DSLNG Project Job No.

: 0-5151-20
Doc. No. : S-900-1670-501 <Rev.0>
TEST AND INSPECTION PLAN FOR STATIC EQUIPMENT ERECTION SHEET 7 OF 62

5. SCOPE OF TEST & INSPECTION

WITNESS BY

CONTRACTOR
SUBCONT’R

OWNER
SITE INSPECTION ITEM REFERENCE REQUIREMENT FREQUENCY FORM REMARKS

1.1 Padding
(1) Material A283, A36 or Material Certificate Check before 5000-102 FI/P SW IW
(Liners) equivalent erection
5000-104
5000-106
5000-302
5000-304
5000-402
(2) Interval Max. spacing 800 mm
(3) Loading Max. 30 kg/cm²

D R A
N
I 01-SEP 2
- 2 0 1
DSLNG Project Job No. : 0-5151-20
Doc. No. : S-900-1670-501 <Rev.0>
TEST AND INSPECTION PLAN FOR STATIC EQUIPMENT ERECTION SHEET 8 OF 59

WITNESS BY

CONTRACTOR
SUBCONT’R
SITE INSPECTION ITEM REFERENCE REQUIREMENT FREQUENCY FORM REMARKS

OWNER
1.2 Verticality / Section 7.2 ±6mm/10m, not exceed 5000-101 FI/P FW FW
Horizontally 18mm/30m
5000-103
5000-105
5000-301
5000-303
5000-305
5000-307
5000-401
1.3 Position / Direction Section 7.1 Set to within ± 3mm of grid line After setting 5000-101 FI/P FW SW Nozzle
Orientation
5000-103
5000-105
5000-301
5000-303
5000-305
5000-307
5000-401

D R A
N
I 01-SEP 2
- 2 0 1
DSLNG Project Job No. : 0-5151-20
Doc. No. : S-900-1670-501 <Rev.0>
TEST AND INSPECTION PLAN FOR STATIC EQUIPMENT ERECTION SHEET 9 OF 59

WITNESS BY

CONTRACTOR
SUBCONT’R

OWNER
SITE INSPECTION ITEM REFERENCE REQUIREMENT FREQUENCY FORM REMARKS

1.4 Elevation Section 7.3 Within ± 1mm / 1m After setting 5000-101 FI/P FW SW

5000-103

5000-105

5000-301

5000-303

5000-305

5000-307

5000-401

1.5 Anchor Bolts ANSI A10.13 Snug tight, fully tightened by After setting 5000-102 FI/P FW SW
Section 9.6 using ordinary spud wrench
5000-104

5000-106

5000-302

5000-304

5000-306

5000-401

1.6 Grouting of base plate No Voids 2000-010 FI/P FW FW

D R A
N
I 01-SEP 2
- 2 0 1
DSLNG Project Job No. : 0-5151-20
Doc. No. : S-900-1670-501 <Rev.0>
TEST AND INSPECTION PLAN FOR STATIC EQUIPMENT ERECTION SHEET 10 OF 59

WITNESS BY

’R

CONTRACT
SUBCONT

OWNER
SITE INSPECTION ITEM REFERENCE REQUIREMENT FREQUENCY FORM REMARKS

OR
1.7 Platform and Ladders As per drawing 5000-999 FI/P FW FW

1.8 Final Connection 5000-001


between Equipment B FI H FW
and Piping. 5000-511
(1) Flange Face
(2) Gasket
(3) Bolt and Nut
(4) Bolt Tightening
1.9 Name Plate As required 5000-320 FI H FW

1.10 Check anodes have


been installed for heat 5000-321 FI H FW
exchanger.

1.11 Field Hydrostatic Test If required Comply with requirements 5000-311 FI/P H H

1.12 Davit Installation If applicable 5000-323 FI/P FW FW

D R A
N
I 01-SEP 2
- 2 0 1
DSLNG Project Job No. : 0-5151-20
Doc. No. : S-900-1670-501 <Rev.0>
TEST AND INSPECTION PLAN FOR STATIC EQUIPMENT ERECTION SHEET 11 OF 59

WITNESS BY

’R

CONTRACT
SUBCONT

OWNER
SITE INSPECTION ITEM REFERENCE REQUIREMENT FREQUENCY FORM REMARKS

OR
1.13 Box Up

(1) Internal cleaning 5000-312 FI/P H FW

(2) Final closure inspection Manhole bolt, nut and gasket 5000-312
Equipment Nozzle Face check
/ MH Face Gasket, Bolt 5000-001 FI/P H FW
and Nut B

(3) Bolt Tightening Final Manhole bolt, nut and gasket 5000-312
closure inspection after check (Bolt tensioning work, if
final manway closure applicable) 5000-511 FI/P H H

D R A
N
I 01-SEP 2
- 2 0 1
DSLNG Project Job No. : 0-5151-20
Doc. No. : S-900-1670-501 <Rev.0>
TEST AND INSPECTION PLAN FOR STATIC EQUIPMENT ERECTION SHEET 12 OF 59

WITNESS BY

CONTRACTOR
SUBCONT’R

OWNER
SITE INSPECTION ITEM REFERENCE REQUIREMENT FREQUENCY FORM REMARKS

2. INTERNAL Drawings
INSTALLATION
2.1 Distributor Pipe 5000-201
(1) Assembly As per drawing After setting FI/P FW FW
(2) Bolt Tightness After setting FI/P FW FW
(3) Gasket As per drawing After setting FI/P FW FW
2.2 Demister 5000-201
(1) Assembly After setting FI/P FW FW

