Anda di halaman 1dari 1
LEIGHTON CONTRACTING Subcontract Payment Certificate Prosece Design and Bud Manateq Oasis OE2-1 [Se Contractor: (Qasar Al Andalus Co. W.LL [Sub Contractor Code ¥ anso0r The Engineering, Supply, Dsveryo Site and Instalaion ofthe Suspended Gypsum, Metal and PVC Celing Subcontact Works Complete Sub Contractor Works: [Commencement Oat: 14.Sep47 Completion Date 2a Nay-18 Sui Contract Vai 1ortt1.00 [Approved Variations: acted Varstons: Jaqusiea suv Contact Waue 1.073.413.00 nieve Ret [sub Contact PC No: 2 tain Contract PC No. 2 Menthe: 30-Jun-18 sub contact Onder Wa, 'sr2117/00053 14 days of receiving the Employer's payment 23Sept8 lPayment Terms: Payment Due Date: |Description Grose conten Previously i Conti erties _| ™ a [Measured Warke lvariatons lDaynorks jctaims )aterats on Site Materials On Site 92,287.96 92,287.95 zsoaeaes| — siaasieo| —(ss7e77] [Amount Certified 35175679 | 31484160 96,918.19 ICC Charo [Ac Acvance Payment Gerted Dit Advance Payment Recovery Less Retention - Works Executed lLess Retention - Materials on Ste Less Conta Charges Direct Payment by Client [Payments to SuppenSubcortractor [rax o2za90 8228.80 9404.16 (023720) [Not Payment Due Certificate s16s01.11 | 293,387.44 Signed 4 Name : Jessie Jay Galvan Senior Quantity Surveyor Date _[S[PH im HUGICOWFRO1472 Rav 09 higcontracting.com

Anda mungkin juga menyukai