1.49 1.54 1.57 1.60 1.62 1.65 1.67 1.69 1.71 1.74 1.76 1.78 1.79 1.81 1.83 1.85 1.87 1.88 1.90 1.91 1.93 1.94 1.96 1.97 1.99 2.00 2.01 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.11 2.12 2.13 2.14 2.15 2.15 2.16 2.17 2.18 2.19 2.20 2.21 2.22 2.22 2.23 2.25 2.26 2.28 2.29 2.31 2.32 2.34 2.35 2.37 2.38 2.40 2.41 2.43 2.44 2.46 2.47 2.49 2.50 2.52 2.53 2.55 2.56 2.57 2.59 2.60 2.62 2.63 2.64 2.66 2.67 2.69 2.70 2.71 2.73 2.74 2.75 2.77 2.78 2.80 2.82 2.84 2.86 2.89 2.91 2.93 2.95 2.98 3.00
Hauling Productivity lcm/hr HP 125 115 106 99 92 88 83 78 74 70 68 65 62 60 57 56 54 52 50 49 48 47 46 46 45 44 44 43 43 42 42 41 41 41 40 40 40 39 39 39 38 38 38 38 37 37 37 37 36 36 36 36 36 35 35 35 35 35 35 35 34 34 34 34 34 34 34 33 33 33 33 32 32 32 32 32 31 31 31 31 31 31 30 30 30 30 30 29 29 29 29 29 29 29 28 28 28 28 28 28 27 27 27 27 27 27 27 26 26 26 26 26 25 25 25
bcm/hr HP 100 92 85 79 74 70 66 62 59 56 54 52 50 48 46 45 43 42 40 39 38 38 37 36 36 35 35 35 34 34 33 33 33 32 32 32 32 31 31 31 31 30 30 30 30 30 29 29 29 29 29 29 29 28 28 28 28 28 28 28 27 27 27 27 27 27 27 27 27 26 26 26 26 26 25 25 25 25 25 25 25 24 24 24 24 24 24 24 23 23 23 23 23 23 23 23 22 22 22 22 22 22 22 22 22 21 21 21 21 21 21 20 20 20 20
Payload capacity cum C 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22
Number of Cicle n 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0
Cicle Time Loader minutes Ct 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42
18 Loaded Truck Speed km/hour V1 14.4 14.4 14.4 14.4 14.4 14.7 14.7 14.7 14.7 14.7 15.0 15.0 15.0 15.0 15.0 15.3 15.3 15.3 15.3 15.3 15.6 15.8 16.1 16.4 16.7 17.0 17.3 17.6 17.9 18.1 18.4 18.7 19.0 19.3 19.6 19.9 20.2 20.4 20.7 21.0 21.3 21.6 21.9 22.2 22.5 22.8 23.0 23.3 23.6 23.9 24.2 24.5 24.8 25.1 25.3 25.6 25.9 26.2 26.5 26.8 27.1 27.4 27.6 27.9 28.2 28.5 28.8 29.1 29.4 29.7 30.0 30.2 30.5 30.8 31.1 31.4 31.7 32.0 32.3 32.5 32.8 33.1 33.4 33.7 34.0 34.3 34.6 34.8 35.1 35.4 35.7 36.0 36.3 36.6 36.9 37.2 37.4 37.7 38.0 38.3 38.6 38.9 39.2 39.5 39.7 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0
25 Empty Truck Speed km/hour V2 20.0 20.0 20.0 20.0 20.0 20.4 20.4 20.4 20.4 20.4 20.8 20.8 20.8 20.8 20.8 21.2 21.2 21.2 21.2 21.2 21.6 22.0 22.4 22.8 23.2 23.6 24.0 24.4 24.8 25.2 25.6 26.0 26.4 26.8 27.2 27.6 28.0 28.4 28.8 29.2 29.6 30.0 30.4 30.8 31.2 31.6 32.0 32.4 32.8 33.2 33.6 34.0 34.4 34.8 35.2 35.6 36.0 36.4 36.8 37.2 37.6 38.0 38.4 38.8 39.2 39.6 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0
40 Dumping Time minutes T1 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
Positioned Time minutes T2 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Job Efficiency 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75
- Speed Factor 0.8 0.80 0.80 0.80 0.80 0.82 0.82 0.82 0.82 0.82 0.83 0.83 0.83 0.83 0.83 0.85 0.85 0.85 0.85 0.85 0.86 0.88 0.90 0.91 0.93 0.94 0.96 0.98 0.99 1.01 1.02 1.04 1.06 1.07 1.09 1.10 1.12 1.14 1.15 1.17 1.18 1.20 1.22 1.23 1.25 1.26 1.28 1.30 1.31 1.33 1.34 1.36 1.38 1.39 1.41 1.42 1.44 1.46 1.47 1.49 1.50 1.52 1.54 1.55 1.57 1.58 1.60 1.62 1.63 1.65 1.66 1.68 1.70 1.71 1.73 1.74 1.76 1.78 1.79 1.81 1.82 1.84 1.86 1.87 1.89 1.90 1.92 1.94 1.95 1.97 1.98 2.00 2.02 2.03 2.05 2.06 2.08 2.10 2.11 2.13 2.14 2.16 2.18 2.19 2.21 2.22 2.24 2.26 2.27 2.29 2.30 2.32 2.34 2.35 2.37
Cycle Time DT CTdt 8.00 8.72 9.43 10.15 10.87 11.44 12.15 12.85 13.55 14.25 14.75 15.44 16.13 16.82 17.51 17.94 18.61 19.29 19.97 20.64 21.01 21.36 21.69 22.02 22.33 22.64 22.93 23.21 23.49 23.76 24.01 24.26 24.51 24.74 24.97 25.19 25.40 25.61 25.82 26.01 26.21 26.39 26.58 26.75 26.93 27.10 27.26 27.42 27.58 27.73 27.88 28.02 28.17 28.31 28.44 28.57 28.70 28.83 28.95 29.08 29.20 29.31 29.43 29.54 29.65 29.75 29.86 30.07 30.28 30.48 30.69 30.90 31.10 31.30 31.51 31.71 31.91 32.11 32.31 32.50 32.70 32.90 33.09 33.29 33.48 33.67 33.87 34.06 34.25 34.44 34.63 34.82 35.01 35.19 35.38 35.57 35.75 35.94 36.12 36.31 36.49 36.67 36.86 37.04 37.22 37.42 37.72 38.02 38.32 38.62 38.92 39.22 39.52 39.82 40.12
Trips per hour tph 5.63 5.16 4.77 4.43 4.14 3.93 3.71 3.50 3.32 3.16 3.05 2.91 2.79 2.68 2.57 2.51 2.42 2.33 2.25 2.18 2.14 2.11 2.07 2.04 2.01 1.99 1.96 1.94 1.92 1.89 1.87 1.85 1.84 1.82 1.80 1.79 1.77 1.76 1.74 1.73 1.72 1.70 1.69 1.68 1.67 1.66 1.65 1.64 1.63 1.62 1.61 1.61 1.60 1.59 1.58 1.57 1.57 1.56 1.55 1.55 1.54 1.54 1.53 1.52 1.52 1.51 1.51 1.50 1.49 1.48 1.47 1.46 1.45 1.44 1.43 1.42 1.41 1.40 1.39 1.38 1.38 1.37 1.36 1.35 1.34 1.34 1.33 1.32 1.31 1.31 1.30 1.29 1.29 1.28 1.27 1.27 1.26 1.25 1.25 1.24 1.23 1.23 1.22 1.21 1.21 1.20 1.19 1.18 1.17 1.17 1.16 1.15 1.14 1.13 1.12
Cycle Speed kph 7.50 8.26 8.90 9.46 9.94 10.49 10.87 11.21 11.51 11.79 12.20 12.43 12.65 12.84 13.02 13.38 13.54 13.69 13.82 13.95 14.28 14.61 14.94 15.26 15.58 15.90 16.22 16.54 16.86 17.18 17.49 17.81 18.12 18.43 18.74 19.06 19.37 19.68 19.99 20.30 20.61 20.91 21.22 21.53 21.84 22.14 22.45 22.76 23.06 23.37 23.67 23.98 24.28 24.59 24.89 25.20 25.50 25.81 26.11 26.41 26.72 27.02 27.32 27.63 27.93 28.23 28.53 28.73 28.93 29.13 29.32 29.52 29.71 29.90 30.09 30.28 30.46 30.65 30.83 31.01 31.19 31.37 31.55 31.72 31.90 32.07 32.25 32.42 32.59 32.75 32.92 33.09 33.25 33.42 33.58 33.74 33.90 34.06 34.22 34.37 34.53 34.68 34.84 34.99 35.14 35.28 35.32 35.35 35.39 35.43 35.46 35.50 35.53 35.56 35.60
OVERBURDEN REMOVAL
Dumptruck Model : 0
DESCRIPTION UNIT ITEM 0.50 0.60 0.70 0.80 0.90 1.00 1.10 1.20 1.30 1.40 1.50 1.60 1.70 1.80 1.90 2.00 2.10 2.20 2.30 2.40 2.50 2.60 2.70 2.80 2.90 3.00 3.10 3.20 3.30 3.40 3.50 3.60 3.70 3.80 3.90 4.00 4.10 4.20 4.30 4.40 4.50 4.60 4.70 4.80 4.90 5.00 5.10 5.20 5.30 5.40 5.50 5.60 5.70 5.80 5.90 6.00 6.10 6.20 6.30 6.40 6.50 6.60 6.70 6.80 6.90 7.00 7.10 7.20 7.30 7.40 7.50 7.60 7.70 7.80 7.90 8.00 8.10 8.20 8.30 8.40 8.50 8.60 8.70 8.80 8.90 9.00 9.10 9.20 9.30 9.40 9.50 9.60 9.70 9.80 9.90 10.00 10.10 10.20 10.30 10.40 10.50 10.60 10.70 10.80 10.90 11.00 11.10 11.20 11.30 11.40 11.50 11.60 11.70 11.80 11.90
Hauling Distance km J 0.50 0.60 0.70 0.80 0.90 1.00 1.10 1.20 1.30 1.40 1.50 1.60 1.70 1.80 1.90 2.00 2.10 2.20 2.30 2.40 2.50 2.60 2.70 2.80 2.90 3.00 3.10 3.20 3.30 3.40 3.50 3.60 3.70 3.80 3.90 4.00 4.10 4.20 4.30 4.40 4.50 4.60 4.70 4.80 4.90 5.00 5.10 5.20 5.30 5.40 5.50 5.60 5.70 5.80 5.90 6.00 6.10 6.20 6.30 6.40 6.50 6.60 6.70 6.80 6.90 7.00 7.10 7.20 7.30 7.40 7.50 7.60 7.70 7.80 7.90 8.00 8.10 8.20 8.30 8.40 8.50 8.60 8.70 8.80 8.90 9.00 9.10 9.20 9.30 9.40 9.50 9.60 9.70 9.80 9.90 10.00 10.10 10.20 10.30 10.40 10.50 10.60 10.70 10.80 10.90 11.00 11.10 11.20 11.30 11.40 11.50 11.60 11.70 11.80 11.90
Unit Cost/bcm $/bcm #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Hauling Productivity lcm/hr HP #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
bcm/hr HP #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Payload capacity cum C #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Number of Cicle n #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Cicle Time Loader minutes Ct 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42
#N/A Loaded Truck Speed km/hour V1 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A Empty Truck Speed km/hour V2 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A Dumping Time minutes T1 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Positioned Time minutes T2 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Job Efficiency #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
- Speed Factor #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Cycle Time DT CTdt #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Trips per hour tph #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Cycle Speed kph #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
DESCRIPTION UNIT ITEM 1.00 1.10 1.20 1.30 1.40 1.50 1.60 1.70 1.80 1.90 2.00 2.10 2.20 2.30 2.40 2.50 2.60 2.70 2.80 2.90 3.00 3.10 3.20 3.30 3.40 3.50 3.60 3.70 3.80 3.90 4.00 4.10 4.20 4.30 4.40 4.50 4.60 4.70 4.80 4.90 5.00 5.10 5.20 5.30 5.40 5.50 5.60 5.70 5.80 5.90 6.00 6.10 6.20 6.30 6.40 6.50 6.60 6.70 6.80 6.90 7.00 7.10 7.20 7.30 7.40 7.50 7.60 7.70 7.80 7.90 8.00 8.10 8.20 8.30 8.40 8.50 8.60 8.70 8.80 8.90 9.00 9.10 9.20 9.30 9.40 9.50 9.60 9.70 9.80 9.90 10.00 10.10 10.20 10.30 10.40 10.50 10.60 10.70 10.80 10.90 11.00 11.10 11.20 11.30 11.40 11.50 11.60 11.70 11.80 11.90 12.00 12.10 12.20 12.30 12.40
Hauling Distance km J 1.00 1.10 1.20 1.30 1.40 1.50 1.60 1.70 1.80 1.90 2.00 2.10 2.20 2.30 2.40 2.50 2.60 2.70 2.80 2.90 3.00 3.10 3.20 3.30 3.40 3.50 3.60 3.70 3.80 3.90 4.00 4.10 4.20 4.30 4.40 4.50 4.60 4.70 4.80 4.90 5.00 5.10 5.20 5.30 5.40 5.50 5.60 5.70 5.80 5.90 6.00 6.10 6.20 6.30 6.40 6.50 6.60 6.70 6.80 6.90 7.00 7.10 7.20 7.30 7.40 7.50 7.60 7.70 7.80 7.90 8.00 8.10 8.20 8.30 8.40 8.50 8.60 8.70 8.80 8.90 9.00 9.10 9.20 9.30 9.40 9.50 9.60 9.70 9.80 9.90 10.00 10.10 10.20 10.30 10.40 10.50 10.60 10.70 10.80 10.90 11.00 11.10 11.20 11.30 11.40 11.50 11.60 11.70 11.80 11.90 12.00 12.10 12.20 12.30 12.40
Unit Cost/bcm $/bcm 0.35 0.36 0.38 0.39 0.41 0.41 0.43 0.44 0.46 0.47 0.48 0.49 0.51 0.52 0.54 0.54 0.56 0.57 0.58 0.60 0.60 0.62 0.63 0.64 0.66 0.66 0.67 0.69 0.70 0.71 0.71 0.73 0.74 0.75 0.77 0.77 0.78 0.79 0.80 0.82 0.82 0.83 0.84 0.85 0.87 0.86 0.88 0.89 0.90 0.91 0.91 0.92 0.93 0.95 0.96 0.95 0.97 0.98 0.99 1.00 1.00 1.01 1.02 1.03 1.04 1.04 1.05 1.06 1.07 1.08 1.08 1.09 1.10 1.11 1.12 1.11 1.13 1.14 1.15 1.16 1.15 1.16 1.17 1.18 1.19 1.19 1.20 1.21 1.22 1.23 1.22 1.23 1.24 1.25 1.26 1.25 1.26 1.27 1.28 1.29 1.29 1.30 1.31 1.32 1.33 1.32 1.33 1.34 1.35 1.36 1.35 1.36 1.37 1.38 1.38
Hauling Productivity lcm/hr HP 98 94 91 87 84 82 79 77 74 72 71 69 67 65 63 62.68 61 60 58 57 56 55 54 52.92 51.83 51.59 50.58 49.61 49 48 48 47 46 45 44 44 44 43 42 42 42 41 40 40 39 39 39 38 38 37 37 37 36 36 36 36 35 34.8 34.4 34.0 34.1 34 33 33 33 33 32 32 32 31 32 31 31 31 30 31 30 30 30 29 30 29 29 29 28 29 28 28 28 28 28 28 27 27 27 27 27 27 26 26 26 26 26 26 26 26 26 25 25 25 25 25 25 25 25
tonnes/hr HP 98 94 91 87 84 82 79 77 74 72 71 69 67 65 63 62.68 61 60 58 57 56 55 54 52.92 51.83 51.59 50.58 49.61 49 48 48 47 46 45 44 44 44 43 42 42 42 41 40 40 39 39 39 38 38 37 37 37 36 36 36 36 35 34.8 34.4 34.0 34.1 34 33 33 33 33 32 32 32 31 32 31 31 31 30 31 30 30 30 29 30 29 29 29 28 29 28 28 28 28 28 28 27 27 27 27 27 27 26 26 26 26 26 26 26 26 26 25 25 25 25 25 25 25 25
Payload capacity cum C 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30
Number of Cicle n 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0
Cicle Time Loader minutes Ct 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33
20 Loaded Truck Speed km/hour V1 16.0 16.0 16.0 16.0 16.0 16.4 16.4 16.4 16.4 16.4 16.8 16.8 16.8 16.8 16.8 17.2 17.2 17.2 17.2 17.2 17.6 17.6 17.6 17.6 17.6 18.0 18.0 18.0 18.0 18.0 18.4 18.4 18.4 18.4 18.4 18.8 18.8 18.8 18.8 18.8 19.2 19.2 19.2 19.2 19.2 19.6 19.6 19.6 19.6 19.6 20.0 20.0 20.0 20.0 20.0 20.4 20.4 20.4 20.4 20.4 20.8 20.8 20.8 20.8 20.8 21.2 21.2 21.2 21.2 21.2 21.6 21.6 21.6 21.6 21.6 22.0 22.0 22.0 22.0 22.0 22.4 22.4 22.4 22.4 22.4 22.8 22.8 22.8 22.8 22.8 23.2 23.2 23.2 23.2 23.2 23.6 23.6 23.6 23.6 23.6 24.0 24.0 24.0 24.0 24.0 24.4 24.4 24.4 24.4 24.4 24.8 24.8 24.8 24.8 24.8
35 Empty Truck Speed km/hour V2 28.0 28.0 28.0 28.0 28.0 28.7 28.7 28.7 28.7 28.7 29.4 29.4 29.4 29.4 29.4 30.1 30.1 30.1 30.1 30.1 30.8 30.8 30.8 30.8 30.8 31.5 31.5 31.5 31.5 31.5 32.2 32.2 32.2 32.2 32.2 32.9 32.9 32.9 32.9 32.9 33.6 33.6 33.6 33.6 33.6 34.3 34.3 34.3 34.3 34.3 35.0 35.0 35.0 35.0 35.0 35.7 35.7 35.7 35.7 35.7 36.4 36.4 36.4 36.4 36.4 37.1 37.1 37.1 37.1 37.1 37.8 37.8 37.8 37.8 37.8 38.5 38.5 38.5 38.5 38.5 39.2 39.2 39.2 39.2 39.2 39.9 39.9 39.9 39.9 39.9 40.6 40.6 40.6 40.6 40.6 41.3 41.3 41.3 41.3 41.3 42.0 42.0 42.0 42.0 42.0 42.7 42.7 42.7 42.7 42.7 43.4 43.4 43.4 43.4 43.4
60 Dumping Time minutes T1 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
Positioned Time minutes T2 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Job Efficiency 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75
- Speed Factor 0.8 0.80 0.80 0.80 0.80 0.82 0.82 0.82 0.82 0.82 0.84 0.84 0.84 0.84 0.84 0.86 0.86 0.86 0.86 0.86 0.88 0.88 0.88 0.88 0.88 0.90 0.90 0.90 0.90 0.90 0.92 0.92 0.92 0.92 0.92 0.94 0.94 0.94 0.94 0.94 0.96 0.96 0.96 0.96 0.96 0.98 0.98 0.98 0.98 0.98 1.00 1.00 1.00 1.00 1.00 1.02 1.02 1.02 1.02 1.02 1.04 1.04 1.04 1.04 1.04 1.06 1.06 1.06 1.06 1.06 1.08 1.08 1.08 1.08 1.08 1.10 1.10 1.10 1.10 1.10 1.12 1.12 1.12 1.12 1.12 1.14 1.14 1.14 1.14 1.14 1.16 1.16 1.16 1.16 1.16 1.18 1.18 1.18 1.18 1.18 1.20 1.20 1.20 1.20 1.20 1.22 1.22 1.22 1.22 1.22 1.24 1.24 1.24 1.24 1.24
Cycle Time DT CTdt 13.73 14.32 14.90 15.49 16.08 16.46 17.03 17.61 18.18 18.76 19.06 19.62 20.18 20.74 21.30 21.54 22.09 22.63 23.18 23.73 23.90 24.44 24.98 25.51 26.05 26.17 26.69 27.21 27.74 28.26 28.33 28.84 29.36 29.87 30.38 30.40 30.90 31.40 31.91 32.41 32.39 32.88 33.37 33.86 34.35 34.29 34.77 35.25 35.73 36.22 36.12 36.59 37.06 37.53 38.00 37.88 38.34 38.80 39.26 39.72 39.56 40.02 40.47 40.92 41.38 41.19 41.63 42.08 42.52 42.97 42.75 43.19 43.63 44.06 44.50 44.26 44.69 45.12 45.55 45.98 45.72 46.14 46.56 46.98 47.40 47.12 47.53 47.95 48.36 48.77 48.47 48.88 49.29 49.69 50.10 49.78 50.18 50.58 50.98 51.38 51.05 51.44 51.83 52.23 52.62 52.27 52.66 53.04 53.43 53.82 53.46 53.84 54.22 54.60 54.98