(2) Bolt Tightness After setting FI/P FW SW

2.3 Tray Drawings


(1) Assembly As per drawings After setting 5000-203 FI/P FW SW
5000-203A
5000-204
5000-204A
(2) Support beam As per drawing After setting 5000-202 FI/P FW SW
installation 5000-202A
5000-203
5000-203A
5000-204
5000-204A

D R A
N
I 01-SEP 2
- 2 0 1
DSLNG Project Job No. : 0-5151-20
Doc. No. : S-900-1670-501 <Rev.0>
TEST AND INSPECTION PLAN FOR STATIC EQUIPMENT ERECTION SHEET 13 OF 59

WITNESS BY

CONTRACTOR
SITE INSPECTION ITEM REFERENCE REQUIREMENT FREQUENCY FORM REMARKS

SUBCONT’R

OWNER
(3) Tray Clamping As per drawing After setting 5000-202 FI/P FW SW
5000-202A
5000-203
5000-203A
5000-204
5000-204A
(4) Bolt Tightness After setting 5000-202 FI/P FW SW
5000-202A
5000-203
5000-204
(5) Tack welding of As per drawing After setting 5000-202 FI/P FW SW
nut
(6) Field welding or ASME Sec IX WPS, PQR,WQT After setting 5000-205 FI/P FW FW
Final check for
every tray
(7) Panel As per drawing After setting 5000-203 FI/P FW SW
Connection

(8) Level Check Manufacturer’s Tolerance = 1/500 After setting 5000-204 FI/P FW FW
specification (unless noted otherwise) 5000-204A

D R A
N
I 01-SEP 2
- 2 0 1
DSLNG Project Job No. : 0-5151-20
Doc. No. : S-900-1670-501 <Rev.0>
TEST AND INSPECTION PLAN FOR STATIC EQUIPMENT ERECTION SHEET 14 OF 59

WITNESS BY

SUBCONT’R

CONTRACTOR

OWNER
SITE INSPECTION ITEM REFERENCE REQUIREMENT FREQUENCY FORM REMARKS

(9) Leak test Manufacturer’s As per drawing After setting 5000-206 FI/P FW FW
specification
(10) Check As per drawing After setting 5000-202 FI/P FW FW
thermowell
location
(11) PMI If required 5000-322 FI/P FW SW

2.4 Dehydration Drum and Drawings As per Drawings 5000-324


Mercury Removal D-900-1352-032 FI/P FW SW
Drum Bed Support
Installation
2.5 Box Up Refer above 1.13

2.6 Check packing


installation
5000-313 FI/P FW FW
1) Random Packing As per Drawing
5000-314
5000-316
2) Structured Packing As per Drawings 5000-314 FI/P FW FW
5000-315
5000-316
5000-317

D R A
N
I 01-SEP 2
- 2 0 1
DSLNG Project Job No. : 0-5151-20
Doc. No. : S-900-1670-501 <Rev.0>
TEST AND INSPECTION PLAN FOR STATIC EQUIPMENT ERECTION SHEET 15 OF 59

WITNESS BY

CONTRACTOR
SUBCONT’R
SITE INSPECITON ITEM REFERENCE REQUIREMENT FREQUENCY FORM REMARKS

OWNER
3. AIR FIN COOLER
Structure Steel Work
refer to Steel structure
(1) Position As per drawing After setting 5000-307 FI/P FW FW

(2)Verticality/Elevation As per vendor After setting 5000-307 FI/P FW FW


recommendation
(3) Platform and ladder After setting 5000-310 FI/P FW FW
As per drawing
(4) Bolting
After setting 5000-307 FI/P FW FW

3.1 Fan Hood / Fan ring As per drawing After setting 5000-307 FI/P FW SW

(1)Verticality/Elevation
3.2 Fan & Drive Assembly 5000-308

Refer to Rotating ITP


(1) Plumb motor shaft 5000-308 FI/P FW FW

Check bearings for As per vendor


After setting
cleanliness & recommendation
Lubrication

D R A
N
I 01-SEP 2
- 2 0 1
DSLNG Project Job No. : 0-5151-20
Doc. No. : S-900-1670-501 <Rev.0>
TEST AND INSPECTION PLAN FOR STATIC EQUIPMENT ERECTION SHEET 16 OF 59

WITNESS BY

CONTRACTOR
SUBCONT’R

OWNER
SITE INSPECITON ITEM REFERENCE REQUIREMENT FREQUENCY FORM REMARKS

(2) Pulley alignment As per vendor After setting 5000-308 FI/P FW FW


recommendation
(3) Blade tip clearance As per vendor
After setting 5000-308 FI/P FW FW
recommendation
(4) Blade Angle As per vendor 5000-308 FI/P FW FW
After setting
recommendation
(5) Hub bolt torque As per vendor 5000-310 FI/P FW FW
After setting
recommendation
(6) V-Belt Tension As per vendor 5000-308 FI/P FW FW
After setting
recommendation
3.3 Tube Bundle Drawings
(1) Dimension / As per drawing After setting 5000-309 FI/P FW IW
Alignment / Height
(2) Tube fins damage/ No damage After setting 5000-310 FI/P FW IW
cleaning
3.4 Finishing
(1) Fan Guards As per drawing 5000-310 FI/P FW SW
installed
(2) Air Sealing Strips As per drawing 5000-310 FI/P FW SW
Installed
(3) Leak Test If required As per Leak Test Procedure 5000-311 FI/P H H