Trips per hour tph 3.28 3.14 3.02 2.90 2.80 2.73 2.64 2.56 2.48 2.40 2.36 2.29 2.23 2.17 2.11 2.09 2.04 1.99 1.94 1.90 1.88 1.84 1.80 1.76 1.73 1.72 1.69 1.65 1.62 1.59 1.59 1.56 1.53 1.51 1.48 1.48 1.46 1.43 1.41 1.39 1.39 1.37 1.35 1.33 1.31 1.31 1.29 1.28 1.26 1.24 1.25 1.23 1.21 1.20 1.18 1.19 1.17 1.16 1.15 1.13 1.14 1.12 1.11 1.10 1.09 1.09 1.08 1.07 1.06 1.05 1.05 1.04 1.03 1.02 1.01 1.02 1.01 1.00 0.99 0.98 0.98 0.98 0.97 0.96 0.95 0.96 0.95 0.94 0.93 0.92 0.93 0.92 0.91 0.91 0.90 0.90 0.90 0.89 0.88 0.88 0.88 0.87 0.87 0.86 0.86 0.86 0.85 0.85 0.84 0.84 0.84 0.84 0.83 0.82 0.82
Cycle Speed kph 8.74 9.22 9.66 10.07 10.45 10.94 11.27 11.59 11.88 12.16 12.59 12.84 13.08 13.31 13.52 13.93 14.13 14.31 14.49 14.66 15.06 15.22 15.37 15.52 15.66 16.05 16.19 16.31 16.44 16.56 16.94 17.06 17.17 17.28 17.38 17.76 17.86 17.96 18.05 18.14 18.53 18.61 18.70 18.78 18.86 19.25 19.33 19.40 19.48 19.55 19.93 20.01 20.07 20.14 20.21 20.59 20.66 20.72 20.78 20.84 21.23 21.29 21.35 21.41 21.46 21.85 21.91 21.96 22.01 22.06 22.45 22.50 22.55 22.60 22.65 23.04 23.09 23.14 23.18 23.23 23.62 23.67 23.71 23.76 23.80 24.19 24.24 24.28 24.32 24.36 24.76 24.80 24.83 24.87 24.91 25.31 25.35 25.38 25.42 25.46 25.86 25.89 25.93 25.96 26.00 26.40 26.43 26.47 26.50 26.53 26.94 26.97 27.00 27.03 27.07
COAL WINNING
DESCRIPTION UNIT ITEM 1.00 1.10 1.20 1.30 1.40 1.50 1.60 1.70 1.80 1.90 2.00 2.10 2.20 2.30 2.40 2.50 2.60 2.70 2.80 2.90 3.00 3.10 3.20 3.30 3.40 3.50 3.60 3.70 3.80 3.90 4.00 4.10 4.20 4.30 4.40 4.50 4.60 4.70 4.80 4.90 5.00 5.10 5.20 5.30 5.40 5.50 5.60 5.70 5.80 5.90 6.00 6.10 6.20 6.30 6.40 6.50 6.60 6.70 6.80 6.90 7.00 7.10 7.20 7.30 7.40 7.50 7.60 7.70 7.80 7.90 8.00 8.10 8.20 8.30 8.40 8.50 8.60 8.70 8.80 8.90 9.00 9.10 9.20 9.30 9.40 9.50 9.60 9.70 9.80 9.90 10.00 10.10 10.20 10.30 10.40 10.50 10.60 10.70 10.80 10.90 11.00 11.10 11.20 11.30 11.40 11.50 11.60 11.70 11.80 11.90 12.00 12.10 12.20 12.30 12.40
COAL WINNING
DESCRIPTION UNIT ITEM 1.00 1.10 1.20 1.30 1.40 1.50 1.60 1.70 1.80 1.90 2.00 2.10 2.20 2.30 2.40 2.50 2.60 2.70 2.80 2.90 3.00 3.10 3.20 3.30 3.40 3.50 3.60 3.70 3.80 3.90 4.00 4.10 4.20 4.30 4.40 4.50 4.60 4.70 4.80 4.90 5.00 5.10 5.20 5.30 5.40 5.50 5.60 5.70 5.80 5.90 6.00 6.10 6.20 6.30 6.40 6.50 6.60 6.70 6.80 6.90 7.00 7.10 7.20 7.30 7.40 7.50 7.60 7.70 7.80 7.90 8.00 8.10 8.20 8.30 8.40 8.50 8.60 8.70 8.80 8.90 9.00 9.10 9.20 9.30 9.40 9.50 9.60 9.70 9.80 9.90 10.00 10.10 10.20 10.30 10.40 10.50 10.60 10.70 10.80 10.90 11.00 11.10 11.20 11.30 11.40 11.50 11.60 11.70 11.80 11.90 12.00 12.10 12.20 12.30 12.40
Hauling Distance km J 1.00 1.10 1.20 1.30 1.40 1.50 1.60 1.70 1.80 1.90 2.00 2.10 2.20 2.30 2.40 2.50 2.60 2.70 2.80 2.90 3.00 3.10 3.20 3.30 3.40 3.50 3.60 3.70 3.80 3.90 4.00 4.10 4.20 4.30 4.40 4.50 4.60 4.70 4.80 4.90 5.00 5.10 5.20 5.30 5.40 5.50 5.60 5.70 5.80 5.90 6.00 6.10 6.20 6.30 6.40 6.50 6.60 6.70 6.80 6.90 7.00 7.10 7.20 7.30 7.40 7.50 7.60 7.70 7.80 7.90 8.00 8.10 8.20 8.30 8.40 8.50 8.60 8.70 8.80 8.90 9.00 9.10 9.20 9.30 9.40 9.50 9.60 9.70 9.80 9.90 10.00 10.10 10.20 10.30 10.40 10.50 10.60 10.70 10.80 10.90 11.00 11.10 11.20 11.30 11.40 11.50 11.60 11.70 11.80 11.90 12.00 12.10 12.20 12.30 12.40
Unit Cost/bcm $/bcm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hauling Productivity lcm/hr HP 58 55 53 51 49 47 46 44 43 41 40 39 38 37 36 36 35 34 33 32 32 31 30 30 29 29 28 28 27 27 27 26 26 25 25 25 24 24 23 23 23 23 22 22 22 22 21 21 21 21 21 20 20 20 20 20 19 19 19 19 19 19 18 18 18 18 18 18 17 17 17 17 17 17 17 17 17 16 16 16 16 16 16 16 16 16 16 15 15 15 15 15 15 15 15 15 15 15 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 13
tonnes/hr HP 58 55 53 51 49 47 46 44 43 41 40 39 38 37 36 36 35 34 33 32 32 31 30 30 29 29 28 28 27 27 27 26 26 25 25 25 24 24 23 23 23 23 22 22 22 22 21 21 21 21 21 20 20 20 20 20 19 19 19 19 19 19 18 18 18 18 18 18 17 17 17 17 17 17 17 17 17 16 16 16 16 16 16 16 16 16 16 15 15 15 15 15 15 15 15 15 15 15 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 13
Payload capacity cum C 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16
Number of Cicle n 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0
Cicle Time Loader minutes Ct 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27
20 Loaded Truck Speed km/hour V1 16.0 16.0 16.0 16.0 16.0 16.4 16.4 16.4 16.4 16.4 16.8 16.8 16.8 16.8 16.8 17.2 17.2 17.2 17.2 17.2 17.6 17.6 17.6 17.6 17.6 18.0 18.0 18.0 18.0 18.0 18.4 18.4 18.4 18.4 18.4 18.8 18.8 18.8 18.8 18.8 19.2 19.2 19.2 19.2 19.2 19.6 19.6 19.6 19.6 19.6 20.0 20.0 20.0 20.0 20.0 20.4 20.4 20.4 20.4 20.4 20.8 20.8 20.8 20.8 20.8 21.2 21.2 21.2 21.2 21.2 21.6 21.6 21.6 21.6 21.6 22.0 22.0 22.0 22.0 22.0 22.4 22.4 22.4 22.4 22.4 22.8 22.8 22.8 22.8 22.8 23.2 23.2 23.2 23.2 23.2 23.6 23.6 23.6 23.6 23.6 24.0 24.0 24.0 24.0 24.0 24.4 24.4 24.4 24.4 24.4 24.8 24.8 24.8 24.8 24.8
35 Empty Truck Speed km/hour V2 28.0 28.0 28.0 28.0 28.0 28.7 28.7 28.7 28.7 28.7 29.4 29.4 29.4 29.4 29.4 30.1 30.1 30.1 30.1 30.1 30.8 30.8 30.8 30.8 30.8 31.5 31.5 31.5 31.5 31.5 32.2 32.2 32.2 32.2 32.2 32.9 32.9 32.9 32.9 32.9 33.6 33.6 33.6 33.6 33.6 34.3 34.3 34.3 34.3 34.3 35.0 35.0 35.0 35.0 35.0 35.7 35.7 35.7 35.7 35.7 36.4 36.4 36.4 36.4 36.4 37.1 37.1 37.1 37.1 37.1 37.8 37.8 37.8 37.8 37.8 38.5 38.5 38.5 38.5 38.5 39.2 39.2 39.2 39.2 39.2 39.9 39.9 39.9 39.9 39.9 40.6 40.6 40.6 40.6 40.6 41.3 41.3 41.3 41.3 41.3 42.0 42.0 42.0 42.0 42.0 42.7 42.7 42.7 42.7 42.7 43.4 43.4 43.4 43.4 43.4
60 Dumping Time minutes T1 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
Positioned Time minutes T2 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Job Efficiency 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75
- Speed Factor 0.8 0.80 0.80 0.80 0.80 0.82 0.82 0.82 0.82 0.82 0.84 0.84 0.84 0.84 0.84 0.86 0.86 0.86 0.86 0.86 0.88 0.88 0.88 0.88 0.88 0.90 0.90 0.90 0.90 0.90 0.92 0.92 0.92 0.92 0.92 0.94 0.94 0.94 0.94 0.94 0.96 0.96 0.96 0.96 0.96 0.98 0.98 0.98 0.98 0.98 1.00 1.00 1.00 1.00 1.00 1.02 1.02 1.02 1.02 1.02 1.04 1.04 1.04 1.04 1.04 1.06 1.06 1.06 1.06 1.06 1.08 1.08 1.08 1.08 1.08 1.10 1.10 1.10 1.10 1.10 1.12 1.12 1.12 1.12 1.12 1.14 1.14 1.14 1.14 1.14 1.16 1.16 1.16 1.16 1.16 1.18 1.18 1.18 1.18 1.18 1.20 1.20 1.20 1.20 1.20 1.22 1.22 1.22 1.22 1.22 1.24 1.24 1.24 1.24 1.24
Cycle Time DT CTdt 12.46 13.05 13.64 14.23 14.82 15.19 15.77 16.34 16.92 17.49 17.79 18.35 18.91 19.47 20.04 20.27 20.82 21.37 21.92 22.46 22.64 23.17 23.71 24.25 24.78 24.90 25.42 25.95 26.47 27.00 27.06 27.58 28.09 28.60 29.11 29.14 29.64 30.14 30.64 31.14 31.12 31.61 32.10 32.59 33.08 33.02 33.51 33.99 34.47 34.95 34.85 35.32 35.80 36.27 36.74 36.61 37.07 37.53 38.00 38.46 38.30 38.75 39.20 39.66 40.11 39.92 40.37 40.81 41.26 41.70 41.49 41.92 42.36 42.80 43.23 43.00 43.42 43.85 44.28 44.71 44.45 44.87 45.29 45.71 46.13 45.85 46.27 46.68 47.09 47.51 47.21 47.61 48.02 48.43 48.83 48.52 48.92 49.31 49.71 50.11 49.78 50.17 50.57 50.96 51.35 51.00 51.39 51.78 52.16 52.55 52.19 52.57 52.95 53.33 53.71
Trips per hour tph 3.61 3.45 3.30 3.16 3.04 2.96 2.85 2.75 2.66 2.57 2.53 2.45 2.38 2.31 2.25 2.22 2.16 2.11 2.05 2.00 1.99 1.94 1.90 1.86 1.82 1.81 1.77 1.73 1.70 1.67 1.66 1.63 1.60 1.57 1.55 1.54 1.52 1.49 1.47 1.45 1.45 1.42 1.40 1.38 1.36 1.36 1.34 1.32 1.31 1.29 1.29 1.27 1.26 1.24 1.22 1.23 1.21 1.20 1.18 1.17 1.18 1.16 1.15 1.13 1.12 1.13 1.11 1.10 1.09 1.08 1.08 1.07 1.06 1.05 1.04 1.05 1.04 1.03 1.02 1.01 1.01 1.00 0.99 0.98 0.98 0.98 0.97 0.96 0.96 0.95 0.95 0.95 0.94 0.93 0.92 0.93 0.92 0.91 0.91 0.90 0.90 0.90 0.89 0.88 0.88 0.88 0.88 0.87 0.86 0.86 0.86 0.86 0.85 0.84 0.84
Cycle Speed kph 9.63 10.12 10.56 10.96 11.34 11.85 12.18 12.48 12.77 13.04 13.49 13.73 13.96 14.17 14.37 14.80 14.99 15.16 15.33 15.49 15.90 16.05 16.20 16.33 16.46 16.87 16.99 17.11 17.23 17.34 17.74 17.84 17.94 18.04 18.14 18.53 18.63 18.71 18.80 18.88 19.28 19.36 19.44 19.51 19.59 19.99 20.06 20.13 20.19 20.26 20.66 20.72 20.78 20.85 20.90 21.31 21.36 21.42 21.48 21.53 21.93 21.99 22.04 22.09 22.14 22.54 22.59 22.64 22.69 22.73 23.14 23.18 23.23 23.27 23.32 23.72 23.77 23.81 23.85 23.89 24.30 24.34 24.38 24.41 24.45 24.86 24.90 24.94 24.97 25.01 25.42 25.45 25.49 25.52 25.56 25.97 26.00 26.04 26.07 26.10 26.52 26.55 26.58 26.61 26.64 27.06 27.09 27.12 27.15 27.17 27.59 27.62 27.65 27.68 27.70
DESCRIPTION UNIT ITEM 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00 21.00 22.00 23.00 24.00 25.00 26.00 27.00 28.00 29.00 30.00 31.00 32.00 33.00 34.00 35.00 36.00 37.00 38.00 39.00 40.00 41.00 42.00 43.00 44.00 45.00 46.00 47.00 48.00 49.00 50.00 51.00 52.00 53.00 54.00 55.00 56.00 57.00 58.00 59.00 60.00 61.00 62.00 63.00 64.00 65.00 66.00 67.00 68.00 69.00 70.00 71.00 72.00 73.00 74.00 75.00 76.00 77.00 78.00 79.00 80.00 81.00 82.00 83.00 84.00 85.00 86.00 87.00 88.00 89.00 90.00 91.00 92.00 93.00 94.00 95.00 96.00 97.00 98.00 99.00 100.00 101.00 102.00 103.00 104.00 105.00 106.00 107.00 108.00 109.00 110.00 111.00 112.00 113.00 114.00 115.00
Hauling Distance km J 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00 21.00 22.00 23.00 24.00 25.00 26.00 27.00 28.00 29.00 30.00 31.00 32.00 33.00 34.00 35.00 36.00 37.00 38.00 39.00 40.00 41.00 42.00 43.00 44.00 45.00 46.00 47.00 48.00 49.00 50.00 51.00 52.00 53.00 54.00 55.00 56.00 57.00 58.00 59.00 60.00 61.00 62.00 63.00 64.00 65.00 66.00 67.00 68.00 69.00 70.00 71.00 72.00 73.00 74.00 75.00 76.00 77.00 78.00 79.00 80.00 81.00 82.00 83.00 84.00 85.00 86.00 87.00 88.00 89.00 90.00 91.00 92.00 93.00 94.00 95.00 96.00 97.00 98.00 99.00 100.00 101.00 102.00 103.00 104.00 105.00 106.00 107.00 108.00 109.00 110.00 111.00 112.00 113.00 114.00 115.00
Unit Cost/bcm $/bcm Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Hauling Productivity lcm/hr HP Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
tonnes/hr HP Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Payload capacity cum C Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Number of Cicle n Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Cicle Time Loader minutes Ct Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
### Loaded Truck Speed km/hour V1 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
### Empty Truck Speed km/hour V2 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
### Dumping Time minutes T1 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Positioned Time minutes T2 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Job Efficiency Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Speed Factor Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Cycle Time DT CTdt Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Trips per hour tph Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Cycle Speed kph Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
COAL TRANSPORTING
DESCRIPTION UNIT ITEM 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00 21.00 22.00 23.00 24.00 25.00 26.00 27.00 28.00 29.00 30.00 31.00 32.00 33.00 34.00 35.00 36.00 37.00 38.00 39.00 40.00 41.00 42.00 43.00 44.00 45.00 46.00 47.00 48.00 49.00 50.00 51.00 52.00 53.00 54.00 55.00 56.00 57.00 58.00 59.00 60.00 61.00 62.00 63.00 64.00 65.00 66.00 67.00 68.00 69.00 70.00 71.00 72.00 73.00 74.00 75.00 76.00 77.00 78.00 79.00 80.00 81.00 82.00 83.00 84.00 85.00 86.00 87.00 88.00 89.00 90.00 91.00 92.00 93.00 94.00 95.00 96.00 97.00 98.00 99.00 100.00 101.00 102.00 103.00 104.00 105.00 106.00 107.00 108.00 109.00 110.00 111.00 112.00 113.00 114.00 115.00
Hauling Distance km J 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00 21.00 22.00 23.00 24.00 25.00 26.00 27.00 28.00 29.00 30.00 31.00 32.00 33.00 34.00 35.00 36.00 37.00 38.00 39.00 40.00 41.00 42.00 43.00 44.00 45.00 46.00 47.00 48.00 49.00 50.00 51.00 52.00 53.00 54.00 55.00 56.00 57.00 58.00 59.00 60.00 61.00 62.00 63.00 64.00 65.00 66.00 67.00 68.00 69.00 70.00 71.00 72.00 73.00 74.00 75.00 76.00 77.00 78.00 79.00 80.00 81.00 82.00 83.00 84.00 85.00 86.00 87.00 88.00 89.00 90.00 91.00 92.00 93.00 94.00 95.00 96.00 97.00 98.00 99.00 100.00 101.00 102.00 103.00 104.00 105.00 106.00 107.00 108.00 109.00 110.00 111.00 112.00 113.00 114.00 115.00
Unit Cost/bcm $/bcm Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Hauling Productivity lcm/hr HP Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
tonnes/hr HP Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Payload capacity cum C Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Number of Cicle n Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Cicle Time Loader minutes Ct Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
### Loaded Truck Speed km/hour V1 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
### Empty Truck Speed km/hour V2 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
### Dumping Time minutes T1 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Positioned Time minutes T2 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Job Efficiency Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Speed Factor Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Cycle Time DT CTdt Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Trips per hour tph Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Cycle Speed kph Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
12.00 12.10 12.20
12.50 12.60 12.70 12.80 12.90 13.00 13.10 13.20 13.30 13.40 13.50 13.60 13.70 13.80 13.90 14.00 14.10 14.20 14.30 14.40
12.50 12.60 12.70 12.80 12.90 13.00 13.10 13.20 13.30 13.40 13.50 13.60 13.70 13.80 13.90 14.00 14.10 14.20 14.30 14.40
1.38 1.38 1.39 1.40 1.41 1.40 1.41 1.42 1.43 1.44 1.43 1.43 1.42 1.42 1.41 1.41 1.40 1.39 1.39 1.38
25 25 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 25
25 25 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 25
30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30
19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0
0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33
25.2 25.2 25.2 25.2 25.2 25.6 25.6 25.6 25.6 25.6 25.9 26.2 26.6 26.9 27.2 27.5 27.8 28.2 28.5 28.8
44.1 44.1 44.1 44.1 44.1 44.8 44.8 44.8 44.8 44.8 45.4 45.9 46.5 47.0 47.6 48.2 48.7 49.3 49.8 50.4
0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75
1.26 1.26 1.26 1.26 1.26 1.28 1.28 1.28 1.28 1.28 1.30 1.31 1.33 1.34 1.36 1.38 1.39 1.41 1.42 1.44
54.60 54.98 55.35 55.72 56.10 55.71 56.08 56.45 56.82 57.19 56.94 56.70 56.47 56.24 56.02 55.80 55.59 55.38 55.17 54.98
0.82 0.82 0.81 0.81 0.80 0.81 0.80 0.80 0.79 0.79 0.79 0.79 0.80 0.80 0.80 0.81 0.81 0.81 0.82 0.82
27.47 27.50 27.53 27.56 27.59 28.00 28.03 28.06 28.09 28.12 28.45 28.78 29.11 29.45 29.78 30.11 30.44 30.77 31.10 31.43
12.50 12.60 12.70 12.80 12.90 13.00 13.10 13.20 13.30 13.40 13.50 13.60 13.70 13.80 13.90 14.00 14.10 14.20 14.30 14.40 14.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50
12.50 12.60 12.70 12.80 12.90 13.00 13.10 13.20 13.30 13.40 13.50 13.60 13.70 13.80 13.90 14.00 14.10 14.20 14.30 14.40 14.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50
3.51 3.53 3.56 3.58 3.61 3.58 3.61 3.63 3.65 3.68 3.66 3.65 3.63 3.62 3.60 3.59 3.57 3.56 3.54 3.53 3.52 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
17 17 17 17 17 17 17 17 16 16 16 16 17 17 17 17 17 17 17 17 17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
17 17 17 17 17 17 17 17 16 16 16 16 17 17 17 17 17 17 17 17 17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
13.0 13.0 13.0 13.0 13.0 13.0 13.0 13.0 13.0 13.0 13.0 13.0 13.0 13.0 13.0 13.0 13.0 13.0 13.0 13.0 13.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
25.2 25.2 25.2 25.2 25.2 25.6 25.6 25.6 25.6 25.6 25.9 26.2 26.6 26.9 27.2 27.5 27.8 28.2 28.5 28.8 29.1 0.4 0.8 1.2 1.6 2.0 2.4 2.8 3.2 3.6 4.0 4.4 4.8 5.2 5.6 6.0 6.4 6.8 7.2 7.6 8.0 8.4 8.8 9.2 9.6 10.0
44.1 44.1 44.1 44.1 44.1 44.8 44.8 44.8 44.8 44.8 45.4 45.9 46.5 47.0 47.6 48.2 48.7 49.3 49.8 50.4 51.0 0.7 1.4 2.1 2.8 3.5 4.2 4.9 5.6 6.3 7.0 7.7 8.4 9.1 9.8 10.5 11.2 11.9 12.6 13.3 14.0 14.7 15.4 16.1 16.8 17.5
0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1.26 1.26 1.26 1.26 1.26 1.28 1.28 1.28 1.28 1.28 1.30 1.31 1.33 1.34 1.36 1.38 1.39 1.41 1.42 1.44 1.46 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 0.22 0.24 0.26 0.28 0.30 0.32 0.34 0.36 0.38 0.40 0.42 0.44 0.46 0.48 0.50
52.60 52.98 53.35 53.72 54.10 53.71 54.08 54.45 54.82 55.19 54.94 54.70 54.47 54.24 54.02 53.80 53.59 53.38 53.17 52.98 52.78 589.29 294.64 196.43 147.32 117.86 98.21 84.18 73.66 65.48 58.93 53.57 49.11 45.33 42.09 39.29 36.83 34.66 32.74 31.02 29.46 28.06 26.79 25.62 24.55 23.57
0.86 0.85 0.84 0.84 0.83 0.84 0.83 0.83 0.82 0.82 0.82 0.82 0.83 0.83 0.83 0.84 0.84 0.84 0.85 0.85 0.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
28.52 28.54 28.57 28.59 28.61 29.04 29.07 29.09 29.11 29.14 29.49 29.83 30.18 30.53 30.88 31.23 31.58 31.92 32.27 32.62 32.97 0.51 1.02 1.53 2.04 2.55 3.05 3.56 4.07 4.58 5.09 5.60 6.11 6.62 7.13 7.64 8.15 8.65 9.16 9.67 10.18 10.69 11.20 11.71 12.22 12.73
12.50 12.60 12.70 12.80 12.90 13.00 13.10 13.20 13.30 13.40 13.50 13.60 13.70 13.80 13.90 14.00 14.10 14.20 14.30 14.40 14.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50
12.50 12.60 12.70 12.80 12.90 13.00 13.10 13.20 13.30 13.40 13.50 13.60 13.70 13.80 13.90 14.00 14.10 14.20 14.30 14.40 14.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
25.2 25.2 25.2 25.2 25.2 25.6 25.6 25.6 25.6 25.6 25.9 26.2 26.6 26.9 27.2 27.5 27.8 28.2 28.5 28.8 29.1 0.4 0.8 1.2 1.6 2.0 2.4 2.8 3.2 3.6 4.0 4.4 4.8 5.2 5.6 6.0 6.4 6.8 7.2 7.6 8.0 8.4 8.8 9.2 9.6 10.0
44.1 44.1 44.1 44.1 44.1 44.8 44.8 44.8 44.8 44.8 45.4 45.9 46.5 47.0 47.6 48.2 48.7 49.3 49.8 50.4 51.0 0.7 1.4 2.1 2.8 3.5 4.2 4.9 5.6 6.3 7.0 7.7 8.4 9.1 9.8 10.5 11.2 11.9 12.6 13.3 14.0 14.7 15.4 16.1 16.8 17.5
0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1.26 1.26 1.26 1.26 1.26 1.28 1.28 1.28 1.28 1.28 1.30 1.31 1.33 1.34 1.36 1.38 1.39 1.41 1.42 1.44 1.46 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 0.22 0.24 0.26 0.28 0.30 0.32 0.34 0.36 0.38 0.40 0.42 0.44 0.46 0.48 0.50
53.34 53.71 54.08 54.46 54.83 54.45 54.81 55.18 55.55 55.92 55.67 55.43 55.20 54.97 54.75 54.53 54.32 54.11 53.91 53.71 53.52 589.29 294.64 196.43 147.32 117.86 98.21 84.18 73.66 65.48 58.93 53.57 49.11 45.33 42.09 39.29 36.83 34.66 32.74 31.02 29.46 28.06 26.79 25.62 24.55 23.57
0.84 0.84 0.83 0.83 0.82 0.83 0.82 0.82 0.81 0.80 0.81 0.81 0.82 0.82 0.82 0.83 0.83 0.83 0.83 0.84 0.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
28.12 28.15 28.18 28.21 28.23 28.65 28.68 28.70 28.73 28.76 29.10 29.44 29.78 30.12 30.47 30.81 31.15 31.49 31.83 32.17 32.51 0.51 1.02 1.53 2.04 2.55 3.05 3.56 4.07 4.58 5.09 5.60 6.11 6.62 7.13 7.64 8.15 8.65 9.16 9.67 10.18 10.69 11.20 11.71 12.22 12.73
116.00 117.00 118.00 119.00 120.00 121.00 122.00 123.00 124.00 125.00 126.00 127.00 128.00 129.00 130.00 131.00 132.00 133.00 134.00 135.00 136.00 137.00 138.00 139.00 140.00 141.00 142.00 143.00 144.00 145.00 146.00 147.00 148.00 149.00 150.00 151.00 152.00 153.00 154.00 155.00 156.00 157.00 158.00 159.00 160.00 161.00 162.00 163.00 164.00 165.00 166.00 167.00 168.00 169.00 170.00 171.00 172.00 173.00 174.00 175.00 176.00 177.00 178.00 179.00 180.00 181.00 182.00 183.00 184.00 185.00 186.00 187.00 188.00 189.00 190.00 191.00 192.00 193.00 194.00 195.00 196.00 197.00 198.00 199.00 200.00 201.00 202.00 203.00 204.00 205.00 206.00 207.00
116.00 117.00 118.00 119.00 120.00 121.00 122.00 123.00 124.00 125.00 126.00 127.00 128.00 129.00 130.00 131.00 132.00 133.00 134.00 135.00 136.00 137.00 138.00 139.00 140.00 141.00 142.00 143.00 144.00 145.00 146.00 147.00 148.00 149.00 150.00 151.00 152.00 153.00 154.00 155.00 156.00 157.00 158.00 159.00 160.00 161.00 162.00 163.00 164.00 165.00 166.00 167.00 168.00 169.00 170.00 171.00 172.00 173.00 174.00 175.00 176.00 177.00 178.00 179.00 180.00 181.00 182.00 183.00 184.00 185.00 186.00 187.00 188.00 189.00 190.00 191.00 192.00 193.00 194.00 195.00 196.00 197.00 198.00 199.00 200.00 201.00 202.00 203.00 204.00 205.00 206.00 207.00
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509
116.00 117.00 118.00 119.00 120.00 121.00 122.00 123.00 124.00 125.00 126.00 127.00 128.00 129.00 130.00 131.00 132.00 133.00 134.00 135.00 136.00 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207
116.00 117.00 118.00 119.00 120.00 121.00 122.00 123.00 124.00 125.00 126.00 127.00 128.00 129.00 130.00 131.00 132.00 133.00 134.00 135.00 136.00 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509
10,000,000 13,000,000 15,000,000 20,000,000 20,000,000
666,667 1,000,000 1,500,000 2,000,000 2,000,000
III EQUIPMENT WORKING HOURS (detail) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
10,577,192 13,233,433 15,391,414 20,272,513 20,272,513
PROD'TY YEAR SIS/CUST OB 105.77% 101.80% 102.61% 101.36% 101.36%
ACTIVITIES
% of contr EQ. MODEL 2011 2012 2013 2014 2015 2016 UNIT TOTAL Y1 Y2 Y3 Y4 Y5
741,204 1,193,597 1,583,375 2,094,991 2,094,991
A OVERBURDEN REMOVAL SIS/CUST COAL 111.18% 119.36% 105.56% 104.75% 104.75%
a. Drilling DP1100 2000 2,000 2,000 2,000 2,000 2,000 bcm/hr 24,960 3,200 4,160 4,800 6,400 6,400 1 1 2 2 2 DP1100 80% 80% 80% 80% 80% DP1100
b. Ripping Dozing D375A-5 394 394 394 394 394 394 bcm/hr 44,625 5,071 6,592 7,606 10,142 15,213 1 2 2 3 4 D375A-5 20% 20% 20% 20% 30% D375A-5
c. Loading PC2000-8 900 900 900 900 900 900 bcm/hr 76,944 9,444 13,000 14,500 20,000 20,000 2 3 4 5 5 PC2000-8 85% 90% 87% 90% 90% PC2000-8 9,490,342 13,525,953 17,088,524 19,783,855 19,783,855 Err:502
PC1250SP-8 550 550 550 550 550 550 bcm/hr - 0 0 0 0 0 0 0 0 0 0 PC1250SP-8 PC1250SP-8 - - - - - Err:502
PC800SE-7 300 300 300 300 300 300 bcm/hr 29,167 5,000 4,333 6,500 6,667 6,667 1 1 2 2 2 PC800SE-7 15% 10% 13% 10% 10% PC800SE-7 1,581,724 1,502,884 2,848,087 2,637,847 2,637,847 Err:502
d. Hauling 1.85 km HM400-1 54.42 54.42 44.75 44.75 44.75 0.00 bcm/hr - 0 0 0 0 0 0 0 0 0 0 HM400-1 HM400-1 - - - - - Err:502
HD465 97.68 97.68 84.16 84.16 84.16 0.00 bcm/hr - 0 0 0 0 0 0 0 0 0 0 HD465 0% 0% 0% 0% 0% HD465 - - - - - Err:502
HD785-7 169.59 169.59 147.10 147.10 147.10 0.00 bcm/hr 452,550 50,120 68,989 88,714 122,364 122,364 10 14 19 28 28 HD785-7 85% 90% 87% 90% 90% HD785-7 8941594.981464 11894269.699 13267098.40289 18108260.59097 18108260.59097 Err:502
CAT740 54.42 54.42 44.75 44.75 44.75 0.00 bcm/hr 184,410 27,566 23,890 43,573 44,690 44,690 6 5 10 11 11 CAT740 15% 10% 13% 10% 10% CAT740 1,635,597 1,339,164 2,124,315 2,164,253 2,164,253 -
e. Spreading D155 336 336 336 336 336 336 bcm/hr - 0 0 0 0 0 D155 0% 0% 0% 0% 0% D155
D85ESS-2 252 252 252 252 252 252 bcm/hr 216,667 27,778 36,111 41,667 55,556 55,556 D85ESS-2 70% 70% 70% 70% 70% D85ESS-2
B COAL WINNING
a. Loading PC400LCSE-7 250 250 250 250 250 250 tonnes/hr 28,811 2,680 4,020 6,030 8,040 8,040 1 1 2 2 2 PC400LCSE-7 100% 100% 100% 100% 100% PC400LCSE-7 1,318,103 1,252,403 2,373,406 2,198,206 2,198,206
PC200-7 125 125 125 125 125 125 tonnes/hr - 0 0 0 0 0 0 0 0 0 0 PC200-7 PC200-7
b. Hauling 4.00 km FM440 47.65 47.65 47.65 47.65 47.65 0.00 tonnes/hr 151,151 14,061 21,091 31,636 42,182 42,182 3 5 7 10 10 FM440 100% 100% 100% 100% 100% FM440 741,204 1,193,597 1,583,375 2,094,991 2,094,991
KERAX 350 34.18 34.18 34.18 34.18 34.18 0.00 tonnes/hr - 0 0 0 0 0 KERAX 350 KERAX 350
FM380 34.18 34.18 34.18 34.18 34.18 0.00 tonnes/hr - 0 0 0 0 0 - - - - - FM380 FM380 - - - - -
c. Stockpiling D85ESS-2 252 252 252 252 252 252 tonnes/hr 1,861 2,792 4,188 5,583 5,583 D85ESS-2 70% 70% 70% 70% 70% D85ESS-2
B COAL WINNING
9 Hydraulic Excavators PC400LCSE-7 28,811 2,680 4,020 6,030 8,040 8,040
10 Hydraulic Excavators PC200-7 - - - - - -
11 Rigid dumptruck FM440 151,151 14,061 21,091 31,636 42,182 42,182
12 Rigid dumptruck KERAX 350 - - - - - -
13 Rigid dumptruck FM380 - - - - - -
C SUPPORT EQUIPMENT
14 Bulldozers D375A-5 - 44,625 5,071 6,592 7,606 10,142 15,213
15 Bulldozers D155 - - - - - -
16 Bulldozers D85ESS-2 5 236,674 29,639 38,903 45,854 61,139 61,139
17 Motor Grader GD705A-2 3 86,792 15,590 14,801 19,034 18,333 19,034 GD705A-2
18 Motor Grader GD825A-2 1 - - - - - - GD825A-2
19 Compactor BW212 24,231 5,197 4,934 4,759 4,583 4,759 BW212
20 Hydraulic Excavators PC200-7 38,331 5,197 4,934 9,517 9,167 9,517 PC200-7
21 Water Truck FM9WT WT 4 48,461 10,393 9,867 9,517 9,167 9,517 FM9WT
22 Washing Truck FM9WST WST 2 24,231 5,197 4,934 4,759 4,583 4,759 FM9WST
23 Fuel Truck FM9FT FT 3 48,461 10,393 9,867 9,517 9,167 9,517 FM9FT
24 Lubetruck FM9LT LT 3 24,231 5,197 4,934 4,759 4,583 4,759 FM9LT
25 Mobile Crane Truck FM9CT CRT 2 24,231 5,197 4,934 4,759 4,583 4,759 FM9CT
26 Crane Truck ATF110 - - - - - - ATF110
27 Tire Handler MLB625 24,231 5,197 4,934 4,759 4,583 4,759 MLB625
D AUXILIARY EQUIPMENT
28 Genset PL30 2 27,226 6,146 5,620 5,270 4,920 5,270 PL30
29 Genset PL250 27,226 6,146 5,620 5,270 4,920 5,270 PL250
30 Mega Tower Lamp LS4-6000 1 27,226 6,146 5,620 5,270 4,920 5,270 LS4-6000
31 Tower lamp L8 9 93,101 12,292 11,241 23,715 22,138 23,715 L8
32 Water pump MFV-420CS - - - - - - MFV-420CS
33 Water pump MFV290 2 27,226 6,146 5,620 5,270 4,920 5,270 MFV290
-
D375A-5
D155
D85ESS-2
GD705A-2 3 3 4 4 4
GD825A-2 0 0 0 0 0
BW212 1 1 1 1 1
PC200-7 1 1 2 2 2
FM9WT WT 2 2 2 2 2
FM9WST WST 1 1 1 1 1
FM9FT FT 2 2 2 2 2
FM9LT LT 1 1 1 1 1
FM9CT CRT 1 1 1 1 1
ATF110
MLB625 1 1 1 1 1
PL30 2 2 2 2 2
PL250 2 2 2 2 2
LS4-6000 2 2 2 2 2
L8 4 4 9 9 9
MFV-420CS
MFV290 2 2 2 2 2
OB REMOVAL = 78,000,000
COAL WINNING = 7,166,667
B COAL WINNING
9 Hydraulic Excavators PC400LCSE-7
10 Hydraulic Excavators PC200-7
11 Rigid dumptruck FM440
12 Rigid dumptruck KERAX 350
13 Rigid dumptruck FM380
0 0
C SUPPORT EQUIPMENT
14 Bulldozers D375A-5
15 Bulldozers D155
16 Bulldozers D85ESS-2
17 Motor Grader GD705A-2
18 Motor Grader GD825A-2
19 Compactor BW212
20 Hydraulic Excavators PC200-7
21 Water Truck FM9WT
22 Washing Truck FM9WST
23 Fuel Truck FM9FT
24 Lubetruck FM9LT
25 Mobile Crane Truck FM9CT
26 Crane Truck ATF110
27 Tire Handler MLB625
0 0
D AUXILIARY EQUIPMENT
28 Genset PL30
29 Genset PL250
30 Mega Tower Lamp LS4-6000
31 Tower lamp L8
32 Water pump MFV-420CS
33 Water pump MFV290
bcm
tonnes
OOCOST EQUIPMENT
EQUIPMENT WHRS UNIT COST
(usd/hr) COST (usd)
WA500/FM
#REF! #REF! #REF! #REF! #REF!
B MOTOR GRADERS
Lo : 0.3 m
GD705A-2 = 6 km/hr
GD825A-2 = 6 km/hr
TOTAL 2011
GD705A-2 3.00
GD825A-2 0.00
CALCULATION
B COAL WINNING
9 Hydraulic Excavators PC400LCSE-7 0.47 0.72 1.11 1.52 1.52
10 Hydraulic Excavators PC200-7 - - - - -
11 Rigid dumptruck FM440 2.49 3.79 5.80 7.96 7.96
12 Rigid dumptruck KERAX 350 - - - - -
13 Rigid dumptruck FM380 - - - - -
C SUPPORT EQUIPMENT -
14 Bulldozers D375A-5 0.88 1.16 1.36 1.84 2.72
15 Bulldozers D155 - - - - -
16 Bulldozers D85ESS-2 5.13 6.86 8.19 11.07 10.92
17 Motor Grader GD705A-2 2.70 2.61 3.40 3.32 3.40
18 Motor Grader GD825A-2 - - - - -
19 Compactor BW212 0.90 0.87 0.85 0.83 0.85
20 Hydraulic Excavators PC200-7 0.90 0.87 1.70 1.66 1.70
21 Water Truck FM9WT WT 1.80 1.74 1.70 1.66 1.70
22 Washing Truck FM9WST WST 0.90 0.87 0.85 0.83 0.85
23 Fuel Truck FM9FT FT 1.80 1.74 1.70 1.66 1.70
24 Lubetruck FM9LT LT 0.90 0.87 0.85 0.83 0.85
25 Mobile Crane Truck FM9CT CRT 0.90 0.87 0.85 0.83 0.85
26 Crane Truck ATF110 - - - - -
27 Tire Handler MLB625 0.90 0.87 0.85 0.83 0.85
D AUXILIARY EQUIPMENT
28 Genset PL30 1.80 1.74 1.70 1.66 1.70
29 Genset PL250 1.80 1.74 1.70 1.66 1.70
30 Mega Tower Lamp LS4-6000 1.80 1.74 1.70 1.66 1.70
31 Tower lamp L8 3.60 3.48 7.65 7.47 7.65
32 Water pump MFV-420CS - - - - -
33 Water pump MFV290 - 1.80 1.74 1.70 1.66 1.70
TOTAL
YEAR
NO EQUIPMENT TYPE MODEL EXISTING UNIT
Y1 Y2 Y3 Y4 Y5 0 2011 2012 2013 2014 2015 2016
D AUXILIARY EQUIPMENT
28 Genset PL30 - 2 2 2 2 2 - PL30
29 Genset PL250 - 2 2 2 2 2 - PL250
30 Mega Tower Lamp LS4-6000 - 2 2 2 2 2 - LS4-6000
31 Tower lamp L8 - 4 4 9 9 9 - L8
32 Water pump MFV-420CS - - - - - - - MFV-420CS
33 Water pump MFV290 - 2 2 2 2 2 - MFV290
YEAR
NO EQUIPMENT TYPE MODEL EXISTING UNIT
2010 Y1 Y2 Y3 Y4 Y5 0
D AUXILIARY EQUIPMENT
28 Genset PL30 - - - 2 - - - - (2)
29 Genset PL250 - - - 2 - - - - (2)
30 Mega Tower Lamp LS4-6000 - - - 2 - - - - (2)
31 Tower lamp L8 - - - 4 - 5 - - (9)
32 Water pump MFV-420CS - - - - - - - - -
33 Water pump MFV290 - - - 2 -
- - - - - -
TOTAL - 56 9 25 19 - (107)
YEAR -
NO EQUIPMENT TYPE MODEL
2010 Y1 Y2 Y3 Y4 Y5 0
D AUXILIARY EQUIPMENT
28 Genset PL30 - -
29 Genset PL250 - -
30 Mega Tower Lamp LS4-6000 - -
31 Tower lamp L8 - -
32 Water pump MFV-420CS - -
33 Water pump MFV290 - -
TOTAL - - - - - -
YEAR -
NO EQUIPMENT TYPE MODEL
2010 Y1 Y2 Y3 Y4 Y5 0
D AUXILIARY EQUIPMENT
28 Genset PL30 - - - 2 - - - - -
29 Genset PL250 - - - 2 - - - - -
30 Mega Tower Lamp LS4-6000 - - - 2 - - - - -
31 Tower lamp L8 - - - 4 - 5 - - -
32 Water pump MFV-420CS - - - - - - - - -
33 Water pump MFV290 - - - 2 - - - - -
TOTAL - 56 10 25 19 1 -
X INVESTMENT (usd)
YEAR -
NO EQUIPMENT TYPE MODEL UNIT PRICE TOTAL 2010 Y1 Y2 Y3 Y4 Y5 0
2010 2011 2012 2013 2014 2015
A OVERBURDEN REMOVAL EQUIPMENT
1 Drilling Machine DP1100 427,000 854,000 - 427,000 - 427,000 - - - 1,305,000
2 Hydraulic Excavators PC800SE-7 540,000 1,080,000 - 540,000 - 540,000 - - - 4,131,000 1,652,400 826,200
3 Hydraulic Excavators PC1250SP-8 814,801 - - - - - - - - 615,000
4 Hydraulic Excavators PC2000-8 1,710,000 8,550,000 - 3,420,000 1,710,000 1,710,000 1,710,000 - -
5 Articulated dumptruck CAT740 405,000 4,860,000 - 2,430,000 - 2,025,000 405,000 - - 13,000,000 5,200,000 1,950,000
6 Rigid dumptruck HD465 534,000 - - - - - - - - 1,925,000
7 Rigid dumptruck HD785-7 799,300 22,380,400 - 7,993,000 3,197,200 3,996,500 7,193,700 - - 1,925,000
8 Articulated dumptruck HM400-1 395,000 - - - - - - - -
-
B COAL WINNING -
9 Hydraulic Excavators PC400LCSE-7 331,000 662,000 - 331,000 - 331,000 - - -
10 Hydraulic Excavators PC200-7 114,000 - - - - - - - -
11 Rigid dumptruck FM440 170,000 1,700,000 - 510,000 340,000 340,000 510,000 - -
12 Rigid dumptruck KERAX 350 152,000 - - - - - - - -
13 Rigid dumptruck FM380 150,000 - - - - - - - - 1,320,000 660,000 1
-
C SUPPORT EQUIPMENT -
14 Bulldozers D375A-5 670,000 2,680,000 - 670,000 670,000 - 670,000 670,000 - 600,000
15 Bulldozers D155 415,000 - - - - - - - - 400,000 400,000
16 Bulldozers D85ESS-2 235,000 3,290,000 - 1,410,000 470,000 470,000 940,000 - -
17 Motor Grader GD705A-2 305,000 1,220,000 - 915,000 - 305,000 - - - 1,546,000 773,000 773,000
18 Motor Grader GD825A-2 490,000 - - - - - - - -
19 Compactor BW212 - - - - - - - - -
20 Hydraulic Excavators PC200-7 114,000 228,000 - 114,000 - 114,000 - - -
0.50 21 Water Truck FM9WT 135,000 WT 270,000 - 270,000 - - - - - 386,000 193,000 193,000
22 Washing Truck FM9WST 135,000 WST 135,000 - 135,000 - - - - -
23 Fuel Truck FM9FT 135,000 FT 270,000 - 270,000 - - - - - 380,000 190,000 190,000
24 Lubetruck FM9LT 135,000 LT 135,000 - 135,000 - - - - - 486,000 243,000
25 Mobile Crane Truck FM9CT 135,000 CRT 135,000 - 135,000 - - - - - 190,000
26 Crane Truck ATF110 800,000 - - - - - - - - -
27 Tire Handler MLB625 136,000 136,000 - 136,000 - - - - - 136,000
D AUXILIARY EQUIPMENT
28 Genset PL30 18,500 37,000 - 37,000 - - - - -
29 Genset PL250 40,000 80,000 - 80,000 - - - - -
30 Mega Tower Lamp LS4-6000 43,500 87,000 - 87,000 - - - - -
31 Tower lamp L8 39,000 351,000 - 156,000 - 195,000 - - - 49,500
32 Water pump MFV-420CS 435,000 - - - - - - - -
33 Water pump MFV290 277,216 554,431 - 554,431 - - - - -
YEAR -
NO EQUIPMENT TYPE MODEL 2010 Y1 Y2 Y3 Y4 Y5 0
D AUXILIARY EQUIPMENT
28 Genset PL30 - 37,000 37,000 37,000 37,000 37,000
29 Genset PL250 - 80,000 80,000 80,000 80,000 80,000
30 Mega Tower Lamp LS4-6000 - 87,000 87,000 87,000 87,000 87,000
31 Tower lamp L8 - 156,000 156,000 351,000 351,000 351,000
32 Water pump MFV-420CS - - - - - -
33 Water pump MFV290 - 554,431 554,431 554,431 554,431 554,431
YEAR -
DEPR
NO EQUIPMENT TYPE MODEL PERIOD TOTAL
(yea rs) 2010 Y1 Y2 Y3 Y4 Y5 0
B COAL WINNING
9 Hydraulic Excavators PC400LCSE-7 5 529,600 66,200 66,200 132,400 132,400 132,400
10 Hydraulic Excavators PC200-7 5 - - - - - -
11 Rigid dumptruck FM440 5 1,190,000 102,000 170,000 238,000 340,000 340,000
12 Rigid dumptruck KERAX 350 5 - - - - - -
13 Rigid dumptruck FM380 5 - - - - - -
C SUPPORT EQUIPMENT
14 Bulldozers D375A-5 5 1,608,000 134,000 268,000 268,000 402,000 536,000
15 Bulldozers D155 5 - - - - - -
16 Bulldozers D85ESS-2 5 2,444,000 282,000 376,000 470,000 658,000 658,000
17 Motor Grader GD705A-2 5 1,098,000 183,000 183,000 244,000 244,000 244,000
18 Motor Grader GD825A-2 5 - - - - - -
19 Compactor BW212 5 - - - - - -
20 Hydraulic Excavators PC200-7 5 182,400 22,800 22,800 45,600 45,600 45,600
21 Water Truck FM9WT 5 270,000 54,000 54,000 54,000 54,000 54,000
22 Washing Truck FM9WST 5 135,000 27,000 27,000 27,000 27,000 27,000
23 Fuel Truck FM9FT 5 270,000 54,000 54,000 54,000 54,000 54,000
24 Lubetruck FM9LT 5 135,000 27,000 27,000 27,000 27,000 27,000
25 Mobile Crane Truck FM9CT 5 135,000 27,000 27,000 27,000 27,000 27,000
26 Crane Truck ATF110 5 - - - - - -
27 Tire Handler MLB625 5 136,000 27,200 27,200 27,200 27,200 27,200
D AUXILIARY EQUIPMENT
28 Genset PL30 5 37,000 7,400 7,400 7,400 7,400 7,400
29 Genset PL250 5 80,000 16,000 16,000 16,000 16,000 16,000
30 Mega Tower Lamp LS4-6000 5 87,000 17,400 17,400 17,400 17,400 17,400
31 Tower lamp L8 5 273,000 31,200 31,200 70,200 70,200 70,200
32 Water pump MFV-420CS 5 - - - - - -
33 Water pump MFV290 5 554,431 110,886 110,886 110,886 110,886 110,886
YEAR
NO EQUIPMENT TYPE MODEL
Y1 Y2 Y3 Y4 Y5 0
D AUXILIARY EQUIPMENT
28 Genset PL30 7,400 14,800 22,200 29,600 37,000
29 Genset PL250 16,000 32,000 48,000 64,000 80,000
30 Mega Tower Lamp LS4-6000 17,400 34,800 52,200 69,600 87,000
31 Tower lamp L8 31,200 62,400 132,600 202,800 273,000
32 Water pump MFV-420CS - - - - -
33 Water pump MFV290 110,886 221,772 332,659 443,545 554,431
Data Teknis WT
Capacity Liter 20,000 20,000 20,000
Kecepatan Isian km/hrs 30.0 30.0 30.0
Kecepatan Kosongan km/hrs 35.0 35.0 35.0
Jarak jangkau Siram km/trip 4.7 4.7 4.7
Ketahanan penyiraman Min 20.0 20.0 20.0
Penyiraman Jalur
6,000 6,000
20 20
120,000 120,000
20,000 20,000
30.0 30.0
35.0 35.0
4.7 4.7
20.0 20.0
5.0 5.0
9.4 9.4
8.1 8.1
3.0 3.0
25.5 25.5
221,549 221,549
360,000 360,000
1.62 1.62
2.00 2.00 -
UNIT SATUAN WT HD 465 - 013 WT FM380 - 023
Kapasitas tank ltr 50,000 20,000
Road Surface Clay compacted Scorea compacted
Pengisian mnt 12.29 4.59
Kecepatan km/hrs 17.50 30
Jarak Penyiraman km/hrs 4.70 4.7
Waktu Penyiraman mnt 16.11 9.40
Ketahanan Penyiraman mnt 10.00 15
Interval penyiraman mnt 33.57 27.65
D AUXILIARY EQUIPMENT
28 Genset PL30
29 Genset PL250
30 Mega Tower Lamp LS4-6000
31 Tower lamp L8
32 Water pump MFV-420CS
33 Water pump MFV290
I OPERATOR REQUIRED
MODEL
MODEL
B COAL WINNING
9 PC400LCSE-7
10 PC200-7
11 FM440
12 KERAX 350
13 FM380
C SUPPORT EQUIPMENT
14 D375A-5
15 D155
16 D85ESS-2
17 GD705A-2
18 GD825A-2
19 BW212
20 PC200-7
21 FM9WT
22 FM9WST
23 FM9FT
24 FM9LT
25 FM9CT
26 ATF110
27 MLB625
D AUXILIARY EQUIPMENT
28 PL30
29 PL250
30 LS4-6000
31 L8
32 MFV-420CS
33 MFV290
II MECHANIC REQUIRED
MODEL
A OB REMOVAL
1 DP1100
2 PC800SE-7
3 PC1250SP-8
4 PC2000-8
5 CAT740
6 HD465
7 HD785-7
8 HM400-1
B COAL WINNING
9 PC400LCSE-7
10 PC200-7
11 FM440
12 KERAX 350
13 FM380
C SUPPORT
14 D375A-5
15 D155
16 D85ESS-2
17 GD705A-2
18 GD825A-2
19 BW212
20 PC200-7
21 FM9WT
22 FM9WST
23 FM9FT
24 FM9LT
25 FM9CT
26 ATF110
27 MLB625
C SUPPORT
28 PL30
29 PL250
30 LS4-6000
31 L8
32 MFV-420CS
33 MFV290
YEAR
Y1
- 1
- 1
- -
- 2
- 6
- - -
- 10
- -
- - 1
- - -
- - 3
- - -
- - -
- -
- -
- - 1
- - -
- - 6
- - 3
- - -
- subcont 1
- - 1
WT - 2
WST - 1
FT - 2
LT - 1
CRT - 1
- - -
- - 1
- - 2
- - 2
- - 2
- - 4
- - -
- - 2
56
ERATOR REQUIRED
YEAR
Y1
PPORT EQUIPMENT
- - 2
- - 2
- - 2
- - 2
- - 2
- subcont -
- - 2
WT - 2
WST - 2
FT - 2
LT - 2
CRT - 2
- - 2
- - 2
XILIARY EQUIPMENT
- -
- -
- -
- -
- -
- -
TOTAL 90
CHANIC REQUIRED
YEAR
FACTOR
Y1
- - 0.75 1
- - 0.75 1
- - 0.75 0
- - 0.75 2
- - 0.75 5
- - 0.75 0
- - 0.75 8
- - 0.75 0
AL WINNING
- - 0.75 1
- - 0.75 0
- - 0.75 2
- - 0.75 0
- - 0.75 0
- - 0.75 1
- - 0.75 0
- - 0.75 5
- - 0.75 2
- - 0.75 0
- subcont 0.75 0
- - 0.75 1
WT - 0.75 2
WST - 0.75 1
FT - 0.75 2
LT - 0.75 1
CRT - 0.75 1
- - 0.25 0
- - 0.25 0
- - 0.25 1
- - 0.25 1
- - 0.25 1
- - 0.25 1
- - 0.25 0
- - 0.25 1
TOTAL 41
Y2 Y3 Y4 Y5
1 2 2 2
1 2 2 2
- - - -
3 4 5 5
5 10 11 11
- - - -
14 19 28 28
- - - -
1 2 2 2
- - - -
5 7 10 10
- - - -
- - - -
2 2 3 4
- - - -
8 10 14 13
3 4 4 4
- - - -
1 1 1 1
1 2 2 2
2 2 2 2
1 1 1 1
2 2 2 2
1 1 1 1
1 1 1 1
- - - -
1 1 1 1
2 2 2 2
2 2 2 2
2 2 2 2
4 9 9 9
- - - -
2 2 2 2
65 90 109 109
Y2 Y3 Y4 Y5
3 5 5 5
3 5 5 5
0 0 0 0
8 11 13 13
13 26 29 29
0 0 0 0
37 50 74 74
0 0 0 0
3 5 5 5
0 0 0 0
13 18 26 26
0 0 0 0
0 0 0 0
2 2 2 2
2 2 2 2
2 2 2 2
2 2 2 2
2 2 2 2
- - - -
2 2 2 2
2 2 2 2
2 2 2 2
2 2 2 2
2 2 2 2
2 2 2 2
2 2 2 2
2 2 2 2
Y2 Y3 Y4 Y5
1 2 2 2
1 2 2 2
0 0 0 0
2 3 4 4
4 8 8 8
0 0 0 0
11 14 21 21
0 0 0 0
1 2 2 2
0 0 0 0
4 5 8 8
0 0 0 0
0 0 0 0
2 2 2 3
0 0 0 0
6 8 11 10
2 3 3 3
0 0 0 0
0 0 0 0
1 2 2 2
2 2 2 2
1 1 1 1
2 2 2 2
1 1 1 1
1 1 1 1
0 0 0 0
0 0 0 0
1 1 1 1
1 1 1 1
1 1 1 1
1 2 2 2
0 0 0 0
1 1 1 1
47 64 78 78
IX MOBILIZATION COST (USD)
B COAL WINNING -
9 Hydraulic Excavators PC400LCSE-7
10 Hydraulic Excavators PC200-7
11 Rigid dumptruck FM440
12 Rigid dumptruck KERAX 350
13 Rigid dumptruck FM380
C SUPPORT EQUIPMENT -
14 Bulldozers D375A-5
15 Bulldozers D155
16 Bulldozers D85ESS-2
17 Motor Grader GD705A-2
18 Motor Grader GD825A-2
19 Compactor BW212
20 Hydraulic Excavators PC200-7
21 Water Truck FM9WT
22 Washing Truck FM9WST
23 Fuel Truck FM9FT
24 Lubetruck FM9LT
25 Mobile Crane Truck FM9CT
26 Crane Truck ATF110
27 Tire Handler MLB625
D AUXILIARY EQUIPMENT
28 Genset PL30
29 Genset PL250
30 Mega Tower Lamp LS4-6000
31 Tower lamp L8
32 Water pump MFV-420CS
33 Water pump MFV290
TOTAL
-
MOB COST
TOTAL
(usd/ea) Y1 Y2 Y3
- - - - -
6,977 20,930 6,977 - 6,977
6,977 - - - -
6,977 90,698 20,930 13,953 13,953
6,977 - - - -
6,977 - - - -
- - - - -
6,977 34,884 6,977 6,977 -
6,977 - - - -
6,977 139,535 41,860 13,953 13,953
6,977 48,837 20,930 - 6,977
6,977 - - - -
6,977 13,953 6,977 - -
6,977 20,930 6,977 - 6,977
6,977 27,907 13,953 - -
6,977 13,953 6,977 - -
6,977 27,907 13,953 - -
6,977 13,953 6,977 - -
6,977 13,953 6,977 - -
6,977 - - - -
6,977 13,953 6,977 - -
- - 4,651
- - 4,651
- - -
4,651 - 9,302
4,651 - 27,907
- - -
62,791 - 69,767
- - -
- - -
- - 6,977
- - -
20,930 - 20,930
- - -
- - -
- - -
6,977 6,977 6,977
- - -
27,907 - 41,860
- - 20,930
- - -
- - 6,977
- - 6,977
- - 13,953
- - 6,977
- - 13,953
- - 6,977
- - 6,977
- - -
- - 6,977
- - 13,953
- - 13,953
- - 13,953
- - 27,907
- - -
- - 13,953
YEAR
NO ITEM UNIT PRICE QTY TOTAL
Y0 Y1 Y2 Y3 Y4 Y5 Y6
YEAR
XIII FIXTURES AND FURNITURES (usd) TOTAL ### Y1 Y2 Y3 Y4 Y5 Y6
Communication System : -
- PABX system ea -
- Facsimile ea - -
- VSAT ea -
Engineering Tools :
- Mining Software and hardware ea 2 - -
- Survey Equipment ea 5 - -
- -
Camp Facilities : - -
- Air Conditioning ea 13 - -
- Refrigator ea 2 - -
TOTAL - - - - - - -
VO
NO DESCRIPTION Y1 Y2
A WORKING DAYS days/year 359 359
BLASTING PER DAY 1 1
C BLASTING PARAMETER
1 Patern
Diameter (d) 6 in
B= 40d : 6.00 m 6.0 6.0
S= 1.1B : 7.00 m 7.0 7.0
Diameter (d) 5 in
B= 40d : 5.00 m 5.0 5.0
S= 1.1B : 6.00 m 6.0 6.0
88 115
Hole per day - diameter 6.0 in 22 29
5.0 in 66 86
10 Powder Factor (kg/bcm)
6.0 in 0.16 0.16
5.0 in 0.14 0.14
7 Cordtex m - -
6.0 in
5.0 in
8 Electric Cable m - -
6.0 in
5.0 in
- - - - -
- - - - -
-
-
-
- - - - -
-
-
-
135,760 181,014 181,014 - 705,955
35,733 47,644 47,644 - 185,810
100,028 133,370 133,370 - 520,144
-
BLASTING MATERIAL REQUIREMENT
DESCRIPTION PRICE
Y1 Y2
Ammonium Nitrat $985 900,942 1,171,225
$788 244,093 317,322
$788 656,849 853,903
Electric Detonator - -
$2.04 -
$2.04 -
Cordtex - -
$0.45 - -
$0.45 - -
Electric Cable - -
$0.24 - -
$0.24 - -
Y1 Y2
EXPLOSIVES $1,283,577 $1,668,650
DTH $329,033 $427,743
FUEL $26,315 $34,209
TOTAL $1,612,610 $2,096,393
Per BCM Production $0.16 $0.16
Per BCM Blasting $0.20 $0.20
220,775 287,008
EXPLOSIVES 0.13 0.13
COST (US$)
Y3 Y4 Y5 Y6
1,351,413 1,801,884 1,801,884 -
366,140 488,187 488,187 -
985,273 1,313,697 1,313,697 -
- - - -
- - -
- - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Y3 Y4 Y5 Y6
$1,925,366 $2,567,154 $2,567,154
$493,550 $658,066 $658,066
$39,472 $52,630 $52,630
$2,418,915 $3,225,221 $3,225,221
$0.16 $0.16 $0.16
$0.20 $0.20 $0.20
Total
$10,011,902
$2,566,459
$205,256
$12,578,361
$0.161
$0.202
86,102,354
22,071,547
1,765,198
109,982,099
-
-
1,722,047
0.13
XI FUEL CONSUMPTION (litres)
YEAR
NO EQUIPMENT MODEL FUEL CONS (l/hr) TOTAL (litres)
Y1 Y2 Y3 Y4 Y5 0
D AUXILIARY EQUIPMENT
PL30 28 PL30 5.00 136,130 30,730 28,102 26,350 24,598 26,350 -
PL250 29 PL250 8.00 217,808 49,168 44,963 42,160 39,357 42,160 -
LS4-6000 30 LS4-6000 5.00 136,130 30,730 28,102 26,350 24,598 26,350 -
L8 31 L8 3.00 279,303 36,876 33,722 71,145 66,415 71,145 -
MFV-420CS 32 MFV-420CS 60.00 - - - - - - -
MFV290 33 MFV290 20.00 544,520 122,920 112,408 105,400 98,392 105,400 -
YEAR
NO EQUIPMENT TYPE FUEL PRICE (usd/l) TOTAL (usd)
Y1 Y2 Y3 Y4 Y5 0
D AUXILIARY EQUIPMENT
28 PL30 1.10 150,376 33,946 31,043 29,108 27,172 29,108 -
29 PL250 1.10 240,602 54,313 49,669 46,572 43,476 46,572 -
30 LS4-6000 1.10 150,376 33,946 31,043 29,108 27,172 29,108 -
31 L8 1.10 308,532 40,735 37,251 78,590 73,365 78,590 -
32 MFV-420CS 1.10 - - - - - - -
33 MFV290 1.10 601,505 135,784 124,172 116,430 108,689 116,430 -
Fuel mobilization cost 300 2,592,570 324,663 405,091 515,737 665,407 681,673 -
1 2 3 4 5 6 7
OIL
MODEL 0-5000 5001-10000 10001-15000 15001-20000 20001-25000 25001-30000
A35D 1.51 1.77 1.52 1.77 1.57 1.77
A40D 1.51 1.77 1.52 1.77 1.56 1.77
A40E 1.63 1.74 1.63 1.74 1.67 1.74
ACTROS4046 1.13 1.13 1.15 1.13 1.17 1.13
BIG BLUE 401 0.19 0.19 0.20 0.19 0.20 0.19
BLACKMER 4X6-13 0.38 0.38 0.40 0.38 0.40 0.38
CAT16M 0.79 0.81 0.80 0.86 0.81 0.81
CAT24M 1.55 1.83 1.57 1.83 1.58 1.83
CAT740 1.32 1.48 1.33 1.68 1.35 1.48
CAT992G 1.95 2.26 2.00 2.26 2.00 2.26
CATD9R 1.36 1.38 1.42 1.38 1.46 1.38
D155 0.72 0.74 0.72 0.74 0.76 0.74
D245S 2.69 2.89 2.78 2.89 2.79 2.89
D375A-5 1.09 1.12 1.09 1.12 1.16 1.12
SKF 2.69 2.89 2.78 2.89 2.79 2.89
D65P-12 0.88 0.93 0.91 0.93 0.91 0.93
D85ESS-2 0.85 0.86 0.87 0.86 0.88 0.86
DP1100 1.43 1.57 1.45 1.57 1.46 1.57
EGS630-3 0.68 0.68 0.71 0.68 0.71 0.68
EX1200-5 1.96 2.15 2.01 2.15 2.02 2.15
EX2500-6 2.31 3.43 2.31 3.43 3.54 2.31
FD50T 0.38 0.38 0.40 0.38 0.40 0.38
FH16 520 0.87 0.87 0.89 0.87 0.91 0.87
FH16 550 0.87 0.87 0.89 0.87 0.91 0.87
FM380 0.80 0.86 0.81 0.86 0.83 0.85
FM440 0.97 1.02 1.02 1.02 1.03 1.02
FM9 1.29 1.29 1.31 1.29 1.37 1.29
GD705A-2 1.21 1.25 1.24 1.25 1.24 1.25
GD825A-2 1.12 1.12 1.14 1.12 1.15 1.12
HAWKC950A 0.15 0.15 0.15 0.15 0.15 0.15
HCR1500 1.49 1.59 1.54 1.59 1.56 1.59
HD465 1.47 1.75 1.59 1.75 1.62 1.75
HD785-5 1.02 1.11 1.02 1.11 1.08 1.11
HD785-7 1.36 1.49 1.36 1.49 1.41 1.49
HM400-1 1.44 1.55 1.45 1.55 1.49 1.55
HT-22.5 Y 0.38 0.38 0.40 0.38 0.40 0.38
KERAX 350 1.29 1.37 1.30 1.37 1.36 1.37
KSAC300-50E 0.16 0.16 0.16 0.16 0.16 0.16
L6 0.38 0.38 0.40 0.38 0.40 0.38
L8 0.38 0.38 0.40 0.38 0.40 0.38
LS4-6000 0.38 0.38 0.40 0.38 0.40 0.38
MFV-420CS 0.56 0.56 0.58 0.56 0.58 0.56
MFVC390 0.56 0.56 0.58 0.56 0.58 0.56
MHT10160L 1.02 1.10 1.03 1.10 1.06 1.10
MLB625 1.02 1.10 1.03 1.10 1.06 1.10
PC1250SP-7 1.80 2.20 1.81 2.20 1.86 2.20
PC1250SP-8 1.80 2.20 1.81 2.20 1.86 2.20
PC1800-6 1.91 2.38 1.95 2.38 1.96 2.38
PC2000-8 2.08 2.64 2.08 2.64 2.13 2.64
PC200-7 0.69 0.74 0.71 0.74 0.72 0.74
PC3000-6 3.63 4.76 3.63 4.76 3.70 4.76
PC400LCSE-7 0.65 0.72 0.65 0.72 0.68 0.72
PC750SE-7 0.94 0.95 0.94 1.23 0.97 0.95
PC800SE-7 1.13 1.27 1.13 1.29 1.17 1.27
PK100-300 0.18 0.18 0.18 0.18 0.18 0.18
PL100 0.38 0.38 0.40 0.38 0.40 0.38
PL200 0.38 0.38 0.40 0.38 0.40 0.38
PL250 0.38 0.38 0.40 0.38 0.40 0.38
PL27.5 0.38 0.38 0.40 0.38 0.40 0.38
PL30 0.38 0.38 0.40 0.38 0.40 0.38
PL9 0.38 0.38 0.40 0.38 0.40 0.38
R580 0.68 0.68 0.69 0.68 0.71 0.68
R9250 4.02 4.02 4.12 5.28 4.15 4.02
R9350 4.02 4.02 4.12 5.28 4.15 4.02
RT190 1.46 1.69 1.49 1.69 1.51 1.69
S50 0.16 0.16 0.16 0.16 0.16 0.16
SQ3300 0.38 0.38 0.40 0.38 0.40 0.38
TAIYO KJ-T130DX 0.38 0.38 0.40 0.38 0.40 0.38
TB41E 0.15 0.15 0.15 0.15 0.15 0.15
TITAN 701 0.38 0.38 0.40 0.38 0.40 0.38
TORISHIMA 0.38 0.38 0.40 0.38 0.40 0.38
W200-16EPT 0.14 0.14 0.14 0.14 0.14 0.14
WA500-3 1.18 1.24 1.21 1.24 1.21 1.24
WA800-3 1.84 2.28 1.85 2.28 1.90 2.28
WD600-3 1.22 1.33 1.22 1.33 1.25 1.33
XP185WIR 0.38 0.38 0.40 0.38 0.40 0.38
YDG5001SE 0.38 0.38 0.40 0.38 0.40 0.38
ZAXIS850H-5 1.31 1.52 1.32 1.57 1.36 1.52
ZAXIS870H-5 1.32 1.53 1.33 1.58 1.37 1.53
1 2 3 4 5 6 7
GROUND ENGAGED TOOL
MODEL 0-5000 5001-10000 10001-15000 15001-20000 20001-25000 25001-30000
CAT16M 3.78 5.68 4.44 4.98 5.80 4.43
CAT24M 3.54 5.79 3.94 5.34 5.92 3.93
CAT992G 0.00 0.52 0.00 0.52 0.00 0.52
CATD9R 2.18 2.54 2.20 2.96 2.22 2.51
D155 0.86 1.70 1.70 0.86 1.70 1.70
D375A-5 1.42 2.03 1.70 1.96 1.71 2.02
D65P-12 0.18 0.35 0.38 0.26 0.38 0.35
D85ESS-2 0.20 0.36 0.36 0.28 0.36 0.36
EX1200-5 2.15 2.36 3.01 2.36 3.04 2.36
EX2500-6 6.71 7.07 7.57 6.71 7.59 6.70
GD705A-2 2.65 2.69 2.69 2.69 2.69 2.67
GD825A-2 1.17 2.17 2.17 2.20 2.32 2.20
PC1250SP-7 4.65 4.65 5.72 4.65 5.75 4.65
PC1250SP-8 4.65 4.65 5.72 4.65 5.75 4.65
PC1800-6 6.71 7.07 7.57 6.71 7.59 6.70
PC2000-8 6.71 7.07 7.57 6.71 7.59 6.70
PC2000-8F 6.71 7.07 7.57 6.71 7.59 6.70
PC200-7 0.75 0.91 0.79 0.90 0.95 0.75
PC3000-6 6.71 7.07 7.57 6.71 7.59 6.70
PC400LCSE-7 0.49 0.77 1.63 0.78 1.67 0.78
PC750SE-7 1.30 2.19 1.30 2.19 1.30 2.18
PC800SE-7 1.30 2.19 1.30 2.19 1.30 2.18
R9250 6.71 7.07 7.57 6.71 7.59 6.70
R9350 6.71 7.07 7.57 6.71 7.59 6.70
WA500-3 2.02 2.01 3.38 2.02 3.41 2.02
WA800-3 3.04 3.04 3.90 3.04 3.92 3.02
WD600-3 5.57 5.57 6.43 5.57 6.97 5.57
ZAXIS850H-5 2.44 3.64 2.44 3.61 3.33 2.75
ZAXIS870H-5 2.44 3.64 2.44 3.61 3.33 2.75
1 2 3 4 5 6 7
DRILLING
5001-30000 MODEL 0-5000 5001-10000 10001-15000 15001-20000 20001-25000 25001-30000
D245S 14.46 15.33 15.60 14.71 15.85 15.08
SKF 14.46 15.33 15.60 14.71 15.85 15.08
DP1100 8.77 9.26 9.31 9.24 8.97 9.24
HCR1500 13.36 13.60 13.87 13.58 13.82 13.58
1 2 3 4 5 6 7
OTHER
MODEL 0-5000 5001-10000 10001-15000 15001-20000 20001-25000 25001-30000
A35D 0.40 0.40 0.40 0.40 0.40 0.40
A40D 0.40 0.40 0.40 0.40 0.40 0.40
A40E 0.40 0.40 0.40 0.40 0.40 0.40
ACTROS4046 0.40 0.40 0.40 0.40 0.40 0.40
BIG BLUE 401 0.40 0.40 0.40 0.40 0.40 0.40
BLACKMER 4X6-13 0.40 0.40 0.40 0.40 0.40 0.40
CAT16M 0.40 0.40 0.40 0.40 0.40 0.40
CAT24M 0.40 0.40 0.40 0.40 0.40 0.40
CAT740 0.40 0.40 0.40 0.40 0.40 0.40
CAT785F 0.40 0.40 0.40 0.40 0.40 0.40
CAT992G 0.40 0.40 0.40 0.40 0.40 0.40
CATD9R 0.40 0.40 0.40 0.40 0.40 0.40
D155 0.40 0.40 0.40 0.40 0.40 0.40
D245S 0.40 0.40 0.40 0.40 0.40 0.40
D375A-5 0.40 0.40 0.40 0.40 0.40 0.40
SKF 0.40 0.40 0.40 0.40 0.40 0.40
D65P-12 0.40 0.40 0.40 0.40 0.40 0.40
D85ESS-2 0.40 0.40 0.40 0.40 0.40 0.40
DP1100 0.40 0.40 0.40 0.40 0.40 0.40
EGS630-3 0.40 0.40 0.40 0.40 0.40 0.40
EH1700F 0.40 0.40 0.40 0.40 0.40 0.40
ETA-N100X80-135 0.40 0.40 0.40 0.40 0.40 0.40
ETA-N200X150X315 0.40 0.40 0.40 0.40 0.40 0.40
EX1200-5 0.40 0.40 0.40 0.40 0.40 0.40
EX2500-6 0.40 0.40 0.40 0.40 0.40 0.40
F2803 0.40 0.40 0.40 0.40 0.40 0.40
FD50T 0.40 0.40 0.40 0.40 0.40 0.40
FH16 520 0.40 0.40 0.40 0.40 0.40 0.40
FH16 550 0.40 0.40 0.40 0.40 0.40 0.40
FM380 0.40 0.40 0.40 0.40 0.40 0.40
FM440 0.40 0.40 0.40 0.40 0.40 0.40
FM9 0.40 0.40 0.40 0.40 0.40 0.40
GD705A-2 0.40 0.40 0.40 0.40 0.40 0.40
GD825A-2 0.40 0.40 0.40 0.40 0.40 0.40
HAWKC950A 0.40 0.40 0.40 0.40 0.40 0.40
HCR1500 0.40 0.40 0.40 0.40 0.40 0.40
HD465 0.40 0.40 0.40 0.40 0.40 0.40
HD785-5 0.40 0.40 0.40 0.40 0.40 0.40
HD785-7 0.40 0.40 0.40 0.40 0.40 0.40
HD785-7F 0.40 0.40 0.40 0.40 0.40 0.40
HM400-1 0.40 0.40 0.40 0.40 0.40 0.40
HT-22.5 Y 0.40 0.40 0.40 0.40 0.40 0.40
KERAX 350 0.40 0.40 0.40 0.40 0.40 0.40
KSAC300-50E 0.40 0.40 0.40 0.40 0.40 0.40
L6 0.40 0.40 0.40 0.40 0.40 0.40
L8 0.40 0.40 0.40 0.40 0.40 0.40
LHI425 0.40 0.40 0.40 0.40 0.40 0.40
LS4-6000 0.40 0.40 0.40 0.40 0.40 0.40
MFV-420CS 0.40 0.40 0.40 0.40 0.40 0.40
MFVC390 0.40 0.40 0.40 0.40 0.40 0.40
MHT10160L 0.40 0.40 0.40 0.40 0.40 0.40
MLB625 0.40 0.40 0.40 0.40 0.40 0.40
PC1250SP-7 0.40 0.40 0.40 0.40 0.40 0.40
PC1250SP-8 0.40 0.40 0.40 0.40 0.40 0.40
PC1800-6 0.40 0.40 0.40 0.40 0.40 0.40
PC2000-8 0.40 0.40 0.40 0.40 0.40 0.40
PC2000-8F 0.40 0.40 0.40 0.40 0.40 0.40
PC200-7 0.40 0.40 0.40 0.40 0.40 0.40
PC3000-6 0.40 0.40 0.40 0.40 0.40 0.40
PC400LCSE-7 0.40 0.40 0.40 0.40 0.40 0.40
PC750SE-7 0.40 0.40 0.40 0.40 0.40 0.40
PC800SE-7 0.40 0.40 0.40 0.40 0.40 0.40
PFD100TL 0.40 0.40 0.40 0.40 0.40 0.40
PH180 0.40 0.40 0.40 0.40 0.40 0.40
PK100-300 0.40 0.40 0.40 0.40 0.40 0.40
PL100 0.40 0.40 0.40 0.40 0.40 0.40
PL160 0.40 0.40 0.40 0.40 0.40 0.40
PL200 0.40 0.40 0.40 0.40 0.40 0.40
PL250 0.40 0.40 0.40 0.40 0.40 0.40
PL27.5 0.40 0.40 0.40 0.40 0.40 0.40
PL30 0.40 0.40 0.40 0.40 0.40 0.40
PL9 0.40 0.40 0.40 0.40 0.40 0.40
R580 0.40 0.40 0.40 0.40 0.40 0.40
R9250 0.40 0.40 0.40 0.40 0.40 0.40
R9350 0.40 0.40 0.40 0.40 0.40 0.40
RT190 0.40 0.40 0.40 0.40 0.40 0.40
S50 0.40 0.40 0.40 0.40 0.40 0.40
SD-100D 0.40 0.40 0.40 0.40 0.40 0.40
SK330 0.40 0.40 0.40 0.40 0.40 0.40
SQ3300 0.40 0.40 0.40 0.40 0.40 0.40
1 2 3 4 5 6
SPARE PART
MODEL 0-5000 5001-10000 10001-15000 15001-20000 20001-25000
A35D 2.52 13.90 19.42 50.13 33.11
A40D 2.70 11.84 21.46 52.06 33.28
A40E 2.71 11.85 21.80 51.75 33.30
ACTROS4046 2.23 6.12 5.93 8.76 6.19
BIG BLUE 401 0.14 0.14 0.15 0.14 0.15
BLACKMER 4X6-13 0.12 0.12 0.12 0.12 0.12
CAT16M 3.96 12.01 4.08 42.13 12.18
CAT24M 3.31 11.39 3.36 41.52 11.52
CAT740 4.55 8.52 4.57 122.96 8.48
CAT992G 2.93 3.23 2.97 3.23 3.10
CATD9R 14.90 30.92 33.77 21.95 34.02
D155 16.68 27.59 28.27 37.16 29.67
D245S 6.68 20.65 28.16 20.65 29.09
D375A-5 19.97 35.16 35.04 57.01 35.87
SKF 10.05 24.48 31.74 24.48 32.53
D65P-12 5.54 10.66 10.85 6.41 10.89
D85ESS-2 5.47 10.84 10.83 19.09 10.86
DP1100 4.06 18.43 11.80 23.26 12.25
EGS630-3 0.32 0.37 0.33 0.37 0.33
EX1200-5 4.10 17.08 5.36 36.28 5.46
EX2500-6 13.37 27.49 72.25 168.51 74.31
F2803 0.14 0.14 0.14 0.14 0.14
FD50T 1.29 1.29 1.32 1.29 1.35
FH16 520 1.15 3.51 10.65 17.44 5.77
FH16 550 1.15 3.51 10.65 17.44 5.77
FM380 0.51 4.45 4.46 7.99 4.58
FM440 1.08 4.85 2.58 18.44 4.91
FM9 0.89 4.60 4.61 8.12 4.73
GD705A-2 3.86 6.41 3.88 35.10 6.49
GD825A-2 1.75 3.89 1.77 42.17 3.86
HCR1500 4.15 22.86 15.56 22.86 16.12
HD465 4.28 9.86 4.29 79.73 12.12
HD785-5 3.12 6.77 3.13 65.45 3.20
HD785-7 4.62 8.31 4.63 66.99 4.73
HM400-1 4.62 10.77 4.68 106.06 10.80
HT-22.5 Y 0.60 0.60 0.63 0.60 0.63
KERAX 350 0.42 0.49 0.43 0.49 0.43
L6 0.24 0.25 0.25 1.28 0.26
L8 0.20 0.20 0.20 1.44 0.20
LS4-6000 0.33 0.33 0.33 1.55 0.35
MFV-420CS 2.32 2.32 2.34 2.32 2.38
MFVC390 1.31 1.31 1.35 11.61 1.36
MHT10160L 0.64 0.69 0.65 0.69 0.67
MLB625 0.89 0.96 0.91 0.96 0.99
PC1250SP-7 5.48 7.80 12.52 89.01 13.83
PC1250SP-8 5.48 14.93 5.59 96.11 7.85
PC1800-6 8.40 8.53 28.18 81.46 28.91
PC2000-8 11.13 15.48 38.84 136.72 44.17
PC200-7 0.79 1.95 12.86 1.95 0.79
PC3000-6 25.95 26.45 85.16 237.72 86.91
PC400LCSE-7 2.63 6.51 26.10 9.37 6.63
PC750SE-7 5.10 20.14 69.74 12.33 16.30
PC800SE-7 4.31 13.69 65.54 9.34 11.30
PK100-300 0.00 0.00 0.00 0.00 0.00
PL100 0.38 0.38 0.39 3.06 0.39
PL200 0.34 0.34 0.35 3.43 0.36
PL250 0.33 0.33 0.34 3.42 0.34
PL27.5 0.29 0.29 0.30 0.29 0.30
PL30 0.34 0.34 0.35 1.98 0.35
PL9 0.33 0.33 0.33 0.33 0.33
R580 1.00 3.37 10.49 17.30 5.60
R9250 23.91 23.94 96.39 212.81 98.52
R9350 23.91 23.94 96.39 212.81 98.52
RT190 2.14 2.14 2.21 2.14 2.26
S50 0.86 0.86 0.87 0.86 0.94
SQ3300 0.45 0.45 0.46 1.27 0.48
TAIYO KJ-T130DX 1.07 1.07 1.12 1.07 1.13
TORISHIMA 0.36 0.36 0.38 0.36 0.38
WA500-3 2.64 2.64 2.71 22.70 2.72
WA800-3 3.46 8.19 3.53 59.01 3.55
WD600-3 1.88 9.15 1.90 52.63 9.10
XP185WIR 0.43 0.46 0.45 0.46 0.45
ZAXIS850H-5 3.60 14.83 3.61 65.31 11.66
ZAXIS870H-5 3.41 14.63 3.41 57.34 11.47
7 1 2 3 4
EKTERNAL SERVICE FEE
25001-30000 MODEL 0-5000 5001-10000 10001-15000
11.41 A35D 0.10 0.56 0.78
11.27 A40D 0.11 0.47 0.86
11.60 A40E 0.11 0.47 0.87
6.23 ACTROS4046 0.09 0.24 0.24
0.14 BIG BLUE 401 0.01 0.01 0.01
0.12 BLACKMER 4X6-13 0.00 0.00 0.00
3.98 CAT16M 0.16 0.48 0.16
3.36 CAT24M 0.13 0.46 0.13
4.66 CAT740 0.18 0.34 0.18
3.22 CAT992G 0.12 0.13 0.12
31.15 CATD9R 0.60 1.24 1.35
26.35 D155 0.67 1.10 1.13
20.64 D245S 0.27 0.83 1.13
34.52 D375A-5 0.80 1.41 1.40
24.47 SKF 0.40 0.98 1.27
10.69 D65P-12 0.22 0.43 0.43
10.86 D85ESS-2 0.22 0.43 0.43
18.43 DP1100 0.16 0.74 0.47
0.37 EGS630-3 0.01 0.01 0.01
17.07 EX1200-5 0.16 0.68 0.21
27.08 EX2500-6 0.53 1.10 2.89
0.14 F2803 0.01 0.01 0.01
1.29 FD50T 0.05 0.05 0.05
8.33 FH16 520 0.05 0.14 0.43
8.33 FH16 550 0.05 0.14 0.43
4.57 FM380 0.02 0.18 0.18
2.62 FM440 0.04 0.19 0.10
4.71 FM9 0.04 0.18 0.18
3.87 9.93 GD705A-2 0.15 0.26 0.16
1.79 9.20 GD825A-2 0.07 0.16 0.07
22.85 HCR1500 0.17 0.91 0.62
4.33 HD465 0.17 0.39 0.17
6.77 14.74 HD785-5 0.12 0.27 0.13
8.30 HD785-7 0.18 0.33 0.19
4.67 HM400-1 0.18 0.43 0.19
0.60 HT-22.5 Y 0.02 0.02 0.03
0.49 KERAX 350 0.02 0.02 0.02
0.25 L6 0.01 0.01 0.01
0.20 L8 0.01 0.01 0.01
0.33 LS4-6000 0.01 0.01 0.01
2.31 MFV-420CS 0.09 0.09 0.09
1.31 MFVC390 0.05 0.05 0.05
0.68 MHT10160L 0.03 0.03 0.03
0.91 MLB625 0.04 0.04 0.04
6.68 PC1250SP-7 0.22 0.31 0.50
12.67 PC1250SP-8 0.22 0.60 0.22
8.53 PC1800-6 0.34 0.34 1.13
11.22 PC2000-8 0.45 0.62 1.55
13.66 PC200-7 0.03 0.08 0.51
26.41 PC3000-6 1.04 1.06 3.41
25.63 PC400LCSE-7 0.11 0.26 1.04
76.36 PC750SE-7 0.20 0.81 2.79
69.83 PC800SE-7 0.17 0.55 2.62
0.00 PK100-300 0.00 0.00 0.00
0.38 PL100 0.02 0.02 0.02
0.34 PL200 0.01 0.01 0.01
0.33 PL250 0.01 0.01 0.01
0.29 PL27.5 0.01 0.01 0.01
0.34 PL30 0.01 0.01 0.01
0.33 PL9 0.01 0.01 0.01
8.18 R580 0.04 0.13 0.42
23.90 R9250 0.96 0.96 3.86
23.90 R9350 0.96 0.96 3.86
2.14 RT190 0.09 0.09 0.09
0.86 S50 0.03 0.03 0.03
0.45 SQ3300 0.02 0.02 0.02
1.07 TAIYO KJ-T130DX 0.04 0.04 0.04
0.36 TORISHIMA 0.01 0.01 0.02
2.64 WA500-3 0.11 0.11 0.11
8.05 WA800-3 0.14 0.33 0.14
1.95 WD600-3 0.08 0.37 0.08
0.46 XP185WIR 0.02 0.02 0.02
8.29 ZAXIS850H-5 0.14 0.59 0.14
8.09 ZAXIS870H-5 0.14 0.59 0.14
5 6 7 1 2 3
RVICE FEE EKTERNAL SERVICE MAT
15001-20000 20001-25000 25001-30000 MODEL 0-5000 5001-10000
2.01 1.32 0.46 A35D 0.05 0.28
2.08 1.33 0.45 A40D 0.05 0.24
2.07 1.33 0.46 A40E 0.05 0.24
0.35 0.25 0.25 ACTROS4046 0.04 0.12
0.01 0.01 0.01 BIG BLUE 401 0.00 0.00
0.00 0.00 0.00 BLACKMER 4X 0.00 0.00
1.69 0.49 0.16 CAT16M 0.08 0.24
1.66 0.46 0.13 CAT24M 0.07 0.23
4.92 0.34 0.19 CAT740 0.09 0.17
0.13 0.12 0.13 CAT992G 0.06 0.06
0.88 1.36 1.25 CATD9R 0.30 0.62
1.49 1.19 1.05 D155 0.33 0.55
0.83 1.16 0.83 D245S 0.13 0.41
2.28 1.43 1.38 D375A-5 0.40 0.70
0.98 1.30 0.98 SKF 0.20 0.49
0.26 0.44 0.43 D65P-12 0.11 0.21
0.76 0.43 0.43 D85ESS-2 0.11 0.22
0.93 0.49 0.74 DP1100 0.08 0.37
0.01 0.01 0.01 EGS630-3 0.01 0.01
1.45 0.22 0.68 EX1200-5 0.08 0.34
6.74 2.97 1.08 EX2500-6 0.27 0.55
0.01 0.01 0.01 F2803 0.00 0.00
0.05 0.05 0.05 FD50T 0.03 0.03
0.70 0.23 0.33 FH16 520 0.02 0.07
0.70 0.23 0.33 FH16 550 0.02 0.07
0.32 0.18 0.18 FM380 0.01 0.09
0.74 0.20 0.10 FM440 0.02 0.10
0.32 0.19 0.19 FM9 0.02 0.09
1.40 0.26 0.15 0.40 GD705A-2 0.08 0.13
1.69 0.15 0.07 0.37 GD825A-2 0.04 0.08
0.91 0.64 0.91 HCR1500 0.08 0.46
3.19 0.48 0.17 HD465 0.09 0.20
2.62 0.13 0.27 HD785-5 0.06 0.14
2.68 0.19 0.33 HD785-7 0.09 0.17
4.24 0.43 0.19 HM400-1 0.09 0.22
0.02 0.03 0.02 HT-22.5 Y 0.01 0.01
0.02 0.02 0.02 KERAX 350 0.01 0.01
0.05 0.01 0.01 L6 0.00 0.01
0.06 0.01 0.01 L8 0.00 0.00
0.06 0.01 0.01 LS4-6000 0.01 0.01
0.09 0.10 0.09 MFV-420CS 0.05 0.05
0.46 0.05 0.05 MFVC390 0.03 0.03
0.03 0.03 0.03 MHT10160L 0.01 0.01
0.04 0.04 0.04 MLB625 0.02 0.02
3.56 0.55 0.27 PC1250SP-7 0.11 0.16
3.84 0.31 0.51 PC1250SP-8 0.11 0.30
3.26 1.16 0.34 PC1800-6 0.17 0.17
5.47 1.77 0.45 PC2000-8 0.22 0.31
0.08 0.03 0.55 PC200-7 0.02 0.04
9.51 3.48 1.06 PC3000-6 0.52 0.53
0.37 0.27 1.03 PC400LCSE-7 0.05 0.13
0.49 0.65 3.05 PC750SE-7 0.10 0.40
0.37 0.45 2.79 PC800SE-7 0.09 0.27
0.00 0.00 0.00 PK100-300 0.00 0.00
0.12 0.02 0.02 PL100 0.01 0.01
0.14 0.01 0.01 PL200 0.01 0.01
0.14 0.01 0.01 PL250 0.01 0.01
0.01 0.01 0.01 PL27.5 0.01 0.01
0.08 0.01 0.01 PL30 0.01 0.01
0.01 0.01 0.01 PL9 0.01 0.01
0.69 0.22 0.33 R580 0.02 0.07
8.51 3.94 0.96 R9250 0.48 0.48
8.51 3.94 0.96 R9350 0.48 0.48
0.09 0.09 0.09 RT190 0.04 0.04
0.03 0.04 0.03 S50 0.02 0.02
0.05 0.02 0.02 SQ3300 0.01 0.01
0.04 0.05 0.04 TAIYO KJ-T130 0.02 0.02
0.01 0.02 0.01 TORISHIMA 0.01 0.01
0.91 0.11 0.11 WA500-3 0.05 0.05
2.36 0.14 0.32 WA800-3 0.07 0.16
2.11 0.36 0.08 WD600-3 0.04 0.18
0.02 0.02 0.02 XP185WIR 0.01 0.01
2.61 0.47 0.33 ZAXIS850H-5 0.07 0.30
2.29 0.46 0.32 ZAXIS870H-5 0.07 0.29
4 5 6 7 1 2
EKTERNAL SERVICE MATERIAL FM
10001-15000 15001-20000 20001-25000 25001-30000 MODEL 0-5000
0.39 1.00 0.66 0.23 EH1700F 28.00
0.43 1.04 0.67 0.23 HD785-7F 27.00
0.44 1.04 0.67 0.23 PC2000-8F 45.00
0.12 0.18 0.12 0.12 CAT785F 45.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.08 0.84 0.24 0.08
0.07 0.83 0.23 0.07
0.09 2.46 0.17 0.09
0.06 0.06 0.06 0.06
0.68 0.44 0.68 0.62
0.57 0.74 0.59 0.53
0.56 0.41 0.58 0.41
0.70 1.14 0.72 0.69
0.63 0.49 0.65 0.49
0.22 0.13 0.22 0.21
0.22 0.38 0.22 0.22
0.24 0.47 0.24 0.37
0.01 0.01 0.01 0.01
0.11 0.73 0.11 0.34
1.45 3.37 1.49 0.54
0.00 0.00 0.00 0.00
0.03 0.03 0.03 0.03
0.21 0.35 0.12 0.17
0.21 0.35 0.12 0.17
0.09 0.16 0.09 0.09
0.05 0.37 0.10 0.05
0.09 0.16 0.09 0.09
0.08 0.70 0.13 0.08 $ 0.20 $ 10.53
0.04 0.84 0.08 0.04 $ 0.18 $ 9.76
0.31 0.46 0.32 0.46
0.09 1.59 0.24 0.09
0.06 1.31 0.06 0.14
0.09 1.34 0.09 0.17
0.09 2.12 0.22 0.09
0.01 0.01 0.01 0.01
0.01 0.01 0.01 0.01
0.00 0.03 0.01 0.01
0.00 0.03 0.00 0.00
0.01 0.03 0.01 0.01
0.05 0.05 0.05 0.05
0.03 0.23 0.03 0.03
0.01 0.01 0.01 0.01
0.02 0.02 0.02 0.02
0.25 1.78 0.28 0.13
0.11 1.92 0.16 0.25
0.56 1.63 0.58 0.17
0.78 2.73 0.88 0.22
0.26 0.04 0.02 0.27
1.70 4.75 1.74 0.53
0.52 0.19 0.13 0.51
1.39 0.25 0.33 1.53
1.31 0.19 0.23 1.40
0.00 0.00 0.00 0.00
0.01 0.06 0.01 0.01
0.01 0.07 0.01 0.01
0.01 0.07 0.01 0.01
0.01 0.01 0.01 0.01
0.01 0.04 0.01 0.01
0.01 0.01 0.01 0.01
0.21 0.35 0.11 0.16
1.93 4.26 1.97 0.48
1.93 4.26 1.97 0.48
0.04 0.04 0.05 0.04
0.02 0.02 0.02 0.02
0.01 0.03 0.01 0.01
0.02 0.02 0.02 0.02
0.01 0.01 0.01 0.01
0.05 0.45 0.05 0.05
0.07 1.18 0.07 0.16
0.04 1.05 0.18 0.04
0.01 0.01 0.01 0.01
0.07 1.31 0.23 0.17
0.07 1.15 0.23 0.16
3 4 5 6 7 1 2
FMC
5001-10000 10001-15000 15001-20000 20001-25000 25001-30000 MODEL 0-5000
28.00 28.00 28.00 28.00 28.00 A35D $ 4.92
27.00 27.00 27.00 27.00 27.00 A40D $ 4.80
45.00 45.00 45.00 45.00 45.00 A40E $ 4.80
45.00 45.00 45.00 45.00 45.00 ACTROS4046 $ 1.57
CAT16M $ 4.80
CAT24M $ 9.87
CAT740 $ 6.10
CAT992G $ 9.74
FD50T $ 0.67
FH16 520 $ 0.18
FH16 550 $ 0.18
FM380 $ 1.83
FM440 $ 1.83
FM9 $ 1.83
GD705A-2 $ 3.77
GD825A-2 $ 4.80
HD465-7 $ 12.59
HD785-5 $ 10.15
HD785-7 $ 10.15
HM400-1 $ 4.11
HT-22.5 Y $ 0.18
KERAX 350 $ 1.83
MHT10160L $ 2.51
MLB625 $ 2.47
WA500-3 $ 4.45
WA800-3 $ 9.74
WD600-3 $ 4.45
HD465 $ 12.59
3 4 5 6 7
TIRE
5001-10000 10001-15000 15001-20000 20001-25000 25001-30000
$ 4.92 $ 4.92 $ 4.92 $ 4.92 $ 4.92
$ 4.80 $ 4.80 $ 4.80 $ 4.80 $ 4.80
$ 4.80 $ 4.80 $ 4.80 $ 4.80 $ 4.80
$ 1.57 $ 1.57 $ 1.57 $ 1.57 $ 1.57
$ 4.80 $ 4.80 $ 4.80 $ 4.80 $ 4.80
$ 9.87 $ 9.87 $ 9.87 $ 9.87 $ 9.87
$ 6.10 $ 6.10 $ 6.10 $ 6.10 $ 6.10
$ 9.74 $ 9.74 $ 9.74 $ 9.74 $ 9.74
$ 0.67 $ 0.67 $ 0.67 $ 0.67 $ 0.67
$ 0.18 $ 0.18 $ 0.18 $ 0.18 $ 0.18
$ 0.18 $ 0.18 $ 0.18 $ 0.18 $ 0.18
$ 1.83 $ 1.83 $ 1.83 $ 1.83 $ 1.83
$ 1.83 $ 1.83 $ 1.83 $ 1.83 $ 1.83
$ 1.83 $ 1.83 $ 1.83 $ 1.83 $ 1.83
$ 3.77 $ 3.77 $ 3.77 $ 3.77 $ 3.77 $ 3.77
$ 4.80 $ 4.80 $ 4.80 $ 4.80 $ 4.80 $ 4.80
$ 12.59 $ 12.59 $ 12.59 $ 12.59 $ 12.59
$ 10.15 $ 10.15 $ 10.15 $ 10.15 $ 10.15
$ 10.15 $ 10.15 $ 10.15 $ 10.15 $ 10.15
$ 4.11 $ 4.11 $ 4.11 $ 4.11 $ 4.11
$ 0.18 $ 0.18 $ 0.18 $ 0.18 $ 0.18
$ 1.83 $ 1.83 $ 1.83 $ 1.83 $ 1.83
$ 2.51 $ 2.51 $ 2.51 $ 2.51 $ 2.51
$ 2.47 $ 2.47 $ 2.47 $ 2.47 $ 2.47
$ 4.45 $ 4.45 $ 4.45 $ 4.45 $ 4.45
$ 9.74 $ 9.74 $ 9.74 $ 9.74 $ 9.74
$ 4.45 $ 4.45 $ 4.45 $ 4.45 $ 4.45
$ 12.59 $ 12.59 $ 12.59 $ 12.59 $ 12.59
CAPITAL EXPENDITURES COST (USD) for ADDITIONAL INVESTMENT
TOTAL YEAR
DESCRIPTION
### 2011 2012 2013 2014 2015 2016
A. Production & Support Equipment 49,694,831### 20,755,431 6,387,200 10,453,500 11,428,700 670,000 -
B. Infrastructures 1,382,500### 1,382,500 - - - - -
C. Fixtures & Furnitures - 0 - - - - - -
-
GRAND TOTAL 51,077,331
### 22,137,931 6,387,200 10,453,500 11,428,700 670,000 -
YEAR
DESCRIPTION
### 2011 2012 2013 2014 2015 2016
ACQUISITION VALUE :
A. Production & Support Equipment ### 20,755,431 27,142,631 37,596,131 49,024,831 49,694,831 -
B. Infrastructures ### 1,382,500 1,382,500 1,382,500 1,382,500 1,382,500
C. Fixtures & Furnitures - - - - -
DEPRECIATION :
A. Production & Support Equipment 36,842,771 4,151,086 5,428,526 7,519,226 9,804,966 9,938,966 -
B. Infrastructures 1,382,500 276,500 276,500 276,500 276,500 276,500 -
C. Fixtures & Furnitures - - - - - - -
12,852,060
A. Production & Support Equipment 36,842,771### 4,151,086 5,428,526 7,519,226 9,804,966 9,938,966
B. Infrastructures 1,382,500### 276,500 276,500 276,500 276,500 276,500
C. Fixtures & Furnitures - - - - - -
Beginning - - - - - - -
0% Addition - - - - - - -
Deduction - - - - -
Ending - - - - - - -
Loan interest 7.50% - - - - -
OWNING AND OPERATING COST 1 2 3
B COAL WINNING
9 Hydraulic Excavators KOMATSU PC400LCSE-7 1.62 CUM
10 Hydraulic Excavators KOMATSU PC200-7 0.85 CUM
11 Rigid dumptruck KOMATSU FM440 30.00 cum
12 Rigid dumptruck VOLVO KERAX 350 20.00 TON
13 Rigid dumptruck VOLVO FM380 20.00 TON
C SUPPORT EQUIPMENT
14 Bulldozers KOMATSU D375A-5 525.00 HP
15 Bulldozers KOMATSU D155 320.00 HP
16 Bulldozers KOMATSU D85ESS-2 225.00 HP
17 Motor Grader KOMATSU GD705A-2 225.00 HP
18 Motor Grader KOMATSU GD825A-2 280.00 HP
19 Compactor BOMAG BW212 9.08 TONNES
20 Hydraulic Excavators KOMATSU PC200-7 0.80 CUM
21 Water Truck VOLVO FM9WT 20000.00 litres
22 Washing Truck VOLVO FM9WST 20000.00 litres
23 Fuel Truck VOLVO FM9FT 20000.00 litres
24 Lubetruck VOLVO FM9LT 0.00 0.00
25 Mobile Crane Truck VOLVO FM9CT 50.00 tonnes
26 Crane Truck TADANO ATF110 90.00 tonnes
27 Tire Handler Manitou MLB625 0.00 0.00
D AUXILIARY EQUIPMENT
28 Genset 0 PL30 30.00 KVA
29 Genset 0 PL250 250.00 KVA
30 Mega Tower Lamp 0 LS4-6000 0.00 0.00
31 Tower lamp 0 L8 0.00 0.00
32 Water pump MULTIFLOW MFV-420CS 150.00 litres/sec
33 Water pump MULTIFLOW MFV290 20.00 litres/sec
ASSUMPTIONS :
Whrs per year 5,000
Annual Rates 10%
OPERATING COST
COST OF OWNING
ECONOMIC DEPRECIATI COST
EQUITY I T I FUEL LUBRICANT
LIFETIME ON COST
FACTOR
(years) (hrs) (usd/hr) (usd/hr) (usd/hr) (lt/hr) (usd/hr) (usd/hr)
EXTERNAL EXTERNAL
DRILLING SPARE
GET TIRE OTHERS SERVICE SERVICE FMC
ACCESSORIES PARTS
FEE MATERIAL
(usd/hr) (usd/hr) (usd/hr) (usd/hr) (usd/hr) (usd/hr) (usd/hr) (usd/hr)
OWNING AND
OPERATING
OPERATING
COST
COST
(usd/hr) (usd/hr)
61.97 84.18
107.00 135.08
132.04 174.41
187.89 276.81
66.03 85.89
84.60 110.45
117.59 156.52
61.97 81.31
54.35 71.56
27.50 33.43
29.22 37.80
23.94 31.59
24.33 31.87
130.13 164.97
73.81 95.39
42.31 54.53
38.50 53.69
42.43 67.23
14.36 18.26
27.50 33.43
25.00 31.76
25.31 32.07
25.27 32.03
25.76 32.52
25.86 32.62
13.26 54.86
23.71 29.26
6.96 7.92
10.52 12.60
6.88 9.14
4.53 6.56
69.72 92.34
25.52 39.94
REPAIR AND MAINTENANCE COST
1 2 3
CAPACITY
EQUIPMENT TYPE BRAND MODEL CLASS
B COAL WINNING
9 Hydraulic Excavators KOMATSU PC400LCSE-7 1.62
10 Hydraulic Excavators KOMATSU PC200-7 0.85
11 Rigid dumptruck KOMATSU FM440 30.00
12 Rigid dumptruck VOLVO KERAX 350 20.00
13 Rigid dumptruck VOLVO FM380 20.00
C SUPPORT EQUIPMENT
14 Bulldozers KOMATSU D375A-5 525.00
15 Bulldozers KOMATSU D155 320.00
16 Bulldozers KOMATSU D85ESS-2 225.00
17 Motor Grader KOMATSU GD705A-2 225.00
18 Motor Grader KOMATSU GD825A-2 280.00
19 Compactor BOMAG BW212 9.08
20 Hydraulic Excavators KOMATSU PC200-7 0.80
21 Water Truck VOLVO FM9WT 20000.00
22 Washing Truck VOLVO FM9WST 20000.00
23 Fuel Truck VOLVO FM9FT 20000.00
24 Lubetruck VOLVO FM9LT 0.00
25 Mobile Crane Truck VOLVO FM9CT 50.00
26 Crane Truck TADANO ATF110 90.00
27 Tire Handler Manitou MLB625 0.00
D AUXILIARY EQUIPMENT
28 Genset 0 PL30 30.00
29 Genset 0 PL250 250.00
30 Mega Tower Lamp 0 LS4-6000 0.00
31 Tower lamp 0 L8 0.00
32 Water pump MULTIFLOW MFV-420CS 150.00
33 Water pump 0 MFV290 20.00
4 5 6 7 8 9 10 11
LUBRICANT
5001- 10001- 15001- 20001-
CAPACITY 10000 15000 20000 25000
ATTACHMENT 0-5000
(usd/hr) (usd/hr) (usd/hr) (usd/hr) (usd/hr)
INCHES rod and bit DP1100 1.43 1.57 1.45 1.57 1.46
CUM bucket PC800SE-7 1.13 1.27 1.13 1.29 1.17
CUM bucket PC1250SP-8 1.80 2.20 1.81 2.20 1.86
CUM bucket PC2000-8 2.08 2.64 2.08 2.64 2.13
TONNES rear dump CAT740 1.32 1.48 1.33 1.68 1.35
TONNES rear dump HD465 1.47 1.75 1.59 1.75 1.62
TONNES rear dump HD785-7 1.36 1.49 1.36 1.49 1.41
TONNES rear dump HM400-1 1.44 1.55 1.45 1.55 1.49
0
0.72 0.49 0.77 1.63 0.78 1.67 0.78 1.02 0.00 0.00
0.74 0.75 0.91 0.79 0.90 0.95 0.75 0.00 0.00
1.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.12 1.42 2.03 1.70 1.96 1.71 2.02 1.81 0.00 0.00
0.74 0.86 1.70 1.70 0.86 1.70 1.70 0.00 0.00
0.86 0.20 0.36 0.36 0.28 0.36 0.36 0.00 0.00
1.25 2.65 2.69 2.69 2.69 2.69 2.67 0.00 0.00
1.12 1.17 2.17 2.17 2.20 2.32 2.20 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.74 0.75 0.91 0.79 0.90 0.95 0.75 0.00 0.00
1.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.18
23 24 25 26 27 28 29 30 31 32 33
9.31 9.24 8.97 9.24 0.40 0.40 0.40 0.40 0.40 0.40
0.00 0.00 0.00 0.00 0.40 0.40 0.40 0.40 0.40 0.40
0.00 0.00 0.00 0.00 0.40 0.40 0.40 0.40 0.40 0.40
0.00 0.00 0.00 0.00 0.40 0.40 0.40 0.40 0.40 0.40
0.00 0.00 0.00 0.00 0.40 0.40 0.40 0.40 0.40 0.40
0.00 0.00 0.00 0.00 0.40 0.40 0.40 0.40 0.40 0.40
0.00 0.00 0.00 0.00 0.40 0.40 0.40 0.40 0.40 0.40
0.00 0.00 0.00 0.00 0.40 0.40 0.40 0.40 0.40 0.40
0.00 0.00 0.00 0.00 0.40 0.40 0.40 0.40 0.40 0.40
0.00 0.00 0.00 0.00 0.40 0.40 0.40 0.40 0.40 0.40
0.00 0.00 0.00 0.00 0.40 0.40 0.40 0.40 0.40 0.40
0.00 0.00 0.00 0.00 0.40 0.40 0.40 0.40 0.40 0.40
0.00 0.00 0.00 0.00 0.40 0.40 0.40 0.40 0.40 0.40
0.00 0.00 0.00 0.00 0.40 0.40 0.40 0.40 0.40 0.40
0.00 0.00 0.00 0.00 0.40 0.40 0.40 0.40 0.40 0.40
0.00 0.00 0.00 0.00 0.40 0.40 0.40 0.40 0.40 0.40
0.00 0.00 0.00 0.00 0.40 0.40 0.40 0.40 0.40 0.40
0.00 0.00 0.00 0.00 0.40 0.40 0.40 0.40 0.40 0.40
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.40 0.40 0.40 0.40 0.40 0.40
0.00 0.00 0.00 0.00 0.40 0.40 0.40 0.40 0.40 0.40
0.00 0.00 0.00 0.00 0.40 0.40 0.40 0.40 0.40 0.40
0.00 0.00 0.00 0.00 0.40 0.40 0.40 0.40 0.40 0.40
0.00 0.00 0.00 0.00 0.40 0.40 0.40 0.40 0.40 0.40
0.00 0.00 0.00 0.00 0.40 0.40 0.40 0.40 0.40 0.40
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.40 0.40 0.40 0.40 0.40 0.40
0.00 0.00 0.00 0.00 0.40 0.40 0.40 0.40 0.40 0.40
0.00 0.00 0.00 0.00 0.40 0.40 0.40 0.40 0.40 0.40
0.00 0.00 0.00 0.00 0.40 0.40 0.40 0.40 0.40 0.40
0.00 0.00 0.00 0.00 0.40 0.40 0.40 0.40 0.40 0.40
0.00 0.00 0.00 0.00 0.40 0.40 0.40 0.40 0.40 0.40
0.00 0.00 0.00 0.00 0.40 0.40 0.40 0.40 0.40 0.40
0.00 0.00 0.00 0.00 0.00 0.00 0.00
34 35 36 37 38 39 40 41 42 43
SPAREPARTS EKSTERNAL S
5001- 10001- 15001- 20001- 25001- 5001-
0-5000 10000 15000 20000 25000 30000 0-5000 10000
(usd/hr) (usd/hr) (usd/hr) (usd/hr) (usd/hr) (usd/hr) (usd/hr) (usd/hr)
0.4 2.63 6.51 26.10 9.37 6.63 25.63 12.81 0.11 0.26
0.79 1.95 12.86 1.95 0.79 13.66 0.03 0.08
1.08 4.85 2.58 18.44 4.91 2.62 0.04 0.19
0.42 0.49 0.43 0.49 0.43 0.49 0.02 0.02
0.51 4.45 4.46 7.99 4.58 4.57 0.02 0.18
0.4 19.97 35.16 35.04 57.01 35.87 34.52 36.26 0.80 1.41
16.68 27.59 28.27 37.16 29.67 26.35 0.67 1.10
5.47 10.84 10.83 19.09 10.86 10.86 0.22 0.43
3.86 6.41 3.88 35.10 6.49 3.87 0.15 0.26
1.75 3.89 1.77 42.17 3.86 1.79 0.07 0.16
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.79 1.95 12.86 1.95 0.79 13.66 0.03 0.08
0.89 4.60 4.61 8.12 4.73 4.71 0.04 0.18
0.89 4.60 4.61 8.12 4.73 4.71 0.15 0.26
0.89 4.60 4.61 8.12 4.73 4.71 0.07 0.16
0.40 0.89 4.60 4.61 8.12 4.73 4.71 4.61 0.17 0.91
0.89 4.60 4.61 8.12 4.73 4.71 0.17 0.39
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.89 0.96 0.91 0.96 0.99 0.91 0.04 0.04
- - -
- - -
- - -
53 54 55 56 57 58 59 60 61 62 63
TIRE
5001- 10001- 15001- 20001- 25001-
10000 15000 20000 25000 30000
(usd/hr) (usd/hr) (usd/hr) (usd/hr) (usd/hr)
B COAL WINNING
9 Hydraulic Excavators PC400LCSE-7
10 Hydraulic Excavators PC200-7
11 Rigid dumptruck FM440
12 Rigid dumptruck KERAX 350
13 Rigid dumptruck FM380
C SUPPORT EQUIPMENT
14 Bulldozers D375A-5
15 Bulldozers D155
16 Bulldozers D85ESS-2
17 Motor Grader GD705A-2
18 Motor Grader GD825A-2
19 Compactor BW212
20 Hydraulic Excavators PC200-7
21 Water Truck FM9WT
22 Washing Truck FM9WST
23 Fuel Truck FM9FT
24 Lubetruck FM9LT
25 Mobile Crane Truck FM9CT
26 Crane Truck ATF110
27 Tire Handler MLB625
D AUXILIARY EQUIPMENT
28 Genset PL30
29 Genset PL250
30 Mega Tower Lamp LS4-6000
31 Tower lamp L8
32 Water pump MFV-420CS
33 Water pump MFV290
TOTAL
B COAL WINNING
9 Hydraulic Excavators PC400LCSE-7
10 Hydraulic Excavators PC200-7
11 Rigid dumptruck FM440
12 Rigid dumptruck KERAX 350
13 Rigid dumptruck FM380
C SUPPORT EQUIPMENT
14 Bulldozers D375A-5
15 Bulldozers D155
16 Bulldozers D85ESS-2
17 Motor Grader GD705A-2
18 Motor Grader GD825A-2
19 Compactor BW212
20 Hydraulic Excavators PC200-7
21 Water Truck FM9WT
22 Washing Truck FM9WST
23 Fuel Truck FM9FT
24 Lubetruck FM9LT
25 Mobile Crane Truck FM9CT
26 Crane Truck ATF110
27 Tire Handler MLB625
D AUXILIARY EQUIPMENT
28 Genset PL30
29 Genset PL250
30 Mega Tower Lamp LS4-6000
31 Tower lamp L8
32 Water pump MFV-420CS
33 Water pump MFV290
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
ADJ. FACTOR
RM/REV %
GPROFIT
TOTAL
TOTAL
TOTAL
XVIII TIRE (USD)
TOTAL
Others
c. R/M Cost
Sparepart
External Service Fee
External Service Material
Workshop Tools
General Supplies
Full Maintenance Contract
TOTAL
b. Consumable Goods
Fuel
Oil/Grease/Lubricant
Ground Engage Tools
Tire
Explosives
Drilling Acessories
Undercarriage
Others
c. R/M Cost
Sparepart
External Service Fee
External Service Material
Workshop Tools
General Supplies
Full Maintenance Contract
LACEMENT EQUIPMENT
YEAR
Y1 Y2
- 1 0
- 1 0
- 0 0
- 2 1
- 6 0
- 0 0
- 10 4
- 0 0
- 1 0
- 0 0
- 3 2
- 0 0
- 0 0
-
- 1 1
- 0 0
- 6 2
- 3 0
- 0 0
subcont 0 0
- 1 0
- 2 0
- 1 0
- 2 0
- 1 0
- 1 0
- 0 0
- 1 0
- 2 0
- 2 0
- 2 0
- 4 0
- 0 0
- 2 0
55 10
56
YEAR
TOTAL
Y1 Y2
55,733 7,553 7,859
44,309 5,936 6,338
- - -
205,204 21,911 36,885
306,913 39,732 43,689
- - -
651,034 71,562 101,757
- - -
- -
- -
25,441 3,425 3,625
- - -
162,609 15,056 25,055
- - -
- - -
- -
- -
63,686 5,658 10,922
- - -
214,479 26,352 33,854
107,285 18,898 18,472
- - -
- - -
27,505 3,606 3,635
63,516 13,430 12,759
31,758 6,715 6,379
63,516 13,430 12,759
31,758 6,715 6,379
31,758 6,715 6,379
- - -
25,675 5,297 5,406
- -
- -
10,574 2,350 2,150
10,574 2,350 2,150
10,574 2,350 2,150
36,133 4,699 4,300
- - -
15,524 3,455 3,162
YEAR
TOTAL
Y1 Y2
- - -
60,928 6,871 10,970
- - -
625,653 70,712 104,388
- - -
- - -
- - -
- - -
- - -
- - -
37,794 2,576 3,858
- - -
- - -
- - -
- - -
- - -
- - -
99,437 7,404 17,056
- - -
75,361 6,286 12,516
232,521 41,262 39,792
- - -
- - -
32,256 3,903 4,478
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
YEAR
TOTAL
Y1 Y2
YEAR
TOTAL
Y1 Y2
YEAR
TOTAL
Y1 Y2
YEAR
TOTAL
Y1 Y2
YEAR
TOTAL
Y1 Y2
YEAR
TOTAL
Y1 Y2
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
FOR ADD EQUIPMENT
YEAR
TOTAL
Y1 Y2
- - -
- - -
- - -
- - -
1,325,643 183,352 180,146
- - -
4,660,310 535,029 711,706
- - -
- - -
- - -
- - -
- - -
296,557 28,516 45,921
- - -
- - -
- - -
- - -
- - -
- - -
- - -
326,947 58,726 55,756
- - -
- - -
- - -
88,846 19,054 18,090
44,423 9,527 9,045
88,846 19,054 18,090
44,423 9,527 9,045
44,423 9,527 9,045
- - -
59,769 12,818 12,170
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
QUIPMENT
TOTAL 2011 Y2
(USD) -
(USD) 2,195,556 287,195 356,066
(USD) 1,163,949 139,014 193,058
(USD) 6,980,185 885,130 1,069,015
(USD) -
(USD) 340,067 46,243 46,373
(USD)
(USD) 23,508,925 940,357 4,231,607
(USD) 999,906 41,201 92,103
(USD) 492,547 20,600 46,052
(USD) -
(USD) -
(USD) - - -
TOTAL 2011 Y2
(USD) - - -
(USD) - - -
(USD) - - -
(USD) - - -
(USD) - - -
(USD) - - -
(USD) - - -
(USD) - - -
(USD)
(USD) - - -
(USD) - - -
(USD) - - -
(USD) - - -
(USD) - - -
(USD) - - -
- - -
TOTAL 2011 Y2
(USD) - - -
(USD) 2,195,556 287,195 356,066
(USD) 1,163,949 139,014 193,058
(USD) 6,980,185 885,130 1,069,015
(USD) - - -
(USD) 340,067 46,243 46,373
(USD) - - -
(USD) 745,160 103,934 118,599
(USD) - -
(USD) 23,508,925 940,357 4,231,607
(USD) 999,906 41,201 92,103
(USD) 492,547 20,600 46,052
(USD) - - -
(USD) - - -
(USD) - - -
1 0 0 0
1 0 0 0
0 0 0 0
1 1 0 0
5 1 0 0
0 0 0 0
5 9 0 0
0 0 0 0
1 0 0 0
0 0 0 0
2 3 0 0
0 0 0 0
0 0 0 0
0 1 1 0
0 0 0 0
2 4 0 0
1 0 0 0
0 0 0 0
0 0 0 0
1 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
5 0 0 0
0 0 0 0
0 0 0 0
25 19 1 0
Y3 Y4 Y5 0
13,702 13,799 12,819
10,695 11,241 10,099
- - -
42,146 53,129 51,132
69,380 82,755 71,357
- - -
124,947 175,740 177,028
- - -
- - -
- - -
6,172 6,363 5,855
- - -
33,385 44,179 44,934
- - -
- - -
- - -
- - -
10,539 15,142 21,425
- - -
41,077 55,069 58,127
23,412 22,881 23,621
- - -
- - -
6,698 6,753 6,813
12,461 11,853 13,013
6,231 5,926 6,507
12,461 11,853 13,013
6,231 5,926 6,507
6,231 5,926 6,507
- - -
4,902 5,022 5,048
- - -
- - -
2,097 1,882 2,096
2,097 1,882 2,096
2,097 1,882 2,096
9,231 8,468 9,434
- - -
3,059 2,768 3,079
Y3 Y4 Y5 0
- - -
12,372 19,255 11,459
- - -
137,206 152,775 160,571
- - -
- - -
- - -
- - -
- - -
- - -
10,061 6,808 14,491
- - -
- - -
- - -
- - -
- - -
- - -
17,775 23,305 33,896
- - -
15,456 18,026 23,077
50,973 49,305 51,190
- - -
- - -
7,324 8,299 8,251
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
Y3 Y4 Y5 0
Y3 Y4 Y5 0
Y3 Y4 Y5 0
Y3 Y4 Y5 0
Y3 Y4 Y5 0
Y3 Y4 Y5 0
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - - -
Y3 Y4 Y5 0
- - -
- - -
- - -
- - -
318,511 321,817 321,817
- - -
915,217 1,249,179 1,249,179
- - -
- - -
- - -
- - -
- - -
60,917 80,601 80,601
- - -
- - -
- - -
- - -
- - -
- - -
- - -
71,702 69,062 71,702
- - -
- - -
- - -
17,448 16,806 17,448
8,724 8,403 8,724
17,448 16,806 17,448
8,724 8,403 8,724
8,724 8,403 8,724
- - -
11,738 11,306 11,738
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
0% 0% 0%
Y3 Y4 Y5 0
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
Y3 Y4 Y5 0
- - - -
449,250 550,438 552,607 -
251,169 277,773 302,935 -
1,439,152 1,790,784 1,796,104 -
- - - -
85,808 81,308 80,335 -
- - - -
156,362 180,504 185,761 -
- - - -
4,795,821 6,464,954 7,076,186 -
119,795 481,441 265,366 -
59,898 240,721 125,277 -
- - - -
- - - -
- - - -
DESCRIPTION PM SH SPV GL
EQ.REQUIED
POSITION EXIST
PM
Section Head
Supervisor
GL
Operator
Mekanik
Worker
Total
DESCRIPTION TOTAL
Salary 10,368,067
Overtime 3,868,378
Allowance 2,959,369
Travelling Cost 2,286,945
Catering 793,175
Labor Supply 422,236
Others 1,525,568
Total 22,223,738
8.93% 7.73% 10.29% 9.35% 9.35%
111
56 65 90 109 109
2016
2016
-
-
-
-
-
-
-
-
e. Other Over Head Cost
Tax & Licences 0.20% 0.20%
Insurance 0.33% 0.33%
Transport Equipment 2.00% 2.00%
Office Expenses 0.20% 0.20%
Mess Expenses 0.10% 0.10%
Safety 0.33% 0.33%
Security 0.01% 0.01%
Training 0.03% 0.03%
Building Maintenance 0.11% 0.11%
CSR 0.47% 0.47%
f. Mobilisation
Equipment Fleet
Spare Part 0.40% 0.40%
Tyre 0.35% 0.35%
Fuel
Others 0.15% 0.15%
NO EQUIPMENT TYPE
TOTAL
NO EQUIPMENT TYPE
A OVERBURDEN REMOVAL EQUIPMENT
1 DP1100
2 PC800SE-7
3 PC1250SP-8
4 PC2000-8
5 CAT740
6 HD465
7 HD785-7
8 HM400-1
- -
B COAL WINNING
9 PC400LCSE-7
10 PC200-7
11 FM440
12 KERAX 350
13 FM380
- -
C SUPPORT EQUIPMENT
14 D375A-5
15 D155
16 D85ESS-2
17 GD705A-2
18 GD825A-2
19 BW212
20 PC200-7
21 FM9WT
22 FM9WST
23 FM9FT
24 FM9LT
25 FM9CT
26 ATF110
27 MLB625
- -
D AUXILIARY EQUIPMENT
28 PL30
29 PL250
30 LS4-6000
31 L8
32 MFV-420CS
33 MFV290
TOTAL
NO EQUIPMENT TYPE
TOTAL
YEAR
PEAK
Y1 Y2 Y3
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
1 1 1 1
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
1 1 1 1
YEAR
TOTAL
Y1 Y2 Y3
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
24,231 5,197 4,934 4,759
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
42.00 - - - -
24.42 - - - -
35.00 - - - -
21.00 - - - -
20.00 - - - -
- - - - -
- - - - -
- - - - -
- - - - -
32.00 - - - -
- - - - -
- - - - -
21.00 508,844 109,127 103,608 99,929
22.00 - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
9,000.00 - - - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
1 1 -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- -
- -
- - -
- - -
- - -
- - -
- -
- -
1 1 -
Y4 Y5 -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
4,583 4,759 -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
4,583 4,759 -
Y4 Y5 -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
96,250 99,929 -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
96,250 99,929 -
1 KONTRAKTOR PRODUCTION
YEAR
TOTAL 2011 2012 2013 2014 2015 2016 2017
PRODUCTION RATE
REVENUE
A PRODUCTION :
B OHDA :
OB removal (usd) -
Coal winning (usd) -
Sub-Total-2 USD - - - - - -
OB removal (usd)
Coal winning (usd)
Coal transporting (usd)
Sub-Total-3 USD
TOTAL 0 241,237,325 30,505,788 39,880,723 46,595,677 62,127,569 62,127,569
REVENUE AND COST SUMMARY
PROJECT : BIMO
REVENUE USD 241,237,325 100% 30,505,788 100% 39,880,723 100% 46,595,677 100% 62,127,569 100% 62,127,569 100%
a. Employee Compensation Cos (USD) 23,037,691 9.55% 2,725,491 8.93% 3,083,142 7.73% 4,795,936 10.29% 5,809,584 9.35% 5,809,584 9.35% 813,953 #DIV/0!
Salary (USD) 10,368,067 4.3% 1,288,625 4.22% 1,450,558 3.64% 2,239,326 4.81% 2,694,779 4.34% 2,694,779 4.34% - #DIV/0!
Overtime (USD) 3,868,378 1.6% 449,946 1.47% 519,909 1.30% 831,281 1.78% 1,033,621 1.66% 1,033,621 1.66% - #DIV/0!
Allowance (USD) 2,959,369 1.2% 388,866 1.27% 436,537 1.09% 631,438 1.36% 751,264 1.21% 751,264 1.21% - #DIV/0!
Travelling Cost (USD) 2,286,945 0.9% 268,446 0.88% 305,306 0.77% 496,894 1.07% 608,150 0.98% 608,150 0.98% - #DIV/0!
Catering (USD) 793,175 0.3% 94,261 0.31% 106,595 0.27% 172,774 0.37% 209,772 0.34% 209,772 0.34% - #DIV/0!
Labor Supply/Closure Cost (USD) 1,236,189 0.5% 46,148 0.15% 52,657 0.13% 92,954 0.20% 115,238 0.19% 115,238 0.19% 813,953 #DIV/0!
Others (USD) 1,525,568 0.6% 189,198 0.62% 211,579 0.53% 331,271 0.71% 396,760 0.64% 396,760 0.64% - #DIV/0!
b. Consumable Goods (USD) 102,960,283 42.68% 12,952,409 42.46% 16,183,880 40.58% 20,528,281 44.06% 26,371,840 42.45% 26,923,873 43.34% - #DIV/0!
Fuel (USD) 81,523,463 33.8% 10,207,316 33.5% 12,732,118 31.93% 16,221,173 34.81% 20,923,879 33.68% 21,438,977 34.51% - #DIV/0!
Oil/Grease/Lubricant (USD) 2,195,556 0.9% 287,195 0.9% 356,066 0.89% 449,250 0.96% 550,438 0.89% 552,607 0.89% - #DIV/0!
Ground Engage Tools (USD) 1,163,949 0.5% 139,014 0.5% 193,058 0.48% 251,169 0.54% 277,773 0.45% 302,935 0.49% - #DIV/0!
Tire (USD) 6,980,185 2.9% 885,130 2.9% 1,069,015 2.68% 1,439,152 3.09% 1,790,784 2.88% 1,796,104 2.89% - #DIV/0!
Explosives (USD) 10,011,902 4.2% 1,283,577 4.2% 1,668,650 4.18% 1,925,366 4.13% 2,567,154 4.13% 2,567,154 4.13% - #DIV/0!
Drilling Acessories (USD) 340,067 0.1% 46,243 0.2% 46,373 0.12% 85,808 0.18% 81,308 0.13% 80,335 0.13% - #DIV/0!
Others (USD) 745,160 0.3% 103,934 0.3% 118,599 0.30% 156,362 0.34% 180,504 0.29% 185,761 0.30% - #DIV/0!
c. R/M Cost (USD) 25,001,378 10.36% 1,002,158 3.29% 4,369,761 10.96% 4,975,513 10.68% 7,187,116 11.57% 7,466,830 12.02% - #DIV/0!
Sparepart (USD) 23,508,925 9.7% 940,357 3.1% 4,231,607 10.61% 4,795,821 10.29% 6,464,954 10.41% 7,076,186 11.39% - #DIV/0!
External Service Fee (USD) 999,906 0.4% 41,201 0.1% 92,103 0.23% 119,795 0.26% 481,441 0.77% 265,366 0.43% - #DIV/0!
External Service Material (USD) 492,547 0.2% 20,600 0.1% 46,052 0.12% 59,898 0.13% 240,721 0.39% 125,277 0.20% - #DIV/0!
Workshop Tools (USD) - 0.0% - 0.0% - 0.00% - 0.00% - 0.00% - 0.00% - #DIV/0!
General Supplies (USD) - 0.0% - 0.0% - 0.00% - 0.00% - 0.00% - 0.00% - #DIV/0!
Full Maintenance Contract (USD) - 0.0% - 0.0% - 0.00% - 0.00% - 0.00% - 0.00% - #DIV/0!
d. Sub Contractor US$ 3,075,302 1.27% 438,160 1.44% 531,351 1.33% 593,479 1.27% 754,316 1.21% 757,995 1.22% - #DIV/0!
Heavy Equipment (USD) 508,844 0.2% 109,127 0.4% 103,608 0.26% 99,929 0.21% 96,250 0.15% 99,929 0.16% - #DIV/0!
Dump Truck (USD) - 0.0% 0.0% 0.00% 0.00% 0.00% 0.00% - #DIV/0!
Prime Mover/Trailer (USD) - 0.0% 0.0% 0.00% 0.00% 0.00% 0.00% - #DIV/0!
Drilling Service (USD) - 0.0% 0.0% 0.00% 0.00% 0.00% 0.00% - #DIV/0!
Blasting Service (USD) 2,566,459 1.1% 329,033 1.1% 427,743 1.07% 493,550 1.06% 658,066 1.06% 658,066 1.06% - #DIV/0!
Dewatering Pump/MMU (USD) - 0.0% 0.0% 0.00% 0.00% 0.00% 0.00% - #DIV/0!
e. Other Over Head Cost (USD) 8,826,587 3.66% 1,229,974 4.03% 1,448,221 3.63% 1,714,475 3.68% 2,261,938 3.64% 2,171,979 3.50% - #DIV/0!
Tax & Licences (USD) 462,349 0.2% 172,270 0.6% 65,467 0.16% 98,899 0.21% 107,836 0.17% 17,877 0.03% - #DIV/0!
Insurance (USD) 793,167 0.3% 100,300 0.3% 131,124 0.33% 153,202 0.33% 204,270 0.33% 204,270 0.33% - #DIV/0!
Transport Equipment (USD) 4,822,279 2.0% 609,804 2.0% 797,207 2.00% 931,437 2.00% 1,241,916 2.00% 1,241,916 2.00% - #DIV/0!
Office Expenses (USD) 486,202 0.2% 61,483 0.2% 80,378 0.20% 93,911 0.20% 125,215 0.20% 125,215 0.20% - #DIV/0!
Mess Expenses (USD) 241,186 0.1% 30,499 0.1% 39,872 0.10% 46,586 0.10% 62,114 0.10% 62,114 0.10% - #DIV/0!
Safety (USD) 790,036 0.3% 99,904 0.3% 130,607 0.33% 152,598 0.33% 203,464 0.33% 203,464 0.33% - #DIV/0!
Security -
Training (USD) 15,224 0.0% 1,925 0.0% 2,517 0.01% 2,941 0.01% 3,921 0.01% 3,921 0.01% - #DIV/0!
Building Maintenance (USD) 82,329 0.0% 10,411 0.0% 13,610 0.03% 15,902 0.03% 21,203 0.03% 21,203 0.03% - #DIV/0!
Others (USD) 1,133,815 0.5% 143,377 0.5% 187,439 0.47% 219,000 0.47% 292,000 0.47% 292,000 0.47% - #DIV/0!
f. Mobilisation (USD) 5,856,729 2.43% 966,656 3.17% 831,459 2.08% 1,090,912 2.34% 1,352,462 2.18% 1,247,798 2.01% 367,442 #DIV/0!
Equipment Fleet (USD) 1,093,023 0.5% 367,442 1.2% 67,442 0.17% 155,814 0.33% 127,907 0.21% 6,977 0.01% 367,442 #DIV/0!
Spare Part (USD) 964,949 0.4% 122,023 0.4% 159,523 0.40% 186,383 0.40% 248,510 0.40% 248,510 0.40% - #DIV/0!
Tyre (USD) 844,331 0.4% 106,770 0.4% 139,583 0.35% 163,085 0.35% 217,446 0.35% 217,446 0.35% - #DIV/0!
Fuel (USD) 2,592,570 1.1% 324,663 1.1% 405,091 1.02% 515,737 1.11% 665,407 1.07% 681,673 1.10% - #DIV/0!
Others (USD) 361,856 0.2% 45,759 0.2% 59,821 0.15% 69,894 0.15% 93,191 0.15% 93,191 0.15% - #DIV/0!
g. Depreciation (USD) 38,225,271 15.85% 4,427,586 14.51% 5,705,026 14.31% 7,795,726 16.73% 10,081,466 16.23% 10,215,466 16.44% - #DIV/0!
Equipment 36,842,771 15.3% 4,151,086 13.6% 5,428,526 13.61% 7,519,226 16.14% 9,804,966 15.78% 9,938,966 16.00% - #DIV/0!
Infrastructures 1,382,500 0.6% 276,500 0.9% 276,500 0.69% 276,500 0.59% 276,500 0.45% 276,500 0.45% - #DIV/0!
Fixtures and Furnitures - 0.0% - 0.0% - 0.00% - 0.00% - 0.00% - 0.00% - #DIV/0!
2% (USD) 4,824,746 2.0% 610,116 2.0% 797,614 2.00% 931,914 2.00% 1,242,551 2.00% 1,242,551 2.00% #DIV/0!
RATE PRODUCTION
COAL
OB REM OB REM COAL WIN S/RATIO ESC RATE EBITDA NPV (i=10%)
WINNING CAPEX DEBT RATIO OPEX EBIT EAT IRR
(usd/bcm) (usd/tonne) (bcm) (ton) (bcm/ton) (usd) (usd/tonne) per year (%ofrev) (%ofrev) (%ofrev) (usd)
2.94 1.67 78,000,000 7,166,667 10.88 51,077,331 0.00% 23.55 0.00% 30.04% 14.20% 8.65% 5,020,405 18.00%
2.94 1.67 78,000,000 7,166,667 10.88 51,077,331 30.00% 23.55 0.00% 30.04% 14.20% 7.63% 6,239,521 27.80%
2.94 1.67 78,000,000 7,166,667 10.88 51,077,331 40.00% 23.55 0.00% 30.04% 14.20% 7.29% 6,645,893 35.32%
2.94 1.67 78,000,000 7,166,667 10.88 51,077,331 50.00% 23.55 0.00% 30.04% 14.20% 6.95% 7,052,265 49.28%
2.94 1.67 78,000,000 7,166,667 10.88 51,077,331 60.00% 23.55 0.00% 30.04% 14.20% 6.61% 7,458,638 80.36%
2.94 1.67 78,000,000 7,166,667 10.88 51,077,331 70.00% 23.55 0.00% 30.04% 14.20% 6.27% 7,865,010 177.32%
2.94 1.67 78,000,000 7,166,667 10.88 51,077,331 0.00% 23.55 0.00% 30.04% 14.20% 8.65% 5,020,405 18.00%
2.94 1.67 78,000,000 7,166,667 10.88 51,077,331 0.00% 23.55 0.00% 30.04% 14.20% 8.65% 5,020,405 18.00%
2.94 1.67 78,000,000 7,166,667 10.88 51,077,331 0.00% 23.55 0.00% 30.04% 14.20% 8.65% 5,020,405 18.00%
2.94 1.67 78,000,000 7,166,667 10.88 51,077,331 0.00% 23.55 0.00% 30.04% 14.20% 8.65% 5,020,405 18.00%
2.94 1.67 78,000,000 7,166,667 10.88 51,077,331 0.00% 23.55 0.00% 30.04% 14.20% 8.65% 5,020,405 18.00%
2.94 1.67 78,000,000 7,166,667 10.88 51,077,331 0.00% 23.55 0.00% 30.04% 14.20% 8.65% 5,020,405 18.00%
2.94 1.67 78,000,000 7,166,667 10.88 51,077,331 0.00% 23.55 0.00% 30.04% 14.20% 8.65% 5,020,405 18.00%
2.94 1.67 78,000,000 7,166,667 10.88 51,077,331 0.00% 23.55 0.00% 30.04% 14.20% 8.65% 5,020,405 18.00%
2.94 1.67 78,000,000 7,166,667 10.88 51,077,331 0.00% 23.55 0.00% 30.04% 14.20% 8.65% 5,020,405 18.00%
2.94 1.67 78,000,000 7,166,667 10.88 51,077,331 0.00% 23.55 0.00% 30.04% 14.20% 8.65% 5,020,405 18.00%
2.94 1.67 78,000,000 7,166,667 10.88 51,077,331 0.00% 23.55 0.00% 30.04% 14.20% 8.65% 5,020,405 18.00%
2.94 1.67 78,000,000 7,166,667 10.88 51,077,331 0.00% 23.55 0.00% 30.04% 14.20% 8.65% 5,020,405 18.00%
2.94 1.67 78,000,000 7,166,667 10.88 51,077,331 0.00% 23.55 0.00% 30.04% 14.20% 8.65% 5,020,405 18.00%
NPV dan IRR
NPV and IRR
tahun
0 1 2 3
IRR 17.13%
4 5 6 7 8
bkan NPV = 0
150%
L N P R T V X Z
PROJECTED INCOME STATEMENT (USD) PROJECTED CASHFLOW (USD) 241,237,325 - 30,505,788 39,880,723 46,595,677 62,127,569 62,127,569 -
1.00 1.00 1.00 1.00 1.00 1.00 1.00
DESCRIPTION TOTAL % of rev Y1 % of rev Y2 % of rev Y3 % of rev Y4 % of rev Y5 % of rev Y6 241,237,325 2010 Y1 Y2 Y3 Y4 Y5 Y6
SALES REVENUE 241,237,325 100.00% 30,505,788 100.00% 39,880,723 100.00% 46,595,677 100.00% 62,127,569 100.00% 62,127,569 100.00% -### Cash inflow : - 27,963,639 39,099,478 46,036,097 60,833,244 62,127,569 15,458,945
Government Royalty - Net Revenue 30 days 27,963,639 39,099,478 46,036,097 60,833,244 62,127,569 5,177,297
Additional Revenue -
Net Revenue 241,237,325 30,505,788 39,880,723 46,595,677 62,127,569 62,127,569 - Longterm loan - - - - - -
Salvage value - - 10,281,648 20.13%
Operating Cost : 168,757,971 69.96% 19,314,849 63.32% 26,447,815 66.32% 33,698,596 72.32% 43,737,257 70.40% 44,378,059 71.43% 1,181,395###
EBITDA 72,479,354 30.04% 11,190,939 36.68% 13,432,908 33.68% 12,897,081 27.68% 18,390,312 29.60% 17,749,510 28.57% (1,181,395)
### Capital Expenditures - 22,137,931 6,387,200 10,453,500 11,428,700 670,000 -
Depreciation 38,225,271 15.85% 4,427,586 14.51% 5,705,026 14.31% 7,795,726 16.73% 10,081,466 16.23% 10,215,466 16.44% -### Operating Expenses - 21,314,784 26,447,815 33,698,596 43,737,257 44,378,059 1,181,395
a. Employee Compensation Cost 2,725,491 3,083,142 4,795,936 5,809,584 5,809,584 813,953
EBIT 34,254,083 14.20% 6,763,353 22.17% 7,727,882 19.38% 5,101,355 10.95% 8,308,846 13.37% 7,534,043 12.13% (1,181,395)
### b. Consumable Goods 12,952,409 16,183,880 20,528,281 26,371,840 26,923,873 -
HO Operating Expenses 4,824,746 2.00% 610,116 2.00% 797,614 2.00% 931,914 2.00% 1,242,551 2.00% 1,242,551 2.00% - 30.00 c. R/M Cost 3,002,093 4,369,761 4,975,513 7,187,116 7,466,830 -
Loan Interest - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - d. Subcontractor cost 438,160 531,351 593,479 754,316 757,995 -
e. Other Over Head Cost 1,229,974 1,448,221 1,714,475 2,261,938 2,171,979 -
Earning before tax (E B T) 29,429,337 12.20% 6,153,237 20.17% 6,930,267 17.38% 4,169,441 8.95% 7,066,295 11.37% 6,291,492 10.13% (1,181,395)
### f. Mobilization Cost 966,656 831,459 1,090,912 1,352,462 1,247,798 367,442
HO operating expenses 610,116 797,614 931,914 1,242,551 1,242,551 -
Corporate tax 28% 8,571,005 3.55% 1,722,906 5.65% 1,940,475 4.87% 1,167,444 2.51% 1,978,562 3.18% 1,761,618 2.84% - ### Principal Loan payment - - - - - -
Loan Interest - - - - - -
Net Profit (Earning After Tax) 20,858,332 8.65% 4,430,330 14.52% 4,989,793 12.51% 3,001,998 6.44% 5,087,732 8.19% 4,529,874 7.29% (1,181,395)
### Corporate tax 1,722,906 1,940,475 1,167,444 1,978,562 1,761,618 -
F ATO 172% 217% 221% 277% 483% Net Cashflow - (17,822,098) 3,526,374 (215,356) 2,446,174 14,075,340 14,277,550
Accumulative Net Cashflow - (17,822,098) (14,295,724) (14,511,080) (12,064,906) 2,010,435 16,287,985
I PRODUCTION TARGET
DESCRIPTION TOTAL Y1 Y2 Y3 Y4 Y5
II EQUIPMENT REQUIRED
DESCRIPTION Y1 Y2 Y3 Y4 Y5
B COAL WINNING
9 Hydraulic Excavators PC400LCSE-7 1 1 2 2 2
10 Hydraulic Excavators PC200-7 0 0 0 0 0
11 Rigid dumptruck FM440 3 5 7 10 10
12 Rigid dumptruck KERAX 350 0 0 0 0 0
13 Rigid dumptruck FM380 0 0 0 0 0
C SUPPORT EQUIPMENT
14 Bulldozers D375A-5 1 2 2 3 4
15 Bulldozers D155 0 0 0 0 0
16 Bulldozers D85ESS-2 6 8 10 14 13
17 Motor Grader GD705A-2 3 3 4 4 4
18 Motor Grader GD825A-2 0 0 0 0 0
19 Compactor BW212 1 1 1 1 1
20 Hydraulic Excavators PC200-7 1 1 2 2 2
21 Water Truck FM9WT 2 2 2 2 2
22 Washing Truck FM9WST 1 1 1 1 1
23 Fuel Truck FM9FT 2 2 2 2 2
24 Lubetruck FM9LT 1 1 1 1 1
25 Mobile Crane Truck FM9CT 1 1 1 1 1
26 Crane Truck ATF110 0 0 0 0 0
27 Tire Handler MLB625 1 1 1 1 1
D AUXILIARY EQUIPMENT
28 Genset PL30 2 2 2 2 2
29 Genset PL250 2 2 2 2 2
30 Mega Tower Lamp LS4-6000 2 2 2 2 2
31 Tower lamp L8 4 4 9 9 9
32 Water pump MFV-420CS 0 0 0 0 0
33 Water pump MFV290 2 2 2 2 2
DESCRIPTION TOTAL Y1 Y2 Y3 Y4 Y5
A. Production & Support Equipment 49,694,831 20,755,431 6,387,200 10,453,500 11,428,700 670,000
B. Infrastructures 1,382,500 1,382,500 - - - -
C. Fixtures & Furnitures - - - - - -
IV FINANCIAL PARAMETERS